1
CUPE Projects: PRINCE2 ® Methodology Diagram Managing A Stage Boundary Plan Next Stage Update Project Plan Update Business Case Produce an Exception Plan Report Stage End Closing a Project Prepare Premature Closure Hand Over Products Evaluate the Project Initiating a Project Prepare Risk Management Strategy Prepare Configuration Management Strategy Prepare Quality Management Strategy Set Up Project Controls Prepare Communication Management Strategy Assemble the PID Create Project Plan Refine Business Case Recommend Project Closure Prepare Planned Closure Appoint Exec. & PM Capture Previous Lessons Design & Appoint Project Management Team Prepare Outline Business Case Select Approach & Assemble Project Brief Plan Initiation Stage Starting Up a Project Project Start Notification Project End Notification Info from External Sources & Feedback Draft PID Project Brief Organisation Initiation Stage Plan Review Stage Status Authorize Work Package Review Work Package Status Take Corrective Action Receive Completed Work Package Report Highlights Escalate Project Issues & Risks Capture & Examine Project Issues Agree to deliver Checkpoint Reports Completed Work Package Managing Product Delivery Accept a Work Package Execute a Work Package Deliver a Work Package PID Lessons Report Followon Actions Benefits Review Plan End Project Report Ad Hoc Direction Work Package Corporate / Programme Management Authorization To Proceed Based on the PRINCE2 ® manual 5 th edition V5.1.5.180510 PRINCE2 ® is a trademark of OGC www.cupe.co.uk Directing a Project Authorize Initiation Authorize the Project Authorize a Stage or Exception Plan Authorize Project Closure Give AdHoc Direction End Stage Report Next Stage Plan Exception Plan Highlight Reports Requests for Advice Exception Reports Controlling a Stage Project Mandate Trigger Stage Planning Trigger Premature Closure Archive Project Files Trigger Exception Plan Project Issues Trigger Planned Closure Authorized Initiation Plan

PRINCE2 Methodology Diagram

Embed Size (px)

Citation preview

Page 1: PRINCE2 Methodology Diagram

CUPE Projects: PRINCE2® Methodology Diagram

Managing A Stage Boundary

Plan Next Stage

UpdateProject Plan

UpdateBusiness  Case

Produce anException Plan

ReportStage End

Closing a 

Project

Prepare Premature Closure

Hand Over Products

Evaluate the Project

Initiating a Project

Prepare Risk Management 

Strategy

Prepare Configuration Management 

Strategy

Prepare Quality Management 

Strategy

Set Up Project Controls

Prepare Communication Management 

Strategy

Assemble the PID

Create Project Plan

Refine Business Case

Recommend Project Closure

Prepare Planned Closure

AppointExec. & PM

Capture Previous Lessons

Design & Appoint Project 

Management Team

Prepare  Outline Business 

Case

Select Approach & Assemble Project Brief Plan

InitiationStage

Starting Upa Project

Project Start NotificationProject End Notification

Info from External Sources & Feedback

•Draft PID

•Project Brief•Organisation•Initiation Stage Plan

ReviewStage Status

AuthorizeWork Package

Review Work Package Status

TakeCorrectiveAction

ReceiveCompleted 

Work Package

ReportHighlights

EscalateProject Issues & 

Risks

Capture & Examine

Project Issues

Agree to deliver

Checkpoint Reports

Completed Work 

Package

Managing Product Delivery

Accept aWork Package

Execute aWork Package

Deliver aWork Package

•PID

•Lessons Report

•Follow‐on Actions

•Benefits Review Plan

•End Project Report

Ad Hoc Direction

Work Package

Corporate / Programme Management Authorising

InitiationAuthorising a

Project

Authorising aStage or

Exception Plan

Confirming Project Closure

GivingAd-Hoc

Direction

DP3DP2DP1 DP4 DP5

Authorization To Proceed

Based on the PRINCE2® manual 5th edition V5.1.5.180510PRINCE2® is a trademark of OGC www.cupe.co.uk

Directing a Project

AuthorizeInitiation

Authorize theProject

Authorize aStage or

Exception Plan

AuthorizeProject Closure

GiveAd‐HocDirection

•End Stage Report•Next Stage Plan•Exception Plan

•Highlight Reports

•Requests for Advice

•Exception Reports

Controllinga Stage

Project Mandate

Trigger Stage

Planning

Trigger Premature

Closure

Archive Project Files

Trigger Exception

Plan

Project Issues

Trigger Planned Closure

Authorized Initiation Plan