Maximo Scheduler Solution Overview
Michigan & Chicago Maximo Users Group
Hosted by Herman Miller
September 8, 2016
Please Note:
• IBM’s statements regarding its plans, directions, and intent are subject to change or
withdrawal without notice at IBM’s sole discretion.
• Information regarding potential future products is intended to outline our general product direction and it should not be relied on in making a purchasing decision.
• The information mentioned regarding potential future products is not a commitment, promise, or legal obligation to deliver any material, code or functionality. Information about potential future products may not be incorporated into any contract.
• The development, release, and timing of any future features or functionality described for our products remains at our sole discretion.
• Performance is based on measurements and projections using standard IBM benchmarks in a controlled environment. The actual throughput or performance that any user will experience will vary depending upon many factors, including considerations such as the amount of multiprogramming in the user’s job stream, the I/O configuration, the storage configuration, and the workload processed. Therefore, no assurance can be given that an individual user will achieve results similar to those stated here.
1
Maximo Scheduler
7.6.3
Maximo Asset Mgmt
7.6.0.5
Maximo Scheduler
iLog
DOC Required only for
Optimization
• Add-on product to Maximo
EAM, code embedded in
core Maximo therefore a
single install
• Requires a separate
license purchase
• Includes integration
adapter and optimization
engine and models
• Optional: clients may choose
not to use the optimization
capability and can skip the
DOC installation during the
install process
DOC Server
Scheduler – embedded in Maximo
• 7.6.0.5 fix pack level 2
New Graphical Technology!
3
• No dependency on Java applet / JRE
• Significant usability enhancements
4 Role Based Applications
1) Graphical Scheduling
2) Graphical Assignment
3) Graphical Assignment – Repair Facilities
4) Graphical Crew Management
Also includes the Everyplace mobile templates to support the Field
Technicians and the Supervisor
4
5
Roles We Accommodate in Managing Work
Maximo Scheduler Pedigree
Work Orders in a Gantt View Labor Load/Avail. Critical Path Methodology PM Forecasts (7.1.1)
Work Orders in a Gantt View Labor Load/Avail. Critical Path Methodology PM Forecasts Graphical Assignment Dispatching Schedule Compliance Crews Asset, Location, Tools & Item Availability
Work Orders in a Gantt View Labor Load/Avail. Critical Path Methodology PM Forecasts Asset, Location, Tools & Item
Avail. Graphical Assignment Dispatching Schedule Compliance Crews Optimization / Automation Scenario Management Compliance Dashboards Graphical Crew Management
Long Term Planning Manual Long, Mid and
Short Term Planning Automated Long, Mid and
Short Term Planning
6
New capabilities built on a new technical foundation • Repair Facility Capacity
Planning • Repair Facility Graphical
Assignment Core Maximo PM costing • Includes Nested Job
Plans “Scheduler” application name change • New name: “Graphical
Scheduling”
Usability enhancements • Improved Gantt tools
and navigation
New Asset/Location scheduling capabilities built on a new technical foundation • Work Orders and PM
forecasts viewed by asset/location hierarchy
Multi-tenancy support Usability enhancements • Improved Gantt tools and
navigation
Port existing applications to the new technical foundation • Graphical Scheduling • Graphical Assignment
• Dispatch • Graphical Crew Management
Usability enhancements • Multi-column sort, search, and
filtering • Multi-craft/skill display • Undo / Redo • Expand / Collapse • Much more….
Addressing RFEs during these releases
7
Scheduler 7.6.x Delivery Timeline
Advanced use cases being requested by clients
• Ability to schedule customer appointments • Match customer's location and requirements with technician's skills and availability to schedule a service
appointment
• Model a complex project plan using real world interdependencies of tasks • A plant turnaround requires many dependent actions to shutdown the location, perform project work, and re-
start the location to bring it back to an operational stage
• Ensure resources with the right qualifications are assigned to work with special requirements • Supervisors need to ensure that technicians have valid certifications to do the work
• How do the current traffic conditions effect work in progress? • Incorporate real-time traffic conditions to better route technicians to their work locations
• Handle larger volumes of data • Many Maximo clients require the ability to manage a heavy volume of work orders be it for shutdowns,
turnarounds, outages, or for dispatching field technicians
Appointment scheduling
• Make customer appointments within a schedule window
• Customer notifications – cancel / reschedule
Managing large projects
• Dependencies across work orders and tasks
• Highlight critical path, backward pass, % complete
Weather integration
• Incorporate weather data into planning/scheduling and dispatching
• Weather alerts / notifications
Dynamic dispatching
• Auto refresh, re-optimization based on real-time progress
• Incorporate real-time traffic conditions
Introducing – Scheduler Plus!
Advanced work management solution, built on top of Maximo Scheduler
The information on the new product is intended to outline our general product direction and it should not be relied on in making a purchasing decision. The information on the new product is for informational purposes only and may not be incorporated into any contract. The information on the new product is not a commitment, promise, or legal obligation to deliver any material, code or
functionality. The development, release, and timing of any features or functionality described for our products remains at our sole discretion. . 9
Scheduler Plus – also embedded in Maximo
Maximo Asset Mgmt
Maximo Scheduler
iLog
DOC
Required for
Optimization
Maximo Scheduler
Maximo Scheduler
Plus
• Advanced scheduling
solution
• Add-on product to
Maximo Scheduler,
code embedded in
core Maximo therefore
still a single install
• On-prem and via SaaS
• Requires a separate
license purchase
• Includes the
optimization models
10
Maximo Scheduler and Scheduler Plus – Roadmap
Notice: IBM’s statements regarding its plans, directions, and intent are subject to change or withdrawal at IBM’s sole discretion. Information regarding potential future
products is intended to outline our general product direction and it should not be relied on in making a purchasing decision. The information mentioned regarding potential
future products is not a commitment, promise, or legal obligation to deliver any material, code or functionality. Information about potential future products may not be
incorporated into any contract. The development, release, and timing of any future features or functionality described for our products remains at our sole discretion.
Weather − Configurable weather views − Enabled in Graphical Scheduling and
Graphical Assignment Appointment Scheduling
- Make customer appointments within a schedule window, see tech availability, incorporate weather
- Cancel, reschedule appointments Network dependencies (Phase 1)
- Link across WOs and tasks
Weather impact on Assets − Weather overlay on maintenance/operational
windows Weather impact on Job Plans
− Adding weather requirements to conditional job plans
− Variable length condition (ex: weather impacted) − Go or No Go criteria − Applying conditional job plan tasks to existing
WOs Network dependencies (Phase 2)
- Backward pass - Highlight critical path - Introduce % complete
Excel Export Enhance status color to include synonyms
Qualifications at WO & Task Level - Manual and Optimization
Weekly and Monthly planning buckets
Performance
Dynamic Dispatching − Auto refresh for improved tracking of
progress − Re-optimization based on real-time
progress, including emergent work − Real-time road conditions and traffic − Continuous weather updates and
weather event notifications − Everyplace template updates - weather
Weather based assignments
− Manual clearing of decks − Optimization – reschedule planned
and emergency
Enhanced resource availability − WO outside schedule, shifts/breaks
PM display − Constraint window − Compare PM scenarios − Emergency template (ex. Weather
event activity) Performance
Scheduler Scheduler Plus
Maximo Scheduler Wiki -
https://www.ibm.com/developerworks/community/wikis/home?lang=en#!/wik
i/IBM%20Maximo%20Asset%20Management/page/Maximo%20Scheduler
If unable to access, you may need to create a developerWorks account here:
http://www.ibm.com/developerworks/
RFE Tool:
https://www.ibm.com/developerworks/rfe/?BRAND_ID=90
Additional Product Resources
12
Questions
13
SOLUTION DEMO