Bond 2016 - Input
2
Citizens Advisory Committee – Quarterly meetings, beginning June 14, 2017District 1 Committee Members• Brian Dillard• Shannan Hern• John Wilkins
Meeting with campus department heads – March 8, 2018• Yesenia Cordova, Principal• Kimberly Ash, Assistant Principal
• (12) department heads
Project Advisory Team (PAT) meeting – March 28, 2018• Stephanie Sheikholeslami• Danny Nguyen• Sebastian Tellez• Michelle Suarez• Peter Acosta• Skye Thomas• Miranda Dominguez• Angelica Truque• Jesus Mancha• Edson Ortiz• Susan Tustison• Mandie Holtsford
• Natalie Moore• Jordan Moore• Gladys Ornelas• Grace Pena• Leticia Johansen• Maria Cano• Jose Fernandez• Alexandra Lucas• Andres Mata• Casandra Gonzales• Charles Mejia• Sonia Guerrero
Bond 2016 - Input
3
Stakeholder meeting – October 4, 2018• Yesenia Cordova, Principal• Kimberly Ash, Assistant Principal• Maria Cordova• Jose Cortez• Carlos Borrego• Blanca Rojas
• Christina Meherg• Irena Stepanenko• Cassandra Gonzales• Diana Elizondo• Lisa Barrera
Trustee follow-up meeting – October 12, 2018• Steve Lecholop, Trustee• Yesenia Cordova, Principal
Stakeholder meeting – October 30, 2018• Steve Lecholop, Trustee• Yesenia Cordova, Principal• Kimberly Ash, Assistant Principal• Lynn Lynch
• Blanca Rojas• Lisa Barrera• Laura Lopez• Kenny Davis
Bond 2016 - Scope
4
Total Construction Budget: $50,362,447Renovations and upgrades to include:• Main Building• Classroom spaces (general learning, dance/pep room, science, special education)• Restrooms• Cafeteria/kitchen• Auditorium• Heating, ventilation and air conditioning• Plumbing and electrical• Technology infrastructure for new and renovated spaces• Lighting• Fire sprinkler systems• Special needs accessibility in entryways, restrooms, and other areas• Front-entry modifications to improve security• Athletic track re-coating• Tennis court fencing• Roofing, building exterior and site improvements
Proposed Master Plan
5
2016 Bond• Administration• Library• Cafeteria & kitchen• Classrooms• Science Labs• Dance Studio renovations
Future bond programA. Fine Arts replacement
• New auditorium• New Dance Studio
B. Athletics replacement• (2) New gyms• New locker rooms• New weight room• New baseball field• New softball field• New tennis courts
A
B
Bond 2016 – Proposed scope
6
VOC. BLDG.
MAIN BUILDING
Main Building & Site• Administration• Library• Cafeteria & kitchen• Classrooms• Science Labs• Track resurfacing• Tennis court fencing
Vocational Building• Dance Studio renovations
• 2,000 sf dance floor• New dance floor• New mirrors• New finishes
• Temporary classroom space
Bond 2016 – First floor
8
Academic renovations• Approx. 215,000 sfA. Secured vestibuleB. Renovated Child Nutrition
ServicesC. Renovated Library
AB C
Bond 2016 – Proposed scope
11
Dance Studio renovations• 2,000 sf dance floor • New dance floor• New mirrors• New finishes• Mechanical repairs• Enlarged storage room• Enlarged dressing room with
restrooms• New lockers
Bond 2016 – Second floor
12
Academic renovations• Future ready classrooms and
science labs• Academic clustersA. New science labsB. New general classroomsC. Small group rooms &
collaboration areas
A A
A
B
B
B
B
C
C
C
Bond 2016 – classrooms
14
• Upgraded mechanical and electrical systems, including LED lighting• New ceilings and finishes• New flexible furniture• Upgraded technology, including new digital teaching wall• Exterior windows into classrooms• Interior windows into extended learning areas
Bond 2016 – Science labs
15
• Upgraded mechanical and electrical systems, including LED lighting• New ceilings and finishes• New white boards• Flexible lab furniture• New digital teaching wall
Bond 2016 – Phasing Plan
17
• Phase 1 March 2019 – November 2019• First & second floor
• Phase 2 December 2019 – July 2020• First & second floor
• Phase 3 June 2020 – July 2020• First & second floor
• Phase 4 June 2020 – December 2020• First & second floor
• Phase 5* July 2020 – December 2020• Vocational building demolition
(alternate)
• Phase 6* October 2020 – July 2021• Fine Arts
*Phase 5 & 6 will be revised. Vocational Building will not be demolished in 2016 bond program.
Bond 2016 – Phasing Plan
18
• Phase 1 March 2019 – November 2019• First & second floor
• Phase 2 December 2019 – July 2020• First & second floor
• Phase 3 June 2020 – July 2020• First & second floor
• Phase 4 June 2020 – December 2020• First & second floor
• Phase 5* July 2020 – December 2020• Vocational building demolition
(alternate)
• Phase 6* October 2020 – July 2021• Fine Arts
*Phase 5 & 6 will be revised. Vocational Building will not be demolished in 2016 bond program.