COST PROPOSAL TEMPLATE
This Template must be used to prepare Cost Proposals, and is available on the State’s Purchasing Department website in Word Format. Vendors are not to change or alter the document in any way other than to provide the information requested. Exceptions or concerns with any aspect of this document are to be brought to the attention of the designated contact for this project as indicated in the Provisions.
COST PROPOSAL PAGE 1 OF 21
Table of Contents
H. COST PROPOSAL TEMPLATE...............................................................................................................................3
H.1. SOFTWARE LICENSING COSTS..........................................................................................................................4
H.2. SOFTWARE CUSTOMIZATION........................................................................................................................7
H.3. INTEGRATION PLANNING AND INTERFACES.........................................................................................8
H.4. DATA CONVERSION SERVICES......................................................................................................................9
H.5. TRAINING SERVICES.........................................................................................................................................10
H.6. IMPLEMENTATION AND DEPLOYMENT SERVICES............................................................................13
H.7. HARDWARE............................................................................................................................................................14
H.8. OTHER COSTS.......................................................................................................................................................15
H.9. COST SUMMARIES..............................................................................................................................................16
H.10 PAYMENT SCHEDULE...............................................................................................................................................17
H.11. Cost Proposal Assumptions.........................................................................................................................21
COST PROPOSAL PAGE 2 OF 21
H. COST PROPOSAL TEMPLATE
INSTRUCTIONS
Project costs can be provided only in the Cost Proposal Template. No cost information is to be included in the Technical Proposal Template. If cost information is provided in the Technical Proposal Template, the vendor will be disqualified.
The Cost Proposal Template provides vendors with the structure to provide a detailed breakdown and summary of licensing and costs for the proposed solution to the Supreme Court, and is organized into the following subsections:
H1. Software Licensing & Costs – Identify licensing for software included in the Technical Proposal. Provide an itemized list of the cost of all software being proposed, including both application (e.g., UCMS, e-Filing, etc.) and system software (i.e., OS, DBMS, etc.).
H.2. Software Customization – Identify the cost of customization, configuration and information exchanges proposed to meet functionality requirements.
H.3. Integration Planning and Interfaces – Identify the cost of the planning and implementation of each information exchange included in the Technical Proposal, and proposed as options.
H.4. Data Conversion Services – Identify all services and costs associated with performing data conversion including the migration of document images.
H.5. Training Services – Identify the cost of all training described in the Technical Proposal.
H.6. Implementation and Deployment Services – List and describe all costs that are associated with the implementation, deployment and after implementation support of the solution (other than Data Conversion and Training). These costs must include all project management related costs.
H.7. Hardware Costs – Provide an itemized list of all hardware included in the Technical Proposal. Please note that the Supreme Court reserves the right to purchase specified hardware from its own designated hardware vendor(s), and may not include hardware in a final contract.
H.8. Other Costs – Provide itemized list of any costs not identified elsewhere in the proposal.
H.9. Cost Summaries – Provides the means to carry forward detailed costs from preceding pages and summarize all one-time and annually recurring costs. Include estimated recurring costs for three years beyond completed implementation.
H.10. Payment Schedule – Provide a preliminary payment schedule for one-time project costs and the start of maintenance and support charges.
H.11. Assumptions – State any assumptions associated with the cost proposal.
All cost pages must be filled out completely. Vendors may add line items to the cost tables where indicated, but no additional tables may be created. Any deviation from the Cost Proposal Template can lead to disqualification. Travel and expenses cannot be itemized separately; all costs provided must be all inclusive of all costs, labor, travel and other expenses.
All of the cost tables in this document include bottom lines for totaling the line items in the table.
COST PROPOSAL PAGE 3 OF 21
H.1. Software Licensing Costs
This section contains information on licensing costs and other costs for all proposed software, whether required or optional. Vendors are asked to include application and system (i.e., OS, DBMS, etc.) software. The total software cost dollar figure should agree with the total in the Costs Summary. Insert additional lines as needed.
H.10.1. Licenses
List and describe all software for which licensing is required (including application and system software). Specify the number of users licensed in this proposal for each software component, including the maximum number of concurrent users with either full access, inquiry-only (or otherwise restricted) users who are defined to the system, and Internet only access (i.e., public, justice partners, etc.) who would represent undefined users. Please keep in mind that local, State and national agencies and the public will require access.
If there are no restrictions on the number of users (i.e., an Enterprise License is provided) please enter “NO LIM”.
Software Component
(List and Describe Functionality)
Number of Concurrent Users
Full AccessDefined
Inquiry-Only Users
Internet Only Users
Insert additional lines as needed
H.10.2. Assumptions
State any limitations regarding users with read-only or update authority, such as whether or not there are restrictions on the total number of users who can be defined to the system.
H.10.3. Additional Users
If there are controls on the number of end-users included in the scope of the proposal, describe what would be needed to increase the number of end-users. Specify any differences between application and system software.
COST PROPOSAL PAGE 4 OF 21
H.10.4. Cost of Required Application Software Licenses
In the table below, provide the license and annual maintenance cost for each separate application software package included in your solution (e.g., Trial Court Case Management System, Appellate Court CMS, Content Management, E-Filing, etc.).
Application System SoftwareOne-Time
Cost
Annual Maintenance
CostComments
TOTAL COST OFREQUIRED APPLICATION SOFTWARE
Insert additional lines as needed
H.10.5. Cost of Required System Software Licenses
In the table below, provide the license and annual maintenance cost of system software (i.e., OS, DBMS) required to run your solution. Do not include Microsoft Office or Microsoft Operating System licenses requirements.
System Software & OtherOne-Time
Cost
Annual Maintenance
CostComments
TOTAL COST OF REQUIREDSYSTEM SOFTWARE
Insert additional lines as needed
COST PROPOSAL PAGE 5 OF 21
H.10.6. Cost of Optional Software Licenses
In the table below, provide the cost of licensing Optional Software. Optional Software is software that is not required to meet the functionality requirements of the UCMS but is part of a value–added capability included in the proposed solution.
Optional Software and PurposeOne-Time
Cost
Annual Maintenance
CostComments
TOTAL COST OFOPTIONAL SOFTWARE
Insert additional lines as needed
COST PROPOSAL PAGE 6 OF 21
H.11. Software Customization
In the table below, list each functional requirement which would be met by proposed customization to the proposed base software package (i.e., a “C” code in the application functional requirements response in Section G.7), and the associated cost of the proposed customization. If there are any groupings of related requirements for which customization cannot be separated (i.e., all or none as it applies to the group of requirements), identify all requirements in the grouping and provide a single price for the group.
The Supreme Court reserves the right to include any of the proposed customization in a contract or none at all.
SOFTWARE CUSTOMIZATION DETAILS
Requirement Item #(s) Comment or Note Cost (One-Time)
TOTAL CUSTOMIZATION COST
Insert additional lines as needed
COST PROPOSAL PAGE 7 OF 21
H.12. Integration Planning and Interfaces
In the table below, list each Information Exchange proposed in your solution and the direct cost of developing, providing and/or customizing Information Exchange Packages (IEP) and for providing IEP Documentation (IEPD). The Supreme Court reserves the right to include any of the proposed IEPs in a contract or none at all.
H.12.1. Required Information Exchanges
In the table below, identify all information exchanges included in your technical proposal that you consider to be necessary to meet the functionality requirements of the UCMS and the related costs.
REQUIRED INFORMATION EXCHANGES
IEP Description Comment or Note Cost (One-Time)
TOTAL INFORMATION EXCHANGE / IEP COST
Insert additional lines as needed
H.12.2. Optional Information Exchanges
In the table below, identify additional information exchanges (including IJIS exchanges) included in your proposal that will provide value-added functionality to the UCMS along with their related costs.
OPTIONAL INFORMATION EXCHANGES
IEP Description Comment or Note Cost (One-Time)
TOTAL OPTIONAL INFORMATION EXCHANGE / IEP COST
Insert additional lines as needed
COST PROPOSAL PAGE 8 OF 21
H.13. Data Conversion Services
H.13.1. Data Conversion
Appendices N1 and N2 contain listings and details of all databases to be converted into the UCMS. In the table below, provide the cost for performing all activities associated with converting each system.
DATA CONVERSION
Database / Conversion Services Activity Cost Notes or Comments
DATA CONVERSION SERVICES COST
Insert additional lines as needed
H.13.2. Document Image Migration
Appendix O contains a listing and details of all Document Management Systems (DMS) from which images will need to be migrated into the UCMS. In the table below, provide the cost for performing all activities associated with migrating images from each system including linking the documents to their respective cases.
DOCUMENT IMAGE MIGRATION
DMS / Migration Services Activity Cost Notes or Comments
IMAGE MIGRATION SERVICES COST
Insert additional lines as needed
COST PROPOSAL PAGE 9 OF 21
H.14. Training Services
List all costs associated with providing training for the UCMS implementation as described in the technical proposal. As defined in the Technical Proposal Template there are multiple categories of training to be provided, including direct training to end-users, System Administration and Technical Staff, and a pilot group of E-Filers, and Train-the-Trainer training that enable the Supreme Court to train future end-users and E-Filers.
H.14.1. Direct Training to Users
List all costs associated with providing training directly to end-users of the UCMS and designated others (e.g., e-Filing pilot users), including all documentation to be developed and provided by the Vendor. Include any classes for those individuals which may be designated as “Super Users.”
DIRECT TRAINING TO USERS
Class DescriptionTotal # of
People# per Class
Cost Per Class
# of Classes
Total Cost
TOTAL COST
Insert additional lines as needed
H.14.2. System Administration / Technical Training
List all costs associated with providing system administration and other technical training.
SYSTEM ADMINISTRATION /TECHNICAL TRAINING
Class DescriptionTotal # of
People# per Class
Cost Per Class
# of Classes
Total Cost
TOTAL COST
Insert additional lines as needed
COST PROPOSAL PAGE 10 OF 21
H.14.3. Train-the-Trainer Training
List all costs associated with training Oklahoma staff who would become the trainers for future users and support staff for the UCMS.
TRAIN-THE-TRAINER TRAINING
Class DescriptionTotal # of
People# per Class
Cost Per Class
# of Classes
Total Cost
TOTAL COST
Insert additional lines as needed
H.14.4. Other Training
List all costs associated with any other training included in your proposal.
OTHER TRAINING
Class DescriptionTotal # of
People# per Class
Cost Per Class
# of Classes
Total Cost
TOTAL COST
Insert additional lines as needed
COST PROPOSAL PAGE 11 OF 21
H.14.5. Training Cost Summary
Provide a roll-up of training costs for each of the above categories in the table below.
TRAINING COST SUMMARY
Training Category Cost
Direct Training to Users
System Administration / Technical Training
Train-the-Trainer Training
Other Proposed Training
TOTAL COST FOR TRAINING
COST PROPOSAL PAGE 12 OF 21
H.15. Implementation and Deployment Services
List all costs associated with the development and execution of the deployment strategy for the proposed system. Do not include costs for those items that have been included in separate section of the Cost Proposal Template (e.g., Information Exchanges, Training, and Data Conversion.) For any line item included in your proposal that is not specifically priced (that is, the cost is included in another line item), enter “INCL”. For any item that is not included in your proposal, enter “NOT INCL”.
IMPLEMENTATION AND DEPLOYMENT SERVICES
Implementation Category Cost Comment
Project Management
System Integration
Interfaces Testing and Implementation
Unit and Systems Testing (prior to roll-out)
Software Installation Support
Hardware Installation Support
On-site “go-live” Assistance (during roll-out)
Knowledge Transfer
Others (list below)
TOTAL IMPLEMENTATION COST
Insert additional lines as needed
COST PROPOSAL PAGE 13 OF 21
H.16. Hardware
List all required and optional hardware, including purchase cost and annual maintenance costs that will begin after the warranty period.
H.16.1. Required Hardware
In the table below, identify hardware that is required to run the proposed architecture for the UCMS (NOTE: this list should be consistent with the hardware configuration listed in Section G.4.7 in the Technical Proposal Template.
The Supreme Court reserves the right to separately procure hardware that meets the specifications provided by Vendors.
REQUIRED HARDWARE
Component Description / Purpose
Make / Model Qty Unit PriceOne-Time
Cost
Annual Maintenance
Cost
TOTAL COST OF REQUIRED HARDWARE
Insert additional lines as needed
H.16.2. Optional Hardware
Optional Hardware is that hardware which is not needed to run the proposed solution but is proposed for the solution as a value–added component (e.g., bio-metric readers). In the table below, identify all hardware that would be used to support optional features of the proposed solution:
The Supreme Court reserves the right to separately procure hardware that meets the specifications provided by Vendors.
OPTIONAL HARDWARE
Component Description / Purpose
Make / Model Qty Unit PriceOne-Time
Cost
Annual Maintenance
Cost
TOTAL COST OF OPTIONAL HARDWARE
Insert additional lines as needed
COST PROPOSAL PAGE 14 OF 21
H.17. Other Costs
List any Other Costs for items included in the proposed solution that have not been addressed in the prior cost tables in this Cost Proposal Template. Cost items proposed as necessary to meet the functionality requirements of the UCMS should be coded as Required (“R”), and those items which provide added-value or extended functionality should be coded as Optional (“O”).
OTHER COSTS
Item DescriptionCode (R/O)
One-Time Cost
Annual/ Re-curring Cost
Comments
TOTAL OTHER COSTS
H.8.1 – SUBTOTAL REQUIRED COSTS
H.8.2 – SUBTOTAL OPTIONAL COSTS
Insert additional lines as needed
COST PROPOSAL PAGE 15 OF 21
H.18. Cost Summaries
H.18.1. Costs for Required Functionality
Provide a roll-up of all costs for items in the proposal necessary to meet the functionality requirements of the UCMS. All subtotals carried forward to this page should agree with the previous detail pages.
SUMMARY OF COSTS FOR REQUIRED FUNCTIONALITY
Section / Subsection
Cost Category One-Time CostAnnually Recurring
H.1.4 Required Application Software License
H.1.5 Required System Software License
H.2.1 Software Customization
H.3.1 Required Information Exchanges
H.4.1 Data Conversion
H.4.2 Document Image Migration
H.5.5 Training Cost Summary
H.6 Implementation and Deployment Services
H.7.1 Required Hardware
H.8.1 Required Other Costs
TOTAL COST FOR REQUIRED ITEMS
H.18.2. Costs for Optional Functionality
Provide a roll-up of all costs for Optional functionality included in the proposal. All subtotals carried forward to this page should agree with the previous detail pages.
SUMMARY OF COSTS FOR OPTIONAL FUNCTIONALITY
Section / Subsection
Cost Category One-Time CostAnnually Recurring
H.1.6 Optional Software Licenses
H.3.2 Optional Information Exchanges
H.7.2 Optional Hardware
H.8.2 Optional Other Costs
TOTAL COST FOR OPTIONAL ITEMS
COST PROPOSAL PAGE 16 OF 21
H.10. Payment Schedule
The Supreme Court requires that payments for products and services be based on the acceptance of completed milestones and deliverables as defined in the Statement of Work.
The payment plan shall be broken down by milestones and deliverables within each Deliverable Group listed in the table below. The table also provides not to exceed percentages of fees for each Deliverable Group.
MAXIMUM PERCENTAGES BY DELIVERABLE GROUP
Deliverable Group Percentage
Project Planning & Preparation 10%
Functional Analysis & Development 10%
Pilot Implementations 25%
Statewide Deployment 40%
Final Acceptance 15%
H.10.1. Preliminary Payment Plan for Project Fees
In the tables below, provide a preliminary payment plan for the one-time costs for all products and services, including the identification of all key project milestones and deliverables in each Deliverable Group based on your proposed project plan. Note that no payments will be made in advance of the Supreme Court’s formal acceptance of a complete milestone or deliverable. The payment plan, including specific acceptance criteria for each milestone and deliverable, will be finalized during contract negotiations.
H.10.1.a. Project Planning and Preparation Deliverable Group
Use the table below to list proposed milestones and payments for Project Planning and Preparation Deliverables:
PRELIMINARY PAYMENT PLAN FOR PROJECT FEES
DELIVERABLE GROUP: PROJECT PLANNING AND PREPARATIONS
Milestone / Deliverable DescriptionProject Plan
Task IDPayment Amount
Comments
DELIVERABLE GROUP PAYMENT TOTAL
Insert additional lines as needed.
COST PROPOSAL PAGE 17 OF 21
H.10.1.b. Functional Analysis and Development Deliverable Group
Use the table below to list proposed milestones and payments for Functional Analysis and Development Deliverables:
PRELIMINARY PAYMENT PLAN FOR PROJECT FEES
DELIVERABLE GROUP: FUNCTIONAL ANALYSIS AND DEVELOPMENT
Milestone / Deliverable DescriptionProject Plan
Task IDPayment Amount
Comments
DELIVERABLE GROUP PAYMENT TOTAL
Insert additional lines as needed.
H.10.1.c. Pilot Implementation Deliverable Group
Use the table below to list proposed milestones and payments for Pilot Implementation Deliverables:
PRELIMINARY PAYMENT PLAN FOR PROJECT FEES
DELIVERABLE GROUP: PILOT IMPLEMENTATION
Milestone / Deliverable DescriptionProject Plan
Task IDPayment Amount
Comments
DELIVERABLE GROUP PAYMENT TOTAL
Insert additional lines as needed.
COST PROPOSAL PAGE 18 OF 21
H.10.1.d. Statewide Deployment Deliverable Group
Use the table below to list proposed milestones and payments for Statewide Deployment Deliverables:
PRELIMINARY PAYMENT PLAN FOR PROJECT FEES
DELIVERABLE GROUP: STATEWIDE DEPLOYMENT
Milestone / Deliverable DescriptionProject Plan
Task IDPayment Amount
Comments
DELIVERABLE GROUP PAYMENT TOTAL
Insert additional lines as needed.
H.10.1.e. Final Acceptance Deliverable Group
Use the table below to list proposed milestones and payments for Final Acceptance Deliverables:
PRELIMINARY PAYMENT PLAN FOR PROJECT FEES
DELIVERABLE GROUP: FINAL ACCEPTANCE
Milestone / Deliverable DescriptionProject Plan
Task IDPayment Amount
Comments
DELIVERABLE GROUP PAYMENT TOTAL
Insert additional lines as needed.
COST PROPOSAL PAGE 19 OF 21
H.10.2. Maintenance and Support Agreements
Identify each item requiring a separate maintenance agreement (e.g., each vendor’s application package; all hardware for which support would be provided under one contract, etc.) for which maintenance and support charges are required, and enter the start date or triggering event (e.g., 1 year after installation; 1 year from System Acceptance, etc.)
MAINTENANCE AND SUPPORT AGREEMENT
Item / Component Annual FeeStart Date
or Triggering Event
Insert additional lines as needed
H.10.3. Hourly Rates for Additional Services
The Supreme Court may want to purchase additional services on a Time and Materials (T&M) basis during or following implementation. List the types/level of positions which may be available to the Courts and the hourly rates for such services that will be guaranteed from the date of contract signing through the duration of the implementation. Note: Services must be rendered before payment.
HOURLY RATES FOR ADDITIONAL SERVICES
Position / Level Hourly Rate Comments
Insert additional lines as needed
COST PROPOSAL PAGE 20 OF 21
H.11. Cost Proposal Assumptions
List any specific assumptions associated with the pricing provided in the Cost Proposal.
COST PROPOSAL ASSUMPTIONS
Item # Cost Proposal Assumptions
Insert additional lines as needed