-Maximo Monday-Topic: Maximo for Utilities 6.3- Compatible Units Demonstration

Date: April 21, 2008

Page 2: -Maximo Monday- Topic: Maximo for Utilities 6.3 ... · -Maximo Monday-Topic: Maximo for Utilities 6.3 - Compatible Units Demonstration Date: April 21, 2008

2Copyright © 2008 Accenture All Rights Reserved.

Today's Objectives

Overview of:• Settings to enable use of CU records and actions• CU Library (T&D)

– Create Linear CU – cables, wires or pipes– Create Point CU – a single pole– Create Labor only CU – create a labor only CU– Create Material only CU – create a Materials only CU

• Building a CUs in Maximo for Utilities 6.3 Demo• CU Estimating (T&D)

Page 3: -Maximo Monday- Topic: Maximo for Utilities 6.3 ... · -Maximo Monday-Topic: Maximo for Utilities 6.3 - Compatible Units Demonstration Date: April 21, 2008

3Copyright © 2008 Accenture All Rights Reserved.

Compatible UnitsBuilding Blocks (Review)

&

Maximo Building BlocksFor Compatible Units

Labor in the form of Crafts/ CrewTypes.

Determines Internal and external effort for Install, Remove, Transfer and

abandon WorkFunctions

Item MasterMaterial IDs

Determines Bill of Material (BOM)

ToolsDetermines any

equipment or special tool to

perform the job

FERCs

Accounting Strings

Asset Codes

Continuous Property Record

Overhead Factors

Contractor’s Cost definition

CU Special Conditions, Utilization,

Structure, etc.

CU

Labor Adders

StoreroomsWork Groups

CrewType Assignment

BidUnit?

CU Classifications and Attributes.

Link to GIS

Integration Enabler

Elements

CU Foundations

Page 4: -Maximo Monday- Topic: Maximo for Utilities 6.3 ... · -Maximo Monday-Topic: Maximo for Utilities 6.3 - Compatible Units Demonstration Date: April 21, 2008

4Copyright © 2008 Accenture All Rights Reserved.

Enabling for CU

• Organizations (T&D) Application – Includes settings for actions and records used for Compatible Units.– Configure Work Groups– Configure Classifications– Configure Crafts– Configure Items– Configure Tools

Page 5: -Maximo Monday- Topic: Maximo for Utilities 6.3 ... · -Maximo Monday-Topic: Maximo for Utilities 6.3 - Compatible Units Demonstration Date: April 21, 2008

5Copyright © 2008 Accenture All Rights Reserved.

Setting The CU Options

• Organizations (T&D) continued:– Account Code Options– Account Override Options – CU Library Options– CU Estimating Options– CU Acceptance Options– Labor Adder Options– Loading Type Options– Work Type Options– Work Zone Options

Page 6: -Maximo Monday- Topic: Maximo for Utilities 6.3 ... · -Maximo Monday-Topic: Maximo for Utilities 6.3 - Compatible Units Demonstration Date: April 21, 2008

6Copyright © 2008 Accenture All Rights Reserved.

CU Applications

• CU Library (T&D) – Located in the Planning module; used to create compatible unit records, build hierarchies, specify the items, labor, and tools to use in specific work site conditions.

• CU Estimating (T&D) – Located in the Work Order module used to create design and construction scenarios; perform and accept estimates.

Page 7: -Maximo Monday- Topic: Maximo for Utilities 6.3 ... · -Maximo Monday-Topic: Maximo for Utilities 6.3 - Compatible Units Demonstration Date: April 21, 2008

7Copyright © 2008 Accenture All Rights Reserved.

Compatible Units Structure

Frame

+

Transformer + Arrester

Level 1Level 2

Pole

Level 3

Compatible Unit selected by designer

Framed Pole

Page 8: -Maximo Monday- Topic: Maximo for Utilities 6.3 ... · -Maximo Monday-Topic: Maximo for Utilities 6.3 - Compatible Units Demonstration Date: April 21, 2008

8Copyright © 2008 Accenture All Rights Reserved.

Contact Information

• Sandy Jones – Senior Executive– [email protected]

• Jeff Daniel – Manager– [email protected]

• Felix J Torres – Manager– [email protected]