gfj;k.kk jkT; lw[kk jkgr ,oa ck<+
fu;a=.k cksMZ
51st MEETING AGENDA CHAIRMANSHIP: HON’BLE CHIEF MINISTER, HARYANA
DATE:-30.12.2019 TIME:-03:00 P.M.
VENUE: CONFERENCE HALL, HARYANA NIWAS, SECTOR-3, CHD. Irrigation and Water Resources Department, Haryana
Sinchai Bhawan, Sector-5, Panchkula.
Ph.No. : 0172-2582541, Fax No. 0172- 2567259
Email: [email protected],
Official website: www.hid.gov.in
I N D E X Description Page No.
Notice for 51st meeting of Haryana State Drought Relief & Flood Control Board (HSDR&FCB) 1
List of Members and Special Invitees 2-5
ITEM NO. 1 : CONFIRMATION OF THE MINUTES OF 50th MEETING OF HSDR
&FCB
6
ITEM NO. 2 : ACTION TAKEN REPORT OF 50th MEETING OF HSDR&FCB 7
ITEM NO. 3 : FLOOD REPORT FOR THE YEAR 2019 8-12
ITEM NO. 4 : NEW SCHEMES OF IRRIGATION AND WATER RESOURCES
DEPARTMENT FOR APPROVAL OF THE BOARD
13-14
ITEM NO. 5
:
REVIEW OF SCHEMES OF IRRIGATION AND WATER
RESOURCES DEPARTMENT ONGOING PRIOR TO 51st MEETING
OF HSDR&FCB
15
ITEM NO. 6 : REVIEW OF ONGOING AND NEW SCHEMES UNDER HEAD-
DEPOSIT
16-17
ITEM NO. 7 : REVIEW OF POSITION OF FUNDS WITH IRRIGATION AND WATER
RESOURCES DEPARTMENT
18-19
ITEM NO. 8 : SCHEMES AND FUNDS POSITION OF PUBLIC HEALTH
ENGINEERING DEPARTMENT.
20-35
ANNEXURE 1.1 : MINUTES OF 50TH MEETING OF HSDR&FCB 36-43
ANNEXURE 2.1 : ABSTRACT OF ALL SCHEMES ONGOING PRIOR TO 50TH
MEETING OF HSDR&FCB
44
ANNEXURE 2.2 : ABSTRACT OF NEW SCHEMES APPROVED IN 50TH MEETING OF
HSDR&FCB
45
ANNEXURE 2.3 : ABSTRACT OF ALL SCHEMES APPROVED UPTO 50TH MEETING
OF HSDR&FCB
46
ANNEXURE 3.1 : RAINFALL DATA FOR THE YEAR 2019 47
ANNEXURE 3.2 : ANNUAL FLOOD PEAK DATA 48
ANNEXURE 3.3 : POSITION OF DRAINGE PUMPS 49
ANNEXURE 4.1 : ABSTRACT OF NEW PROPOSED FLOOD SCHEMES 50
ANNEXURE 4.2 : DETAILS OF NEW PROPOSED FLOOD SCHEMES 51-65
ANNEXURE 5.1 : DETAIL OF COMPLETED SCHEMES OF IRRIGATION AND WATER
RESOURCES DEPARTMENT ONGOING PRIOR TO 51st MEETING
OF HSDR&FCB
66-77
ANNEXURE 5.2 : DETAILS OF DROPPED SCHEMES OF IRRIGATION AND WATER
RESOURCES DEPARTMENT ONGOING PRIOR TO 51st MEETING
OF HSDR&FCB
78-80
ANNEXURE 5.3 : ABSTRACT OF ONGOING SCHEMES OF IRRIGATION AND WATER
RESOURCES DEPARTMENT IN 51st MEETING OF HSDR&FCB
81
ANNEXURE 5.4 : DETAILS OF ONGOING SCHEMES OF IRRIGATION AND WATER
RESOURCES DEPARTMENT IN 51st MEETING OF HSDR&FCB
82-105
ANNEXURE 6.1 : DETAILS OF ONGOING SCHEMES OF I&WRD UNDER DEPOSIT
HEAD
106-108
“gj cwan lap;] gj [ksr ikuh”
Engineer-in-Chief,
Irrigation & Water Resources Department
Panchkula, Haryana.
e-mail:[email protected]
Meeting
30.12.2019 at 03:00 P.M.
No. 4647 /Drainage/14/2020 Dated: 24.12.2019
From
Engineer-in-Chief,
Haryana Irrigation and Water Resources Department,
Sinchai Bhawan, Sector-5, Panchkula.
Phone No. 0172-2582541
Fax No. 0172- 2567259
To
1. The Members
2. Special Invitees
Haryana State Drought Relief & Flood Control Board (HSDR&FCB).
(As per list enclosed)
Subject: 51st Meeting of Haryana State Drought Relief & Flood Control Board.
In this regard it is informed that the 51st Meeting of Haryana State Drought Relief & Flood
Control Board (HSDR&FCB) is scheduled to be held on 30.12.2019 at 03:00 P.M. under the
Chairmanship of Hon’ble Chief Minister, Haryana in Conference Hall, Haryana Niwas, Sector-3
Chandigarh. All Divisional Commissioners and Deputy Commissioners of the state are requested to join
the meeting through video conference at their respective Headquarters alongwith the concerned
Xens’.The agenda for the meeting can be downloaded from the official website “www.hid.gov.in”.
It is requested to kindly make it convenient to attend the above said meeting.
-Sd/-
Engineer in Chief, Irrigation and Water Resources Department, Haryana, Panchkula, Cum-Member Secretary,
Haryana State Drought Relief &Flood Control Board
1
LIST OF MEMBERS
HARYANA STATE DROUGHT RELIEF &FLOOD CONTROL BOARD
OFFICIAL MEMBERS
1. Hon'ble Chief Minister, Haryana. Chairman
2. Irrigation and Water Resources Minister, Haryana. Vice Chairman
3. Finance Minister, Haryana. Member
4. Agriculture Minister, Haryana. -do-
5. Revenue & Disaster Management Minister, Haryana. -do-
6. Chief Secretary, Govt. of Haryana, Chandigarh. -do-
7. Additional Chief Secretary, Govt. of Haryana,
Animal Husbandry and Dairying Department, Chandigarh.
-do-
8. Additional Chief Secretary, Govt. of Haryana, Revenue & Disaster Management Department, Chandigarh
-do-
9. Additional Chief Secretary, Government of Haryana, Agriculture Department, Chandigarh.
-do-
10. Additional Chief Secretary to Government of Haryana, Forest & Wildlife Department, Chandigarh
-do-
11. Additional Chief Secretary, Government of Haryana, Irrigation and Water Resources Department, Chandigarh.
-do-
12. Additional Chief Secretary, Government of Haryana, Public Health Engineering Department, Chandigarh.
-do-
13. Additional Chief Secretary, Govt. of Haryana, Power Department, Chandigarh.
-do-
14. Additional Chief Secretary, Govt. of Haryana, PW (B&R) Department, Chandigarh.
-do-
15. Additional Chief Secretary, Govt. of Haryana, Finance Department, Chandigarh.
Member
16. Additional Chief Secretary, Govt. of Haryana, Planning Department, Chandigarh.
-do-
2
17. Principal Secretary, Govt. of Haryana, Development and Panchayat Department, Chandigarh.
-do-
18. Principal Secretary, Govt. of Haryana, Mines and Geology Department, Chandigarh.
-do-
19. Principal Secretary, Govt. of Haryana,
Town and Country Planning Department, Chandigarh.
-do-
20. Principal Secretary, Govt. of Haryana,
Urban Local Bodies Department, Chandigarh.
-do-
21. Commissioner, Ambala Division, Ambala. -do-
22. Commissioner, Gurgaon Division, Gurgaon. -do-
23. Commissioner, Hisar Division, Hisar. -do-
24. Commissioner, Rohtak Division, Rohtak. -do-
25. Engineer-In-Chief, PW(B&R) Department, Haryana, Sector-33, Chandigarh.
-do-
26. Engineer-In-Chief, Public Health Engineering Department, Haryana, Panchkula.
-do-
27. Member (RM) Central Water Commission, Room No. 212(S) SewaBhawan, R.K.Puram, New Delhi. 110066
-do-
28. Principal Chief Conservator of Forest, Haryana, Panchkula. -do-
29. Engineer-In-Chief, Irrigation and Water Resources Department Haryana, Panchkula.
Member Secretary
30. Chief Engineer/YWS (North) Irrigation and Water Resources Department, Haryana, Panchkula.
Joint Member Secretary
31. Chief Engineer/ YWS (South) Irrigation and Water Resources Department, Haryana, Delhi.
Member
32. Chief Engineer/BWS, Irrigation and Water Resources Department, Haryana, Panchkula.
-do-
33. Chief Engineer/LCU, Irrigation and Water Resources Department, Haryana, Panchkula.
-do-
3
SPECIAL INVITEES
1. Principal Secretary to Chief Minister Haryana, Chandigarh.
2. Additional Principal Secretary-I to Chief Minister, Haryana, Chandigarh.
3. Additional Principal Secretary-II to Chief Minister, Haryana, Chandigarh.
4. Dy. Principal Secretary to Chief Minister, Haryana, Chandigarh
5. Principal Officer on Special Duty to Chief Minister Haryana, Chandigarh.
6. Officer on Special Duty to Chief Minister Haryana, Chandigarh.
7. Chairman & Managing Director, DISCOM (UHBVNL and DHBVNL), Panchkula.
8. Administrator, CADA, Panchkula.
9. Secretary, Revenue & Disaster Management Department, Haryana, Chandigarh.
10. Secretary, Irrigation and Water Resources Department, Haryana, Chandigarh.
11. Director General-cum- Secretary, Information, Public Relations & Cultural affairs, Haryana, Chandigarh.
12. Commander/Headquarter, Punjab, Haryana and Himachal Pradesh, Independent Sub Area, Western Command, Ambala Cantt.
13. Representative of National Highway Authority of India, New Delhi-110075
14. Representative of Indian Meteorological Department, Regional Office, Chandigarh
15. Representative of Haryana Space Application Centre, Hisar
16. Chief Engineer / Co-ordination, Irrigation and Water Resources Department, Haryana, Panchkula.
17. Chief Engineer/Construction,Irrigation and Water Resources Department, Haryana, Panchkula.
18. Chief Engineer / CADA, Panchkula.
19. Deputy Commissioner, Ambala.
20. Deputy Commissioner, Bhiwani.
21. Deputy Commissioner, Faridabad.
22. Deputy Commissioner, Fatehabad.
23. Deputy Commissioner, Gurgaon.
24. Deputy Commissioner, Hisar.
25. Deputy Commissioner, Jhajjar.
26. Deputy Commissioner, Jind.
27. Deputy Commissioner, Kaithal.
28. Deputy Commissioner, Karnal.
29. Deputy Commissioner, Kurukshetra.
30. Deputy Commissioner, Mahendergarh at Narnaul.
31. Deputy Commissioner, Mewat at Nuh.
32. Deputy Commissioner, Palwal.
33. Deputy Commissioner, Panchkula.
34. Deputy Commissioner, Panipat.
35. Deputy Commissioner, Rewari.
4
36. Deputy Commissioner, Rohtak.
37. Deputy Commissioner, Sirsa.
38. Deputy Commissioner, Sonepat.
39. Deputy Commissioner, Yamuna Nagar.
40. Superintending Engineer, Planning, Irrigation and Water Resources Department, Haryana, Panchkula.
41. Superintending Engineer, HKB Circle, Jagadhari.
42. Superintending Engineer, YWS Circle, Karnal.
43. Superintending Engineer, YWS Circle, Sonepat.
44. Superintending Engineer, YWS Circle, Delhi.
45. Superintending Engineer, YWS Circle, Faridabad.
46. Superintending Engineer, YWS Circle, Jind.
47. Superintending Engineer, SYL W.S. Circle, Ambala.
48. Superintending Engineer, BWS Circle, Kaithal.
49. Superintending Engineer, BWS Circle,Hisar.
50. Superintending Engineer, BWS Circle, Fatehabad.
51. Superintending Engineer, BWS Circle, Sirsa.
52. Superintending Engineer, YWS Circle, Rohtak.
53. Superintending Engineer, Jhajjar W.S. Circle, Jhajjar.
54. Superintending Engineer, YWS Circle, Bhiwani.
55. Superintending Engineer, LWS Circle, Bhiwani.
56. Superintending Engineer, JLN W.S. Circle, Rewari.
57. Superintending Engineer, JLN W.S. Circle, Narnaul.
58. Superintending Engineer, Work Shop Circle, Karnal.
59. Superintending Engineer/CDO, Irrigation and Water Resources Department, Haryana, Panchkula.
60. Executive Engineer/CDO-I, Irrigation and Water Resources Department, Haryana, Panchkula.
61. Executive Engineer/Drainage, Irrigation and Water Resources Department, Haryana, Panchkula.
62. Executive Engineer/Nabard, Irrigation and Water Resources Department, Haryana, Panchkula.
---------------------------------------------------------
5
ITEM NO. 1
CONFIRMATION OF THE MINUTES OF 50th
MEETING OF HSDR &FCB HELD ON 15.01.2019. 50th Meeting of Haryana State Drought Relief and Flood Control Board was held under
the Chairmanship of Hon’ble Chief Minister, Haryana on 15.01.2019. The minutes of meeting
(Annexure-1.1) were circulated vide letter No. 416-511 /Drainage/14/2019 Dated: 05.02.2019.
No comments have been received from any quarter. It is requested that minutes may
kindly be confirmed.
6
ITEM NO. 2
ACTION TAKEN REPORT ON THE DECISIONS TAKEN IN 50th MEETING OF HSDR & FCB HELD ON 15.01.2019
Sr. No
Issue Action Taken
1. In the 50th Meeting of HSDR&FCB, 165 New Schemes and 111 Ongoing Schemes with Balance work were approved.
Status of Schemes Approved in 50th Meeting of HSDR&FCB
Total Schemes
Amt. Completed Schemes
In Progress
Yet to Start
Dropped
New Schemes
165 163.73 94 46 18 07
Ongoing Schemes
111 250.63 70 28 09 04
The detail at Annexure 2.1(pg. 44) and Annexure 2.2 (pg. 45).
2. Regarding balance amount pending with various department like HSVP, HSIIDC, ULB for the execution of deposit works.
Out of 08 nos. schemes, 03 Schemes are yet to start and 01 no. scheme is in progress. It is further mentioned that in spite of requesting the following departments regarding requirement of funds the same is still pending. Rs. In Crores
The detail at Annexure 6.1 at pg no. 106
Sr. No.
Name of Department
Name of Work Amount not deposited
1. Haryana Tourism
Cosnt. Retaining wall in front of King Fisher Resort, Ambala
1.00
2. HSVP Satrod Mirka Drain, Hisar+ Sarai Aurangabad of Kassar Link Drain,+ lining & railing of Panipat Drain
5.00+0.55+8.80 = (14.33)
3. HSIIDC Sarai Aurangabad Kassar Link Drain
2.03
4. ULB Remodelling of Panipat Drain.
20.31
G.Total 37.69
3. Regarding exploring the alternative to re-use the water and not just throwing into the drain.
In this regard policy on re-use of treated waste water was framed by PHED and the same stands approved by the Govt. and the same has been notified vide no. 5/18/2018-3PH dated 30.10.2019. A comprehensive scheme has been prepared by I&WRD for the whole state for using treated waste water for irrigation using 747 cusecs treated water, cost of schemes is estimated to be Rs. 1098 crore and it is proposed to be executed in 05 years.
4. Regarding increase of scope of scheme purposed to protect village Kamalpur and Village Lal Chappar on River Yamuna
As per the report the flood schemes executed in these villages acted efficiently and protected the river banks from further erosion in spite of the highest discharge received in River Yamuna this year i.e. 8.28 lac cusecs.
5. Regarding monitoring the flood protection schemes by the District Administration.
A District Level Committee was constituted comprising a representative from D.C. Office to check the flood works having stone boulders components. The DLC checked the works and submitted its report.
7
ITEM NO. 3
FLOOD REPORT OF HARYANA FOR THE YEAR 2019
Haryana is a small landlocked state situated in the North West part of India and is bounded
by Shivalik range in the North- East and river Yamuna in the East, Aravali range in the South-West
and river Ghaggar in the West. River Yamuna form part of the boundary between Haryana & Uttar
Pradesh and River Ghaggar between Haryana & Punjab. The total area of the state is 44.2 lac
hectares out of which about 39.0 lac hectares is arable.
Topographically, from drainage angle the entire state is divided into two parts i.e. area
draining into Yamuna Sub Basin of Ganga Basin and area draining into Ghaggar Sub Basin of Indus
Basin.
Yamuna Sub Basin Drainage area of Yamuna Sub Basin comprises of area of Yamuna Nagar (part), Karnal,
Panipat, Sonepat, Rohtak, Jhajjar, Rewari, Gurgaon, Mewat, Mahendergarh, Jind (part), Faridabad
and Palwal districts. It covers about 40% area of the state and it drains into river Yamuna.
Experiencing high flooding during heavy rainfall, diversion drains were constructed in the northern
portion of this catchment out-falling into river Yamuna in the North of Delhi. Ujjina Diversion Drain
was constructed to out-fall into river Yamuna in Haryana territory in the South of Delhi to check
drainage congestion through Khaluka Regulator in Rajasthan. Due to the construction of a number
of bunds in Rajasthan territory in catchment area of river Sahibi, Krishnawati, Dohan and Landoha
Nalla originating from Aravali hills of Rajasthan, the flood problem in Rewari, Mahendargarh,
Jhajjar and Mewat has now reduced considerably. The problem arises only when there is heavy
downpour in low lying pockets and in such situation, dewatering is resorted to, on SOS basis.
Important drains of Yamuna Sub Basin area are Chautang Nallah, Dhanaura Escape, Nissing
Drain, Indri Drain, Main Drain No. 2, NaiNallah, Drain No. 8, Diversion Drain No. 8, Out-fall Drain
No. 8, Najafgarh Drain, Chhapra Drain, Meham-Lakhanmajra Drain, KCB Drain, Supplementary
Drain, Nuh Drain, Ujjina Drain, Ujjina diversion Drain, Gaunchi Main Drain etc.
Ghaggar Sub Basin
Remaining 60% area of the state drains into the Ghaggar Sub Basin of Indus Basin
comprising of Yamuna Nagar (part), Panchkula, Ambala, Kurukshetra, Kaithal, Jind, Bhiwani, Hisar,
Fatehabad and Sirsa districts. This area has a country slope towards river Ghaggar. The river
Ghaggar enters Haryana State in district Panchkula from the foothills of Shivalik and flows in South-
West direction to Rajasthan through Haryana and Punjab. River Tangri and Markanda merge in the
Ghaggar River in Kaithal district. Ghaggar River and its tributaries create serious problems enroute
in districts Ambala, Kurukshetra, Kaithal, Fatehabad and Sirsa. The Ghaggar River drains into
8
desert area of Rajasthan. Important drains of Ghaggar Sub Basin are Ganda Nallah, SYL Parallel
Drain, Saraswati Drain, Kaithal Drain, Amin Drain, Pundri Drain No. 1, Pundri Drain No. 2, Kasan
Drain, Kalwa-Kinana Drain, Padana Drain, Hansi Drain, Rori-Ghaggar Drain, RangoiKharif Channel
cum Drain, RangoiNallah, Rangoi Diversion Drain. The Bass-Hisar-Ghaggar Drain is under
implementation which will provide relief to the areas in Hisar, Fatehabad and Sirsa districts.
A number of ring/protection bunds and embankments have been constructed with high level
approaches and ramps to protect abadi of important towns and villages which otherwise could get
marooned as a result of spillover from rivers/nallahs due to their location in flood belt of this basin.
Beside this, Ottulake has also been deepened to store Ghaggar flood water to use the same in a
number of Kharif channels in district Sirsa.
Main drains, their capacity and out-fall source is as under:-
Sr. No.
Name of Drain Capacity Discharge in Cusec
Out-fall
YAMUNA SUB BASIN
1 Main Drain No. 2 6325 River Yamuna
2 NaiNallah 2241 Drain No. 8
3 Diversion Drain NO. 8 7320 River Yamuna
4 West Jua Drain 500 Mangeshpur Drain
5 Drain No. 8 1537 Bhindawas lake/Drain
6 Out-fall Drain No. 8 4000 Dhansa out-fall Drain
7 KCB Drain 692 Mangeshpur Drain
8 Chandeni Drain 425 NuhDrain
9 Nuh Drain 1362 UjinaDrain
10 UjinaDrain 2200 Ujina Diversion Drain
11 Ujina Diversion Drain 2200 Gaunchi Main Drain
12 Gaunchi Main Drain 6655 River Yamuna
GHAGGAR SUB BASIN
1 Saraswati Drain 16660 A tributary of River Ghaggar
2 Kaithal Drain 213 River Ghaggar
3 Rangoi Diversion Drain
4088 River Ghaggar
4 HisarGhaggar multipurpose channel
500 River Ghaggar
5 MirpurChoe Drain 830 River Ghaggar
6 Amin Drain 2250 River Ghaggar
7 HisarGhaggar Drain 750 River Ghaggar
8 Baretta Drain 1380 River Ghaggar
9 SirhindChoe Drain 2454 River Ghaggar
10 RangoiNallah 7000 River Ghaggar
9
Flood situation in the year 2019
During 2019 Haryana received deficit –43.31% rainfall and district wise statement of rainfall
during the monsoon of 2019, as collected from IMD, Chandigarh is given in Annexure 3.1. The
rainfall received during the months of June, July, August and September 2019 was on the lower side
of normal rainfall in state Haryana this year. Although no major flood situation was faced during the
flood period of 2019. Apart from the maximum discharge received in river Yamuna i.e. 828072
Cusecs and the medium discharge received in other rivers was mainly due to heavy rainfall in the
catchments of the river located in the states of Uttarakhand and Himachal Pradesh.
The basin wise status of flood received during 2019 is given below:-
Yamuna Sub Basin
This year Highest flood discharge was recorded in river Yamuna at Hathni Kund Barrage with
maximum discharge of 08,28,072 cs. on 18.08.2019. This flood in river Yamuna passed safely but
eroded some agricultural land along the river edge at location near village Lal Chappar, Jathlana,
Unheri, Odri, Kamalpur in district Yamunanagar.
Apart from this the medium flood discharge was received in the tributaries of River Somb,
Pathrala, Sadhaura and Markanda which eroded fertile agriculture land near villages Gadwali,
Muzafat, Ranjitpur, Ramgarh Sawai, Chintpur, Rampur gainda and Khannuwala.The temporary
remedial measures at some critical areas on river Somb and Pathrala to protect village abadi from
flood were taken, although no substantial damages were observed.
A medium flood discharge was also received in River Pathrala and its tributaries and some
villages were effected like vill Manakpur, Arjun Majra, Rajpur, Dadupur Jattan and Mukaravpur.
Apart from this, in district Karnal, some damages like scouring of fertile agricultural land,
formation of loops in some complexes were reported. Although major damages due to flood were
averted by initiating immediate flood preventive measures by deploying labour, machinery and
material like wooden ballies, EC bags etc. The critical sites where temporary flood preventive
measures where initiated are Chandrao complex, Garhpur complex, Kalsora complex, Nabiabad
complex, Dabkoli, Shergarh tapu complex. The Kalsora complex experienced the worst impact from
the heavy discharge received in river Yamuna, however the same was combat through various
preventive measures.
In districts Jhajjar, Rohtak, Jind, Narnaul and Rewari no problem of water logging in fields or
flood was reported and hence no flood damages in these districts were noticed this year.
10
Ghaggar Sub Basin
River Ghaggar comprises of various tributaries like Markanda, Tangri, Patiala Nadi, Merapur
Choe drain and Para River. In district Panchkula no major losses were reported however some
minor damages like scouring of river banks, water logging etc. were noticed in village Toda,
Paploha; a landslide in the month of July 2019 occurred in vill. Khera Sitaram along Orian river.
Although protection work of stone steining and laying of E.C bags was executed to provide
immediate protection. Furthermore, the water level of Kaushalya Dam increased to 476.80 mtr. on
dated 18.08.2019, which was a considerable rise of more than 4 mtr. height in a span of one day;
and the accumulated water was released gradually to avoid any adverse effect on the dam and
upper reaches of Kaushalya river.
In district Kaithal, the Ghaggar river crossed the level of 21.00 feet and the water spilled in
the fields of villages namely Sihali and Ratta Khera. This year the maximum discharge received in
River Ghaggar was 52,387 Cusecs (24.20 feet) on 18.07.19 and it crossed the danger level i.e.
23.00 feet. This huge discharge water logged the Pucca road leading to village Sihali-Ratta Khera
and Mangra-Manjheri. The Ghaggar Bund from RD 117500 to 115000 was damaged and the same
was protected by laying earth filled E.C bags. Due to flood received in river Ghaggar 300 acres
crops at outlet of Saraswati Nala and along Ghaggar Bund (RD 105525-106125) were badly
damaged near village Bhatain and Hansu Majra, some other villages effected during flood are
Mohanpur, Bhusla, Budanpur, Arnoli, Banpur, Kamheri, Channa Agriyan, Ratta Khera
lukman,Sadhipur in district Kaithal.
Whereas in District Sirsa there was not much localized rainfall but the problem of water
logging was reported in some villages like Patli Dabar, Narelkra-sikanderpur-Bajekan area due to
heavy discharge received in River Ghaggar in the month of July, 2019 along with some local spells
of rainfalls which added up to the discharge. However the problem was well tackled with the best
efforts of Department.
District Ambala experienced spells of heavy to extremely heavy rainfall this year in the
month of July,2019 which resulted in water logging in various urban as well as low lying area. The
intensity of rainfall and water logging was so high that District administration had to close various
schools and colleges in the District Ambala. Apart from this the accumulated rain water entered the
houses of various officers of HVPNL in Power Colony in Dhulkot along National Highway. The
residents suffered loss of property and had to be rescued from the water logged residences via
boats. On the direction of Deputy Commissioner Ambala the process of dewatering was initiated by
the Irrigation department on emergent basis. Apart from this the problem of water logging was also
reported in villages Machhonda, Chanderpuri, Sundernagar and some area along National highway.
11
The dewatering was done throughout so as to relieve the residents and temporary protection works
were executed by laying Earth filled E.C bags for the protection of Shiv Colony in Kala Amb and to
strengthen Babyal Bund along river Tangri.
The maximum discharge observed in the main rivers during the year was as under:-
Sr. No.
River Discharge Site at Danger Level
Maximum Discharge Recorded in Cusec
Date on which maximum Discharge recorded
1 River Yamuna Hathni Kund Barrage 2,50,000 8,28,072 18.08.2019
2 River Ghaggar Panchkula Site 4A 20,000 19,240 18.08.2019
Gulha Cheeka (Kaithal) 51,733 52,387 18.07.2019
Khanauri (Sirsa ) 25,000 14,225 19.07.2019
Chandpur including Rangoi Nallah and JoyaNallah (Punjab)
25,000 12,800 21.07.2019
Downstream Ottu (Sirsa) 25,000 26,950 24.07.2019
3 River Markanda Mulana Bridge (Ambala) 50,000 64,530 18.08.2019
4 River Tangri Shahpur (Ambala) 34,000 26,605 18.08.2019
Further statement showing Annual Peak Flood Data of various sites since 2002 is given in
Annexure 3.2. In Addition to this position of pumps along with the number of pumps purchased
during 2018-19, for dewatering of flood water from low lying areas is given in Annexure 3.3.
12
ITEM NO. 4
New Schemes of Irrigation and Water Resources Department proposed for 51st
meeting of HSDR&FCB.
During the monsoon season 2019, there were medium to high precipitation in the catchment
areas of Yamuna and its tributaries, lying in some part of Uttarakhand and Himachal Pradesh.
Maximum discharge of 8,28,072 cusecs was received in river Yamuna at the Hathni Kund Barrage
(HKB) on 18.08.2019. In addition to the flood discharge of Yamuna, flood discharge of Rivers Somb
and Pathrala were moderate during flood season 2019 and caused minimal damages. Some
damages like erosion of land along the river edges, erosion of embankments, spilling of water
occurred at a few places in District Yamunanagar but the damages were contained as the flood works
executed before the onset of monsoon of 2019 performed well and efficiently.
As such, preparedness for monsoon season 2020, meeting of State Level Committee under
the Chairmanship of Engineer-in-Chief, Irrigation and Water Resources Department was held on
12.12.2019 wherein 203 schemes amounting to ₹ 198.31 Cr. were finalized for recommendation to
HSTAC & HSDR&FCB.
The schemes related to renovation of damaged bunds, procurement of pumps, construction of
bunds, studs to protect village Abadis, V.R. Bridges on drains, Sump wells, Remodeling of Drains
etc.. The schemes have been prepared after due consultation / recommendations of respective
District Flood Control Committees under the Chairmanship of respective Deputy Commissioners and
Chairman, Zila Parishad.
The Department has further prioritized the works in such a way that the works proposed to be
completed upto 30.06.2020 are taken as Short term, the works proposed to be completed upto
30.06.2021 are taken as Medium term and the works proposed to be completed upto 30.06.2022
are taken as Long term. The abstract of schemes so worked out is as under:-
₹ in Crores
Sr. No.
Type of Schemes
No. of Schemes
Estimated Cost
Requirement of funds
Total 2020-21 2021-22 2022-23
1 Short term (S)
120 70.54 70.54 70.54 0.00 0.00
2 Medium term (M)
76 96.07 96.07 49.34 46.73 0.00
3 Long term (L) 7 31.70 31.70 11.45 11.34 8.91
TOTAL 203 198.31 198.31 131.33 58.07 8.91
13
The district wise abstract of total schemes along with their requirement of funds is given in
Annexure 4.1. (Pg. no. 50).
Further details of these schemes are given at Annexure 4.2 (Pg. no. 51) Haryana State
Drought Relief and Flood Control Board is requested to kindly consider these schemes for approval
and schemes will be taken up as per availability of funds during financial year 2020-21 and thereafter.
All these schemes shall be taken up under State Plan Head 4711-Flood Control & Drainage
14
ITEM No.5
Review of Schemes of Irrigation and Water Resources Department ongoing prior to
51st Meeting of HSDR&FCB under head 4711 – Flood Control & Drainage
During the 50th Meeting of Haryana State Flood Control Board, 111 On-Going
Schemes and 165 New Schemes under head 4711-Flood Control & Drainage were
reviewed and approved. With the best efforts of the department, 164 schemes have been
completed during the year (details at Annexure-5.1, Pg. no. 66). Further, 11 schemes
approved in the 50th Meeting which could not executed due to various administrative and
technical reasons are proposed to be dropped from the list of ongoing schemes (details at
Annexure-5.2, Pg. no. 91).
Apart from this, the department however, intends to continue with remaining 101
schemes (Abstract at Annexure 5.3, Pg. no. 95 and details at Annexure 5.4, Pg. no. 96)
actually in progress or yet to start earlier approved and the funds to the tune of ₹ 258.83
Cr. are required to complete these schemes during the next three financial years as
detailed below.
Further, these schemes have also been reprioritized and identified as short term, medium term and long term schemes keeping in view their urgency of completion before
the flood season. The abstract of schemes so worked out is as under:-
Table no. 5 ₹In Crore
Sr. No
Type of Schemes
No. of Schemes
Revised Cost
Expenditure Requirement of funds
Total 2020-21 2021-22 2022-23
1 Short Term
21 62.55 23.74 38.81 38.81 0.00 0.00
2 Medium
Term 63 123.19 31.43 91.76 45.88 45.88 0.00
3 Long Term
17 73.09 0.03 73.06 24.84 24.11 24.11
4 Total 101 258.83 55.20 203.63 109.53 69.99 24.11
Haryana State Drought Relief &Flood Control Board is requested to consider the approval of these schemes. The schemes will be taken up on priority as per availability of
funds during 2020-21 and thereafter.
15
Item No. 6
Sr.
No.
Name of District Name of
Circle
Name of Scheme Status Remarks
1 AMBALA SYL CIRCLE
AMBALA
Constructing Retaining wall in the side
of three Nos. Air field drain in front of
King Fisher Resort Ambala City
(Deposit Work of Haryana Tourism
Corporation ) (120.00 Lakh)
Yet to Start Rs. 20.00 lac have been deposited
by Haryana Tourism. Balance
amount should be deposited soon.
2 HISSAR BWS
CIRCLE
HISAR
CONSTRUCTION OF SATROD
MIRKA DRAIN RD 0 TO 6450 AND
DABRA LINK DRAIN RD 0 TO
7525(DEPOSITE WORK OF HUDA).
In Progress Expenditure incurred = 6.57 Cr.
HSVP deposited Rs. 6.00 Cr.
Balance funds still required to be
deposited by HSVP is Rs. 5.03 Cr.
3 Kurukshetra SYL CIRCLE
AMBALA
Constg. of RCC rectangular open
drain of size 5.50`X2.75` parallel to
Saraswati Creak for sewerage water
disposal work Sector-13, U.E.
Kurukshetra and 7` X3.50` from Public
Health STP point to siphon Narwana
Branch,Jyotisar. Funds are to be
provided by HUDA and PHED.
Completed Work Completed
4 Gurugram CONSTRUC
TION
CIRCLE
GURGAON
Construction of RCC open Trough for
channelisation of Badshahpur Drain K
to L (Dhankot road to Njafgarh Drain)
Dropped Work proposed to be dropped as
funds not provided by HSVP.
5 BAHADURGARH YWS
CIRCLE
ROHTAK
Increasing capacity of Sarai
Aurangabad Kassar Link Drain from
RD 0 to 34052 out falling into KCB
Drain at RD 8103-L including its
extension and Sump Well Pump
House. Amounting 404.18 Lac.
(HSIIDC share 202.09 lacs and HSVP
share 202.09 lacs).
Yet to Start HSIIDC was required to deposit
202.09 lacs but the requests have
been turned down. However the
HSVP has agreed to submit an
amount of Rs. 146.68 lac. The
Balance amount of Rs. 8.80 cr. still
pending from HSVP.
6 PANIPAT YWS
CIRCLE
KARNAL
Providing lining and railing of panipat
drain from RD 55673-27000. total cost
of the scheme RS. 37.80 crore fund is
to be provided by HSVP.
Completed Balance amounting to Rs. 8.80 Cr.
is still pending from HSVP.
7 PANIPAT YWS
CIRCLE
KARNAL
Remodelling of panipat drain by
providing lining and replacing of pucca
structure from RD 55673 to 64400
(phase-2 costing rs. 13.55 crore).
Dropped Funds still not deposited by ULB.
Scheme proposed to be dropped.
8 FARIDABAD YWS
CIRCLE
FARIDABAD
PROVIDING LINING OF GAUNCHI
DRAIN FROM RD 0-15534. TOTAL
COST OF THE PROJECT RS. 1510.0
LACS BEING SHARED BY HUDA
MUNICIPAL CORP.
FARIDABADD,URBAN LOCAL
BODIES, IRRIGATION
DEPARTMENT . AMOUNT SHARED
BY VARIOUS DEPARTMENTS.
HUDA 250.00 LACS, MCF-255.00
Completed The work is completed
Review of On-Going and New Schemes of Irrigation and Water Resources
Department under head- 8443-Irrigation Department Deposit Works.
During the 50th
meeting of HSDR&FCB 08 no. schemes under Deposit Head were approved; the brief
status of the same is as under:-
02 no. schemes are yet to start due to non-submission of required funds from the departments HSVP,
Haryana Tourism. Apart from this 01 no. scheme is in progress in district Hisar but could not be
completed due to pending funds from the department HSVP, therefore the Board is requested to
allow to complete this scheme from the funds allotted under State Plan-4711 head till the funds are
received from HSVP, however in case of Sarai Aurngabad Kasar Link Drain no fund has been
deposited till date from HSIIDC and HSVP in spite of several requests made to these departments,
hence the Board may allow the department to drop this scheme in case the requisite funds are not
received in FY-2020-21. A total sum of Rs. 37.69 Cr. is pending from these departments and the
detail is given in the table on next page:-
16
(Rs. In Cr.)
Sr. No.Name of
DepartmentName of Work
Amount not
deposited
1Haryana
Tourism
Cosnt. Retaining wall in front of King
Fisher Resort, Ambala1.00
2 HSVP
Satrod Mirka Drain, Hisar+ Sarai
Aurangabad of Kassar Link Drain,+
lining & railing of Panipat Drain
5.00+0.55+8
.80 =
(14.33)
3 HSIIDC Sarai Aurangabad Kassar Link Drain 2.03
4 ULB Remodelling of Panipat Drain. 20.31
G.Total 37.69
17
ITEM NO. 7
Review Position of Funds for Irrigation and Water Resources Department under head 4711-
Flood Control & Drainage
As per details given in Item No. 4 and 5, Irrigation and Water Resources Department
has proposed 203 New Schemes and intends to continue 101 Ongoing Schemes costing ₹ 198.31
crore and ₹ 258.83 crore (amount required for balance work) respectively under head 4711-
Flood Control & Drainage.
Now the department has made an exercise by prioritizing the schemes by identifying
the period of completion i.e. the works proposed to be completed by 30.06.2020 are taken as short
term, the works proposed to be completed by 30.06.2021 are taken as medium term; the works
proposed to be completed by 30.06.2022 are taken as long term.
Accordingly, requirement of funds for these schemes has been worked out is as under:- Table-I: Requirement of funds: (₹in crore)
Schemes Type of
Schemes No. of
Schemes Estimated
Cost Expenditure
Requirement of funds
Total 2020-
21 2021-22 2022-23
Ongoing (In
Progress & Yet To be
Start)
Short term (S)
21 62.55 23.74 38.81 38.81 0.00 0.00
Medium term (M)
63 123.19 31.43 91.76 45.88 45.88 0.00
Long term (L)
17 73.09 0.03 73.06 24.84 24.11 24.11
Total 101 258.83 55.20 203.63 109.53 69.99 24.11
New Schemes
Short term (S)
120 70.54 0.00 70.54 70.54 0.00 0.00
Medium term (M)
76 96.07 0.00 96.07 49.34 46.73 0.00
Long term (L)
7 31.70 0.00 31.7 11.45 11.34 8.91
Total 203 198.31 0.00 198.31 131.33 58.07 8.91
Grand Total
Short term (S)
141 133.09 23.74 109.35 109.35 0.00 0.00
Medium term (M)
139 219.26 31.43 187.83 95.22 92.61 0.00
Long term (L)
24 104.79 0.03 104.76 36.29 35.45 33.02
Total 304 457.14 55.20 401.94 240.86 128.06 33.02
18
During the FY 2019-20, Finance Department has allocated only Rs 120.00 Cr. in original
budget estimate and additional amount of Rs. 30 Cr. was allocated during 1st Supplementary, as
such total available budget till date is Rs. 150 Cr. against which Rs. 130.00 Cr. has already been
utilized upto 30.11.2019 for completion of various flood schemes. The work on some ongoing
schemes is in progress and the remaining are yet to be taken up. Accordingly, budget position so
worked out is as under:-
Table-II: Budget Position (₹in crore)
Ongoing Schemes
New Schemes
Total Requirement
Budget Available (Rs. In Cr.)
Funds Required in 2019-20
40.00 0.00 40.00 20.00
Funds required in 2020-21
69.53 131.33 200.86
150.00 (Tentative,
however same shall be
approved in budget
session-2020)
Total 109.53 131.33 240.86
170.00
The additional budget shall be demanded from the Planning/Finance Department under 1st &
2nd supplementary after observing the pace of actual execution of work and the expenditure incurred
during FY 2020-21.
19
ITEM NO.8
AGENDA OF PUBLIC HEALTH ENGINEERING DEPARTMENT FOR
THE HARYANA STATE DROUGHT RELIEF & FLOOD CONTROL
BOARD.
Agenda for the Drought Relief and Flood Control Board Meeting
A) New proposals Description No. of Schemes
Total number of scheme
proposed
02 Annexure-A
Total cost Rs.2733.13 lacs Annexure-A
B) Revised Cost Schemes Description No. of Schemes
Total number of schemes
to be revised
01 Annexure-B
Total cost Rs.189.00 lacs to
Rs. 306.32 lacs
Annexure-B
C) Status of Schemes Description No. of Schemes
Total No. of approved Schemes 23
No. of completed schemes 05 Annexure-C
No. of Ongoing Schemes 18 Annexure-D
D) Funds required for the financial year 2020-21 Rs. 16.02 Crore (at
Annexure A, B & D) (for ongoing & upcoming project).
E) Physical Progress of the ongoing schemes is attached (at Annexure-E)
20
Sr. No.
Name of Circle
Name of Work Estimate Cost
2020-21 2021-22 2022-23
1 Hisar Rough cost estimate for shifting of existing storm water drain on Bagla road required due to land acquisition by HSVP Hisar at existing site of storm water drain in Sector-33 HISAR
1456.00 550.00 600.00 306.00
2 Rohtak Laying of rising main Dl pipeline from HUDA complex and Sandasar disposal to Public Health Carrier Channel near second water works, Jhajjar road Rohtak under CM Announcement No. 24985 dt. 19.02.2019
1198.00 600.00 400.00 198.00
Grand Total 2654.00 1150.00 1000.00 504.00
Annexure A (For upcoming project under Head Urban 4711 Flood)All Amount Rs. In Lacs
Requirement of fund
21
Sr. No.
Name of Circle
Name of Work Estimate Cost
2020-21 2021-22 2022-23
1 Palwal Hodal - Proportionate cost for SWD system by constructing RCC box drain along NH-2 [21/06/2018] -[10/01/2019]-[30/06/2020]
189.00 to 306.32 117.00
Grand Total 306.32 117.00 0.00 0.00
Annexure B (For revised cost schemes under Head Urban 4711 Flood)
All Amount Rs. In LacsRequirement of fund
22
Name of Work/Adm Approval Date/Start Dt./Work Closure Dt
status Adm. App.Amt(Tech.
San.Amt)
Exp Upto31/03/2019
Funds During 19- 20
Exp. during
November2019
Hisar CircleHisar PHED No. 3Hisar - Estimate for remodelling of existing storm water drain of old city area and arrangement of DG set at Hisar[27/05/2016] -[01/12/2016]-[30/09/2019]
Closed20/08/2019
280.00(280.00)
279.84 0.16 0.00
Division Total 280.00 279.84 0.16 0.00Circle Total 280.00 279.84 0.16 0.00
Kaithal CircleKaithal PHED No. 1Kaithal - Remodelling of Katcha Manas Drain from RD 10075 to RD 19164 passing through Kaithal Town(Deposit Work)[Revised dt.-27/04/2017][03/05/2014] -[03/08/2014]-[31/03/2019]
Closed14/05/2019
715.00 733.57 0.00 0.00
Division Total 715.00 733.57 0.00 0.00Kurukshetra PHEDKurukshetra - Estimate for construction of RCC Box type drain from Jai Bharti School onward at Kurukshetra town.[27/04/2017] -[10/08/2017]-[30/09/2019]
Closed05/11/2019
134.31(100.35)
93.39 26.91 0.00
Division Total 134.31 93.39 26.91 0.00Circle Total 849.31 826.96 26.91 0.00
Hisar CircleHansi PHEDNarnaund - Rough cost est. construction of storm water disposal near Hisar major distry. covering Ward 4,6and7 [26/04/2018] -[]-[31/10/2019]
Closed13/12/2019
73.25 45.62 23.82 0.00
Division Total 73.25 45.62 23.82 0.00
Circle Total 73.25 45.62 23.82 0.00
Narnaul CircleNarnaul PHED No. 2Narnaul - Est.for prov.,lowering of RCC pipe class NP3 to drain out the storm water in various mohalla of NNL Town(CM Announcement)[26/04/2016] -[09/02/2017]-[30/09/2019]
Closed13/12/2019
209.35 172.67 0.00 0.00
Division Total 209.35 172.67 0.00 0.00
Circle Total 209.35 172.67 0.00 0.00
Grand Total 1411.91 1325.09 50.89 0.00
172.67
4
ANNEXURE CAll Amt. Rs. in Lacs
45.62
Rural/Urban : UrbanProgram Name: Urban 4711 Flood ,
Expenditure upto 30/11/2019Selection of Report : Closed Works
Administrative Approval Date: From 06/06/1995 To 12/12/2019
45.620.00
16.90 1342.00
0.00
0.00
172.670.00
0.00 172.67
5
16.90 843.87
0.00 733.57
3 16.90 110.29
16.90 110.29
2 0.00 733.57
279.840.00 279.84
Sr.No
Exp. During 19- 20
Cumulative Exp.Upto November
2019
0.00 45.62
1 0.00 279.84
0.00
23
Name of Work/Adm Approval Date/Start Dt./Work Closure Dt
status Adm. App.Amt(Tech.
San.Amt)
Exp Upto31/03/201
9
Funds During 19- 20
Exp. during
Nov2019
Likely expenditure upto 31.03.2020
Funds demand for year 2020-21
Ambala CircleAmbala City PHEDAmbala City - Construction of Nala along G.T. Road from Kalka chowk to Banuri Nakka extension (RD 205.9 Km to 211.46 Km)[Revised dt.-27/04/2017][21/03/2012] -[23/12/2013]-[30/09/2019]
In Progress 1093.62(1093.62)
746.33 120.00 0.00 746.33 200.00
Ambala City town- Estimate for construction of RCC covered storm water drain (Box Type) at Kalka Chowk area along HN-1(Vidhan Sabha Matter)[26/04/2016] -[21/07/2016]-[30/09/2019]
In Progress 619.30(619.30)
582.77 30.91 0.00 613.63
Division Total 1712.92 1329.10 150.91 0.00 1359.96 200.00Ambala PHEDAmbala Sadar - Laying of 800mm dia RCC storm water drainage extended pipe upto Mahesh Nagar drain for improvement drain[06/03/2019] -[]-[30/09/2020]
In Progress 52.45 0.00 50.00 0.00 50.00
Division Total 52.45 0.00 50.00 0.00 50.00Circle Total 1765.37 1329.10 200.91 0.00 1409.96 200.00
Bhiwani CircleBhiwani PHED No. 1Bhiwani - Est. for providing 5 No. subsidiary pumping station for disposal of storm of various low lying area[30/06/2017] -[17/11/2017]-[30/06/2020]
In Progress 693.90 692.81 1.09 0.00 693.90
Bhiwani : Estimate for providing storm water drainage system including road gullies, intercepting manholes [27/05/2016] -[]-[30/09/2019]
In Progress 298.00 176.40 121.10 5.58 247.50
Division Total 991.90 869.21 122.19 5.58 941.40Siwani PHEDSiwani - Prov. storm water drainage system for dewatering nearby Ladwani Pond at Parshuram Chowk Distt. Bhiwani[26/04/2018] -[01/06/2019]-[30/04/2020]
In Progress 227.00(227.00)
147.62 55.00 0.00 157.62
Division Total 227.00 147.62 55.00 0.00 157.62Circle Total 1218.90 1016.83 177.19 0.00 1099.02
Hisar CircleHansi PHEDHansi - Rough Cost Estimate for providing storm water drainage for Yati Nagar and surrounding area Hansi town[27/04/2017] -[10/01/2019]-[30/09/2019]
In Progress 45.00 23.31 0.00 0.00 45.00
Circle Total 45.00 23.31 0.00 0.00 45.0015.70 39.01
7 15.70 39.01
13.25 1030.07
6 4.42 152.04
4.42 152.04
8.83 878.03
4 0.00 692.81
5 8.83 185.23
0.00 0.0020.85 1349.95
3 0.00 0.00
2 20.85 603.63
20.85 1349.95
1 0.00 746.33
Cumulative Exp.
Upto Nov 2019
All Amt. Rs. in Lacs
Annexure D (Ongoing schemes under Head Urban 4711 Flood)
Sr.No
Exp. During 19- 20
24
Name of Work/Adm Approval Date/Start Dt./Work Closure Dt
status Adm. App.Amt(Tech.
San.Amt)
Exp Upto31/03/201
9
Funds During 19- 20
Exp. during
Nov2019
Likely expenditure upto 31.03.2020
Funds demand for year 2020-21
Cumulative Exp.
Upto Nov 2019
All Amt. Rs. in Lacs
Annexure D (Ongoing schemes under Head Urban 4711 Flood)
Sr.No
Exp. During 19- 20
Jhajjar CircleJhajjar PHED No. 1Beri - Laying of 600 mm i/d DI rising main for Storm Water Disposal No.1 Point A to Drain No.8 [26/04/2018] -[03/09/2018]-[30/09/2019]
In Progress 31.15 26.49 4.66 0.00 31.15
Circle Total 31.15 26.49 4.66 0.00 31.15
Kaithal CircleKaithal PHED No. 1Pundri - Upgradation of storm water system Pundri Town (under CM announcement No. 10321)(CM Announcement)[Revised dt.-21/06/2018][30/11/2015] -[11/08/2016]-[30/09/2019]
In Progress 513.10 307.79 120.00 0.00 477.79 35.00
Supplementary estimate for remodelling of Katcha Manas drain from Cheek road near Birpati Kund to Kaithal drain Balance [11/09/2019] -[15/09/2019]-[30/09/2021]
In Progress 75.82 0.00 75.82 0.00 75.00
Division Total 588.92 307.79 195.82 0.00 552.79 35.00Circle Total 588.92 307.79 195.82 0.00 552.79 35.00
Palwal CirclePalwal PHED No. 3Hodal - Proportionate cost for SWD system by constructing RCC box drain along NH-2 [21/06/2018] -[10/01/2019]-[30/06/2020]
In Progress 189.00(189.00)
0.00 189.00 63.20 189.00 117.00
Hodel-Providing storm water drainage system by constructing RCC drain[03/12/2016] -[21/04/2017]-[30/09/2019]
In Progress 418.00(418.00)
305.22 58.84 11.26 418.00
Palwal-Remodeling of existing storm water drain and construction of additional RCC box type drain for storm water system(CM Announcement)[22/07/2016] -[15/12/2016]-[30/09/2019]
In Progress 242.50(242.50)
101.58 66.14 0.00 242.00
Division Total 849.50 406.79 313.98 74.45 849.00 120.00Circle Total 849.50 406.79 313.98 74.45 849.00 120.00
Rewari CircleRewari PHED No. 1Rewari - To provide storm water drainage scheme for balance existing drain/ Nallah from Bawal road to Garhi Bolani road(CM Announcement)[13/01/2016] -[01/05/2016]-[30/09/2019]
In Progress 305.82(305.82)
154.07 80.22 43.36 260.10
Division Total 305.82 154.07 80.22 43.36 260.10Circle Total 305.82 154.07 80.22 43.36 260.1071.77 225.83
14 71.77 225.83
71.77 225.83
309.28 716.07309.28 716.07
12 83.08 388.29
13 45.99 147.56
11 180.22 180.22
55.82 363.61
10 19.37 19.37
55.82 363.61
9 36.45 344.24
0.00 26.49
8 0.00 26.49
25
Name of Work/Adm Approval Date/Start Dt./Work Closure Dt
status Adm. App.Amt(Tech.
San.Amt)
Exp Upto31/03/201
9
Funds During 19- 20
Exp. during
Nov2019
Likely expenditure upto 31.03.2020
Funds demand for year 2020-21
Cumulative Exp.
Upto Nov 2019
All Amt. Rs. in Lacs
Annexure D (Ongoing schemes under Head Urban 4711 Flood)
Sr.No
Exp. During 19- 20
Rohtak CircleRohtak PHED No. 3Rohtak – Providing storm water drainage system parallel to Sonipat road from culvert Sector-3 to Sector-4 [27/04/2017] -[29/03/2018]-[30/09/2019]
In Progress 356.60(356.60)
30.86 40.00 0.00 40.86
Rohtak – Rehabilitation for storm water RCC carrier channel Hisar road and connecting to drain No.8.[27/04/2017] -[10/02/2018]-[30/09/2019]
In Progress 382.22(382.22)
338.30 43.92 0.00 367.22
Rohtak - Special repair and desilting of 64` i/d storm water line from PHED office to 2nd disposal Jhajjar road[26/04/2018] -[28/06/2018]-[30/04/2020]
In Progress 98.50(98.50)
29.09 48.80 0.00 57.09
Division Total 837.32 398.25 132.72 0.00 465.17Circle Total 837.32 398.25 132.72 0.00 465.17
Sonipat CircleSonipat PHED No. 2Ganaur - Providing Storm Water Drainage System[24/11/2011] -[18/01/2012]-[30/09/2019]
In Progress 1785.00 1171.40 70.00 0.00 1221.8 100.00
Division Total 1785.00 1171.40 70.00 0.00 100.00Circle Total 1785.00 1171.40 70.00 0.00 1221.8 100.00Grand Total 7426.98 4834.03 1095.28 123.39 6078.23 452.00517.14 5351.17
0.40 1171.800.40 1171.80
18 0.40 1171.80
30.07 428.3230.07 428.32
16 15.11 353.41
17 10.21 39.30
15 4.76 35.61
26
ANNEXURE-E
Physical progress of ongoing works for Flood Works
SN Name of work/ Adm approval date
Estt. Cost Upto date expenditure
Physical scope of work as per estimate
Latest Status Likely date of completion
PHE Circle Ambala 1. PHED Ambala City
Ambala City - Construction of Nala along G.T. Road from Kalka chowk to Banuri Nakka extension (RD 205.9 Km to 211.46 Km)[Revised dt.-27/04/2017][21/03/2012] -[23/12/2013]-[30/09/2019]
1093.62 )1093.62(
746.33 Phase-1st 31.12.2020 Work could not be completed due to late clearance from Forest Deptt. In June, 2018, thereafter due to monsoon season. Also due to construction of fly over, the proposal needs to be changed and now instead of Open Drain, HDEP pipe is proposed for which proposal is under preparation.
Construction of drain 1400 mtr
Work Completed
Laying of RCC pipe 2000 Mtr.
Work Completed
Phase-2nd Construction of Drain 8’x4’ = 2165 Mtr.
Construction of Drain 8’x4’ = 350 Mtr. (Balance = 1815)
2. Ambala City town- Estimate for construction of RCC covered storm water drain (Box Type) at Kalka Chowk area along HN-1(Vidhan Sabha Matter)[26/04/2016] -[21/07/2016]-[30/09/2019]
619.30 )619.30(
603.63 RCC Storm Water Drain Size 2’-0” x 2’-0”
400 Mtr. Laid and commissioned with other existing drain.
31.3.2020
600 mm DI pipe alongwith 900mm M.S. pipe 12 mm thick
Work completed.
Const. of sump well of size 2.00Mtr. x 2.00Mtr.
Work completed
RCC Storm Water Drain 2’ – 6” x 1’-6”
Work completed
700mm i/d RCC pipe drain
1110 Mtr. RCC pipe drain laid (Work
27
SN Name of work/ Adm approval date
Estt. Cost Upto date expenditure
Physical scope of work as per estimate
Latest Status Likely date of completion
Completed) 1000mm i/d RCC pipe Drain
550 Mtr. Pipes laid. (Work Completed)
Const. of RCC Circular collecting tank of 8.50 mtr. Dia
Work completed
Const. of Screening chamber of size 2.50x1.80x2.65 mtr.
95% work completed
Const. of pump chamber of size 10` x 12`
Work completed
Cosnt. of boundary wall and laying of Distribution system
75 % work completed
PHED, AmbalaCantt 3. Ambala Sadar - Laying of
800mm dia RCC Storm Water Drainage extended pipe upto Mahesh Nagar drain for improvement drain.
52.45 0 Laying of 800mm RCC NP-3 Storm
Water pipe line = 1000mm
The work was allotted the agency during the month of 07/2019. During execution of work, there arises dispute by public. However, the RCC pipe have been arranged by agency at site. Now the execution work has been re-started and will be completed by 28.02.2020
31.03.2020
Bhiwani Circle Bhiwani PHED No.1
4. Bhiwani- Estimate for providing 5 No. subsidiary pumping station for disposal of strom of various low lying area
693.90
692.81
Pumping station for disposal - 5 No. RCC box type drain 0.76 M x 0.16 M
Work completed except rising main connection is pending near ROB Loharu Road
28.02.2020
28
SN Name of work/ Adm approval date
Estt. Cost Upto date expenditure
Physical scope of work as per estimate
Latest Status Likely date of completion
150 mtr. RCC tank 18’ dia - 1 No. Pumping machinery - 2 No. RCC box type drain 0.76 M x 0.16 M - 300 mtr. RCC tank 18’ dia - 1 No. Pumping machinery - 2 No. RCC box type drain 0.76 M x 0.16 M - 350 mtr. RCC tank 18’ dia - 1 No. Pumping machinery - 2 No. RCC box type drain 0.76 M x 0.16 M- 100 mtr. RCC tank 18’ dia – 1 No. Pumping machinery 2 No. RCC box type drain 0.76 M x 0.16 M – 92 mtr. RCC box type drain 0.76 M x 0.16 M- 92 mtr. RCC tank 24’ dia – 1 No. Pumping machinery – 2 No.
with existing 600mm dia pipe
5. Bhiwani: Estimate for providing storm water drainage system including road gullies, intercepting manholes (27/05/2016)-(1-(30/09/2019)
298.00
185.23
Cost. Of type drain 3200 mtr. 230 mtr. RCC NP-3 pipe 600 mm
86% work completed
50% work completed
31.03.2020
29
SN Name of work/ Adm approval date
Estt. Cost Upto date expenditure
Physical scope of work as per estimate
Latest Status Likely date of completion
Siwani PHED 6. Siwani - Prov. storm
water drainage system for dewatering nearby Ladwani Pond at Parshuram Chowk Distt. Bhiwani[26/04/2018] -[01/06/2019]-[30/04/2020]
227.00 152.04 Pump Chamber -1 No. Collecting Tank-1 No. Screen Chamber-1 No. Open Drain-600 Rft. Boundary Wall-400 Rft P/Machinery-2 No. 450 mm i/d D.I. Piipe-2500 MTr.
Pump Chamber -0% Collecting Tank-40% Screen Chamber-0% Open Drain-90% Boundary Wall-0% P/Machinery-0% 450 mm i/d D.I. Piipe-90%
31.03.2020
PHE Circle Hisar PHED Hansi
7. Hansi - Rough Cost Estimate for providing storm water drainage for Yati Nagar and surrounding area Hansi town [27/04/2017]
45.00 39.01 Const. of Disposal, P/M, DI pipes etc.
90% work completed
31.03.2020
Jhajjar Circle Jhajjar PHED No.1
8. Beri – Laying of 600 mm i/d DI rising main for Storm Water Disposal No.1 Point A to Drain No.8 [26/04/2018] – [30/04/2019--]
31.15 26.49 Rising main = 600 mm
285 mtr
250 mtr. 31.12.2019
Kaithal Circle Kaithal PHED No.1
9. Pundri - Upgradation of storm water system Pundri Town (under CM announcement No. 10321)(CM Announcement) [Revised dt.-21/06/2018][30/11/2015] -[11/08/2016]-[30/09/2019]
513.10 344.24 Sub Head No. 1 :- Storm Water Drainage from PHC-Kaithli Gate - Baraat Ghar -Existing Disposal works
30.06.2020 Land not available for IPS/MPS. As per report of SE Kaithal the matter has been taken up with MLA Pundri and will be resolved shortly.
350 mm i/d RCC pipe = 920 mtr
920 Mtr
500 mm i/d RCC pipe = 800 mtr
800 mtr
250 mm i/d SW = 520 mtr
520 mtr
Sub Head No.
30
SN Name of work/ Adm approval date
Estt. Cost Upto date expenditure
Physical scope of work as per estimate
Latest Status Likely date of completion
2 :- 600 mm DI Rising main & RCC NP3 Gravity pipe from Junction point to Pumping Station near Drain 600 mm i/d DI pipe = 1000 mtr
1000 mtr
1000 mm i/d RCC pipe = 1600 mtr
1600 mtr
Const. of RCC pillars NP3 = 650 No.
-
Sub Head No. 3 :- Pumping Station Near Cranation Ground
Construction of RCC collecting tank size 10.50 m x 2.50 mtr = 1 No.
100% work completed
Non clog Sewage submetsible sewage pump set = 4 Nos. 11000 LPM Head- 15 M (65 HP)
100% work completed
1 No. Gen. Set = 85.50 KVA
-
1 No. Independent Feeder
-
1 No. Pump Chamber of size 3.05 x 4.57 m
100% work completed
4 No. Panel Board
100% work completed
Pipe & specials 100% work completed
1 No. Staff Quarter 41 sqm
-
Const. of boundary wall = 300 mtr
100% work completed
600 mm i/d DI 100% work
31
SN Name of work/ Adm approval date
Estt. Cost Upto date expenditure
Physical scope of work as per estimate
Latest Status Likely date of completion
pipe = 30 mtr completed Sub Head No. 4 :- Pumping Station Near Pond
Construction of RCC collecting tank size 4.25 m x 2.50 mtr = 1 No.
DNIT under preparation
Non clog Sewage submetsible sewage pump set = 4 Nos. 1700 LPM Head- 15 M (10 HP) 1 No. Gen. Set = 20 KVA 1 No. Pump Chamber of size 3.05 x 4.57 m 4 No. Panel Board 1 No. Staff Quarter 41 sqm Const. of boundary wall = 200 mtr 400 mm i/d DI pipe = 1470 mtr
10. Supplementary estimate for remodelling of Katcha Manas drain from Cheek road near Birpati Kund to Kaithal drain Balance [11/09/2019] -[15/09/2019]-[30/09/2021]
75.82 19.37 Construction of balance work for RCC Pucca Manad drain Point E-F size 10'x7.50' = 2986 Rft
800 Rft 31.03.2020
Palwal Circle Palwal PHED No.3
32
SN Name of work/ Adm approval date
Estt. Cost Upto date expenditure
Physical scope of work as per estimate
Latest Status Likely date of completion
11. Hodal - Proportionate cost for SWD system by constructing RCC box drain along NH-2 [21/06/2018] -[]-[30/06/2020]
189.00 180.22 RCC box type drain against main estimate cost Rs.670.00 lacs. i)0.60 M x 0.75 m = 1000 M ii)0.90 M x 0.90 m = 1000 M iii)1.35 M x 1.00 m = 700 M iv)1.50 M x 1.00 m = 200 M v)2.00 M x 1.10 m = 1300 M vi)2.00 M x 1.10 m = 1570 M 5770 M
RCC box type drain against main estimate cost Rs.670.00 lacs. i)0.60 M x 0.75 m = -- ii)0.90 M x 0.90 m = -- iii)1.35 M x 1.00 m = -- iv)1.50 M x 1.00 m = -- v)2.00 M x 1.10 m = 1200 M vi)2.00 M x 1.10 m= 1550 M
30.06.2020 Due to estimate cost revised from Rs. 189.00 lacs to Rs. 306.32 lacs due to increase in quantities of RCC work and Steel work as per approved design from NIT Kurukshetra of the RCC Box Drain.
12. Hodel-Providing storm water drainage system by constructing RCC drain [03/12/2016] -[21/04/2017]-[30/09/2019]
418.00 388.30 (i) RCC box type drain=3100m. (ii) Cutting of road
(i) RCC box type drain = 3050m.
28.02.2020
13. Palwal-Remodeling of existing storm water drain and construction of additional RCC box type drain for storm water system (CM Announcement) [22/07/2016] -[15/12/2016]-[30/09/2019]
242.50 147.56 (i) New RCC box Drain. Size 0.90 M x 0.90 M=2300 M (ii) Raising of Drain = 1900 m.
Drain = 2100 M (ii) Raising of Drain = 850 m.
31.03.2020
Rewari Circle Rewari PHED No.1
14. Rewari - To provide storm water drainage scheme for balance existing drain/ Nallah from Bawal road to Garhi Bolani road(CM Announcement)[13/01/2016] -[30/06/2018]
305.82
225.83
(i) RCC box type drain 10’x3’ = 900 mtr.
870 mtr. drain constructed
28.02.2020
Rohtak Circle Rohtak PHED No.3
15. Rohtak – Providing storm water drainage system parallel to Sonipat road from
356.60 30.86 Construction of Disposal, Pumping Machinery,
The existing bricks storm water channel has
31.03.2020
33
SN Name of work/ Adm approval date
Estt. Cost Upto date expenditure
Physical scope of work as per estimate
Latest Status Likely date of completion
culvert Sector-3 to Sector-4 (27/04/2017)
Rising main 450mm, 582 mtr. Lengths, Const. of new RCC carrier channel (nallah)
been extended on the upstream side in a length of about 200 mtr. In addition a RCC pipe 400 mm storm water sewer has been laid in Ram Gopal Colony. Rest of the work could not be done due to non-availability of land by HSVP and the existing disposal of HSVP serve the purpose to take storm water.
16. Rohtak – Rehabilitation for storm water RCC carrier channel Hisar road and connecting to drain No.8.(27/04/2017)
382.22 338.30 Construction of Disposal, Pumping Machinery, Rising main 450mm, 980 mtr. Lengths, laying of RCC NP3 pipe line 700mm, 1615 Mtr. Lengths and construction of manholes
1. Disposal Constructed. 2. Pumping Machinery installation is in progress. 3. Rising main laid. 4. RCC NP3 Pipe laid. 5. Manholes Constructed.
31.03.2020
17. Rohtak - Special repair and desilting of 64` i/d storm water line from PHED office to 2nd disposal Jhajjar road (26/04/2018)
98.50 29.09 Repair and desilting of RCC NP2 64" i/d Storm Water line
50% work completed.
31.03.2020
Sonepat Circle Sonepat PHED No.2
34
SN Name of work/ Adm approval date
Estt. Cost Upto date expenditure
Physical scope of work as per estimate
Latest Status Likely date of completion
18. Ganaur - Providing Storm Water Drainage System[24/11/2011] -[18/01/2012]-[30/09/2019]
1785.00
1171.40 (i) RCC box type drain = 10 No. (ii) RCC collecting tank = 2 No. (iii) P/ Machinery = 4 No. (iv) R/ main 900 mm = 1500 mtr. (v) Railway crossing = LS
(i) Completed (ii) Not constructed (iii) Not installed (iv) Not laying (v) The railway crossing work recently completed
30.06.2020 Delayed due to railway crossing. DNIT of amounting Rs. 70.00 lacs (approx.) is under observation in circle office.
35
Annexure-1.1
Minutes of 50th
meeting of Haryana State Drought Relief & Flood Control Board
(HSDR&FCB) held on 15.01.2019 under the Chairmanship of Hon’ble Chief Minister,
Haryana.
The list of participants is at Annexure A.
The Additional Chief Secretary, Revenue & Disaster Management Department,
Haryana welcomed the Hon’ble Chief Minister, Hon’ble Finance minister, Haryana, and senior
officers in the meeting. All Divisional Commissioners, Deputy Commissioners and Senior officers of
I&WRD & PHED, who had joined in the meeting through video conference, were also welcomed.
ACS, Revenue apprised the Board about the discussions held in 48th
meeting of
Haryana State Technical Advisory Committee (HSTAC) held on 15.01.2019 in the forenoon session.
It was brought out that all the new schemes (except that of Jind Distt.) proposed for approval of the
Board were discussed in detail. She further told that 10 new schemes and 2 schemes of distt.
Yamunanagar with revised scope on the request of respective Deputy Commissioners were also
considered by HSTAC and same were circulated as recommendation of HSTAC as supplementary
agenda for consideration and approval of Board. (Supplementary agenda annexed as Annexure –B).
The Principal Secretary (Irrigation & Water Resources Department) welcomed the
Chairman and all the participants and further gave a brief account of the flood situation during 2018.
The PS/I&WRD also informed about the efficiency and benefits of the flood protection works
executed in previous years. The Engineer in Chief and Chief Engineer/LCU, IWRD briefed about the
success stories of dewatering and land reclamation after the execution of schemes in village Dighal in
District Jhajjar, Villages Shakkerpura and Singwa in District Hisar and he further stated that based on
the past experiences this year similar new dewatering schemes are proposed in villages Dighal and
Kondrawali.
Thereafter, discussions/deliberations on the agenda items were held. The record of
discussions and decisions are brought out as under:-
Item No. 1: No comments were received from any quarter. The minutes of 49th
meeting of
HSDR&FCB held on 19.03.2018 were confirmed.
Item No.2: Action Taken Report (ATR) was noted. Regarding Sr. no. 1 of (ATR), it was apprised
that work of 117 schemes has been completed whereas work on 57 schemes are under
progress. Furthermore, this year 15 schemes have been proposed to be dropped due to
non- availability of land and other technical issues. The Hon’ble Chief Minister asked
36
the district administration to create awareness among farmers/public regarding the
benefits of the schemes and the land holders must be encouraged to provide their land
voluntarily at collector’s rate. He further desired that land holders should not hesitate in
giving their land for flood protection works at collector rate.
On Sr. no. 2 regarding balance payment from Urban Local Bodies for the deposit
work of remodeling of Panipat Drain from Rd 55673 to 64400 (Phase-II) with estimated
cost of Rs 13.55 Crore, the Principal Secretary, ULB agreed to provide the funds at the
earliest.
On Sr. no. 3 regarding exploring the alternatives to reuse the water and not just
throwing into drain, it was informed that I&WRD has planned schemes for reutilization
of flood water in districts Jhajjar and Panipat in association with Haryana State
Pollution Control Board .
On Sr. no. 4 regarding preparations to face serious Heat Wave conditions in Year
2018; the ACS, Revenue stated that due to well-coordinated efforts with I&WRD &
PHED no causality or major damage occurred due to Heat wave in the State and no
drought conditions were reported last year.
On Sr. no. 5 regarding checking the quality of water before injecting into the
ground water recharge or bore wells, it was brought out that required instructions were
circulated to all concerned officers to ensure its compliance.
On Sr. no. 6 regarding monitoring the flood protection schemes by the District
Administration; the instructions regarding same were given to all concerned and the
committee was constituted to check the flood protection works.
Item No. 3: Flood report of Haryana for the year 2018 was noted. The PS/I&WRD pointed out that
despite the fact that the State experienced 10.10 % deficit rain fall during monsoon
2018, some districts have still faced water logging problem due to accumulation of rain
water in low laying fields & abadi area during the unprecedented rainfall of 22-23-24
September, 2018. The heavy rains during this period flooded about 2,30,000 acres,
resulting in damage of crops. However, well-coordinated efforts of officers of I.W.R.D
with Distt. Administration, the dewatering of fields were carried out efficiently. PS/
I&WRD further apprised that additional 245 pumps have been procured during 2018
and same were utilized for draining out the flood water in low lying areas timely and
efficiently. Further procurement of some additional pumps has been proposed in this
37
year also. Apart from this river Yamuna received more than 6 lac cusecs of discharge
which passed safely; however erosion of banks at few places along river were reported.
It was desired that district administration shall clear the bills of private operators
engaged for dewatering of fields at the earliest after arranging the funds from Revenue
Department. The Position of pumps and new inventory that was added this year with IWRD
were also discussed. The Chief Minister directed to compile and prepare a consolidated list of
all inventories available with all departments in Haryana and the compiled information may be
circulated to all concerned departments, for utilizing the same in case of occurrence of flood
like situation anywhere in state. As regard to payment of compensation (Kharaba) to farmers,
ACS Revenue informed that all the Deputy Commissioners have been directed to complete
survey associated with District Agricultural Officers within three days and send the report to
H.Q at the earliest. Further compensation to farmers shall be disbursed in association with
agriculture department.
Item No. 4: PS/I&WRD informed that HSTAC has recommended 153 schemes costing Rs. 152.77
Cr (cost later increased to Rs. 154.17 Crore) including supplementary schemes as
circulated as Annexure-B for approval of the Board. The Chief Minister, Haryana
directed that schemes pertaining to flood protection and drainage works only be
proposed to the Board. The 12 schemes of District Jind were not discussed due to
imposition of model code of conduct by Election Commission and the decision
regarding the same shall be taken separately. The Board authorized the Chairman to
consider the approval of schemes of Jind District on file after completion of election
process in District Jind.
The Chairman of the Board desired to know the actual reason behind lakhs of
acre of land becoming unfit for agricultural purpose in Ellenabad in District Sirsa, The
Deputy Commissioner Sirsa explained that this problem has occurred due to the rise in
Ground Water Table in that region. The Addl. Chief Secretary, Agriculture added that to
know the root cause and solution thereof, the manual mapping of the area has been done
and the work to digitalize the same is in progress. However, a comprehensive solution
in consultation with the experts shall also be proposed very soon.
The Deputy Commissioner Bhiwani pointed out that 02 schemes are proposed to
be dropped as the land owners refused to provide their land for execution of flood
protection scheme. The Chairman directed that merely dropping the schemes should not
be the intention but the affected people must also be persuaded to provide their land
38
where urgent flood protection schemes are required or otherwise the officers must
provide an alternative solution to overcome the existing problem.
The Finance Minister also pointed out that district administration must ensure
that the culverts on National Highway should never be blocked; rather any obstruction
to the flow of water must be removed immediately.
The Deputy Commissioner Yamunanagar briefed to the Chairman that high flood
discharge was received in river Yamuna in 2018 which affected various villages along
river Yamuna. The agendas to protect these villages have been incorporated in this
year’s proposals. However due to paucity of funds, the scheme proposed in the agenda
to protect village Odri is inadequate; and the Board was requested to allow to increase
the scope of work in district Yamunanagar at Sr. no.142 page no. 55 of main agenda as
mentioned below:-
“Agenda for construction of 1855 ft stone steining & 06 stone studs for the
protection of village Odri from River Yamuna amounting to Rs. 195 Lacs (against the
initial cost Rs.55.03 Lacs)”
Finally, after detailed deliberations, 153 schemes amounting to Rs. 154.17
Crore were approved by the Board.
Item No.5: The Principal Secretary (I&WRD) briefed the Board regarding the status of on-going
schemes which were approved during 49th
meeting of Haryana State Drought Relief &
Flood Control Board held on 19.03.2018. It was informed that a total of 111 schemes
with balance requirement of funds of Rs.148.12 Crore were discussed in the 48th
meeting of HSTAC in the noon session and proposed to be carried forward for FY
2019-20 and thereafter. However, 15 schemes, approved in previous Board meetings
were proposed to be dropped on account of unavailability of land and various
administrative and technical reasons. Thence, 111 no. ongoing schemes with balance
requirement of Rs. 216.34 Cr. for the next 03 financial years were also noted by the
Board for continuation.
Item No.6: The PS/(I&WRD) informed the Board that 07 schemes approved in previous Board
meetings under Deposit Head could not be taken up as the balance amount of Rs 79.84
Cr. is still pending with Haryana Urban Development Authority (HUDA) now HSVP,
Municipal Corporation Panipat, Municipal Corporation Faridabad and HSIIDC. The
39
Principal Secretary, Town and Country Planning expressed his inability to provide the
funds in view of the financial constraints of the Authority. However, during the last
meeting it was decided that Irrigation & Water resources Department may clear the
liability of contractors to avoid litigation. The I&WRD had cleared the liability from its
own resources after approval from Hon’ble Chief Minister, Haryana, but the pending
funds are yet to be deposited by the departments to reconcile the accounts to avoid any
audit objection. The PS/Town & Country Planning and PS, Urban Local Bodies agreed
to clear the current liability at the earliest.
Item No. 7: It was informed by Principal Secretary (I&WRD) that during the FY 2018-19, Finance
Department had allocated Rs 120.00 Crore in original budget estimate and out of that,
Rs. 66.00 Crore has already been spent so far on various flood protection schemes.
Further, the total requirement of budget for the financial year 2019-20 is as under:-
Sr.
No.
Schemes Amount required during 2019-20
(Rs. in Cr.)
1. New schemes (153) 154.17
2. Ongoing schemes (111) 148.11
Total 309.48
(*12 new schemes amounting to Rs. 15.69 Cr. in Distt Jind shall be taken up Separately after the
culmination of model code of conduct)
Accordingly ACS, Finance was requested to allocate additional budget under
head 4711-Flood Control & Drainage, so that Department is able to complete the
maximum number of schemes on priority basis during the Financial Year 2019-20. The
ACS, Finance brought out that allocation of budget of Rs. 309.48 Crore during
Financial Year 2019-20 is subject to availability of funds. Initially, the budget of about
Rs. 125.00 Cr. would be allocated for 2019-20. However, he assured that the
requirement of additional funds, if any, will be reviewed at the time of supplementary
budget as per performance of the department.
The PS/I&WRD requested that as per the previous practice, the works approved
by the Board, should be exempted from taking administrative approval of individual
works and the concerned officers shall be allowed to take up approved flood works
immediately without any further delay.
40
After deliberations, it was decided that I&WRD & PHED may start the
works immediately as approval of the Board is de facto administrative approval.
However regarding technical sanction of individual works, the same may be taken from
the respective competent authorities, as the case may be.
Item No.8: The Principal Secretary, Public Health Engineering Department briefed about the Status
of Schemes completed during 2018-19, on-going schemes and funds required to
complete the ongoing works during 2019-20. Out of total 36 schemes approved, 13
schemes were completed during 2018-19 and 23 schemes were reported as in progress.
To complete these 23 ongoing schemes, funds to the tune of Rs.2000.00 lacs are
required during 2019-20.
The Board approved the proposal of Public Health Engineering Department.
Additional Discussions:-
1. The Chairman of the Board, Hon’ble Chief Minister also directed the Irrigation and
Water Resources Department to start the internal clearance and desilting of drains well
before the monsoon and district administration shall provide MNREGA labour to the
department for clearance of drains timely. I&WRD shall utilize the maximum funds
available under MNREGA for clearance of drains and canals. District Administration
and Irrigation Department shall certify that all the drains have been cleared as per
requirement before 15th
May 2019 to the Revenue and Irrigation Department
respectively.
2. The Chairman of the Board mentioned that the schemes for construction of new bridges
on rivers/rivulets must be taken up separately by the PWD (B&R) or Marketing Board
as the case may be, and that such schemes should not be proposed before the
HSDR&FCB.
The Hon’ble Chief Minister directed all the Deputy Commissioners to monitor
the flood protection schemes, their effectiveness and ensure reliability and quality of
works executed. The meeting was concluded with the message from Chairman to all
members that “Hope for best but prepare for the worst”.
The meeting ended with a vote of thanks to the Chair.
------------ooooo-----------
41
Annexure B
Recommendation of the Meeting on 48th meeting of Haryana State Technical Advisory Committee on
Drought Relief & Floods held under the Chairpersonship of Addl. Chief Secretary (Revenue & Disaster
Management) on dated 15.01.2019 at Haryana Niwas, Sector-3, Chandigarh.
In order to finalize the agenda for the Haryana State Drought Relief & Flood Control Board meeting,
the discussions regarding the new as well ongoing flood protection schemes were held with the concerned
Deputy Commissioners; after the detailed deliberation with concerned officers the following Supplementary
Schemes are recommended for addition in 50th meeting of Haryana State Drought Relief & Flood Control
Board:-
(Rs. In Lacs)
Sr. No.
Name of Constituency
Name of Irrigation
Circle
Name of Schemes
S, M, L
Estimated Cost
Requirement of Funds Remarks
2019-20 2020-21 2021-22
Supplementary Schemes
BWS Unit
District Panchkula
01 Kalka SYL Circle Ambala
Double tier steining for the protection of village of village Jholuwal from Sirsa River after flood 2018.
S 17.00 17.00 0.00 0.00 Recommended by the concerned Deputy Commissioner
02 Kalka SYL Circle, Ambala
Three tier steining for the protection of village abadi of village Madhanwala from River Madhanwali after flood 2018.
S 23.00 23.00 0.00 0.00 Recommended by the concerned Deputy Commissioner
District Hisar
03 Adampur BWS Circle Hisar
Providing protection and restoration of capacity of Hisar Ghggar Multipurpose channel (Drain) from RD 205230 to 269650
M 80.25 40.25 40.00 0.00 Recommended by the concerned Deputy Commissioner
YWS (S) UNIT
District Sonipat
04 Sonipat YWS Circle, Sonipat
Providing protection at Tikola Complex by constructing 01 No. new stone stud and 1055 feet revetment on river Yamuna A/F 2018
S 98.45 98.45 0.00 0.00 Recommended by the concerned Deputy Commissioner
05 Gohana YWS Circle, Sonipat
To make pucca drain in village Bhatgaon Dongran from Purbia Dera to Bhatgaon Malyan i.e. providing brick lining on side slope of Bhatgaon Dongran link Drain from RD 3500 to 5000 (CM Announcement code No. 23606)
S 16.00 16.00 0.00 0.00 Recommended by the concerned Deputy Commissioner
42
Sr. No.
Name of Constituency
Name of Irrigation
Circle
Name of Schemes
S, M, L
Estimated Cost
Requirement of Funds
Remarks
2019-20 2020-21 2021-22
LIFT CANAL UNIT
District Rohtak
06 Kalanaur YWS Circle Rohtak
Laying underground PVC pipeline at village pond Kateshra to Pilana Minor RD 10700-R
S 38.00 38.00 0.00 0.00 Recommended by the concerned Deputy Commissioner
07 Kalanaur YWS Circle Rohtak
Constructing Sundana pipeline pump house link drain from RD 0 to 5950 and Bhutian Minor tail to Drain No. 8 pipe link drain from RD 0 to 7250 outfall at RD 202000-L Drain No. 8
L 376.23 76.23 150.00 150.00 Recommended by the concerned Deputy Commissioner
08 Kalanaur YWS Circle Rohtak
Procurement of PVC pipeline of 8 inch dia to drain out flood water from the fields of village Gudhan and Katesra
S 29.60 29.60 0.00 0.00 Item procured, Ex-Post Facto approval required.
District Jhajhar
09 Jhajhar JWS Circle, Jhajhar
Procurement of HDPE pipeline 200 mm dia and 160 mm dia in W.S Mech. Divn. Jhajhar
S 32.00 32.00 0.00 0.00 Item procured, Ex-Post Facto approval required.
District Bhiwani
10 Charkhi Dadri LWS Circle, Bhiwani
Procurement of 4 No. 10 cs. Vertical pumps alongwith motors of 50 HP, starters and 20 No. EP sets of 3 cs. Capacity
S 72.50 72.50 0.00 0.00 Item procured, Ex-Post Facto approval required.
YAMUNA WATER SERVICES(N) UNIT
District Yamuna Nagar
11 Radaur HKB Circle, Jagadhari
Construction of 1730 feet stone steining for the protection of village Kamalpur from River Yamuna
S 108.47 (initial cost
27.47)
108.47 (Amount raised Rs.
81.00 lacs).
0.00 0.00 Recommended by the concerned Deputy Commissioner in replacement of Agenda at serial No. 133 of original agenda (Amount raised Rs. 81.00 lacs).
12 Radaur HKB Circle, Jagadhari
Construction of 06 Nos. stone stud and 700 feet stone steining for protection of village Lal Chappar from river Yamuna
S 181.00 (initial cost
91.00)
181.00 (Amount raised Rs.
90.00 lacs).
00.00 00.00 Recommended by the concerned Deputy Commissioner in replacement of Agenda at serial No. 135 of original agenda. ( Amount raised Rs. 90.00 lacs)
Total 954.03 614.03 190.00 150.00
43
Sr.
No
Name of
District
Name of Circle Estimated
Cost
Expenditure
Incurred
S L Total Total 2020-21 2021-22 2022-23 S M L Total S M L S M Total
1 AMBALA SYL CIRCLE
AMBALA 7 4 13 6769.77 1659.41 5110.37 2676.56 1551.48 882.33 3 1 0 4 0 0 4 4 1 5
2 FATEHABAD BWS CIRCLE
FATEHABAD 1 1 5 616.08 166.83 449.25 170.07 147.18 132.00 0 1 0 1 0 0 1 1 2 3
3 HISAR BWS CIRCLE
HISAR 2 0 4 517.50 216.70 300.81 154.58 146.23 0.00 0 1 0 1 0 0 0 2 0 2
4 KURUKSHETRA SYL CIRCLE
AMBALA 1 0 1 15.00 10.66 4.34 4.34 0.00 0.00 0 0 0 0 0 0 0 1 0 1
5 PANCHKULA SYL CIRCLE
AMBALA 1 0 2 614.76 284.57 330.20 165.10 165.10 0.00 0 1 0 1 0 0 0 1 0 1
Total 12 5 25 8533.11 2338.17 6194.96 3170.65 2009.98 1014.33 3 4 0 7 0 0 5 9 3 12
6 GURGAON CONSTRUCTIO
N CIRCLE
GURGAON
1 0 1 60.00 0.00 60.00 60.00 0.00 0.00 0 0 0 0 0 0 0 1 0 1
7 JHAJJAR CONSTRUCTIO
N CIRCLE
GURGAON
1 0 1 109.81 15.00 94.81 94.81 0.00 0.00 1 0 0 1 0 0 0 0 0 0
8 ROHTAK YWS CIRCLE
ROHTAK 0 0 2 286.37 274.75 11.63 5.82 5.81 0.00 0 0 0 0 0 0 0 0 2 2
Total2 0 4 456.18 289.75 166.44 160.63 5.81 0.00 1 0 0 1 0 0 0 1 2 3
9 BHIWANI LWS CIRCLE
BHIWANI 1 0 2 544.05 248.93 295.12 177.56 117.56 0.00 0 0 0 0 0 0 0 1 1 2
10 JHAJJAR JWS CIRCLE
JHAJJAR 4 1 6 1139.94 178.67 961.27 627.64 183.56 150.06 2 1 1 4 0 0 0 2 0 2
11 MAHENDRAGA
RH
JLN WS
CIRCLE
NARNAUL
2 0 3 431.12 241.12 190.01 151.30 38.71 0.00 0 1 0 1 0 0 0 2 0 2
12 REWARI JLN WS
CIRCLE
REWARI
1 0 1 60.00 0.00 60.00 60.00 0.00 0.00 0 0 0 0 0 0 0 1 0 1
13 ROHTAK YWS CIRCLE
ROHTAK 5 1 13 1832.72 726.17 1106.56 526.96 366.75 212.85 0 2 1 3 0 0 0 4 4 8
14 SONIPAT YWS CIRCLE
ROHTAK 0 0 5 486.38 147.72 338.67 169.34 169.33 0.00 0 0 0 0 0 3 0 0 2 2
Total 13 2 30 4494.21 1542.61 2951.62 1712.80 875.90 362.91 2 4 2 8 0 3 0 10 7 17
15 KARNAL WORKSHOP
CIRCLE
KARNAL
1 0 2 313.75 230.71 83.04 66.33 16.71 0.00 0 0 0 0 0 0 0 1 1 2
Total1 0 2 313.75 230.71 83.04 66.33 16.71 0.00 0 0 0 0 0 0 0 1 1 2
16 BHIWANI YWS CIRCLE
BHIWANI 3 1 4 403.15 191.00 212.15 118.33 46.91 46.91 2 0 0 2 0 0 1 1 0 1
17 JIND YWS CIRCLE
JIND 5 0 5 1260.53 960.59 299.94 299.94 0.00 0.00 1 0 0 1 0 0 0 4 0 4
18 KARNAL YWS CIRCLE
KARNAL 6 1 8 1488.82 484.85 1003.97 365.74 319.33 318.90 0 0 1 1 0 0 0 6 1 7
19 PANIPAT YWS CIRCLE
KARNAL 11 0 11 1369.94 1359.50 10.44 10.44 0.00 0.00 2 0 0 2 0 0 0 9 0 9
20 YAMUNANAGA
R
HKB CIRCLE
JAGADHRI 2 0 4 2074.00 669.81 1404.19 1371.23 32.96 0.00 1 1 0 2 0 0 0 1 1 2
Total 27 2 32 6596.44 3665.75 2930.69 2165.68 399.20 365.81 6 1 1 8 0 0 1 21 2 23
21 FARIDABAD YWS CIRCLE
FARIDABAD 0 0 1 795.00 507.24 287.76 143.88 143.88 0.00 0 1 0 1 0 0 0 0 0 0
22 MEWAT YWS CIRCLE
FARIDABAD 8 0 8 886.34 739.71 146.63 146.63 0.00 0.00 2 0 0 2 0 0 0 6 0 6
23 PALWAL YWS CIRCLE
FARIDABAD 7 0 7 2343.75 1406.20 937.55 937.55 0.00 0.00 1 0 0 1 0 0 0 5 0 5
24 PANIPAT YWS CIRCLE
SONEPAT 0 0 1 503.00 503.00 0.00 0.00 0.00 0.00 0 0 0 0 0 0 0 0 1 1
25 SONIPAT YWS CIRCLE
SONEPAT 1 0 1 141.00 104.00 37.00 37.00 0.00 0.00 0 0 0 0 0 0 0 1 0 1
Total 16 0 18 4669.09 3260.15 1408.94 1265.06 143.88 0.00 3 1 0 4 0 0 0 12 1 13
Grand Total 71 9 111 25062.78 11327.14 13735.69 8541.15 3451.48 1743.06 15 10 3 28 0 3 6 54 16 7031 9 0 4
Districtwise Abstract of Ongoing Schemes(Short,Medium, Long) Approved upto 49th meeting of HSDR & FCB
Annexure 2.1
0 0 0 0
2 0 0 1
0 0 0 1
1 0 0 0
1 0 0 0
0 0 0 0
3 1 0 0
YWS(S)
0 0 0 0
2 0 0 0
0 0 0 0
1 0 0 0
YWS(N)
0 1 0 0
1 0 0 0
1 0 0 0
15 3 0 2
PROJECT, ENVIRONMENT AND
MATERIAL
7 0 0 2
5 3 0 0
1 0 0 0
0 0 0 0
1 0 0 0
1 0 0 0
2 0 0 0
LCU
0 0 0 0
2 0 0 0
CONSTRUCTION
0 0 0 0
1 0 0 0
8 5 0 1
2 0 0 1
0 0 0 0
2 4 0 0
3 1 0 0
M Total L
BWS
Head:Flood Protection Works
Approved in Meeting :42th,45th,46th,47th,48th,49th,
(Rs in lacs)
No. of Schemes Requirement of Funds In Prog. Yet to Start Completed Dropped
44
Sr.
No
Name of District Name of Circle Estimated
Cost
Expenditure
Incurred
S L Total Total 2020-21 2021-22 2022-
23
S M L Total S M L S M Total
1 AMBALA SYL CIRCLE
AMBALA 11 2 17 2332.34 403.00 1929.35 931.60 760.67 237.09 1 2 0 3 0 2 2 10 0 10
2 FATEHABAD BWS CIRCLE
FATEHABAD 0 0 3 103.57 28.49 75.09 37.55 37.54 0.00 0 0 0 0 0 1 0 0 2 2
3 HISAR BWS CIRCLE
HISAR 6 0 7 550.00 180.40 369.60 345.11 24.49 0.00 2 0 0 2 0 0 0 3 1 4
4 KAITHAL BWS CIRCLE
KAITHAL 3 0 4 123.07 103.31 19.76 10.13 9.63 0.00 0 1 0 1 0 0 0 3 0 3
5 KURUKSHETRA SYL CIRCLE
AMBALA 6 1 8 777.83 60.92 716.91 308.99 235.21 172.71 0 0 0 0 0 0 0 4 0 4
6 PANCHKULA SYL CIRCLE
AMBALA 12 0 13 522.92 319.15 203.78 170.67 33.11 0.00 0 1 0 1 0 0 0 12 0 12
7 SIRSA BWS CIRCLE
SIRSA 3 0 3 50.79 25.83 24.96 24.96 0.00 0.00 0 0 0 0 0 0 0 3 0 3
Total 41 3 55 4460.52 1121.10 3339.45 1829.01 1100.64 409.80 3 4 0 7 0 3 2 35 3 38
8 KAITHAL SARASWATI
HERITAGE
CIRCLE
1 0 1 36.21 0.00 36.21 36.21 0.00 0.00 1 0 0 1 0 0 0 0 0 0
9 KARNAL SARASWATI
HERITAGE
CIRCLE
KURUKSHETRA
1 0 1 34.90 11.43 23.47 23.47 0.00 0.00 0 0 0 0 0 0 0 1 0 1
10 KURUKSHETRA SARASWATI
HERITAGE
CIRCLE
KURUKSHETRA
1 0 1 19.02 19.02 0.00 0.00 0.00 0.00 0 0 0 0 0 0 0 1 0 1
11 ROHTAK YWS CIRCLE
ROHTAK 0 0 2 349.26 114.85 234.42 117.21 117.21 0.00 0 2 0 2 0 0 0 0 0 0
Total 3 0 5 439.39 145.30 294.10 176.89 117.21 0.00 1 2 0 3 0 0 0 2 0 2
12 BHIWANI LWS CIRCLE
BHIWANI 0 0 1 277.00 89.05 187.96 93.98 93.98 0.00 0 1 0 1 0 0 0 0 0 0
13 Charkhi Dadri LWS CIRCLE
BHIWANI 8 0 8 995.95 565.87 430.08 430.08 0.00 0.00 1 0 0 1 0 0 0 7 0 7
14 JHAJJAR JWS CIRCLE
JHAJJAR 6 0 13 916.50 140.36 776.17 398.83 377.34 0.00 0 5 0 5 0 2 0 6 0 6
15 ROHTAK YWS CIRCLE
ROHTAK 2 4 15 1345.17 30.35 1314.83 541.89 495.89 277.05 0 3 0 3 0 4 4 2 2 4
16 SONIPAT YWS CIRCLE
ROHTAK 0 1 2 332.00 0.00 332.00 120.72 117.89 93.39 0 0 0 0 0 1 1 0 0 0
Total 16 5 39 3866.62 825.63 3041.03 1585.50 1085.09 370.44 1 9 0 10 0 7 5 15 2 17
17 KARNAL WORKSHOP
CIRCLE
KARNAL0 0 3 274.77 0.00 274.78 137.39 137.39 0.00 0 3 0 3 0 0 0 0 0 0
Total 0 0 3 274.77 0.00 274.78 137.39 137.39 0.00 0 3 0 3 0 0 0 0 0 0
18 BHIWANI YWS CIRCLE
BHIWANI 0 1 3 664.36 220.74 443.62 192.58 190.75 60.29 0 2 0 2 0 0 1 0 0 0
19 JIND YWS CIRCLE
JIND 3 0 12 1568.53 566.82 1001.72 554.22 447.50 0.00 0 7 0 7 0 0 0 2 2 4
20 KARNAL YWS CIRCLE
KARNAL 5 0 6 665.25 674.71 -9.47 -7.65 -1.82 0.00 0 0 0 0 0 0 0 4 1 5
21 PANIPAT YWS CIRCLE
KARNAL 3 0 9 684.88 249.77 435.13 212.68 222.45 0.00 0 5 0 5 0 0 0 3 1 4
22 YAMUNANAGAR HKB CIRCLE
JAGADHRI 19 0 19 1192.71 956.82 235.89 235.89 0.00 0.00 0 0 0 0 0 0 0 19 0 19
Total 30 1 49 4775.73 2668.86 2106.90 1187.72 858.89 60.29 0 14 0 14 0 0 1 28 4 32
23 FARIDABAD YWS CIRCLE
FARIDABAD 3 0 5 808.69 488.80 319.90 190.65 129.25 0.00 0 2 0 2 0 0 0 3 0 3
24 MEWAT YWS CIRCLE
FARIDABAD 1 0 5 1047.60 160.20 887.40 460.70 426.70 0.00 1 4 0 5 0 0 0 0 0 0
25 PALWAL YWS CIRCLE
FARIDABAD 0 0 2 585.21 0.67 584.54 292.27 292.27 0.00 0 2 0 2 0 0 0 0 0 0
26 SONIPAT YWS CIRCLE
SONEPAT 2 0 2 114.45 56.50 57.95 57.95 0.00 0.00 0 0 0 0 0 0 0 2 0 2
Total 6 0 14 2555.95 706.17 1849.79 1001.57 848.22 0.00 1 8 0 9 0 0 0 5 0 5
Grand Total 96 9 165 16372.98 5467.06 10906.03 5918.08 4147.42 840.53 6 40 0 46 0 10 8 85 9 94
8 0 0 0
60 18 0 7
2 0 0 0
0 0 0 0
2 0 0 0
4 0 0 0
18 1 0 2
YWS(S)
6 0 0 0
0 0 0 0
9 0 0 1
1 0 0 1
YWS(N)
2 1 0 0
3 0 0 0
3 0 0 0
18 12 0 0
PROJECT, ENVIRONMENT AND
MATERIAL
9 8 0 0
1 2 0 0
0 0 0 0
7 2 0 0
LCU
1 0 0 0
2 0 0 0
2 0 0 0
0 0 0 0
0 0 0 0
CONSTRUCTION
0 0 0 0
0 0 0 0
11 5 0 5
1 0 0 4
1 0 0 0
1 0 0 1
1 0 0 0
4 4 0 0
3 1 0 0
Annexure 2.2
M Total L
BWS
Districtwise Abstract of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting of HSDR & FCB
Head:Flood Protection Works
Approved in Meeting :50th,
(Rs in lacs)
No. of Schemes Requirement of Funds In Prog. Yet to Start Completed Dropped
45
Sr.
No
Name of District Name of Circle Estimated
Cost
Expenditure
Incurred
S L Total Total 2020-21 2021-22 2022-23 S M L Total S M L S M Total
1 AMBALA SYL CIRCLE
AMBALA18 6 30 9102.11 2062.41 7039.72 3608.16 2312.14 1119.42 4 3 0 7 0 2 6 14 1 15
2 FATEHABAD BWS CIRCLE
FATEHABAD1 1 8 719.65 195.32 524.34 207.62 184.72 132.00 0 1 0 1 0 1 1 1 4 5
3 HISAR BWS CIRCLE
HISAR8 0 11 1067.50 397.10 670.41 499.69 170.72 0.00 2 1 0 3 0 0 0 5 1 6
4 KAITHAL BWS CIRCLE
KAITHAL3 0 4 123.07 103.31 19.76 10.13 9.63 0.00 0 1 0 1 0 0 0 3 0 3
5 KURUKSHETRA SYL CIRCLE
AMBALA7 1 9 792.83 71.58 721.25 313.33 235.21 172.71 0 0 0 0 0 0 0 5 0 5
6 PANCHKULA SYL CIRCLE
AMBALA13 0 15 1137.68 603.72 533.97 335.77 198.20 0.00 0 2 0 2 0 0 0 13 0 13
7 SIRSA BWS CIRCLE
SIRSA3 0 3 50.79 25.83 24.96 24.96 0.00 0.00 0 0 0 0 0 0 0 3 0 3
Total 53 8 80 12993.63 3459.27 9534.41 4999.66 3110.62 1424.13 6 8 0 14 0 3 7 44 6 50
8 GURGAON CONSTRUCTION
CIRCLE
GURGAON
1 0 1 60.00 0.00 60.00 60.00 0.00 0.00 0 0 0 0 0 0 0 1 0 1
9 JHAJJAR CONSTRUCTION
CIRCLE
GURGAON
1 0 1 109.81 15.00 94.81 94.81 0.00 0.00 1 0 0 1 0 0 0 0 0 0
10 KAITHAL SARASWATI
HERITAGE
CIRCLE
KURUKSHETRA
1 0 1 36.21 0.00 36.21 36.21 0.00 0.00 1 0 0 1 0 0 0 0 0 0
11 KARNAL SARASWATI
HERITAGE
CIRCLE
KURUKSHETRA
1 0 1 34.90 11.43 23.47 23.47 0.00 0.00 0 0 0 0 0 0 0 1 0 1
12 KURUKSHETRA SARASWATI
HERITAGE
CIRCLE
KURUKSHETRA
1 0 1 19.02 19.02 0.00 0.00 0.00 0.00 0 0 0 0 0 0 0 1 0 1
13 ROHTAK YWS CIRCLE
ROHTAK0 0 4 635.63 389.60 246.05 123.03 123.02 0.00 0 2 0 2 0 0 0 0 2 2
Total 5 0 9 895.57 435.05 460.54 337.52 123.02 0.00 2 2 0 4 0 0 0 3 2 5
14 BHIWANI LWS CIRCLE
BHIWANI1 0 3 821.05 337.98 483.08 271.54 211.54 0.00 0 1 0 1 0 0 0 1 1 2
15 Charkhi Dadri LWS CIRCLE
BHIWANI8 0 8 995.95 565.87 430.08 430.08 0.00 0.00 1 0 0 1 0 0 0 7 0 7
16 JHAJJAR JWS CIRCLE
JHAJJAR10 1 19 2056.44 319.03 1737.43 1026.47 560.90 150.06 2 6 1 9 0 2 0 8 0 8
17 MAHENDRAGAR
H
JLN WS CIRCLE
NARNAUL 2 0 3 431.12 241.12 190.01 151.30 38.71 0.00 0 1 0 1 0 0 0 2 0 2
18 REWARI JLN WS CIRCLE
REWARI 1 0 1 60.00 0.00 60.00 60.00 0.00 0.00 0 0 0 0 0 0 0 1 0 1
19 ROHTAK YWS CIRCLE
ROHTAK7 5 28 3177.89 756.52 2421.38 1068.85 862.63 489.90 0 5 1 6 0 4 4 6 6 12
20 SONIPAT YWS CIRCLE
ROHTAK0 1 7 818.38 147.72 670.67 290.06 287.22 93.39 0 0 0 0 0 4 1 0 2 2
Total 29 7 69 8360.83 2368.24 5992.65 3298.30 1960.99 733.36 3 13 2 18 0 10 5 25 9 34
21 KARNAL WORKSHOP
CIRCLE KARNAL 1 0 5 588.52 230.71 357.82 203.72 154.10 0.00 0 3 0 3 0 0 0 1 1 2
Total 1 0 5 588.52 230.71 357.82 203.72 154.10 0.00 0 3 0 3 0 0 0 1 1 2
22 BHIWANI YWS CIRCLE
BHIWANI3 2 7 1067.51 411.74 655.77 310.91 237.66 107.20 2 2 0 4 0 0 2 1 0 1
23 JIND YWS CIRCLE
JIND8 0 17 2829.06 1527.41 1301.66 854.16 447.50 0.00 1 7 0 8 0 0 0 6 2 8
24 KARNAL YWS CIRCLE
KARNAL11 1 14 2154.07 1159.56 994.50 358.09 317.51 318.90 0 0 1 1 0 0 0 10 2 12
25 PANIPAT YWS CIRCLE
KARNAL14 0 20 2054.82 1609.27 445.57 223.12 222.45 0.00 2 5 0 7 0 0 0 12 1 13
26 YAMUNANAGAR HKB CIRCLE
JAGADHRI21 0 23 3266.71 1626.63 1640.08 1607.12 32.96 0.00 1 1 0 2 0 0 0 20 1 21
Total 57 3 81 11372.17 6334.61 5037.58 3353.40 1258.09 426.10 6 15 1 22 0 0 2 49 6 55
27 FARIDABAD YWS CIRCLE
FARIDABAD3 0 6 1603.69 996.04 607.66 334.53 273.13 0.00 0 3 0 3 0 0 0 3 0 3
28 MEWAT YWS CIRCLE
FARIDABAD9 0 13 1933.94 899.91 1034.03 607.33 426.70 0.00 3 4 0 7 0 0 0 6 0 6
29 PALWAL YWS CIRCLE
FARIDABAD7 0 9 2928.96 1406.87 1522.09 1229.82 292.27 0.00 1 2 0 3 0 0 0 5 0 5
30 PANIPAT YWS CIRCLE
SONEPAT0 0 1 503.00 503.00 0.00 0.00 0.00 0.00 0 0 0 0 0 0 0 0 1 1
31 SONIPAT YWS CIRCLE
SONEPAT3 0 3 255.45 160.50 94.95 94.95 0.00 0.00 0 0 0 0 0 0 0 3 0 3
Total 22 0 32 7225.04 3966.32 3258.73 2266.63 992.10 0.00 4 9 0 13 0 0 0 17 1 18
Grand Total 167 18 276 41435.76 16794.20 24641.72 14459.23 7598.90 2583.59 21 50 3 74 0 13 14 139 25 16491 27 0 11
0 0 0 0
10 0 0 1
2 0 0 1
1 0 0 0
3 0 0 0
4 0 0 0
21 2 0 2
YWS(S)
6 0 0 0
2 0 0 0
9 0 0 1
2 0 0 1
YWS(N)
2 2 0 0
4 0 0 0
4 0 0 0
33 15 0 2
PROJECT, ENVIRONMENT AND
16 8 0 2
6 5 0 0
1 0 0 0
0 0 0 0
0 0 0 0
8 2 0 0
LCU
2 0 0 0
4 0 0 0
4 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
CONSTRUCTION
0 0 0 0
0 0 0 0
19 10 0 6
1 0 0 4
2 0 0 0
3 0 0 2
1 0 0 0
6 8 0 0
6 2 0 0
Annexure 2.3
M Total L
BWS
Districtwise Abstract of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting of HSDR & FCB
Head:Flood Protection Works (Rs in lacs)
No. of Schemes Requirement of Funds In Prog. Yet to Start Completed Dropped
46
Annexure 3.1
District
ACTUAL NORMAL ACTUAL NORMAL ACTUAL NORMAL ACTUAL NORMAL ACTUAL NORMALDep%
AMBALA22.6 106.8 267.6 303.8 261.1 276.3 76.9 163.5 628.2 850.4 -26.13
BHIWANI26.9 35.2 98.5 122 54.1 119.8 3 57.4 182.5 334.4 -45.42
FARIDABAD5.7 41.7 149 190.1 124.9 228.2 60.3 118.6 339.9 578.6 -41.25
FATEHABAD14.3 33.5 53.7 98.1 27.7 93.6 7 52.1 102.7 277.3 -62.96
GURGAON4.6 42.5 148.2 179 97.3 193.3 34.6 88.5 284.7 503.3 -43.43
HISAR42.1 37.8 83.5 111.6 32.5 102.5 1.8 57.7 159.9 309.6 -48.35
JHAJJAR8.1 30.7 97.4 137.3 40.8 139.1 16 69.3 162.3 376.4 -56.88
JIND22.2 41.3 92.2 139.7 71.8 135.1 11 84.9 197.2 401 -50.82
KAITHAL14.3 42.6 88 122.2 43 121.8 27 59.2 172.3 345.8 -50.17
KARNAL14.2 62.4 264.2 193.7 126.3 196.1 13.6 93.8 418.3 546 -23.39
KURUKSHETRA30.8 70.7 252.3 184.8 62.5 167.4 38 76.7 383.6 499.6 -23.22
MAHENDRAGARH26.1 50.8 102.8 151.7 63.5 144.8 15.3 60.5 207.7 407.8 -49.07
MEWAT4 44.4 124.8 159 129.6 201.5 15.3 99.4 273.7 504.3 -45.73
PALWAL1.7 31.7 102.1 140.9 93.8 168.3 53.3 85.7 250.9 426.6 -41.19
PANCHKULA9.8 113.8 108 317.8 177.5 329.8 102.6 163.6 397.9 925 -56.98
PANIPAT6.8 58.4 87.3 163.3 78.3 173.4 12 85 184.4 480.1 -61.59
REWARI14.4 37.9 152.4 150.3 117.9 169.2 33.9 74.7 318.6 432.1 -26.27
ROHTAK7.8 53.2 88 179 42.5 187.6 3.3 82.2 141.6 502 -71.79
SIRSA27.5 24.8 113 89.1 39.4 66.6 3 30.8 182.9 211.3 -13.44
SONEPAT22.8 49.9 144.3 184.5 54.8 198 6.5 91.8 228.4 524.2 -56.43
YAMUNA NAGAR10.7 115.9 331 289.8 303.2 280.7 55.5 136.5 700.4 822.9 -14.89
AVERAGE 16.07 53.62 140.40 171.80 97.26 175.86 28.09 87.23 281.81 488.51 -43.31
DISTRICT WISE MONSOON RAINFALL DATA AS RECEIVED FROM IMD, CHANDIGARH FOR
THE YEAR 2019
(JUNE TO SEPTEMBER)Jun-19 Jul-19 Aug-19 Sep-19 Total
47
Annexure 3.2
STATEMENT SHOWING ANNUAL FLOOD PEAK DATA AT VARIOUS SITES (Discharge in Cusecs) YEAR YAMUNA
RIVER
MARKANDA TANGRI GHAGGAR RIVER
U/S
TAJEWALA
JHANSA JANSUI 4-A
Panchkula
Guhla
Cheeka
Khanauri Chandpur D/S Ottu
2002 3,11,174
on 14.8.02
59,000
On14.8.02
26,890
on 15.7.02
17,862
On 14.8.02
45,096 on
16.8.02
14,900
on 17.8.02
9,850
on17.8.02
5,850
on 16.9.02
2003 86,411
on 5.7.03
52,570
on 5.9.03
11,298
On4.9.03
10,818
on 1.7.03
46,029
On 5.9.03
14,650
on 5.9.03
10,500
on
7.9.03
6,000
On8.9.03
2004 81,929
on 18.8.04
25,010
on 17.8.04
47,818
On3.8.04
83,684
on 3.8.04
61,730
on 7.8.04
17,500
on 7.8.04
17,000
on 11.8.04
20,700
on 13.8.04
2005
1,56,000
on 5.7.05
55,500
on 6.7.05
23,427
on 5.7.05
17,862
On 5.7.05
45,403
on 7.7.05
14,800
on 8.7.05
6,850
on 9.7.05
7,500
on 11.7.05
2006 1,56,237
On23.7.06
59,000
on 27.7.06
Leakage 33,822 on
9.7.06
36,440
on 27.7.06
11,300
On 29.7.06
4,600
on 29.7.06
-
2007 1,07,346 on
13.8.07
8,545
on 15.8.07
7,344
on 13.8.07
49,088 on
13.8.07
43,260
on 16.8.07
14,450
On17.8.07
8,000
on 18.8.07
4,700 on
18.8.07
2008 4,09,876
on 20.9.08
8,195 on
22.09.08
19,998
on 21.9.08
36,786on
20.9.08
50,454
On22.9.08
18,250
On24.9.08
13,550
on 22.9.08
-
2009 4,30,454
On11.9.09
9661 on
13.09.09
17,560
On
13.9.09
58,670on
12.9.09
49,174
On14.9.09
12,575
On16.9.09
12,800
On16.9.09
8,050
On15.9.09
2010
7,44,507
on 20.9.10
10904 on
10.09.10
45,458
on 6.7.10
58,667 on
17.7.10
63,460on
7.7.10
49,500
On 10.7.10
38,000
on 11.7.10
20,500
on 14.7.10
2011 6,41,462
on 16.8.11
9548 on
30.06.11
7,099
On1.7.11
11,485 on
8.7.11
33,602 on
25.7.11
8,350
On26.7.11
4,350
On26.7.11
2,550
on 28.8.11
2012 88201
on 4.8.12
7864 on
31.07.12
4731
On8.7.12
7423on
18.9.12
28560
On20.9.12
20020
On19.9.12
4350
On21.9.12
4930
On3.9.12
2013 8,06,464
on 17.06.13
9548 on
16.08.13
2509
On10.8.13
22514on
24.7.13
26422
On18.6.13
8000
On10.8.13
6750
On18.8.13
3750
On14.8.13
2014 128339
on 16.7.14
8529 on
20.07.14
110
on 25.7.14
114872 on
15.8.14
27582 on
21.7.14
6725
on 21.7.14
14450 on
9.9.14
NIL
2015 101360 on
16.08.2015
8529 on
02.08.15
8100 on
14.08.2015
11409 on
16.07.2015
38441 on
14.07.2015
13275 on
15.07.2015
10500 on
15.07.2015
8850 on
21.07.2015
2016 159219 on
01.08.2016
8085 on
11.08.16
Leakage 16090 on
13.08.2016
13860 on
12.08.2016
3450 on
13.08.2016
2750 on
13.08.2016
850 on
15.08.2016
2017 147212 on
02.09.2017
8529 on
04.09.17
10317 on
26.08.2017
18323 on
19.08.2017
26132 on
23.08.2017
7100 on
04.09.2017
4150 on
06.09.2017
3060 on
17.09.2017
2018 605949 on
28.07.2018
7975 on
26.09.18
3260 on
05.08.2018
12751 on
13.08.2018
45403 on
27.09.2018
12800 on
29.09.2018
12650 on
29.09.2018
16500 on
30.09.2018
2019 828072 on
18.08.2019
10943 on
21.08.2019
17670 on
16.07.2019
19240 on
18.08.2019
52387 on
18.07.2019
14225 on
19.07.2019
12800 on
21.08.2019
26605 on
24.07.2019
48
Annexure 3.3
POSITION OF DRAINAGE PUMPS AS ON 30.11.2019
Name of Unit Total No. of Pumps
Capacity in Cs.
Pumps in working
order
Capacity in Cs.
Pumps under repair
DIESEL MOBILE PUMPS
BWS Unit 256 512 198 396 46
YWS Unit (N) 26 52 26 52 0
YWS Unit (S) 122 244 101 202 21
LCU Unit 290 580 210 420 80
TOTAL 694 1388 535 1070 147
ELECTRICAL MOBILE PUMPS
BWS Unit 101 312 74 244 17
YWS Unit (N) 43 211 43 211 0
YWS Unit (S) 73 268 68 258 5
LCU Unit 400 1333 271 939 129
TOTAL 617 2124 456 1652 151
PERMANENT PUMPS
BWS Unit 328 3030 287 2710 35
YWS Unit (N) 34 180 34 180 0
YWS Unit (S) 71 977 67 957 4
LCU Unit 207 1719 165 1444 42
TOTAL 640 5906 553 5291 81
G.Total (Diesel, Electrical & VT Pumps)
1951 9418 1544 8013 379
Note: Pumps purchased, in I&WRD Haryana is as under:
During the FY 2018-19 During the FY 2019-20
EP Sets = 70, DP Sets = 175, Total = 245 VT PUMPS =32 Sets =435 Cs.
49
Sr.
No
Name of District Name of Circle Estimated
Cost
(S) (M) (L) Total 2020-21
1 AMBALA SYL CIRCLE AMBALA 18 8 1 27 4399.77 2183.32
2 FATEHABAD BWS CIRCLE
FATEHABAD
0 7 1 8 469.98 256.27
3 KAITHAL BWS CIRCLE KAITHAL 3 3 0 6 244.92 184.92
4 KURUKSHETRA SYL CIRCLE AMBALA 6 3 0 9 271.26 192.28
5 PANCHKULA SYL CIRCLE AMBALA 17 1 0 18 600.44 560.44
6 SIRSA BWS CIRCLE SIRSA 4 0 0 4 111.23 111.23
Total 48 22 2 72 6097.60 3488.46
7 KAITHAL SARASWATI HERITAGE
CIRCLE KURUKSHETRA
2 1 0 3 118.00 77.80
8 KARNAL SARASWATI HERITAGE
CIRCLE KURUKSHETRA
1 0 0 1 39.71 39.71
9 PANIPAT YWS CIRCLE SONEPAT 0 1 0 1 441.00 221.00
10 ROHTAK YWS CIRCLE ROHTAK 0 3 0 3 654.34 339.35
Total 3 5 0 8 1253.05 677.86
11 BHIWANI LWS CIRCLE BHIWANI 1 1 0 2 236.00 133.00
12 CHARKHI DADRI LWS CIRCLE BHIWANI 1 3 0 4 682.00 416.00
13 JHAJJAR JWS CIRCLE JHAJJAR 0 5 0 5 421.05 211.84
14 JHAJJAR YWS CIRCLE ROHTAK 0 1 0 1 81.00 41.00
15 MAHENDRAGARH JLN WS CIRCLE
NARNAUL
0 1 0 1 658.14 329.14
16 ROHTAK LWS CIRCLE BHIWANI 1 0 0 1 52.00 52.00
17 ROHTAK YWS CIRCLE ROHTAK 12 8 4 24 1319.76 646.33
18 SONIPAT YWS CIRCLE ROHTAK 0 1 0 1 108.00 54.00
Total 15 20 4 39 3557.95 1883.31
19 JIND WORKSHOP CIRCLE
KARNAL
0 2 0 2 298.68 166.60
Total 0 2 0 2 298.68 166.60
20 BHIWANI YWS CIRCLE BHIWANI 1 1 0 2 159.50 124.25
21 JIND YWS CIRCLE JIND 0 3 1 4 937.53 438.27
22 KARNAL YWS CIRCLE KARNAL 7 2 0 9 1149.57 1110.07
23 PANIPAT YWS CIRCLE KARNAL 3 7 0 10 1236.00 793.00
24 YAMUNANAGAR HKB CIRCLE JAGADHRI 32 1 0 33 3049.00 2983.00
Total 43 14 1 58 6531.60 5448.59
25 FARIDABAD YWS CIRCLE
FARIDABAD
2 3 0 5 502.40 406.25
26 GURGAON YWS CIRCLE
FARIDABAD
0 1 0 1 16.00 8.00
27 MEWAT YWS CIRCLE
FARIDABAD
6 6 0 12 741.00 520.36
28 PALWAL YWS CIRCLE
FARIDABAD
0 3 0 3 663.29 365.00
29 SONIPAT YWS CIRCLE SONEPAT 3 0 0 3 169.00 169.00
Total 11 13 0 24 2091.69 1468.61
Grand Total 120 76 7 203 19830.57 13133.43
Annexure 4.1
Head:Flood Protection Works
(Rs in lacs)
No. of Estimate Funds Required
2021-22 2022-23
Districtwise Abstract of New Proposed Flood Schemes for 51st Meeting of HSDR&FCB
BWS
1640.05 576.40
198.26 15.45
60.00 0.00
78.98 0.00
40.00 0.00
0.00 0.00
2017.29 591.85
CONSTRUCTION
40.20 0.00
0.00 0.00
220.00 0.00
314.99 0.00
575.19 0.00
LCU
103.00 0.00
266.00 0.00
209.21 0.00
40.00 0.00
329.00 0.00
0.00 0.00
436.38 237.05
54.00 0.00
1437.59 237.05
PROJECT, ENVIRONMENT AND MATERIAL
132.08 0.00
132.08 0.00
YWS(N)
35.25 0.00
437.27 62.00
39.50 0.00
443.00 0.00
66.00 0.00
1021.02 62.00
YWS(S)
96.15 0.00
8.00 0.00
220.64 0.00
298.29 0.00
0.00 0.00
623.08 0.00
5806.25 890.90
50
Sr.
No
Name of
Constituency
Name of
Irrigation
Circle
Name of Work Short
Medium,
Long
Term,(S/M
/L)
Est. Cost
2021-22
1 AMBALA CANTT. SYL CIRCLE
AMBALA
SCHEME FOR RAISING AND STRENGTHENING OF
RAMPUR SIRSHERI BUND FROM RD 900 TO 5150
FOR THE PROTECTION OF VILLAGE RAMPUR AND
ADJOINING AREA
S 20.22 0
2 AMBALA CANTT. SYL CIRCLE
AMBALA
SCHEME FOR CONSTRUCTING STONE STEINING
FOR THE PROTECTION OF ABADI OF AMBALA
CANTT. FROM RIVER TANGRI FROM RD 4650 TO
5000 OF BABYAL BUND.
S 51.85 0
3 AMBALA CITY SYL CIRCLE
AMBALA
SCHEME FOR CONSTRUCTING 656 FEET LONG
THREE TIER STONE STEINING FOR THE
PROTECTION OF LMB TANGRI D/S NARWANA
BRANCH AT RD 3344 TO 4000 VILLAGE GORSIAN
S 53.1 0
4 MULLANA SYL CIRCLE
AMBALA
SCHEME FOR RESTORATION OF DESIGN SECTION
OF GOLA-GOLI BUND FOR THE PROTECTION OF
ABADI AND AGRICULTURE LAND OF VILLAGE GOLA-
GOLI AND NAHONI FROM RIVER BEGNA
S 20.71 0
5 MULLANA SYL CIRCLE
AMBALA
SCHEME FOR RESTORATION OF DESIGN SECTION
OF GOKALGARH DRAIN FOR THE PROTECTION OF
VILLAGE ABADI AND AGRICULTURE LANDA OF
VILLAGE GOKALGARH.
S 6.58 0
6 MULLANA SYL CIRCLE
AMBALA
SCHEME FOR RESTORATION OF DESIGN SECTION
OF TAMROLI BUND FOR THE PROTECTION OF
ABADI AND AGRICULTURE LAND OF VILLAGE
TAMROLI AND NAHOUNI FROM RIVER BEGNA.
S 17.73 0
7 MULLANA SYL CIRCLE
AMBALA
SCHEME FOR CONSTRUCTING STONE STEINING
FOR THE PROTECTION OF ABADI OF VILLAGE
ROLANHERI.
S 39.92 0
8 MULLANA SYL CIRCLE
AMBALA
Scheme for constructing stone steining for the protection
agriculture land of village Gokalgarh from River Begna.
S 37.16 0
9 NARAINGARH SYL CIRCLE
AMBALA
SCHEME FOR REPLENISHING OLD STONE STEINING
FOR THE PROTECTION OF TOKA GURUDWARA AND
APPROACH ROAD OF GURUDWARA FROM ROON
NADI.
S 15.08 0
10 NARAINGARH SYL CIRCLE
AMBALA
SCHEME FOR REPLENISHING 5 NO. OLD STONE
STUDS FOR THE PROTECTION OF AGRICULTURAL
LAND OF VILLAGE DEHAR FROM RIVER MARKANDA
S 33.74 0
11 NARAINGARH SYL CIRCLE
AMBALA
SCHEME FOR REPLENISHING 1 NO. STONE STUD
AND CONSTRUCTING STONE STEINING FOR THE
PROTECTION OF AGRICULTURE LAND OF VILLAGE
SADIKPUR FROM RIVER BEGNA
S 31.31 0
12 NARAINGARH SYL CIRCLE
AMBALA
SCHEME FOR CONSTRUCTING 3 NO. STONE STUDS
FOR THE PROTECTION OF AGRICULTURE LAND OF
VILLAGE AMBLI FROM RIVER MARKANDA.
S 22.51 0
13 NARAINGARH SYL CIRCLE
AMBALA
SCHEME FOR RESTORATION OF DESIGN SECTION
OF BANOUNDI BUND FOR THE PROTECTION OF
ABADI AND AGRICULTURE LAND OF VILLAGE
BANOUNDI AND TANDWAL FROM RIVER BEGNA
S 29.39 0
14 NARAINGARH SYL CIRCLE
AMBALA
Scheme for const. stone steining for the protection of
Agriculture land of village Nagawan from River Begna.
S 15.03 0
29.39 0
15.03 0
33.74 0
31.31 0
22.51 0
39.92 0
37.16 0
15.08 0
20.71 0
6.58 0
17.73 0
20.22 0
51.85 0
53.1 0
BWSDist:- AMBALA
Annexure 4.2
Head:Flood Protection Works
(Rs. in lacs)
Requriments of funds
2020-21 2022-23
Districtwise Details of New Proposed Flood Schemes for 51st Meeting of HSDR&FCB
51
Sr.
No
Name of
Constituency
Name of
Irrigation
Circle
Name of Work Short
Medium,
Long
Term,(S/M
/L)
Est. Cost
2021-22
Annexure 4.2
Head:Flood Protection Works
(Rs. in lacs)
Requriments of funds
2020-21 2022-23
Districtwise Details of New Proposed Flood Schemes for 51st Meeting of HSDR&FCB
15 NARAINGARH SYL CIRCLE
AMBALA
Scheme for Const. stone steining for the protection of
agriculture land of village Batoura from River Begna.
S 19.99 0
16 NARAINGARH SYL CIRCLE
AMBALA
Scheme for Const. stone steining for the protection of
agriculture land of village Laha from River Begna.
S 62.12 0
17 NARAINGARH SYL CIRCLE
AMBALA
Scheme for Const. stone steining for the protection of
agriculture land of village Bhareri Khurd from River
Begna.
S 42.89 0
18 NARAINGARH SYL CIRCLE
AMBALA
Scheme for Const. 552 ft. long and 2 Nos. 3 tier stone
stud for the protection of agriculture land of village
Nagouli from River Begna
S 41.23 0
Total 560.56 0
19 AMBALA CANTT. SYL CIRCLE
AMBALA
CONSTRUCTION OF UNDER GROUND RCC NP3 900
MM dia PIPE LINE FROM SHAHPUR POND TO RIVER
TANGRI TO PROTECT THE ABADI AND
AGRICULTURE LAND OF VILLAGE SHAHPUR FROM
FLOOD WATER.
M 166.67 83.67
20 AMBALA CANTT. SYL CIRCLE
AMBALA
SCHEME FOR CONSTRUCTING RCC OPEN TROUGH
FROM RD 4000 TO 6000 AND RD 15000 TO 17000 OF
MAHESH NAGAR DRAIN.
M 435 200
21 AMBALA CANTT. SYL CIRCLE
AMBALA
Scheme for const. of RCC open troughs from RD 19500
to 15335 and RD 14700 to 12877 on Ambala Drain.
M 705 400
22 AMBALA CITY SYL CIRCLE
AMBALA
PROVIDING GATED INLET STRUCTURE AT RD 0 OF
BAKNOUR AREA DRAIN OUTFALLING IN RIVER
TANGRI TO PROTECT THE ABADI AND
AGRICULTURAL LAND OF VILLAGES METLAN,
CHHOTI NIHARSI, KHANNA MAJRA AND BAKNOUR
ETC.
M 57.69 28.69
23 AMBALA CITY SYL CIRCLE
AMBALA
Scheme for purchase 05 nos. pumping sets of 5 Cs.
capacity, 05 nos. electric pumping sets of 2 Cs. capacity
and 05 nos. sewerage pump of 3400 LPM, capacity for
district Ambala as inventory for utilization in dewatering
M 48 21
24 MULLANA SYL CIRCLE
AMBALA
SCHEME FOR RESTORATION OF DESIGN SECTION
OF MULLANA AND TANGAIL BUND FOR THE
PROTECTION OF ABADI AND AGRICULTURE LAND
OF VILLAGE MULLANA TANGAIL AND ROLANHERI
FROM RIVER MARKANDA
M 203.69 83.69
25 MULLANA SYL CIRCLE
AMBALA
SCHEME FOR RESTORATION OF DESIGN SECTION
AND CONSTRUCTING GATE STRUCTURE OF
GHELLERY DRAIN AND GHELLERY LINK DRAIN FOR
THE PROTECTION OF ABADI AND AGRICULTURE
LAND OF VILLAGE HEMAMAJRA AND GHELLERY.
M 24.62 12
26 MULLANA SYL CIRCLE
AMBALA
SCHEME FOR RESTORATION OF DESIGN SECTION
and PROVIDING GATE STRUCTURE OF HARDA
HARDI, ALLAH PUR DRAIN FOR THE PROTECTION
OF ABADI AND AGRICULTURE LAND OF VILLAGE
HARDA-HARDI, ALLAHPUR, RAMPUR.
M 22.14 11
Total 1662.81 840.05
27 AMBALA CANTT. SYL CIRCLE
AMBALA
CONSTRUCTING PANJOKHRA GHAGGAR LINK
DRAIN BY PROVIDING RCC PIPE LINE BELOW THE
SERVICE ROAD OF PANJOKHRA MINOR
OUTFALLING IN AMBALA DRAIN.
L 2176.4 800
Total 2176.4 800
District Total (S+M+L) 4399.77 1640.052183.32 576.4
Dist:- FATEHABAD
822.76 0
800 576.4
800 576.4
120 0
12.62 0
11.14 0
305 0
29 0
27 0
560.56 0
83 0
235 0
62.12 0
42.89 0
41.23 0
19.99 0
52
Sr.
No
Name of
Constituency
Name of
Irrigation
Circle
Name of Work Short
Medium,
Long
Term,(S/M
/L)
Est. Cost
2021-22
Annexure 4.2
Head:Flood Protection Works
(Rs. in lacs)
Requriments of funds
2020-21 2022-23
Districtwise Details of New Proposed Flood Schemes for 51st Meeting of HSDR&FCB
28 TOHANA BWS CIRCLE
FATEHABAD
Agenda note for constructing pipeline drains for
dewatering of floodwater of village Meond and Nathuwal
from RD 0 to 6820 out falling into Rangoi Nallah at RD
1.90 Km Left side.
M 67.43 17.43
29 TOHANA BWS CIRCLE
FATEHABAD
Agenda note for constructing pipeline drains for
dewatering of floodwater of village Meond Khurd from RD
0 to 2200 outfalling into Rangoi Nallah at RD 0.50 Km
Left side
M 22.93 11
30 TOHANA BWS CIRCLE
FATEHABAD
Agenda note for constructing pipeline drains for
dewatering of floodwater of village Hindalwala (Dhani
Tailan) from RD 0 to 12200 outfalling into Rangoi Nallah
at RD 6.35 Km Left side.
M 129.95 64
31 TOHANA BWS CIRCLE
FATEHABAD
Agenda note for constructing pipeline drains for
dewatering of floodwater of village Rattatheh and Diwana
from RD 0 to 3960 out falling into Rangoi Nallah at RD
10.35 Km Left side
M 39.83 19.83
32 TOHANA BWS CIRCLE
FATEHABAD
Constructing pipeline drains for dewatering of floodwater
of village Dher from RD 0 to 3300 Linking existing hodi
already constructed pipeline drain of Village Dher
Outfalling into Rangoi Nallah at RD 6.35 Km Left Side.
M 33.46 16
33 TOHANA BWS CIRCLE
FATEHABAD
Constructing pipeline drain for dewatering of flood water
of village Kanakhera from RD 0 TO 2552 Linking existing
Hodi already comstructed pipeline drain Village
Kanakhera out falling into Rangoi Nallah at RD 6.35 KM
Right side.
M 30.93 15
34 TOHANA BWS CIRCLE
FATEHABAD
Purchasing one no. Tata Hitachi ex 210 LC with
excavator (Long Boom).
M 90 40
Total 414.53 183.26
35 RATIA BWS CIRCLE
FATEHABAD
Repairing of fall structure of bridge at RD 2000 Sirhind
Choe Drain.
L 55.45 15
Total 55.45 15
District Total (S+M+L) 469.98 198.26
36 GUHLA BWS CIRCLE
KAITHAL
Scheme for laying RCC pipe line to drain out the flood
water of low lying area of village Urlana from RD 0-1800
and out fall in Ghaggar River.
S 25.12 0
37 GUHLA BWS CIRCLE
KAITHAL
Scheme for providing stone pitching from RD 105625 to
106125 on right side of Ghaggar Bund for protection of
village Bhatian, Kheri-Daban and Hamu Majra
S 23.18 0
38 GUHLA BWS CIRCLE
KAITHAL
Scheme for providing 02 No. stone studs at RD 52550 to
RD 52950 of Ghaggar Bund on left side of Ghaggar River
for protection village Urlana, Kasour and Ramthali.
S 74.77 0
Total 123.07 0
39 GUHLA BWS CIRCLE
KAITHAL
Scheme for constructing inlet of Saraswati Creek outfall
into Para River and strengthening of bank in a length of
1000 feet in D/S Side and 200 in U/S of proposed inlet.
M 70.88 3535.88 0
23.18 0
74.77 0
123.07 0
256.27 15.45
Dist:- KAITHAL25.12 0
231.27 0
25 15.45
25 15.45
17.46 0
15.93 0
50 0
11.93 0
65.95 0
20 0
50 0
53
Sr.
No
Name of
Constituency
Name of
Irrigation
Circle
Name of Work Short
Medium,
Long
Term,(S/M
/L)
Est. Cost
2021-22
Annexure 4.2
Head:Flood Protection Works
(Rs. in lacs)
Requriments of funds
2020-21 2022-23
Districtwise Details of New Proposed Flood Schemes for 51st Meeting of HSDR&FCB
40 KAITHAL BWS CIRCLE
KAITHAL
Requirement of 1 No. 100 KVA 3 PHASE LIQUID
COOLED DG Set with AMF control panel with part
No.243G0100A3L0Y2 at 1500 RPM for use in various
Pump Houses alongwith Trolley.
M 14 7
41 PEHOWA BWS CIRCLE
KAITHAL
Scheme for laying RCC pipe line to drain out the flood
water of low laying area of village Diwana from RD 0-
1500 and out fall into Markanda River.
M 36.97 18
Total 121.85 60
District Total (S+M+L) 244.92 60
42 PEHOWA SYL CIRCLE
AMBALA
Scheme for repair of inlet at KM 23.650/L SYL Canal S 15.63 0
43 PEHOWA SYL CIRCLE
AMBALA
Scheme for strengthening of Left Marginal Bund at RD
37000 U/S of River Markanda Bridge to protect village
bodha etc (by providing stone pitching/staining).
S 18.41 0
44 PEHOWA SYL CIRCLE
AMBALA
Scheme for construction of drainage syphon at RD 4450
Ismailabad Link Drain.
S 11 0
45 PEHOWA SYL CIRCLE
AMBALA
Scheme for construction of drainage syphon at RD
15000 Lukhi Minor Drain.
S 10.98 0
46 PEHOWA SYL CIRCLE
AMBALA
Scheme for construction of 3 tier Stone Steining for
protection of RMB D/S Jhansa at RD 6000 for safety for
village abadi and agriculture land of Rohti Nurpur Buchi
Thaska Miraji, etc.
S 17.88 0
47 PEHOWA SYL CIRCLE
AMBALA
Scheme for construction of inlet at KM 14.527/L of SYL
Canal.
S 26.76 0
Total 100.66 0
48 PEHOWA SYL CIRCLE
AMBALA
Scheme for replacement of 02 nos. 10Cs horizontal
Pumps with 01 no. 20Cs V.T. Pump and and 02 nos.
10Cs V.T. Pump at Permanent Pump House Lukhi in
Water Services Mech. Sub Division Kurukshetra.
M 84.98 44.98
49 PEHOWA SYL CIRCLE
AMBALA
Scheme for purchase of 01 No. Bolero Camper (New). M 8.54 4
50 THANESAR SYL CIRCLE
AMBALA
Scheme for replacement of 02 nos. VT Pump of 05Cs
V.T. Pump with 02 nos.Pump of 10Cs and 01 nos. of
05Cs at PPH Budhera in W/S Mech. S/D KKR
M 77.08 30
Total 170.6 78.98
District Total (S+M+L) 271.26 78.98
51 KALKA SYL CIRCLE
AMBALA
Scheme for constructing 376ft (248 plus 128) double
tier steining for the protection for Vayayam Shala and
abadi of village Kiratpur from river Baad Godam after
flood 2019.
S 17.17 0
52 KALKA SYL CIRCLE
AMBALA
Scheme for constructing 496ft double tier steining for the
protection of abadi of Ganga Colony Near Police Station
Kalka from river Jhajjra after flood 2019.
S 22.56 0
53 KALKA SYL CIRCLE
AMBALA
Scheme for constructing 200ft double tier steining and
256ft three tier steining for the protection of abadi of ward
no. 4 Manakpur Nanak Chand Pinjore from river Jhajjra
after flood 2019.
S 23.15 023.15 0
Dist:- PANCHKULA 17.17 0
22.56 0
47.08 0
91.62 0
192.28 0
100.66 0
40 0
4.54 0
10.98 0
17.88 0
26.76 0
15.63 0
18.41 0
11 0
61.85 0
184.92 0
Dist:- KURUKSHETRA
7 0
18.97 0
54
Sr.
No
Name of
Constituency
Name of
Irrigation
Circle
Name of Work Short
Medium,
Long
Term,(S/M
/L)
Est. Cost
2021-22
Annexure 4.2
Head:Flood Protection Works
(Rs. in lacs)
Requriments of funds
2020-21 2022-23
Districtwise Details of New Proposed Flood Schemes for 51st Meeting of HSDR&FCB
54 KALKA SYL CIRCLE
AMBALA
Scheme for constructing 352ft double tier steining and
160ft single tier steining for the protection of land from
temporary bundhs for diversion of water flow for pumps
house Nawa Nagar, Khokhran lift Irrigation scheme after
flood 2019.
S 17.55 0
55 KALKA SYL CIRCLE
AMBALA
Scheme for constructing 400ft (168 plus 136 plus 96)
double tier steining for the protection of village abadi and
Sarswati Mandir at Balmiki Basti ward No. 1, Kalka from
river Orian after flood 2019.
S 18.26 0
56 KALKA SYL CIRCLE
AMBALA
Scheme for constructing 256 ft double tier steining for the
protection of abadi area of village Bharuli from river
Talan wali nadi tributary of river Tangri after flood 2019.
S 15.63 0
57 KALKA SYL CIRCLE
AMBALA
Scheme for constructing 416ft double tier steining and 3
Nos. crated bed bars (Double tier) for the protection of
school and agriculture land of village Badhor from river
Tangri after flood 2019.
S 17.35 0
58 KALKA SYL CIRCLE
AMBALA
Scheme for constructing 416ft three tier steining for the
protection of abadi of village Mandlaya from river Begna
after flood 2019.
S 34.05 0
59 KALKA SYL CIRCLE
AMBALA
Scheme for constructing 536ft double tier steining for the
protection of Link Road of Raipur Rani to Rampur from
river Tangri after flood 2019.
S 24.43 0
60 KALKA SYL CIRCLE
AMBALA
Scheme of constructing 304ft four tier steining for the
protection of land near village-Burj Kotian, Panchkula
from Ghaggar after flood 2019.
S 39.03 0
61 KALKA SYL CIRCLE
AMBALA
Scheme for constructing 6 nos crated bed bars (double
tier) steining for the protection of agriculture land of
village Toda from river Tangri after flood 2019
S 19.68 0
62 KALKA SYL CIRCLE
AMBALA
Scheme for constructing 5 Nos. crated bed bars (Double
tier) for the protection of Agriculture Land of Village
Damdama from river Kaushalya after flood 2019
S 19.58 0
63 PANCHKULA SYL CIRCLE
AMBALA
Scheme for constructing 896ft four tier steining for the
protection of Golf Course, Panchkula from Ghaggar after
flood 2019.
S 114.57 0
64 PANCHKULA SYL CIRCLE
AMBALA
Scheme for constructing 256ft three tier steining for the
protection of village abadi in village Aasrewali from
Aasrewali nadi tributary of river Ghaggar after flood 2019.
S 20.97 0
65 PANCHKULA SYL CIRCLE
AMBALA
Scheme for constructing 128 plus 352 plus 376 ft three
tier steining for the protection of abadi area of village
Belwali from Belwali nadi tributary of river Ghaggar after
flood 2019.
S 69.9 0
66 PANCHKULA SYL CIRCLE
AMBALA
Scheme for constructing 224ft double tier steining for the
protection of Abadi area of village Manakyan from river
Manakyan wali nadi tributary of river Ghaggar after flood
2019.
S 10.26 0
67 PANCHKULA SYL CIRCLE
AMBALA
Scheme for constructing 376ft three tier steining for the
protection of Rehod Bundh and agriculture land of Village
Rehod from rivver Tangri after flood 2019.
S 30.76 0
Total 514.9 0
68 PANCHKULA SYL CIRCLE
AMBALA
Construction of Causeway and Steining in Village Tibbi at
Tibbi Wali Nadi Tributary of River Tangri After Flood
2019.
M 85.54 40
Total 85.54 40
District Total (S+M+L) 600.44 40560.44 0
Dist:- SIRSA
514.9 0
45.54 0
45.54 0
69.9 0
10.26 0
30.76 0
19.58 0
114.57 0
20.97 0
24.43 0
39.03 0
19.68 0
15.63 0
17.35 0
34.05 0
17.55 0
18.26 0
55
Sr.
No
Name of
Constituency
Name of
Irrigation
Circle
Name of Work Short
Medium,
Long
Term,(S/M
/L)
Est. Cost
2021-22
Annexure 4.2
Head:Flood Protection Works
(Rs. in lacs)
Requriments of funds
2020-21 2022-23
Districtwise Details of New Proposed Flood Schemes for 51st Meeting of HSDR&FCB
69 ELLENABAD BWS CIRCLE
SIRSA
Agenda Note for Internal Clearance of HGMPD from RD.
0-141000.
S 53.61 0
70 KALANWALI BWS CIRCLE
SIRSA
Clearance of Patera, Sarkanda and Jal Khumbi from bed
and side slope of Rangoi Kharif Channel from 153600-
280700 an Desilting from RD 163000-180000.
S 44.72 0
71 KALANWALI BWS CIRCLE
SIRSA
Internal clearance of Rori Ghaggar Drain from RD
100000 to 130750 tail and its subsidiary Drains.
S 10.22 0
72 RANIA BWS CIRCLE
SIRSA
internal clearance of Rania Link Drain from RD 0 to
13000 tail.
S 2.68 0
Total 111.23 0
District Total (S+M+L) 111.23 0
Unit Total 6097.6 2017.29
73 KAITHAL SARASWATI
HERITAGE
CIRCLE
KURUKSHET
RA
Scheme for construction of inlet/causeway at RD
135500/L of BML-HB-BB-MPLC to protect agriculture
land of Village Nouch.
S 13.9 0
74 KALAYAT SARASWATI
HERITAGE
CIRCLE
KURUKSHET
RA
Scheme for construction of inlet/causeway at RD
208200/L of BML-HB-BB-MPLC to protect agriculture
land of Village Kakaut, Pundri Etc.
S 13.9 0
Total 27.8 0
75 KAITHAL SARASWATI
HERITAGE
CIRCLE
KURUKSHET
RA
Flood agenda for procurement of one No. Crawler Type
Hydraulic Excavator-220 (Long Boom) and 1 No. JCB
(Excavator cum Loader) in Sarasvati Heritage Division
No. 3, Kaithal.
M 90.2 40.2
Total 90.2 40.2
District Total (S+M+L) 118 40.2
76 ASSANDH SARASWATI
HERITAGE
CIRCLE
KURUKSHET
RA
Scheme for construction of inlet at RD 308500/L of BML-
HB-BB-MPLC to protect agriculture land of Village
Fafdana, Thrii, Zabala Etc
S 39.71 0
Total 39.71 0
District Total (S+M+L) 39.71 0
77 ISRANA YWS CIRCLE
SONEPAT
Bring to design section of Hartari Drain and sepration of
Drain from village pond and abadi area in village Hartari,
Bursham and Didwari CM Ann. Code No. 22474.
M 441 220
Total 441 220
District Total (S+M+L) 441 220
78 ROHTAK YWS CIRCLE
ROHTAK
Agenda Note for Re-construction of VR Bridge at RD
44460 of Drain No. 8
M 198.02 98.02
79 ROHTAK YWS CIRCLE
ROHTAK
Agenda note for Re-construction of VR Bridge at RD
126200 of KCB Drain.
M 78.7 39.35
100 0
39.35 0
221 0
221 0
Dist:- ROHTAK
39.71 0
Dist:- PANIPAT221 0
Dist:- KARNAL39.71 0
39.71 0
50 0
50 0
77.8 0
13.9 0
13.9 0
27.8 0
CONSTRUCTIONDist:- KAITHAL
111.23 0
111.23 0
3488.46 591.85
44.72 0
10.22 0
2.68 0
53.61 0
56
Sr.
No
Name of
Constituency
Name of
Irrigation
Circle
Name of Work Short
Medium,
Long
Term,(S/M
/L)
Est. Cost
2021-22
Annexure 4.2
Head:Flood Protection Works
(Rs. in lacs)
Requriments of funds
2020-21 2022-23
Districtwise Details of New Proposed Flood Schemes for 51st Meeting of HSDR&FCB
80 ROHTAK YWS CIRCLE
ROHTAK
Agenda note for Re-construction of VR Bridge at RD
139290 of Diversion Drain No. 8.
M 377.62 177.62
Total 654.34 314.99
District Total (S+M+L) 654.34 314.99
Unit Total 1253.05 575.19
81 BAWANI KHERA LWS CIRCLE
BHIWANI
Agenda Note for providing Brick Pitching over Cement
Concrete 1:3:6 on side slope and Toe wall in Bed of
Kalinga Drain No-I from RD 0 to 1650 near village Abadi
out falling at RD 250-L Kharak kalan Sub Minor.
S 33 0
Total 33 0
82 BAWANI KHERA LWS CIRCLE
BHIWANI
Agenda Note for providing Brick Pitching over Cement
Concrete 1:3:6 on R-side, slope and Toe wall in Bed of
Kharak Drain from RD 4500 to 15740 near village Abadi
out falling at RD 8500-R Dadri Disty.
M 203 103
Total 203 103
District Total (S+M+L) 236 103
83 DADRI LWS CIRCLE
BHIWANI
Agenda Note for Drainage cum Irrigation Scheme for the
village Bond Khurd along Bond Unn Road from RD 0 to
5400 outfall at RD 4500-R of Sanjarwas Minor.
S 150 0
Total 150 0
84 DADRI LWS CIRCLE
BHIWANI
Agenda Note for Drainage cum Irrigation Scheme for the
village Mirch from RD 0 to 9600 outfall at RD 7500-R of
Jai Shree Drain.
M 226 113
85 DADRI LWS CIRCLE
BHIWANI
Agenda of drainage cum irrigation scheme for the village
Imlota from RD 0 to 7400 outfalling at RD 5000-L
Badhwana Disty.
M 178 89
86 DADRI LWS CIRCLE
BHIWANI
Agenda of drainage cum irrigation scheme for the village
Kanheti from RD 0 to 5400 outfalling at RD 9500-L
Badhwana Disty.
M 128 64
Total 532 266
District Total (S+M+L) 682 266
87 BADLI JWS CIRCLE
JHAJJAR
Agenda note for laying pipe line from RD 0 to 7850 off
take from RD 35800-L of Kasni minor.
M 26.89 13
88 BAHADURGARH YWS CIRCLE
ROHTAK
Flood Agenda note for purchasing one No. Tata Hitachi
Ex 210 LC with excavator (long boom) for use in Water
Services Division, Bahadurgarh
M 81 40
89 BERI JWS CIRCLE
JHAJJAR
Agenda note for constructing Ditch Drain along Right
Side of Loharu Feeder from RD 0 to 32935 Outfalling into
drain no 8 at RD 213000-R for taking discharge of Majra
Siwana Link Drain.
M 240.42 120.21
90 JHAJJAR JWS CIRCLE
JHAJJAR
Agenda note for constructing inlet with sump well
outfalling point of Khaparwas link drain at RD 5600-R
JSB escape channel.
M 20 10
41 0
120.21 0
10 0
416 0
Dist:- JHAJJAR 13.89 0
89 0
64 0
266 0
150 0
150 0
113 0
100 0
133 0
Dist:- CHARKHI DADRI
33 0
33 0
100 0
LCUDist:- BHIWANI
339.35 0
339.35 0
677.86 0
200 0
57
Sr.
No
Name of
Constituency
Name of
Irrigation
Circle
Name of Work Short
Medium,
Long
Term,(S/M
/L)
Est. Cost
2021-22
Annexure 4.2
Head:Flood Protection Works
(Rs. in lacs)
Requriments of funds
2020-21 2022-23
Districtwise Details of New Proposed Flood Schemes for 51st Meeting of HSDR&FCB
91 JHAJJAR JWS CIRCLE
JHAJJAR
Agenda note for Purchase 1 No. 415 V, 800 A, 3 Phase,
50 Hz. Motor control Centre L.T Panel with copper bus
bar and 500 KVA Transformer 11/0.433 V, 3 Phase, 50
Hz , Oil immersed outdoor type, with all standard fittings
and accessories having losses as per IS 1180 energy
efficiency level-2 at Rewari Road Pump House in W.S
Mech. Division, Jhajjar.
M 54.65 27
92 JHAJJAR JWS CIRCLE
JHAJJAR
Agenda note for constructing of Mechanical Diesel
Workshop at Jhajjar for maintenance and up keeping of
Diesel Engines in W.S Mech. Division, Jhajjar.
M 79.09 39
Total 502.05 249.21
District Total (S+M+L) 502.05 249.21
93 NANGAL
CHOUDHRY
JLN WS
CIRCLE
NARNAUL
Agenda Note for providing stone pitching and
Constructing spillway at various villages bunds in Nangal
Choudhary Area.
M 658.14 329
Total 658.14 329
District Total (S+M+L) 658.14 329
94 GARHI SAMPLA -
KALOI
YWS CIRCLE
ROHTAK
Agenda Note for Construction of permanent pump house
at RD 136000/R JLN Feeder.
S 13 0
95 GARHI SAMPLA -
KALOI
YWS CIRCLE
ROHTAK
Agenda note for constructing Mattan Link Drain from RD
0 to 3000 outfalling into KCB Drain at RD 57000.
S 22.49 0
96 GARHI SAMPLA -
KALOI
YWS CIRCLE
ROHTAK
Agenda note for laying underground P.V.C Pipe line from
fields of village Chiri to Chapra Drain at RD 18050/Right
for dewatering flood water of village Chiri District Rohtak.
S 13 0
97 KALANAUR YWS CIRCLE
ROHTAK
Agenda Note for laying undeground PVC pipeline from
fields to Drain No.8 at RD 141400/Right for Dewatering
flood water of Village Madodhi, Dist Rohtak. (CM
Announcement Code No. 24923)
S 9.2 0
98 KALANAUR YWS CIRCLE
ROHTAK
Agenda Note for laying underground P.V.C Pipe line from
Baliyana Dhani to Drain No. 8 RD 148600 for dewatering
flood water of village Patwapur, District Rohtak.(CM
Announcement code No. 24925)
S 12.25 0
99 KALANAUR YWS CIRCLE
ROHTAK
Agenda note for laying underground P.V.C. Pipe line
from fields of Meham Drain at RD 10500/L for dewatering
flood waterof village Patwapur District Rohtak.
S 23.5 0
100 KALANAUR YWS CIRCLE
ROHTAK
Agenda Note for Construction of pump house for
dewatering of Balmiki pond in village Kahanaur, District-
Rohtak. (CM Announcement code No. 24922)
S 12.25 0
101 KALANAUR YWS CIRCLE
ROHTAK
Agenda note for construction of Embankment of Drain
No.8 from RD 187000 to 188250
S 31 0
102 KALANAUR YWS CIRCLE
ROHTAK
Agenda note for laying underground P.V.C Pipe line from
fields to Drain No 8 at RD 143500/Right for dewatering
flood water of village Patwapur District.
Rohtak.
S 18.25 0
103 MEHAM LWS CIRCLE
BHIWANI
Agenda Note for providing Brick Pitching over Cement
Concrete 1:3:6 on Bed and side slope and Toe wall in
Bed of Escape channel from RD 0 to 1100 offtake at RD
107200 tail Bhiwani Sub Branch.
S 52 052 0
12.25 0
31 0
18.25 0
9.2 0
12.25 0
23.5 0
13 0
22.49 0
13 0
329.14 0
329.14 0
Dist:- ROHTAK
252.84 0
Dist:- MAHENDRAGARH329.14 0
27.65 0
40.09 0
252.84 0
58
Sr.
No
Name of
Constituency
Name of
Irrigation
Circle
Name of Work Short
Medium,
Long
Term,(S/M
/L)
Est. Cost
2021-22
Annexure 4.2
Head:Flood Protection Works
(Rs. in lacs)
Requriments of funds
2020-21 2022-23
Districtwise Details of New Proposed Flood Schemes for 51st Meeting of HSDR&FCB
104 MEHAM YWS CIRCLE
ROHTAK
Agenda Note for laying underground Pipeline and
constructing Pump house at RD 68100/R Bhiwani Sub
Branch.
S 18 0
105 MEHAM YWS CIRCLE
ROHTAK
Agenda Note for constructing temporary Pump House on
Nindana, Momadpur link Drain which outfalls at RD
121000/L Meham Drain to drain out flood water.
S 18 0
106 ROHTAK YWS CIRCLE
ROHTAK
Agenda Note for laying underground P.V.C Pipe line from
Dahar to Drain No 8 at RD 151500/R for dewatering flood
water of village Patwapur, District Rohtak. (CM
Announcement code no. 24926)
S 19.7 0
Total 262.64 0
107 BERI YWS CIRCLE
ROHTAK
Agenda note for constructing temporary pump house of
outfall point Dighal Link Drain.
M 35.1 15.1
108 GARHI SAMPLA -
KALOI
YWS CIRCLE
ROHTAK
Agenda note for providing regulation gates in Jassia link
drain at outfall into drain no.08 at RD-99000/L
M 43 20
109 MEHAM YWS CIRCLE
ROHTAK
Agenda Note for controlling the sloughing problem of
bank of Meham Drain by applying the Geosynthetic mat
on side slope from RD 135000 to RD 135500 both side.
M 43 21.5
110 MEHAM YWS CIRCLE
ROHTAK
Agenda note for procurement of new pump for flood
protection works at Nindana Pump House at RD 122000-
L of Meham Drain in WS Mech Sub Division, Rohtak
M 76 38
111 MEHAM YWS CIRCLE
ROHTAK
Flood agenda note for re-construction of VR Bridge at
RD 3460 of Kidoli Pahalapur Link Drain
M 30.16 15
112 ROHTAK YWS CIRCLE
ROHTAK
Agenda Note for purchasing 1 No. Jcb Machine wheel
type, 1 No. Tractor, 1 No. Trolla for Rohtak water
services division Rohtak.
M 66.5 33
113 ROHTAK YWS CIRCLE
ROHTAK
Agenda note for controlling the sloughing problem of
bank of Kakrana Link Drain by applying synthetic mat on
side slope from RD 0 to 3000 on both side bank.
M 57.24 34.24
114 ROHTAK YWS CIRCLE
ROHTAK
Agenda note for procurement of New Vehicle Mahindra
Bolero Camper 2WD for loading and shifting of material
and machinery in Sampla WS Division, Rohtak of
Yamuna Water Services Circle, Rohtak.
M 7.33 3
Total 358.33 179.84
115 KALANAUR YWS CIRCLE
ROHTAK
Agenda note for construction of temporary pump house
at RD 10574 Meham Drain crossing KahanaurDisty. at
RD 141025.(CM Announcement code No. 24921)
L 280.5 100
116 KALANAUR YWS CIRCLE
ROHTAK
Agenda note for construction of temporary pump house
at RD 37000 Meham Drain crossing Kalanaur minor at
RD 24500. (CM Announcement code No. 24920)
L 186.66 62
117 KALANAUR YWS CIRCLE
ROHTAK
Agenda Note for construction of Kahanaur Masudpur
Pipeline Pump House Link Drain from RD 0 to 7850
outfall at RD 201000L of Drain No.8
L 168.63 56.21
118 MEHAM YWS CIRCLE
ROHTAK
Agenda note for constructing Cross Regulator at RD
73400 on Meham Drain.
L 115 38.33
Total 750.79 256.54
District Total (S+M+L) 1371.76 436.38
257.2 237.05
698.33 237.05
62.66 62
56.21 56.21
38.33 38.34
4.33 0
178.49 0
100 80.5
15.16 0
33.5 0
23 0
23 0
21.5 0
38 0
19.7 0
262.64 0
20 0
18 0
18 0
59
Sr.
No
Name of
Constituency
Name of
Irrigation
Circle
Name of Work Short
Medium,
Long
Term,(S/M
/L)
Est. Cost
2021-22
Annexure 4.2
Head:Flood Protection Works
(Rs. in lacs)
Requriments of funds
2020-21 2022-23
Districtwise Details of New Proposed Flood Schemes for 51st Meeting of HSDR&FCB
119 GOHANA YWS CIRCLE
ROHTAK
Procurement of 06 Nos.New Pumps of 10 Cusec
Capacity For flood Protection Works at RD 95000-R of
Bhutana Branch Sump-Well in W.S Mech Sub Division
,Gohana.(
M 108 54
Total 108 54
District Total (S+M+L) 108 54
Unit Total 3557.95 1437.59
120 JIND WORKSHOP
CIRCLE
KARNAL
Replacement/Renovation of 6 No. of V.T. Pumps of 10
Cs. capacity and 08 No. V.T. Pumps of 5 Cs. capacity
pumping sets with allied accessories in District Jind.
M 166.08 66.08
121 JIND WORKSHOP
CIRCLE
KARNAL
Procurement of 03 No. Diesel Generating sets of 320
KVA, 01 No. Diesel Generating sets of 250 KVA,03
Diesel Generating sets of 125 KVA and 02 No. Diesel
Generating Sets of 62.5 KVA for use in permanent pump
houses in the event of power failure in District Jind.
M 132.6 66
Total 298.68 132.08
District Total (S+M+L) 298.68 132.08
Unit Total 298.68 132.08
122 BAWANI KHERA YWS CIRCLE
BHIWANI
PROJECT ESTIMATE FOR PROVIDING BRICK
PITCHING OF SAIMAN DHANANA LINK DRAIN FROM
RD 80575 TO 83575 OUTFALLING AT RD 55400/R
BHIWANI GHAGGAR DRAIN
S 89 0
Total 89 0
123 BAWANI KHERA YWS CIRCLE
BHIWANI
PROJECT ESTIMATE FOR EXTENSION OF 1-L JATAI
DRAIN FROM RD 20000-21958 OUTFALLING AT RD
77265-R SAIMAN DHANANA LINK DRAIN
M 70.5 35.25
Total 70.5 35.25
District Total (S+M+L) 159.5 35.25
124 JIND YWS CIRCLE
JIND
Agenda Note for Remodeling of Poli Pump House at
Design Capacity 66 Cusec to 110 Cusec at RD 420000-R
Bhiwani Sub Branch (only civil work) amounting to Rs.
144.00 Lacs.
M 144 72
125 SAFIDON YWS CIRCLE
JIND
Agenda Note for Laying Pipe line for Dewatering of field
water to Ditch Drain of Village Nimnabad including
construction of Permanent Pump House to Rs.112.53lcs
M 112.53 56.27
126 SAFIDON YWS CIRCLE
JIND
Flood Agenda for providing Brick pitching on both Side
from RD 0 to 8950 Padana drain including
Reconstruction of 3 Nos. Bridges.
M 494 247
Total 750.53 375.27
127 JIND YWS CIRCLE
JIND
Agenda Note for providing brick pitching on both side of
Nizampur Bharon Khera Link Drain in sloughing reach
RD 0 to 4000 including pucca structure.
L 187 62
Total 187 62
District Total (S+M+L) 937.53 437.27
63 62
438.27 62
Dist:- KARNAL
247 0
375.27 0
63 62
Dist:- JIND72 0
56.27 0
35.25 0
35.25 0
124.25 0
Dist:- BHIWANI89 0
89 0
166.6 0
166.6 0
YWS(N)
100 0
66.6 0
166.6 0
1883.31 237.05
PROJECT, ENVIRONMENT AND MATERIALDist:- JIND
54 0
54 0
54 0
Dist:- SONIPAT
60
Sr.
No
Name of
Constituency
Name of
Irrigation
Circle
Name of Work Short
Medium,
Long
Term,(S/M
/L)
Est. Cost
2021-22
Annexure 4.2
Head:Flood Protection Works
(Rs. in lacs)
Requriments of funds
2020-21 2022-23
Districtwise Details of New Proposed Flood Schemes for 51st Meeting of HSDR&FCB
128 GHARAUNDA YWS CIRCLE
KARNAL
Agenda for providing protection to Dakwala Complex by
constructing 1 No. new stone stud and repairing of 3 No.
damaged stone stud on river Yamuna after flood 2019.
S 71.45 0
129 GHARAUNDA YWS CIRCLE
KARNAL
Agenda for providing protection to Mustafabad Complex
by constructing 3 No. new stone stud and repairing of 7
No. damaged stone stud and constructing 1365’ stone
revetment on river Yamuna after flood 2019
S 314.61 0
130 GHARAUNDA YWS CIRCLE
KARNAL
Agenda for the work of providing protection to Kunda
Kalan complex by 4 no repairing of damaged stone stud
on river Yamuna after flood 2019.
S 60.09 0
131 GHARAUNDA YWS CIRCLE
KARNAL
Agenda for the work of providing protection to Sadarpur
complex by repairing 5 no. old damaged stone studs on
Yamuna after flood 2019
S 78.15 0
132 GHARAUNDA YWS CIRCLE
KARNAL
Agenda for repairing of spur at RD 238000 river Yamuna
embankment after flood 2019
S 15.26 0
133 INDRI YWS CIRCLE
KARNAL
Agenda for providing protection to Shergarh Tapu
Complex by constructing 9 No. new stone studs on river
Yamuna after flood 2019.
S 263.17 0
134 INDRI YWS CIRCLE
KARNAL
Agenda for the work of providing protection to Kalsora
complex by 3 no repairing of damaged stone stud and
constructing 840’ stone revetment on river Yamuna after
flood 2019.
S 257.84 0
Total 1060.57 0
135 GHARAUNDA YWS CIRCLE
KARNAL
Agenda for construction of outfall gate at RD 0 and sump
well at RD 13400 and remodeling of 01 No. culvert at RD
3300 of Bazida drain.
M 50 20
136 GHARAUNDA YWS CIRCLE
KARNAL
Agenda for constructing cause way opposite RD 137310
Kunjpura
embankment on Dhanaura creek (based on sanctioned
estimate for constructing causeway opposite RD 144200
of Kunjpura embankment on creek of Dhanaura escape).
M 39 19.5
Total 89 39.5
District Total (S+M+L) 1149.57 39.5
137 SAMALKHA YWS CIRCLE
KARNAL
Providing protection to Tamsabad Complex by repairing
4 No. Old Stone Studs after Flood 2019
S 62 0
138 SAMALKHA YWS CIRCLE
KARNAL
Providing protection to Nanhera Complex by repairing 5
No. Old Stone Studs and 120 Ft long Constructing
Revetment D/S of Stud No. 27 after Flood 2019
S 158 0
139 SAMALKHA YWS CIRCLE
KARNAL
Providing protection to Mirzapur Complex by repairing 5
No. Old Stone Studs and 275 Ft long Constructing
Revetment U/S of Stud No. 10 after Flood 2019
S 127 0
Total 347 0
140 ISRANA YWS CIRCLE
KARNAL
Bringing to design section of Try. Drain No. 1 from RD
57800 to 56900 for separation of drain from village pond
and abadi area in village Thirana
M 52 26
141 ISRANA YWS CIRCLE
KARNAL
Bringing to design section of Brahman Majra Drain from
RD 1000 to 3500 for separation of drain from village
pond and abadi area in village Brahman Majra
M 96 4848 0
127 0
347 0
26 0
Dist:- PANIPAT62 0
158 0
19.5 0
49.5 0
1110.07 0
257.84 0
1060.57 0
30 0
78.15 0
15.26 0
263.17 0
71.45 0
314.61 0
60.09 0
61
Sr.
No
Name of
Constituency
Name of
Irrigation
Circle
Name of Work Short
Medium,
Long
Term,(S/M
/L)
Est. Cost
2021-22
Annexure 4.2
Head:Flood Protection Works
(Rs. in lacs)
Requriments of funds
2020-21 2022-23
Districtwise Details of New Proposed Flood Schemes for 51st Meeting of HSDR&FCB
142 ISRANA YWS CIRCLE
KARNAL
Bringing to design section of Bijawa-Chirana-Mundlana
Link Drain from R.D 22000 to 25200 for separation of
Drain from village pond and abadi area in village
Shahpur
M 125 62
143 ISRANA YWS CIRCLE
KARNAL
Bringing to Design section of Gawalra Link Drain From
R.D 8200 To 4000 for Sepration of Drain from village
pond and Abadi Area In village Gawalra
M 107 53
144 PANIPAT CITY YWS CIRCLE
KARNAL
Bringing to Design section of Begampur Drain from RD
7200 to 9000 for Separation of drain from village pond
and abadi area in village Rajapur
M 66 33
145 PANIPAT RURAL YWS CIRCLE
KARNAL
Bringing to Design section of Nohra Drain From RD
17500 to 21000 for village Sodhapur and various
colonies such as Dutta colony etc.
M 101 50
146 PANIPAT RURAL YWS CIRCLE
KARNAL
Bringing to design section of Nohra Drain from RD 34000
to 47000 and separation of drain from village pond and
abadi area in village Binjhol and Dahar. (Ex-post facto
sanction).
M 342 171
Total 889 443
District Total (S+M+L) 1236 443
147 JAGADHRI HKB CIRCLE
JAGADHRI
Constg. apron for connecting the RLDSE Bund from RD
1700 to 1900 after Flood 2019
S 98 0
148 JAGADHRI HKB CIRCLE
JAGADHRI
Constg. Apron for connecting the RLDSE Bund from RD
3750 to 4270 after Flood 2019.
S 466 0
149 JAGADHRI HKB CIRCLE
JAGADHRI
Repairing of Damaged Apron of Gorden Groyne at Vill
Tajewala after Flood 2019.
S 315 0
150 JAGADHRI HKB CIRCLE
JAGADHRI
Protection of Old Tajewala Head by constructing Apron
around the Head after Flood 2019
S 140 0
151 SADHAURA HKB CIRCLE
JAGADHRI
Providing 1200 ft. stone steining for the protection of
Agriculture land of Village Laharpur Dummawala from
River Markanda.
S 29.36 0
152 YAMUNA
NAGAR
HKB CIRCLE
JAGADHRI
Providing 09 no. stone studs for the protection of
agriculture land of village Gumthala Rao from River
Yamuna.
S 218.51 0
153 YAMUNA
NAGAR
HKB CIRCLE
JAGADHRI
CONSTRUCTING 600 FT STONE STEINING FOR
PROTECTION OF AZAT ASHRAM GAUSHALA FROM
CHIKKEN KHOL (RIVER PATHRALA).
S 13 0
154 YAMUNA
NAGAR
HKB CIRCLE
JAGADHRI
CONSTRUCTING 1200 FT STONE STEINING FOR
PROTECTION OF VILLAGE KALESAR and KALESAR
MAHAMANTRA VALLEY FROM RIVER YAMUNA
S 30 0
155 YAMUNA
NAGAR
HKB CIRCLE
JAGADHRI
CONSTRUCTING 1000 FT STONE STEINING FOR
PROTECTION OF AGRICULTURAL LAND AND ABADI
OF VILLAGE MUKARAVPUR IN D/S OF MUKARAVPUR
BRIDGE FROM PLASI KHOL (RIVER PATHRALA)
S 15.17 0
156 YAMUNA
NAGAR
HKB CIRCLE
JAGADHRI
CONSTRUCTING 550 FT STONE STEINING FOR
PROTECTION OF VILLAGE NATHANPUR FROM
KANSLI KHOL (RIVER PATHRALA).
S 8 0
157 YAMUNA
NAGAR
HKB CIRCLE
JAGADHRI
CONSTRUCTING 600 FT STONE STEINING FOR
PROTECTION OF VILLAGE KOTRA KAHAN SINGH
FROM RIVER PATHRALA
S 9.16 0
158 YAMUNA
NAGAR
HKB CIRCLE
JAGADHRI
CONSTRUCTING 1900 FT BUND WITH STONE
PITCHING FOR PROTECTION OF VILLAGE
MUKARVPUR AND ABADI IN THE U/S OF BRIDGE
FROM PLASI KHOL (RIVER PATHRALA).
S 44.39 0
159 YAMUNA
NAGAR
HKB CIRCLE
JAGADHRI
PROVIDING 1400 Ft. STONE STEINING FOR
PROTECTION OF AGRICULTURAL LAND AND ABADI
NEAR LOHGARH GURUDWARA FROM LOHGARH
KHOL.
S 44.71 044.71 0
8 0
9.16 0
44.39 0
13 0
30 0
15.17 0
140 0
29.36 0
218.51 0
98 0
466 0
315 0
446 0
793 0
Dist:- YAMUNANAGAR
33 0
51 0
171 0
63 0
54 0
62
Sr.
No
Name of
Constituency
Name of
Irrigation
Circle
Name of Work Short
Medium,
Long
Term,(S/M
/L)
Est. Cost
2021-22
Annexure 4.2
Head:Flood Protection Works
(Rs. in lacs)
Requriments of funds
2020-21 2022-23
Districtwise Details of New Proposed Flood Schemes for 51st Meeting of HSDR&FCB
160 YAMUNA
NAGAR
HKB CIRCLE
JAGADHRI
RESTORATION OF KHANNUWALA BUND FOR
PROTECTION OF KHANNUWALA VILLAGE FROM
RIVER SOMB.
S 3.89 0
161 YAMUNA
NAGAR
HKB CIRCLE
JAGADHRI
CONSTRUCTION OF 700 Ft. STONE STEINNING FOR
PROTECTION OF VILLAGE ABADI OF VILLAGE
SANGHOLI FROM TRIBUTARY OF SADHOURA
RIVER.
S 17.11 0
162 YAMUNA
NAGAR
HKB CIRCLE
JAGADHRI
PROVIDING 300 Ft. STONE STEINNING FOR
PROTECTION OF AGRICULTURAL LAND OF VILLAGE
JAIRAMPUR AND DAMUPURA FROM RIVER SOMB.
S 14.59 0
163 YAMUNA
NAGAR
HKB CIRCLE
JAGADHRI
PROVIDING 436 FT. STONE STEINING FOR
PROTECTION OF VILLAGE RAMPUR GAINDA BUND
FROM RIVER SOMB.
S 18.37 0
164 YAMUNA
NAGAR
HKB CIRCLE
JAGADHRI
PROVIDING 06 NOs BED BARS FOR THE
PROTECTION OF AGRICULTURE LAND OF
RAMGARH SAWAI AND VILLAGE ABADI OF BANKAT
FROM RIVER SOMB
S 30.16 0
165 YAMUNA
NAGAR
HKB CIRCLE
JAGADHRI
Construction of 07 Nos. stone studs and 450 ft. stone
steining for the protection of village Tapu kamalpur from
River Yamuna.
S 220.74 0
166 YAMUNA
NAGAR
HKB CIRCLE
JAGADHRI
Construction of 1400 ft. stone steining for the protection
of village Lal Chaper from River Yamuna.
S 171.17 0
167 YAMUNA
NAGAR
HKB CIRCLE
JAGADHRI
Construction of 08 Nos. stone studs for the protection of
village Bagwali from River Yamuna
S 187.22 0
168 YAMUNA
NAGAR
HKB CIRCLE
JAGADHRI
CONSTRUCTING 1000 FT BUND WITH STONE
PITCHING FOR PROTECTION OF VILLAGE
BANIYAWALA FROM KANSLI KHOL (RIVER
PATHRALA).
S 24 0
169 YAMUNA
NAGAR
HKB CIRCLE
JAGADHRI
Providing protection to agriculture land from Flood water
by providing Pump House in Village Shadipur in District
Yamuna Nagar
S 18 0
170 YAMUNA
NAGAR
HKB CIRCLE
JAGADHRI
SCHEME FOR CONSTRUCTION OF 900 FT. STONE
STEINING AND 06 NO. STONE STUDS FOR THE
PROTECTION OF VILLAGE ODHRI FROM RIVER
YAMUNA.
S 214.5 0
171 YAMUNA
NAGAR
HKB CIRCLE
JAGADHRI
Scheme for Providing 335 mtr. stone steining between
studs for the protection of agriculture land and village
abadi of village Gumthla from River Yamuna.
S 189.3 0
172 YAMUNA
NAGAR
HKB CIRCLE
JAGADHRI
SCHEME FOR THE CONSTRUCTION OF 5 NOS
STONE STUDS FOR THE PROTECTION OF VILLAGE
KANALSI FROM RIVER YAMUNA.
S 103.5 0
173 YAMUNA
NAGAR
HKB CIRCLE
JAGADHRI
SCHEME FOR REPLENISHMENT OF 3 NOS STONE
STUD FOR THE PROTECTION OF VILLAGE MANDOLI
FROM RYVER YAMUNA
S 60.69 0
174 YAMUNA
NAGAR
HKB CIRCLE
JAGADHRI
ESTIMATE FOR CONSTRUCTING 02 NO. STONE
STUDS AND 600FT. STONE STEINING FOR
PROTECTION OF VILLAGE BABURAMBASS FROM
RIVER YAMUNA.
S 39.14 0
175 YAMUNA
NAGAR
HKB CIRCLE
JAGADHRI
ESTIMATE FOR CONSTRUCTING 02 NO. STONE
STUDS AND 800FT. STONE STEINING FOR
PROTECTION OF VILLAGE KALESAR FROM RIVER
YAMUNA.
S 45.39 0
176 YAMUNA
NAGAR
HKB CIRCLE
JAGADHRI
SCHEME FOR CONSTRUCTING 05 NO. STONE
STUDS FOR PROTECTION OF VILLAGE LAKKARMAI
PARTAPPUR FROM RIVER YAMUNA.
S 48.45 0
177 YAMUNA
NAGAR
HKB CIRCLE
JAGADHRI
SCHEME FOR CONSTRUCTING 6 NO. STONE STUDS
FOR THE PROTECTION OF VILL. KANNEWALA FROM
RIVER YAMUNA.
S 58.14 058.14 0
39.14 0
45.39 0
48.45 0
189.3 0
103.5 0
60.69 0
24 0
18 0
214.5 0
220.74 0
171.17 0
187.22 0
14.59 0
18.37 0
30.16 0
3.89 0
17.11 0
63
Sr.
No
Name of
Constituency
Name of
Irrigation
Circle
Name of Work Short
Medium,
Long
Term,(S/M
/L)
Est. Cost
2021-22
Annexure 4.2
Head:Flood Protection Works
(Rs. in lacs)
Requriments of funds
2020-21 2022-23
Districtwise Details of New Proposed Flood Schemes for 51st Meeting of HSDR&FCB
178 YAMUNA
NAGAR
HKB CIRCLE
JAGADHRI
RESTORATION OF CHAUTANG NALLAH FROM RD
29800 TO 47400.
S 20.34 0
Total 2916 0
179 YAMUNA
NAGAR
HKB CIRCLE
JAGADHRI
REHABILITATION OF CHAUTANG NALLAH FROM RD
0 TO 136428
M 133 66
Total 133 66
District Total (S+M+L) 3049 66
Unit Total 6531.6 1021.02
180 PRITHLA YWS CIRCLE
FARIDABAD
Providing 06 no. stone studs and 1000ft. edge protection
to protect village abadi and its agricultre land of village
Latipur Sahupura khadar after flood 2019.
S 225 0
181 TIGAON YWS CIRCLE
FARIDABAD
Repairing 5 no. new stone studs to protect village abadi
and its agricultre land of village Rajpur Dungarpur and
rainy well tubewell of Rajupr Dungarpur river complex
after flood 2019
S 80 0
Total 305 0
182 BALABGARH YWS CIRCLE
FARIDABAD
Reconstruction of central mechanical workshop at
ballabgarh in W.S. Mech. Sub Divn. Faridabad
M 75 37.5
183 FARIDABAD YWS CIRCLE
FARIDABAD
Bolero camper 5 seater cabin mahendra. M 7.5 3.75
184 PRITHLA YWS CIRCLE
FARIDABAD
Re-construcion of 1 no. Bridge at RD 220000 of Gaunchi
Main Drain
M 114.9 54.9
Total 197.4 96.15
District Total (S+M+L) 502.4 96.15
185 GURGAON YWS CIRCLE
FARIDABAD
Diesel truck- 7.8 ton payload with 17 ft length full frame
chasis (Eicher make), quantity-1(for Gurgaon )
M 16 8
Total 16 8
District Total (S+M+L) 16 8
186 NUH YWS CIRCLE
FARIDABAD
Flood agenda for internal clearance of silt and slush of
outfall channel RD.122200 of Gurgaon Canal at RD.0-
32250
S 9.3 0
187 NUH YWS CIRCLE
FARIDABAD
Flood agenda for internal clearance of silt and slush of
outfall channel RD.146200 of Gurgaon Canal at RD.0-
18725
S 15.63 0
188 NUH YWS CIRCLE
FARIDABAD
Flood agenda for Internal clearance of silt of outfall
channel RD.90000 of Gurgaon Canal from RD.0-19000.
S 54.15 0
189 NUH YWS CIRCLE
FARIDABAD
Flood agenda for bringing design section of Landwa
Nallah from RD 0 to 26956 ft. (8216 Mtr.).
S 88 0
190 PUNHANA YWS CIRCLE
FARIDABAD
Flood agenda for providing side slope pitching from RD
4650 to 6650 of Hinganpur Link Drain
S 25.63 0
191 PUNHANA YWS CIRCLE
FARIDABAD
Flood Agenda for Internal clearance of New Kot Drain
from RD.0-64964.
S 51.65 0
Total 244.36 0
51.65 0
244.36 0
54.15 0
88 0
25.63 0
Dist:- MEWAT9.3 0
15.63 0
8 0
8 0
8 0
101.25 0
406.25 0
Dist:- GURGAON
37.5 0
3.75 0
60 0
225 0
80 0
305 0
5448.59 62
YWS(S)Dist:- FARIDABAD
67 0
67 0
2983 0
20.34 0
2916 0
64
Sr.
No
Name of
Constituency
Name of
Irrigation
Circle
Name of Work Short
Medium,
Long
Term,(S/M
/L)
Est. Cost
2021-22
Annexure 4.2
Head:Flood Protection Works
(Rs. in lacs)
Requriments of funds
2020-21 2022-23
Districtwise Details of New Proposed Flood Schemes for 51st Meeting of HSDR&FCB
192 FIROZEPUR
JHIRKA
YWS CIRCLE
FARIDABAD
Flood agenda for replacement of V.R. Bridge at RD.
2400 of F.P. Jhirka Link Drain
M 34 17
193 NUH YWS CIRCLE
FARIDABAD
Electrical Pumping set 3 cusec discharge with 20 HP
motors along with panel Kirloskar make quantity-10 for
Distt Nuh
M 16 8
194 NUH YWS CIRCLE
FARIDABAD
Flood Agenda for Reconstruction of V.R. Bridge at RD.
18300 of Nuh Drain from village Ujina to Terakpur
M 167.23 67.23
195 PUNHANA YWS CIRCLE
FARIDABAD
Flood Agenda for replacement of V.R. Bridge at RD.1350
of North Possar Drain.
M 34 17
196 PUNHANA YWS CIRCLE
FARIDABAD
Flood Agenda for replacement of V.R. Bridges at
RD.1826 and RD.4181 of Maryaka Drain
M 68 34
197 PUNHANA YWS CIRCLE
FARIDABAD
Flood Agenda for re-construction of V.R Bridge at Km
33.70 (from village Leherwari to Khera) of Ujina Diversion
Drain in Distt. Nuh (Mewat).
M 177.41 77.41
Total 496.64 220.64
District Total (S+M+L) 741 220.64
198 HODAL YWS CIRCLE
FARIDABAD
Bringing Design section of Ujina Diversion Drain from KM
6.76 to 18.00
M 150 75
199 HODAL YWS CIRCLE
FARIDABAD
Agenda for replacement of V.R.Bridge at KM 7.158 from
Vilage Khirbi to Hathana of U.D.D.
M 375 175
200 PALWAL YWS CIRCLE
FARIDABAD
Agenda for Constructing Pucca Hump at RD 152000 of
Gaunchi Main Drain.
M 138.29 48.29
Total 663.29 298.29
District Total (S+M+L) 663.29 298.29
201 GANAUR YWS CIRCLE
SONEPAT
Providing Protection to Bega Complex by constructing 4
No. new stone studs on River Yamuna after flood 2019
in district Sonipat.
S 80 0
202 RAI YWS CIRCLE
SONEPAT
Providing protection at Tikola Complex by constructing 1
No. New stone stud and 350 ft revetment and repairing of
04 No. stone stud on River Yamuna after flood 2019 in
District Sonipat.
S 75 0
203 RAI YWS CIRCLE
SONEPAT
Providing protection at Mimarpur Complex by Repairing
of 02 No. stone stud on River Yamuna after flood 2019 in
District Sonipat.
S 14 0
Total 169 0
District Total (S+M+L) 169 0
Unit Total 2091.69 623.08
Grand Total 19830.57 5806.25
169 0
1468.61 0
13133.43 890.9
75 0
14 0
169 0
365 0
Dist:- SONIPAT80 0
200 0
90 0
365 0
520.36 0
Dist:- PALWAL75 0
34 0
100 0
276 0
8 0
100 0
17 0
17 0
65
Name of
Constituenc
y
Name of Irrigation
Circle
Name of Work Appvd.
in
meeting
of
HSFCB
(S/M/L) Est. Cost Phy.
Prog.
AMBALA
CITY
SYL CIRCLE
AMBALA
Rehabilitation and up gradation of Pump
House at RD 0 of Mahesh Nagar Drain to
protect the abadi of Ambala Cantt , villages
Boh, Babyal and Dalip Ghar etc. from River
Tangri
47th S 230.40 100 %
AMBALA
CANTT.
SYL CIRCLE
AMBALA
Upgradation of existing pump house at Babyal
by providing 2No. VT Pumps of 50 Cuces each
for the protection of village abadi of Boh,
Babyal and Dalipgarh of Ambala Cantt
48th S 260.00 100 %
AMBALA
CITY
SYL CIRCLE
AMBALA
Scheme for strengthening of Ghaggar bund by
laying stone pitching over crated stone toe wall
in reach rd 45620 to 47240 D/S inlet to protect
abadi of village Devi Nagar/Ambala City from
river Ghaggar (Near Drain Portion)
49th S 120.83 100 %
AMBALA
CITY
SYL CIRCLE
AMBALA
Scheme for purchase of 1 No. Hydraulic
Excavator (Long Boom) Model EX-200 LC
Super fitted with Super long front END
attachment and standard kit for use in SYL
W.S. Division Ambala
49th S 54.90 100 %
MULLANA SYL CIRCLE
AMBALA
Constructing stone steining for the protection
of Abadi of village Kakkarkunda from River
Markanda
50th S 23.24 100 %
MULLANA SYL CIRCLE
AMBALA
Constructing stone steining for the protection
of Abadi and agriculture land of village
Rolanhari from River Markanda
50th S 11.91 100 %
NARAINGAR
H
SYL CIRCLE
AMBALA
Constructing stone steining for the protection
of Abadi of Durga Colony in Kala –Amb from
river Markanda
50th S 28.24 100 %
NARAINGAR
H
SYL CIRCLE
AMBALA
Constructing stone steining for the protection
of agriculture land of village Pullewala from
River Begna
50th S 20.00 100 %
NARAINGAR
H
SYL CIRCLE
AMBALA
Constructing stone stud for the protection of
agriculture land of village Ambli from River
markanda
50th S 42.91 100 %
NARAINGAR
H
SYL CIRCLE
AMBALA
Constructing stone steining for the protection of
abadi of village Ramabagh Colony in Kala-Amb
from river Markanda
50th S 50.00 100 %
NARAINGAR
H
SYL CIRCLE
AMBALA
Repair and replenishing old stone steining for
the protection of abadi of village Kala-Amb
from river Markanda
50th S 30.00 100 %
NARAINGAR
H
SYL CIRCLE
AMBALA
Repair and replenishing old stone steining for
the protection of abadi of village Jiriwala from
Sakroon Nadi
50th S 18.21 100 %
NARAINGAR
H
SYL CIRCLE
AMBALA
Constructing stone steining for the protection of
Shamshanghat and agriculture land of village
Nasrouli from Dhanana Chowe
50th S 18.11 100 %
NARAINGAR
H
SYL CIRCLE
AMBALA
Constructing stone steining for the protection of
Dera on Ganda Nallah
50th S 7.20 100 %
AMBALA
CANTT.
SYL CIRCLE
AMBALA
Scheme for constructing cause way on field
road from village Ghasitpur to village Dukheri
in District Ambala
49th M 90.00 100 %
District Total 1005.95
FATEHABAD
14 Completed
15 Completed
12 Completed
13 Completed
10 Completed
11 Completed
8 Completed
9 Completed
6 Completed
7 Completed
4 Completed
5 Completed
2 Completed
3 Completed
AMBALA
1 Completed
BWS
Annexure 5.1
Head:Flood Protection Works
Status: Completed,
(Rs. in lacs)
Sr.
No
Status
Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB
66
Name of
Constituenc
y
Name of Irrigation
Circle
Name of Work Appvd.
in
meeting
of
HSFCB
(S/M/L) Est. Cost Phy.
Prog.
Annexure 5.1
Head:Flood Protection Works
Status: Completed,
(Rs. in lacs)
Sr.
No
Status
Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB
TOHANA BWS CIRCLE
FATEHABAD
Providing protection to X-ing River Ghaggar
Syphon RD 64050 Bhakra Main Branch
49th S 111.86 100 %
TOHANA BWS CIRCLE
FATEHABAD
Constructing protection wall and pitching on
side slope to provide protection to the bank of
Rangoi Nallah at RD 9.35 Km (Construct on
one side first)
49th M 38.84 100 %
TOHANA BWS CIRCLE
FATEHABAD
Constricting 10 Nos Outlet/inlet at various sites
of Rangoi Nallah
49th M 35.06 100 %
TOHANA BWS CIRCLE
FATEHABAD
Agenda note for constructing pipeline drains for
dewatering of floodwater of village Shakkerpura
falling into Rangoi Nallah at RD 7.25 Km Right
side
50th M 19.14 100 %
TOHANA BWS CIRCLE
FATEHABAD
Agenda note for constructing pipeline drains for
de-watering of floodwater of village Talwara
outfalling into River Ghaggar U/S Bridge at
Jakhal - Kullan Road
50th M 12.64 100 %
District Total 217.54
NARNAUND BWS CIRCLE
HISAR
Laying of pipe line and installation of
submersible pump set with solar system in
village Singhwa behind sugar mill. (Issue MOU
in similar cases)
49th S 208.00 100 %
HANSI BWS CIRCLE
HISAR
Protection of Hansi Drain by providing pitching
U/S and D/S of bridges and minor at various
points.
49th S 17.05 100 %
HANSI BWS CIRCLE
HISAR
Bring to design section of HMPC Drain (RD 0
to 38320)
50th S 45.00 100 %
NARNAUND BWS CIRCLE
HISAR
Bring to design section of BMPC Drain (RD 0
to 155580)...
50th S 137.00 100 %
NARNAUND BWS CIRCLE
HISAR
Bring to design section of Puthi Mundhal Link
Drain (RD 0 to 60000).
50th S 32.00 100 %
ADAMPUR BWS CIRCLE
HISAR
Providing protection and restoration of capacity
of Hisar Ghggar Multipurpose channel (Drain)
from RD 205230 to 269650 (Supplementary
Scheme).
50th M 80.25 100 %
District Total 519.30
GUHLA BWS CIRCLE
KAITHAL
Scheme for constructing inlet at RD 100700 of
Ghaggar Bund to drain out the flood water of
village namely Channa Jattan, Seon Majra,
Duserpur and Bhatian.
50th S 21.08 100 %
KAITHAL BWS CIRCLE
KAITHAL
Scheme for replacement of pipe type bridge
into slab type bridge at RD 1936 of Old Manas
Link Drain leading from village Qutabpur to
Bhanpura.
50th S 5.30 100 %
KAITHAL BWS CIRCLE
KAITHAL
Scheme for re-construction of bridge at RD
15750 on Mago Majri Link Drain leading from
village Sirta to Kaithal.
50th S 12.50 100 %
District Total 38.88
PEHOWA SYL CIRCLE
AMBALA
SCHEME FOR CONSTRUCTION OF
HUMP/FALL AT RD 300/200 OF JAKHWALA
DRAIN TO PROTECT THE AGRICULTURE
LAND OF VILLAGE JAKHWALA, TEOKAR,
TANGOLI, PUNJAB AREA ETC
49th S 15.00 100 %
PEHOWA SYL CIRCLE
AMBALA
Scheme for construction of V.R. Bridge at RD
13022 Sandholi Drain on Pehowa to Dera
Fateh Singh Road.
50th S 50.60 100 %
30 Completed
31 Completed
KURUKSHETRA
28 Completed
29 Completed
KAITHAL
27 Completed
26 Completed
24 Completed
25 Completed
22 Completed
23 Completed
HISAR
21 Completed
20 Completed
18 Completed
19 Completed
16 Completed
17 Completed
67
Name of
Constituenc
y
Name of Irrigation
Circle
Name of Work Appvd.
in
meeting
of
HSFCB
(S/M/L) Est. Cost Phy.
Prog.
Annexure 5.1
Head:Flood Protection Works
Status: Completed,
(Rs. in lacs)
Sr.
No
Status
Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB
PEHOWA SYL CIRCLE
AMBALA
Scheme for construction of V.R. Bridge at RD
15300 Sandholi Drain on Pehowa to Pooja
Colony Road.
50th S 43.17 100 %
THANESAR SYL CIRCLE
AMBALA
Procurement of 1 No. Eicher Truck Tempo
Model 1110 XP
50th S 18.77 100 %
THANESAR SYL CIRCLE
AMBALA
Construction of sumpwell at RD 87000 of Sirsa
Branch upstream at Budhera Complex.
50th S 5.00 100 %
District Total 132.54
PANCHKUL
A
SYL CIRCLE
AMBALA
Purchase of 2 no. Diesel driven Pump Set of 2
Cs capacity for W/S Sub Dn Panchkula
48th S 5.44 100 %
PANCHKUL
A
SYL CIRCLE
AMBALA
Scheme for constructing 232 ft three tier
steining for the protection of village Shamshan
Ghat and Bataur Bundh of village Bataur from
river Tangri after flood 2018
50th S 20.92 100 %
KALKA SYL CIRCLE
AMBALA
Scheme for constructing 448 ft three tier
steining for the protection of village abadi of
village Natwal from river Tangri after flood 2018
50th S 40.32 100 %
PANCHKUL
A
SYL CIRCLE
AMBALA
Scheme for constructing 248 ft double tier
steining, for the protection of village abadi of
village Nada from Nada Choe tributary of river
Ghaggar after flood 2018
50th S 12.47 100 %
PANCHKUL
A
SYL CIRCLE
AMBALA
Scheme for constructing 448 feet double tier
steining for the protection of abadi area of
village Manakyan from River Manakyan wali
nadi tributary of river Ghaggar after flood 2018
50th S 20.00 100 %
PANCHKUL
A
SYL CIRCLE
AMBALA
Scheme for constructing 568 feet three tier
steining for the protection of Rehod Bundh and
agriculture land of village Rehod from River
Tangri after flood 2018
50th S 45.00 100 %
KALKA SYL CIRCLE
AMBALA
Scheme for constructing 512 feet double tier
steining for the protection of Government
school of village Mandalya from River Begna
after flood 2018
50th S 25.62 100 %
KALKA SYL CIRCLE
AMBALA
Scheme for constructing 536 feet three tier
steining for the protection of village abadi of
village Mirpur from Mirpur Wali Nadi tributary of
River Tangri after flood 2018
50th S 60.88 100 %
KALKA SYL CIRCLE
AMBALA
Scheme for constructing 4 No. bed bars and
repair of damaged Ishar Nagar Drain to protect
abadi and road of village Ishar Nagar and
Himshikha from Ishar Nagar Drain and
Kaushalya River after flood 2018
50th S 60.47 100 %
KALKA SYL CIRCLE
AMBALA
Scheme for constructing 464 feet (296 plus
168) double tier steining for the protection of
village abadi of village Paploha from River
Baadgodam, tributary of River Sarsa after flood
2018
50th S 23.30 100 %
KALKA SYL CIRCLE
AMBALA
Scheme for constructing 576 feet (328 plus
248) three tier steining for the protection of
abadi of village Rampur Seori from River
Jhajjra after flood 2018
50th S 51.83 100 %
KALKA SYL CIRCLE
AMBALA
Double tier steining for the protection of village
of village Jholuwal from Sirsa River after flood
2018 (Supplementry Scheme).
50th S 17.00 100 %46 Completed
44 Completed
45 Completed
42 Completed
43 Completed
40 Completed
41 Completed
38 Completed
39 Completed
36 Completed
37 Completed
PANCHKULA
35 Completed
34 Completed
32 Completed
33 Completed
68
Name of
Constituenc
y
Name of Irrigation
Circle
Name of Work Appvd.
in
meeting
of
HSFCB
(S/M/L) Est. Cost Phy.
Prog.
Annexure 5.1
Head:Flood Protection Works
Status: Completed,
(Rs. in lacs)
Sr.
No
Status
Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB
KALKA SYL CIRCLE
AMBALA
Three tier steining for the protection of village
abadi of village Madhanwala from River
Madhanwali after flood 2018 (Supplementry
Scheme).
50th S 23.00 100 %
District Total 406.25
ELLENABAD BWS CIRCLE
SIRSA
Internal clearance of Hisar-Ghaggar
Multipurpose Drain from RD. 0-141000
50th S 26.80 100 %
ELLENABAD BWS CIRCLE
SIRSA
Bringing to design section and unloading of
Bank of Hisar-Ghaggar Multipurpose Drain
from RD. 111000-127000.
50th S 14.54 100 %
KALANWALI BWS CIRCLE
SIRSA
Agenda Note for Internal clearance of Rori
Ghaggar Drain from RD 100000 to 130750-Tail
and its subsidiary Drains
50th S 9.45 100 %
District Total 50.79
Unit Total 2371.25
GURGAON CONSTRUCTION
CIRCLE GURGAON
Procurement of Earth Moving Machine for
internal clearance of Drains (Supplementary
Agenda).
49th S 60.00 100 %
District Total 60.00
NILOKHERI SARASWATI
HERITAGE CIRCLE
KURUKSHETRA
Construction of sumpwell and pumphouse at
tail R.D116400 of Rakshinadi out falling into
Sirsa branch.
50th S 34.90 100%
District Total 34.90
PEHOWA SARASWATI
HERITAGE CIRCLE
KURUKSHETRA
Construction of inlet at RD 116200 of Saraswati
Drain for protection of abadi of villages:
Bilochpura, Dhanipura, Urnai, Sainsa and
Saraswati Khera etc.
50th S 19.02 100 %
District Total 19.02
GARHI
SAMPLA -
KALOI
YWS CIRCLE
ROHTAK
Reconstruction of 01 no. V.R. Bridge at RD
56044 on drain no. 8
49th M 153.19 100 %
MEHAM YWS CIRCLE
ROHTAK
Reconstruction of 01 no. V.R bridge at RD
100000 on drain no. 8
49th M 133.18 100 %
District Total 286.37
Unit Total 400.29
BHIWANI LWS CIRCLE
BHIWANI
Agenda note for procurement of new earth
moving machine for internal clearance of drains
and banks strengthening of canal and drain
(Supplementary Agenda).
49th S 60.00 100 %
DADRI LWS CIRCLE
BHIWANI
Increasing capacity of Jai Shree Drain from RD
0 to13500 outfalling at RD 89000-R Loharu
Feeder.
42th M 484.05 100 %
District Total 544.05
Charkhi Dadri
56 Completed
57 Completed
LCU
BHIWANI
54 Completed
55 Completed
ROHTAK
KURUKSHETRA
53 Completed
52 Completed
KARNAL
GURGAON
51 Completed
CONSTRUCTION
50 Completed
48 Completed
49 Completed
SIRSA
47 Completed
69
Name of
Constituenc
y
Name of Irrigation
Circle
Name of Work Appvd.
in
meeting
of
HSFCB
(S/M/L) Est. Cost Phy.
Prog.
Annexure 5.1
Head:Flood Protection Works
Status: Completed,
(Rs. in lacs)
Sr.
No
Status
Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB
DADRI LWS CIRCLE
BHIWANI
Increasing Capacity of Bond Drain and Brick
Pitching on one sides from RD 12000 to 20435
Bond Drain outfall at RD 6000-R of Bond Disty.
50th S 250.00 100 %
DADRI LWS CIRCLE
BHIWANI
Laying Underground Pipe Line in Jai Shree
Link Drain from RD 0 to 8200 outfall at RD
12700-L of Jai Shree Drain.
50th S 231.00 100 %
DADRI LWS CIRCLE
BHIWANI
Increasing Capacity of Nimri Malkosh Link
Drain from RD 0 to 12244 outfall at RD 2350-R
of Bond Drain.
50th S 137.00 100 %
DADRI LWS CIRCLE
BHIWANI
Procurement of New Earth moving machine for
Internal clearance of drain and bank
strengthening of Canal and drains in LWS
circle Bhiwani specially for District Ch. Dadri
50th S 25.60 100 %
DADRI LWS CIRCLE
BHIWANI
Agenda Note for Purchase of Vechicle for flood
Dewatering work.
50th S 17.85 100 %
DADRI LWS CIRCLE
BHIWANI
Agenda Note for Purchase of 10 Cs. V.T.
Pumps for flood Dewatering.
50th S 115.00 100 %
DADRI LWS CIRCLE
BHIWANI
Procurement of 4 No. 10 cs. Vertical pumps
alongwith motors of 50 HP, starters and 20 No.
EP sets of 3 cs. Capacity (Ex-Post Facto
approval)
50th S 72.50 100 %
District Total 848.95
JHAJJAR JWS CIRCLE
JHAJJAR
Agenda note for procurement of new earth
moving machine for internal clearance of
drains and bank strengthening of Canal and
Drain.
49th S 180.00 100 %
BERI JWS CIRCLE
JHAJJAR
Agenda note for constructing Pump House
Beldar Hut and purchasing new Pumps Motors,
Control Panel and allied accessories at RD 216-
R of JLN Feeder.
49th S 62.50 100 %
BERI JWS CIRCLE
JHAJJAR
Agenda note for Proposed pipe line to dewater
pond of village Dujana from RD 0 to 2200
outfalling into Beri Dujana Dhaur link drain at
RD 38025
50th S 9.31 100 %
JHAJJAR JWS CIRCLE
JHAJJAR
Agenda note for Constructing RCC Pipe culvert
at RD 290550-R of Ditch Drain R/side of JLN
Feeder
50th S 15.00 100 %
JHAJJAR JWS CIRCLE
JHAJJAR
Agenda note for providing Geo Membrane to
control sloughing in Matanhail Pump House
link drain along with slope of ramp of VR Bridge
RD 297000-R of JLN feeder.
50th S 20.14 100 %
JHAJJAR JWS CIRCLE
JHAJJAR
Agenda note for dewatering of flood water by
reversible bore wells in village Kondrawali (on
sample basis).
50th S 8.74 100 %
BERI JWS CIRCLE
JHAJJAR
Agenda note for Dewatering of flood water by
reversible bore-wells of village Dighal.
50th S 8.74 100 %
JHAJJAR JWS CIRCLE
JHAJJAR
Procurement of HDPE pipeline 200 mm dia and
160 mm dia in W.S Mech. Divn. Jhajhar (Ex-
Post Facto approval).
50th S 32.00 100 %
District Total 336.43
NANGAL
CHOUDHRY
JLN WS CIRCLE
NARNAUL
Constructing of Waste weir/spillway at Totaheri
Bund on Krishnwati River.
48th S 312.47 100 %
MAHENDRAGARH
73 Completed
72 Completed
70 Completed
71 Completed
68 Completed
69 Completed
66 Completed
67 Completed
JHAJJAR
65 Completed
64 Completed
62 Completed
63 Completed
60 Completed
61 Completed
58 Completed
59 Completed
70
Name of
Constituenc
y
Name of Irrigation
Circle
Name of Work Appvd.
in
meeting
of
HSFCB
(S/M/L) Est. Cost Phy.
Prog.
Annexure 5.1
Head:Flood Protection Works
Status: Completed,
(Rs. in lacs)
Sr.
No
Status
Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB
NARNAUL JLN WS CIRCLE
NARNAUL
Agenda note for procurement of new earth
moving machine for internal clearance of drains
and banks strengthening of canal and drain
(Supplementary Agenda).
49th S 30.00 100 %
District Total 342.47
REWARI JLN WS CIRCLE
REWARI
Agenda note for procurement of new earth
moving machine for internal clearance of drains
and banks strengthening of canal and drain
(supplementary Agenda)
49th S 60.00 100 %
District Total 60.00
MEHAM YWS CIRCLE
ROHTAK
Constructing Bharan Sub Link Drain from RD 0
to 2150 outfall at RD 5800-L Ajaib Bharan Link
Drain.
48th S 28.60 100 %
BERI YWS CIRCLE
ROHTAK
Construction of Link Drain from Kharhar to
village Mandothi side drain.
48th S 174.74 100 %
MEHAM YWS CIRCLE
ROHTAK
Constructing Pump House at RD 122000/R
Meham Drain.
48th S 16.00 100 %
MEHAM YWS CIRCLE
ROHTAK
Brick Pitching of Bahu Akbarpur Link Drain
from RD 3750 to 4850 and inlet of Lakhan
Majra Link Drain at RD 29750.
49th S 18.20 100 %
KALANAUR YWS CIRCLE
ROHTAK
Laying underground PVC pipeline at village
pond Kateshra to Pilana Minor RD 10700-R
(Supplementary Scheme)
50th S 38.00 100 %
KALANAUR YWS CIRCLE
ROHTAK
Procurement of PVC pipeline of 8 inch dia to
drain out flood water from the fields of village
Gudhan and Katesra (Ex-Post Facto approval ).
50th S 29.60 100 %
MEHAM YWS CIRCLE
ROHTAK
Agenda note for constructing vertical wall on
left side in south Behlaba Drain From RD 1110
to 1810.
49th M 31.30 100 %
ROHTAK YWS CIRCLE
ROHTAK
Agenda note for Procurement of New V.T
Pumps for flood protection works in W.S.
Mech. Division, Rohtak.
49th M 99.00 100 %
GOHANA YWS CIRCLE
ROHTAK
Agenda note for construction of Civil structure
(pump house) and procurement of New Pumps
for flood protection works at Banwasa Pump
House RD 46000-R Chhapra Drain village
Banwasa in W.S. Mech. Division, Rohtak.
49th M 104.00 100 %
ROHTAK YWS CIRCLE
ROHTAK
Agenda note for procurement of New Pumps
for flood protection works at nine number of
Newly constructed pump houses at RD 46000-
L Meham Drain, RD 46000-R Meham Drain,
RD 47900-L Meham Drain, RD 47900-R
Meham Drain, 62000-L Meham Drain, RD
63000-R Meham Drain RD 86000-R Meham
Drain, RD 94000-R B.S.B. and RD 43000
Kahanaur Disty. in W.S. Mech. Division,
Rohtak.
49th M 332.00 100 %
ROHTAK YWS CIRCLE
ROHTAK
Agenda Note for Replacement of V.R. Bridge
at RD 31200 of Jassia Drain.
50th M 19.00 100 %86 Completed
84 Completed
85 Completed
82 Completed
83 Completed
80 Completed
81 Completed
78 Completed
79 Completed
76 Completed
77 Completed
ROHTAK
REWARI
75 Completed
74 Completed
71
Name of
Constituenc
y
Name of Irrigation
Circle
Name of Work Appvd.
in
meeting
of
HSFCB
(S/M/L) Est. Cost Phy.
Prog.
Annexure 5.1
Head:Flood Protection Works
Status: Completed,
(Rs. in lacs)
Sr.
No
Status
Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB
ROHTAK YWS CIRCLE
ROHTAK
Agenda note for providing and laying
interlocking tiles from RD 105260 to 107200
BSB and from RD 107200 BSB to Meham
Drain Pump House RD 73000-Left Side on
service road.
50th M 32.14 100 %
District Total 922.58
BARODA YWS CIRCLE
ROHTAK
Agenda note for constructing vertical walls
Chhapra drain from RD 46000 to 48500 both
sides.
49th M 115.44 100 %
BARODA YWS CIRCLE
ROHTAK
Agenda note for reconstruction of V.R. Bridges
at RD 4670 and 7130 Wazirpur Khandrai link
drain.
49th M 41.35 100 %
District Total 156.79
Unit Total 3211.27
KARNAL WORKSHOP
CIRCLE KARNAL
Procuring 10 no. V.T. Pumps (5 cs. capacity
each) for Kurukshetra District for dewatering.
(43rd). (45th)
45th S 80.00 100 %
JIND WORKSHOP
CIRCLE KARNAL
Replacement/Renovation of V.T Pumps 48th M 233.75 100 %
District Total 313.75
Unit Total 313.75
TOSHAM YWS CIRCLE
BHIWANI
20 No. TV-2 DP set 14 HP to 16 HP, 20 no.
Submersible Pump set 20 HP8 stage, 10 no.
V.T Pump 5 Cs discharge with motor of column
height 10` and 2 no. Bolero Camper (5 seater
cabin).
48th S 107.00 100 %
District Total 107.00
SAFIDON YWS CIRCLE JIND Brick Pitching in side slope and Bed in Head
Reach RD 128000 to RD 129000 and U/S and
D/s of railway x-ing from RD 118100 to RD
119100 and Berm Cutting from RD 116000 to
RD 128000 including construction of cattle ghat
at RD 128800 of Nai Nallah Drain/ Indri Drain
48th S 275.43 100 %
JULANA YWS CIRCLE JIND Increasing capacity of Lizwana Pauli Drain from
RD 0 to 10000 including extension from RD
24800 to 26800 outfalling at RD 42000/R
Bhiwani Sub Branch (Through Lift System)
49th S 345.00 100 %
JULANA YWS CIRCLE JIND Agenda note for Padana Kalwa-Kinana Link
Drain from RD 0 to 14700 out falling at RD
81000/R Sunder Sub Branch(Through Lift
System).
49th S 272.00 100 %
JULANA YWS CIRCLE JIND Bringing to design section of Nandgarh
Sirsakheri Drain from RD 0 to RD 9600 falling
at RD 18750/R Quilazafargarh Minor.
49th S 45.31 100 %
SAFIDON YWS CIRCLE JIND Agenda for bringing to Design Section Hadwa
Gangoli Link Drain from RD 0 to RD 36600
including Re-Construction of One No. Bridge
50th S 51.89 100 %
96 Completed
97 Completed
94 Completed
95 Completed
JIND
93 Completed
92 Completed
YWS(N)
BHIWANI
90 Completed
91 Completed
PROJECT, ENVIRONMENT AND
MATERIALKARNAL
88 Completed
89 Completed
SONIPAT
87 Completed
72
Name of
Constituenc
y
Name of Irrigation
Circle
Name of Work Appvd.
in
meeting
of
HSFCB
(S/M/L) Est. Cost Phy.
Prog.
Annexure 5.1
Head:Flood Protection Works
Status: Completed,
(Rs. in lacs)
Sr.
No
Status
Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB
SAFIDON YWS CIRCLE JIND Agenda for Construction of Permanent Pump
House (Sump Well Only) at RD 4500/L
Bhirtana Link Drain
50th S 7.00 100 %
JULANA YWS CIRCLE JIND Agenda for increasing capacity of Kalwa
Kinana Drain RD 0 to RD 19000 from 125 cs to
150 cs lifting at RD 81000/R Sunder Sub
Branch
50th M 51.00 100 %
JULANA YWS CIRCLE JIND Agenda for Providing Brick Pitching in reach
RD 43250 to RD 43850 Kalwa Kinana Drain
lifting at RD 81000/R Sunder Sub Branch.
50th M 50.44 100 %
District Total 1098.07
NILOKHERI YWS CIRCLE
KARNAL
Replacement of existing pipe culvert at RD
35830 and 52050 and desilting from RD 51150
to RD 53150 including replacement of outlet at
outfall point on Balu Link Drain
49th S 92.60 100 %
ASSANDH YWS CIRCLE
KARNAL
Replacement of VR Bridge at RD 78600 Indri
Drain
49th S 100.95 100 %
ASSANDH YWS CIRCLE
KARNAL
Replacement of VR Brdige at RD 39600 Indri
Drain
49th S 167.28 100 %
ASSANDH YWS CIRCLE
KARNAL
Remodeling of Nai Nallah Drain Near Village
Padha by providing earthen banks with pitching
towards Panch Dev Tirth for maintaining the
Sancity of Panch Dev Tirth
49th S 37.01 100 %
ASSANDH YWS CIRCLE
KARNAL
Construction of permanent pump house on
Bhakra Main Line Hansi Butana Canal Near
Karnal Assandh Road for disposal of Flood
Water of Village Uplana, Thari, Chorkarsa,
Daachar for the year of 2018-19.
49th S 77.35 100 %
ASSANDH YWS CIRCLE
KARNAL
Replacement of V.R. Bridge at RD 11010 of
Sheikhupura Manchuri Drain.
49th S 19.77 100 %
INDRI YWS CIRCLE
KARNAL
Agenda for the work of providing protection to
Kalsora Complex by repairing 8 No. old
damaged stone stud and constructing 610’
stone revetment on river Yamuna after flood
2018
50th S 160.59 100 %
INDRI YWS CIRCLE
KARNAL
Agenda for the work of providing protection to
Nabiabad Complex by repairing 3 No.
damaged stone studs on river Yamuna after
flood 2018
50th S 19.86 100 %
GHARAUND
A
YWS CIRCLE
KARNAL
Agenda for the work of providing protection to
Jammukhala Complex by constructing 465’
stone revetment, 1 No. new stone stud and
repairing of 4 No. stone studs on river Yamuna
after flood 2018
50th S 155.10 100 %
GHARAUND
A
YWS CIRCLE
KARNAL
Agenda for the work of providing protection to
Mustfabad Complex by constructing 726’
stone revetment and repairing of 6 No. stone
stud on river Yamuna after flood 2018
50th S 291.41 100 %
ASSANDH YWS CIRCLE
KARNAL
Replacement of VR Bridge at RD 0 of Assandh
Bund Drain.
49th M 24.12 100 %
NILOKHERI YWS CIRCLE
KARNAL
Replacement Of Existing Pipe Culverts At RD
33530 and RD 45050 Of Balu Link Drain
50th M 35.64 100 %
District Total 1181.68
PANIPAT
112 Completed
110 Completed
111 Completed
108 Completed
109 Completed
106 Completed
107 Completed
104 Completed
105 Completed
102 Completed
103 Completed
KARNAL
101 Completed
100 Completed
98 Completed
99 Completed
73
Name of
Constituenc
y
Name of Irrigation
Circle
Name of Work Appvd.
in
meeting
of
HSFCB
(S/M/L) Est. Cost Phy.
Prog.
Annexure 5.1
Head:Flood Protection Works
Status: Completed,
(Rs. in lacs)
Sr.
No
Status
Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB
ISRANA YWS CIRCLE
KARNAL
Protection against errosion of agriculture land
of Dadlana village from flood and waste water
flowing in Munak Drain by providing lining from
RD 27360 to 28950.
48th S 39.04 100 %
SAMALKHA YWS CIRCLE
KARNAL
Protection of village pond, land and Abadi of
village Balana and Mandi from flood and waste
chemical water flowing in Try. Drain no.4 by
providing lining in drain in concerened villages
48th S 149.89 100 %
ISRANA YWS CIRCLE
KARNAL
Protection of village pond, land and Abadi of
village Shodhapur from flood and waste water
flowing in Nohra Drain by providing lining in
village
48th S 145.61 100 %
PANIPAT
RURAL
YWS CIRCLE
KARNAL
Replacement/construction of Bridges at RD
134800 and 72500 on Main drain No. 2
49th S 424.06 100 %
ISRANA YWS CIRCLE
KARNAL
Replacement of Bridges at RD 18156 and
28270 on Thirana Drain
49th S 44.03 100 %
ISRANA YWS CIRCLE
KARNAL
Replacement of Bridges at RD 25300, 42320
and 52450 on Try. Drain No. 2.
49th S 79.10 100 %
ISRANA YWS CIRCLE
KARNAL
Replacing of VR Bridge at RD 21650, 47133
and 48200 on Joshi Drain
49th S 92.06 100 %
ISRANA YWS CIRCLE
KARNAL
Protection of village pond, land and abadi of
village Waiser from flood and waste
contaminated water flowing in Try. Drain No. 1
by providing lining from RD 39700 to 36200
(Water sample be taken before and after
execution of scheme).
49th S 176.96 100 %
SAMALKHA YWS CIRCLE
KARNAL
Replacement/construction of Bridges at RD
3035, 8830 and 68280 on Panipat Drain
49th S 118.64 100 %
SAMALKHA YWS CIRCLE
KARNAL
Providing protection to Tamsabad complex by
repairing 2 No. stone studs and construction of
486’ long revetment.
50th S 46.66 100 %
SAMALKHA YWS CIRCLE
KARNAL
Providing protection to Mirzapur complex by
repairing 3 No. stone studs and repair of
Revetment
50th S 49.97 100 %
SAMALKHA YWS CIRCLE
KARNAL
Providing protection to Nanhera Complex by
repairing 3 No. old stone studs
50th S 37.24 100 %
ISRANA YWS CIRCLE
KARNAL
Separation of village pond from flood and
waste chemical water flowing in Try. Drain No.
1 and protection to village abadi in village
Bhandari
50th M 108.32 100 %
District Total 1511.58
RADAUR HKB CIRCLE
JAGADHRI
Rehabilitation of Rakshi Nallah from RD 0 to
90000 (Supplementary Agenda)
49th S 187.00 100 %
YAMUNA
NAGAR
HKB CIRCLE
JAGADHRI
Agenda for construction of 1855 ft. stone
steining and 06 no. stone studs for the
protection of village Odri from river Yamuna.
50th S 195.00 100 %
SADHAURA HKB CIRCLE
JAGADHRI
Agenda for providing 03 Nos. Bed Bars for
protection of village Rajpur Bund from river
Pathrala.
50th S 19.91 100 %
RADAUR HKB CIRCLE
JAGADHRI
Agenda for Construction of 1730 ft. Stone
steining for the protection of village Kamalpur
from river Yamuna.
50th S 108.47 100 %
128 Completed
129 Completed
126 Completed
127 Completed
YAMUNANAGAR
124 Completed
125 Completed
122 Completed
123 Completed
120 Completed
121 Completed
118 Completed
119 Completed
116 Completed
117 Completed
114 Completed
115 Completed
113 Completed
74
Name of
Constituenc
y
Name of Irrigation
Circle
Name of Work Appvd.
in
meeting
of
HSFCB
(S/M/L) Est. Cost Phy.
Prog.
Annexure 5.1
Head:Flood Protection Works
Status: Completed,
(Rs. in lacs)
Sr.
No
Status
Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB
RADAUR HKB CIRCLE
JAGADHRI
Agenda for Construction of 02 Nos. stone studs
and 230 ft. Stone steining for the protection of
village Ramgarh/Bagwali from river Yamuna.
50th S 60.77 100 %
RADAUR HKB CIRCLE
JAGADHRI
Agenda for construction of 6 No. stone studs
and 700 feet stone steining for protection of
village Lal Chappar from river Yamuna.
50th S 181.00 100 %
SADHAURA HKB CIRCLE
JAGADHRI
Agenda for restoration of Rampur Jattan Bund
on river Pathrala.
50th S 8.54 100 %
JAGADHRI HKB CIRCLE
JAGADHRI
Agenda for constructing 1500 ft. bund with
stone pitching for the protection of Village
Shazadwala From Chikken Khol (River
Pathrala ).
50th S 44.55 100 %
JAGADHRI HKB CIRCLE
JAGADHRI
Agenda for construction of stone steining
between studs and renovation of 02 nos. old
stone studs for the protection of Village Mali
Majra From River Yamuna.
50th S 77.43 100 %
JAGADHRI HKB CIRCLE
JAGADHRI
Agenda for construction of stone steining
between studs and renovation of 02 nos. old
stone studs for the protection of Village
Nawazpur From River Yamuna.
50th S 85.43 100 %
JAGADHRI HKB CIRCLE
JAGADHRI
Agenda for Renovation 3000` old Bund with
stone pitching for the protection of Village
Mukaravpur From Plasi Khol (River Pathrala).
50th S 77.10 100 %
RADAUR HKB CIRCLE
JAGADHRI
Agenda for providing 140 mtr. stone steining
between studs for the protection of village
Abadi of Gumthala Rao from River Yamuna
after floods 2018 in District : Yamuna Nagar.
50th S 48.87 100 %
RADAUR HKB CIRCLE
JAGADHRI
Agenda for providing 260 mtr. stone steining
for the protection of village : Sandhala and
Nagli from River Yamuna after floods 2018 in
District : Yamuna Nagar.
50th S 89.67 100 %
JAGADHRI HKB CIRCLE
JAGADHRI
Agenda for Constructing 400 ft. Stone Steining
and 01 No. new stone stud for the protection of
Village Mamdubass from River Yamuna.
50th S 30.40 100 %
YAMUNA
NAGAR
HKB CIRCLE
JAGADHRI
Agenda for construction of sump well at RD
39000 R/s MLL to Drain Out Flood Water from
Agricultural land in Village Sugh, District
Yamuna Nagar after flood 2018
50th S 9.00 100 %
RADAUR HKB CIRCLE
JAGADHRI
Agenda for providing 400 Mtr. stone pitching
for the protection of village Gadholi Khurd at
RD 7525 Left side of Chautang Nallah.
50th S 30.00 100 %
JAGADHRI HKB CIRCLE
JAGADHRI
Agenda for Renovation of 300` old Stone
Steining along with construction of 250` stone
steining for the protection of Village Baniyawala
From Chikken Khol (River Pathrala).
50th S 9.72 100 %
SADHAURA HKB CIRCLE
JAGADHRI
Agenda for providing 328 feet Stone steining
for protection of village abadi of village Nagli
from river Pathrala.
50th S 7.83 100 %
JAGADHRI HKB CIRCLE
JAGADHRI
Construction for 03 no. studs for the protection
of village Kalesar from River Yamuna.
50th S 59.02 100 %144 Completed
142 Completed
143 Completed
140 Completed
141 Completed
138 Completed
139 Completed
136 Completed
137 Completed
134 Completed
135 Completed
132 Completed
133 Completed
130 Completed
131 Completed
75
Name of
Constituenc
y
Name of Irrigation
Circle
Name of Work Appvd.
in
meeting
of
HSFCB
(S/M/L) Est. Cost Phy.
Prog.
Annexure 5.1
Head:Flood Protection Works
Status: Completed,
(Rs. in lacs)
Sr.
No
Status
Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB
JAGADHRI HKB CIRCLE
JAGADHRI
Construction of 250 feet steining and 02 no.
stone studs for the protection of village
Baburam Bass from River Yamuna.
50th S 50.00 100 %
RADAUR HKB CIRCLE
JAGADHRI
Providing gates and gearing for X-regulation on
Bubka Head on Chauntg and Rakshi Nallah.
49th M 37.00 100 %
District Total 1416.71
Unit Total 5315.04
TIGAON YWS CIRCLE
FARIDABAD
Repairing of 7 Nos. stone studs to protect
village abadi and agricultural land of village
Dadasia/Kidawali River Complex A.F. 2018.
50th S 85.75 100 %
PRITHLA YWS CIRCLE
FARIDABAD
460 ft. edge protection to protect village abadi
and agriculture land of village Mohna R/C after
flood 2018
50th S 31.01 100 %
TIGAON YWS CIRCLE
FARIDABAD
6 no. Stone Studs to protect village Abadi and
it`s agricultural land of village chandpur R/C
A.F. 2018
50th S 137.41 100 %
District Total 254.17
PUNHANA YWS CIRCLE
FARIDABAD
Construction of X-regulator in Ujina Diversion
Drain near village Bichore (With 4 Nos. pump
houses).
47th S 600.00 100 %
HATHIN YWS CIRCLE
FARIDABAD
Extension to drain out the flood and seepage
water of Gurgaon Canal accumulated in laying
area of village Hasanpur, Kanali and Kherli-
Jeeta outfalling at RD 1300 of Existing Flood
Drain.
49th S 4.65 100 %
NUH YWS CIRCLE
FARIDABAD
Scheme for construction kaccha cunneete to
save agriculture land of vill. Devela Nangli from
water logging and outfall in Rithat Drain at RD.
6000
49th S 2.80 100 %
NUH YWS CIRCLE
FARIDABAD
Scheme for Tajpur (Ujina) earthen cunnittee
from RD. 0 to 11200 to save agriculture land
from water logging.
49th S 6.38 100 %
NUH YWS CIRCLE
FARIDABAD
Scheme for Dhenkli village earthen cunnette
from RD. 0 to 7250 to save agriculture land
from water logging.
49th S 12.64 100 %
NUH YWS CIRCLE
FARIDABAD
Scheme for Ujina village Pipe lines from RD.0
to 2905 to save agriculture land from water
logging.
49th S 7.55 100 %
District Total 634.02
HODAL YWS CIRCLE
FARIDABAD
CONSTRUCTION OF V.R. BRIDGE AT RD
105785 OF GAUNCHI MAIN DRAIN (FROM
VILLAGE KONDAL TO GHELAB).
49th S 177.51 100 %
HATHIN YWS CIRCLE
FARIDABAD
Replacement of V.R. Bridge at RD 82500 of
GMD (Village Sevali to Khatela Sarai). The
drawing for this bridge under preparation with
CDO, Panchkula.
49th S 174.96 100 %
HODAL YWS CIRCLE
FARIDABAD
Internal Clearance of GMD from RD 43300 to
229500 estimate is under observations
49th S 390.91 100 %
HODAL YWS CIRCLE
FARIDABAD
Constructing Pucca Hump at KM 7.50 of UDD
for providing Irrigation facilities in adjoining
area of village Khirbi and recharging thereof
ground water. The drawing received for
comments and re-submitted to CDO for
finalization.
49th S 155.23 100 %
158 Completed
159 Completed
156 Completed
157 Completed
PALWAL
154 Completed
155 Completed
152 Completed
153 Completed
150 Completed
151 Completed
MEWAT
148 Completed
149 Completed
FARIDABAD
147 Completed
YWS(S)
146 Completed
145 Completed
76
Name of
Constituenc
y
Name of Irrigation
Circle
Name of Work Appvd.
in
meeting
of
HSFCB
(S/M/L) Est. Cost Phy.
Prog.
Annexure 5.1
Head:Flood Protection Works
Status: Completed,
(Rs. in lacs)
Sr.
No
Status
Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB
PALWAL YWS CIRCLE
FARIDABAD
Scheme for construction of
Stone pitching to protect village
abadi and Sidh Baba Temple of
village Kushak on right side of
village Kushak on right side of
River Yamuna after flood 2018.
49th S 12.97 100 %
District Total 911.58
SAMALKHA YWS CIRCLE
SONEPAT
Agenda for construction of Bridge at RD
157330 of main Drain No. 2
49th M 503.00 100 %
District Total 503.00
SONEPAT YWS CIRCLE
SONEPAT
Internal clearance of East Juan Drain from RD
0 to 89500 and providing pitching on sides from
RD 49000 to 52000.
49th S 141.00 100 %
SONEPAT YWS CIRCLE
SONEPAT
Providing protection at Tikola Complex by
constructing 01 No. new stone stud and 1055
feet revetment on river Yamuna A/F 2018
(Supplementary Scheme)
50th S 98.45 100 %
GOHANA YWS CIRCLE
SONEPAT
To make pucca drain in village Bhatgaon
Dongran from Purbia Dera to Bhatgaon
Malyan i.e. providing brick lining on side slope
of Bhatgaon Dongran link Drain from RD 3500
to 5000 (CM Announcement code No. 23606)
(Supplementary Scheme).
50th S 16.00 100 %
District Total 255.45
Unit Total 2558.22
Grand Total 14169.82
164 Completed
162 Completed
163 Completed
SONIPAT
PANIPAT
161 Completed
160 Completed
77
Name of
Constituenc
y
Name of
Irrigation
Circle
Name of Work Appvd.
in
meeting
of
HSFCB
(S/M/L) Est. Cost Expdt.
booked
during year
Phy.
Prog.
Remarks Status
NARNAUND BWS
CIRCLE
HISAR
Rehabilitation of
Narnaund Drain
(RD 0 to 19689).
50th S 121.00 0.00 100 % No work was done as per site
requirement and the scheme is
required to be dropped.
Dropped
BARWALA BWS
CIRCLE
HISAR
Laying RCC pipe
line for Kharkari
Drain from RD 0 to
5800 out-falling at
RD 18900-R,
Balsamand Branch.
49th M 96.26 0.00 0 % The scheme already dropped
as per discussed with ACS,
Irrigation and WR Deptt.
Dropped
District Total 217.26 0.00
PEHOWA SYL
CIRCLE
AMBALA
Scheme for
procurement of
PVC pipeline for
flood in District
Kurukshetra
50th S 10.00 0.00 0 % Case has already been
submitted to higher Authority
for dropping this scheme vide
this office letter no. 7004-05/21-
W dated 18/10/2019
Dropped
THANESAR SYL
CIRCLE
AMBALA
Replacement of
one No. Diesel
Welding Set 550 A
(Moveable)
50th S 1.92 0.00 0 % Case has been submitted to
higher Authority for dropping
this scheme vide this office
letter no. 7004-05/21-W dated
18/10/2019
Dropped
PEHOWA SYL
CIRCLE
AMBALA
Scheme for
remodeling of
Sandholi Drain
from RD 12000 to
RD 18000 to
safeguard the
abadi as well as
agricultural area of
village Sandholi,
Sandhola,
Asmanpur,
Pehowa etc.
50th M 125.00 0.00 0 % Technical bid submitted to
Competent authority and
Worthy CE/BWS, IandWR
Department Panchkula issued
the direction that X-section of
the drain cannot reduced and
this scheme will be dropped out
in the next meeting of HSDR
and FCB received vide SE/SYL
W/S Circle Ambala vide letter
no. 5523/81-A dated
14.05.2019 and case for
dropping this scheme sent to
the higher office vide this office
letter no. 147 dated 03.06.2019.
Dropped
BWS
Annexure 5.2
Head:Flood Protection Works
Status: Dropped,
(Rs. in lacs)
Sr.
No
2
HISAR
1
4
5
KURUKSHETRA
3
Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB
78
Name of
Constituenc
y
Name of
Irrigation
Circle
Name of Work Appvd.
in
meeting
of
HSFCB
(S/M/L) Est. Cost Expdt.
booked
during year
Phy.
Prog.
Remarks Status
Annexure 5.2
Head:Flood Protection Works
Status: Dropped,
(Rs. in lacs)
Sr.
No
Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB
PEHOWA SYL
CIRCLE
AMBALA
Scheme for
extension of
Ismailabad Link
Drain (Katcha
Drain with land
acquisition) from
RD 17230 to RD
27230 parallel to
Thaska Distributary
from RD 36000 to
RD 26000.
50th L 523.37 0.00 0 % Agenda approved in meeting
for extension of Katcha Drain.
For execution of Katcha drain
about 5.05 Acres land is to be
acquired. The report of
demarcation of land received
from concerned Tehsildar but
undersigned is not satisfied.
Again demarcation was done
on dated 03.06.2018 the report
of Tehsildar has been received
on dated 11/06/2019. The
hearing was fixed on dated
23/10/2019 but no irrigator
attend the hearing. Now next
date of hearing is fixed on
dated 04/11/2019.
Dropped
District Total 660.29 0.00
Unit Total 877.55 0.00
BAHADURG
ARH
YWS
CIRCLE
ROHTAK
C.C. Concrete
lining in Abadi area
of village Asaudha
of West Jua drain
from RD 29500 to
34500
48th S 116.86 22.00 20 % The scheme has been dropped. Dropped
BAHADURG
ARH
YWS
CIRCLE
ROHTAK
Flood agenda for
re-construction of
V.R. Bridge at RD
31390 of West Jua
Drain
49th M 102.02 0.00 0 % Revised drawing
approved.Extra quantity
submitted to CE/LCU vide this
office letter no. 1456/36-W
dated 15.10.2019. Revised
flood agenda will be submitted
in the next meeting of HSFCB.
Dropped
District Total 218.88 22.00
Unit Total 218.88 22.00
LCU
6
8
ROHTAK
7
JIND
YWS(N)
79
Name of
Constituenc
y
Name of
Irrigation
Circle
Name of Work Appvd.
in
meeting
of
HSFCB
(S/M/L) Est. Cost Expdt.
booked
during year
Phy.
Prog.
Remarks Status
Annexure 5.2
Head:Flood Protection Works
Status: Dropped,
(Rs. in lacs)
Sr.
No
Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB
JULANA YWS
CIRCLE
JIND
Providing
Reinforced cement
concrete truff in
Nizampur Bharon
Khara Ramkali
drain from RD 0
TO RD 47100 out
falling at RD 8650-
L pf Padhana drain
in sloughing reach
RD 4000 TO rd
15000,including
replacing of pipes
culverts in slab
culverts from RD
2800 to 4000(
Balance work of
scheme already
approved in 47th
meeting of HSDR
and FCB.)
50th S 90.00 0.00 0 % As per site conditions, the
scheme has not been found
feasible and as per requirement
at site.
Dropped
District Total 90.00 0.00
NILOKHERI YWS
CIRCLE
KARNAL
Agenda for
restoring left bank
of Sambhli Link
Drain from RD 0 to
RD 6560
50th S 2.65 0.00 5 % Work held up due to dispute
and the proposal to drop short
term scheme has been
submitted to Deputy
Commissioner, Karnal by
XEN/KNL vide his office letter
No.7366 -68/61-R
Dt.02.07.2019
Dropped
District Total 2.65 0.00
Unit Total 92.65 0.00
HATHIN YWS
CIRCLE
FARIDAB
AD
Utilization of Flood
Water by
constructing Hump
and Pump House
on Gaunchi Main
Drain at RD 97500
to Augment the
Hathin Disty. To
feed tail reach
villages
(Supplementary
Agenda).
49th S 193.91 0.00 0 % Dropped as the scheme
already exists.
Dropped
District Total 193.91 0.00
Unit Total 193.91 0.00
Grand Total 1382.99 22.00
9
10
KARNAL
11
YWS(S)
PALWAL
80
Sr.
No
Name of District Name of Circle Estimated
Cost
Expenditure
Incurred
S L Total Total 2020-21 2021-22 2022-23 S M L Total S M L S M Total
1 AMBALA SYL CIRCLE
AMBALA 4 6 15 8096.16 1483.26 6612.92 3182.01 2311.49 1119.42 4 3 0 7 0 2 6 0 0 0
2 FATEHABAD BWS CIRCLE
FATEHABAD 0 1 3 502.11 18.30 483.82 177.91 173.91 132.00 0 1 0 1 0 1 1 0 0 0
3 HISAR BWS CIRCLE
HISAR 2 0 3 330.94 0.00 330.95 232.85 98.10 0.00 2 1 0 3 0 0 0 0 0 0
4 KAITHAL BWS CIRCLE
KAITHAL 0 0 1 84.19 64.93 19.26 9.63 9.63 0.00 0 1 0 1 0 0 0 0 0 0
5 PANCHKULA SYL CIRCLE
AMBALA 0 0 2 731.43 335.03 396.41 198.21 198.20 0.00 0 2 0 2 0 0 0 0 0 0
Total 6 7 24 9744.83 1901.52 7843.35 3800.61 2791.32 1251.42 6 8 0 14 0 3 7 0 0 0
6 JHAJJAR CONSTRUCTION
CIRCLE
GURGAON
1 0 1 109.81 15.00 94.81 94.81 0.00 0.00 1 0 0 1 0 0 0 0 0 0
7 KAITHAL SARASWATI
HERITAGE
CIRCLE
1 0 1 36.21 0.00 36.21 36.21 0.00 0.00 1 0 0 1 0 0 0 0 0 0
8 ROHTAK YWS CIRCLE
ROHTAK 0 0 2 349.26 114.85 234.42 117.21 117.21 0.00 0 2 0 2 0 0 0 0 0 0
Total 2 0 4 495.28 129.85 365.44 248.23 117.21 0.00 2 2 0 4 0 0 0 0 0 0
9 BHIWANI LWS CIRCLE
BHIWANI 0 0 1 277.00 89.05 187.96 93.98 93.98 0.00 0 1 0 1 0 0 0 0 0 0
10 Charkhi Dadri LWS CIRCLE
BHIWANI 1 0 1 147.00 0.00 147.00 147.00 0.00 0.00 1 0 0 1 0 0 0 0 0 0
11 JHAJJAR JWS CIRCLE
JHAJJAR 2 1 11 1720.01 119.59 1600.44 889.48 560.90 150.06 2 6 1 9 0 2 0 0 0 0
12 MAHENDRAGAR
H
JLN WS CIRCLE
NARNAUL 0 0 1 88.65 11.24 77.42 38.71 38.71 0.00 0 1 0 1 0 0 0 0 0 0
13 ROHTAK YWS CIRCLE
ROHTAK 0 5 14 2036.43 51.63 1984.81 754.88 740.03 489.90 0 5 1 6 0 4 4 0 0 0
14 SONIPAT YWS CIRCLE
ROHTAK 0 1 5 661.59 0.00 661.60 285.52 282.69 93.39 0 0 0 0 0 4 1 0 0 0
Total 3 7 33 4930.68 271.51 4659.22 2209.57 1716.29 733.36 3 13 2 18 0 10 5 0 0 0
15 KARNAL WORKSHOP
CIRCLE KARNAL 0 0 3 274.77 0.00 274.78 137.39 137.39 0.00 0 3 0 3 0 0 0 0 0 0
Total 0 0 3 274.77 0.00 274.78 137.39 137.39 0.00 0 3 0 3 0 0 0 0 0 0
16 BHIWANI YWS CIRCLE
BHIWANI 2 2 6 960.51 304.74 655.77 310.91 237.66 107.20 2 2 0 4 0 0 2 0 0 0
17 JIND YWS CIRCLE
JIND 1 0 8 1640.99 657.58 983.42 535.92 447.50 0.00 1 7 0 8 0 0 0 0 0 0
18 KARNAL YWS CIRCLE
KARNAL 0 1 1 969.74 3.38 966.36 328.56 318.90 318.90 0 0 1 1 0 0 0 0 0 0
19 PANIPAT YWS CIRCLE
KARNAL 2 0 7 543.24 37.49 505.77 290.57 215.20 0.00 2 5 0 7 0 0 0 0 0 0
20 YAMUNANAGAR HKB CIRCLE
JAGADHRI 1 0 2 1850.00 622.00 1228.00 1203.00 25.00 0.00 1 1 0 2 0 0 0 0 0 0
Total 6 3 24 5964.48 1625.19 4339.32 2668.96 1244.26 426.10 6 15 1 22 0 0 2 0 0 0
21 FARIDABAD YWS CIRCLE
FARIDABAD 0 0 3 1349.52 803.27 546.26 273.13 273.13 0.00 0 3 0 3 0 0 0 0 0 0
22 MEWAT YWS CIRCLE
FARIDABAD 3 0 7 1299.92 275.69 1024.23 597.53 426.70 0.00 3 4 0 7 0 0 0 0 0 0
23 PALWAL YWS CIRCLE
FARIDABAD 1 0 3 1823.47 513.99 1309.48 1017.21 292.27 0.00 1 2 0 3 0 0 0 0 0 0
Total 4 0 13 4472.91 1592.95 2879.97 1887.87 992.10 0.00 4 9 0 13 0 0 0 0 0 0
Grand Total 21 17 101 25882.95 5521.02 20362.06 10952.63 6998.55 2410.88 21 50 3 74 0 13 14 0 0 0
Annexure 5.3
Head:Flood Protection Works
Status: In Progress,Yet To Start,(Rs in lacs)
No. of Schemes Requirement of Funds In Prog. Yet to Start Completed Dropped
Districtwise Abstract of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting of HSDR & FCB
M Total L
BWS
5 8 0 0
2 2 0 0
1 0 0 0
1 0 0 0
2 0 0 0
11 10 0 0
CONSTRUCTION
0 0 0 0
0 0 0 0
2 0 0 0
2 0 0 0
LCU
1 0 0 0
0 0 0 0
8 2 0 0
1 0 0 0
9 8 0 0
4 5 0 0
23 15 0 0
PROJECT, ENVIRONMENT AND
MATERIAL
3 0 0 0
3 0 0 0
YWS(N)
2 2 0 0
7 0 0 0
0 0 0 0
5 0 0 0
1 0 0 0
15 2 0 0
YWS(S)
0 0
3 0 0 0
4 0 0 0
63 27 0 0
2 0 0 0
9 0
81
Name of
Constitue
ncy
Name of
Irrigation
Circle
Name of Work Appvd.
in
meeting
of
HSFCB
(S/M/L) Est. Cost Expdt.
booked
during
year
Phy.
Prog.
Total Bal
Req.
Remarks
2020-21 2021-22
AMBALA
CANTT.
SYL
CIRCLE
AMBALA
Construction of
main nallah from
railway line near
village Nanhera
upto nh-1 near
Shamshan gath in
ward no. 16
ambala cantt (MC
Ambala).
48th S 524.90 201.17 50 % 323.73 323.73 0.00 work in
progress.
Initially
work be
executed by
MC
Ambala.
MC Ambala
transferred
the work to
irrigation
Deptt.
AMBALA
CANTT.
SYL
CIRCLE
AMBALA
Constructing RCC
open Trough from
RD 36000 to 30000
(Sub reach of
Mahesh Nagar
drain)
48th S 550.00 444.42 95 % 105.58 105.58 0.00 Work in
progress.
AMBALA
CANTT.
SYL
CIRCLE
AMBALA
Scheme for
constructing open
trough from RD
30000 to Gate at
RD 26000 of
Mahesh Nagar
drain
49th S 415.00 51.45 15 % 363.55 363.55 0.00 Work delay
due to Land
record not
available in
LAO office
as well as
in division
office.
Preparation
of duplicate
is in
process.
Work in
progress.
AMBALA
CITY
SYL
CIRCLE
AMBALA
Construction of
Inlet at KM 11.956
on Left Bank of
SYL Canal
50th S 60.00 16.28 90 % 43.72 43.72 0.00 Work held
up due to
water
remaining
in canal
and the
same will
be
completed
after
withdrawal
of same.
AMBALA
CANTT.
SYL
CIRCLE
AMBALA
Constructing
Machonda Drain by
laying NP3 hume
pipeline below
Machonda,Bara,Ko
t Kachhuwa Road.
48th M 1850.00 513.02 40 % 1336.98 668.49 668.49 Due to
change in
alignment
and scope
of work
Annexure 5.4
Head:Flood Protection Works
Status: In Progress,Yet To Start,(Rs. in lacs)
Sr.
No
Requriments of funds Status
Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB
2022-23
BWS
AMBALA
1 0.00 IP
2 0.00 IP
3 0.00 IP
4 0.00 IP
5 0.00 IP
82
Name of
Constitue
ncy
Name of
Irrigation
Circle
Name of Work Appvd.
in
meeting
of
HSFCB
(S/M/L) Est. Cost Expdt.
booked
during
year
Phy.
Prog.
Total Bal
Req.
Remarks
2020-21 2021-22
Annexure 5.4
Head:Flood Protection Works
Status: In Progress,Yet To Start,(Rs. in lacs)
Sr.
No
Requriments of funds Status
Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB
2022-23
AMBALA
CANTT.
SYL
CIRCLE
AMBALA
Purchase of land
for cunnettee D/S
of Mahesh Nagar
drain in a length of
1000 feet from RD
2132 to 3132
50th M 75.00 0.00 0 % 75.00 37.50 37.50 Land
acquisition
involved.
Alignment
is under
process
AMBALA
CITY
SYL
CIRCLE
AMBALA
Constructing RCC
open trough on
Singhawala drain
from RD 6650 to
5750
50th M 77.08 0.03 20 % 77.06 38.53 38.53 work in
progress
AMBALA
CANTT.
SYL
CIRCLE
AMBALA
Constructing RCC
Open trough from
RD 0 to 4000 of
Mahesh Nagar
drain
50th M 592.00 1.44 0 % 590.56 295.28 295.28 Cost
revised as
per
approved
drawings
and design
and revised
of HSR
item of Mix
design
AMBALA
CITY
SYL
CIRCLE
AMBALA
Construction of
RCC Open Trough
from RD 19500 to
22500 on Ambala
Drain, with
extension RD 2300
to 1300.
50th M 560.00 255.45 45 % 304.56 152.28 152.28 Flood
protection
AMBALA
CITY
SYL
CIRCLE
AMBALA
Constructing
Singha Wala-
Sullar link Drain
from RD 0 to 29000
off take from
Singhawala drain
at RD 0 and Outfall
in Sullar Drain at
RD 20100
48th L 2224.00 0.00 0 % 2224.00 756.16 733.92 Land
acquisition
involved.
Alignment
approved.
land Detail
has been
uploaded
on the e-
bhumi
portal
AMBALA
CITY
SYL
CIRCLE
AMBALA
Constructing
Bhanokheri Ganda
Nalla link Drain
from RD 0 to 3111
out falling in Ganda
Nalla at RD 31650
47th L 108.23 0.00 0 % 108.24 36.80 35.72 ALIGNMEN
T
APPROVE
D ON
28.03.2016
LAND
DETAIL OF
1.18 ACRE
UPLOADE
D ON E-
BHOOMI
PORTAL
AS PER
NEW LAND
PURCHAS
E POLICY.
6 0.00 YTS
7 0.00 IP
8 0.00 YTS
9 0.00 IP
10 733.92 YTS
11 35.72 YTS
83
Name of
Constitue
ncy
Name of
Irrigation
Circle
Name of Work Appvd.
in
meeting
of
HSFCB
(S/M/L) Est. Cost Expdt.
booked
during
year
Phy.
Prog.
Total Bal
Req.
Remarks
2020-21 2021-22
Annexure 5.4
Head:Flood Protection Works
Status: In Progress,Yet To Start,(Rs. in lacs)
Sr.
No
Requriments of funds Status
Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB
2022-23
MULLANA SYL
CIRCLE
AMBALA
Scheme for
constructing New
Gola Goli Bund
from RD 0 to 4200
on U/S Side of
existing bund for
the protection of
village Gola Goli on
river Begna (If
farmers provide
land on collector
Rate)
49th L 271.90 0.00 0 % 271.91 92.45 89.73 Land
purchase
involved.
NARAING
ARH
SYL
CIRCLE
AMBALA
Scheme for
constructing new
Banaundi bund
from RD 0 to 1000
on upstream side
of existing bund for
the protection of
village Banaoundi
on river begna (If
farmers provide
land on collectors
rate)
49th L 69.61 0.00 0 % 69.61 23.67 22.97 Land
purchase
involved.
MULLANA SYL
CIRCLE
AMBALA
Constructing Tejan
Drain from RD 0-
8250 outfalling in
Ganda Nallah at
RD 17150. (C.M.
Announcement No.
22934 dt 15-08-
2018)
50th L 273.44 0.00 0 % 273.45 92.97 90.24 Land
acquisition
involved.
Alignment
approved.
land Detail
has been
uploaded
on the e-
bhumi
portal
AMBALA
CITY
SYL
CIRCLE
AMBALA
Restoration of
design
section/pitching in
village abadi area
and remodelling of
8 no. bridges of
Ganda Nallah for
the protection of
village abadi and
agriculture land of
villages Kanwla,
Jalbera, Lakhnour
Sahib, Bara,
Adhomajra, Ugara,
Sakroan, Naggal
and Segti etc.
50th L 445.00 0.00 0 % 445.00 151.30 146.85 estimate
approved.
Tender to
be open on
18/12/2019.
District Total 8096.16 1483.26 6612.95 3182.01 2311.49
12 89.73 YTS
13 22.97 YTS
14 90.24 YTS
15 146.85 YTS
1119.42
FATEHABAD
84
Name of
Constitue
ncy
Name of
Irrigation
Circle
Name of Work Appvd.
in
meeting
of
HSFCB
(S/M/L) Est. Cost Expdt.
booked
during
year
Phy.
Prog.
Total Bal
Req.
Remarks
2020-21 2021-22
Annexure 5.4
Head:Flood Protection Works
Status: In Progress,Yet To Start,(Rs. in lacs)
Sr.
No
Requriments of funds Status
Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB
2022-23
TOHANA BWS
CIRCLE
FATEHAB
AD
Construction of 10
Nos bore-wells for
recharging of flood
water From the
fields of village
Sidhani. (May be
done on
experimental basis
after studying
Mansa/Sangrur
models)
49th M 30.32 18.30 90 % 12.02 6.01 6.01 In Progress
RATIA BWS
CIRCLE
FATEHAB
AD
Agenda Note for
remodelling / re-
construction of
bridge at RD 5640
Barreta Drain on
Pucca road from
village Nangal to
Nangal Dhani
Tehsil Ratia District
Fatehabad
50th M 71.79 0.00 0 % 71.80 35.90 35.90 The Design
data
submitted
to C.D.O for
preparing
the drawing
TOHANA BWS
CIRCLE
FATEHAB
AD
Construction of V.R
Bridge at RD 1.15
Km Rangoi Nallah
49th L 400.00 0.00 0 % 400.00 136.00 132.00 Design /
Drawing
approved
and
estimate
under
preparation
District Total 502.11 18.30 483.82 177.91 173.91
HANSI BWS
CIRCLE
HISAR
Procuring one No.
Poclaine 230
Excavator.
50th S 60.00 0.00 0 % 60.00 60.00 0.00 DSandD
has opened
the tender
andfinalisati
on of
purchase
will be done
after Model
code of
conduct.
HANSI BWS
CIRCLE
HISAR
Procurement of
HDPE 200 mm dia
pipe.
50th S 74.75 0.00 0 % 74.75 74.75 0.00 Bid opened
on GEM on
dated
16/9/2019
and case is
under
process for
approval of
rates.
16 0.00 IP
17 0.00 YTS
18 132.00 YTS
132.00
HISAR
19 0.00 IP
20 0.00 IP
85
Name of
Constitue
ncy
Name of
Irrigation
Circle
Name of Work Appvd.
in
meeting
of
HSFCB
(S/M/L) Est. Cost Expdt.
booked
during
year
Phy.
Prog.
Total Bal
Req.
Remarks
2020-21 2021-22
Annexure 5.4
Head:Flood Protection Works
Status: In Progress,Yet To Start,(Rs. in lacs)
Sr.
No
Requriments of funds Status
Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB
2022-23
BARWALA BWS
CIRCLE
HISAR
Agenda Note for
pipe Drain No. 1
from RD 0 to RD
9000 and
Drain No. 2 From
RD 0 to RD 2000
for Village Ladwa
out falling at RD
170200-L of New
Siwani Feeder and
RD 8114-L of O. P.
Jindal Nalwa Disty
respectively.
49th M 196.19 0.00 25 % 196.20 98.10 98.10 25% work
done and
work will be
completed
upto
31.07.2019.
District Total 330.94 0.00 330.95 232.85 98.10
KALAYAT BWS
CIRCLE
KAITHAL
Scheme for laying
RCC NP3 pipe line
along Batta Mr.
from RD 33800 to
37500 to drain out
the flood water of
village Kharak
Pandwa into
Pundri Drain No. II
at RD. 24410-L
50th M 84.19 64.93 95 % 19.26 9.63 9.63
District Total 84.19 64.93 19.26 9.63 9.63
PANCHKU
LA
SYL
CIRCLE
AMBALA
Constructon of box
RCC drain for safe
passage of
flood/waste water
from Barwala and
Bataur (Panchkula)
into River Tangri.
47th M 609.32 279.13 55 % 330.20 165.10 165.10 Tender
called
PANCHKU
LA
SYL
CIRCLE
AMBALA
Scheme for
Construction of
Causeway and
steining in village
Aasrewali at
Aasrewali nadi
tributary of river
Ghaggar in
Panchkula District
50th M 122.11 55.90 95 % 66.22 33.11 33.11
District Total 731.43 335.03 396.42 198.21 198.20
Unit Total 9744.83 1901.52 7843.40 3800.61 2791.32
21 0.00 IP
0.00
KAITHAL
22 0.00 IP
0.00
PANCHKULA
23 0.00 IP
24 0.00 IP
0.00
1251.42
CONSTRUCTION
JHAJJAR
86
Name of
Constitue
ncy
Name of
Irrigation
Circle
Name of Work Appvd.
in
meeting
of
HSFCB
(S/M/L) Est. Cost Expdt.
booked
during
year
Phy.
Prog.
Total Bal
Req.
Remarks
2020-21 2021-22
Annexure 5.4
Head:Flood Protection Works
Status: In Progress,Yet To Start,(Rs. in lacs)
Sr.
No
Requriments of funds Status
Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB
2022-23
BAHADUR
GARH
CONSTR
UCTION
CIRCLE
GURGAO
N
Constructing Ditch
Drain from KM
31.915 to 46.185
along NCR
Channel (Approved
with condition that
the water drained
would be utilized
for Irrigation)
49th S 109.81 15.00 80 % 94.81 94.81 0.00 As per the
site
condition
E/W is
completed
100% and
out of three
structure 02
is
completed
and other
01 structure
will be
completed
after NOC
received
from PWD
BandR
Deptt.,
diversion
has also
been
constructed
on this
bridge and
work will be
completed
upto
31.01.2020
District Total 109.81 15.00 94.81 94.81 0.00
KAITHAL SARASW
ATI
HERITAG
E CIRCLE
KURUKS
HETRA
Scheme for
remodeling of flood
inlets and repair of
adjoining lining at
RD 197400/L and
RD233500/L of
Bhakhra Main Line-
Hansi Branch-
Butana Branch-
Multi Purpose Link
channel
50th S 36.21 0.00 50 % 36.21 36.21 0.00 Work in
Progress
District Total 36.21 0.00 36.21 36.21 0.00
ROHTAK YWS
CIRCLE
ROHTAK
Agenda Note for
reconstruction of
V.R. Bridge at RD
68000 Drain No. 8
50th M 174.63 0.00 20 % 174.64 87.32 87.32 Work in
progress.
ROHTAK YWS
CIRCLE
ROHTAK
Agenda Note for
reconstruction of
V.R. Bridge at RD
94500 Drain No. 8
50th M 174.63 114.85 70 % 59.78 29.89 29.89 Work in
prograss.
District Total 349.26 114.85 234.42 117.21 117.21
Unit Total 495.28 129.85 365.44 248.23 117.21
25 0.00 IP
0.00
KAITHAL
26 0.00 IP
0.00
ROHTAK
27 0.00 IP
28 0.00 IP
0.00
0.00
LCU
BHIWANI
87
Name of
Constitue
ncy
Name of
Irrigation
Circle
Name of Work Appvd.
in
meeting
of
HSFCB
(S/M/L) Est. Cost Expdt.
booked
during
year
Phy.
Prog.
Total Bal
Req.
Remarks
2020-21 2021-22
Annexure 5.4
Head:Flood Protection Works
Status: In Progress,Yet To Start,(Rs. in lacs)
Sr.
No
Requriments of funds Status
Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB
2022-23
KALANAU
R
LWS
CIRCLE
BHIWANI
agenda note for
laying underground
pipeline in Gudhan
link drain from RD
0 TO 9900 outfall
at RD 129000-L
OF Bond Disty.
50th M 277.00 89.05 30 % 187.96 93.98 93.98 work in
progress
and 30%
completed
District Total 277.00 89.05 187.96 93.98 93.98
DADRI LWS
CIRCLE
BHIWANI
Agenda Note for
purchase of EP
and DP sets for
flood Dewatering.
50th S 147.00 0.00 0 % 147.00 147.00 0.00 Finalisation
will be done
by DSandD
in coming
HPPC
meeting.
District Total 147.00 0.00 147.00 147.00 0.00
JHAJJAR JWS
CIRCLE
JHAJJAR
Agenda note for
constructing Pump
House Beldar Hut
rehabilitation of
civil structures and
fixing of steel
grantings at 11
Nos. of flood pump
houses .
49th S 92.00 0.00 70 % 92.00 92.00 0.00 Work in
progress.
JHAJJAR JWS
CIRCLE
JHAJJAR
Agenda note for
providing Brick
Lining on both
banks of JLN
Escape Channel
KM 0.100 to KM
2.000
49th S 283.70 51.69 25 % 232.01 232.01 0.00 Work in
progress.
BERI JWS
CIRCLE
JHAJJAR
Agenda note for
constructing Pump
House Beldar Hut
and purchasing
new Pumps
Motors, Control
Panel and allied
accessories at RD
243-R of JLN
Feeder.
49th M 67.00 0.00 25 % 67.00 33.50 33.50 Work in
Progress.
BADLI JWS
CIRCLE
JHAJJAR
Agenda note for
constructing
Dhakla Link Drain
through
(underground RCC
Pipe Line) from RD
0 to 10000
outfalling into SLC
at RD 20910-L (By
lift)
50th M 169.17 19.50 15 % 149.68 74.84 74.84 Work in
Progress.
29 0.00 IP
0.00
Charkhi Dadri
30 0.00 IP
0.00
JHAJJAR
31 0.00 IP
32 0.00 IP
33 0.00 IP
34 0.00 IP
88
Name of
Constitue
ncy
Name of
Irrigation
Circle
Name of Work Appvd.
in
meeting
of
HSFCB
(S/M/L) Est. Cost Expdt.
booked
during
year
Phy.
Prog.
Total Bal
Req.
Remarks
2020-21 2021-22
Annexure 5.4
Head:Flood Protection Works
Status: In Progress,Yet To Start,(Rs. in lacs)
Sr.
No
Requriments of funds Status
Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB
2022-23
BERI JWS
CIRCLE
JHAJJAR
Agenda note for
constructing Majra-
Siwana-Dubaldhan
Link Drain through
(underground RCC
Pipe Line) from RD
0 to 15000
outfalling into
Loharu Feeder at
RD 32935-R With
interlinking of
Village Ponds.
50th M 291.36 0.00 0 % 291.36 145.68 145.68 Alignment
not finalised
due to
objection of
villagers
BADLI JWS
CIRCLE
JHAJJAR
Agenda note for
constructing
R/Bank of outfall
Drain No. 8 (critical
reaches) in Km.
2.258 to 6.800, Km.
11.00 to 18.500
and Km. 19.500 to
25.00
50th M 137.17 0.00 10 % 137.18 68.59 68.59 Work in
progress.
BERI JWS
CIRCLE
JHAJJAR
Agenda note for
constructing
Dubaldhan Link
Drain (Through
underground RCC
Pipe Line) from RD
0 to 5000 outfalling
inot Loharu Feeder
at RD 19648-L.
50th M 27.35 0.00 25 % 27.36 13.68 13.68 Work in
progress.
BERI JWS
CIRCLE
JHAJJAR
Agenda note for
constructing Beri-
Bishan Pipe Link
Drain from RD 0 to
9500 outfalling into
Drain No. 8 at RD
210000-L
50th M 119.48 32.00 25 % 87.48 43.74 43.74 Work in
Progress.
JHAJJAR JWS
CIRCLE
JHAJJAR
Agenda for repair
and rehabilitation of
existing Pumps,
Motors, Control
Panels and allied
accessories and
Transformer at
Rewari Road Pump
House in W.S.
Mech. Division,
Jhajjar for the year
2018-19.
50th M 17.07 0.00 0 % 17.08 8.54 8.54 Estimate
stands
sanctioned.
Tender will
be called
shortly.
BADLI JWS
CIRCLE
JHAJJAR
Agenda note for
constructing of
Khudan Drain from
RD o to 4000
outfalling
at RD 17000-R
Zahidpur Minor (By
lift)
50th M 60.97 16.40 30 % 44.58 22.29 22.29 Work in
Progress.
35 0.00 YTS
36 0.00 IP
37 0.00 IP
38 0.00 IP
39 0.00 YTS
40 0.00 IP
89
Name of
Constitue
ncy
Name of
Irrigation
Circle
Name of Work Appvd.
in
meeting
of
HSFCB
(S/M/L) Est. Cost Expdt.
booked
during
year
Phy.
Prog.
Total Bal
Req.
Remarks
2020-21 2021-22
Annexure 5.4
Head:Flood Protection Works
Status: In Progress,Yet To Start,(Rs. in lacs)
Sr.
No
Requriments of funds Status
Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB
2022-23
BADLI JWS
CIRCLE
JHAJJAR
Constructing
underground
pressurized
Subana Link Drain
from KM 0 to 7.210
out falling at KM
2.300-R of outfall
drain no. 8.
48th L 454.74 0.00 10 % 454.73 154.61 150.06 Work in
Progress.
District Total 1720.01 119.59 1600.46 889.48 560.90
NARNAUL JLN WS
CIRCLE
NARNAU
L
Agenda note
construction D.R
Bridge at K.M
2.238 and 2.410
Guide Bund cum
Drain.
49th M 88.65 11.24 50 % 77.42 38.71 38.71 1. Case for
permission
to construct
DR Bridge
at km 2.410
stands
submitted
to NHAI
Authority,
Bhiwani.
2. Work of
DR Bridge
at km 2.238
is 100%
completed
District Total 88.65 11.24 77.42 38.71 38.71
ISRANA YWS
CIRCLE
ROHTAK
Reconstruction of
V.R. Bridge at RD
40200 Nai Nallah
drain.
48th M 132.00 51.28 85 % 80.72 40.36 40.36 Work in
progress
ROHTAK YWS
CIRCLE
ROHTAK
Agenda note for
Procurement of
New Pump Sets for
flood protection
works in W.S.
Mech. Division,
Rohtak.
49th M 33.00 0.00 0 % 33.00 16.50 16.50 The
material will
be procured
by
SE/Worksh
op, Circle,
karnal.
Indent
placed by
XEN, Mech.
Rohtak to
XEN, Proc.,
Panchkula.
41 150.06 IP
150.06
MAHENDRAGARH
42 0.00 IP
0.00
ROHTAK
43 0.00 IP
44 0.00 IP
90
Name of
Constitue
ncy
Name of
Irrigation
Circle
Name of Work Appvd.
in
meeting
of
HSFCB
(S/M/L) Est. Cost Expdt.
booked
during
year
Phy.
Prog.
Total Bal
Req.
Remarks
2020-21 2021-22
Annexure 5.4
Head:Flood Protection Works
Status: In Progress,Yet To Start,(Rs. in lacs)
Sr.
No
Requriments of funds Status
Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB
2022-23
ROHTAK YWS
CIRCLE
ROHTAK
Agenda Note for
Purchasing 1 No.
Excavator Loader
and 1 No.
Mahindra maxi
Truck for Rohtak
WS Dvn Rohtak.
50th M 64.00 0.00 50 % 64.00 32.00 32.00 Mahindra
Maxi Truck
has been
received at
site and
indent for 1
No.
Excavator
chain type
replace
long boom
with
stander
boom
length has
been
placed by
DGSandD
Haryana on
dated
20.05.2019.
ROHTAK YWS
CIRCLE
ROHTAK
Agenda Note for
Renovation of VR
Bridge at RD
112300 at Lakhan
Majra Link Drain.
50th M 40.00 0.35 0 % 39.66 19.83 19.83 Tender rate
approved
letter of
acceptance
issued to
agency.
Work will
be started
after recepit
of direction
from NGT.
GOHANA YWS
CIRCLE
ROHTAK
Agenda Note for
Restoring the bank
of Tributary Drain
No.4 from RD
51500 to 53000
around village
Kasanda and RD
53600 to 54200
and 57000 to
57500 along
Village Kasandi.(
CM Announcement
Code 23605 dated
17.09.2018 and
23940 dated
12.10.2018)
50th M 18.94 0.00 50 % 18.94 9.47 9.47 50% work
has been
completed
in village
Kasandi
and
remaining
work will be
completed
shortly.
45 0.00 IP
46 0.00 YTS
47 0.00 IP
91
Name of
Constitue
ncy
Name of
Irrigation
Circle
Name of Work Appvd.
in
meeting
of
HSFCB
(S/M/L) Est. Cost Expdt.
booked
during
year
Phy.
Prog.
Total Bal
Req.
Remarks
2020-21 2021-22
Annexure 5.4
Head:Flood Protection Works
Status: In Progress,Yet To Start,(Rs. in lacs)
Sr.
No
Requriments of funds Status
Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB
2022-23
GOHANA YWS
CIRCLE
ROHTAK
Agenda Note for
Purchase and
supply of special T
and P Machine i.e.
1 No. JCB
JS205LR with
Excavator
(Pocklain) for use
in Gohana WS
division, Gohana.
50th M 73.29 0.00 0 % 73.30 36.65 36.65 Indent
placed to
procuremen
t division
vide
XEN/Gohan
a No. 210/6-
M dated
11.03.2019.
The case is
with
DSandD
and tender
were called
only single
agency
come the
mater of
retendering
in process
with
DSandD
Chandigarh
.
ROHTAK YWS
CIRCLE
ROHTAK
Agenda Note for
Procurement of
New Electric
Pannels for Flood
Protection Works in
WS Mech Division,
Rohtak
50th M 76.00 0.00 0 % 76.00 38.00 38.00 Quantity
submitted
to CE/LCU
vide this
office letter
no.
643/180/6
W dated
18.03.2019.
ROHTAK YWS
CIRCLE
ROHTAK
Agenda Note for
Procurement of
New Electric Pump
Sets for Flood
Protection Works in
WS Mech Division,
Rohtak
50th M 50.00 0.00 0 % 50.00 25.00 25.00 Indent
placed to
XEN/Procur
ement/PKL.
MEHAM YWS
CIRCLE
ROHTAK
Agenda Note for
Improving Capacity
by widening of Civil
structure (Pump
House) at RD-100
Left Meham Drain
Pump House
Village Bharan in
WS Mech Division,
Rohtak
50th M 64.64 0.00 0 % 64.64 32.32 32.32 Estimate
under
process in
division
office.
48 0.00 YTS
49 0.00 YTS
50 0.00 IP
51 0.00 YTS
92
Name of
Constitue
ncy
Name of
Irrigation
Circle
Name of Work Appvd.
in
meeting
of
HSFCB
(S/M/L) Est. Cost Expdt.
booked
during
year
Phy.
Prog.
Total Bal
Req.
Remarks
2020-21 2021-22
Annexure 5.4
Head:Flood Protection Works
Status: In Progress,Yet To Start,(Rs. in lacs)
Sr.
No
Requriments of funds Status
Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB
2022-23
MEHAM YWS
CIRCLE
ROHTAK
Revised Agenda
note for
constructing tail
regulator at RD 50
at Mehem Drain
out-falling into
Drain No. 8 at RD
177550 (Est. amt.
aproved in 49th
meeting was Rs.
484.00 lac and
amt. now revised in
50th meeting=
645.00).
49th L 645.00 0.00 40 % 645.00 219.30 212.85 Work in
progress.
The
estimated
cost
increased
to Rs.
645.00 lac
against Rs.
484.00
lacs)
GARHI
SAMPLA -
KALOI
YWS
CIRCLE
ROHTAK
Agenda Note for
Re-placement of
Pipe Culvert into
VR Bridge at RD
35000 of Rohtak
Link Drain.
50th L 27.23 0.00 0 % 27.24 9.26 8.99 Estimate
sanctioned.
Tender
called and
to be
opened on
12.12.2019.
GARHI
SAMPLA -
KALOI
YWS
CIRCLE
ROHTAK
Agenda Note for
Construction of
RCC Truff of
Baland Pump
House Link Drain
from RD 0 to 3500.
50th L 164.10 0.00 0 % 164.09 55.79 54.15 Work will
be start
after
harvesting
of Kharif
Crop.
ROHTAK YWS
CIRCLE
ROHTAK
Agenda Note for
Construction of
One Side Vertical
wall on Left Side
from RD 99400 to
102900 and laying
interlocking tiles for
service road from
RD 99400 to
100760 Meham
Drain (up to Pump
House)
50th L 272.00 0.00 0 % 272.00 92.48 89.76 Estimate
under
process.
KALANAU
R
YWS
CIRCLE
ROHTAK
Constructing
Sundana pipeline
pump house link
drain from RD 0 to
5950 and Bhutian
Minor tail to Drain
No. 8 pipe link
drain from RD 0 to
7250 outfall at RD
202000-L Drain No.
8 (Supplementary
Scheme).
50th L 376.23 0.00 0 % 376.24 127.92 124.16 1st part
work tender
called and
to be
opened on
12.12.2019.
2nd part
work
estimate
submitted
to higher
authority for
approval.
District Total 2036.43 51.63 1984.83 754.88 740.03
52 212.85 IP
53 8.99 YTS
54 54.15 YTS
55 89.76 YTS
56 124.16 YTS
489.90
SONIPAT
93
Name of
Constitue
ncy
Name of
Irrigation
Circle
Name of Work Appvd.
in
meeting
of
HSFCB
(S/M/L) Est. Cost Expdt.
booked
during
year
Phy.
Prog.
Total Bal
Req.
Remarks
2020-21 2021-22
Annexure 5.4
Head:Flood Protection Works
Status: In Progress,Yet To Start,(Rs. in lacs)
Sr.
No
Requriments of funds Status
Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB
2022-23
BARODA YWS
CIRCLE
ROHTAK
Reconstruction of
V.R. Bridges at RD
13000, 15780 of
Chhapra Drain
49th M 248.52 0.00 0 % 248.52 124.26 124.26 Tender
rates
approved
and work
will be
started
shortly..
BARODA YWS
CIRCLE
ROHTAK
Agenda Note for
constructing cross
drainage work i.e.
aqueduct at RD
8300 on Dubheta
Drain
49th M 21.07 0.00 0 % 21.08 10.54 10.54 Estimate
sanctioned.
Tender
rates
approved.
Work will
be started
shortly.
Agreement
done on
08.03.2019.
Notice has
been given
to the
agency.
BARODA YWS
CIRCLE
ROHTAK
Agenda note for
reconstruction of
V.R. Bridges at RD
3050, 8870, 10180,
14100, 12780,
15400 and Bhawar
link drain.
49th M 60.00 0.00 0 % 60.00 30.00 30.00 Drawing
approved.
Estimate
sanctioned.
Tender
rates
approved.
Agreement
done on
28.06.2019.
GOHANA YWS
CIRCLE
ROHTAK
Agenda Note for
Construction of 07
Nos. Civil
Structures (Sump
Wells) for Flood
Protection Works
at Various Flood
Sites in WS Mech.
Division, Rohtak.
50th M 49.00 0.00 0 % 49.00 24.50 24.50 Drawing
approved
for sump
wall.
GOHANA YWS
CIRCLE
ROHTAK
Agenda Note for
procurement of
New Pump for
Flood Protection
works at Various
Flood sites in WS
Mech. Division,
Rohtak.
50th L 283.00 0.00 0 % 283.00 96.22 93.39 Qty.
submitted
to CE/LCU
vide this
office letter
no.
644/180/6
W dated
18.03.2019
District Total 661.59 0.00 661.60 285.52 282.69
Unit Total 4930.68 271.51 4659.27 2209.57 1716.29
57 0.00 YTS
58 0.00 YTS
59 0.00 YTS
60 0.00 YTS
61 93.39 YTS
93.39
733.36
PROJECT,
ENVIRONMENT AND KARNAL
94
Name of
Constitue
ncy
Name of
Irrigation
Circle
Name of Work Appvd.
in
meeting
of
HSFCB
(S/M/L) Est. Cost Expdt.
booked
during
year
Phy.
Prog.
Total Bal
Req.
Remarks
2020-21 2021-22
Annexure 5.4
Head:Flood Protection Works
Status: In Progress,Yet To Start,(Rs. in lacs)
Sr.
No
Requriments of funds Status
Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB
2022-23
KARNAL WORKSH
OP
CIRCLE
KARNAL
Purchase of 40
number electric
pumping sets of 5
cs. capacity for
distt. Karnal and
Jind as inventory
for utilization in
emergency
dewatering.
50th M 171.00 0.00 10 % 171.00 85.50 85.50 Finalization
of rates will
be done by
DS and D
in coming
HPPC
meeting.
KARNAL WORKSH
OP
CIRCLE
KARNAL
Procurement of
tempo excel pick
up and truck tata
407 in replacement
of condemned
vehicles.
50th M 25.50 0.00 10 % 25.50 12.75 12.75 indent
received on
21/05/2019.
sent to DS
and D
Haryana
on
12/06/2019
and DS and
D asked for
proprietary
certificate
,accordingly
indentor
was asked
for
supplying
the same
for
submission
to DS and
D Haryana.
The same
has been
received on
07.11.2019
and same
has been
sent to DS
and D by
XEN/Procur
ement and
Disposal
Division,
Pkl. The
case is now
pending
with
DSandD.
62 0.00 IP
63 0.00 IP
95
Name of
Constitue
ncy
Name of
Irrigation
Circle
Name of Work Appvd.
in
meeting
of
HSFCB
(S/M/L) Est. Cost Expdt.
booked
during
year
Phy.
Prog.
Total Bal
Req.
Remarks
2020-21 2021-22
Annexure 5.4
Head:Flood Protection Works
Status: In Progress,Yet To Start,(Rs. in lacs)
Sr.
No
Requriments of funds Status
Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB
2022-23
KARNAL WORKSH
OP
CIRCLE
KARNAL
Replacement/Reno
vation of pumping
sets with allied
accessories in
district JIND .
50th M 78.27 0.00 10 % 78.28 39.14 39.14 The tender
rates has
been
approved
by Chief
Engineer
Project in
favour of
M/s KRP
Engineering
Pvt. Ltd.
vide letter
No. 453-
54/6/F-
11/Tender/
XEN(works)
/P dated
20.09.2019.
The
agreement
has been
executed
with the
agency by
XEN/W.S.
(M)
Division,
Karnal and
letter for
proceeding
of work has
been
issued to
the Firm on
20.09.2019.
District Total 274.77 0.00 274.78 137.39 137.39
Unit Total 274.77 0.00 274.78 137.39 137.39
TOSHAM YWS
CIRCLE
BHIWANI
Flood Agenda for
Purchase of New
Machinery for
Flood Protection
Works During 2018-
19
49th S 44.00 14.00 30 % 30.00 30.00 0.00 D.G Set
Received.
Regarding
20 EP sets
(3 Cs), the
case will be
discussed
in the
upcoming
HPPC
meeting on
dated
23.12.2019
for
approval.
64 0.00 IP
0.00
0.00
YWS(N)
BHIWANI
65 0.00 IP
96
Name of
Constitue
ncy
Name of
Irrigation
Circle
Name of Work Appvd.
in
meeting
of
HSFCB
(S/M/L) Est. Cost Expdt.
booked
during
year
Phy.
Prog.
Total Bal
Req.
Remarks
2020-21 2021-22
Annexure 5.4
Head:Flood Protection Works
Status: In Progress,Yet To Start,(Rs. in lacs)
Sr.
No
Requriments of funds Status
Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB
2022-23
BHIWANI YWS
CIRCLE
BHIWANI
Procurement of
New Earth Moving
Machine for
internal clearance
of drains and bank
strengthening of
canal/drain
(Supplementary
Agenda).
49th S 110.00 70.00 65 % 40.00 40.00 0.00 H-
Excavator
Received.
Tenders for
the balance
work has
been called
twice but no
bid
received.
Now
DSandD
has been
requested
for calling
tender
again on
dated
04.12.2019.
BHIWANI YWS
CIRCLE
BHIWANI
Agenda for
Providing sump
well, gates and
gearing on Bhiwani
Ghaggar drain from
RD. 28345-165600
out-falling at RD
384000-L Hisar
Ghaggar Drain
50th M 331.66 220.74 85 % 110.92 55.46 55.46 Work in
progress
and will be
complete
by
31.12.2019
66 0.00 IP
67 0.00 IP
97
Name of
Constitue
ncy
Name of
Irrigation
Circle
Name of Work Appvd.
in
meeting
of
HSFCB
(S/M/L) Est. Cost Expdt.
booked
during
year
Phy.
Prog.
Total Bal
Req.
Remarks
2020-21 2021-22
Annexure 5.4
Head:Flood Protection Works
Status: In Progress,Yet To Start,(Rs. in lacs)
Sr.
No
Requriments of funds Status
Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB
2022-23
BHIWANI YWS
CIRCLE
BHIWANI
AGENDA FOR
PURCHASE OF
NEW MACHINERY
FOR FLOOD
PROTECTION
WORKS DURING
2019-20, 1 No.
AXIAL FLOW VT
PUMP 20 CS WITH
MOTOR AND
DELIVERY PIPE
WITH STARTER
PANEL, 7 NO`S.
AXIAL FLOW VT
PUMP 10 CS WITH
MOTOR AND
DELIVERY PIPE
WITH STARTER
PANEL, 7 NO.
AXIAL FLOW VT
PUMP 5 CS WITH
MOTOR AND
DELIVERY PIPE
WITH STARTER
PANEL AND 6
NO. DIESEL
PUMPING SETS
WITH ENGINE 10
HP AND PUMP OF
SIZE 4`X4`.
50th M 150.00 0.00 0 % 150.00 75.00 75.00 Regarding
VT pump
20 Cs 01
no., VT
pump 10
Cs 07 no.,
VT pump 5
Cs 07 no.-
supply
order has
been
issued to
firm on
dated
13.09.2019
and the
material will
be supplied
by the firm
within four
months.
Regarding
DP sets 2
Cs 06 no.
tenders has
been called
and the
case will be
discussed
in the
upcoming
HPPC
meeting on
dated
23.12.2019
for
approval.
BAWANI
KHERA
YWS
CIRCLE
BHIWANI
Extension of 1-L
talu link drain form
rd 10198- 14050
outfalling at rd
26277- L siwana
talu link Drain (if
shareholders agree
to give land at
collectors rate)
49th L 142.15 0.00 0 % 142.15 48.33 46.91 8.34 Acres
land
acquisition
is involved.
Shareholde
rs are not
interested
to give their
land on
collector
rate.
BAWANI
KHERA
YWS
CIRCLE
BHIWANI
Agenda for
Dewatering fields
of village Badesra
by constructing
Badesra Drain no.
1 from RD 0 to
4500 and providing
sumpwell for lifting
of flood water
50th L 182.70 0.00 0 % 182.70 62.12 60.29 Alignment
approved
on
28.05.2019.
Survey
work and
3.58 Acres
Land
purchase
process in
progress.
District Total 960.51 304.74 655.77 310.91 237.66
68 0.00 IP
69 46.91 YTS
70 60.29 YTS
107.20
JIND
98
Name of
Constitue
ncy
Name of
Irrigation
Circle
Name of Work Appvd.
in
meeting
of
HSFCB
(S/M/L) Est. Cost Expdt.
booked
during
year
Phy.
Prog.
Total Bal
Req.
Remarks
2020-21 2021-22
Annexure 5.4
Head:Flood Protection Works
Status: In Progress,Yet To Start,(Rs. in lacs)
Sr.
No
Requriments of funds Status
Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB
2022-23
SAFIDON YWS
CIRCLE
JIND
Flood agenda note
for construction of
Head Regulator at
RD 354760/R
B.M.L., Hansi
Branch , Butana
Branch, M.P.L.C.
and Inlet at RD
61000/R Hansi
Branch including
bringing to design
section of New Nai
Nallah Abondoned
Drain from RD 0 to
3600.
49th S 322.79 234.38 75 % 88.41 88.41 0.00 work in
progress
and will be
completed
by
31/01/2020
JULANA YWS
CIRCLE
JIND
Agenda for
increasing capacity
of Padana Bass
Link Drain from RD
0 to RD 49900 and
its structure out
falling at RD
155580-L Bass
Multipurpose
Channel
50th M 335.00 150.00 50 % 185.00 92.50 92.50 Tender
Approved.
Work in
Progress
and will be
completed
by
31.03.2020.
JULANA YWS
CIRCLE
JIND
Agenda for
increasing capacity
of Karela Pump
House from 60 cs
to 120 cs.
50th M 160.00 0.00 5 % 160.00 80.00 80.00 Regarding
04 no. 20
Cs VT
pump -
Supply
order
issued to
Firm on
Dated
19/9/2019
and work
will be
completed
by
31.03.2020.
SAFIDON YWS
CIRCLE
JIND
Agenda for
Increasing capacity
of Padana Drain
from RD 0 to RD
52000 and bringing
to Design Section
from RD 52000 to
92000 including Re-
Construction of 1
No Bridge
50th M 268.00 180.00 95 % 88.00 44.00 44.00 Tender
rates
approved.
Work in
progress
and will be
completed
by
31/12/2019.
71 0.00 IP
72 0.00 IP
73 0.00 IP
74 0.00 IP
99
Name of
Constitue
ncy
Name of
Irrigation
Circle
Name of Work Appvd.
in
meeting
of
HSFCB
(S/M/L) Est. Cost Expdt.
booked
during
year
Phy.
Prog.
Total Bal
Req.
Remarks
2020-21 2021-22
Annexure 5.4
Head:Flood Protection Works
Status: In Progress,Yet To Start,(Rs. in lacs)
Sr.
No
Requriments of funds Status
Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB
2022-23
SAFIDON YWS
CIRCLE
JIND
Agenda for laying
RCC Pipe Line
from fields of
village Bhagkhera,
Bangru and
Siwanamal
including
constructing of
Pump House at RD
81400-L Padana
Drain
50th M 91.23 38.20 60 % 53.04 26.52 26.52 Tenders
rates
approved.B
alance
Work will
be restarted
after Rabi
Season and
will be
completed
by
30.06.2020.
SAFIDON YWS
CIRCLE
JIND
Agenda for laying
RCC Pipe Line
NP2 from fields of
village Gangoli
including
constructing of
Pump House at RD
18500-L Hadwa
Gangoli Link Drain
50th M 53.97 0.00 10 % 53.98 26.99 26.99 Work is in
Progress.W
ork will be
restarted
after Rabi
Season and
will be
completed
by
30.06.2020.
SAFIDON YWS
CIRCLE
JIND
Agenda for Laying
RCC Pipe Line for
De-watering of
Lake/Dabbar Area
of Agricultural land
of village
Siwanamal
including
constructing of
Temporary Pump
House at RD
81400-L Padana
Drain
50th M 110.00 55.00 60 % 55.00 27.50 27.50 Tender
rates
approved
and Work
will be
restarted
after Rabi
Season and
will be
completed
by
30.06.2020.
SAFIDON YWS
CIRCLE
JIND
Agenda for
increasing capacity
of Pump House at
Outfall of Padana
Drain at Shamlo
Pump House at RD
70000-R Sunder
Sub Branch from
120 Cs to 240 Cs
including Civil work
50th M 300.00 0.00 5 % 300.00 150.00 150.00 Regarding
10 No. 20
Cs VT
pump-
Supply
order
issued to
Firm on
Dated
19/9/2019
and Work
will be
completed
upto
31.03.2020.
District Total 1640.99 657.58 983.43 535.92 447.50
75 0.00 IP
76 0.00 IP
77 0.00 IP
78 0.00 IP
0.00
KARNAL
100
Name of
Constitue
ncy
Name of
Irrigation
Circle
Name of Work Appvd.
in
meeting
of
HSFCB
(S/M/L) Est. Cost Expdt.
booked
during
year
Phy.
Prog.
Total Bal
Req.
Remarks
2020-21 2021-22
Annexure 5.4
Head:Flood Protection Works
Status: In Progress,Yet To Start,(Rs. in lacs)
Sr.
No
Requriments of funds Status
Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB
2022-23
KARNAL YWS
CIRCLE
KARNAL
Agenda for
connecting main
drain no. 1 (Choti
Yamuna) to main
drain no. 2 at RD
68000 (CM
announcement
code no. 148960).
48th L 969.74 3.38 25 % 966.36 328.56 318.90 Work in
Progress
and will be
completed
by
30/06/2020
District Total 969.74 3.38 966.36 328.56 318.90
PANIPAT
RURAL
YWS
CIRCLE
KARNAL
Protection of village
pond, agriculture
land and abadi of
village Mehrana
from flood in
Mehrana Drain at
existing alignment
from RD 0 to 3900
48th S 13.05 0.00 0 % 13.05 13.05 0.00 Work
started at
site but
suspended
due to court
case stay.
SAMALKH
A
YWS
CIRCLE
KARNAL
Purchase and
supply of Special
TandP Machine i.e.
1 No. Tata Hitachi
EX200 Super Fitted
Pocklain and 1 No.
Tata Hitachi Model
TH76 Excavator
cum Bachoke
Loader fitted with
standard
attachment and 1
No. Bolero Camper
(Pick-Up) for use in
Panipat Water
Services Division,
Panipat
49th S 87.50 25.20 30 % 62.30 62.30 0.00 1. Bolero
Camper
has been
purchased.
2. The ALE
Backhoe
Loader of
ACE
Company
has been
delivered in
this office.
3. 1 No.
Tata Hitachi
Model
TH76
Excavator
cum
Bachoke
Loader.Tec
hnical
specificatio
n has been
approved in
STC
meeting.
Tender has
been called
and the
case will be
put up in
the
upcoming
HPPC
meeting for
approval.
79 318.90 IP
318.90
PANIPAT
80 0.00 IP
81 0.00 IP
101
Name of
Constitue
ncy
Name of
Irrigation
Circle
Name of Work Appvd.
in
meeting
of
HSFCB
(S/M/L) Est. Cost Expdt.
booked
during
year
Phy.
Prog.
Total Bal
Req.
Remarks
2020-21 2021-22
Annexure 5.4
Head:Flood Protection Works
Status: In Progress,Yet To Start,(Rs. in lacs)
Sr.
No
Requriments of funds Status
Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB
2022-23
SAMALKH
A
YWS
CIRCLE
KARNAL
Providing
protection to River
Yamuna
embankment in
reach RD 18910 to
27410 in
Pathargarh
Complex by
providing lining
50th M 212.53 0.00 5 % 212.54 106.27 106.27 Work in
progress
and will be
completed
upto
31.03.2020.
PANIPAT
CITY
YWS
CIRCLE
KARNAL
Bringing to design
section and
strengthening of
banks of Main
Drain No. 2, Munak
escape drain and
old Munak drain for
safe passage of
design discharge.
50th M 64.42 12.29 65 % 52.14 26.07 26.07 Work in
Progress
and will be
completed
by
31/01/2020.
ISRANA YWS
CIRCLE
KARNAL
Replacement/const
ruction of syphon at
RD 4670 of Shera
Link crossing
Madlauda Minor
and replacement of
bridge at RD 2750
on Shera Link
Drain`
50th M 23.51 0.00 10 % 23.52 11.76 11.76 Work in
Progress
and will be
completed
by
31/03/2020.
ISRANA YWS
CIRCLE
KARNAL
Separation of
village pond from
flood and waste
water flowing in
Idyana Link Drain
and protection to
village abadi in
village Idyana
50th M 45.68 0.00 10 % 45.68 22.84 22.84 Work in
Progress
and will be
completed
by
31/03/2020.
ISRANA YWS
CIRCLE
KARNAL
Separation of
village pond from
flood and waste
chemical water
flowing in Try.
Drain No. 4 and
protection to village
abadi in village
Chamrara
50th M 96.55 0.00 45 % 96.56 48.28 48.28 Work in
Progress
and will be
completed
by
31/03/2020
District Total 543.24 37.49 505.79 290.57 215.20
JAGADHRI HKB
CIRCLE
JAGADH
RI
Work of repair of
damaged portion of
Hathnikund
Barrage.
48th S 1800.00 622.00 45 % 1178.00 1178.00 0.00 45% work
completed
and
balance
work will be
competed
upto
30.04.2020.
SADHAUR
A
HKB
CIRCLE
JAGADH
RI
Construction of
Bridges on
Chautang Nallah
from RD 0 to
136400.
49th M 50.00 0.00 30 % 50.00 25.00 25.00 Work in
Progress
and will be
completed
by
31.03.2020.
District Total 1850.00 622.00 1228.00 1203.00 25.00
82 0.00 IP
83 0.00 IP
84 0.00 IP
85 0.00 IP
86 0.00 IP
0.00
YAMUNANAGAR
87 0.00 IP
88 0.00 IP
0.00
102
Name of
Constitue
ncy
Name of
Irrigation
Circle
Name of Work Appvd.
in
meeting
of
HSFCB
(S/M/L) Est. Cost Expdt.
booked
during
year
Phy.
Prog.
Total Bal
Req.
Remarks
2020-21 2021-22
Annexure 5.4
Head:Flood Protection Works
Status: In Progress,Yet To Start,(Rs. in lacs)
Sr.
No
Requriments of funds Status
Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB
2022-23
Unit Total 5964.48 1625.19 4339.35 2668.96 1244.26
TIGAON YWS
CIRCLE
FARIDAB
AD
Construction of
Sehatpur Drain
with Brick lining
with M.S Railing to
Carry storm water
from RD 11000 to
19000 and
remodeling katcha
reach from RD 0 to
11000.
48th M 795.00 507.24 90 % 287.76 143.88 143.88 work likely
to be
completed
upto
31.12.2018
BADKHAL YWS
CIRCLE
FARIDAB
AD
Construction of CC
open drain from RD
0 to 2000 and
laying of RCC
hume pipe from RD
2000 to 6000 of
Badhkal escape
channel for
disposal of flood
water and storm
water of village
Badhkal and
Aakhir.
50th M 283.37 117.45 70 % 165.92 82.96 82.96
PRITHLA YWS
CIRCLE
FARIDAB
AD
Reconstruction of £
no. bridges at RD
201500 , 191000
and 208500 of
Gaunchi main
drain.
50th M 271.15 178.58 80 % 92.58 46.29 46.29
District Total 1349.52 803.27 546.26 273.13 273.13
PUNHANA YWS
CIRCLE
FARIDAB
AD
RE-PLACEMENT
OF 03 NOS. V.R.
BRIDGES AT RD
6250, RD 10750
AND RD 14850 OF
MARYAKA DRAIN
IN DISTRICT NUH
CONNECTING
VILLAGES (I) NAI
TO SHINGAR (II)
JHAROKHARI TO
SHINGAR (III)
MARYAKA TO
SHINGAR
RESPECTIVELY.
49th S 53.32 36.74 90 % 16.58 16.58 0.00 Work in
progress
and likely to
be
completed
upto
31.12.2019.
PUNHANA YWS
CIRCLE
FARIDAB
AD
Internal Clearance
and bringing upto
design section
(inner) from
RD.22600 to
112600 of Ujina
Drain.
49th S 199.00 78.75 95 % 120.25 120.25 0.00 Work
completed
FIROZEPU
R JHIRKA
YWS
CIRCLE
FARIDAB
AD
Flood agenda for
replacement of V.R
Bridge at RD 5700
of Ferozpur Jhirka
Link Drain.
50th S 34.00 0.00 20 % 34.00 34.00 0.00 In progress
426.10
YWS(S)
FARIDABAD
89 0.00 IP
90 0.00 IP
91 0.00 IP
0.00
MEWAT
92 0.00 IP
93 0.00 IP
94 0.00 IP
103
Name of
Constitue
ncy
Name of
Irrigation
Circle
Name of Work Appvd.
in
meeting
of
HSFCB
(S/M/L) Est. Cost Expdt.
booked
during
year
Phy.
Prog.
Total Bal
Req.
Remarks
2020-21 2021-22
Annexure 5.4
Head:Flood Protection Works
Status: In Progress,Yet To Start,(Rs. in lacs)
Sr.
No
Requriments of funds Status
Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB
2022-23
PUNHANA YWS
CIRCLE
FARIDAB
AD
Flood Agenda for
Re-construction of
D.R. Bridge on
Ujina Drain at RD.
79266 for crossing
from village
Bhadas to
Punhana
50th M 394.50 0.00 10 % 394.50 197.25 197.25 In progress
PUNHANA YWS
CIRCLE
FARIDAB
AD
Agenda for re-
construction of V.R.
Bridge at Km
24.885 (from
village Nai to
Nunera) of Ujina
Diversion Drain in
Distt. Nuh
50th M 320.74 160.20 90 % 160.54 80.27 80.27 In progress
NUH YWS
CIRCLE
FARIDAB
AD
Flood agenda for
Re-construction of
V.R. Bridge at RD.
37150 of Nuh Drain
50th M 127.00 0.00 5 % 127.00 63.50 63.50 In Progress
NUH YWS
CIRCLE
FARIDAB
AD
Flood agenda for
Re-construction of
V.R. Bridge at RD.
58145 of Nuh Drain
50th M 171.36 0.00 10 % 171.36 85.68 85.68 Work is in
progress
District Total 1299.92 275.69 1024.23 597.53 426.70
PUNHANA YWS
CIRCLE
FARIDAB
AD
RE-PLACEMENT
OF 04 NO. V.R.
BRIDGES AT RD
KM 12.208, KM
15.080, KM 18.935
AND KM 21.953
OF UJINA
DIVERSION DRAIN
IN DISTRICT
PALWAL AND
NUH
CONNECTING
VILLAGES (I)
BHULWANA TO
UMRALA (II)
HODAL GARHI
PATTI TO LALPUR
(III) BICHHOR TO
LALPR (IV)
BICHHOR TO
NUNERA
RESPECTIVELY.
49th S 1238.26 513.32 50 % 724.94 724.94 0.00 Work under
progress of
VRB km
15.080. and
Tender rate
of VRB
12.280 has
been
approved
and work
will be
started
shortly.
Work of
VRB km
18.935 and
21.953 is
under
progress.
HATHIN YWS
CIRCLE
FARIDAB
AD
utilisation of flood
water by
constructing of
hump and pump
house on gaunchi
main drain at RD
97500 to augment
the hathin disty. to
feed tail reach
villages.
50th M 193.21 0.67 10 % 192.54 96.27 96.27 In progress
95 0.00 IP
96 0.00 IP
97 0.00 IP
98 0.00 IP
0.00
PALWAL
99 0.00 IP
100 0.00 IP
104
Name of
Constitue
ncy
Name of
Irrigation
Circle
Name of Work Appvd.
in
meeting
of
HSFCB
(S/M/L) Est. Cost Expdt.
booked
during
year
Phy.
Prog.
Total Bal
Req.
Remarks
2020-21 2021-22
Annexure 5.4
Head:Flood Protection Works
Status: In Progress,Yet To Start,(Rs. in lacs)
Sr.
No
Requriments of funds Status
Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB
2022-23
HODAL YWS
CIRCLE
FARIDAB
AD
Agenda for
replacement of 2
Nos. V.R. Bridge at
RD. 10300 and RD.
12000 of Gaunchi
Main Drain.
50th M 392.00 0.00 10 % 392.00 196.00 196.00 In progress
District Total 1823.47 513.99 1309.48 1017.21 292.27
Unit Total 4472.91 1592.95 2879.97 1887.87 992.10
Grand Total 25882.95 5521.02 20362.21 10952.63 6998.55
101 0.00 IP
2410.88
0.00
0.00
105
Name of
Constitue
ncy
Name of
Irrigation
Circle
Name of Work Appvd.
in
meeting
of
HSFCB
(S/M/L) Est. Cost Expdt.
booked
during
year
Phy.
Prog.
Total Bal
Req.
Remarks
2020-21 2021-22
AMBALA
CITY
SYL
CIRCLE
AMBALA
Constructing
Retaining wall in
the side of three
Nos. Air field drain
in front of King
Fisher Resort
Ambala City
(Deposit Work of
Haryana Tourism
Corporation )
(120.00 Lakh)
50th L 120.00 0.00 0 % 120.00 40.80 39.60 Deposit
work
(120.00
Lakh)
Amount to
be
deposited
by Haryana
Tourism
Corporation
.
District Total 120.00 0.00 120.00 40.80 39.60
HISSAR BWS
CIRCLE
HISAR
CONSTRUCTION
OF SATROD
MIRKA DRAIN RD
0 TO 6450 AND
DABRA LINK
DRAIN RD 0 TO
7525(DEPOSITE
WORK OF HUDA).
46th S 983.05 657.44 90 % 325.61 325.61 0.00 Work will
be
completed
upto
31.03.2020.
Subject the
condition
that the
funds will
be provided
by HUDA.
District Total 983.05 657.44 325.61 325.61 0.00
THANESA
R
SYL
CIRCLE
AMBALA
Constg. of RCC
rectangular open
drain of size
5.50`X2.75` parallel
to Saraswati Creak
for sewerage water
disposal work
Sector-13, U.E.
Kurukshetra and 7`
X3.50` from Public
Health STP point to
siphon Narwana
Branch,Jyotisar.
Funds are to be
provided by HUDA
and PHED.
45th L 4070.00 4039.21 100 % 30.79 10.47 10.16 Flood
Protection
Work...
District Total 4070.00 4039.21 30.79 10.47 10.16
Unit Total 5173.05 4696.65 476.40 376.88 49.76
BADSHAP
UR
CONSTR
UCTION
CIRCLE
GURGAO
N
Construction of
RCC open Trough
for channelisation
of Badshahpur
Drain K to L
(Dhankot road to
Njafgarh Drain)
47th M 4837.00 0.00 0 % 4837.00 2418.50 2418.50 Work
proposed to
be dropped
as funds
not
provided by
HSVP.
District Total 4837.00 0.00 4837.00 2418.50 2418.50
Unit Total 4837.00 0.00 4837.00 2418.50 2418.50
ROHTAK
0.00
LCU
4 0.00 Droppe
d
0.00
CONSTRUCTION
GURGAON
10.16
49.76
KURUKSHETRA
3 10.16 Comple
ted
2 0.00 IP
0.00
39.60
HISAR
AMBALA
1 39.60 YTS
2022-23
BWS
Annexure 6.1Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB
Head:8443-Irrigation Department Deposit Works (Rs. in lacs)
Sr.
No
Requriments of funds Status
106
Name of
Constitue
ncy
Name of
Irrigation
Circle
Name of Work Appvd.
in
meeting
of
HSFCB
(S/M/L) Est. Cost Expdt.
booked
during
year
Phy.
Prog.
Total Bal
Req.
Remarks
2020-21 2021-22 2022-23
Annexure 6.1Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB
Head:8443-Irrigation Department Deposit Works (Rs. in lacs)
Sr.
No
Requriments of funds Status
BAHADUR
GARH
YWS
CIRCLE
ROHTAK
Increasing capacity
of Sarai
Aurangabad
Kassar Link Drain
from RD 0 to 34052
out falling into KCB
Drain at RD 8103-L
including its
extension and
Sump Well Pump
House
47th M 404.18 0.00 0 % 404.18 202.09 202.09 Deposit
work of
HUDA and
HSIDC.
Amount not
deposited
by HUDA
and HSIDC.
L-section
and
drawing
approved.
HUDA need
to deposit
146.98 lacs
and HSIDC
need to
deposit
257.20
lacs.
Necessary
written
letter to
CE/LCY,
PKL
regarding
clarification
vide this
office letter
no. 2004/70-
W dated
20.08.2019
District Total 404.18 0.00 404.18 202.09 202.09
Unit Total 404.18 0.00 404.18 202.09 202.09
PANIPAT
RURAL
YWS
CIRCLE
KARNAL
Providing lining and
railing of panipat
drain from RD
55673-27000. total
cost of the scheme
RS. 44.08 crore
fund is to be
provided by HUDA.
45th S 3780.00 2900.00 100 % 880.00 880.00 0.00 DEPOSIT
WORK OF
HUDA.
HUDA HAS
NOT
DEPOSITE
D THE
BALANCE
AMOUNT
OF RS.8.80
CRORE
FOR
EXECUTIO
N OF THE
SCHEME .
6 0.00 Comple
ted
YWS(N)
PANIPAT
0.00
0.00
5 0.00 YTS
107
Name of
Constitue
ncy
Name of
Irrigation
Circle
Name of Work Appvd.
in
meeting
of
HSFCB
(S/M/L) Est. Cost Expdt.
booked
during
year
Phy.
Prog.
Total Bal
Req.
Remarks
2020-21 2021-22 2022-23
Annexure 6.1Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB
Head:8443-Irrigation Department Deposit Works (Rs. in lacs)
Sr.
No
Requriments of funds Status
PANIPAT
RURAL
YWS
CIRCLE
KARNAL
Remodelling of
panipat drain by
providing lining and
replacing of pucca
structure from RD
55673 to 64400
(phase-2 costing
rs. 13.55 crore).
46th S 1355.00 0.00 0 % 1355.00 1355.00 0.00 deposite
work of MC
panipat/UL
B.MC/PANI
PAThas not
deposited
the required
amount to
execute the
work.Now
this work is
under CM
announcem
ent and is
being dealt
seperately.
District Total 5135.00 2900.00 2235.00 2235.00 0.00
Unit Total 5135.00 2900.00 2235.00 2235.00 0.00
BALABGA
RH
YWS
CIRCLE
FARIDAB
AD
PROVIDING
LINING OF
GAUNCHI DRAIN
FROM RD 0-
15534. TOTAL
COST OF THE
PROJECT RS.
1510.0 LACS
BEING SHARED
BY HUDA
MUNICIPAL
CORP.
FARIDABADD,URB
AN LOCAL
BODIES,
IRRIGATION
DEPARTMENT .
AMOUNT SHARED
BY VARIOUS
DEPARTMENTS.
HUDA 250.00
LACS, MCF-255.00
LACS,
IRRIGATION-
250.00.
45th S 1420.00 1325.00 95 % 95.00 95.00 0.00
THE
BALANCED
AMOUNT
TO THE
TUNE OF
RS. 95.00
LACS IS
PENDING
WITH MCF.
SHARE
ALREADY
RECEIVED
HUDA-
250.00 ,
MCF-70.00
LACS, ULB-
755.00
LACS,
IWRD-
250.00
LACS.
District Total 1420.00 1325.00 95.00 95.00 0.00
Unit Total 1420.00 1325.00 95.00 95.00 0.00
Grand Total 16969.23 8921.65 8047.58 5327.47 2670.35
0.00
49.76
8 0.00 IP
0.00
YWS(S)
FARIDABAD
0.00
0.00
7 0.00 YTS
108