Click here to load reader

IBM Asset Management Pulse 2013 - Maximo... Maximo . Fix-pack 7.1.1.xx. Maximo Mobile 7.5.1 • Android support •RFID Smart Cloud Control Desk 7.5.1. Maximo . Fix-pack 7.5.0.4. Maximo

  • View
    24

  • Download
    1

Embed Size (px)

Text of IBM Asset Management Pulse 2013 - Maximo... Maximo . Fix-pack 7.1.1.xx. Maximo Mobile 7.5.1 •...

  • © 2013 IBM Corporation

    IBM Asset Management Roadmap, New Capabilities

    Pete Karns, Director, Product Management & Strategy Asset Management & Smarter Infrastructure

  • © 2013 IBM Corporation2

    Smarter Infrastructure relies on an Asset Management foundation IBM Asset Management

    Enterprise Assets

    Operational Technology & Service Management

    Workplace Management

    AN ALYTICS

    M O

    BILITY

    Facility & Space

    Real Estate

    Energy & Sustainability

    Capital Projects

    Work & Asset Management

    Supply Chain

    Health & Safety

    Service Providers

    Service Desk

    IT Asset Management

    Change Mgt

    Compliance

    Common Platform Services

    Asset, Device, System Infrastructure Interaction

    AUTOMATIONVISIBILITY CONTROL

    Com m

    erce

  • © 2013 IBM Corporation3

    Asset Management roadmap

  • © 2013 IBM Corporation4

    2012 Asset Management Roadmap

    Address high-value customer requirements across multiple industries and markets with delivery of new solution for advanced Scheduling, Dispatch & Routing of work

    • Enhance existing Maximo, TRIRIGA and ISM solutions

    • Continued maintenance for multiple releases, delivering Fix- packs for R6.2.x, 7.1.x and 7.5.x

    Q1 2012 Q32012

    Maximo Fix-pack 7.1.1.11TRIRIGA Energy Optimization -

    Rebranding

    Q4 2012Q2 2012

    Maximo Fix-pack 7.5.0.2

    Maximo Adapter for SAP

    Fix-pack 7.5.0.1

    Service Mgmt

    IT Asset Mgmt

    Change Mgmt

    Smart Cloud Control Desk 7.5

    TRIRIGA 10.2 - Additional

    Languages

    Maximo Scheduler 7.5.1.0

    - Schedule Compliance

    - Graphical Labor Assignments

    - Dispatching - Additional

    Resources - WO Actions

    Fix-pack 7.5.0.3 - Features: - Crews - Public Map API - Service Addresses

    Advanced Scheduling

    The information on the new product is intended to outline our general product direction and it should not be relied on in making a purchasing decision. The information on the new product is for informational purposes only and may not be incorporated into any contract. The information on the new product is not a commitment, promise, or legal obligation to deliver any material, code or functionality. The development, release, and timing of any features or functionality described for our products remains at our sole discretion. .

    Maximo Service Provider

    Fix-pack 7.5.1.1

    Maximo for Utilities

    Fix-pack 7.5.0.1

    Maximo for Spatial

    Fix-pack 7.5.0.1

    TRIRIGA 10.3 - Reservation

    Mgmt - Sustainability

    enhancements - Building

    System Integrations

    Maximo Fix-pack 6.2.9

    Maximo Nuclear 7.5.1.0

    • LCO Tracking • Duty Stations

  • © 2013 IBM Corporation5

    2013 Asset Management Roadmap

    Fix-Packs/Mod Release

    Major Releases

    New Products

    Key

    H1 2013 H2 2013

    Maximo ACM/Transportation 7.5.x.x

    • Aviation/Spec 2000 • Flight Log Book • Progressive Inspections

    Maximo Scheduler 7.5.x.0

    - Automated Schedule Optimization

    - Automated Route Optimization

    TRIRIGA 10.x • Implementation

    accelerators • Localization

    enhancements • Lease

    accounting enhancements

    Maximo Fix-pack 7.5.0.x

    Mobile Next • Mobile platform • Android support • Connected/Discon

    nected • Maximo Work

    Mgmt applications

    Maximo Fix-pack

    7.1.1.xx

    Maximo Mobile 7.5.1

    • Android support • RFID

    Smart Cloud Control Desk 7.5.1

    Maximo Fix-pack 7.5.0.4

    Maximo Integration for TRIRIGA

    • Facility Condition Assessment

    • ISM Library download

    Maximo Oil & Gas/HS&E 7.5.1

    • Permit to Work • Audit and

    Surveys

    Trellis Real-time Infrastructure Optimization Data Center Infrastructure Mgt (DCIM)

    Maximo Integration for TRIRIGA 1.1

    • Space & Move Mgmt

    • ISM Library download

    TRIRIGA 10.3.x • Enhanced

    browser support • Energy Star and

    ESRI updates • Phase 1 508

    Accessibility;

    Maximo 7.5 on PureApplication System

    2014

    SmartCloud Control Desk

    Fix-pack 7.5.1.1

    SmartCloud Control Desk

    Fix-pack 7.5.0.2

    Tivoli Asset Discovery for z/OS 8.1.0

    • Lower TCO w/ SQLite support;

    • Enhance audit readiness reporting

    Analytics • Predictive Insights

    TRIRIGA Energy Optimization

    • Real-time energy & operating analytics

    • Event filtering & root cause analysis

    Mobile • iOS Support • TRIRIGA, SCCD,

    Maximo applications

    • Appl Designer

    Maximo Next • Multi Tenancy • Usability • Crews • Mapping • Broad capability

    enhancements

    SmartCloud Control Desk Next

    The information on the new product is intended to outline our general product direction and it should not be relied on in making a purchasing decision. The information on the new product is for informational purposes only and may not be incorporated into any contract. The information on the new product is not a commitment, promise, or legal obligation to deliver any material, code or functionality. The development, release, and timing of any features or functionality described for our products remains at our sole discretion. .

    TRIRIGA • Lease accounting • User experience • Serviceability / time

    to value

    SaaS • Intelligent Asset Mgt

  • © 2013 IBM Corporation6

    Enhancing our purpose built applications, and extending common services

    • Enhanced mobile platform • Common BIM enablement • Common middleware • One UI user experience

    enhancements • Unified Analytics solution

    • EAM Space management integration

    • Unified mobile platform • Integrated EAM, Space

    Management, Facility Condition Assesment

    • Enhanced integration capabilities (OSLC-based)

    Maximo

    TRIRIGA

    • Enhanced mobile platform • Multiple solution delivery

    models • User experience

    enhancements • Unified Analytics solution

    TRIRIGATRIRIGA 10.xTRIRIGA 10.3

    MaximoMaximo 7.xMaximo 7.5

    2012 2013* 2014* • Advanced scheduling & dispatch • Flexible graphical mapping • Nuclear Enhancements • Service Provider updates

    • Scheduling optimization • New mobile applications • Predictive analytics • Enhanced HS&E capabilities • Industry solution enhancements

    • Support for crews, mapping service addresses

    • Usability, Reporting and KPI enhancements

    • Additional mobile applications • SaaS enabled platform (Multi-tenancy) • Time to Value Enhancements

    2015+ * • Supply Chain and Financial

    mgmt enhancements • Manifesting and logistics • Additional mobile applications • Energy Management

    enhancements

    • Reservation management • Sustainability management

    enhancements • Building Mgmt System integration

    enablement • Additional translations

    • Implementation and upgrade accelerators

    • Localization compliance enhancements • US Federal enhancements • FASB/IASB Lease Accounting updates • Additional database and browser support • Updated ESRI / Energy Star integrations

    • Energy Management enhancements • Next generation mobile applications • Localization compliance enhancements • CAD integrator support for Revit • FASB/IASB Lease Accounting updates • Implementation and upgrade accelerators

    * Considered investment

    • Additional mobile applications • Facility and real estate management

    analytics • Workplace performance

    management benchmarking • Energy Management enhancements • Demographic analysis with GIS

    integration

    The information on the new product is intended to outline our general product direction and it should not be relied on in making a purchasing decision. The information on the new product is for informational purposes only and may not be incorporated into any contract. The information on the new product is not a commitment, promise, or legal obligation to deliver any material, code or functionality. The development, release, and timing of any features or functionality described for our products remains at our sole discretion. .

  • © 2013 IBM Corporation7

    A New Approach to Work Force Management Support for optimization models,

    automated labor and crew assignment

    IBM Maximo Scheduler 7.5.x  Embedded engine delivers objective based

    optimization models  Scenario based work planning  Graphical crew management capabilities  Optimized spatial scheduling for reduced crew

    windshield time

    Replaces the need for pure planning and scheduling tools

    Effective resource utilization through optimized work schedules

    Improves the ability to respond quickly to emergency situations

  • © 2013 IBM Corporation88

    Scheduler Optimization Models

    Capacity Planning

    A set of work orders that need to be completed within a certain time period

    Adjusts craft, skill and crew type availability to execute as best as possible the work as r

Search related