gfj;k.kk jkT; lw[kk jkgr ,oa ck<+ fu;a=.k cksMZ 51 st MEETING AGENDA CHAIRMANSHIP: HON’BLE CHIEF MINISTER, HARYANA DATE:-30.12.2019 TIME:-03:00 P.M. VENUE: CONFERENCE HALL, HARYANA NIWAS, SECTOR-3, CHD. Irrigation and Water Resources Department, Haryana Sinchai Bhawan, Sector-5, Panchkula. Ph.No. : 0172-2582541, Fax No. 0172- 2567259 Email: [email protected], Official website: www.hid.gov.in

gfj;k.kk jkT; lw[kk jkgr ,oa ck

  • Upload
    others

  • View
    7

  • Download
    0

Embed Size (px)

Citation preview

Page 1: gfj;k.kk jkT; lw[kk jkgr ,oa ck

gfj;k.kk jkT; lw[kk jkgr ,oa ck<+

fu;a=.k cksMZ

51st MEETING AGENDA CHAIRMANSHIP: HON’BLE CHIEF MINISTER, HARYANA

DATE:-30.12.2019 TIME:-03:00 P.M.

VENUE: CONFERENCE HALL, HARYANA NIWAS, SECTOR-3, CHD. Irrigation and Water Resources Department, Haryana

Sinchai Bhawan, Sector-5, Panchkula.

Ph.No. : 0172-2582541, Fax No. 0172- 2567259

Email: [email protected],

Official website: www.hid.gov.in

Page 2: gfj;k.kk jkT; lw[kk jkgr ,oa ck
Page 3: gfj;k.kk jkT; lw[kk jkgr ,oa ck

I N D E X Description Page No.

Notice for 51st meeting of Haryana State Drought Relief & Flood Control Board (HSDR&FCB) 1

List of Members and Special Invitees 2-5

ITEM NO. 1 : CONFIRMATION OF THE MINUTES OF 50th MEETING OF HSDR

&FCB

6

ITEM NO. 2 : ACTION TAKEN REPORT OF 50th MEETING OF HSDR&FCB 7

ITEM NO. 3 : FLOOD REPORT FOR THE YEAR 2019 8-12

ITEM NO. 4 : NEW SCHEMES OF IRRIGATION AND WATER RESOURCES

DEPARTMENT FOR APPROVAL OF THE BOARD

13-14

ITEM NO. 5

:

REVIEW OF SCHEMES OF IRRIGATION AND WATER

RESOURCES DEPARTMENT ONGOING PRIOR TO 51st MEETING

OF HSDR&FCB

15

ITEM NO. 6 : REVIEW OF ONGOING AND NEW SCHEMES UNDER HEAD-

DEPOSIT

16-17

ITEM NO. 7 : REVIEW OF POSITION OF FUNDS WITH IRRIGATION AND WATER

RESOURCES DEPARTMENT

18-19

ITEM NO. 8 : SCHEMES AND FUNDS POSITION OF PUBLIC HEALTH

ENGINEERING DEPARTMENT.

20-35

ANNEXURE 1.1 : MINUTES OF 50TH MEETING OF HSDR&FCB 36-43

ANNEXURE 2.1 : ABSTRACT OF ALL SCHEMES ONGOING PRIOR TO 50TH

MEETING OF HSDR&FCB

44

ANNEXURE 2.2 : ABSTRACT OF NEW SCHEMES APPROVED IN 50TH MEETING OF

HSDR&FCB

45

ANNEXURE 2.3 : ABSTRACT OF ALL SCHEMES APPROVED UPTO 50TH MEETING

OF HSDR&FCB

46

ANNEXURE 3.1 : RAINFALL DATA FOR THE YEAR 2019 47

ANNEXURE 3.2 : ANNUAL FLOOD PEAK DATA 48

ANNEXURE 3.3 : POSITION OF DRAINGE PUMPS 49

ANNEXURE 4.1 : ABSTRACT OF NEW PROPOSED FLOOD SCHEMES 50

ANNEXURE 4.2 : DETAILS OF NEW PROPOSED FLOOD SCHEMES 51-65

ANNEXURE 5.1 : DETAIL OF COMPLETED SCHEMES OF IRRIGATION AND WATER

RESOURCES DEPARTMENT ONGOING PRIOR TO 51st MEETING

OF HSDR&FCB

66-77

ANNEXURE 5.2 : DETAILS OF DROPPED SCHEMES OF IRRIGATION AND WATER

RESOURCES DEPARTMENT ONGOING PRIOR TO 51st MEETING

OF HSDR&FCB

78-80

ANNEXURE 5.3 : ABSTRACT OF ONGOING SCHEMES OF IRRIGATION AND WATER

RESOURCES DEPARTMENT IN 51st MEETING OF HSDR&FCB

81

ANNEXURE 5.4 : DETAILS OF ONGOING SCHEMES OF IRRIGATION AND WATER

RESOURCES DEPARTMENT IN 51st MEETING OF HSDR&FCB

82-105

ANNEXURE 6.1 : DETAILS OF ONGOING SCHEMES OF I&WRD UNDER DEPOSIT

HEAD

106-108

Page 4: gfj;k.kk jkT; lw[kk jkgr ,oa ck

“gj cwan lap;] gj [ksr ikuh”

Engineer-in-Chief,

Irrigation & Water Resources Department

Panchkula, Haryana.

e-mail:[email protected]

Meeting

30.12.2019 at 03:00 P.M.

No. 4647 /Drainage/14/2020 Dated: 24.12.2019

From

Engineer-in-Chief,

Haryana Irrigation and Water Resources Department,

Sinchai Bhawan, Sector-5, Panchkula.

Phone No. 0172-2582541

Fax No. 0172- 2567259

To

1. The Members

2. Special Invitees

Haryana State Drought Relief & Flood Control Board (HSDR&FCB).

(As per list enclosed)

Subject: 51st Meeting of Haryana State Drought Relief & Flood Control Board.

In this regard it is informed that the 51st Meeting of Haryana State Drought Relief & Flood

Control Board (HSDR&FCB) is scheduled to be held on 30.12.2019 at 03:00 P.M. under the

Chairmanship of Hon’ble Chief Minister, Haryana in Conference Hall, Haryana Niwas, Sector-3

Chandigarh. All Divisional Commissioners and Deputy Commissioners of the state are requested to join

the meeting through video conference at their respective Headquarters alongwith the concerned

Xens’.The agenda for the meeting can be downloaded from the official website “www.hid.gov.in”.

It is requested to kindly make it convenient to attend the above said meeting.

-Sd/-

Engineer in Chief, Irrigation and Water Resources Department, Haryana, Panchkula, Cum-Member Secretary,

Haryana State Drought Relief &Flood Control Board

1

Page 5: gfj;k.kk jkT; lw[kk jkgr ,oa ck

LIST OF MEMBERS

HARYANA STATE DROUGHT RELIEF &FLOOD CONTROL BOARD

OFFICIAL MEMBERS

1. Hon'ble Chief Minister, Haryana. Chairman

2. Irrigation and Water Resources Minister, Haryana. Vice Chairman

3. Finance Minister, Haryana. Member

4. Agriculture Minister, Haryana. -do-

5. Revenue & Disaster Management Minister, Haryana. -do-

6. Chief Secretary, Govt. of Haryana, Chandigarh. -do-

7. Additional Chief Secretary, Govt. of Haryana,

Animal Husbandry and Dairying Department, Chandigarh.

-do-

8. Additional Chief Secretary, Govt. of Haryana, Revenue & Disaster Management Department, Chandigarh

-do-

9. Additional Chief Secretary, Government of Haryana, Agriculture Department, Chandigarh.

-do-

10. Additional Chief Secretary to Government of Haryana, Forest & Wildlife Department, Chandigarh

-do-

11. Additional Chief Secretary, Government of Haryana, Irrigation and Water Resources Department, Chandigarh.

-do-

12. Additional Chief Secretary, Government of Haryana, Public Health Engineering Department, Chandigarh.

-do-

13. Additional Chief Secretary, Govt. of Haryana, Power Department, Chandigarh.

-do-

14. Additional Chief Secretary, Govt. of Haryana, PW (B&R) Department, Chandigarh.

-do-

15. Additional Chief Secretary, Govt. of Haryana, Finance Department, Chandigarh.

Member

16. Additional Chief Secretary, Govt. of Haryana, Planning Department, Chandigarh.

-do-

2

Page 6: gfj;k.kk jkT; lw[kk jkgr ,oa ck

17. Principal Secretary, Govt. of Haryana, Development and Panchayat Department, Chandigarh.

-do-

18. Principal Secretary, Govt. of Haryana, Mines and Geology Department, Chandigarh.

-do-

19. Principal Secretary, Govt. of Haryana,

Town and Country Planning Department, Chandigarh.

-do-

20. Principal Secretary, Govt. of Haryana,

Urban Local Bodies Department, Chandigarh.

-do-

21. Commissioner, Ambala Division, Ambala. -do-

22. Commissioner, Gurgaon Division, Gurgaon. -do-

23. Commissioner, Hisar Division, Hisar. -do-

24. Commissioner, Rohtak Division, Rohtak. -do-

25. Engineer-In-Chief, PW(B&R) Department, Haryana, Sector-33, Chandigarh.

-do-

26. Engineer-In-Chief, Public Health Engineering Department, Haryana, Panchkula.

-do-

27. Member (RM) Central Water Commission, Room No. 212(S) SewaBhawan, R.K.Puram, New Delhi. 110066

-do-

28. Principal Chief Conservator of Forest, Haryana, Panchkula. -do-

29. Engineer-In-Chief, Irrigation and Water Resources Department Haryana, Panchkula.

Member Secretary

30. Chief Engineer/YWS (North) Irrigation and Water Resources Department, Haryana, Panchkula.

Joint Member Secretary

31. Chief Engineer/ YWS (South) Irrigation and Water Resources Department, Haryana, Delhi.

Member

32. Chief Engineer/BWS, Irrigation and Water Resources Department, Haryana, Panchkula.

-do-

33. Chief Engineer/LCU, Irrigation and Water Resources Department, Haryana, Panchkula.

-do-

3

Page 7: gfj;k.kk jkT; lw[kk jkgr ,oa ck

SPECIAL INVITEES

1. Principal Secretary to Chief Minister Haryana, Chandigarh.

2. Additional Principal Secretary-I to Chief Minister, Haryana, Chandigarh.

3. Additional Principal Secretary-II to Chief Minister, Haryana, Chandigarh.

4. Dy. Principal Secretary to Chief Minister, Haryana, Chandigarh

5. Principal Officer on Special Duty to Chief Minister Haryana, Chandigarh.

6. Officer on Special Duty to Chief Minister Haryana, Chandigarh.

7. Chairman & Managing Director, DISCOM (UHBVNL and DHBVNL), Panchkula.

8. Administrator, CADA, Panchkula.

9. Secretary, Revenue & Disaster Management Department, Haryana, Chandigarh.

10. Secretary, Irrigation and Water Resources Department, Haryana, Chandigarh.

11. Director General-cum- Secretary, Information, Public Relations & Cultural affairs, Haryana, Chandigarh.

12. Commander/Headquarter, Punjab, Haryana and Himachal Pradesh, Independent Sub Area, Western Command, Ambala Cantt.

13. Representative of National Highway Authority of India, New Delhi-110075

14. Representative of Indian Meteorological Department, Regional Office, Chandigarh

15. Representative of Haryana Space Application Centre, Hisar

16. Chief Engineer / Co-ordination, Irrigation and Water Resources Department, Haryana, Panchkula.

17. Chief Engineer/Construction,Irrigation and Water Resources Department, Haryana, Panchkula.

18. Chief Engineer / CADA, Panchkula.

19. Deputy Commissioner, Ambala.

20. Deputy Commissioner, Bhiwani.

21. Deputy Commissioner, Faridabad.

22. Deputy Commissioner, Fatehabad.

23. Deputy Commissioner, Gurgaon.

24. Deputy Commissioner, Hisar.

25. Deputy Commissioner, Jhajjar.

26. Deputy Commissioner, Jind.

27. Deputy Commissioner, Kaithal.

28. Deputy Commissioner, Karnal.

29. Deputy Commissioner, Kurukshetra.

30. Deputy Commissioner, Mahendergarh at Narnaul.

31. Deputy Commissioner, Mewat at Nuh.

32. Deputy Commissioner, Palwal.

33. Deputy Commissioner, Panchkula.

34. Deputy Commissioner, Panipat.

35. Deputy Commissioner, Rewari.

4

Page 8: gfj;k.kk jkT; lw[kk jkgr ,oa ck

36. Deputy Commissioner, Rohtak.

37. Deputy Commissioner, Sirsa.

38. Deputy Commissioner, Sonepat.

39. Deputy Commissioner, Yamuna Nagar.

40. Superintending Engineer, Planning, Irrigation and Water Resources Department, Haryana, Panchkula.

41. Superintending Engineer, HKB Circle, Jagadhari.

42. Superintending Engineer, YWS Circle, Karnal.

43. Superintending Engineer, YWS Circle, Sonepat.

44. Superintending Engineer, YWS Circle, Delhi.

45. Superintending Engineer, YWS Circle, Faridabad.

46. Superintending Engineer, YWS Circle, Jind.

47. Superintending Engineer, SYL W.S. Circle, Ambala.

48. Superintending Engineer, BWS Circle, Kaithal.

49. Superintending Engineer, BWS Circle,Hisar.

50. Superintending Engineer, BWS Circle, Fatehabad.

51. Superintending Engineer, BWS Circle, Sirsa.

52. Superintending Engineer, YWS Circle, Rohtak.

53. Superintending Engineer, Jhajjar W.S. Circle, Jhajjar.

54. Superintending Engineer, YWS Circle, Bhiwani.

55. Superintending Engineer, LWS Circle, Bhiwani.

56. Superintending Engineer, JLN W.S. Circle, Rewari.

57. Superintending Engineer, JLN W.S. Circle, Narnaul.

58. Superintending Engineer, Work Shop Circle, Karnal.

59. Superintending Engineer/CDO, Irrigation and Water Resources Department, Haryana, Panchkula.

60. Executive Engineer/CDO-I, Irrigation and Water Resources Department, Haryana, Panchkula.

61. Executive Engineer/Drainage, Irrigation and Water Resources Department, Haryana, Panchkula.

62. Executive Engineer/Nabard, Irrigation and Water Resources Department, Haryana, Panchkula.

---------------------------------------------------------

5

Page 9: gfj;k.kk jkT; lw[kk jkgr ,oa ck

ITEM NO. 1

CONFIRMATION OF THE MINUTES OF 50th

MEETING OF HSDR &FCB HELD ON 15.01.2019. 50th Meeting of Haryana State Drought Relief and Flood Control Board was held under

the Chairmanship of Hon’ble Chief Minister, Haryana on 15.01.2019. The minutes of meeting

(Annexure-1.1) were circulated vide letter No. 416-511 /Drainage/14/2019 Dated: 05.02.2019.

No comments have been received from any quarter. It is requested that minutes may

kindly be confirmed.

6

Page 10: gfj;k.kk jkT; lw[kk jkgr ,oa ck

ITEM NO. 2

ACTION TAKEN REPORT ON THE DECISIONS TAKEN IN 50th MEETING OF HSDR & FCB HELD ON 15.01.2019

Sr. No

Issue Action Taken

1. In the 50th Meeting of HSDR&FCB, 165 New Schemes and 111 Ongoing Schemes with Balance work were approved.

Status of Schemes Approved in 50th Meeting of HSDR&FCB

Total Schemes

Amt. Completed Schemes

In Progress

Yet to Start

Dropped

New Schemes

165 163.73 94 46 18 07

Ongoing Schemes

111 250.63 70 28 09 04

The detail at Annexure 2.1(pg. 44) and Annexure 2.2 (pg. 45).

2. Regarding balance amount pending with various department like HSVP, HSIIDC, ULB for the execution of deposit works.

Out of 08 nos. schemes, 03 Schemes are yet to start and 01 no. scheme is in progress. It is further mentioned that in spite of requesting the following departments regarding requirement of funds the same is still pending. Rs. In Crores

The detail at Annexure 6.1 at pg no. 106

Sr. No.

Name of Department

Name of Work Amount not deposited

1. Haryana Tourism

Cosnt. Retaining wall in front of King Fisher Resort, Ambala

1.00

2. HSVP Satrod Mirka Drain, Hisar+ Sarai Aurangabad of Kassar Link Drain,+ lining & railing of Panipat Drain

5.00+0.55+8.80 = (14.33)

3. HSIIDC Sarai Aurangabad Kassar Link Drain

2.03

4. ULB Remodelling of Panipat Drain.

20.31

G.Total 37.69

3. Regarding exploring the alternative to re-use the water and not just throwing into the drain.

In this regard policy on re-use of treated waste water was framed by PHED and the same stands approved by the Govt. and the same has been notified vide no. 5/18/2018-3PH dated 30.10.2019. A comprehensive scheme has been prepared by I&WRD for the whole state for using treated waste water for irrigation using 747 cusecs treated water, cost of schemes is estimated to be Rs. 1098 crore and it is proposed to be executed in 05 years.

4. Regarding increase of scope of scheme purposed to protect village Kamalpur and Village Lal Chappar on River Yamuna

As per the report the flood schemes executed in these villages acted efficiently and protected the river banks from further erosion in spite of the highest discharge received in River Yamuna this year i.e. 8.28 lac cusecs.

5. Regarding monitoring the flood protection schemes by the District Administration.

A District Level Committee was constituted comprising a representative from D.C. Office to check the flood works having stone boulders components. The DLC checked the works and submitted its report.

7

Page 11: gfj;k.kk jkT; lw[kk jkgr ,oa ck

ITEM NO. 3

FLOOD REPORT OF HARYANA FOR THE YEAR 2019

Haryana is a small landlocked state situated in the North West part of India and is bounded

by Shivalik range in the North- East and river Yamuna in the East, Aravali range in the South-West

and river Ghaggar in the West. River Yamuna form part of the boundary between Haryana & Uttar

Pradesh and River Ghaggar between Haryana & Punjab. The total area of the state is 44.2 lac

hectares out of which about 39.0 lac hectares is arable.

Topographically, from drainage angle the entire state is divided into two parts i.e. area

draining into Yamuna Sub Basin of Ganga Basin and area draining into Ghaggar Sub Basin of Indus

Basin.

Yamuna Sub Basin Drainage area of Yamuna Sub Basin comprises of area of Yamuna Nagar (part), Karnal,

Panipat, Sonepat, Rohtak, Jhajjar, Rewari, Gurgaon, Mewat, Mahendergarh, Jind (part), Faridabad

and Palwal districts. It covers about 40% area of the state and it drains into river Yamuna.

Experiencing high flooding during heavy rainfall, diversion drains were constructed in the northern

portion of this catchment out-falling into river Yamuna in the North of Delhi. Ujjina Diversion Drain

was constructed to out-fall into river Yamuna in Haryana territory in the South of Delhi to check

drainage congestion through Khaluka Regulator in Rajasthan. Due to the construction of a number

of bunds in Rajasthan territory in catchment area of river Sahibi, Krishnawati, Dohan and Landoha

Nalla originating from Aravali hills of Rajasthan, the flood problem in Rewari, Mahendargarh,

Jhajjar and Mewat has now reduced considerably. The problem arises only when there is heavy

downpour in low lying pockets and in such situation, dewatering is resorted to, on SOS basis.

Important drains of Yamuna Sub Basin area are Chautang Nallah, Dhanaura Escape, Nissing

Drain, Indri Drain, Main Drain No. 2, NaiNallah, Drain No. 8, Diversion Drain No. 8, Out-fall Drain

No. 8, Najafgarh Drain, Chhapra Drain, Meham-Lakhanmajra Drain, KCB Drain, Supplementary

Drain, Nuh Drain, Ujjina Drain, Ujjina diversion Drain, Gaunchi Main Drain etc.

Ghaggar Sub Basin

Remaining 60% area of the state drains into the Ghaggar Sub Basin of Indus Basin

comprising of Yamuna Nagar (part), Panchkula, Ambala, Kurukshetra, Kaithal, Jind, Bhiwani, Hisar,

Fatehabad and Sirsa districts. This area has a country slope towards river Ghaggar. The river

Ghaggar enters Haryana State in district Panchkula from the foothills of Shivalik and flows in South-

West direction to Rajasthan through Haryana and Punjab. River Tangri and Markanda merge in the

Ghaggar River in Kaithal district. Ghaggar River and its tributaries create serious problems enroute

in districts Ambala, Kurukshetra, Kaithal, Fatehabad and Sirsa. The Ghaggar River drains into

8

Page 12: gfj;k.kk jkT; lw[kk jkgr ,oa ck

desert area of Rajasthan. Important drains of Ghaggar Sub Basin are Ganda Nallah, SYL Parallel

Drain, Saraswati Drain, Kaithal Drain, Amin Drain, Pundri Drain No. 1, Pundri Drain No. 2, Kasan

Drain, Kalwa-Kinana Drain, Padana Drain, Hansi Drain, Rori-Ghaggar Drain, RangoiKharif Channel

cum Drain, RangoiNallah, Rangoi Diversion Drain. The Bass-Hisar-Ghaggar Drain is under

implementation which will provide relief to the areas in Hisar, Fatehabad and Sirsa districts.

A number of ring/protection bunds and embankments have been constructed with high level

approaches and ramps to protect abadi of important towns and villages which otherwise could get

marooned as a result of spillover from rivers/nallahs due to their location in flood belt of this basin.

Beside this, Ottulake has also been deepened to store Ghaggar flood water to use the same in a

number of Kharif channels in district Sirsa.

Main drains, their capacity and out-fall source is as under:-

Sr. No.

Name of Drain Capacity Discharge in Cusec

Out-fall

YAMUNA SUB BASIN

1 Main Drain No. 2 6325 River Yamuna

2 NaiNallah 2241 Drain No. 8

3 Diversion Drain NO. 8 7320 River Yamuna

4 West Jua Drain 500 Mangeshpur Drain

5 Drain No. 8 1537 Bhindawas lake/Drain

6 Out-fall Drain No. 8 4000 Dhansa out-fall Drain

7 KCB Drain 692 Mangeshpur Drain

8 Chandeni Drain 425 NuhDrain

9 Nuh Drain 1362 UjinaDrain

10 UjinaDrain 2200 Ujina Diversion Drain

11 Ujina Diversion Drain 2200 Gaunchi Main Drain

12 Gaunchi Main Drain 6655 River Yamuna

GHAGGAR SUB BASIN

1 Saraswati Drain 16660 A tributary of River Ghaggar

2 Kaithal Drain 213 River Ghaggar

3 Rangoi Diversion Drain

4088 River Ghaggar

4 HisarGhaggar multipurpose channel

500 River Ghaggar

5 MirpurChoe Drain 830 River Ghaggar

6 Amin Drain 2250 River Ghaggar

7 HisarGhaggar Drain 750 River Ghaggar

8 Baretta Drain 1380 River Ghaggar

9 SirhindChoe Drain 2454 River Ghaggar

10 RangoiNallah 7000 River Ghaggar

9

Page 13: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Flood situation in the year 2019

During 2019 Haryana received deficit –43.31% rainfall and district wise statement of rainfall

during the monsoon of 2019, as collected from IMD, Chandigarh is given in Annexure 3.1. The

rainfall received during the months of June, July, August and September 2019 was on the lower side

of normal rainfall in state Haryana this year. Although no major flood situation was faced during the

flood period of 2019. Apart from the maximum discharge received in river Yamuna i.e. 828072

Cusecs and the medium discharge received in other rivers was mainly due to heavy rainfall in the

catchments of the river located in the states of Uttarakhand and Himachal Pradesh.

The basin wise status of flood received during 2019 is given below:-

Yamuna Sub Basin

This year Highest flood discharge was recorded in river Yamuna at Hathni Kund Barrage with

maximum discharge of 08,28,072 cs. on 18.08.2019. This flood in river Yamuna passed safely but

eroded some agricultural land along the river edge at location near village Lal Chappar, Jathlana,

Unheri, Odri, Kamalpur in district Yamunanagar.

Apart from this the medium flood discharge was received in the tributaries of River Somb,

Pathrala, Sadhaura and Markanda which eroded fertile agriculture land near villages Gadwali,

Muzafat, Ranjitpur, Ramgarh Sawai, Chintpur, Rampur gainda and Khannuwala.The temporary

remedial measures at some critical areas on river Somb and Pathrala to protect village abadi from

flood were taken, although no substantial damages were observed.

A medium flood discharge was also received in River Pathrala and its tributaries and some

villages were effected like vill Manakpur, Arjun Majra, Rajpur, Dadupur Jattan and Mukaravpur.

Apart from this, in district Karnal, some damages like scouring of fertile agricultural land,

formation of loops in some complexes were reported. Although major damages due to flood were

averted by initiating immediate flood preventive measures by deploying labour, machinery and

material like wooden ballies, EC bags etc. The critical sites where temporary flood preventive

measures where initiated are Chandrao complex, Garhpur complex, Kalsora complex, Nabiabad

complex, Dabkoli, Shergarh tapu complex. The Kalsora complex experienced the worst impact from

the heavy discharge received in river Yamuna, however the same was combat through various

preventive measures.

In districts Jhajjar, Rohtak, Jind, Narnaul and Rewari no problem of water logging in fields or

flood was reported and hence no flood damages in these districts were noticed this year.

10

Page 14: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Ghaggar Sub Basin

River Ghaggar comprises of various tributaries like Markanda, Tangri, Patiala Nadi, Merapur

Choe drain and Para River. In district Panchkula no major losses were reported however some

minor damages like scouring of river banks, water logging etc. were noticed in village Toda,

Paploha; a landslide in the month of July 2019 occurred in vill. Khera Sitaram along Orian river.

Although protection work of stone steining and laying of E.C bags was executed to provide

immediate protection. Furthermore, the water level of Kaushalya Dam increased to 476.80 mtr. on

dated 18.08.2019, which was a considerable rise of more than 4 mtr. height in a span of one day;

and the accumulated water was released gradually to avoid any adverse effect on the dam and

upper reaches of Kaushalya river.

In district Kaithal, the Ghaggar river crossed the level of 21.00 feet and the water spilled in

the fields of villages namely Sihali and Ratta Khera. This year the maximum discharge received in

River Ghaggar was 52,387 Cusecs (24.20 feet) on 18.07.19 and it crossed the danger level i.e.

23.00 feet. This huge discharge water logged the Pucca road leading to village Sihali-Ratta Khera

and Mangra-Manjheri. The Ghaggar Bund from RD 117500 to 115000 was damaged and the same

was protected by laying earth filled E.C bags. Due to flood received in river Ghaggar 300 acres

crops at outlet of Saraswati Nala and along Ghaggar Bund (RD 105525-106125) were badly

damaged near village Bhatain and Hansu Majra, some other villages effected during flood are

Mohanpur, Bhusla, Budanpur, Arnoli, Banpur, Kamheri, Channa Agriyan, Ratta Khera

lukman,Sadhipur in district Kaithal.

Whereas in District Sirsa there was not much localized rainfall but the problem of water

logging was reported in some villages like Patli Dabar, Narelkra-sikanderpur-Bajekan area due to

heavy discharge received in River Ghaggar in the month of July, 2019 along with some local spells

of rainfalls which added up to the discharge. However the problem was well tackled with the best

efforts of Department.

District Ambala experienced spells of heavy to extremely heavy rainfall this year in the

month of July,2019 which resulted in water logging in various urban as well as low lying area. The

intensity of rainfall and water logging was so high that District administration had to close various

schools and colleges in the District Ambala. Apart from this the accumulated rain water entered the

houses of various officers of HVPNL in Power Colony in Dhulkot along National Highway. The

residents suffered loss of property and had to be rescued from the water logged residences via

boats. On the direction of Deputy Commissioner Ambala the process of dewatering was initiated by

the Irrigation department on emergent basis. Apart from this the problem of water logging was also

reported in villages Machhonda, Chanderpuri, Sundernagar and some area along National highway.

11

Page 15: gfj;k.kk jkT; lw[kk jkgr ,oa ck

The dewatering was done throughout so as to relieve the residents and temporary protection works

were executed by laying Earth filled E.C bags for the protection of Shiv Colony in Kala Amb and to

strengthen Babyal Bund along river Tangri.

The maximum discharge observed in the main rivers during the year was as under:-

Sr. No.

River Discharge Site at Danger Level

Maximum Discharge Recorded in Cusec

Date on which maximum Discharge recorded

1 River Yamuna Hathni Kund Barrage 2,50,000 8,28,072 18.08.2019

2 River Ghaggar Panchkula Site 4A 20,000 19,240 18.08.2019

Gulha Cheeka (Kaithal) 51,733 52,387 18.07.2019

Khanauri (Sirsa ) 25,000 14,225 19.07.2019

Chandpur including Rangoi Nallah and JoyaNallah (Punjab)

25,000 12,800 21.07.2019

Downstream Ottu (Sirsa) 25,000 26,950 24.07.2019

3 River Markanda Mulana Bridge (Ambala) 50,000 64,530 18.08.2019

4 River Tangri Shahpur (Ambala) 34,000 26,605 18.08.2019

Further statement showing Annual Peak Flood Data of various sites since 2002 is given in

Annexure 3.2. In Addition to this position of pumps along with the number of pumps purchased

during 2018-19, for dewatering of flood water from low lying areas is given in Annexure 3.3.

12

Page 16: gfj;k.kk jkT; lw[kk jkgr ,oa ck

ITEM NO. 4

New Schemes of Irrigation and Water Resources Department proposed for 51st

meeting of HSDR&FCB.

During the monsoon season 2019, there were medium to high precipitation in the catchment

areas of Yamuna and its tributaries, lying in some part of Uttarakhand and Himachal Pradesh.

Maximum discharge of 8,28,072 cusecs was received in river Yamuna at the Hathni Kund Barrage

(HKB) on 18.08.2019. In addition to the flood discharge of Yamuna, flood discharge of Rivers Somb

and Pathrala were moderate during flood season 2019 and caused minimal damages. Some

damages like erosion of land along the river edges, erosion of embankments, spilling of water

occurred at a few places in District Yamunanagar but the damages were contained as the flood works

executed before the onset of monsoon of 2019 performed well and efficiently.

As such, preparedness for monsoon season 2020, meeting of State Level Committee under

the Chairmanship of Engineer-in-Chief, Irrigation and Water Resources Department was held on

12.12.2019 wherein 203 schemes amounting to ₹ 198.31 Cr. were finalized for recommendation to

HSTAC & HSDR&FCB.

The schemes related to renovation of damaged bunds, procurement of pumps, construction of

bunds, studs to protect village Abadis, V.R. Bridges on drains, Sump wells, Remodeling of Drains

etc.. The schemes have been prepared after due consultation / recommendations of respective

District Flood Control Committees under the Chairmanship of respective Deputy Commissioners and

Chairman, Zila Parishad.

The Department has further prioritized the works in such a way that the works proposed to be

completed upto 30.06.2020 are taken as Short term, the works proposed to be completed upto

30.06.2021 are taken as Medium term and the works proposed to be completed upto 30.06.2022

are taken as Long term. The abstract of schemes so worked out is as under:-

₹ in Crores

Sr. No.

Type of Schemes

No. of Schemes

Estimated Cost

Requirement of funds

Total 2020-21 2021-22 2022-23

1 Short term (S)

120 70.54 70.54 70.54 0.00 0.00

2 Medium term (M)

76 96.07 96.07 49.34 46.73 0.00

3 Long term (L) 7 31.70 31.70 11.45 11.34 8.91

TOTAL 203 198.31 198.31 131.33 58.07 8.91

13

Page 17: gfj;k.kk jkT; lw[kk jkgr ,oa ck

The district wise abstract of total schemes along with their requirement of funds is given in

Annexure 4.1. (Pg. no. 50).

Further details of these schemes are given at Annexure 4.2 (Pg. no. 51) Haryana State

Drought Relief and Flood Control Board is requested to kindly consider these schemes for approval

and schemes will be taken up as per availability of funds during financial year 2020-21 and thereafter.

All these schemes shall be taken up under State Plan Head 4711-Flood Control & Drainage

14

Page 18: gfj;k.kk jkT; lw[kk jkgr ,oa ck

ITEM No.5

Review of Schemes of Irrigation and Water Resources Department ongoing prior to

51st Meeting of HSDR&FCB under head 4711 – Flood Control & Drainage

During the 50th Meeting of Haryana State Flood Control Board, 111 On-Going

Schemes and 165 New Schemes under head 4711-Flood Control & Drainage were

reviewed and approved. With the best efforts of the department, 164 schemes have been

completed during the year (details at Annexure-5.1, Pg. no. 66). Further, 11 schemes

approved in the 50th Meeting which could not executed due to various administrative and

technical reasons are proposed to be dropped from the list of ongoing schemes (details at

Annexure-5.2, Pg. no. 91).

Apart from this, the department however, intends to continue with remaining 101

schemes (Abstract at Annexure 5.3, Pg. no. 95 and details at Annexure 5.4, Pg. no. 96)

actually in progress or yet to start earlier approved and the funds to the tune of ₹ 258.83

Cr. are required to complete these schemes during the next three financial years as

detailed below.

Further, these schemes have also been reprioritized and identified as short term, medium term and long term schemes keeping in view their urgency of completion before

the flood season. The abstract of schemes so worked out is as under:-

Table no. 5 ₹In Crore

Sr. No

Type of Schemes

No. of Schemes

Revised Cost

Expenditure Requirement of funds

Total 2020-21 2021-22 2022-23

1 Short Term

21 62.55 23.74 38.81 38.81 0.00 0.00

2 Medium

Term 63 123.19 31.43 91.76 45.88 45.88 0.00

3 Long Term

17 73.09 0.03 73.06 24.84 24.11 24.11

4 Total 101 258.83 55.20 203.63 109.53 69.99 24.11

Haryana State Drought Relief &Flood Control Board is requested to consider the approval of these schemes. The schemes will be taken up on priority as per availability of

funds during 2020-21 and thereafter.

15

Page 19: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Item No. 6

Sr.

No.

Name of District Name of

Circle

Name of Scheme Status Remarks

1 AMBALA SYL CIRCLE

AMBALA

Constructing Retaining wall in the side

of three Nos. Air field drain in front of

King Fisher Resort Ambala City

(Deposit Work of Haryana Tourism

Corporation ) (120.00 Lakh)

Yet to Start Rs. 20.00 lac have been deposited

by Haryana Tourism. Balance

amount should be deposited soon.

2 HISSAR BWS

CIRCLE

HISAR

CONSTRUCTION OF SATROD

MIRKA DRAIN RD 0 TO 6450 AND

DABRA LINK DRAIN RD 0 TO

7525(DEPOSITE WORK OF HUDA).

In Progress Expenditure incurred = 6.57 Cr.

HSVP deposited Rs. 6.00 Cr.

Balance funds still required to be

deposited by HSVP is Rs. 5.03 Cr.

3 Kurukshetra SYL CIRCLE

AMBALA

Constg. of RCC rectangular open

drain of size 5.50`X2.75` parallel to

Saraswati Creak for sewerage water

disposal work Sector-13, U.E.

Kurukshetra and 7` X3.50` from Public

Health STP point to siphon Narwana

Branch,Jyotisar. Funds are to be

provided by HUDA and PHED.

Completed Work Completed

4 Gurugram CONSTRUC

TION

CIRCLE

GURGAON

Construction of RCC open Trough for

channelisation of Badshahpur Drain K

to L (Dhankot road to Njafgarh Drain)

Dropped Work proposed to be dropped as

funds not provided by HSVP.

5 BAHADURGARH YWS

CIRCLE

ROHTAK

Increasing capacity of Sarai

Aurangabad Kassar Link Drain from

RD 0 to 34052 out falling into KCB

Drain at RD 8103-L including its

extension and Sump Well Pump

House. Amounting 404.18 Lac.

(HSIIDC share 202.09 lacs and HSVP

share 202.09 lacs).

Yet to Start HSIIDC was required to deposit

202.09 lacs but the requests have

been turned down. However the

HSVP has agreed to submit an

amount of Rs. 146.68 lac. The

Balance amount of Rs. 8.80 cr. still

pending from HSVP.

6 PANIPAT YWS

CIRCLE

KARNAL

Providing lining and railing of panipat

drain from RD 55673-27000. total cost

of the scheme RS. 37.80 crore fund is

to be provided by HSVP.

Completed Balance amounting to Rs. 8.80 Cr.

is still pending from HSVP.

7 PANIPAT YWS

CIRCLE

KARNAL

Remodelling of panipat drain by

providing lining and replacing of pucca

structure from RD 55673 to 64400

(phase-2 costing rs. 13.55 crore).

Dropped Funds still not deposited by ULB.

Scheme proposed to be dropped.

8 FARIDABAD YWS

CIRCLE

FARIDABAD

PROVIDING LINING OF GAUNCHI

DRAIN FROM RD 0-15534. TOTAL

COST OF THE PROJECT RS. 1510.0

LACS BEING SHARED BY HUDA

MUNICIPAL CORP.

FARIDABADD,URBAN LOCAL

BODIES, IRRIGATION

DEPARTMENT . AMOUNT SHARED

BY VARIOUS DEPARTMENTS.

HUDA 250.00 LACS, MCF-255.00

Completed The work is completed

Review of On-Going and New Schemes of Irrigation and Water Resources

Department under head- 8443-Irrigation Department Deposit Works.

During the 50th

meeting of HSDR&FCB 08 no. schemes under Deposit Head were approved; the brief

status of the same is as under:-

02 no. schemes are yet to start due to non-submission of required funds from the departments HSVP,

Haryana Tourism. Apart from this 01 no. scheme is in progress in district Hisar but could not be

completed due to pending funds from the department HSVP, therefore the Board is requested to

allow to complete this scheme from the funds allotted under State Plan-4711 head till the funds are

received from HSVP, however in case of Sarai Aurngabad Kasar Link Drain no fund has been

deposited till date from HSIIDC and HSVP in spite of several requests made to these departments,

hence the Board may allow the department to drop this scheme in case the requisite funds are not

received in FY-2020-21. A total sum of Rs. 37.69 Cr. is pending from these departments and the

detail is given in the table on next page:-

16

Page 20: gfj;k.kk jkT; lw[kk jkgr ,oa ck

(Rs. In Cr.)

Sr. No.Name of

DepartmentName of Work

Amount not

deposited

1Haryana

Tourism

Cosnt. Retaining wall in front of King

Fisher Resort, Ambala1.00

2 HSVP

Satrod Mirka Drain, Hisar+ Sarai

Aurangabad of Kassar Link Drain,+

lining & railing of Panipat Drain

5.00+0.55+8

.80 =

(14.33)

3 HSIIDC Sarai Aurangabad Kassar Link Drain 2.03

4 ULB Remodelling of Panipat Drain. 20.31

G.Total 37.69

17

Page 21: gfj;k.kk jkT; lw[kk jkgr ,oa ck

ITEM NO. 7

Review Position of Funds for Irrigation and Water Resources Department under head 4711-

Flood Control & Drainage

As per details given in Item No. 4 and 5, Irrigation and Water Resources Department

has proposed 203 New Schemes and intends to continue 101 Ongoing Schemes costing ₹ 198.31

crore and ₹ 258.83 crore (amount required for balance work) respectively under head 4711-

Flood Control & Drainage.

Now the department has made an exercise by prioritizing the schemes by identifying

the period of completion i.e. the works proposed to be completed by 30.06.2020 are taken as short

term, the works proposed to be completed by 30.06.2021 are taken as medium term; the works

proposed to be completed by 30.06.2022 are taken as long term.

Accordingly, requirement of funds for these schemes has been worked out is as under:- Table-I: Requirement of funds: (₹in crore)

Schemes Type of

Schemes No. of

Schemes Estimated

Cost Expenditure

Requirement of funds

Total 2020-

21 2021-22 2022-23

Ongoing (In

Progress & Yet To be

Start)

Short term (S)

21 62.55 23.74 38.81 38.81 0.00 0.00

Medium term (M)

63 123.19 31.43 91.76 45.88 45.88 0.00

Long term (L)

17 73.09 0.03 73.06 24.84 24.11 24.11

Total 101 258.83 55.20 203.63 109.53 69.99 24.11

New Schemes

Short term (S)

120 70.54 0.00 70.54 70.54 0.00 0.00

Medium term (M)

76 96.07 0.00 96.07 49.34 46.73 0.00

Long term (L)

7 31.70 0.00 31.7 11.45 11.34 8.91

Total 203 198.31 0.00 198.31 131.33 58.07 8.91

Grand Total

Short term (S)

141 133.09 23.74 109.35 109.35 0.00 0.00

Medium term (M)

139 219.26 31.43 187.83 95.22 92.61 0.00

Long term (L)

24 104.79 0.03 104.76 36.29 35.45 33.02

Total 304 457.14 55.20 401.94 240.86 128.06 33.02

18

Page 22: gfj;k.kk jkT; lw[kk jkgr ,oa ck

During the FY 2019-20, Finance Department has allocated only Rs 120.00 Cr. in original

budget estimate and additional amount of Rs. 30 Cr. was allocated during 1st Supplementary, as

such total available budget till date is Rs. 150 Cr. against which Rs. 130.00 Cr. has already been

utilized upto 30.11.2019 for completion of various flood schemes. The work on some ongoing

schemes is in progress and the remaining are yet to be taken up. Accordingly, budget position so

worked out is as under:-

Table-II: Budget Position (₹in crore)

Ongoing Schemes

New Schemes

Total Requirement

Budget Available (Rs. In Cr.)

Funds Required in 2019-20

40.00 0.00 40.00 20.00

Funds required in 2020-21

69.53 131.33 200.86

150.00 (Tentative,

however same shall be

approved in budget

session-2020)

Total 109.53 131.33 240.86

170.00

The additional budget shall be demanded from the Planning/Finance Department under 1st &

2nd supplementary after observing the pace of actual execution of work and the expenditure incurred

during FY 2020-21.

19

Page 23: gfj;k.kk jkT; lw[kk jkgr ,oa ck

ITEM NO.8

AGENDA OF PUBLIC HEALTH ENGINEERING DEPARTMENT FOR

THE HARYANA STATE DROUGHT RELIEF & FLOOD CONTROL

BOARD.

Agenda for the Drought Relief and Flood Control Board Meeting

A) New proposals Description No. of Schemes

Total number of scheme

proposed

02 Annexure-A

Total cost Rs.2733.13 lacs Annexure-A

B) Revised Cost Schemes Description No. of Schemes

Total number of schemes

to be revised

01 Annexure-B

Total cost Rs.189.00 lacs to

Rs. 306.32 lacs

Annexure-B

C) Status of Schemes Description No. of Schemes

Total No. of approved Schemes 23

No. of completed schemes 05 Annexure-C

No. of Ongoing Schemes 18 Annexure-D

D) Funds required for the financial year 2020-21 Rs. 16.02 Crore (at

Annexure A, B & D) (for ongoing & upcoming project).

E) Physical Progress of the ongoing schemes is attached (at Annexure-E)

20

Page 24: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Sr. No.

Name of Circle

Name of Work Estimate Cost

2020-21 2021-22 2022-23

1 Hisar Rough cost estimate for shifting of existing storm water drain on Bagla road required due to land acquisition by HSVP Hisar at existing site of storm water drain in Sector-33 HISAR

1456.00 550.00 600.00 306.00

2 Rohtak Laying of rising main Dl pipeline from HUDA complex and Sandasar disposal to Public Health Carrier Channel near second water works, Jhajjar road Rohtak under CM Announcement No. 24985 dt. 19.02.2019

1198.00 600.00 400.00 198.00

Grand Total 2654.00 1150.00 1000.00 504.00

Annexure A (For upcoming project under Head Urban 4711 Flood)All Amount Rs. In Lacs

Requirement of fund

21

Page 25: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Sr. No.

Name of Circle

Name of Work Estimate Cost

2020-21 2021-22 2022-23

1 Palwal Hodal - Proportionate cost for SWD system by constructing RCC box drain along NH-2 [21/06/2018] -[10/01/2019]-[30/06/2020]

189.00 to 306.32 117.00

Grand Total 306.32 117.00 0.00 0.00

Annexure B (For revised cost schemes under Head Urban 4711 Flood)

All Amount Rs. In LacsRequirement of fund

22

Page 26: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Name of Work/Adm Approval Date/Start Dt./Work Closure Dt

status Adm. App.Amt(Tech.

San.Amt)

Exp Upto31/03/2019

Funds During 19- 20

Exp. during

November2019

Hisar CircleHisar PHED No. 3Hisar - Estimate for remodelling of existing storm water drain of old city area and arrangement of DG set at Hisar[27/05/2016] -[01/12/2016]-[30/09/2019]

Closed20/08/2019

280.00(280.00)

279.84 0.16 0.00

Division Total 280.00 279.84 0.16 0.00Circle Total 280.00 279.84 0.16 0.00

Kaithal CircleKaithal PHED No. 1Kaithal - Remodelling of Katcha Manas Drain from RD 10075 to RD 19164 passing through Kaithal Town(Deposit Work)[Revised dt.-27/04/2017][03/05/2014] -[03/08/2014]-[31/03/2019]

Closed14/05/2019

715.00 733.57 0.00 0.00

Division Total 715.00 733.57 0.00 0.00Kurukshetra PHEDKurukshetra - Estimate for construction of RCC Box type drain from Jai Bharti School onward at Kurukshetra town.[27/04/2017] -[10/08/2017]-[30/09/2019]

Closed05/11/2019

134.31(100.35)

93.39 26.91 0.00

Division Total 134.31 93.39 26.91 0.00Circle Total 849.31 826.96 26.91 0.00

Hisar CircleHansi PHEDNarnaund - Rough cost est. construction of storm water disposal near Hisar major distry. covering Ward 4,6and7 [26/04/2018] -[]-[31/10/2019]

Closed13/12/2019

73.25 45.62 23.82 0.00

Division Total 73.25 45.62 23.82 0.00

Circle Total 73.25 45.62 23.82 0.00

Narnaul CircleNarnaul PHED No. 2Narnaul - Est.for prov.,lowering of RCC pipe class NP3 to drain out the storm water in various mohalla of NNL Town(CM Announcement)[26/04/2016] -[09/02/2017]-[30/09/2019]

Closed13/12/2019

209.35 172.67 0.00 0.00

Division Total 209.35 172.67 0.00 0.00

Circle Total 209.35 172.67 0.00 0.00

Grand Total 1411.91 1325.09 50.89 0.00

172.67

4

ANNEXURE CAll Amt. Rs. in Lacs

45.62

Rural/Urban : UrbanProgram Name: Urban 4711 Flood ,

Expenditure upto 30/11/2019Selection of Report : Closed Works

Administrative Approval Date: From 06/06/1995 To 12/12/2019

45.620.00

16.90 1342.00

0.00

0.00

172.670.00

0.00 172.67

5

16.90 843.87

0.00 733.57

3 16.90 110.29

16.90 110.29

2 0.00 733.57

279.840.00 279.84

Sr.No

Exp. During 19- 20

Cumulative Exp.Upto November

2019

0.00 45.62

1 0.00 279.84

0.00

23

Page 27: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Name of Work/Adm Approval Date/Start Dt./Work Closure Dt

status Adm. App.Amt(Tech.

San.Amt)

Exp Upto31/03/201

9

Funds During 19- 20

Exp. during

Nov2019

Likely expenditure upto 31.03.2020

Funds demand for year 2020-21

Ambala CircleAmbala City PHEDAmbala City - Construction of Nala along G.T. Road from Kalka chowk to Banuri Nakka extension (RD 205.9 Km to 211.46 Km)[Revised dt.-27/04/2017][21/03/2012] -[23/12/2013]-[30/09/2019]

In Progress 1093.62(1093.62)

746.33 120.00 0.00 746.33 200.00

Ambala City town- Estimate for construction of RCC covered storm water drain (Box Type) at Kalka Chowk area along HN-1(Vidhan Sabha Matter)[26/04/2016] -[21/07/2016]-[30/09/2019]

In Progress 619.30(619.30)

582.77 30.91 0.00 613.63

Division Total 1712.92 1329.10 150.91 0.00 1359.96 200.00Ambala PHEDAmbala Sadar - Laying of 800mm dia RCC storm water drainage extended pipe upto Mahesh Nagar drain for improvement drain[06/03/2019] -[]-[30/09/2020]

In Progress 52.45 0.00 50.00 0.00 50.00

Division Total 52.45 0.00 50.00 0.00 50.00Circle Total 1765.37 1329.10 200.91 0.00 1409.96 200.00

Bhiwani CircleBhiwani PHED No. 1Bhiwani - Est. for providing 5 No. subsidiary pumping station for disposal of storm of various low lying area[30/06/2017] -[17/11/2017]-[30/06/2020]

In Progress 693.90 692.81 1.09 0.00 693.90

Bhiwani : Estimate for providing storm water drainage system including road gullies, intercepting manholes [27/05/2016] -[]-[30/09/2019]

In Progress 298.00 176.40 121.10 5.58 247.50

Division Total 991.90 869.21 122.19 5.58 941.40Siwani PHEDSiwani - Prov. storm water drainage system for dewatering nearby Ladwani Pond at Parshuram Chowk Distt. Bhiwani[26/04/2018] -[01/06/2019]-[30/04/2020]

In Progress 227.00(227.00)

147.62 55.00 0.00 157.62

Division Total 227.00 147.62 55.00 0.00 157.62Circle Total 1218.90 1016.83 177.19 0.00 1099.02

Hisar CircleHansi PHEDHansi - Rough Cost Estimate for providing storm water drainage for Yati Nagar and surrounding area Hansi town[27/04/2017] -[10/01/2019]-[30/09/2019]

In Progress 45.00 23.31 0.00 0.00 45.00

Circle Total 45.00 23.31 0.00 0.00 45.0015.70 39.01

7 15.70 39.01

13.25 1030.07

6 4.42 152.04

4.42 152.04

8.83 878.03

4 0.00 692.81

5 8.83 185.23

0.00 0.0020.85 1349.95

3 0.00 0.00

2 20.85 603.63

20.85 1349.95

1 0.00 746.33

Cumulative Exp.

Upto Nov 2019

All Amt. Rs. in Lacs

Annexure D (Ongoing schemes under Head Urban 4711 Flood)

Sr.No

Exp. During 19- 20

24

Page 28: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Name of Work/Adm Approval Date/Start Dt./Work Closure Dt

status Adm. App.Amt(Tech.

San.Amt)

Exp Upto31/03/201

9

Funds During 19- 20

Exp. during

Nov2019

Likely expenditure upto 31.03.2020

Funds demand for year 2020-21

Cumulative Exp.

Upto Nov 2019

All Amt. Rs. in Lacs

Annexure D (Ongoing schemes under Head Urban 4711 Flood)

Sr.No

Exp. During 19- 20

Jhajjar CircleJhajjar PHED No. 1Beri - Laying of 600 mm i/d DI rising main for Storm Water Disposal No.1 Point A to Drain No.8 [26/04/2018] -[03/09/2018]-[30/09/2019]

In Progress 31.15 26.49 4.66 0.00 31.15

Circle Total 31.15 26.49 4.66 0.00 31.15

Kaithal CircleKaithal PHED No. 1Pundri - Upgradation of storm water system Pundri Town (under CM announcement No. 10321)(CM Announcement)[Revised dt.-21/06/2018][30/11/2015] -[11/08/2016]-[30/09/2019]

In Progress 513.10 307.79 120.00 0.00 477.79 35.00

Supplementary estimate for remodelling of Katcha Manas drain from Cheek road near Birpati Kund to Kaithal drain Balance [11/09/2019] -[15/09/2019]-[30/09/2021]

In Progress 75.82 0.00 75.82 0.00 75.00

Division Total 588.92 307.79 195.82 0.00 552.79 35.00Circle Total 588.92 307.79 195.82 0.00 552.79 35.00

Palwal CirclePalwal PHED No. 3Hodal - Proportionate cost for SWD system by constructing RCC box drain along NH-2 [21/06/2018] -[10/01/2019]-[30/06/2020]

In Progress 189.00(189.00)

0.00 189.00 63.20 189.00 117.00

Hodel-Providing storm water drainage system by constructing RCC drain[03/12/2016] -[21/04/2017]-[30/09/2019]

In Progress 418.00(418.00)

305.22 58.84 11.26 418.00

Palwal-Remodeling of existing storm water drain and construction of additional RCC box type drain for storm water system(CM Announcement)[22/07/2016] -[15/12/2016]-[30/09/2019]

In Progress 242.50(242.50)

101.58 66.14 0.00 242.00

Division Total 849.50 406.79 313.98 74.45 849.00 120.00Circle Total 849.50 406.79 313.98 74.45 849.00 120.00

Rewari CircleRewari PHED No. 1Rewari - To provide storm water drainage scheme for balance existing drain/ Nallah from Bawal road to Garhi Bolani road(CM Announcement)[13/01/2016] -[01/05/2016]-[30/09/2019]

In Progress 305.82(305.82)

154.07 80.22 43.36 260.10

Division Total 305.82 154.07 80.22 43.36 260.10Circle Total 305.82 154.07 80.22 43.36 260.1071.77 225.83

14 71.77 225.83

71.77 225.83

309.28 716.07309.28 716.07

12 83.08 388.29

13 45.99 147.56

11 180.22 180.22

55.82 363.61

10 19.37 19.37

55.82 363.61

9 36.45 344.24

0.00 26.49

8 0.00 26.49

25

Page 29: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Name of Work/Adm Approval Date/Start Dt./Work Closure Dt

status Adm. App.Amt(Tech.

San.Amt)

Exp Upto31/03/201

9

Funds During 19- 20

Exp. during

Nov2019

Likely expenditure upto 31.03.2020

Funds demand for year 2020-21

Cumulative Exp.

Upto Nov 2019

All Amt. Rs. in Lacs

Annexure D (Ongoing schemes under Head Urban 4711 Flood)

Sr.No

Exp. During 19- 20

Rohtak CircleRohtak PHED No. 3Rohtak – Providing storm water drainage system parallel to Sonipat road from culvert Sector-3 to Sector-4 [27/04/2017] -[29/03/2018]-[30/09/2019]

In Progress 356.60(356.60)

30.86 40.00 0.00 40.86

Rohtak – Rehabilitation for storm water RCC carrier channel Hisar road and connecting to drain No.8.[27/04/2017] -[10/02/2018]-[30/09/2019]

In Progress 382.22(382.22)

338.30 43.92 0.00 367.22

Rohtak - Special repair and desilting of 64` i/d storm water line from PHED office to 2nd disposal Jhajjar road[26/04/2018] -[28/06/2018]-[30/04/2020]

In Progress 98.50(98.50)

29.09 48.80 0.00 57.09

Division Total 837.32 398.25 132.72 0.00 465.17Circle Total 837.32 398.25 132.72 0.00 465.17

Sonipat CircleSonipat PHED No. 2Ganaur - Providing Storm Water Drainage System[24/11/2011] -[18/01/2012]-[30/09/2019]

In Progress 1785.00 1171.40 70.00 0.00 1221.8 100.00

Division Total 1785.00 1171.40 70.00 0.00 100.00Circle Total 1785.00 1171.40 70.00 0.00 1221.8 100.00Grand Total 7426.98 4834.03 1095.28 123.39 6078.23 452.00517.14 5351.17

0.40 1171.800.40 1171.80

18 0.40 1171.80

30.07 428.3230.07 428.32

16 15.11 353.41

17 10.21 39.30

15 4.76 35.61

26

Page 30: gfj;k.kk jkT; lw[kk jkgr ,oa ck

ANNEXURE-E

Physical progress of ongoing works for Flood Works

SN Name of work/ Adm approval date

Estt. Cost Upto date expenditure

Physical scope of work as per estimate

Latest Status Likely date of completion

PHE Circle Ambala 1. PHED Ambala City

Ambala City - Construction of Nala along G.T. Road from Kalka chowk to Banuri Nakka extension (RD 205.9 Km to 211.46 Km)[Revised dt.-27/04/2017][21/03/2012] -[23/12/2013]-[30/09/2019]

1093.62 )1093.62(

746.33 Phase-1st 31.12.2020 Work could not be completed due to late clearance from Forest Deptt. In June, 2018, thereafter due to monsoon season. Also due to construction of fly over, the proposal needs to be changed and now instead of Open Drain, HDEP pipe is proposed for which proposal is under preparation.

Construction of drain 1400 mtr

Work Completed

Laying of RCC pipe 2000 Mtr.

Work Completed

Phase-2nd Construction of Drain 8’x4’ = 2165 Mtr.

Construction of Drain 8’x4’ = 350 Mtr. (Balance = 1815)

2. Ambala City town- Estimate for construction of RCC covered storm water drain (Box Type) at Kalka Chowk area along HN-1(Vidhan Sabha Matter)[26/04/2016] -[21/07/2016]-[30/09/2019]

619.30 )619.30(

603.63 RCC Storm Water Drain Size 2’-0” x 2’-0”

400 Mtr. Laid and commissioned with other existing drain.

31.3.2020

600 mm DI pipe alongwith 900mm M.S. pipe 12 mm thick

Work completed.

Const. of sump well of size 2.00Mtr. x 2.00Mtr.

Work completed

RCC Storm Water Drain 2’ – 6” x 1’-6”

Work completed

700mm i/d RCC pipe drain

1110 Mtr. RCC pipe drain laid (Work

27

Page 31: gfj;k.kk jkT; lw[kk jkgr ,oa ck

SN Name of work/ Adm approval date

Estt. Cost Upto date expenditure

Physical scope of work as per estimate

Latest Status Likely date of completion

Completed) 1000mm i/d RCC pipe Drain

550 Mtr. Pipes laid. (Work Completed)

Const. of RCC Circular collecting tank of 8.50 mtr. Dia

Work completed

Const. of Screening chamber of size 2.50x1.80x2.65 mtr.

95% work completed

Const. of pump chamber of size 10` x 12`

Work completed

Cosnt. of boundary wall and laying of Distribution system

75 % work completed

PHED, AmbalaCantt 3. Ambala Sadar - Laying of

800mm dia RCC Storm Water Drainage extended pipe upto Mahesh Nagar drain for improvement drain.

52.45 0 Laying of 800mm RCC NP-3 Storm

Water pipe line = 1000mm

The work was allotted the agency during the month of 07/2019. During execution of work, there arises dispute by public. However, the RCC pipe have been arranged by agency at site. Now the execution work has been re-started and will be completed by 28.02.2020

31.03.2020

Bhiwani Circle Bhiwani PHED No.1

4. Bhiwani- Estimate for providing 5 No. subsidiary pumping station for disposal of strom of various low lying area

693.90

692.81

Pumping station for disposal - 5 No. RCC box type drain 0.76 M x 0.16 M

Work completed except rising main connection is pending near ROB Loharu Road

28.02.2020

28

Page 32: gfj;k.kk jkT; lw[kk jkgr ,oa ck

SN Name of work/ Adm approval date

Estt. Cost Upto date expenditure

Physical scope of work as per estimate

Latest Status Likely date of completion

150 mtr. RCC tank 18’ dia - 1 No. Pumping machinery - 2 No. RCC box type drain 0.76 M x 0.16 M - 300 mtr. RCC tank 18’ dia - 1 No. Pumping machinery - 2 No. RCC box type drain 0.76 M x 0.16 M - 350 mtr. RCC tank 18’ dia - 1 No. Pumping machinery - 2 No. RCC box type drain 0.76 M x 0.16 M- 100 mtr. RCC tank 18’ dia – 1 No. Pumping machinery 2 No. RCC box type drain 0.76 M x 0.16 M – 92 mtr. RCC box type drain 0.76 M x 0.16 M- 92 mtr. RCC tank 24’ dia – 1 No. Pumping machinery – 2 No.

with existing 600mm dia pipe

5. Bhiwani: Estimate for providing storm water drainage system including road gullies, intercepting manholes (27/05/2016)-(1-(30/09/2019)

298.00

185.23

Cost. Of type drain 3200 mtr. 230 mtr. RCC NP-3 pipe 600 mm

86% work completed

50% work completed

31.03.2020

29

Page 33: gfj;k.kk jkT; lw[kk jkgr ,oa ck

SN Name of work/ Adm approval date

Estt. Cost Upto date expenditure

Physical scope of work as per estimate

Latest Status Likely date of completion

Siwani PHED 6. Siwani - Prov. storm

water drainage system for dewatering nearby Ladwani Pond at Parshuram Chowk Distt. Bhiwani[26/04/2018] -[01/06/2019]-[30/04/2020]

227.00 152.04 Pump Chamber -1 No. Collecting Tank-1 No. Screen Chamber-1 No. Open Drain-600 Rft. Boundary Wall-400 Rft P/Machinery-2 No. 450 mm i/d D.I. Piipe-2500 MTr.

Pump Chamber -0% Collecting Tank-40% Screen Chamber-0% Open Drain-90% Boundary Wall-0% P/Machinery-0% 450 mm i/d D.I. Piipe-90%

31.03.2020

PHE Circle Hisar PHED Hansi

7. Hansi - Rough Cost Estimate for providing storm water drainage for Yati Nagar and surrounding area Hansi town [27/04/2017]

45.00 39.01 Const. of Disposal, P/M, DI pipes etc.

90% work completed

31.03.2020

Jhajjar Circle Jhajjar PHED No.1

8. Beri – Laying of 600 mm i/d DI rising main for Storm Water Disposal No.1 Point A to Drain No.8 [26/04/2018] – [30/04/2019--]

31.15 26.49 Rising main = 600 mm

285 mtr

250 mtr. 31.12.2019

Kaithal Circle Kaithal PHED No.1

9. Pundri - Upgradation of storm water system Pundri Town (under CM announcement No. 10321)(CM Announcement) [Revised dt.-21/06/2018][30/11/2015] -[11/08/2016]-[30/09/2019]

513.10 344.24 Sub Head No. 1 :- Storm Water Drainage from PHC-Kaithli Gate - Baraat Ghar -Existing Disposal works

30.06.2020 Land not available for IPS/MPS. As per report of SE Kaithal the matter has been taken up with MLA Pundri and will be resolved shortly.

350 mm i/d RCC pipe = 920 mtr

920 Mtr

500 mm i/d RCC pipe = 800 mtr

800 mtr

250 mm i/d SW = 520 mtr

520 mtr

Sub Head No.

30

Page 34: gfj;k.kk jkT; lw[kk jkgr ,oa ck

SN Name of work/ Adm approval date

Estt. Cost Upto date expenditure

Physical scope of work as per estimate

Latest Status Likely date of completion

2 :- 600 mm DI Rising main & RCC NP3 Gravity pipe from Junction point to Pumping Station near Drain 600 mm i/d DI pipe = 1000 mtr

1000 mtr

1000 mm i/d RCC pipe = 1600 mtr

1600 mtr

Const. of RCC pillars NP3 = 650 No.

-

Sub Head No. 3 :- Pumping Station Near Cranation Ground

Construction of RCC collecting tank size 10.50 m x 2.50 mtr = 1 No.

100% work completed

Non clog Sewage submetsible sewage pump set = 4 Nos. 11000 LPM Head- 15 M (65 HP)

100% work completed

1 No. Gen. Set = 85.50 KVA

-

1 No. Independent Feeder

-

1 No. Pump Chamber of size 3.05 x 4.57 m

100% work completed

4 No. Panel Board

100% work completed

Pipe & specials 100% work completed

1 No. Staff Quarter 41 sqm

-

Const. of boundary wall = 300 mtr

100% work completed

600 mm i/d DI 100% work

31

Page 35: gfj;k.kk jkT; lw[kk jkgr ,oa ck

SN Name of work/ Adm approval date

Estt. Cost Upto date expenditure

Physical scope of work as per estimate

Latest Status Likely date of completion

pipe = 30 mtr completed Sub Head No. 4 :- Pumping Station Near Pond

Construction of RCC collecting tank size 4.25 m x 2.50 mtr = 1 No.

DNIT under preparation

Non clog Sewage submetsible sewage pump set = 4 Nos. 1700 LPM Head- 15 M (10 HP) 1 No. Gen. Set = 20 KVA 1 No. Pump Chamber of size 3.05 x 4.57 m 4 No. Panel Board 1 No. Staff Quarter 41 sqm Const. of boundary wall = 200 mtr 400 mm i/d DI pipe = 1470 mtr

10. Supplementary estimate for remodelling of Katcha Manas drain from Cheek road near Birpati Kund to Kaithal drain Balance [11/09/2019] -[15/09/2019]-[30/09/2021]

75.82 19.37 Construction of balance work for RCC Pucca Manad drain Point E-F size 10'x7.50' = 2986 Rft

800 Rft 31.03.2020

Palwal Circle Palwal PHED No.3

32

Page 36: gfj;k.kk jkT; lw[kk jkgr ,oa ck

SN Name of work/ Adm approval date

Estt. Cost Upto date expenditure

Physical scope of work as per estimate

Latest Status Likely date of completion

11. Hodal - Proportionate cost for SWD system by constructing RCC box drain along NH-2 [21/06/2018] -[]-[30/06/2020]

189.00 180.22 RCC box type drain against main estimate cost Rs.670.00 lacs. i)0.60 M x 0.75 m = 1000 M ii)0.90 M x 0.90 m = 1000 M iii)1.35 M x 1.00 m = 700 M iv)1.50 M x 1.00 m = 200 M v)2.00 M x 1.10 m = 1300 M vi)2.00 M x 1.10 m = 1570 M 5770 M

RCC box type drain against main estimate cost Rs.670.00 lacs. i)0.60 M x 0.75 m = -- ii)0.90 M x 0.90 m = -- iii)1.35 M x 1.00 m = -- iv)1.50 M x 1.00 m = -- v)2.00 M x 1.10 m = 1200 M vi)2.00 M x 1.10 m= 1550 M

30.06.2020 Due to estimate cost revised from Rs. 189.00 lacs to Rs. 306.32 lacs due to increase in quantities of RCC work and Steel work as per approved design from NIT Kurukshetra of the RCC Box Drain.

12. Hodel-Providing storm water drainage system by constructing RCC drain [03/12/2016] -[21/04/2017]-[30/09/2019]

418.00 388.30 (i) RCC box type drain=3100m. (ii) Cutting of road

(i) RCC box type drain = 3050m.

28.02.2020

13. Palwal-Remodeling of existing storm water drain and construction of additional RCC box type drain for storm water system (CM Announcement) [22/07/2016] -[15/12/2016]-[30/09/2019]

242.50 147.56 (i) New RCC box Drain. Size 0.90 M x 0.90 M=2300 M (ii) Raising of Drain = 1900 m.

Drain = 2100 M (ii) Raising of Drain = 850 m.

31.03.2020

Rewari Circle Rewari PHED No.1

14. Rewari - To provide storm water drainage scheme for balance existing drain/ Nallah from Bawal road to Garhi Bolani road(CM Announcement)[13/01/2016] -[30/06/2018]

305.82

225.83

(i) RCC box type drain 10’x3’ = 900 mtr.

870 mtr. drain constructed

28.02.2020

Rohtak Circle Rohtak PHED No.3

15. Rohtak – Providing storm water drainage system parallel to Sonipat road from

356.60 30.86 Construction of Disposal, Pumping Machinery,

The existing bricks storm water channel has

31.03.2020

33

Page 37: gfj;k.kk jkT; lw[kk jkgr ,oa ck

SN Name of work/ Adm approval date

Estt. Cost Upto date expenditure

Physical scope of work as per estimate

Latest Status Likely date of completion

culvert Sector-3 to Sector-4 (27/04/2017)

Rising main 450mm, 582 mtr. Lengths, Const. of new RCC carrier channel (nallah)

been extended on the upstream side in a length of about 200 mtr. In addition a RCC pipe 400 mm storm water sewer has been laid in Ram Gopal Colony. Rest of the work could not be done due to non-availability of land by HSVP and the existing disposal of HSVP serve the purpose to take storm water.

16. Rohtak – Rehabilitation for storm water RCC carrier channel Hisar road and connecting to drain No.8.(27/04/2017)

382.22 338.30 Construction of Disposal, Pumping Machinery, Rising main 450mm, 980 mtr. Lengths, laying of RCC NP3 pipe line 700mm, 1615 Mtr. Lengths and construction of manholes

1. Disposal Constructed. 2. Pumping Machinery installation is in progress. 3. Rising main laid. 4. RCC NP3 Pipe laid. 5. Manholes Constructed.

31.03.2020

17. Rohtak - Special repair and desilting of 64` i/d storm water line from PHED office to 2nd disposal Jhajjar road (26/04/2018)

98.50 29.09 Repair and desilting of RCC NP2 64" i/d Storm Water line

50% work completed.

31.03.2020

Sonepat Circle Sonepat PHED No.2

34

Page 38: gfj;k.kk jkT; lw[kk jkgr ,oa ck

SN Name of work/ Adm approval date

Estt. Cost Upto date expenditure

Physical scope of work as per estimate

Latest Status Likely date of completion

18. Ganaur - Providing Storm Water Drainage System[24/11/2011] -[18/01/2012]-[30/09/2019]

1785.00

1171.40 (i) RCC box type drain = 10 No. (ii) RCC collecting tank = 2 No. (iii) P/ Machinery = 4 No. (iv) R/ main 900 mm = 1500 mtr. (v) Railway crossing = LS

(i) Completed (ii) Not constructed (iii) Not installed (iv) Not laying (v) The railway crossing work recently completed

30.06.2020 Delayed due to railway crossing. DNIT of amounting Rs. 70.00 lacs (approx.) is under observation in circle office.

35

Page 39: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Annexure-1.1

Minutes of 50th

meeting of Haryana State Drought Relief & Flood Control Board

(HSDR&FCB) held on 15.01.2019 under the Chairmanship of Hon’ble Chief Minister,

Haryana.

The list of participants is at Annexure A.

The Additional Chief Secretary, Revenue & Disaster Management Department,

Haryana welcomed the Hon’ble Chief Minister, Hon’ble Finance minister, Haryana, and senior

officers in the meeting. All Divisional Commissioners, Deputy Commissioners and Senior officers of

I&WRD & PHED, who had joined in the meeting through video conference, were also welcomed.

ACS, Revenue apprised the Board about the discussions held in 48th

meeting of

Haryana State Technical Advisory Committee (HSTAC) held on 15.01.2019 in the forenoon session.

It was brought out that all the new schemes (except that of Jind Distt.) proposed for approval of the

Board were discussed in detail. She further told that 10 new schemes and 2 schemes of distt.

Yamunanagar with revised scope on the request of respective Deputy Commissioners were also

considered by HSTAC and same were circulated as recommendation of HSTAC as supplementary

agenda for consideration and approval of Board. (Supplementary agenda annexed as Annexure –B).

The Principal Secretary (Irrigation & Water Resources Department) welcomed the

Chairman and all the participants and further gave a brief account of the flood situation during 2018.

The PS/I&WRD also informed about the efficiency and benefits of the flood protection works

executed in previous years. The Engineer in Chief and Chief Engineer/LCU, IWRD briefed about the

success stories of dewatering and land reclamation after the execution of schemes in village Dighal in

District Jhajjar, Villages Shakkerpura and Singwa in District Hisar and he further stated that based on

the past experiences this year similar new dewatering schemes are proposed in villages Dighal and

Kondrawali.

Thereafter, discussions/deliberations on the agenda items were held. The record of

discussions and decisions are brought out as under:-

Item No. 1: No comments were received from any quarter. The minutes of 49th

meeting of

HSDR&FCB held on 19.03.2018 were confirmed.

Item No.2: Action Taken Report (ATR) was noted. Regarding Sr. no. 1 of (ATR), it was apprised

that work of 117 schemes has been completed whereas work on 57 schemes are under

progress. Furthermore, this year 15 schemes have been proposed to be dropped due to

non- availability of land and other technical issues. The Hon’ble Chief Minister asked

36

Page 40: gfj;k.kk jkT; lw[kk jkgr ,oa ck

the district administration to create awareness among farmers/public regarding the

benefits of the schemes and the land holders must be encouraged to provide their land

voluntarily at collector’s rate. He further desired that land holders should not hesitate in

giving their land for flood protection works at collector rate.

On Sr. no. 2 regarding balance payment from Urban Local Bodies for the deposit

work of remodeling of Panipat Drain from Rd 55673 to 64400 (Phase-II) with estimated

cost of Rs 13.55 Crore, the Principal Secretary, ULB agreed to provide the funds at the

earliest.

On Sr. no. 3 regarding exploring the alternatives to reuse the water and not just

throwing into drain, it was informed that I&WRD has planned schemes for reutilization

of flood water in districts Jhajjar and Panipat in association with Haryana State

Pollution Control Board .

On Sr. no. 4 regarding preparations to face serious Heat Wave conditions in Year

2018; the ACS, Revenue stated that due to well-coordinated efforts with I&WRD &

PHED no causality or major damage occurred due to Heat wave in the State and no

drought conditions were reported last year.

On Sr. no. 5 regarding checking the quality of water before injecting into the

ground water recharge or bore wells, it was brought out that required instructions were

circulated to all concerned officers to ensure its compliance.

On Sr. no. 6 regarding monitoring the flood protection schemes by the District

Administration; the instructions regarding same were given to all concerned and the

committee was constituted to check the flood protection works.

Item No. 3: Flood report of Haryana for the year 2018 was noted. The PS/I&WRD pointed out that

despite the fact that the State experienced 10.10 % deficit rain fall during monsoon

2018, some districts have still faced water logging problem due to accumulation of rain

water in low laying fields & abadi area during the unprecedented rainfall of 22-23-24

September, 2018. The heavy rains during this period flooded about 2,30,000 acres,

resulting in damage of crops. However, well-coordinated efforts of officers of I.W.R.D

with Distt. Administration, the dewatering of fields were carried out efficiently. PS/

I&WRD further apprised that additional 245 pumps have been procured during 2018

and same were utilized for draining out the flood water in low lying areas timely and

efficiently. Further procurement of some additional pumps has been proposed in this

37

Page 41: gfj;k.kk jkT; lw[kk jkgr ,oa ck

year also. Apart from this river Yamuna received more than 6 lac cusecs of discharge

which passed safely; however erosion of banks at few places along river were reported.

It was desired that district administration shall clear the bills of private operators

engaged for dewatering of fields at the earliest after arranging the funds from Revenue

Department. The Position of pumps and new inventory that was added this year with IWRD

were also discussed. The Chief Minister directed to compile and prepare a consolidated list of

all inventories available with all departments in Haryana and the compiled information may be

circulated to all concerned departments, for utilizing the same in case of occurrence of flood

like situation anywhere in state. As regard to payment of compensation (Kharaba) to farmers,

ACS Revenue informed that all the Deputy Commissioners have been directed to complete

survey associated with District Agricultural Officers within three days and send the report to

H.Q at the earliest. Further compensation to farmers shall be disbursed in association with

agriculture department.

Item No. 4: PS/I&WRD informed that HSTAC has recommended 153 schemes costing Rs. 152.77

Cr (cost later increased to Rs. 154.17 Crore) including supplementary schemes as

circulated as Annexure-B for approval of the Board. The Chief Minister, Haryana

directed that schemes pertaining to flood protection and drainage works only be

proposed to the Board. The 12 schemes of District Jind were not discussed due to

imposition of model code of conduct by Election Commission and the decision

regarding the same shall be taken separately. The Board authorized the Chairman to

consider the approval of schemes of Jind District on file after completion of election

process in District Jind.

The Chairman of the Board desired to know the actual reason behind lakhs of

acre of land becoming unfit for agricultural purpose in Ellenabad in District Sirsa, The

Deputy Commissioner Sirsa explained that this problem has occurred due to the rise in

Ground Water Table in that region. The Addl. Chief Secretary, Agriculture added that to

know the root cause and solution thereof, the manual mapping of the area has been done

and the work to digitalize the same is in progress. However, a comprehensive solution

in consultation with the experts shall also be proposed very soon.

The Deputy Commissioner Bhiwani pointed out that 02 schemes are proposed to

be dropped as the land owners refused to provide their land for execution of flood

protection scheme. The Chairman directed that merely dropping the schemes should not

be the intention but the affected people must also be persuaded to provide their land

38

Page 42: gfj;k.kk jkT; lw[kk jkgr ,oa ck

where urgent flood protection schemes are required or otherwise the officers must

provide an alternative solution to overcome the existing problem.

The Finance Minister also pointed out that district administration must ensure

that the culverts on National Highway should never be blocked; rather any obstruction

to the flow of water must be removed immediately.

The Deputy Commissioner Yamunanagar briefed to the Chairman that high flood

discharge was received in river Yamuna in 2018 which affected various villages along

river Yamuna. The agendas to protect these villages have been incorporated in this

year’s proposals. However due to paucity of funds, the scheme proposed in the agenda

to protect village Odri is inadequate; and the Board was requested to allow to increase

the scope of work in district Yamunanagar at Sr. no.142 page no. 55 of main agenda as

mentioned below:-

“Agenda for construction of 1855 ft stone steining & 06 stone studs for the

protection of village Odri from River Yamuna amounting to Rs. 195 Lacs (against the

initial cost Rs.55.03 Lacs)”

Finally, after detailed deliberations, 153 schemes amounting to Rs. 154.17

Crore were approved by the Board.

Item No.5: The Principal Secretary (I&WRD) briefed the Board regarding the status of on-going

schemes which were approved during 49th

meeting of Haryana State Drought Relief &

Flood Control Board held on 19.03.2018. It was informed that a total of 111 schemes

with balance requirement of funds of Rs.148.12 Crore were discussed in the 48th

meeting of HSTAC in the noon session and proposed to be carried forward for FY

2019-20 and thereafter. However, 15 schemes, approved in previous Board meetings

were proposed to be dropped on account of unavailability of land and various

administrative and technical reasons. Thence, 111 no. ongoing schemes with balance

requirement of Rs. 216.34 Cr. for the next 03 financial years were also noted by the

Board for continuation.

Item No.6: The PS/(I&WRD) informed the Board that 07 schemes approved in previous Board

meetings under Deposit Head could not be taken up as the balance amount of Rs 79.84

Cr. is still pending with Haryana Urban Development Authority (HUDA) now HSVP,

Municipal Corporation Panipat, Municipal Corporation Faridabad and HSIIDC. The

39

Page 43: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Principal Secretary, Town and Country Planning expressed his inability to provide the

funds in view of the financial constraints of the Authority. However, during the last

meeting it was decided that Irrigation & Water resources Department may clear the

liability of contractors to avoid litigation. The I&WRD had cleared the liability from its

own resources after approval from Hon’ble Chief Minister, Haryana, but the pending

funds are yet to be deposited by the departments to reconcile the accounts to avoid any

audit objection. The PS/Town & Country Planning and PS, Urban Local Bodies agreed

to clear the current liability at the earliest.

Item No. 7: It was informed by Principal Secretary (I&WRD) that during the FY 2018-19, Finance

Department had allocated Rs 120.00 Crore in original budget estimate and out of that,

Rs. 66.00 Crore has already been spent so far on various flood protection schemes.

Further, the total requirement of budget for the financial year 2019-20 is as under:-

Sr.

No.

Schemes Amount required during 2019-20

(Rs. in Cr.)

1. New schemes (153) 154.17

2. Ongoing schemes (111) 148.11

Total 309.48

(*12 new schemes amounting to Rs. 15.69 Cr. in Distt Jind shall be taken up Separately after the

culmination of model code of conduct)

Accordingly ACS, Finance was requested to allocate additional budget under

head 4711-Flood Control & Drainage, so that Department is able to complete the

maximum number of schemes on priority basis during the Financial Year 2019-20. The

ACS, Finance brought out that allocation of budget of Rs. 309.48 Crore during

Financial Year 2019-20 is subject to availability of funds. Initially, the budget of about

Rs. 125.00 Cr. would be allocated for 2019-20. However, he assured that the

requirement of additional funds, if any, will be reviewed at the time of supplementary

budget as per performance of the department.

The PS/I&WRD requested that as per the previous practice, the works approved

by the Board, should be exempted from taking administrative approval of individual

works and the concerned officers shall be allowed to take up approved flood works

immediately without any further delay.

40

Page 44: gfj;k.kk jkT; lw[kk jkgr ,oa ck

After deliberations, it was decided that I&WRD & PHED may start the

works immediately as approval of the Board is de facto administrative approval.

However regarding technical sanction of individual works, the same may be taken from

the respective competent authorities, as the case may be.

Item No.8: The Principal Secretary, Public Health Engineering Department briefed about the Status

of Schemes completed during 2018-19, on-going schemes and funds required to

complete the ongoing works during 2019-20. Out of total 36 schemes approved, 13

schemes were completed during 2018-19 and 23 schemes were reported as in progress.

To complete these 23 ongoing schemes, funds to the tune of Rs.2000.00 lacs are

required during 2019-20.

The Board approved the proposal of Public Health Engineering Department.

Additional Discussions:-

1. The Chairman of the Board, Hon’ble Chief Minister also directed the Irrigation and

Water Resources Department to start the internal clearance and desilting of drains well

before the monsoon and district administration shall provide MNREGA labour to the

department for clearance of drains timely. I&WRD shall utilize the maximum funds

available under MNREGA for clearance of drains and canals. District Administration

and Irrigation Department shall certify that all the drains have been cleared as per

requirement before 15th

May 2019 to the Revenue and Irrigation Department

respectively.

2. The Chairman of the Board mentioned that the schemes for construction of new bridges

on rivers/rivulets must be taken up separately by the PWD (B&R) or Marketing Board

as the case may be, and that such schemes should not be proposed before the

HSDR&FCB.

The Hon’ble Chief Minister directed all the Deputy Commissioners to monitor

the flood protection schemes, their effectiveness and ensure reliability and quality of

works executed. The meeting was concluded with the message from Chairman to all

members that “Hope for best but prepare for the worst”.

The meeting ended with a vote of thanks to the Chair.

------------ooooo-----------

41

Page 45: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Annexure B

Recommendation of the Meeting on 48th meeting of Haryana State Technical Advisory Committee on

Drought Relief & Floods held under the Chairpersonship of Addl. Chief Secretary (Revenue & Disaster

Management) on dated 15.01.2019 at Haryana Niwas, Sector-3, Chandigarh.

In order to finalize the agenda for the Haryana State Drought Relief & Flood Control Board meeting,

the discussions regarding the new as well ongoing flood protection schemes were held with the concerned

Deputy Commissioners; after the detailed deliberation with concerned officers the following Supplementary

Schemes are recommended for addition in 50th meeting of Haryana State Drought Relief & Flood Control

Board:-

(Rs. In Lacs)

Sr. No.

Name of Constituency

Name of Irrigation

Circle

Name of Schemes

S, M, L

Estimated Cost

Requirement of Funds Remarks

2019-20 2020-21 2021-22

Supplementary Schemes

BWS Unit

District Panchkula

01 Kalka SYL Circle Ambala

Double tier steining for the protection of village of village Jholuwal from Sirsa River after flood 2018.

S 17.00 17.00 0.00 0.00 Recommended by the concerned Deputy Commissioner

02 Kalka SYL Circle, Ambala

Three tier steining for the protection of village abadi of village Madhanwala from River Madhanwali after flood 2018.

S 23.00 23.00 0.00 0.00 Recommended by the concerned Deputy Commissioner

District Hisar

03 Adampur BWS Circle Hisar

Providing protection and restoration of capacity of Hisar Ghggar Multipurpose channel (Drain) from RD 205230 to 269650

M 80.25 40.25 40.00 0.00 Recommended by the concerned Deputy Commissioner

YWS (S) UNIT

District Sonipat

04 Sonipat YWS Circle, Sonipat

Providing protection at Tikola Complex by constructing 01 No. new stone stud and 1055 feet revetment on river Yamuna A/F 2018

S 98.45 98.45 0.00 0.00 Recommended by the concerned Deputy Commissioner

05 Gohana YWS Circle, Sonipat

To make pucca drain in village Bhatgaon Dongran from Purbia Dera to Bhatgaon Malyan i.e. providing brick lining on side slope of Bhatgaon Dongran link Drain from RD 3500 to 5000 (CM Announcement code No. 23606)

S 16.00 16.00 0.00 0.00 Recommended by the concerned Deputy Commissioner

42

Page 46: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Sr. No.

Name of Constituency

Name of Irrigation

Circle

Name of Schemes

S, M, L

Estimated Cost

Requirement of Funds

Remarks

2019-20 2020-21 2021-22

LIFT CANAL UNIT

District Rohtak

06 Kalanaur YWS Circle Rohtak

Laying underground PVC pipeline at village pond Kateshra to Pilana Minor RD 10700-R

S 38.00 38.00 0.00 0.00 Recommended by the concerned Deputy Commissioner

07 Kalanaur YWS Circle Rohtak

Constructing Sundana pipeline pump house link drain from RD 0 to 5950 and Bhutian Minor tail to Drain No. 8 pipe link drain from RD 0 to 7250 outfall at RD 202000-L Drain No. 8

L 376.23 76.23 150.00 150.00 Recommended by the concerned Deputy Commissioner

08 Kalanaur YWS Circle Rohtak

Procurement of PVC pipeline of 8 inch dia to drain out flood water from the fields of village Gudhan and Katesra

S 29.60 29.60 0.00 0.00 Item procured, Ex-Post Facto approval required.

District Jhajhar

09 Jhajhar JWS Circle, Jhajhar

Procurement of HDPE pipeline 200 mm dia and 160 mm dia in W.S Mech. Divn. Jhajhar

S 32.00 32.00 0.00 0.00 Item procured, Ex-Post Facto approval required.

District Bhiwani

10 Charkhi Dadri LWS Circle, Bhiwani

Procurement of 4 No. 10 cs. Vertical pumps alongwith motors of 50 HP, starters and 20 No. EP sets of 3 cs. Capacity

S 72.50 72.50 0.00 0.00 Item procured, Ex-Post Facto approval required.

YAMUNA WATER SERVICES(N) UNIT

District Yamuna Nagar

11 Radaur HKB Circle, Jagadhari

Construction of 1730 feet stone steining for the protection of village Kamalpur from River Yamuna

S 108.47 (initial cost

27.47)

108.47 (Amount raised Rs.

81.00 lacs).

0.00 0.00 Recommended by the concerned Deputy Commissioner in replacement of Agenda at serial No. 133 of original agenda (Amount raised Rs. 81.00 lacs).

12 Radaur HKB Circle, Jagadhari

Construction of 06 Nos. stone stud and 700 feet stone steining for protection of village Lal Chappar from river Yamuna

S 181.00 (initial cost

91.00)

181.00 (Amount raised Rs.

90.00 lacs).

00.00 00.00 Recommended by the concerned Deputy Commissioner in replacement of Agenda at serial No. 135 of original agenda. ( Amount raised Rs. 90.00 lacs)

Total 954.03 614.03 190.00 150.00

43

Page 47: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Sr.

No

Name of

District

Name of Circle Estimated

Cost

Expenditure

Incurred

S L Total Total 2020-21 2021-22 2022-23 S M L Total S M L S M Total

1 AMBALA SYL CIRCLE

AMBALA 7 4 13 6769.77 1659.41 5110.37 2676.56 1551.48 882.33 3 1 0 4 0 0 4 4 1 5

2 FATEHABAD BWS CIRCLE

FATEHABAD 1 1 5 616.08 166.83 449.25 170.07 147.18 132.00 0 1 0 1 0 0 1 1 2 3

3 HISAR BWS CIRCLE

HISAR 2 0 4 517.50 216.70 300.81 154.58 146.23 0.00 0 1 0 1 0 0 0 2 0 2

4 KURUKSHETRA SYL CIRCLE

AMBALA 1 0 1 15.00 10.66 4.34 4.34 0.00 0.00 0 0 0 0 0 0 0 1 0 1

5 PANCHKULA SYL CIRCLE

AMBALA 1 0 2 614.76 284.57 330.20 165.10 165.10 0.00 0 1 0 1 0 0 0 1 0 1

Total 12 5 25 8533.11 2338.17 6194.96 3170.65 2009.98 1014.33 3 4 0 7 0 0 5 9 3 12

6 GURGAON CONSTRUCTIO

N CIRCLE

GURGAON

1 0 1 60.00 0.00 60.00 60.00 0.00 0.00 0 0 0 0 0 0 0 1 0 1

7 JHAJJAR CONSTRUCTIO

N CIRCLE

GURGAON

1 0 1 109.81 15.00 94.81 94.81 0.00 0.00 1 0 0 1 0 0 0 0 0 0

8 ROHTAK YWS CIRCLE

ROHTAK 0 0 2 286.37 274.75 11.63 5.82 5.81 0.00 0 0 0 0 0 0 0 0 2 2

Total2 0 4 456.18 289.75 166.44 160.63 5.81 0.00 1 0 0 1 0 0 0 1 2 3

9 BHIWANI LWS CIRCLE

BHIWANI 1 0 2 544.05 248.93 295.12 177.56 117.56 0.00 0 0 0 0 0 0 0 1 1 2

10 JHAJJAR JWS CIRCLE

JHAJJAR 4 1 6 1139.94 178.67 961.27 627.64 183.56 150.06 2 1 1 4 0 0 0 2 0 2

11 MAHENDRAGA

RH

JLN WS

CIRCLE

NARNAUL

2 0 3 431.12 241.12 190.01 151.30 38.71 0.00 0 1 0 1 0 0 0 2 0 2

12 REWARI JLN WS

CIRCLE

REWARI

1 0 1 60.00 0.00 60.00 60.00 0.00 0.00 0 0 0 0 0 0 0 1 0 1

13 ROHTAK YWS CIRCLE

ROHTAK 5 1 13 1832.72 726.17 1106.56 526.96 366.75 212.85 0 2 1 3 0 0 0 4 4 8

14 SONIPAT YWS CIRCLE

ROHTAK 0 0 5 486.38 147.72 338.67 169.34 169.33 0.00 0 0 0 0 0 3 0 0 2 2

Total 13 2 30 4494.21 1542.61 2951.62 1712.80 875.90 362.91 2 4 2 8 0 3 0 10 7 17

15 KARNAL WORKSHOP

CIRCLE

KARNAL

1 0 2 313.75 230.71 83.04 66.33 16.71 0.00 0 0 0 0 0 0 0 1 1 2

Total1 0 2 313.75 230.71 83.04 66.33 16.71 0.00 0 0 0 0 0 0 0 1 1 2

16 BHIWANI YWS CIRCLE

BHIWANI 3 1 4 403.15 191.00 212.15 118.33 46.91 46.91 2 0 0 2 0 0 1 1 0 1

17 JIND YWS CIRCLE

JIND 5 0 5 1260.53 960.59 299.94 299.94 0.00 0.00 1 0 0 1 0 0 0 4 0 4

18 KARNAL YWS CIRCLE

KARNAL 6 1 8 1488.82 484.85 1003.97 365.74 319.33 318.90 0 0 1 1 0 0 0 6 1 7

19 PANIPAT YWS CIRCLE

KARNAL 11 0 11 1369.94 1359.50 10.44 10.44 0.00 0.00 2 0 0 2 0 0 0 9 0 9

20 YAMUNANAGA

R

HKB CIRCLE

JAGADHRI 2 0 4 2074.00 669.81 1404.19 1371.23 32.96 0.00 1 1 0 2 0 0 0 1 1 2

Total 27 2 32 6596.44 3665.75 2930.69 2165.68 399.20 365.81 6 1 1 8 0 0 1 21 2 23

21 FARIDABAD YWS CIRCLE

FARIDABAD 0 0 1 795.00 507.24 287.76 143.88 143.88 0.00 0 1 0 1 0 0 0 0 0 0

22 MEWAT YWS CIRCLE

FARIDABAD 8 0 8 886.34 739.71 146.63 146.63 0.00 0.00 2 0 0 2 0 0 0 6 0 6

23 PALWAL YWS CIRCLE

FARIDABAD 7 0 7 2343.75 1406.20 937.55 937.55 0.00 0.00 1 0 0 1 0 0 0 5 0 5

24 PANIPAT YWS CIRCLE

SONEPAT 0 0 1 503.00 503.00 0.00 0.00 0.00 0.00 0 0 0 0 0 0 0 0 1 1

25 SONIPAT YWS CIRCLE

SONEPAT 1 0 1 141.00 104.00 37.00 37.00 0.00 0.00 0 0 0 0 0 0 0 1 0 1

Total 16 0 18 4669.09 3260.15 1408.94 1265.06 143.88 0.00 3 1 0 4 0 0 0 12 1 13

Grand Total 71 9 111 25062.78 11327.14 13735.69 8541.15 3451.48 1743.06 15 10 3 28 0 3 6 54 16 7031 9 0 4

Districtwise Abstract of Ongoing Schemes(Short,Medium, Long) Approved upto 49th meeting of HSDR & FCB

Annexure 2.1

0 0 0 0

2 0 0 1

0 0 0 1

1 0 0 0

1 0 0 0

0 0 0 0

3 1 0 0

YWS(S)

0 0 0 0

2 0 0 0

0 0 0 0

1 0 0 0

YWS(N)

0 1 0 0

1 0 0 0

1 0 0 0

15 3 0 2

PROJECT, ENVIRONMENT AND

MATERIAL

7 0 0 2

5 3 0 0

1 0 0 0

0 0 0 0

1 0 0 0

1 0 0 0

2 0 0 0

LCU

0 0 0 0

2 0 0 0

CONSTRUCTION

0 0 0 0

1 0 0 0

8 5 0 1

2 0 0 1

0 0 0 0

2 4 0 0

3 1 0 0

M Total L

BWS

Head:Flood Protection Works

Approved in Meeting :42th,45th,46th,47th,48th,49th,

(Rs in lacs)

No. of Schemes Requirement of Funds In Prog. Yet to Start Completed Dropped

44

Page 48: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Sr.

No

Name of District Name of Circle Estimated

Cost

Expenditure

Incurred

S L Total Total 2020-21 2021-22 2022-

23

S M L Total S M L S M Total

1 AMBALA SYL CIRCLE

AMBALA 11 2 17 2332.34 403.00 1929.35 931.60 760.67 237.09 1 2 0 3 0 2 2 10 0 10

2 FATEHABAD BWS CIRCLE

FATEHABAD 0 0 3 103.57 28.49 75.09 37.55 37.54 0.00 0 0 0 0 0 1 0 0 2 2

3 HISAR BWS CIRCLE

HISAR 6 0 7 550.00 180.40 369.60 345.11 24.49 0.00 2 0 0 2 0 0 0 3 1 4

4 KAITHAL BWS CIRCLE

KAITHAL 3 0 4 123.07 103.31 19.76 10.13 9.63 0.00 0 1 0 1 0 0 0 3 0 3

5 KURUKSHETRA SYL CIRCLE

AMBALA 6 1 8 777.83 60.92 716.91 308.99 235.21 172.71 0 0 0 0 0 0 0 4 0 4

6 PANCHKULA SYL CIRCLE

AMBALA 12 0 13 522.92 319.15 203.78 170.67 33.11 0.00 0 1 0 1 0 0 0 12 0 12

7 SIRSA BWS CIRCLE

SIRSA 3 0 3 50.79 25.83 24.96 24.96 0.00 0.00 0 0 0 0 0 0 0 3 0 3

Total 41 3 55 4460.52 1121.10 3339.45 1829.01 1100.64 409.80 3 4 0 7 0 3 2 35 3 38

8 KAITHAL SARASWATI

HERITAGE

CIRCLE

1 0 1 36.21 0.00 36.21 36.21 0.00 0.00 1 0 0 1 0 0 0 0 0 0

9 KARNAL SARASWATI

HERITAGE

CIRCLE

KURUKSHETRA

1 0 1 34.90 11.43 23.47 23.47 0.00 0.00 0 0 0 0 0 0 0 1 0 1

10 KURUKSHETRA SARASWATI

HERITAGE

CIRCLE

KURUKSHETRA

1 0 1 19.02 19.02 0.00 0.00 0.00 0.00 0 0 0 0 0 0 0 1 0 1

11 ROHTAK YWS CIRCLE

ROHTAK 0 0 2 349.26 114.85 234.42 117.21 117.21 0.00 0 2 0 2 0 0 0 0 0 0

Total 3 0 5 439.39 145.30 294.10 176.89 117.21 0.00 1 2 0 3 0 0 0 2 0 2

12 BHIWANI LWS CIRCLE

BHIWANI 0 0 1 277.00 89.05 187.96 93.98 93.98 0.00 0 1 0 1 0 0 0 0 0 0

13 Charkhi Dadri LWS CIRCLE

BHIWANI 8 0 8 995.95 565.87 430.08 430.08 0.00 0.00 1 0 0 1 0 0 0 7 0 7

14 JHAJJAR JWS CIRCLE

JHAJJAR 6 0 13 916.50 140.36 776.17 398.83 377.34 0.00 0 5 0 5 0 2 0 6 0 6

15 ROHTAK YWS CIRCLE

ROHTAK 2 4 15 1345.17 30.35 1314.83 541.89 495.89 277.05 0 3 0 3 0 4 4 2 2 4

16 SONIPAT YWS CIRCLE

ROHTAK 0 1 2 332.00 0.00 332.00 120.72 117.89 93.39 0 0 0 0 0 1 1 0 0 0

Total 16 5 39 3866.62 825.63 3041.03 1585.50 1085.09 370.44 1 9 0 10 0 7 5 15 2 17

17 KARNAL WORKSHOP

CIRCLE

KARNAL0 0 3 274.77 0.00 274.78 137.39 137.39 0.00 0 3 0 3 0 0 0 0 0 0

Total 0 0 3 274.77 0.00 274.78 137.39 137.39 0.00 0 3 0 3 0 0 0 0 0 0

18 BHIWANI YWS CIRCLE

BHIWANI 0 1 3 664.36 220.74 443.62 192.58 190.75 60.29 0 2 0 2 0 0 1 0 0 0

19 JIND YWS CIRCLE

JIND 3 0 12 1568.53 566.82 1001.72 554.22 447.50 0.00 0 7 0 7 0 0 0 2 2 4

20 KARNAL YWS CIRCLE

KARNAL 5 0 6 665.25 674.71 -9.47 -7.65 -1.82 0.00 0 0 0 0 0 0 0 4 1 5

21 PANIPAT YWS CIRCLE

KARNAL 3 0 9 684.88 249.77 435.13 212.68 222.45 0.00 0 5 0 5 0 0 0 3 1 4

22 YAMUNANAGAR HKB CIRCLE

JAGADHRI 19 0 19 1192.71 956.82 235.89 235.89 0.00 0.00 0 0 0 0 0 0 0 19 0 19

Total 30 1 49 4775.73 2668.86 2106.90 1187.72 858.89 60.29 0 14 0 14 0 0 1 28 4 32

23 FARIDABAD YWS CIRCLE

FARIDABAD 3 0 5 808.69 488.80 319.90 190.65 129.25 0.00 0 2 0 2 0 0 0 3 0 3

24 MEWAT YWS CIRCLE

FARIDABAD 1 0 5 1047.60 160.20 887.40 460.70 426.70 0.00 1 4 0 5 0 0 0 0 0 0

25 PALWAL YWS CIRCLE

FARIDABAD 0 0 2 585.21 0.67 584.54 292.27 292.27 0.00 0 2 0 2 0 0 0 0 0 0

26 SONIPAT YWS CIRCLE

SONEPAT 2 0 2 114.45 56.50 57.95 57.95 0.00 0.00 0 0 0 0 0 0 0 2 0 2

Total 6 0 14 2555.95 706.17 1849.79 1001.57 848.22 0.00 1 8 0 9 0 0 0 5 0 5

Grand Total 96 9 165 16372.98 5467.06 10906.03 5918.08 4147.42 840.53 6 40 0 46 0 10 8 85 9 94

8 0 0 0

60 18 0 7

2 0 0 0

0 0 0 0

2 0 0 0

4 0 0 0

18 1 0 2

YWS(S)

6 0 0 0

0 0 0 0

9 0 0 1

1 0 0 1

YWS(N)

2 1 0 0

3 0 0 0

3 0 0 0

18 12 0 0

PROJECT, ENVIRONMENT AND

MATERIAL

9 8 0 0

1 2 0 0

0 0 0 0

7 2 0 0

LCU

1 0 0 0

2 0 0 0

2 0 0 0

0 0 0 0

0 0 0 0

CONSTRUCTION

0 0 0 0

0 0 0 0

11 5 0 5

1 0 0 4

1 0 0 0

1 0 0 1

1 0 0 0

4 4 0 0

3 1 0 0

Annexure 2.2

M Total L

BWS

Districtwise Abstract of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting of HSDR & FCB

Head:Flood Protection Works

Approved in Meeting :50th,

(Rs in lacs)

No. of Schemes Requirement of Funds In Prog. Yet to Start Completed Dropped

45

Page 49: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Sr.

No

Name of District Name of Circle Estimated

Cost

Expenditure

Incurred

S L Total Total 2020-21 2021-22 2022-23 S M L Total S M L S M Total

1 AMBALA SYL CIRCLE

AMBALA18 6 30 9102.11 2062.41 7039.72 3608.16 2312.14 1119.42 4 3 0 7 0 2 6 14 1 15

2 FATEHABAD BWS CIRCLE

FATEHABAD1 1 8 719.65 195.32 524.34 207.62 184.72 132.00 0 1 0 1 0 1 1 1 4 5

3 HISAR BWS CIRCLE

HISAR8 0 11 1067.50 397.10 670.41 499.69 170.72 0.00 2 1 0 3 0 0 0 5 1 6

4 KAITHAL BWS CIRCLE

KAITHAL3 0 4 123.07 103.31 19.76 10.13 9.63 0.00 0 1 0 1 0 0 0 3 0 3

5 KURUKSHETRA SYL CIRCLE

AMBALA7 1 9 792.83 71.58 721.25 313.33 235.21 172.71 0 0 0 0 0 0 0 5 0 5

6 PANCHKULA SYL CIRCLE

AMBALA13 0 15 1137.68 603.72 533.97 335.77 198.20 0.00 0 2 0 2 0 0 0 13 0 13

7 SIRSA BWS CIRCLE

SIRSA3 0 3 50.79 25.83 24.96 24.96 0.00 0.00 0 0 0 0 0 0 0 3 0 3

Total 53 8 80 12993.63 3459.27 9534.41 4999.66 3110.62 1424.13 6 8 0 14 0 3 7 44 6 50

8 GURGAON CONSTRUCTION

CIRCLE

GURGAON

1 0 1 60.00 0.00 60.00 60.00 0.00 0.00 0 0 0 0 0 0 0 1 0 1

9 JHAJJAR CONSTRUCTION

CIRCLE

GURGAON

1 0 1 109.81 15.00 94.81 94.81 0.00 0.00 1 0 0 1 0 0 0 0 0 0

10 KAITHAL SARASWATI

HERITAGE

CIRCLE

KURUKSHETRA

1 0 1 36.21 0.00 36.21 36.21 0.00 0.00 1 0 0 1 0 0 0 0 0 0

11 KARNAL SARASWATI

HERITAGE

CIRCLE

KURUKSHETRA

1 0 1 34.90 11.43 23.47 23.47 0.00 0.00 0 0 0 0 0 0 0 1 0 1

12 KURUKSHETRA SARASWATI

HERITAGE

CIRCLE

KURUKSHETRA

1 0 1 19.02 19.02 0.00 0.00 0.00 0.00 0 0 0 0 0 0 0 1 0 1

13 ROHTAK YWS CIRCLE

ROHTAK0 0 4 635.63 389.60 246.05 123.03 123.02 0.00 0 2 0 2 0 0 0 0 2 2

Total 5 0 9 895.57 435.05 460.54 337.52 123.02 0.00 2 2 0 4 0 0 0 3 2 5

14 BHIWANI LWS CIRCLE

BHIWANI1 0 3 821.05 337.98 483.08 271.54 211.54 0.00 0 1 0 1 0 0 0 1 1 2

15 Charkhi Dadri LWS CIRCLE

BHIWANI8 0 8 995.95 565.87 430.08 430.08 0.00 0.00 1 0 0 1 0 0 0 7 0 7

16 JHAJJAR JWS CIRCLE

JHAJJAR10 1 19 2056.44 319.03 1737.43 1026.47 560.90 150.06 2 6 1 9 0 2 0 8 0 8

17 MAHENDRAGAR

H

JLN WS CIRCLE

NARNAUL 2 0 3 431.12 241.12 190.01 151.30 38.71 0.00 0 1 0 1 0 0 0 2 0 2

18 REWARI JLN WS CIRCLE

REWARI 1 0 1 60.00 0.00 60.00 60.00 0.00 0.00 0 0 0 0 0 0 0 1 0 1

19 ROHTAK YWS CIRCLE

ROHTAK7 5 28 3177.89 756.52 2421.38 1068.85 862.63 489.90 0 5 1 6 0 4 4 6 6 12

20 SONIPAT YWS CIRCLE

ROHTAK0 1 7 818.38 147.72 670.67 290.06 287.22 93.39 0 0 0 0 0 4 1 0 2 2

Total 29 7 69 8360.83 2368.24 5992.65 3298.30 1960.99 733.36 3 13 2 18 0 10 5 25 9 34

21 KARNAL WORKSHOP

CIRCLE KARNAL 1 0 5 588.52 230.71 357.82 203.72 154.10 0.00 0 3 0 3 0 0 0 1 1 2

Total 1 0 5 588.52 230.71 357.82 203.72 154.10 0.00 0 3 0 3 0 0 0 1 1 2

22 BHIWANI YWS CIRCLE

BHIWANI3 2 7 1067.51 411.74 655.77 310.91 237.66 107.20 2 2 0 4 0 0 2 1 0 1

23 JIND YWS CIRCLE

JIND8 0 17 2829.06 1527.41 1301.66 854.16 447.50 0.00 1 7 0 8 0 0 0 6 2 8

24 KARNAL YWS CIRCLE

KARNAL11 1 14 2154.07 1159.56 994.50 358.09 317.51 318.90 0 0 1 1 0 0 0 10 2 12

25 PANIPAT YWS CIRCLE

KARNAL14 0 20 2054.82 1609.27 445.57 223.12 222.45 0.00 2 5 0 7 0 0 0 12 1 13

26 YAMUNANAGAR HKB CIRCLE

JAGADHRI21 0 23 3266.71 1626.63 1640.08 1607.12 32.96 0.00 1 1 0 2 0 0 0 20 1 21

Total 57 3 81 11372.17 6334.61 5037.58 3353.40 1258.09 426.10 6 15 1 22 0 0 2 49 6 55

27 FARIDABAD YWS CIRCLE

FARIDABAD3 0 6 1603.69 996.04 607.66 334.53 273.13 0.00 0 3 0 3 0 0 0 3 0 3

28 MEWAT YWS CIRCLE

FARIDABAD9 0 13 1933.94 899.91 1034.03 607.33 426.70 0.00 3 4 0 7 0 0 0 6 0 6

29 PALWAL YWS CIRCLE

FARIDABAD7 0 9 2928.96 1406.87 1522.09 1229.82 292.27 0.00 1 2 0 3 0 0 0 5 0 5

30 PANIPAT YWS CIRCLE

SONEPAT0 0 1 503.00 503.00 0.00 0.00 0.00 0.00 0 0 0 0 0 0 0 0 1 1

31 SONIPAT YWS CIRCLE

SONEPAT3 0 3 255.45 160.50 94.95 94.95 0.00 0.00 0 0 0 0 0 0 0 3 0 3

Total 22 0 32 7225.04 3966.32 3258.73 2266.63 992.10 0.00 4 9 0 13 0 0 0 17 1 18

Grand Total 167 18 276 41435.76 16794.20 24641.72 14459.23 7598.90 2583.59 21 50 3 74 0 13 14 139 25 16491 27 0 11

0 0 0 0

10 0 0 1

2 0 0 1

1 0 0 0

3 0 0 0

4 0 0 0

21 2 0 2

YWS(S)

6 0 0 0

2 0 0 0

9 0 0 1

2 0 0 1

YWS(N)

2 2 0 0

4 0 0 0

4 0 0 0

33 15 0 2

PROJECT, ENVIRONMENT AND

16 8 0 2

6 5 0 0

1 0 0 0

0 0 0 0

0 0 0 0

8 2 0 0

LCU

2 0 0 0

4 0 0 0

4 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

CONSTRUCTION

0 0 0 0

0 0 0 0

19 10 0 6

1 0 0 4

2 0 0 0

3 0 0 2

1 0 0 0

6 8 0 0

6 2 0 0

Annexure 2.3

M Total L

BWS

Districtwise Abstract of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting of HSDR & FCB

Head:Flood Protection Works (Rs in lacs)

No. of Schemes Requirement of Funds In Prog. Yet to Start Completed Dropped

46

Page 50: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Annexure 3.1

District

ACTUAL NORMAL ACTUAL NORMAL ACTUAL NORMAL ACTUAL NORMAL ACTUAL NORMALDep%

AMBALA22.6 106.8 267.6 303.8 261.1 276.3 76.9 163.5 628.2 850.4 -26.13

BHIWANI26.9 35.2 98.5 122 54.1 119.8 3 57.4 182.5 334.4 -45.42

FARIDABAD5.7 41.7 149 190.1 124.9 228.2 60.3 118.6 339.9 578.6 -41.25

FATEHABAD14.3 33.5 53.7 98.1 27.7 93.6 7 52.1 102.7 277.3 -62.96

GURGAON4.6 42.5 148.2 179 97.3 193.3 34.6 88.5 284.7 503.3 -43.43

HISAR42.1 37.8 83.5 111.6 32.5 102.5 1.8 57.7 159.9 309.6 -48.35

JHAJJAR8.1 30.7 97.4 137.3 40.8 139.1 16 69.3 162.3 376.4 -56.88

JIND22.2 41.3 92.2 139.7 71.8 135.1 11 84.9 197.2 401 -50.82

KAITHAL14.3 42.6 88 122.2 43 121.8 27 59.2 172.3 345.8 -50.17

KARNAL14.2 62.4 264.2 193.7 126.3 196.1 13.6 93.8 418.3 546 -23.39

KURUKSHETRA30.8 70.7 252.3 184.8 62.5 167.4 38 76.7 383.6 499.6 -23.22

MAHENDRAGARH26.1 50.8 102.8 151.7 63.5 144.8 15.3 60.5 207.7 407.8 -49.07

MEWAT4 44.4 124.8 159 129.6 201.5 15.3 99.4 273.7 504.3 -45.73

PALWAL1.7 31.7 102.1 140.9 93.8 168.3 53.3 85.7 250.9 426.6 -41.19

PANCHKULA9.8 113.8 108 317.8 177.5 329.8 102.6 163.6 397.9 925 -56.98

PANIPAT6.8 58.4 87.3 163.3 78.3 173.4 12 85 184.4 480.1 -61.59

REWARI14.4 37.9 152.4 150.3 117.9 169.2 33.9 74.7 318.6 432.1 -26.27

ROHTAK7.8 53.2 88 179 42.5 187.6 3.3 82.2 141.6 502 -71.79

SIRSA27.5 24.8 113 89.1 39.4 66.6 3 30.8 182.9 211.3 -13.44

SONEPAT22.8 49.9 144.3 184.5 54.8 198 6.5 91.8 228.4 524.2 -56.43

YAMUNA NAGAR10.7 115.9 331 289.8 303.2 280.7 55.5 136.5 700.4 822.9 -14.89

AVERAGE 16.07 53.62 140.40 171.80 97.26 175.86 28.09 87.23 281.81 488.51 -43.31

DISTRICT WISE MONSOON RAINFALL DATA AS RECEIVED FROM IMD, CHANDIGARH FOR

THE YEAR 2019

(JUNE TO SEPTEMBER)Jun-19 Jul-19 Aug-19 Sep-19 Total

47

Page 51: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Annexure 3.2

STATEMENT SHOWING ANNUAL FLOOD PEAK DATA AT VARIOUS SITES (Discharge in Cusecs) YEAR YAMUNA

RIVER

MARKANDA TANGRI GHAGGAR RIVER

U/S

TAJEWALA

JHANSA JANSUI 4-A

Panchkula

Guhla

Cheeka

Khanauri Chandpur D/S Ottu

2002 3,11,174

on 14.8.02

59,000

On14.8.02

26,890

on 15.7.02

17,862

On 14.8.02

45,096 on

16.8.02

14,900

on 17.8.02

9,850

on17.8.02

5,850

on 16.9.02

2003 86,411

on 5.7.03

52,570

on 5.9.03

11,298

On4.9.03

10,818

on 1.7.03

46,029

On 5.9.03

14,650

on 5.9.03

10,500

on

7.9.03

6,000

On8.9.03

2004 81,929

on 18.8.04

25,010

on 17.8.04

47,818

On3.8.04

83,684

on 3.8.04

61,730

on 7.8.04

17,500

on 7.8.04

17,000

on 11.8.04

20,700

on 13.8.04

2005

1,56,000

on 5.7.05

55,500

on 6.7.05

23,427

on 5.7.05

17,862

On 5.7.05

45,403

on 7.7.05

14,800

on 8.7.05

6,850

on 9.7.05

7,500

on 11.7.05

2006 1,56,237

On23.7.06

59,000

on 27.7.06

Leakage 33,822 on

9.7.06

36,440

on 27.7.06

11,300

On 29.7.06

4,600

on 29.7.06

-

2007 1,07,346 on

13.8.07

8,545

on 15.8.07

7,344

on 13.8.07

49,088 on

13.8.07

43,260

on 16.8.07

14,450

On17.8.07

8,000

on 18.8.07

4,700 on

18.8.07

2008 4,09,876

on 20.9.08

8,195 on

22.09.08

19,998

on 21.9.08

36,786on

20.9.08

50,454

On22.9.08

18,250

On24.9.08

13,550

on 22.9.08

-

2009 4,30,454

On11.9.09

9661 on

13.09.09

17,560

On

13.9.09

58,670on

12.9.09

49,174

On14.9.09

12,575

On16.9.09

12,800

On16.9.09

8,050

On15.9.09

2010

7,44,507

on 20.9.10

10904 on

10.09.10

45,458

on 6.7.10

58,667 on

17.7.10

63,460on

7.7.10

49,500

On 10.7.10

38,000

on 11.7.10

20,500

on 14.7.10

2011 6,41,462

on 16.8.11

9548 on

30.06.11

7,099

On1.7.11

11,485 on

8.7.11

33,602 on

25.7.11

8,350

On26.7.11

4,350

On26.7.11

2,550

on 28.8.11

2012 88201

on 4.8.12

7864 on

31.07.12

4731

On8.7.12

7423on

18.9.12

28560

On20.9.12

20020

On19.9.12

4350

On21.9.12

4930

On3.9.12

2013 8,06,464

on 17.06.13

9548 on

16.08.13

2509

On10.8.13

22514on

24.7.13

26422

On18.6.13

8000

On10.8.13

6750

On18.8.13

3750

On14.8.13

2014 128339

on 16.7.14

8529 on

20.07.14

110

on 25.7.14

114872 on

15.8.14

27582 on

21.7.14

6725

on 21.7.14

14450 on

9.9.14

NIL

2015 101360 on

16.08.2015

8529 on

02.08.15

8100 on

14.08.2015

11409 on

16.07.2015

38441 on

14.07.2015

13275 on

15.07.2015

10500 on

15.07.2015

8850 on

21.07.2015

2016 159219 on

01.08.2016

8085 on

11.08.16

Leakage 16090 on

13.08.2016

13860 on

12.08.2016

3450 on

13.08.2016

2750 on

13.08.2016

850 on

15.08.2016

2017 147212 on

02.09.2017

8529 on

04.09.17

10317 on

26.08.2017

18323 on

19.08.2017

26132 on

23.08.2017

7100 on

04.09.2017

4150 on

06.09.2017

3060 on

17.09.2017

2018 605949 on

28.07.2018

7975 on

26.09.18

3260 on

05.08.2018

12751 on

13.08.2018

45403 on

27.09.2018

12800 on

29.09.2018

12650 on

29.09.2018

16500 on

30.09.2018

2019 828072 on

18.08.2019

10943 on

21.08.2019

17670 on

16.07.2019

19240 on

18.08.2019

52387 on

18.07.2019

14225 on

19.07.2019

12800 on

21.08.2019

26605 on

24.07.2019

48

Page 52: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Annexure 3.3

POSITION OF DRAINAGE PUMPS AS ON 30.11.2019

Name of Unit Total No. of Pumps

Capacity in Cs.

Pumps in working

order

Capacity in Cs.

Pumps under repair

DIESEL MOBILE PUMPS

BWS Unit 256 512 198 396 46

YWS Unit (N) 26 52 26 52 0

YWS Unit (S) 122 244 101 202 21

LCU Unit 290 580 210 420 80

TOTAL 694 1388 535 1070 147

ELECTRICAL MOBILE PUMPS

BWS Unit 101 312 74 244 17

YWS Unit (N) 43 211 43 211 0

YWS Unit (S) 73 268 68 258 5

LCU Unit 400 1333 271 939 129

TOTAL 617 2124 456 1652 151

PERMANENT PUMPS

BWS Unit 328 3030 287 2710 35

YWS Unit (N) 34 180 34 180 0

YWS Unit (S) 71 977 67 957 4

LCU Unit 207 1719 165 1444 42

TOTAL 640 5906 553 5291 81

G.Total (Diesel, Electrical & VT Pumps)

1951 9418 1544 8013 379

Note: Pumps purchased, in I&WRD Haryana is as under:

During the FY 2018-19 During the FY 2019-20

EP Sets = 70, DP Sets = 175, Total = 245 VT PUMPS =32 Sets =435 Cs.

49

Page 53: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Sr.

No

Name of District Name of Circle Estimated

Cost

(S) (M) (L) Total 2020-21

1 AMBALA SYL CIRCLE AMBALA 18 8 1 27 4399.77 2183.32

2 FATEHABAD BWS CIRCLE

FATEHABAD

0 7 1 8 469.98 256.27

3 KAITHAL BWS CIRCLE KAITHAL 3 3 0 6 244.92 184.92

4 KURUKSHETRA SYL CIRCLE AMBALA 6 3 0 9 271.26 192.28

5 PANCHKULA SYL CIRCLE AMBALA 17 1 0 18 600.44 560.44

6 SIRSA BWS CIRCLE SIRSA 4 0 0 4 111.23 111.23

Total 48 22 2 72 6097.60 3488.46

7 KAITHAL SARASWATI HERITAGE

CIRCLE KURUKSHETRA

2 1 0 3 118.00 77.80

8 KARNAL SARASWATI HERITAGE

CIRCLE KURUKSHETRA

1 0 0 1 39.71 39.71

9 PANIPAT YWS CIRCLE SONEPAT 0 1 0 1 441.00 221.00

10 ROHTAK YWS CIRCLE ROHTAK 0 3 0 3 654.34 339.35

Total 3 5 0 8 1253.05 677.86

11 BHIWANI LWS CIRCLE BHIWANI 1 1 0 2 236.00 133.00

12 CHARKHI DADRI LWS CIRCLE BHIWANI 1 3 0 4 682.00 416.00

13 JHAJJAR JWS CIRCLE JHAJJAR 0 5 0 5 421.05 211.84

14 JHAJJAR YWS CIRCLE ROHTAK 0 1 0 1 81.00 41.00

15 MAHENDRAGARH JLN WS CIRCLE

NARNAUL

0 1 0 1 658.14 329.14

16 ROHTAK LWS CIRCLE BHIWANI 1 0 0 1 52.00 52.00

17 ROHTAK YWS CIRCLE ROHTAK 12 8 4 24 1319.76 646.33

18 SONIPAT YWS CIRCLE ROHTAK 0 1 0 1 108.00 54.00

Total 15 20 4 39 3557.95 1883.31

19 JIND WORKSHOP CIRCLE

KARNAL

0 2 0 2 298.68 166.60

Total 0 2 0 2 298.68 166.60

20 BHIWANI YWS CIRCLE BHIWANI 1 1 0 2 159.50 124.25

21 JIND YWS CIRCLE JIND 0 3 1 4 937.53 438.27

22 KARNAL YWS CIRCLE KARNAL 7 2 0 9 1149.57 1110.07

23 PANIPAT YWS CIRCLE KARNAL 3 7 0 10 1236.00 793.00

24 YAMUNANAGAR HKB CIRCLE JAGADHRI 32 1 0 33 3049.00 2983.00

Total 43 14 1 58 6531.60 5448.59

25 FARIDABAD YWS CIRCLE

FARIDABAD

2 3 0 5 502.40 406.25

26 GURGAON YWS CIRCLE

FARIDABAD

0 1 0 1 16.00 8.00

27 MEWAT YWS CIRCLE

FARIDABAD

6 6 0 12 741.00 520.36

28 PALWAL YWS CIRCLE

FARIDABAD

0 3 0 3 663.29 365.00

29 SONIPAT YWS CIRCLE SONEPAT 3 0 0 3 169.00 169.00

Total 11 13 0 24 2091.69 1468.61

Grand Total 120 76 7 203 19830.57 13133.43

Annexure 4.1

Head:Flood Protection Works

(Rs in lacs)

No. of Estimate Funds Required

2021-22 2022-23

Districtwise Abstract of New Proposed Flood Schemes for 51st Meeting of HSDR&FCB

BWS

1640.05 576.40

198.26 15.45

60.00 0.00

78.98 0.00

40.00 0.00

0.00 0.00

2017.29 591.85

CONSTRUCTION

40.20 0.00

0.00 0.00

220.00 0.00

314.99 0.00

575.19 0.00

LCU

103.00 0.00

266.00 0.00

209.21 0.00

40.00 0.00

329.00 0.00

0.00 0.00

436.38 237.05

54.00 0.00

1437.59 237.05

PROJECT, ENVIRONMENT AND MATERIAL

132.08 0.00

132.08 0.00

YWS(N)

35.25 0.00

437.27 62.00

39.50 0.00

443.00 0.00

66.00 0.00

1021.02 62.00

YWS(S)

96.15 0.00

8.00 0.00

220.64 0.00

298.29 0.00

0.00 0.00

623.08 0.00

5806.25 890.90

50

Page 54: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Sr.

No

Name of

Constituency

Name of

Irrigation

Circle

Name of Work Short

Medium,

Long

Term,(S/M

/L)

Est. Cost

2021-22

1 AMBALA CANTT. SYL CIRCLE

AMBALA

SCHEME FOR RAISING AND STRENGTHENING OF

RAMPUR SIRSHERI BUND FROM RD 900 TO 5150

FOR THE PROTECTION OF VILLAGE RAMPUR AND

ADJOINING AREA

S 20.22 0

2 AMBALA CANTT. SYL CIRCLE

AMBALA

SCHEME FOR CONSTRUCTING STONE STEINING

FOR THE PROTECTION OF ABADI OF AMBALA

CANTT. FROM RIVER TANGRI FROM RD 4650 TO

5000 OF BABYAL BUND.

S 51.85 0

3 AMBALA CITY SYL CIRCLE

AMBALA

SCHEME FOR CONSTRUCTING 656 FEET LONG

THREE TIER STONE STEINING FOR THE

PROTECTION OF LMB TANGRI D/S NARWANA

BRANCH AT RD 3344 TO 4000 VILLAGE GORSIAN

S 53.1 0

4 MULLANA SYL CIRCLE

AMBALA

SCHEME FOR RESTORATION OF DESIGN SECTION

OF GOLA-GOLI BUND FOR THE PROTECTION OF

ABADI AND AGRICULTURE LAND OF VILLAGE GOLA-

GOLI AND NAHONI FROM RIVER BEGNA

S 20.71 0

5 MULLANA SYL CIRCLE

AMBALA

SCHEME FOR RESTORATION OF DESIGN SECTION

OF GOKALGARH DRAIN FOR THE PROTECTION OF

VILLAGE ABADI AND AGRICULTURE LANDA OF

VILLAGE GOKALGARH.

S 6.58 0

6 MULLANA SYL CIRCLE

AMBALA

SCHEME FOR RESTORATION OF DESIGN SECTION

OF TAMROLI BUND FOR THE PROTECTION OF

ABADI AND AGRICULTURE LAND OF VILLAGE

TAMROLI AND NAHOUNI FROM RIVER BEGNA.

S 17.73 0

7 MULLANA SYL CIRCLE

AMBALA

SCHEME FOR CONSTRUCTING STONE STEINING

FOR THE PROTECTION OF ABADI OF VILLAGE

ROLANHERI.

S 39.92 0

8 MULLANA SYL CIRCLE

AMBALA

Scheme for constructing stone steining for the protection

agriculture land of village Gokalgarh from River Begna.

S 37.16 0

9 NARAINGARH SYL CIRCLE

AMBALA

SCHEME FOR REPLENISHING OLD STONE STEINING

FOR THE PROTECTION OF TOKA GURUDWARA AND

APPROACH ROAD OF GURUDWARA FROM ROON

NADI.

S 15.08 0

10 NARAINGARH SYL CIRCLE

AMBALA

SCHEME FOR REPLENISHING 5 NO. OLD STONE

STUDS FOR THE PROTECTION OF AGRICULTURAL

LAND OF VILLAGE DEHAR FROM RIVER MARKANDA

S 33.74 0

11 NARAINGARH SYL CIRCLE

AMBALA

SCHEME FOR REPLENISHING 1 NO. STONE STUD

AND CONSTRUCTING STONE STEINING FOR THE

PROTECTION OF AGRICULTURE LAND OF VILLAGE

SADIKPUR FROM RIVER BEGNA

S 31.31 0

12 NARAINGARH SYL CIRCLE

AMBALA

SCHEME FOR CONSTRUCTING 3 NO. STONE STUDS

FOR THE PROTECTION OF AGRICULTURE LAND OF

VILLAGE AMBLI FROM RIVER MARKANDA.

S 22.51 0

13 NARAINGARH SYL CIRCLE

AMBALA

SCHEME FOR RESTORATION OF DESIGN SECTION

OF BANOUNDI BUND FOR THE PROTECTION OF

ABADI AND AGRICULTURE LAND OF VILLAGE

BANOUNDI AND TANDWAL FROM RIVER BEGNA

S 29.39 0

14 NARAINGARH SYL CIRCLE

AMBALA

Scheme for const. stone steining for the protection of

Agriculture land of village Nagawan from River Begna.

S 15.03 0

29.39 0

15.03 0

33.74 0

31.31 0

22.51 0

39.92 0

37.16 0

15.08 0

20.71 0

6.58 0

17.73 0

20.22 0

51.85 0

53.1 0

BWSDist:- AMBALA

Annexure 4.2

Head:Flood Protection Works

(Rs. in lacs)

Requriments of funds

2020-21 2022-23

Districtwise Details of New Proposed Flood Schemes for 51st Meeting of HSDR&FCB

51

Page 55: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Sr.

No

Name of

Constituency

Name of

Irrigation

Circle

Name of Work Short

Medium,

Long

Term,(S/M

/L)

Est. Cost

2021-22

Annexure 4.2

Head:Flood Protection Works

(Rs. in lacs)

Requriments of funds

2020-21 2022-23

Districtwise Details of New Proposed Flood Schemes for 51st Meeting of HSDR&FCB

15 NARAINGARH SYL CIRCLE

AMBALA

Scheme for Const. stone steining for the protection of

agriculture land of village Batoura from River Begna.

S 19.99 0

16 NARAINGARH SYL CIRCLE

AMBALA

Scheme for Const. stone steining for the protection of

agriculture land of village Laha from River Begna.

S 62.12 0

17 NARAINGARH SYL CIRCLE

AMBALA

Scheme for Const. stone steining for the protection of

agriculture land of village Bhareri Khurd from River

Begna.

S 42.89 0

18 NARAINGARH SYL CIRCLE

AMBALA

Scheme for Const. 552 ft. long and 2 Nos. 3 tier stone

stud for the protection of agriculture land of village

Nagouli from River Begna

S 41.23 0

Total 560.56 0

19 AMBALA CANTT. SYL CIRCLE

AMBALA

CONSTRUCTION OF UNDER GROUND RCC NP3 900

MM dia PIPE LINE FROM SHAHPUR POND TO RIVER

TANGRI TO PROTECT THE ABADI AND

AGRICULTURE LAND OF VILLAGE SHAHPUR FROM

FLOOD WATER.

M 166.67 83.67

20 AMBALA CANTT. SYL CIRCLE

AMBALA

SCHEME FOR CONSTRUCTING RCC OPEN TROUGH

FROM RD 4000 TO 6000 AND RD 15000 TO 17000 OF

MAHESH NAGAR DRAIN.

M 435 200

21 AMBALA CANTT. SYL CIRCLE

AMBALA

Scheme for const. of RCC open troughs from RD 19500

to 15335 and RD 14700 to 12877 on Ambala Drain.

M 705 400

22 AMBALA CITY SYL CIRCLE

AMBALA

PROVIDING GATED INLET STRUCTURE AT RD 0 OF

BAKNOUR AREA DRAIN OUTFALLING IN RIVER

TANGRI TO PROTECT THE ABADI AND

AGRICULTURAL LAND OF VILLAGES METLAN,

CHHOTI NIHARSI, KHANNA MAJRA AND BAKNOUR

ETC.

M 57.69 28.69

23 AMBALA CITY SYL CIRCLE

AMBALA

Scheme for purchase 05 nos. pumping sets of 5 Cs.

capacity, 05 nos. electric pumping sets of 2 Cs. capacity

and 05 nos. sewerage pump of 3400 LPM, capacity for

district Ambala as inventory for utilization in dewatering

M 48 21

24 MULLANA SYL CIRCLE

AMBALA

SCHEME FOR RESTORATION OF DESIGN SECTION

OF MULLANA AND TANGAIL BUND FOR THE

PROTECTION OF ABADI AND AGRICULTURE LAND

OF VILLAGE MULLANA TANGAIL AND ROLANHERI

FROM RIVER MARKANDA

M 203.69 83.69

25 MULLANA SYL CIRCLE

AMBALA

SCHEME FOR RESTORATION OF DESIGN SECTION

AND CONSTRUCTING GATE STRUCTURE OF

GHELLERY DRAIN AND GHELLERY LINK DRAIN FOR

THE PROTECTION OF ABADI AND AGRICULTURE

LAND OF VILLAGE HEMAMAJRA AND GHELLERY.

M 24.62 12

26 MULLANA SYL CIRCLE

AMBALA

SCHEME FOR RESTORATION OF DESIGN SECTION

and PROVIDING GATE STRUCTURE OF HARDA

HARDI, ALLAH PUR DRAIN FOR THE PROTECTION

OF ABADI AND AGRICULTURE LAND OF VILLAGE

HARDA-HARDI, ALLAHPUR, RAMPUR.

M 22.14 11

Total 1662.81 840.05

27 AMBALA CANTT. SYL CIRCLE

AMBALA

CONSTRUCTING PANJOKHRA GHAGGAR LINK

DRAIN BY PROVIDING RCC PIPE LINE BELOW THE

SERVICE ROAD OF PANJOKHRA MINOR

OUTFALLING IN AMBALA DRAIN.

L 2176.4 800

Total 2176.4 800

District Total (S+M+L) 4399.77 1640.052183.32 576.4

Dist:- FATEHABAD

822.76 0

800 576.4

800 576.4

120 0

12.62 0

11.14 0

305 0

29 0

27 0

560.56 0

83 0

235 0

62.12 0

42.89 0

41.23 0

19.99 0

52

Page 56: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Sr.

No

Name of

Constituency

Name of

Irrigation

Circle

Name of Work Short

Medium,

Long

Term,(S/M

/L)

Est. Cost

2021-22

Annexure 4.2

Head:Flood Protection Works

(Rs. in lacs)

Requriments of funds

2020-21 2022-23

Districtwise Details of New Proposed Flood Schemes for 51st Meeting of HSDR&FCB

28 TOHANA BWS CIRCLE

FATEHABAD

Agenda note for constructing pipeline drains for

dewatering of floodwater of village Meond and Nathuwal

from RD 0 to 6820 out falling into Rangoi Nallah at RD

1.90 Km Left side.

M 67.43 17.43

29 TOHANA BWS CIRCLE

FATEHABAD

Agenda note for constructing pipeline drains for

dewatering of floodwater of village Meond Khurd from RD

0 to 2200 outfalling into Rangoi Nallah at RD 0.50 Km

Left side

M 22.93 11

30 TOHANA BWS CIRCLE

FATEHABAD

Agenda note for constructing pipeline drains for

dewatering of floodwater of village Hindalwala (Dhani

Tailan) from RD 0 to 12200 outfalling into Rangoi Nallah

at RD 6.35 Km Left side.

M 129.95 64

31 TOHANA BWS CIRCLE

FATEHABAD

Agenda note for constructing pipeline drains for

dewatering of floodwater of village Rattatheh and Diwana

from RD 0 to 3960 out falling into Rangoi Nallah at RD

10.35 Km Left side

M 39.83 19.83

32 TOHANA BWS CIRCLE

FATEHABAD

Constructing pipeline drains for dewatering of floodwater

of village Dher from RD 0 to 3300 Linking existing hodi

already constructed pipeline drain of Village Dher

Outfalling into Rangoi Nallah at RD 6.35 Km Left Side.

M 33.46 16

33 TOHANA BWS CIRCLE

FATEHABAD

Constructing pipeline drain for dewatering of flood water

of village Kanakhera from RD 0 TO 2552 Linking existing

Hodi already comstructed pipeline drain Village

Kanakhera out falling into Rangoi Nallah at RD 6.35 KM

Right side.

M 30.93 15

34 TOHANA BWS CIRCLE

FATEHABAD

Purchasing one no. Tata Hitachi ex 210 LC with

excavator (Long Boom).

M 90 40

Total 414.53 183.26

35 RATIA BWS CIRCLE

FATEHABAD

Repairing of fall structure of bridge at RD 2000 Sirhind

Choe Drain.

L 55.45 15

Total 55.45 15

District Total (S+M+L) 469.98 198.26

36 GUHLA BWS CIRCLE

KAITHAL

Scheme for laying RCC pipe line to drain out the flood

water of low lying area of village Urlana from RD 0-1800

and out fall in Ghaggar River.

S 25.12 0

37 GUHLA BWS CIRCLE

KAITHAL

Scheme for providing stone pitching from RD 105625 to

106125 on right side of Ghaggar Bund for protection of

village Bhatian, Kheri-Daban and Hamu Majra

S 23.18 0

38 GUHLA BWS CIRCLE

KAITHAL

Scheme for providing 02 No. stone studs at RD 52550 to

RD 52950 of Ghaggar Bund on left side of Ghaggar River

for protection village Urlana, Kasour and Ramthali.

S 74.77 0

Total 123.07 0

39 GUHLA BWS CIRCLE

KAITHAL

Scheme for constructing inlet of Saraswati Creek outfall

into Para River and strengthening of bank in a length of

1000 feet in D/S Side and 200 in U/S of proposed inlet.

M 70.88 3535.88 0

23.18 0

74.77 0

123.07 0

256.27 15.45

Dist:- KAITHAL25.12 0

231.27 0

25 15.45

25 15.45

17.46 0

15.93 0

50 0

11.93 0

65.95 0

20 0

50 0

53

Page 57: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Sr.

No

Name of

Constituency

Name of

Irrigation

Circle

Name of Work Short

Medium,

Long

Term,(S/M

/L)

Est. Cost

2021-22

Annexure 4.2

Head:Flood Protection Works

(Rs. in lacs)

Requriments of funds

2020-21 2022-23

Districtwise Details of New Proposed Flood Schemes for 51st Meeting of HSDR&FCB

40 KAITHAL BWS CIRCLE

KAITHAL

Requirement of 1 No. 100 KVA 3 PHASE LIQUID

COOLED DG Set with AMF control panel with part

No.243G0100A3L0Y2 at 1500 RPM for use in various

Pump Houses alongwith Trolley.

M 14 7

41 PEHOWA BWS CIRCLE

KAITHAL

Scheme for laying RCC pipe line to drain out the flood

water of low laying area of village Diwana from RD 0-

1500 and out fall into Markanda River.

M 36.97 18

Total 121.85 60

District Total (S+M+L) 244.92 60

42 PEHOWA SYL CIRCLE

AMBALA

Scheme for repair of inlet at KM 23.650/L SYL Canal S 15.63 0

43 PEHOWA SYL CIRCLE

AMBALA

Scheme for strengthening of Left Marginal Bund at RD

37000 U/S of River Markanda Bridge to protect village

bodha etc (by providing stone pitching/staining).

S 18.41 0

44 PEHOWA SYL CIRCLE

AMBALA

Scheme for construction of drainage syphon at RD 4450

Ismailabad Link Drain.

S 11 0

45 PEHOWA SYL CIRCLE

AMBALA

Scheme for construction of drainage syphon at RD

15000 Lukhi Minor Drain.

S 10.98 0

46 PEHOWA SYL CIRCLE

AMBALA

Scheme for construction of 3 tier Stone Steining for

protection of RMB D/S Jhansa at RD 6000 for safety for

village abadi and agriculture land of Rohti Nurpur Buchi

Thaska Miraji, etc.

S 17.88 0

47 PEHOWA SYL CIRCLE

AMBALA

Scheme for construction of inlet at KM 14.527/L of SYL

Canal.

S 26.76 0

Total 100.66 0

48 PEHOWA SYL CIRCLE

AMBALA

Scheme for replacement of 02 nos. 10Cs horizontal

Pumps with 01 no. 20Cs V.T. Pump and and 02 nos.

10Cs V.T. Pump at Permanent Pump House Lukhi in

Water Services Mech. Sub Division Kurukshetra.

M 84.98 44.98

49 PEHOWA SYL CIRCLE

AMBALA

Scheme for purchase of 01 No. Bolero Camper (New). M 8.54 4

50 THANESAR SYL CIRCLE

AMBALA

Scheme for replacement of 02 nos. VT Pump of 05Cs

V.T. Pump with 02 nos.Pump of 10Cs and 01 nos. of

05Cs at PPH Budhera in W/S Mech. S/D KKR

M 77.08 30

Total 170.6 78.98

District Total (S+M+L) 271.26 78.98

51 KALKA SYL CIRCLE

AMBALA

Scheme for constructing 376ft (248 plus 128) double

tier steining for the protection for Vayayam Shala and

abadi of village Kiratpur from river Baad Godam after

flood 2019.

S 17.17 0

52 KALKA SYL CIRCLE

AMBALA

Scheme for constructing 496ft double tier steining for the

protection of abadi of Ganga Colony Near Police Station

Kalka from river Jhajjra after flood 2019.

S 22.56 0

53 KALKA SYL CIRCLE

AMBALA

Scheme for constructing 200ft double tier steining and

256ft three tier steining for the protection of abadi of ward

no. 4 Manakpur Nanak Chand Pinjore from river Jhajjra

after flood 2019.

S 23.15 023.15 0

Dist:- PANCHKULA 17.17 0

22.56 0

47.08 0

91.62 0

192.28 0

100.66 0

40 0

4.54 0

10.98 0

17.88 0

26.76 0

15.63 0

18.41 0

11 0

61.85 0

184.92 0

Dist:- KURUKSHETRA

7 0

18.97 0

54

Page 58: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Sr.

No

Name of

Constituency

Name of

Irrigation

Circle

Name of Work Short

Medium,

Long

Term,(S/M

/L)

Est. Cost

2021-22

Annexure 4.2

Head:Flood Protection Works

(Rs. in lacs)

Requriments of funds

2020-21 2022-23

Districtwise Details of New Proposed Flood Schemes for 51st Meeting of HSDR&FCB

54 KALKA SYL CIRCLE

AMBALA

Scheme for constructing 352ft double tier steining and

160ft single tier steining for the protection of land from

temporary bundhs for diversion of water flow for pumps

house Nawa Nagar, Khokhran lift Irrigation scheme after

flood 2019.

S 17.55 0

55 KALKA SYL CIRCLE

AMBALA

Scheme for constructing 400ft (168 plus 136 plus 96)

double tier steining for the protection of village abadi and

Sarswati Mandir at Balmiki Basti ward No. 1, Kalka from

river Orian after flood 2019.

S 18.26 0

56 KALKA SYL CIRCLE

AMBALA

Scheme for constructing 256 ft double tier steining for the

protection of abadi area of village Bharuli from river

Talan wali nadi tributary of river Tangri after flood 2019.

S 15.63 0

57 KALKA SYL CIRCLE

AMBALA

Scheme for constructing 416ft double tier steining and 3

Nos. crated bed bars (Double tier) for the protection of

school and agriculture land of village Badhor from river

Tangri after flood 2019.

S 17.35 0

58 KALKA SYL CIRCLE

AMBALA

Scheme for constructing 416ft three tier steining for the

protection of abadi of village Mandlaya from river Begna

after flood 2019.

S 34.05 0

59 KALKA SYL CIRCLE

AMBALA

Scheme for constructing 536ft double tier steining for the

protection of Link Road of Raipur Rani to Rampur from

river Tangri after flood 2019.

S 24.43 0

60 KALKA SYL CIRCLE

AMBALA

Scheme of constructing 304ft four tier steining for the

protection of land near village-Burj Kotian, Panchkula

from Ghaggar after flood 2019.

S 39.03 0

61 KALKA SYL CIRCLE

AMBALA

Scheme for constructing 6 nos crated bed bars (double

tier) steining for the protection of agriculture land of

village Toda from river Tangri after flood 2019

S 19.68 0

62 KALKA SYL CIRCLE

AMBALA

Scheme for constructing 5 Nos. crated bed bars (Double

tier) for the protection of Agriculture Land of Village

Damdama from river Kaushalya after flood 2019

S 19.58 0

63 PANCHKULA SYL CIRCLE

AMBALA

Scheme for constructing 896ft four tier steining for the

protection of Golf Course, Panchkula from Ghaggar after

flood 2019.

S 114.57 0

64 PANCHKULA SYL CIRCLE

AMBALA

Scheme for constructing 256ft three tier steining for the

protection of village abadi in village Aasrewali from

Aasrewali nadi tributary of river Ghaggar after flood 2019.

S 20.97 0

65 PANCHKULA SYL CIRCLE

AMBALA

Scheme for constructing 128 plus 352 plus 376 ft three

tier steining for the protection of abadi area of village

Belwali from Belwali nadi tributary of river Ghaggar after

flood 2019.

S 69.9 0

66 PANCHKULA SYL CIRCLE

AMBALA

Scheme for constructing 224ft double tier steining for the

protection of Abadi area of village Manakyan from river

Manakyan wali nadi tributary of river Ghaggar after flood

2019.

S 10.26 0

67 PANCHKULA SYL CIRCLE

AMBALA

Scheme for constructing 376ft three tier steining for the

protection of Rehod Bundh and agriculture land of Village

Rehod from rivver Tangri after flood 2019.

S 30.76 0

Total 514.9 0

68 PANCHKULA SYL CIRCLE

AMBALA

Construction of Causeway and Steining in Village Tibbi at

Tibbi Wali Nadi Tributary of River Tangri After Flood

2019.

M 85.54 40

Total 85.54 40

District Total (S+M+L) 600.44 40560.44 0

Dist:- SIRSA

514.9 0

45.54 0

45.54 0

69.9 0

10.26 0

30.76 0

19.58 0

114.57 0

20.97 0

24.43 0

39.03 0

19.68 0

15.63 0

17.35 0

34.05 0

17.55 0

18.26 0

55

Page 59: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Sr.

No

Name of

Constituency

Name of

Irrigation

Circle

Name of Work Short

Medium,

Long

Term,(S/M

/L)

Est. Cost

2021-22

Annexure 4.2

Head:Flood Protection Works

(Rs. in lacs)

Requriments of funds

2020-21 2022-23

Districtwise Details of New Proposed Flood Schemes for 51st Meeting of HSDR&FCB

69 ELLENABAD BWS CIRCLE

SIRSA

Agenda Note for Internal Clearance of HGMPD from RD.

0-141000.

S 53.61 0

70 KALANWALI BWS CIRCLE

SIRSA

Clearance of Patera, Sarkanda and Jal Khumbi from bed

and side slope of Rangoi Kharif Channel from 153600-

280700 an Desilting from RD 163000-180000.

S 44.72 0

71 KALANWALI BWS CIRCLE

SIRSA

Internal clearance of Rori Ghaggar Drain from RD

100000 to 130750 tail and its subsidiary Drains.

S 10.22 0

72 RANIA BWS CIRCLE

SIRSA

internal clearance of Rania Link Drain from RD 0 to

13000 tail.

S 2.68 0

Total 111.23 0

District Total (S+M+L) 111.23 0

Unit Total 6097.6 2017.29

73 KAITHAL SARASWATI

HERITAGE

CIRCLE

KURUKSHET

RA

Scheme for construction of inlet/causeway at RD

135500/L of BML-HB-BB-MPLC to protect agriculture

land of Village Nouch.

S 13.9 0

74 KALAYAT SARASWATI

HERITAGE

CIRCLE

KURUKSHET

RA

Scheme for construction of inlet/causeway at RD

208200/L of BML-HB-BB-MPLC to protect agriculture

land of Village Kakaut, Pundri Etc.

S 13.9 0

Total 27.8 0

75 KAITHAL SARASWATI

HERITAGE

CIRCLE

KURUKSHET

RA

Flood agenda for procurement of one No. Crawler Type

Hydraulic Excavator-220 (Long Boom) and 1 No. JCB

(Excavator cum Loader) in Sarasvati Heritage Division

No. 3, Kaithal.

M 90.2 40.2

Total 90.2 40.2

District Total (S+M+L) 118 40.2

76 ASSANDH SARASWATI

HERITAGE

CIRCLE

KURUKSHET

RA

Scheme for construction of inlet at RD 308500/L of BML-

HB-BB-MPLC to protect agriculture land of Village

Fafdana, Thrii, Zabala Etc

S 39.71 0

Total 39.71 0

District Total (S+M+L) 39.71 0

77 ISRANA YWS CIRCLE

SONEPAT

Bring to design section of Hartari Drain and sepration of

Drain from village pond and abadi area in village Hartari,

Bursham and Didwari CM Ann. Code No. 22474.

M 441 220

Total 441 220

District Total (S+M+L) 441 220

78 ROHTAK YWS CIRCLE

ROHTAK

Agenda Note for Re-construction of VR Bridge at RD

44460 of Drain No. 8

M 198.02 98.02

79 ROHTAK YWS CIRCLE

ROHTAK

Agenda note for Re-construction of VR Bridge at RD

126200 of KCB Drain.

M 78.7 39.35

100 0

39.35 0

221 0

221 0

Dist:- ROHTAK

39.71 0

Dist:- PANIPAT221 0

Dist:- KARNAL39.71 0

39.71 0

50 0

50 0

77.8 0

13.9 0

13.9 0

27.8 0

CONSTRUCTIONDist:- KAITHAL

111.23 0

111.23 0

3488.46 591.85

44.72 0

10.22 0

2.68 0

53.61 0

56

Page 60: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Sr.

No

Name of

Constituency

Name of

Irrigation

Circle

Name of Work Short

Medium,

Long

Term,(S/M

/L)

Est. Cost

2021-22

Annexure 4.2

Head:Flood Protection Works

(Rs. in lacs)

Requriments of funds

2020-21 2022-23

Districtwise Details of New Proposed Flood Schemes for 51st Meeting of HSDR&FCB

80 ROHTAK YWS CIRCLE

ROHTAK

Agenda note for Re-construction of VR Bridge at RD

139290 of Diversion Drain No. 8.

M 377.62 177.62

Total 654.34 314.99

District Total (S+M+L) 654.34 314.99

Unit Total 1253.05 575.19

81 BAWANI KHERA LWS CIRCLE

BHIWANI

Agenda Note for providing Brick Pitching over Cement

Concrete 1:3:6 on side slope and Toe wall in Bed of

Kalinga Drain No-I from RD 0 to 1650 near village Abadi

out falling at RD 250-L Kharak kalan Sub Minor.

S 33 0

Total 33 0

82 BAWANI KHERA LWS CIRCLE

BHIWANI

Agenda Note for providing Brick Pitching over Cement

Concrete 1:3:6 on R-side, slope and Toe wall in Bed of

Kharak Drain from RD 4500 to 15740 near village Abadi

out falling at RD 8500-R Dadri Disty.

M 203 103

Total 203 103

District Total (S+M+L) 236 103

83 DADRI LWS CIRCLE

BHIWANI

Agenda Note for Drainage cum Irrigation Scheme for the

village Bond Khurd along Bond Unn Road from RD 0 to

5400 outfall at RD 4500-R of Sanjarwas Minor.

S 150 0

Total 150 0

84 DADRI LWS CIRCLE

BHIWANI

Agenda Note for Drainage cum Irrigation Scheme for the

village Mirch from RD 0 to 9600 outfall at RD 7500-R of

Jai Shree Drain.

M 226 113

85 DADRI LWS CIRCLE

BHIWANI

Agenda of drainage cum irrigation scheme for the village

Imlota from RD 0 to 7400 outfalling at RD 5000-L

Badhwana Disty.

M 178 89

86 DADRI LWS CIRCLE

BHIWANI

Agenda of drainage cum irrigation scheme for the village

Kanheti from RD 0 to 5400 outfalling at RD 9500-L

Badhwana Disty.

M 128 64

Total 532 266

District Total (S+M+L) 682 266

87 BADLI JWS CIRCLE

JHAJJAR

Agenda note for laying pipe line from RD 0 to 7850 off

take from RD 35800-L of Kasni minor.

M 26.89 13

88 BAHADURGARH YWS CIRCLE

ROHTAK

Flood Agenda note for purchasing one No. Tata Hitachi

Ex 210 LC with excavator (long boom) for use in Water

Services Division, Bahadurgarh

M 81 40

89 BERI JWS CIRCLE

JHAJJAR

Agenda note for constructing Ditch Drain along Right

Side of Loharu Feeder from RD 0 to 32935 Outfalling into

drain no 8 at RD 213000-R for taking discharge of Majra

Siwana Link Drain.

M 240.42 120.21

90 JHAJJAR JWS CIRCLE

JHAJJAR

Agenda note for constructing inlet with sump well

outfalling point of Khaparwas link drain at RD 5600-R

JSB escape channel.

M 20 10

41 0

120.21 0

10 0

416 0

Dist:- JHAJJAR 13.89 0

89 0

64 0

266 0

150 0

150 0

113 0

100 0

133 0

Dist:- CHARKHI DADRI

33 0

33 0

100 0

LCUDist:- BHIWANI

339.35 0

339.35 0

677.86 0

200 0

57

Page 61: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Sr.

No

Name of

Constituency

Name of

Irrigation

Circle

Name of Work Short

Medium,

Long

Term,(S/M

/L)

Est. Cost

2021-22

Annexure 4.2

Head:Flood Protection Works

(Rs. in lacs)

Requriments of funds

2020-21 2022-23

Districtwise Details of New Proposed Flood Schemes for 51st Meeting of HSDR&FCB

91 JHAJJAR JWS CIRCLE

JHAJJAR

Agenda note for Purchase 1 No. 415 V, 800 A, 3 Phase,

50 Hz. Motor control Centre L.T Panel with copper bus

bar and 500 KVA Transformer 11/0.433 V, 3 Phase, 50

Hz , Oil immersed outdoor type, with all standard fittings

and accessories having losses as per IS 1180 energy

efficiency level-2 at Rewari Road Pump House in W.S

Mech. Division, Jhajjar.

M 54.65 27

92 JHAJJAR JWS CIRCLE

JHAJJAR

Agenda note for constructing of Mechanical Diesel

Workshop at Jhajjar for maintenance and up keeping of

Diesel Engines in W.S Mech. Division, Jhajjar.

M 79.09 39

Total 502.05 249.21

District Total (S+M+L) 502.05 249.21

93 NANGAL

CHOUDHRY

JLN WS

CIRCLE

NARNAUL

Agenda Note for providing stone pitching and

Constructing spillway at various villages bunds in Nangal

Choudhary Area.

M 658.14 329

Total 658.14 329

District Total (S+M+L) 658.14 329

94 GARHI SAMPLA -

KALOI

YWS CIRCLE

ROHTAK

Agenda Note for Construction of permanent pump house

at RD 136000/R JLN Feeder.

S 13 0

95 GARHI SAMPLA -

KALOI

YWS CIRCLE

ROHTAK

Agenda note for constructing Mattan Link Drain from RD

0 to 3000 outfalling into KCB Drain at RD 57000.

S 22.49 0

96 GARHI SAMPLA -

KALOI

YWS CIRCLE

ROHTAK

Agenda note for laying underground P.V.C Pipe line from

fields of village Chiri to Chapra Drain at RD 18050/Right

for dewatering flood water of village Chiri District Rohtak.

S 13 0

97 KALANAUR YWS CIRCLE

ROHTAK

Agenda Note for laying undeground PVC pipeline from

fields to Drain No.8 at RD 141400/Right for Dewatering

flood water of Village Madodhi, Dist Rohtak. (CM

Announcement Code No. 24923)

S 9.2 0

98 KALANAUR YWS CIRCLE

ROHTAK

Agenda Note for laying underground P.V.C Pipe line from

Baliyana Dhani to Drain No. 8 RD 148600 for dewatering

flood water of village Patwapur, District Rohtak.(CM

Announcement code No. 24925)

S 12.25 0

99 KALANAUR YWS CIRCLE

ROHTAK

Agenda note for laying underground P.V.C. Pipe line

from fields of Meham Drain at RD 10500/L for dewatering

flood waterof village Patwapur District Rohtak.

S 23.5 0

100 KALANAUR YWS CIRCLE

ROHTAK

Agenda Note for Construction of pump house for

dewatering of Balmiki pond in village Kahanaur, District-

Rohtak. (CM Announcement code No. 24922)

S 12.25 0

101 KALANAUR YWS CIRCLE

ROHTAK

Agenda note for construction of Embankment of Drain

No.8 from RD 187000 to 188250

S 31 0

102 KALANAUR YWS CIRCLE

ROHTAK

Agenda note for laying underground P.V.C Pipe line from

fields to Drain No 8 at RD 143500/Right for dewatering

flood water of village Patwapur District.

Rohtak.

S 18.25 0

103 MEHAM LWS CIRCLE

BHIWANI

Agenda Note for providing Brick Pitching over Cement

Concrete 1:3:6 on Bed and side slope and Toe wall in

Bed of Escape channel from RD 0 to 1100 offtake at RD

107200 tail Bhiwani Sub Branch.

S 52 052 0

12.25 0

31 0

18.25 0

9.2 0

12.25 0

23.5 0

13 0

22.49 0

13 0

329.14 0

329.14 0

Dist:- ROHTAK

252.84 0

Dist:- MAHENDRAGARH329.14 0

27.65 0

40.09 0

252.84 0

58

Page 62: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Sr.

No

Name of

Constituency

Name of

Irrigation

Circle

Name of Work Short

Medium,

Long

Term,(S/M

/L)

Est. Cost

2021-22

Annexure 4.2

Head:Flood Protection Works

(Rs. in lacs)

Requriments of funds

2020-21 2022-23

Districtwise Details of New Proposed Flood Schemes for 51st Meeting of HSDR&FCB

104 MEHAM YWS CIRCLE

ROHTAK

Agenda Note for laying underground Pipeline and

constructing Pump house at RD 68100/R Bhiwani Sub

Branch.

S 18 0

105 MEHAM YWS CIRCLE

ROHTAK

Agenda Note for constructing temporary Pump House on

Nindana, Momadpur link Drain which outfalls at RD

121000/L Meham Drain to drain out flood water.

S 18 0

106 ROHTAK YWS CIRCLE

ROHTAK

Agenda Note for laying underground P.V.C Pipe line from

Dahar to Drain No 8 at RD 151500/R for dewatering flood

water of village Patwapur, District Rohtak. (CM

Announcement code no. 24926)

S 19.7 0

Total 262.64 0

107 BERI YWS CIRCLE

ROHTAK

Agenda note for constructing temporary pump house of

outfall point Dighal Link Drain.

M 35.1 15.1

108 GARHI SAMPLA -

KALOI

YWS CIRCLE

ROHTAK

Agenda note for providing regulation gates in Jassia link

drain at outfall into drain no.08 at RD-99000/L

M 43 20

109 MEHAM YWS CIRCLE

ROHTAK

Agenda Note for controlling the sloughing problem of

bank of Meham Drain by applying the Geosynthetic mat

on side slope from RD 135000 to RD 135500 both side.

M 43 21.5

110 MEHAM YWS CIRCLE

ROHTAK

Agenda note for procurement of new pump for flood

protection works at Nindana Pump House at RD 122000-

L of Meham Drain in WS Mech Sub Division, Rohtak

M 76 38

111 MEHAM YWS CIRCLE

ROHTAK

Flood agenda note for re-construction of VR Bridge at

RD 3460 of Kidoli Pahalapur Link Drain

M 30.16 15

112 ROHTAK YWS CIRCLE

ROHTAK

Agenda Note for purchasing 1 No. Jcb Machine wheel

type, 1 No. Tractor, 1 No. Trolla for Rohtak water

services division Rohtak.

M 66.5 33

113 ROHTAK YWS CIRCLE

ROHTAK

Agenda note for controlling the sloughing problem of

bank of Kakrana Link Drain by applying synthetic mat on

side slope from RD 0 to 3000 on both side bank.

M 57.24 34.24

114 ROHTAK YWS CIRCLE

ROHTAK

Agenda note for procurement of New Vehicle Mahindra

Bolero Camper 2WD for loading and shifting of material

and machinery in Sampla WS Division, Rohtak of

Yamuna Water Services Circle, Rohtak.

M 7.33 3

Total 358.33 179.84

115 KALANAUR YWS CIRCLE

ROHTAK

Agenda note for construction of temporary pump house

at RD 10574 Meham Drain crossing KahanaurDisty. at

RD 141025.(CM Announcement code No. 24921)

L 280.5 100

116 KALANAUR YWS CIRCLE

ROHTAK

Agenda note for construction of temporary pump house

at RD 37000 Meham Drain crossing Kalanaur minor at

RD 24500. (CM Announcement code No. 24920)

L 186.66 62

117 KALANAUR YWS CIRCLE

ROHTAK

Agenda Note for construction of Kahanaur Masudpur

Pipeline Pump House Link Drain from RD 0 to 7850

outfall at RD 201000L of Drain No.8

L 168.63 56.21

118 MEHAM YWS CIRCLE

ROHTAK

Agenda note for constructing Cross Regulator at RD

73400 on Meham Drain.

L 115 38.33

Total 750.79 256.54

District Total (S+M+L) 1371.76 436.38

257.2 237.05

698.33 237.05

62.66 62

56.21 56.21

38.33 38.34

4.33 0

178.49 0

100 80.5

15.16 0

33.5 0

23 0

23 0

21.5 0

38 0

19.7 0

262.64 0

20 0

18 0

18 0

59

Page 63: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Sr.

No

Name of

Constituency

Name of

Irrigation

Circle

Name of Work Short

Medium,

Long

Term,(S/M

/L)

Est. Cost

2021-22

Annexure 4.2

Head:Flood Protection Works

(Rs. in lacs)

Requriments of funds

2020-21 2022-23

Districtwise Details of New Proposed Flood Schemes for 51st Meeting of HSDR&FCB

119 GOHANA YWS CIRCLE

ROHTAK

Procurement of 06 Nos.New Pumps of 10 Cusec

Capacity For flood Protection Works at RD 95000-R of

Bhutana Branch Sump-Well in W.S Mech Sub Division

,Gohana.(

M 108 54

Total 108 54

District Total (S+M+L) 108 54

Unit Total 3557.95 1437.59

120 JIND WORKSHOP

CIRCLE

KARNAL

Replacement/Renovation of 6 No. of V.T. Pumps of 10

Cs. capacity and 08 No. V.T. Pumps of 5 Cs. capacity

pumping sets with allied accessories in District Jind.

M 166.08 66.08

121 JIND WORKSHOP

CIRCLE

KARNAL

Procurement of 03 No. Diesel Generating sets of 320

KVA, 01 No. Diesel Generating sets of 250 KVA,03

Diesel Generating sets of 125 KVA and 02 No. Diesel

Generating Sets of 62.5 KVA for use in permanent pump

houses in the event of power failure in District Jind.

M 132.6 66

Total 298.68 132.08

District Total (S+M+L) 298.68 132.08

Unit Total 298.68 132.08

122 BAWANI KHERA YWS CIRCLE

BHIWANI

PROJECT ESTIMATE FOR PROVIDING BRICK

PITCHING OF SAIMAN DHANANA LINK DRAIN FROM

RD 80575 TO 83575 OUTFALLING AT RD 55400/R

BHIWANI GHAGGAR DRAIN

S 89 0

Total 89 0

123 BAWANI KHERA YWS CIRCLE

BHIWANI

PROJECT ESTIMATE FOR EXTENSION OF 1-L JATAI

DRAIN FROM RD 20000-21958 OUTFALLING AT RD

77265-R SAIMAN DHANANA LINK DRAIN

M 70.5 35.25

Total 70.5 35.25

District Total (S+M+L) 159.5 35.25

124 JIND YWS CIRCLE

JIND

Agenda Note for Remodeling of Poli Pump House at

Design Capacity 66 Cusec to 110 Cusec at RD 420000-R

Bhiwani Sub Branch (only civil work) amounting to Rs.

144.00 Lacs.

M 144 72

125 SAFIDON YWS CIRCLE

JIND

Agenda Note for Laying Pipe line for Dewatering of field

water to Ditch Drain of Village Nimnabad including

construction of Permanent Pump House to Rs.112.53lcs

M 112.53 56.27

126 SAFIDON YWS CIRCLE

JIND

Flood Agenda for providing Brick pitching on both Side

from RD 0 to 8950 Padana drain including

Reconstruction of 3 Nos. Bridges.

M 494 247

Total 750.53 375.27

127 JIND YWS CIRCLE

JIND

Agenda Note for providing brick pitching on both side of

Nizampur Bharon Khera Link Drain in sloughing reach

RD 0 to 4000 including pucca structure.

L 187 62

Total 187 62

District Total (S+M+L) 937.53 437.27

63 62

438.27 62

Dist:- KARNAL

247 0

375.27 0

63 62

Dist:- JIND72 0

56.27 0

35.25 0

35.25 0

124.25 0

Dist:- BHIWANI89 0

89 0

166.6 0

166.6 0

YWS(N)

100 0

66.6 0

166.6 0

1883.31 237.05

PROJECT, ENVIRONMENT AND MATERIALDist:- JIND

54 0

54 0

54 0

Dist:- SONIPAT

60

Page 64: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Sr.

No

Name of

Constituency

Name of

Irrigation

Circle

Name of Work Short

Medium,

Long

Term,(S/M

/L)

Est. Cost

2021-22

Annexure 4.2

Head:Flood Protection Works

(Rs. in lacs)

Requriments of funds

2020-21 2022-23

Districtwise Details of New Proposed Flood Schemes for 51st Meeting of HSDR&FCB

128 GHARAUNDA YWS CIRCLE

KARNAL

Agenda for providing protection to Dakwala Complex by

constructing 1 No. new stone stud and repairing of 3 No.

damaged stone stud on river Yamuna after flood 2019.

S 71.45 0

129 GHARAUNDA YWS CIRCLE

KARNAL

Agenda for providing protection to Mustafabad Complex

by constructing 3 No. new stone stud and repairing of 7

No. damaged stone stud and constructing 1365’ stone

revetment on river Yamuna after flood 2019

S 314.61 0

130 GHARAUNDA YWS CIRCLE

KARNAL

Agenda for the work of providing protection to Kunda

Kalan complex by 4 no repairing of damaged stone stud

on river Yamuna after flood 2019.

S 60.09 0

131 GHARAUNDA YWS CIRCLE

KARNAL

Agenda for the work of providing protection to Sadarpur

complex by repairing 5 no. old damaged stone studs on

Yamuna after flood 2019

S 78.15 0

132 GHARAUNDA YWS CIRCLE

KARNAL

Agenda for repairing of spur at RD 238000 river Yamuna

embankment after flood 2019

S 15.26 0

133 INDRI YWS CIRCLE

KARNAL

Agenda for providing protection to Shergarh Tapu

Complex by constructing 9 No. new stone studs on river

Yamuna after flood 2019.

S 263.17 0

134 INDRI YWS CIRCLE

KARNAL

Agenda for the work of providing protection to Kalsora

complex by 3 no repairing of damaged stone stud and

constructing 840’ stone revetment on river Yamuna after

flood 2019.

S 257.84 0

Total 1060.57 0

135 GHARAUNDA YWS CIRCLE

KARNAL

Agenda for construction of outfall gate at RD 0 and sump

well at RD 13400 and remodeling of 01 No. culvert at RD

3300 of Bazida drain.

M 50 20

136 GHARAUNDA YWS CIRCLE

KARNAL

Agenda for constructing cause way opposite RD 137310

Kunjpura

embankment on Dhanaura creek (based on sanctioned

estimate for constructing causeway opposite RD 144200

of Kunjpura embankment on creek of Dhanaura escape).

M 39 19.5

Total 89 39.5

District Total (S+M+L) 1149.57 39.5

137 SAMALKHA YWS CIRCLE

KARNAL

Providing protection to Tamsabad Complex by repairing

4 No. Old Stone Studs after Flood 2019

S 62 0

138 SAMALKHA YWS CIRCLE

KARNAL

Providing protection to Nanhera Complex by repairing 5

No. Old Stone Studs and 120 Ft long Constructing

Revetment D/S of Stud No. 27 after Flood 2019

S 158 0

139 SAMALKHA YWS CIRCLE

KARNAL

Providing protection to Mirzapur Complex by repairing 5

No. Old Stone Studs and 275 Ft long Constructing

Revetment U/S of Stud No. 10 after Flood 2019

S 127 0

Total 347 0

140 ISRANA YWS CIRCLE

KARNAL

Bringing to design section of Try. Drain No. 1 from RD

57800 to 56900 for separation of drain from village pond

and abadi area in village Thirana

M 52 26

141 ISRANA YWS CIRCLE

KARNAL

Bringing to design section of Brahman Majra Drain from

RD 1000 to 3500 for separation of drain from village

pond and abadi area in village Brahman Majra

M 96 4848 0

127 0

347 0

26 0

Dist:- PANIPAT62 0

158 0

19.5 0

49.5 0

1110.07 0

257.84 0

1060.57 0

30 0

78.15 0

15.26 0

263.17 0

71.45 0

314.61 0

60.09 0

61

Page 65: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Sr.

No

Name of

Constituency

Name of

Irrigation

Circle

Name of Work Short

Medium,

Long

Term,(S/M

/L)

Est. Cost

2021-22

Annexure 4.2

Head:Flood Protection Works

(Rs. in lacs)

Requriments of funds

2020-21 2022-23

Districtwise Details of New Proposed Flood Schemes for 51st Meeting of HSDR&FCB

142 ISRANA YWS CIRCLE

KARNAL

Bringing to design section of Bijawa-Chirana-Mundlana

Link Drain from R.D 22000 to 25200 for separation of

Drain from village pond and abadi area in village

Shahpur

M 125 62

143 ISRANA YWS CIRCLE

KARNAL

Bringing to Design section of Gawalra Link Drain From

R.D 8200 To 4000 for Sepration of Drain from village

pond and Abadi Area In village Gawalra

M 107 53

144 PANIPAT CITY YWS CIRCLE

KARNAL

Bringing to Design section of Begampur Drain from RD

7200 to 9000 for Separation of drain from village pond

and abadi area in village Rajapur

M 66 33

145 PANIPAT RURAL YWS CIRCLE

KARNAL

Bringing to Design section of Nohra Drain From RD

17500 to 21000 for village Sodhapur and various

colonies such as Dutta colony etc.

M 101 50

146 PANIPAT RURAL YWS CIRCLE

KARNAL

Bringing to design section of Nohra Drain from RD 34000

to 47000 and separation of drain from village pond and

abadi area in village Binjhol and Dahar. (Ex-post facto

sanction).

M 342 171

Total 889 443

District Total (S+M+L) 1236 443

147 JAGADHRI HKB CIRCLE

JAGADHRI

Constg. apron for connecting the RLDSE Bund from RD

1700 to 1900 after Flood 2019

S 98 0

148 JAGADHRI HKB CIRCLE

JAGADHRI

Constg. Apron for connecting the RLDSE Bund from RD

3750 to 4270 after Flood 2019.

S 466 0

149 JAGADHRI HKB CIRCLE

JAGADHRI

Repairing of Damaged Apron of Gorden Groyne at Vill

Tajewala after Flood 2019.

S 315 0

150 JAGADHRI HKB CIRCLE

JAGADHRI

Protection of Old Tajewala Head by constructing Apron

around the Head after Flood 2019

S 140 0

151 SADHAURA HKB CIRCLE

JAGADHRI

Providing 1200 ft. stone steining for the protection of

Agriculture land of Village Laharpur Dummawala from

River Markanda.

S 29.36 0

152 YAMUNA

NAGAR

HKB CIRCLE

JAGADHRI

Providing 09 no. stone studs for the protection of

agriculture land of village Gumthala Rao from River

Yamuna.

S 218.51 0

153 YAMUNA

NAGAR

HKB CIRCLE

JAGADHRI

CONSTRUCTING 600 FT STONE STEINING FOR

PROTECTION OF AZAT ASHRAM GAUSHALA FROM

CHIKKEN KHOL (RIVER PATHRALA).

S 13 0

154 YAMUNA

NAGAR

HKB CIRCLE

JAGADHRI

CONSTRUCTING 1200 FT STONE STEINING FOR

PROTECTION OF VILLAGE KALESAR and KALESAR

MAHAMANTRA VALLEY FROM RIVER YAMUNA

S 30 0

155 YAMUNA

NAGAR

HKB CIRCLE

JAGADHRI

CONSTRUCTING 1000 FT STONE STEINING FOR

PROTECTION OF AGRICULTURAL LAND AND ABADI

OF VILLAGE MUKARAVPUR IN D/S OF MUKARAVPUR

BRIDGE FROM PLASI KHOL (RIVER PATHRALA)

S 15.17 0

156 YAMUNA

NAGAR

HKB CIRCLE

JAGADHRI

CONSTRUCTING 550 FT STONE STEINING FOR

PROTECTION OF VILLAGE NATHANPUR FROM

KANSLI KHOL (RIVER PATHRALA).

S 8 0

157 YAMUNA

NAGAR

HKB CIRCLE

JAGADHRI

CONSTRUCTING 600 FT STONE STEINING FOR

PROTECTION OF VILLAGE KOTRA KAHAN SINGH

FROM RIVER PATHRALA

S 9.16 0

158 YAMUNA

NAGAR

HKB CIRCLE

JAGADHRI

CONSTRUCTING 1900 FT BUND WITH STONE

PITCHING FOR PROTECTION OF VILLAGE

MUKARVPUR AND ABADI IN THE U/S OF BRIDGE

FROM PLASI KHOL (RIVER PATHRALA).

S 44.39 0

159 YAMUNA

NAGAR

HKB CIRCLE

JAGADHRI

PROVIDING 1400 Ft. STONE STEINING FOR

PROTECTION OF AGRICULTURAL LAND AND ABADI

NEAR LOHGARH GURUDWARA FROM LOHGARH

KHOL.

S 44.71 044.71 0

8 0

9.16 0

44.39 0

13 0

30 0

15.17 0

140 0

29.36 0

218.51 0

98 0

466 0

315 0

446 0

793 0

Dist:- YAMUNANAGAR

33 0

51 0

171 0

63 0

54 0

62

Page 66: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Sr.

No

Name of

Constituency

Name of

Irrigation

Circle

Name of Work Short

Medium,

Long

Term,(S/M

/L)

Est. Cost

2021-22

Annexure 4.2

Head:Flood Protection Works

(Rs. in lacs)

Requriments of funds

2020-21 2022-23

Districtwise Details of New Proposed Flood Schemes for 51st Meeting of HSDR&FCB

160 YAMUNA

NAGAR

HKB CIRCLE

JAGADHRI

RESTORATION OF KHANNUWALA BUND FOR

PROTECTION OF KHANNUWALA VILLAGE FROM

RIVER SOMB.

S 3.89 0

161 YAMUNA

NAGAR

HKB CIRCLE

JAGADHRI

CONSTRUCTION OF 700 Ft. STONE STEINNING FOR

PROTECTION OF VILLAGE ABADI OF VILLAGE

SANGHOLI FROM TRIBUTARY OF SADHOURA

RIVER.

S 17.11 0

162 YAMUNA

NAGAR

HKB CIRCLE

JAGADHRI

PROVIDING 300 Ft. STONE STEINNING FOR

PROTECTION OF AGRICULTURAL LAND OF VILLAGE

JAIRAMPUR AND DAMUPURA FROM RIVER SOMB.

S 14.59 0

163 YAMUNA

NAGAR

HKB CIRCLE

JAGADHRI

PROVIDING 436 FT. STONE STEINING FOR

PROTECTION OF VILLAGE RAMPUR GAINDA BUND

FROM RIVER SOMB.

S 18.37 0

164 YAMUNA

NAGAR

HKB CIRCLE

JAGADHRI

PROVIDING 06 NOs BED BARS FOR THE

PROTECTION OF AGRICULTURE LAND OF

RAMGARH SAWAI AND VILLAGE ABADI OF BANKAT

FROM RIVER SOMB

S 30.16 0

165 YAMUNA

NAGAR

HKB CIRCLE

JAGADHRI

Construction of 07 Nos. stone studs and 450 ft. stone

steining for the protection of village Tapu kamalpur from

River Yamuna.

S 220.74 0

166 YAMUNA

NAGAR

HKB CIRCLE

JAGADHRI

Construction of 1400 ft. stone steining for the protection

of village Lal Chaper from River Yamuna.

S 171.17 0

167 YAMUNA

NAGAR

HKB CIRCLE

JAGADHRI

Construction of 08 Nos. stone studs for the protection of

village Bagwali from River Yamuna

S 187.22 0

168 YAMUNA

NAGAR

HKB CIRCLE

JAGADHRI

CONSTRUCTING 1000 FT BUND WITH STONE

PITCHING FOR PROTECTION OF VILLAGE

BANIYAWALA FROM KANSLI KHOL (RIVER

PATHRALA).

S 24 0

169 YAMUNA

NAGAR

HKB CIRCLE

JAGADHRI

Providing protection to agriculture land from Flood water

by providing Pump House in Village Shadipur in District

Yamuna Nagar

S 18 0

170 YAMUNA

NAGAR

HKB CIRCLE

JAGADHRI

SCHEME FOR CONSTRUCTION OF 900 FT. STONE

STEINING AND 06 NO. STONE STUDS FOR THE

PROTECTION OF VILLAGE ODHRI FROM RIVER

YAMUNA.

S 214.5 0

171 YAMUNA

NAGAR

HKB CIRCLE

JAGADHRI

Scheme for Providing 335 mtr. stone steining between

studs for the protection of agriculture land and village

abadi of village Gumthla from River Yamuna.

S 189.3 0

172 YAMUNA

NAGAR

HKB CIRCLE

JAGADHRI

SCHEME FOR THE CONSTRUCTION OF 5 NOS

STONE STUDS FOR THE PROTECTION OF VILLAGE

KANALSI FROM RIVER YAMUNA.

S 103.5 0

173 YAMUNA

NAGAR

HKB CIRCLE

JAGADHRI

SCHEME FOR REPLENISHMENT OF 3 NOS STONE

STUD FOR THE PROTECTION OF VILLAGE MANDOLI

FROM RYVER YAMUNA

S 60.69 0

174 YAMUNA

NAGAR

HKB CIRCLE

JAGADHRI

ESTIMATE FOR CONSTRUCTING 02 NO. STONE

STUDS AND 600FT. STONE STEINING FOR

PROTECTION OF VILLAGE BABURAMBASS FROM

RIVER YAMUNA.

S 39.14 0

175 YAMUNA

NAGAR

HKB CIRCLE

JAGADHRI

ESTIMATE FOR CONSTRUCTING 02 NO. STONE

STUDS AND 800FT. STONE STEINING FOR

PROTECTION OF VILLAGE KALESAR FROM RIVER

YAMUNA.

S 45.39 0

176 YAMUNA

NAGAR

HKB CIRCLE

JAGADHRI

SCHEME FOR CONSTRUCTING 05 NO. STONE

STUDS FOR PROTECTION OF VILLAGE LAKKARMAI

PARTAPPUR FROM RIVER YAMUNA.

S 48.45 0

177 YAMUNA

NAGAR

HKB CIRCLE

JAGADHRI

SCHEME FOR CONSTRUCTING 6 NO. STONE STUDS

FOR THE PROTECTION OF VILL. KANNEWALA FROM

RIVER YAMUNA.

S 58.14 058.14 0

39.14 0

45.39 0

48.45 0

189.3 0

103.5 0

60.69 0

24 0

18 0

214.5 0

220.74 0

171.17 0

187.22 0

14.59 0

18.37 0

30.16 0

3.89 0

17.11 0

63

Page 67: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Sr.

No

Name of

Constituency

Name of

Irrigation

Circle

Name of Work Short

Medium,

Long

Term,(S/M

/L)

Est. Cost

2021-22

Annexure 4.2

Head:Flood Protection Works

(Rs. in lacs)

Requriments of funds

2020-21 2022-23

Districtwise Details of New Proposed Flood Schemes for 51st Meeting of HSDR&FCB

178 YAMUNA

NAGAR

HKB CIRCLE

JAGADHRI

RESTORATION OF CHAUTANG NALLAH FROM RD

29800 TO 47400.

S 20.34 0

Total 2916 0

179 YAMUNA

NAGAR

HKB CIRCLE

JAGADHRI

REHABILITATION OF CHAUTANG NALLAH FROM RD

0 TO 136428

M 133 66

Total 133 66

District Total (S+M+L) 3049 66

Unit Total 6531.6 1021.02

180 PRITHLA YWS CIRCLE

FARIDABAD

Providing 06 no. stone studs and 1000ft. edge protection

to protect village abadi and its agricultre land of village

Latipur Sahupura khadar after flood 2019.

S 225 0

181 TIGAON YWS CIRCLE

FARIDABAD

Repairing 5 no. new stone studs to protect village abadi

and its agricultre land of village Rajpur Dungarpur and

rainy well tubewell of Rajupr Dungarpur river complex

after flood 2019

S 80 0

Total 305 0

182 BALABGARH YWS CIRCLE

FARIDABAD

Reconstruction of central mechanical workshop at

ballabgarh in W.S. Mech. Sub Divn. Faridabad

M 75 37.5

183 FARIDABAD YWS CIRCLE

FARIDABAD

Bolero camper 5 seater cabin mahendra. M 7.5 3.75

184 PRITHLA YWS CIRCLE

FARIDABAD

Re-construcion of 1 no. Bridge at RD 220000 of Gaunchi

Main Drain

M 114.9 54.9

Total 197.4 96.15

District Total (S+M+L) 502.4 96.15

185 GURGAON YWS CIRCLE

FARIDABAD

Diesel truck- 7.8 ton payload with 17 ft length full frame

chasis (Eicher make), quantity-1(for Gurgaon )

M 16 8

Total 16 8

District Total (S+M+L) 16 8

186 NUH YWS CIRCLE

FARIDABAD

Flood agenda for internal clearance of silt and slush of

outfall channel RD.122200 of Gurgaon Canal at RD.0-

32250

S 9.3 0

187 NUH YWS CIRCLE

FARIDABAD

Flood agenda for internal clearance of silt and slush of

outfall channel RD.146200 of Gurgaon Canal at RD.0-

18725

S 15.63 0

188 NUH YWS CIRCLE

FARIDABAD

Flood agenda for Internal clearance of silt of outfall

channel RD.90000 of Gurgaon Canal from RD.0-19000.

S 54.15 0

189 NUH YWS CIRCLE

FARIDABAD

Flood agenda for bringing design section of Landwa

Nallah from RD 0 to 26956 ft. (8216 Mtr.).

S 88 0

190 PUNHANA YWS CIRCLE

FARIDABAD

Flood agenda for providing side slope pitching from RD

4650 to 6650 of Hinganpur Link Drain

S 25.63 0

191 PUNHANA YWS CIRCLE

FARIDABAD

Flood Agenda for Internal clearance of New Kot Drain

from RD.0-64964.

S 51.65 0

Total 244.36 0

51.65 0

244.36 0

54.15 0

88 0

25.63 0

Dist:- MEWAT9.3 0

15.63 0

8 0

8 0

8 0

101.25 0

406.25 0

Dist:- GURGAON

37.5 0

3.75 0

60 0

225 0

80 0

305 0

5448.59 62

YWS(S)Dist:- FARIDABAD

67 0

67 0

2983 0

20.34 0

2916 0

64

Page 68: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Sr.

No

Name of

Constituency

Name of

Irrigation

Circle

Name of Work Short

Medium,

Long

Term,(S/M

/L)

Est. Cost

2021-22

Annexure 4.2

Head:Flood Protection Works

(Rs. in lacs)

Requriments of funds

2020-21 2022-23

Districtwise Details of New Proposed Flood Schemes for 51st Meeting of HSDR&FCB

192 FIROZEPUR

JHIRKA

YWS CIRCLE

FARIDABAD

Flood agenda for replacement of V.R. Bridge at RD.

2400 of F.P. Jhirka Link Drain

M 34 17

193 NUH YWS CIRCLE

FARIDABAD

Electrical Pumping set 3 cusec discharge with 20 HP

motors along with panel Kirloskar make quantity-10 for

Distt Nuh

M 16 8

194 NUH YWS CIRCLE

FARIDABAD

Flood Agenda for Reconstruction of V.R. Bridge at RD.

18300 of Nuh Drain from village Ujina to Terakpur

M 167.23 67.23

195 PUNHANA YWS CIRCLE

FARIDABAD

Flood Agenda for replacement of V.R. Bridge at RD.1350

of North Possar Drain.

M 34 17

196 PUNHANA YWS CIRCLE

FARIDABAD

Flood Agenda for replacement of V.R. Bridges at

RD.1826 and RD.4181 of Maryaka Drain

M 68 34

197 PUNHANA YWS CIRCLE

FARIDABAD

Flood Agenda for re-construction of V.R Bridge at Km

33.70 (from village Leherwari to Khera) of Ujina Diversion

Drain in Distt. Nuh (Mewat).

M 177.41 77.41

Total 496.64 220.64

District Total (S+M+L) 741 220.64

198 HODAL YWS CIRCLE

FARIDABAD

Bringing Design section of Ujina Diversion Drain from KM

6.76 to 18.00

M 150 75

199 HODAL YWS CIRCLE

FARIDABAD

Agenda for replacement of V.R.Bridge at KM 7.158 from

Vilage Khirbi to Hathana of U.D.D.

M 375 175

200 PALWAL YWS CIRCLE

FARIDABAD

Agenda for Constructing Pucca Hump at RD 152000 of

Gaunchi Main Drain.

M 138.29 48.29

Total 663.29 298.29

District Total (S+M+L) 663.29 298.29

201 GANAUR YWS CIRCLE

SONEPAT

Providing Protection to Bega Complex by constructing 4

No. new stone studs on River Yamuna after flood 2019

in district Sonipat.

S 80 0

202 RAI YWS CIRCLE

SONEPAT

Providing protection at Tikola Complex by constructing 1

No. New stone stud and 350 ft revetment and repairing of

04 No. stone stud on River Yamuna after flood 2019 in

District Sonipat.

S 75 0

203 RAI YWS CIRCLE

SONEPAT

Providing protection at Mimarpur Complex by Repairing

of 02 No. stone stud on River Yamuna after flood 2019 in

District Sonipat.

S 14 0

Total 169 0

District Total (S+M+L) 169 0

Unit Total 2091.69 623.08

Grand Total 19830.57 5806.25

169 0

1468.61 0

13133.43 890.9

75 0

14 0

169 0

365 0

Dist:- SONIPAT80 0

200 0

90 0

365 0

520.36 0

Dist:- PALWAL75 0

34 0

100 0

276 0

8 0

100 0

17 0

17 0

65

Page 69: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Name of

Constituenc

y

Name of Irrigation

Circle

Name of Work Appvd.

in

meeting

of

HSFCB

(S/M/L) Est. Cost Phy.

Prog.

AMBALA

CITY

SYL CIRCLE

AMBALA

Rehabilitation and up gradation of Pump

House at RD 0 of Mahesh Nagar Drain to

protect the abadi of Ambala Cantt , villages

Boh, Babyal and Dalip Ghar etc. from River

Tangri

47th S 230.40 100 %

AMBALA

CANTT.

SYL CIRCLE

AMBALA

Upgradation of existing pump house at Babyal

by providing 2No. VT Pumps of 50 Cuces each

for the protection of village abadi of Boh,

Babyal and Dalipgarh of Ambala Cantt

48th S 260.00 100 %

AMBALA

CITY

SYL CIRCLE

AMBALA

Scheme for strengthening of Ghaggar bund by

laying stone pitching over crated stone toe wall

in reach rd 45620 to 47240 D/S inlet to protect

abadi of village Devi Nagar/Ambala City from

river Ghaggar (Near Drain Portion)

49th S 120.83 100 %

AMBALA

CITY

SYL CIRCLE

AMBALA

Scheme for purchase of 1 No. Hydraulic

Excavator (Long Boom) Model EX-200 LC

Super fitted with Super long front END

attachment and standard kit for use in SYL

W.S. Division Ambala

49th S 54.90 100 %

MULLANA SYL CIRCLE

AMBALA

Constructing stone steining for the protection

of Abadi of village Kakkarkunda from River

Markanda

50th S 23.24 100 %

MULLANA SYL CIRCLE

AMBALA

Constructing stone steining for the protection

of Abadi and agriculture land of village

Rolanhari from River Markanda

50th S 11.91 100 %

NARAINGAR

H

SYL CIRCLE

AMBALA

Constructing stone steining for the protection

of Abadi of Durga Colony in Kala –Amb from

river Markanda

50th S 28.24 100 %

NARAINGAR

H

SYL CIRCLE

AMBALA

Constructing stone steining for the protection

of agriculture land of village Pullewala from

River Begna

50th S 20.00 100 %

NARAINGAR

H

SYL CIRCLE

AMBALA

Constructing stone stud for the protection of

agriculture land of village Ambli from River

markanda

50th S 42.91 100 %

NARAINGAR

H

SYL CIRCLE

AMBALA

Constructing stone steining for the protection of

abadi of village Ramabagh Colony in Kala-Amb

from river Markanda

50th S 50.00 100 %

NARAINGAR

H

SYL CIRCLE

AMBALA

Repair and replenishing old stone steining for

the protection of abadi of village Kala-Amb

from river Markanda

50th S 30.00 100 %

NARAINGAR

H

SYL CIRCLE

AMBALA

Repair and replenishing old stone steining for

the protection of abadi of village Jiriwala from

Sakroon Nadi

50th S 18.21 100 %

NARAINGAR

H

SYL CIRCLE

AMBALA

Constructing stone steining for the protection of

Shamshanghat and agriculture land of village

Nasrouli from Dhanana Chowe

50th S 18.11 100 %

NARAINGAR

H

SYL CIRCLE

AMBALA

Constructing stone steining for the protection of

Dera on Ganda Nallah

50th S 7.20 100 %

AMBALA

CANTT.

SYL CIRCLE

AMBALA

Scheme for constructing cause way on field

road from village Ghasitpur to village Dukheri

in District Ambala

49th M 90.00 100 %

District Total 1005.95

FATEHABAD

14 Completed

15 Completed

12 Completed

13 Completed

10 Completed

11 Completed

8 Completed

9 Completed

6 Completed

7 Completed

4 Completed

5 Completed

2 Completed

3 Completed

AMBALA

1 Completed

BWS

Annexure 5.1

Head:Flood Protection Works

Status: Completed,

(Rs. in lacs)

Sr.

No

Status

Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

66

Page 70: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Name of

Constituenc

y

Name of Irrigation

Circle

Name of Work Appvd.

in

meeting

of

HSFCB

(S/M/L) Est. Cost Phy.

Prog.

Annexure 5.1

Head:Flood Protection Works

Status: Completed,

(Rs. in lacs)

Sr.

No

Status

Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

TOHANA BWS CIRCLE

FATEHABAD

Providing protection to X-ing River Ghaggar

Syphon RD 64050 Bhakra Main Branch

49th S 111.86 100 %

TOHANA BWS CIRCLE

FATEHABAD

Constructing protection wall and pitching on

side slope to provide protection to the bank of

Rangoi Nallah at RD 9.35 Km (Construct on

one side first)

49th M 38.84 100 %

TOHANA BWS CIRCLE

FATEHABAD

Constricting 10 Nos Outlet/inlet at various sites

of Rangoi Nallah

49th M 35.06 100 %

TOHANA BWS CIRCLE

FATEHABAD

Agenda note for constructing pipeline drains for

dewatering of floodwater of village Shakkerpura

falling into Rangoi Nallah at RD 7.25 Km Right

side

50th M 19.14 100 %

TOHANA BWS CIRCLE

FATEHABAD

Agenda note for constructing pipeline drains for

de-watering of floodwater of village Talwara

outfalling into River Ghaggar U/S Bridge at

Jakhal - Kullan Road

50th M 12.64 100 %

District Total 217.54

NARNAUND BWS CIRCLE

HISAR

Laying of pipe line and installation of

submersible pump set with solar system in

village Singhwa behind sugar mill. (Issue MOU

in similar cases)

49th S 208.00 100 %

HANSI BWS CIRCLE

HISAR

Protection of Hansi Drain by providing pitching

U/S and D/S of bridges and minor at various

points.

49th S 17.05 100 %

HANSI BWS CIRCLE

HISAR

Bring to design section of HMPC Drain (RD 0

to 38320)

50th S 45.00 100 %

NARNAUND BWS CIRCLE

HISAR

Bring to design section of BMPC Drain (RD 0

to 155580)...

50th S 137.00 100 %

NARNAUND BWS CIRCLE

HISAR

Bring to design section of Puthi Mundhal Link

Drain (RD 0 to 60000).

50th S 32.00 100 %

ADAMPUR BWS CIRCLE

HISAR

Providing protection and restoration of capacity

of Hisar Ghggar Multipurpose channel (Drain)

from RD 205230 to 269650 (Supplementary

Scheme).

50th M 80.25 100 %

District Total 519.30

GUHLA BWS CIRCLE

KAITHAL

Scheme for constructing inlet at RD 100700 of

Ghaggar Bund to drain out the flood water of

village namely Channa Jattan, Seon Majra,

Duserpur and Bhatian.

50th S 21.08 100 %

KAITHAL BWS CIRCLE

KAITHAL

Scheme for replacement of pipe type bridge

into slab type bridge at RD 1936 of Old Manas

Link Drain leading from village Qutabpur to

Bhanpura.

50th S 5.30 100 %

KAITHAL BWS CIRCLE

KAITHAL

Scheme for re-construction of bridge at RD

15750 on Mago Majri Link Drain leading from

village Sirta to Kaithal.

50th S 12.50 100 %

District Total 38.88

PEHOWA SYL CIRCLE

AMBALA

SCHEME FOR CONSTRUCTION OF

HUMP/FALL AT RD 300/200 OF JAKHWALA

DRAIN TO PROTECT THE AGRICULTURE

LAND OF VILLAGE JAKHWALA, TEOKAR,

TANGOLI, PUNJAB AREA ETC

49th S 15.00 100 %

PEHOWA SYL CIRCLE

AMBALA

Scheme for construction of V.R. Bridge at RD

13022 Sandholi Drain on Pehowa to Dera

Fateh Singh Road.

50th S 50.60 100 %

30 Completed

31 Completed

KURUKSHETRA

28 Completed

29 Completed

KAITHAL

27 Completed

26 Completed

24 Completed

25 Completed

22 Completed

23 Completed

HISAR

21 Completed

20 Completed

18 Completed

19 Completed

16 Completed

17 Completed

67

Page 71: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Name of

Constituenc

y

Name of Irrigation

Circle

Name of Work Appvd.

in

meeting

of

HSFCB

(S/M/L) Est. Cost Phy.

Prog.

Annexure 5.1

Head:Flood Protection Works

Status: Completed,

(Rs. in lacs)

Sr.

No

Status

Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

PEHOWA SYL CIRCLE

AMBALA

Scheme for construction of V.R. Bridge at RD

15300 Sandholi Drain on Pehowa to Pooja

Colony Road.

50th S 43.17 100 %

THANESAR SYL CIRCLE

AMBALA

Procurement of 1 No. Eicher Truck Tempo

Model 1110 XP

50th S 18.77 100 %

THANESAR SYL CIRCLE

AMBALA

Construction of sumpwell at RD 87000 of Sirsa

Branch upstream at Budhera Complex.

50th S 5.00 100 %

District Total 132.54

PANCHKUL

A

SYL CIRCLE

AMBALA

Purchase of 2 no. Diesel driven Pump Set of 2

Cs capacity for W/S Sub Dn Panchkula

48th S 5.44 100 %

PANCHKUL

A

SYL CIRCLE

AMBALA

Scheme for constructing 232 ft three tier

steining for the protection of village Shamshan

Ghat and Bataur Bundh of village Bataur from

river Tangri after flood 2018

50th S 20.92 100 %

KALKA SYL CIRCLE

AMBALA

Scheme for constructing 448 ft three tier

steining for the protection of village abadi of

village Natwal from river Tangri after flood 2018

50th S 40.32 100 %

PANCHKUL

A

SYL CIRCLE

AMBALA

Scheme for constructing 248 ft double tier

steining, for the protection of village abadi of

village Nada from Nada Choe tributary of river

Ghaggar after flood 2018

50th S 12.47 100 %

PANCHKUL

A

SYL CIRCLE

AMBALA

Scheme for constructing 448 feet double tier

steining for the protection of abadi area of

village Manakyan from River Manakyan wali

nadi tributary of river Ghaggar after flood 2018

50th S 20.00 100 %

PANCHKUL

A

SYL CIRCLE

AMBALA

Scheme for constructing 568 feet three tier

steining for the protection of Rehod Bundh and

agriculture land of village Rehod from River

Tangri after flood 2018

50th S 45.00 100 %

KALKA SYL CIRCLE

AMBALA

Scheme for constructing 512 feet double tier

steining for the protection of Government

school of village Mandalya from River Begna

after flood 2018

50th S 25.62 100 %

KALKA SYL CIRCLE

AMBALA

Scheme for constructing 536 feet three tier

steining for the protection of village abadi of

village Mirpur from Mirpur Wali Nadi tributary of

River Tangri after flood 2018

50th S 60.88 100 %

KALKA SYL CIRCLE

AMBALA

Scheme for constructing 4 No. bed bars and

repair of damaged Ishar Nagar Drain to protect

abadi and road of village Ishar Nagar and

Himshikha from Ishar Nagar Drain and

Kaushalya River after flood 2018

50th S 60.47 100 %

KALKA SYL CIRCLE

AMBALA

Scheme for constructing 464 feet (296 plus

168) double tier steining for the protection of

village abadi of village Paploha from River

Baadgodam, tributary of River Sarsa after flood

2018

50th S 23.30 100 %

KALKA SYL CIRCLE

AMBALA

Scheme for constructing 576 feet (328 plus

248) three tier steining for the protection of

abadi of village Rampur Seori from River

Jhajjra after flood 2018

50th S 51.83 100 %

KALKA SYL CIRCLE

AMBALA

Double tier steining for the protection of village

of village Jholuwal from Sirsa River after flood

2018 (Supplementry Scheme).

50th S 17.00 100 %46 Completed

44 Completed

45 Completed

42 Completed

43 Completed

40 Completed

41 Completed

38 Completed

39 Completed

36 Completed

37 Completed

PANCHKULA

35 Completed

34 Completed

32 Completed

33 Completed

68

Page 72: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Name of

Constituenc

y

Name of Irrigation

Circle

Name of Work Appvd.

in

meeting

of

HSFCB

(S/M/L) Est. Cost Phy.

Prog.

Annexure 5.1

Head:Flood Protection Works

Status: Completed,

(Rs. in lacs)

Sr.

No

Status

Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

KALKA SYL CIRCLE

AMBALA

Three tier steining for the protection of village

abadi of village Madhanwala from River

Madhanwali after flood 2018 (Supplementry

Scheme).

50th S 23.00 100 %

District Total 406.25

ELLENABAD BWS CIRCLE

SIRSA

Internal clearance of Hisar-Ghaggar

Multipurpose Drain from RD. 0-141000

50th S 26.80 100 %

ELLENABAD BWS CIRCLE

SIRSA

Bringing to design section and unloading of

Bank of Hisar-Ghaggar Multipurpose Drain

from RD. 111000-127000.

50th S 14.54 100 %

KALANWALI BWS CIRCLE

SIRSA

Agenda Note for Internal clearance of Rori

Ghaggar Drain from RD 100000 to 130750-Tail

and its subsidiary Drains

50th S 9.45 100 %

District Total 50.79

Unit Total 2371.25

GURGAON CONSTRUCTION

CIRCLE GURGAON

Procurement of Earth Moving Machine for

internal clearance of Drains (Supplementary

Agenda).

49th S 60.00 100 %

District Total 60.00

NILOKHERI SARASWATI

HERITAGE CIRCLE

KURUKSHETRA

Construction of sumpwell and pumphouse at

tail R.D116400 of Rakshinadi out falling into

Sirsa branch.

50th S 34.90 100%

District Total 34.90

PEHOWA SARASWATI

HERITAGE CIRCLE

KURUKSHETRA

Construction of inlet at RD 116200 of Saraswati

Drain for protection of abadi of villages:

Bilochpura, Dhanipura, Urnai, Sainsa and

Saraswati Khera etc.

50th S 19.02 100 %

District Total 19.02

GARHI

SAMPLA -

KALOI

YWS CIRCLE

ROHTAK

Reconstruction of 01 no. V.R. Bridge at RD

56044 on drain no. 8

49th M 153.19 100 %

MEHAM YWS CIRCLE

ROHTAK

Reconstruction of 01 no. V.R bridge at RD

100000 on drain no. 8

49th M 133.18 100 %

District Total 286.37

Unit Total 400.29

BHIWANI LWS CIRCLE

BHIWANI

Agenda note for procurement of new earth

moving machine for internal clearance of drains

and banks strengthening of canal and drain

(Supplementary Agenda).

49th S 60.00 100 %

DADRI LWS CIRCLE

BHIWANI

Increasing capacity of Jai Shree Drain from RD

0 to13500 outfalling at RD 89000-R Loharu

Feeder.

42th M 484.05 100 %

District Total 544.05

Charkhi Dadri

56 Completed

57 Completed

LCU

BHIWANI

54 Completed

55 Completed

ROHTAK

KURUKSHETRA

53 Completed

52 Completed

KARNAL

GURGAON

51 Completed

CONSTRUCTION

50 Completed

48 Completed

49 Completed

SIRSA

47 Completed

69

Page 73: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Name of

Constituenc

y

Name of Irrigation

Circle

Name of Work Appvd.

in

meeting

of

HSFCB

(S/M/L) Est. Cost Phy.

Prog.

Annexure 5.1

Head:Flood Protection Works

Status: Completed,

(Rs. in lacs)

Sr.

No

Status

Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

DADRI LWS CIRCLE

BHIWANI

Increasing Capacity of Bond Drain and Brick

Pitching on one sides from RD 12000 to 20435

Bond Drain outfall at RD 6000-R of Bond Disty.

50th S 250.00 100 %

DADRI LWS CIRCLE

BHIWANI

Laying Underground Pipe Line in Jai Shree

Link Drain from RD 0 to 8200 outfall at RD

12700-L of Jai Shree Drain.

50th S 231.00 100 %

DADRI LWS CIRCLE

BHIWANI

Increasing Capacity of Nimri Malkosh Link

Drain from RD 0 to 12244 outfall at RD 2350-R

of Bond Drain.

50th S 137.00 100 %

DADRI LWS CIRCLE

BHIWANI

Procurement of New Earth moving machine for

Internal clearance of drain and bank

strengthening of Canal and drains in LWS

circle Bhiwani specially for District Ch. Dadri

50th S 25.60 100 %

DADRI LWS CIRCLE

BHIWANI

Agenda Note for Purchase of Vechicle for flood

Dewatering work.

50th S 17.85 100 %

DADRI LWS CIRCLE

BHIWANI

Agenda Note for Purchase of 10 Cs. V.T.

Pumps for flood Dewatering.

50th S 115.00 100 %

DADRI LWS CIRCLE

BHIWANI

Procurement of 4 No. 10 cs. Vertical pumps

alongwith motors of 50 HP, starters and 20 No.

EP sets of 3 cs. Capacity (Ex-Post Facto

approval)

50th S 72.50 100 %

District Total 848.95

JHAJJAR JWS CIRCLE

JHAJJAR

Agenda note for procurement of new earth

moving machine for internal clearance of

drains and bank strengthening of Canal and

Drain.

49th S 180.00 100 %

BERI JWS CIRCLE

JHAJJAR

Agenda note for constructing Pump House

Beldar Hut and purchasing new Pumps Motors,

Control Panel and allied accessories at RD 216-

R of JLN Feeder.

49th S 62.50 100 %

BERI JWS CIRCLE

JHAJJAR

Agenda note for Proposed pipe line to dewater

pond of village Dujana from RD 0 to 2200

outfalling into Beri Dujana Dhaur link drain at

RD 38025

50th S 9.31 100 %

JHAJJAR JWS CIRCLE

JHAJJAR

Agenda note for Constructing RCC Pipe culvert

at RD 290550-R of Ditch Drain R/side of JLN

Feeder

50th S 15.00 100 %

JHAJJAR JWS CIRCLE

JHAJJAR

Agenda note for providing Geo Membrane to

control sloughing in Matanhail Pump House

link drain along with slope of ramp of VR Bridge

RD 297000-R of JLN feeder.

50th S 20.14 100 %

JHAJJAR JWS CIRCLE

JHAJJAR

Agenda note for dewatering of flood water by

reversible bore wells in village Kondrawali (on

sample basis).

50th S 8.74 100 %

BERI JWS CIRCLE

JHAJJAR

Agenda note for Dewatering of flood water by

reversible bore-wells of village Dighal.

50th S 8.74 100 %

JHAJJAR JWS CIRCLE

JHAJJAR

Procurement of HDPE pipeline 200 mm dia and

160 mm dia in W.S Mech. Divn. Jhajhar (Ex-

Post Facto approval).

50th S 32.00 100 %

District Total 336.43

NANGAL

CHOUDHRY

JLN WS CIRCLE

NARNAUL

Constructing of Waste weir/spillway at Totaheri

Bund on Krishnwati River.

48th S 312.47 100 %

MAHENDRAGARH

73 Completed

72 Completed

70 Completed

71 Completed

68 Completed

69 Completed

66 Completed

67 Completed

JHAJJAR

65 Completed

64 Completed

62 Completed

63 Completed

60 Completed

61 Completed

58 Completed

59 Completed

70

Page 74: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Name of

Constituenc

y

Name of Irrigation

Circle

Name of Work Appvd.

in

meeting

of

HSFCB

(S/M/L) Est. Cost Phy.

Prog.

Annexure 5.1

Head:Flood Protection Works

Status: Completed,

(Rs. in lacs)

Sr.

No

Status

Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

NARNAUL JLN WS CIRCLE

NARNAUL

Agenda note for procurement of new earth

moving machine for internal clearance of drains

and banks strengthening of canal and drain

(Supplementary Agenda).

49th S 30.00 100 %

District Total 342.47

REWARI JLN WS CIRCLE

REWARI

Agenda note for procurement of new earth

moving machine for internal clearance of drains

and banks strengthening of canal and drain

(supplementary Agenda)

49th S 60.00 100 %

District Total 60.00

MEHAM YWS CIRCLE

ROHTAK

Constructing Bharan Sub Link Drain from RD 0

to 2150 outfall at RD 5800-L Ajaib Bharan Link

Drain.

48th S 28.60 100 %

BERI YWS CIRCLE

ROHTAK

Construction of Link Drain from Kharhar to

village Mandothi side drain.

48th S 174.74 100 %

MEHAM YWS CIRCLE

ROHTAK

Constructing Pump House at RD 122000/R

Meham Drain.

48th S 16.00 100 %

MEHAM YWS CIRCLE

ROHTAK

Brick Pitching of Bahu Akbarpur Link Drain

from RD 3750 to 4850 and inlet of Lakhan

Majra Link Drain at RD 29750.

49th S 18.20 100 %

KALANAUR YWS CIRCLE

ROHTAK

Laying underground PVC pipeline at village

pond Kateshra to Pilana Minor RD 10700-R

(Supplementary Scheme)

50th S 38.00 100 %

KALANAUR YWS CIRCLE

ROHTAK

Procurement of PVC pipeline of 8 inch dia to

drain out flood water from the fields of village

Gudhan and Katesra (Ex-Post Facto approval ).

50th S 29.60 100 %

MEHAM YWS CIRCLE

ROHTAK

Agenda note for constructing vertical wall on

left side in south Behlaba Drain From RD 1110

to 1810.

49th M 31.30 100 %

ROHTAK YWS CIRCLE

ROHTAK

Agenda note for Procurement of New V.T

Pumps for flood protection works in W.S.

Mech. Division, Rohtak.

49th M 99.00 100 %

GOHANA YWS CIRCLE

ROHTAK

Agenda note for construction of Civil structure

(pump house) and procurement of New Pumps

for flood protection works at Banwasa Pump

House RD 46000-R Chhapra Drain village

Banwasa in W.S. Mech. Division, Rohtak.

49th M 104.00 100 %

ROHTAK YWS CIRCLE

ROHTAK

Agenda note for procurement of New Pumps

for flood protection works at nine number of

Newly constructed pump houses at RD 46000-

L Meham Drain, RD 46000-R Meham Drain,

RD 47900-L Meham Drain, RD 47900-R

Meham Drain, 62000-L Meham Drain, RD

63000-R Meham Drain RD 86000-R Meham

Drain, RD 94000-R B.S.B. and RD 43000

Kahanaur Disty. in W.S. Mech. Division,

Rohtak.

49th M 332.00 100 %

ROHTAK YWS CIRCLE

ROHTAK

Agenda Note for Replacement of V.R. Bridge

at RD 31200 of Jassia Drain.

50th M 19.00 100 %86 Completed

84 Completed

85 Completed

82 Completed

83 Completed

80 Completed

81 Completed

78 Completed

79 Completed

76 Completed

77 Completed

ROHTAK

REWARI

75 Completed

74 Completed

71

Page 75: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Name of

Constituenc

y

Name of Irrigation

Circle

Name of Work Appvd.

in

meeting

of

HSFCB

(S/M/L) Est. Cost Phy.

Prog.

Annexure 5.1

Head:Flood Protection Works

Status: Completed,

(Rs. in lacs)

Sr.

No

Status

Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

ROHTAK YWS CIRCLE

ROHTAK

Agenda note for providing and laying

interlocking tiles from RD 105260 to 107200

BSB and from RD 107200 BSB to Meham

Drain Pump House RD 73000-Left Side on

service road.

50th M 32.14 100 %

District Total 922.58

BARODA YWS CIRCLE

ROHTAK

Agenda note for constructing vertical walls

Chhapra drain from RD 46000 to 48500 both

sides.

49th M 115.44 100 %

BARODA YWS CIRCLE

ROHTAK

Agenda note for reconstruction of V.R. Bridges

at RD 4670 and 7130 Wazirpur Khandrai link

drain.

49th M 41.35 100 %

District Total 156.79

Unit Total 3211.27

KARNAL WORKSHOP

CIRCLE KARNAL

Procuring 10 no. V.T. Pumps (5 cs. capacity

each) for Kurukshetra District for dewatering.

(43rd). (45th)

45th S 80.00 100 %

JIND WORKSHOP

CIRCLE KARNAL

Replacement/Renovation of V.T Pumps 48th M 233.75 100 %

District Total 313.75

Unit Total 313.75

TOSHAM YWS CIRCLE

BHIWANI

20 No. TV-2 DP set 14 HP to 16 HP, 20 no.

Submersible Pump set 20 HP8 stage, 10 no.

V.T Pump 5 Cs discharge with motor of column

height 10` and 2 no. Bolero Camper (5 seater

cabin).

48th S 107.00 100 %

District Total 107.00

SAFIDON YWS CIRCLE JIND Brick Pitching in side slope and Bed in Head

Reach RD 128000 to RD 129000 and U/S and

D/s of railway x-ing from RD 118100 to RD

119100 and Berm Cutting from RD 116000 to

RD 128000 including construction of cattle ghat

at RD 128800 of Nai Nallah Drain/ Indri Drain

48th S 275.43 100 %

JULANA YWS CIRCLE JIND Increasing capacity of Lizwana Pauli Drain from

RD 0 to 10000 including extension from RD

24800 to 26800 outfalling at RD 42000/R

Bhiwani Sub Branch (Through Lift System)

49th S 345.00 100 %

JULANA YWS CIRCLE JIND Agenda note for Padana Kalwa-Kinana Link

Drain from RD 0 to 14700 out falling at RD

81000/R Sunder Sub Branch(Through Lift

System).

49th S 272.00 100 %

JULANA YWS CIRCLE JIND Bringing to design section of Nandgarh

Sirsakheri Drain from RD 0 to RD 9600 falling

at RD 18750/R Quilazafargarh Minor.

49th S 45.31 100 %

SAFIDON YWS CIRCLE JIND Agenda for bringing to Design Section Hadwa

Gangoli Link Drain from RD 0 to RD 36600

including Re-Construction of One No. Bridge

50th S 51.89 100 %

96 Completed

97 Completed

94 Completed

95 Completed

JIND

93 Completed

92 Completed

YWS(N)

BHIWANI

90 Completed

91 Completed

PROJECT, ENVIRONMENT AND

MATERIALKARNAL

88 Completed

89 Completed

SONIPAT

87 Completed

72

Page 76: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Name of

Constituenc

y

Name of Irrigation

Circle

Name of Work Appvd.

in

meeting

of

HSFCB

(S/M/L) Est. Cost Phy.

Prog.

Annexure 5.1

Head:Flood Protection Works

Status: Completed,

(Rs. in lacs)

Sr.

No

Status

Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

SAFIDON YWS CIRCLE JIND Agenda for Construction of Permanent Pump

House (Sump Well Only) at RD 4500/L

Bhirtana Link Drain

50th S 7.00 100 %

JULANA YWS CIRCLE JIND Agenda for increasing capacity of Kalwa

Kinana Drain RD 0 to RD 19000 from 125 cs to

150 cs lifting at RD 81000/R Sunder Sub

Branch

50th M 51.00 100 %

JULANA YWS CIRCLE JIND Agenda for Providing Brick Pitching in reach

RD 43250 to RD 43850 Kalwa Kinana Drain

lifting at RD 81000/R Sunder Sub Branch.

50th M 50.44 100 %

District Total 1098.07

NILOKHERI YWS CIRCLE

KARNAL

Replacement of existing pipe culvert at RD

35830 and 52050 and desilting from RD 51150

to RD 53150 including replacement of outlet at

outfall point on Balu Link Drain

49th S 92.60 100 %

ASSANDH YWS CIRCLE

KARNAL

Replacement of VR Bridge at RD 78600 Indri

Drain

49th S 100.95 100 %

ASSANDH YWS CIRCLE

KARNAL

Replacement of VR Brdige at RD 39600 Indri

Drain

49th S 167.28 100 %

ASSANDH YWS CIRCLE

KARNAL

Remodeling of Nai Nallah Drain Near Village

Padha by providing earthen banks with pitching

towards Panch Dev Tirth for maintaining the

Sancity of Panch Dev Tirth

49th S 37.01 100 %

ASSANDH YWS CIRCLE

KARNAL

Construction of permanent pump house on

Bhakra Main Line Hansi Butana Canal Near

Karnal Assandh Road for disposal of Flood

Water of Village Uplana, Thari, Chorkarsa,

Daachar for the year of 2018-19.

49th S 77.35 100 %

ASSANDH YWS CIRCLE

KARNAL

Replacement of V.R. Bridge at RD 11010 of

Sheikhupura Manchuri Drain.

49th S 19.77 100 %

INDRI YWS CIRCLE

KARNAL

Agenda for the work of providing protection to

Kalsora Complex by repairing 8 No. old

damaged stone stud and constructing 610’

stone revetment on river Yamuna after flood

2018

50th S 160.59 100 %

INDRI YWS CIRCLE

KARNAL

Agenda for the work of providing protection to

Nabiabad Complex by repairing 3 No.

damaged stone studs on river Yamuna after

flood 2018

50th S 19.86 100 %

GHARAUND

A

YWS CIRCLE

KARNAL

Agenda for the work of providing protection to

Jammukhala Complex by constructing 465’

stone revetment, 1 No. new stone stud and

repairing of 4 No. stone studs on river Yamuna

after flood 2018

50th S 155.10 100 %

GHARAUND

A

YWS CIRCLE

KARNAL

Agenda for the work of providing protection to

Mustfabad Complex by constructing 726’

stone revetment and repairing of 6 No. stone

stud on river Yamuna after flood 2018

50th S 291.41 100 %

ASSANDH YWS CIRCLE

KARNAL

Replacement of VR Bridge at RD 0 of Assandh

Bund Drain.

49th M 24.12 100 %

NILOKHERI YWS CIRCLE

KARNAL

Replacement Of Existing Pipe Culverts At RD

33530 and RD 45050 Of Balu Link Drain

50th M 35.64 100 %

District Total 1181.68

PANIPAT

112 Completed

110 Completed

111 Completed

108 Completed

109 Completed

106 Completed

107 Completed

104 Completed

105 Completed

102 Completed

103 Completed

KARNAL

101 Completed

100 Completed

98 Completed

99 Completed

73

Page 77: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Name of

Constituenc

y

Name of Irrigation

Circle

Name of Work Appvd.

in

meeting

of

HSFCB

(S/M/L) Est. Cost Phy.

Prog.

Annexure 5.1

Head:Flood Protection Works

Status: Completed,

(Rs. in lacs)

Sr.

No

Status

Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

ISRANA YWS CIRCLE

KARNAL

Protection against errosion of agriculture land

of Dadlana village from flood and waste water

flowing in Munak Drain by providing lining from

RD 27360 to 28950.

48th S 39.04 100 %

SAMALKHA YWS CIRCLE

KARNAL

Protection of village pond, land and Abadi of

village Balana and Mandi from flood and waste

chemical water flowing in Try. Drain no.4 by

providing lining in drain in concerened villages

48th S 149.89 100 %

ISRANA YWS CIRCLE

KARNAL

Protection of village pond, land and Abadi of

village Shodhapur from flood and waste water

flowing in Nohra Drain by providing lining in

village

48th S 145.61 100 %

PANIPAT

RURAL

YWS CIRCLE

KARNAL

Replacement/construction of Bridges at RD

134800 and 72500 on Main drain No. 2

49th S 424.06 100 %

ISRANA YWS CIRCLE

KARNAL

Replacement of Bridges at RD 18156 and

28270 on Thirana Drain

49th S 44.03 100 %

ISRANA YWS CIRCLE

KARNAL

Replacement of Bridges at RD 25300, 42320

and 52450 on Try. Drain No. 2.

49th S 79.10 100 %

ISRANA YWS CIRCLE

KARNAL

Replacing of VR Bridge at RD 21650, 47133

and 48200 on Joshi Drain

49th S 92.06 100 %

ISRANA YWS CIRCLE

KARNAL

Protection of village pond, land and abadi of

village Waiser from flood and waste

contaminated water flowing in Try. Drain No. 1

by providing lining from RD 39700 to 36200

(Water sample be taken before and after

execution of scheme).

49th S 176.96 100 %

SAMALKHA YWS CIRCLE

KARNAL

Replacement/construction of Bridges at RD

3035, 8830 and 68280 on Panipat Drain

49th S 118.64 100 %

SAMALKHA YWS CIRCLE

KARNAL

Providing protection to Tamsabad complex by

repairing 2 No. stone studs and construction of

486’ long revetment.

50th S 46.66 100 %

SAMALKHA YWS CIRCLE

KARNAL

Providing protection to Mirzapur complex by

repairing 3 No. stone studs and repair of

Revetment

50th S 49.97 100 %

SAMALKHA YWS CIRCLE

KARNAL

Providing protection to Nanhera Complex by

repairing 3 No. old stone studs

50th S 37.24 100 %

ISRANA YWS CIRCLE

KARNAL

Separation of village pond from flood and

waste chemical water flowing in Try. Drain No.

1 and protection to village abadi in village

Bhandari

50th M 108.32 100 %

District Total 1511.58

RADAUR HKB CIRCLE

JAGADHRI

Rehabilitation of Rakshi Nallah from RD 0 to

90000 (Supplementary Agenda)

49th S 187.00 100 %

YAMUNA

NAGAR

HKB CIRCLE

JAGADHRI

Agenda for construction of 1855 ft. stone

steining and 06 no. stone studs for the

protection of village Odri from river Yamuna.

50th S 195.00 100 %

SADHAURA HKB CIRCLE

JAGADHRI

Agenda for providing 03 Nos. Bed Bars for

protection of village Rajpur Bund from river

Pathrala.

50th S 19.91 100 %

RADAUR HKB CIRCLE

JAGADHRI

Agenda for Construction of 1730 ft. Stone

steining for the protection of village Kamalpur

from river Yamuna.

50th S 108.47 100 %

128 Completed

129 Completed

126 Completed

127 Completed

YAMUNANAGAR

124 Completed

125 Completed

122 Completed

123 Completed

120 Completed

121 Completed

118 Completed

119 Completed

116 Completed

117 Completed

114 Completed

115 Completed

113 Completed

74

Page 78: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Name of

Constituenc

y

Name of Irrigation

Circle

Name of Work Appvd.

in

meeting

of

HSFCB

(S/M/L) Est. Cost Phy.

Prog.

Annexure 5.1

Head:Flood Protection Works

Status: Completed,

(Rs. in lacs)

Sr.

No

Status

Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

RADAUR HKB CIRCLE

JAGADHRI

Agenda for Construction of 02 Nos. stone studs

and 230 ft. Stone steining for the protection of

village Ramgarh/Bagwali from river Yamuna.

50th S 60.77 100 %

RADAUR HKB CIRCLE

JAGADHRI

Agenda for construction of 6 No. stone studs

and 700 feet stone steining for protection of

village Lal Chappar from river Yamuna.

50th S 181.00 100 %

SADHAURA HKB CIRCLE

JAGADHRI

Agenda for restoration of Rampur Jattan Bund

on river Pathrala.

50th S 8.54 100 %

JAGADHRI HKB CIRCLE

JAGADHRI

Agenda for constructing 1500 ft. bund with

stone pitching for the protection of Village

Shazadwala From Chikken Khol (River

Pathrala ).

50th S 44.55 100 %

JAGADHRI HKB CIRCLE

JAGADHRI

Agenda for construction of stone steining

between studs and renovation of 02 nos. old

stone studs for the protection of Village Mali

Majra From River Yamuna.

50th S 77.43 100 %

JAGADHRI HKB CIRCLE

JAGADHRI

Agenda for construction of stone steining

between studs and renovation of 02 nos. old

stone studs for the protection of Village

Nawazpur From River Yamuna.

50th S 85.43 100 %

JAGADHRI HKB CIRCLE

JAGADHRI

Agenda for Renovation 3000` old Bund with

stone pitching for the protection of Village

Mukaravpur From Plasi Khol (River Pathrala).

50th S 77.10 100 %

RADAUR HKB CIRCLE

JAGADHRI

Agenda for providing 140 mtr. stone steining

between studs for the protection of village

Abadi of Gumthala Rao from River Yamuna

after floods 2018 in District : Yamuna Nagar.

50th S 48.87 100 %

RADAUR HKB CIRCLE

JAGADHRI

Agenda for providing 260 mtr. stone steining

for the protection of village : Sandhala and

Nagli from River Yamuna after floods 2018 in

District : Yamuna Nagar.

50th S 89.67 100 %

JAGADHRI HKB CIRCLE

JAGADHRI

Agenda for Constructing 400 ft. Stone Steining

and 01 No. new stone stud for the protection of

Village Mamdubass from River Yamuna.

50th S 30.40 100 %

YAMUNA

NAGAR

HKB CIRCLE

JAGADHRI

Agenda for construction of sump well at RD

39000 R/s MLL to Drain Out Flood Water from

Agricultural land in Village Sugh, District

Yamuna Nagar after flood 2018

50th S 9.00 100 %

RADAUR HKB CIRCLE

JAGADHRI

Agenda for providing 400 Mtr. stone pitching

for the protection of village Gadholi Khurd at

RD 7525 Left side of Chautang Nallah.

50th S 30.00 100 %

JAGADHRI HKB CIRCLE

JAGADHRI

Agenda for Renovation of 300` old Stone

Steining along with construction of 250` stone

steining for the protection of Village Baniyawala

From Chikken Khol (River Pathrala).

50th S 9.72 100 %

SADHAURA HKB CIRCLE

JAGADHRI

Agenda for providing 328 feet Stone steining

for protection of village abadi of village Nagli

from river Pathrala.

50th S 7.83 100 %

JAGADHRI HKB CIRCLE

JAGADHRI

Construction for 03 no. studs for the protection

of village Kalesar from River Yamuna.

50th S 59.02 100 %144 Completed

142 Completed

143 Completed

140 Completed

141 Completed

138 Completed

139 Completed

136 Completed

137 Completed

134 Completed

135 Completed

132 Completed

133 Completed

130 Completed

131 Completed

75

Page 79: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Name of

Constituenc

y

Name of Irrigation

Circle

Name of Work Appvd.

in

meeting

of

HSFCB

(S/M/L) Est. Cost Phy.

Prog.

Annexure 5.1

Head:Flood Protection Works

Status: Completed,

(Rs. in lacs)

Sr.

No

Status

Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

JAGADHRI HKB CIRCLE

JAGADHRI

Construction of 250 feet steining and 02 no.

stone studs for the protection of village

Baburam Bass from River Yamuna.

50th S 50.00 100 %

RADAUR HKB CIRCLE

JAGADHRI

Providing gates and gearing for X-regulation on

Bubka Head on Chauntg and Rakshi Nallah.

49th M 37.00 100 %

District Total 1416.71

Unit Total 5315.04

TIGAON YWS CIRCLE

FARIDABAD

Repairing of 7 Nos. stone studs to protect

village abadi and agricultural land of village

Dadasia/Kidawali River Complex A.F. 2018.

50th S 85.75 100 %

PRITHLA YWS CIRCLE

FARIDABAD

460 ft. edge protection to protect village abadi

and agriculture land of village Mohna R/C after

flood 2018

50th S 31.01 100 %

TIGAON YWS CIRCLE

FARIDABAD

6 no. Stone Studs to protect village Abadi and

it`s agricultural land of village chandpur R/C

A.F. 2018

50th S 137.41 100 %

District Total 254.17

PUNHANA YWS CIRCLE

FARIDABAD

Construction of X-regulator in Ujina Diversion

Drain near village Bichore (With 4 Nos. pump

houses).

47th S 600.00 100 %

HATHIN YWS CIRCLE

FARIDABAD

Extension to drain out the flood and seepage

water of Gurgaon Canal accumulated in laying

area of village Hasanpur, Kanali and Kherli-

Jeeta outfalling at RD 1300 of Existing Flood

Drain.

49th S 4.65 100 %

NUH YWS CIRCLE

FARIDABAD

Scheme for construction kaccha cunneete to

save agriculture land of vill. Devela Nangli from

water logging and outfall in Rithat Drain at RD.

6000

49th S 2.80 100 %

NUH YWS CIRCLE

FARIDABAD

Scheme for Tajpur (Ujina) earthen cunnittee

from RD. 0 to 11200 to save agriculture land

from water logging.

49th S 6.38 100 %

NUH YWS CIRCLE

FARIDABAD

Scheme for Dhenkli village earthen cunnette

from RD. 0 to 7250 to save agriculture land

from water logging.

49th S 12.64 100 %

NUH YWS CIRCLE

FARIDABAD

Scheme for Ujina village Pipe lines from RD.0

to 2905 to save agriculture land from water

logging.

49th S 7.55 100 %

District Total 634.02

HODAL YWS CIRCLE

FARIDABAD

CONSTRUCTION OF V.R. BRIDGE AT RD

105785 OF GAUNCHI MAIN DRAIN (FROM

VILLAGE KONDAL TO GHELAB).

49th S 177.51 100 %

HATHIN YWS CIRCLE

FARIDABAD

Replacement of V.R. Bridge at RD 82500 of

GMD (Village Sevali to Khatela Sarai). The

drawing for this bridge under preparation with

CDO, Panchkula.

49th S 174.96 100 %

HODAL YWS CIRCLE

FARIDABAD

Internal Clearance of GMD from RD 43300 to

229500 estimate is under observations

49th S 390.91 100 %

HODAL YWS CIRCLE

FARIDABAD

Constructing Pucca Hump at KM 7.50 of UDD

for providing Irrigation facilities in adjoining

area of village Khirbi and recharging thereof

ground water. The drawing received for

comments and re-submitted to CDO for

finalization.

49th S 155.23 100 %

158 Completed

159 Completed

156 Completed

157 Completed

PALWAL

154 Completed

155 Completed

152 Completed

153 Completed

150 Completed

151 Completed

MEWAT

148 Completed

149 Completed

FARIDABAD

147 Completed

YWS(S)

146 Completed

145 Completed

76

Page 80: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Name of

Constituenc

y

Name of Irrigation

Circle

Name of Work Appvd.

in

meeting

of

HSFCB

(S/M/L) Est. Cost Phy.

Prog.

Annexure 5.1

Head:Flood Protection Works

Status: Completed,

(Rs. in lacs)

Sr.

No

Status

Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

PALWAL YWS CIRCLE

FARIDABAD

Scheme for construction of

Stone pitching to protect village

abadi and Sidh Baba Temple of

village Kushak on right side of

village Kushak on right side of

River Yamuna after flood 2018.

49th S 12.97 100 %

District Total 911.58

SAMALKHA YWS CIRCLE

SONEPAT

Agenda for construction of Bridge at RD

157330 of main Drain No. 2

49th M 503.00 100 %

District Total 503.00

SONEPAT YWS CIRCLE

SONEPAT

Internal clearance of East Juan Drain from RD

0 to 89500 and providing pitching on sides from

RD 49000 to 52000.

49th S 141.00 100 %

SONEPAT YWS CIRCLE

SONEPAT

Providing protection at Tikola Complex by

constructing 01 No. new stone stud and 1055

feet revetment on river Yamuna A/F 2018

(Supplementary Scheme)

50th S 98.45 100 %

GOHANA YWS CIRCLE

SONEPAT

To make pucca drain in village Bhatgaon

Dongran from Purbia Dera to Bhatgaon

Malyan i.e. providing brick lining on side slope

of Bhatgaon Dongran link Drain from RD 3500

to 5000 (CM Announcement code No. 23606)

(Supplementary Scheme).

50th S 16.00 100 %

District Total 255.45

Unit Total 2558.22

Grand Total 14169.82

164 Completed

162 Completed

163 Completed

SONIPAT

PANIPAT

161 Completed

160 Completed

77

Page 81: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Name of

Constituenc

y

Name of

Irrigation

Circle

Name of Work Appvd.

in

meeting

of

HSFCB

(S/M/L) Est. Cost Expdt.

booked

during year

Phy.

Prog.

Remarks Status

NARNAUND BWS

CIRCLE

HISAR

Rehabilitation of

Narnaund Drain

(RD 0 to 19689).

50th S 121.00 0.00 100 % No work was done as per site

requirement and the scheme is

required to be dropped.

Dropped

BARWALA BWS

CIRCLE

HISAR

Laying RCC pipe

line for Kharkari

Drain from RD 0 to

5800 out-falling at

RD 18900-R,

Balsamand Branch.

49th M 96.26 0.00 0 % The scheme already dropped

as per discussed with ACS,

Irrigation and WR Deptt.

Dropped

District Total 217.26 0.00

PEHOWA SYL

CIRCLE

AMBALA

Scheme for

procurement of

PVC pipeline for

flood in District

Kurukshetra

50th S 10.00 0.00 0 % Case has already been

submitted to higher Authority

for dropping this scheme vide

this office letter no. 7004-05/21-

W dated 18/10/2019

Dropped

THANESAR SYL

CIRCLE

AMBALA

Replacement of

one No. Diesel

Welding Set 550 A

(Moveable)

50th S 1.92 0.00 0 % Case has been submitted to

higher Authority for dropping

this scheme vide this office

letter no. 7004-05/21-W dated

18/10/2019

Dropped

PEHOWA SYL

CIRCLE

AMBALA

Scheme for

remodeling of

Sandholi Drain

from RD 12000 to

RD 18000 to

safeguard the

abadi as well as

agricultural area of

village Sandholi,

Sandhola,

Asmanpur,

Pehowa etc.

50th M 125.00 0.00 0 % Technical bid submitted to

Competent authority and

Worthy CE/BWS, IandWR

Department Panchkula issued

the direction that X-section of

the drain cannot reduced and

this scheme will be dropped out

in the next meeting of HSDR

and FCB received vide SE/SYL

W/S Circle Ambala vide letter

no. 5523/81-A dated

14.05.2019 and case for

dropping this scheme sent to

the higher office vide this office

letter no. 147 dated 03.06.2019.

Dropped

BWS

Annexure 5.2

Head:Flood Protection Works

Status: Dropped,

(Rs. in lacs)

Sr.

No

2

HISAR

1

4

5

KURUKSHETRA

3

Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

78

Page 82: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Name of

Constituenc

y

Name of

Irrigation

Circle

Name of Work Appvd.

in

meeting

of

HSFCB

(S/M/L) Est. Cost Expdt.

booked

during year

Phy.

Prog.

Remarks Status

Annexure 5.2

Head:Flood Protection Works

Status: Dropped,

(Rs. in lacs)

Sr.

No

Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

PEHOWA SYL

CIRCLE

AMBALA

Scheme for

extension of

Ismailabad Link

Drain (Katcha

Drain with land

acquisition) from

RD 17230 to RD

27230 parallel to

Thaska Distributary

from RD 36000 to

RD 26000.

50th L 523.37 0.00 0 % Agenda approved in meeting

for extension of Katcha Drain.

For execution of Katcha drain

about 5.05 Acres land is to be

acquired. The report of

demarcation of land received

from concerned Tehsildar but

undersigned is not satisfied.

Again demarcation was done

on dated 03.06.2018 the report

of Tehsildar has been received

on dated 11/06/2019. The

hearing was fixed on dated

23/10/2019 but no irrigator

attend the hearing. Now next

date of hearing is fixed on

dated 04/11/2019.

Dropped

District Total 660.29 0.00

Unit Total 877.55 0.00

BAHADURG

ARH

YWS

CIRCLE

ROHTAK

C.C. Concrete

lining in Abadi area

of village Asaudha

of West Jua drain

from RD 29500 to

34500

48th S 116.86 22.00 20 % The scheme has been dropped. Dropped

BAHADURG

ARH

YWS

CIRCLE

ROHTAK

Flood agenda for

re-construction of

V.R. Bridge at RD

31390 of West Jua

Drain

49th M 102.02 0.00 0 % Revised drawing

approved.Extra quantity

submitted to CE/LCU vide this

office letter no. 1456/36-W

dated 15.10.2019. Revised

flood agenda will be submitted

in the next meeting of HSFCB.

Dropped

District Total 218.88 22.00

Unit Total 218.88 22.00

LCU

6

8

ROHTAK

7

JIND

YWS(N)

79

Page 83: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Name of

Constituenc

y

Name of

Irrigation

Circle

Name of Work Appvd.

in

meeting

of

HSFCB

(S/M/L) Est. Cost Expdt.

booked

during year

Phy.

Prog.

Remarks Status

Annexure 5.2

Head:Flood Protection Works

Status: Dropped,

(Rs. in lacs)

Sr.

No

Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

JULANA YWS

CIRCLE

JIND

Providing

Reinforced cement

concrete truff in

Nizampur Bharon

Khara Ramkali

drain from RD 0

TO RD 47100 out

falling at RD 8650-

L pf Padhana drain

in sloughing reach

RD 4000 TO rd

15000,including

replacing of pipes

culverts in slab

culverts from RD

2800 to 4000(

Balance work of

scheme already

approved in 47th

meeting of HSDR

and FCB.)

50th S 90.00 0.00 0 % As per site conditions, the

scheme has not been found

feasible and as per requirement

at site.

Dropped

District Total 90.00 0.00

NILOKHERI YWS

CIRCLE

KARNAL

Agenda for

restoring left bank

of Sambhli Link

Drain from RD 0 to

RD 6560

50th S 2.65 0.00 5 % Work held up due to dispute

and the proposal to drop short

term scheme has been

submitted to Deputy

Commissioner, Karnal by

XEN/KNL vide his office letter

No.7366 -68/61-R

Dt.02.07.2019

Dropped

District Total 2.65 0.00

Unit Total 92.65 0.00

HATHIN YWS

CIRCLE

FARIDAB

AD

Utilization of Flood

Water by

constructing Hump

and Pump House

on Gaunchi Main

Drain at RD 97500

to Augment the

Hathin Disty. To

feed tail reach

villages

(Supplementary

Agenda).

49th S 193.91 0.00 0 % Dropped as the scheme

already exists.

Dropped

District Total 193.91 0.00

Unit Total 193.91 0.00

Grand Total 1382.99 22.00

9

10

KARNAL

11

YWS(S)

PALWAL

80

Page 84: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Sr.

No

Name of District Name of Circle Estimated

Cost

Expenditure

Incurred

S L Total Total 2020-21 2021-22 2022-23 S M L Total S M L S M Total

1 AMBALA SYL CIRCLE

AMBALA 4 6 15 8096.16 1483.26 6612.92 3182.01 2311.49 1119.42 4 3 0 7 0 2 6 0 0 0

2 FATEHABAD BWS CIRCLE

FATEHABAD 0 1 3 502.11 18.30 483.82 177.91 173.91 132.00 0 1 0 1 0 1 1 0 0 0

3 HISAR BWS CIRCLE

HISAR 2 0 3 330.94 0.00 330.95 232.85 98.10 0.00 2 1 0 3 0 0 0 0 0 0

4 KAITHAL BWS CIRCLE

KAITHAL 0 0 1 84.19 64.93 19.26 9.63 9.63 0.00 0 1 0 1 0 0 0 0 0 0

5 PANCHKULA SYL CIRCLE

AMBALA 0 0 2 731.43 335.03 396.41 198.21 198.20 0.00 0 2 0 2 0 0 0 0 0 0

Total 6 7 24 9744.83 1901.52 7843.35 3800.61 2791.32 1251.42 6 8 0 14 0 3 7 0 0 0

6 JHAJJAR CONSTRUCTION

CIRCLE

GURGAON

1 0 1 109.81 15.00 94.81 94.81 0.00 0.00 1 0 0 1 0 0 0 0 0 0

7 KAITHAL SARASWATI

HERITAGE

CIRCLE

1 0 1 36.21 0.00 36.21 36.21 0.00 0.00 1 0 0 1 0 0 0 0 0 0

8 ROHTAK YWS CIRCLE

ROHTAK 0 0 2 349.26 114.85 234.42 117.21 117.21 0.00 0 2 0 2 0 0 0 0 0 0

Total 2 0 4 495.28 129.85 365.44 248.23 117.21 0.00 2 2 0 4 0 0 0 0 0 0

9 BHIWANI LWS CIRCLE

BHIWANI 0 0 1 277.00 89.05 187.96 93.98 93.98 0.00 0 1 0 1 0 0 0 0 0 0

10 Charkhi Dadri LWS CIRCLE

BHIWANI 1 0 1 147.00 0.00 147.00 147.00 0.00 0.00 1 0 0 1 0 0 0 0 0 0

11 JHAJJAR JWS CIRCLE

JHAJJAR 2 1 11 1720.01 119.59 1600.44 889.48 560.90 150.06 2 6 1 9 0 2 0 0 0 0

12 MAHENDRAGAR

H

JLN WS CIRCLE

NARNAUL 0 0 1 88.65 11.24 77.42 38.71 38.71 0.00 0 1 0 1 0 0 0 0 0 0

13 ROHTAK YWS CIRCLE

ROHTAK 0 5 14 2036.43 51.63 1984.81 754.88 740.03 489.90 0 5 1 6 0 4 4 0 0 0

14 SONIPAT YWS CIRCLE

ROHTAK 0 1 5 661.59 0.00 661.60 285.52 282.69 93.39 0 0 0 0 0 4 1 0 0 0

Total 3 7 33 4930.68 271.51 4659.22 2209.57 1716.29 733.36 3 13 2 18 0 10 5 0 0 0

15 KARNAL WORKSHOP

CIRCLE KARNAL 0 0 3 274.77 0.00 274.78 137.39 137.39 0.00 0 3 0 3 0 0 0 0 0 0

Total 0 0 3 274.77 0.00 274.78 137.39 137.39 0.00 0 3 0 3 0 0 0 0 0 0

16 BHIWANI YWS CIRCLE

BHIWANI 2 2 6 960.51 304.74 655.77 310.91 237.66 107.20 2 2 0 4 0 0 2 0 0 0

17 JIND YWS CIRCLE

JIND 1 0 8 1640.99 657.58 983.42 535.92 447.50 0.00 1 7 0 8 0 0 0 0 0 0

18 KARNAL YWS CIRCLE

KARNAL 0 1 1 969.74 3.38 966.36 328.56 318.90 318.90 0 0 1 1 0 0 0 0 0 0

19 PANIPAT YWS CIRCLE

KARNAL 2 0 7 543.24 37.49 505.77 290.57 215.20 0.00 2 5 0 7 0 0 0 0 0 0

20 YAMUNANAGAR HKB CIRCLE

JAGADHRI 1 0 2 1850.00 622.00 1228.00 1203.00 25.00 0.00 1 1 0 2 0 0 0 0 0 0

Total 6 3 24 5964.48 1625.19 4339.32 2668.96 1244.26 426.10 6 15 1 22 0 0 2 0 0 0

21 FARIDABAD YWS CIRCLE

FARIDABAD 0 0 3 1349.52 803.27 546.26 273.13 273.13 0.00 0 3 0 3 0 0 0 0 0 0

22 MEWAT YWS CIRCLE

FARIDABAD 3 0 7 1299.92 275.69 1024.23 597.53 426.70 0.00 3 4 0 7 0 0 0 0 0 0

23 PALWAL YWS CIRCLE

FARIDABAD 1 0 3 1823.47 513.99 1309.48 1017.21 292.27 0.00 1 2 0 3 0 0 0 0 0 0

Total 4 0 13 4472.91 1592.95 2879.97 1887.87 992.10 0.00 4 9 0 13 0 0 0 0 0 0

Grand Total 21 17 101 25882.95 5521.02 20362.06 10952.63 6998.55 2410.88 21 50 3 74 0 13 14 0 0 0

Annexure 5.3

Head:Flood Protection Works

Status: In Progress,Yet To Start,(Rs in lacs)

No. of Schemes Requirement of Funds In Prog. Yet to Start Completed Dropped

Districtwise Abstract of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting of HSDR & FCB

M Total L

BWS

5 8 0 0

2 2 0 0

1 0 0 0

1 0 0 0

2 0 0 0

11 10 0 0

CONSTRUCTION

0 0 0 0

0 0 0 0

2 0 0 0

2 0 0 0

LCU

1 0 0 0

0 0 0 0

8 2 0 0

1 0 0 0

9 8 0 0

4 5 0 0

23 15 0 0

PROJECT, ENVIRONMENT AND

MATERIAL

3 0 0 0

3 0 0 0

YWS(N)

2 2 0 0

7 0 0 0

0 0 0 0

5 0 0 0

1 0 0 0

15 2 0 0

YWS(S)

0 0

3 0 0 0

4 0 0 0

63 27 0 0

2 0 0 0

9 0

81

Page 85: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Name of

Constitue

ncy

Name of

Irrigation

Circle

Name of Work Appvd.

in

meeting

of

HSFCB

(S/M/L) Est. Cost Expdt.

booked

during

year

Phy.

Prog.

Total Bal

Req.

Remarks

2020-21 2021-22

AMBALA

CANTT.

SYL

CIRCLE

AMBALA

Construction of

main nallah from

railway line near

village Nanhera

upto nh-1 near

Shamshan gath in

ward no. 16

ambala cantt (MC

Ambala).

48th S 524.90 201.17 50 % 323.73 323.73 0.00 work in

progress.

Initially

work be

executed by

MC

Ambala.

MC Ambala

transferred

the work to

irrigation

Deptt.

AMBALA

CANTT.

SYL

CIRCLE

AMBALA

Constructing RCC

open Trough from

RD 36000 to 30000

(Sub reach of

Mahesh Nagar

drain)

48th S 550.00 444.42 95 % 105.58 105.58 0.00 Work in

progress.

AMBALA

CANTT.

SYL

CIRCLE

AMBALA

Scheme for

constructing open

trough from RD

30000 to Gate at

RD 26000 of

Mahesh Nagar

drain

49th S 415.00 51.45 15 % 363.55 363.55 0.00 Work delay

due to Land

record not

available in

LAO office

as well as

in division

office.

Preparation

of duplicate

is in

process.

Work in

progress.

AMBALA

CITY

SYL

CIRCLE

AMBALA

Construction of

Inlet at KM 11.956

on Left Bank of

SYL Canal

50th S 60.00 16.28 90 % 43.72 43.72 0.00 Work held

up due to

water

remaining

in canal

and the

same will

be

completed

after

withdrawal

of same.

AMBALA

CANTT.

SYL

CIRCLE

AMBALA

Constructing

Machonda Drain by

laying NP3 hume

pipeline below

Machonda,Bara,Ko

t Kachhuwa Road.

48th M 1850.00 513.02 40 % 1336.98 668.49 668.49 Due to

change in

alignment

and scope

of work

Annexure 5.4

Head:Flood Protection Works

Status: In Progress,Yet To Start,(Rs. in lacs)

Sr.

No

Requriments of funds Status

Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

2022-23

BWS

AMBALA

1 0.00 IP

2 0.00 IP

3 0.00 IP

4 0.00 IP

5 0.00 IP

82

Page 86: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Name of

Constitue

ncy

Name of

Irrigation

Circle

Name of Work Appvd.

in

meeting

of

HSFCB

(S/M/L) Est. Cost Expdt.

booked

during

year

Phy.

Prog.

Total Bal

Req.

Remarks

2020-21 2021-22

Annexure 5.4

Head:Flood Protection Works

Status: In Progress,Yet To Start,(Rs. in lacs)

Sr.

No

Requriments of funds Status

Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

2022-23

AMBALA

CANTT.

SYL

CIRCLE

AMBALA

Purchase of land

for cunnettee D/S

of Mahesh Nagar

drain in a length of

1000 feet from RD

2132 to 3132

50th M 75.00 0.00 0 % 75.00 37.50 37.50 Land

acquisition

involved.

Alignment

is under

process

AMBALA

CITY

SYL

CIRCLE

AMBALA

Constructing RCC

open trough on

Singhawala drain

from RD 6650 to

5750

50th M 77.08 0.03 20 % 77.06 38.53 38.53 work in

progress

AMBALA

CANTT.

SYL

CIRCLE

AMBALA

Constructing RCC

Open trough from

RD 0 to 4000 of

Mahesh Nagar

drain

50th M 592.00 1.44 0 % 590.56 295.28 295.28 Cost

revised as

per

approved

drawings

and design

and revised

of HSR

item of Mix

design

AMBALA

CITY

SYL

CIRCLE

AMBALA

Construction of

RCC Open Trough

from RD 19500 to

22500 on Ambala

Drain, with

extension RD 2300

to 1300.

50th M 560.00 255.45 45 % 304.56 152.28 152.28 Flood

protection

AMBALA

CITY

SYL

CIRCLE

AMBALA

Constructing

Singha Wala-

Sullar link Drain

from RD 0 to 29000

off take from

Singhawala drain

at RD 0 and Outfall

in Sullar Drain at

RD 20100

48th L 2224.00 0.00 0 % 2224.00 756.16 733.92 Land

acquisition

involved.

Alignment

approved.

land Detail

has been

uploaded

on the e-

bhumi

portal

AMBALA

CITY

SYL

CIRCLE

AMBALA

Constructing

Bhanokheri Ganda

Nalla link Drain

from RD 0 to 3111

out falling in Ganda

Nalla at RD 31650

47th L 108.23 0.00 0 % 108.24 36.80 35.72 ALIGNMEN

T

APPROVE

D ON

28.03.2016

LAND

DETAIL OF

1.18 ACRE

UPLOADE

D ON E-

BHOOMI

PORTAL

AS PER

NEW LAND

PURCHAS

E POLICY.

6 0.00 YTS

7 0.00 IP

8 0.00 YTS

9 0.00 IP

10 733.92 YTS

11 35.72 YTS

83

Page 87: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Name of

Constitue

ncy

Name of

Irrigation

Circle

Name of Work Appvd.

in

meeting

of

HSFCB

(S/M/L) Est. Cost Expdt.

booked

during

year

Phy.

Prog.

Total Bal

Req.

Remarks

2020-21 2021-22

Annexure 5.4

Head:Flood Protection Works

Status: In Progress,Yet To Start,(Rs. in lacs)

Sr.

No

Requriments of funds Status

Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

2022-23

MULLANA SYL

CIRCLE

AMBALA

Scheme for

constructing New

Gola Goli Bund

from RD 0 to 4200

on U/S Side of

existing bund for

the protection of

village Gola Goli on

river Begna (If

farmers provide

land on collector

Rate)

49th L 271.90 0.00 0 % 271.91 92.45 89.73 Land

purchase

involved.

NARAING

ARH

SYL

CIRCLE

AMBALA

Scheme for

constructing new

Banaundi bund

from RD 0 to 1000

on upstream side

of existing bund for

the protection of

village Banaoundi

on river begna (If

farmers provide

land on collectors

rate)

49th L 69.61 0.00 0 % 69.61 23.67 22.97 Land

purchase

involved.

MULLANA SYL

CIRCLE

AMBALA

Constructing Tejan

Drain from RD 0-

8250 outfalling in

Ganda Nallah at

RD 17150. (C.M.

Announcement No.

22934 dt 15-08-

2018)

50th L 273.44 0.00 0 % 273.45 92.97 90.24 Land

acquisition

involved.

Alignment

approved.

land Detail

has been

uploaded

on the e-

bhumi

portal

AMBALA

CITY

SYL

CIRCLE

AMBALA

Restoration of

design

section/pitching in

village abadi area

and remodelling of

8 no. bridges of

Ganda Nallah for

the protection of

village abadi and

agriculture land of

villages Kanwla,

Jalbera, Lakhnour

Sahib, Bara,

Adhomajra, Ugara,

Sakroan, Naggal

and Segti etc.

50th L 445.00 0.00 0 % 445.00 151.30 146.85 estimate

approved.

Tender to

be open on

18/12/2019.

District Total 8096.16 1483.26 6612.95 3182.01 2311.49

12 89.73 YTS

13 22.97 YTS

14 90.24 YTS

15 146.85 YTS

1119.42

FATEHABAD

84

Page 88: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Name of

Constitue

ncy

Name of

Irrigation

Circle

Name of Work Appvd.

in

meeting

of

HSFCB

(S/M/L) Est. Cost Expdt.

booked

during

year

Phy.

Prog.

Total Bal

Req.

Remarks

2020-21 2021-22

Annexure 5.4

Head:Flood Protection Works

Status: In Progress,Yet To Start,(Rs. in lacs)

Sr.

No

Requriments of funds Status

Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

2022-23

TOHANA BWS

CIRCLE

FATEHAB

AD

Construction of 10

Nos bore-wells for

recharging of flood

water From the

fields of village

Sidhani. (May be

done on

experimental basis

after studying

Mansa/Sangrur

models)

49th M 30.32 18.30 90 % 12.02 6.01 6.01 In Progress

RATIA BWS

CIRCLE

FATEHAB

AD

Agenda Note for

remodelling / re-

construction of

bridge at RD 5640

Barreta Drain on

Pucca road from

village Nangal to

Nangal Dhani

Tehsil Ratia District

Fatehabad

50th M 71.79 0.00 0 % 71.80 35.90 35.90 The Design

data

submitted

to C.D.O for

preparing

the drawing

TOHANA BWS

CIRCLE

FATEHAB

AD

Construction of V.R

Bridge at RD 1.15

Km Rangoi Nallah

49th L 400.00 0.00 0 % 400.00 136.00 132.00 Design /

Drawing

approved

and

estimate

under

preparation

District Total 502.11 18.30 483.82 177.91 173.91

HANSI BWS

CIRCLE

HISAR

Procuring one No.

Poclaine 230

Excavator.

50th S 60.00 0.00 0 % 60.00 60.00 0.00 DSandD

has opened

the tender

andfinalisati

on of

purchase

will be done

after Model

code of

conduct.

HANSI BWS

CIRCLE

HISAR

Procurement of

HDPE 200 mm dia

pipe.

50th S 74.75 0.00 0 % 74.75 74.75 0.00 Bid opened

on GEM on

dated

16/9/2019

and case is

under

process for

approval of

rates.

16 0.00 IP

17 0.00 YTS

18 132.00 YTS

132.00

HISAR

19 0.00 IP

20 0.00 IP

85

Page 89: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Name of

Constitue

ncy

Name of

Irrigation

Circle

Name of Work Appvd.

in

meeting

of

HSFCB

(S/M/L) Est. Cost Expdt.

booked

during

year

Phy.

Prog.

Total Bal

Req.

Remarks

2020-21 2021-22

Annexure 5.4

Head:Flood Protection Works

Status: In Progress,Yet To Start,(Rs. in lacs)

Sr.

No

Requriments of funds Status

Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

2022-23

BARWALA BWS

CIRCLE

HISAR

Agenda Note for

pipe Drain No. 1

from RD 0 to RD

9000 and

Drain No. 2 From

RD 0 to RD 2000

for Village Ladwa

out falling at RD

170200-L of New

Siwani Feeder and

RD 8114-L of O. P.

Jindal Nalwa Disty

respectively.

49th M 196.19 0.00 25 % 196.20 98.10 98.10 25% work

done and

work will be

completed

upto

31.07.2019.

District Total 330.94 0.00 330.95 232.85 98.10

KALAYAT BWS

CIRCLE

KAITHAL

Scheme for laying

RCC NP3 pipe line

along Batta Mr.

from RD 33800 to

37500 to drain out

the flood water of

village Kharak

Pandwa into

Pundri Drain No. II

at RD. 24410-L

50th M 84.19 64.93 95 % 19.26 9.63 9.63

District Total 84.19 64.93 19.26 9.63 9.63

PANCHKU

LA

SYL

CIRCLE

AMBALA

Constructon of box

RCC drain for safe

passage of

flood/waste water

from Barwala and

Bataur (Panchkula)

into River Tangri.

47th M 609.32 279.13 55 % 330.20 165.10 165.10 Tender

called

PANCHKU

LA

SYL

CIRCLE

AMBALA

Scheme for

Construction of

Causeway and

steining in village

Aasrewali at

Aasrewali nadi

tributary of river

Ghaggar in

Panchkula District

50th M 122.11 55.90 95 % 66.22 33.11 33.11

District Total 731.43 335.03 396.42 198.21 198.20

Unit Total 9744.83 1901.52 7843.40 3800.61 2791.32

21 0.00 IP

0.00

KAITHAL

22 0.00 IP

0.00

PANCHKULA

23 0.00 IP

24 0.00 IP

0.00

1251.42

CONSTRUCTION

JHAJJAR

86

Page 90: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Name of

Constitue

ncy

Name of

Irrigation

Circle

Name of Work Appvd.

in

meeting

of

HSFCB

(S/M/L) Est. Cost Expdt.

booked

during

year

Phy.

Prog.

Total Bal

Req.

Remarks

2020-21 2021-22

Annexure 5.4

Head:Flood Protection Works

Status: In Progress,Yet To Start,(Rs. in lacs)

Sr.

No

Requriments of funds Status

Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

2022-23

BAHADUR

GARH

CONSTR

UCTION

CIRCLE

GURGAO

N

Constructing Ditch

Drain from KM

31.915 to 46.185

along NCR

Channel (Approved

with condition that

the water drained

would be utilized

for Irrigation)

49th S 109.81 15.00 80 % 94.81 94.81 0.00 As per the

site

condition

E/W is

completed

100% and

out of three

structure 02

is

completed

and other

01 structure

will be

completed

after NOC

received

from PWD

BandR

Deptt.,

diversion

has also

been

constructed

on this

bridge and

work will be

completed

upto

31.01.2020

District Total 109.81 15.00 94.81 94.81 0.00

KAITHAL SARASW

ATI

HERITAG

E CIRCLE

KURUKS

HETRA

Scheme for

remodeling of flood

inlets and repair of

adjoining lining at

RD 197400/L and

RD233500/L of

Bhakhra Main Line-

Hansi Branch-

Butana Branch-

Multi Purpose Link

channel

50th S 36.21 0.00 50 % 36.21 36.21 0.00 Work in

Progress

District Total 36.21 0.00 36.21 36.21 0.00

ROHTAK YWS

CIRCLE

ROHTAK

Agenda Note for

reconstruction of

V.R. Bridge at RD

68000 Drain No. 8

50th M 174.63 0.00 20 % 174.64 87.32 87.32 Work in

progress.

ROHTAK YWS

CIRCLE

ROHTAK

Agenda Note for

reconstruction of

V.R. Bridge at RD

94500 Drain No. 8

50th M 174.63 114.85 70 % 59.78 29.89 29.89 Work in

prograss.

District Total 349.26 114.85 234.42 117.21 117.21

Unit Total 495.28 129.85 365.44 248.23 117.21

25 0.00 IP

0.00

KAITHAL

26 0.00 IP

0.00

ROHTAK

27 0.00 IP

28 0.00 IP

0.00

0.00

LCU

BHIWANI

87

Page 91: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Name of

Constitue

ncy

Name of

Irrigation

Circle

Name of Work Appvd.

in

meeting

of

HSFCB

(S/M/L) Est. Cost Expdt.

booked

during

year

Phy.

Prog.

Total Bal

Req.

Remarks

2020-21 2021-22

Annexure 5.4

Head:Flood Protection Works

Status: In Progress,Yet To Start,(Rs. in lacs)

Sr.

No

Requriments of funds Status

Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

2022-23

KALANAU

R

LWS

CIRCLE

BHIWANI

agenda note for

laying underground

pipeline in Gudhan

link drain from RD

0 TO 9900 outfall

at RD 129000-L

OF Bond Disty.

50th M 277.00 89.05 30 % 187.96 93.98 93.98 work in

progress

and 30%

completed

District Total 277.00 89.05 187.96 93.98 93.98

DADRI LWS

CIRCLE

BHIWANI

Agenda Note for

purchase of EP

and DP sets for

flood Dewatering.

50th S 147.00 0.00 0 % 147.00 147.00 0.00 Finalisation

will be done

by DSandD

in coming

HPPC

meeting.

District Total 147.00 0.00 147.00 147.00 0.00

JHAJJAR JWS

CIRCLE

JHAJJAR

Agenda note for

constructing Pump

House Beldar Hut

rehabilitation of

civil structures and

fixing of steel

grantings at 11

Nos. of flood pump

houses .

49th S 92.00 0.00 70 % 92.00 92.00 0.00 Work in

progress.

JHAJJAR JWS

CIRCLE

JHAJJAR

Agenda note for

providing Brick

Lining on both

banks of JLN

Escape Channel

KM 0.100 to KM

2.000

49th S 283.70 51.69 25 % 232.01 232.01 0.00 Work in

progress.

BERI JWS

CIRCLE

JHAJJAR

Agenda note for

constructing Pump

House Beldar Hut

and purchasing

new Pumps

Motors, Control

Panel and allied

accessories at RD

243-R of JLN

Feeder.

49th M 67.00 0.00 25 % 67.00 33.50 33.50 Work in

Progress.

BADLI JWS

CIRCLE

JHAJJAR

Agenda note for

constructing

Dhakla Link Drain

through

(underground RCC

Pipe Line) from RD

0 to 10000

outfalling into SLC

at RD 20910-L (By

lift)

50th M 169.17 19.50 15 % 149.68 74.84 74.84 Work in

Progress.

29 0.00 IP

0.00

Charkhi Dadri

30 0.00 IP

0.00

JHAJJAR

31 0.00 IP

32 0.00 IP

33 0.00 IP

34 0.00 IP

88

Page 92: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Name of

Constitue

ncy

Name of

Irrigation

Circle

Name of Work Appvd.

in

meeting

of

HSFCB

(S/M/L) Est. Cost Expdt.

booked

during

year

Phy.

Prog.

Total Bal

Req.

Remarks

2020-21 2021-22

Annexure 5.4

Head:Flood Protection Works

Status: In Progress,Yet To Start,(Rs. in lacs)

Sr.

No

Requriments of funds Status

Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

2022-23

BERI JWS

CIRCLE

JHAJJAR

Agenda note for

constructing Majra-

Siwana-Dubaldhan

Link Drain through

(underground RCC

Pipe Line) from RD

0 to 15000

outfalling into

Loharu Feeder at

RD 32935-R With

interlinking of

Village Ponds.

50th M 291.36 0.00 0 % 291.36 145.68 145.68 Alignment

not finalised

due to

objection of

villagers

BADLI JWS

CIRCLE

JHAJJAR

Agenda note for

constructing

R/Bank of outfall

Drain No. 8 (critical

reaches) in Km.

2.258 to 6.800, Km.

11.00 to 18.500

and Km. 19.500 to

25.00

50th M 137.17 0.00 10 % 137.18 68.59 68.59 Work in

progress.

BERI JWS

CIRCLE

JHAJJAR

Agenda note for

constructing

Dubaldhan Link

Drain (Through

underground RCC

Pipe Line) from RD

0 to 5000 outfalling

inot Loharu Feeder

at RD 19648-L.

50th M 27.35 0.00 25 % 27.36 13.68 13.68 Work in

progress.

BERI JWS

CIRCLE

JHAJJAR

Agenda note for

constructing Beri-

Bishan Pipe Link

Drain from RD 0 to

9500 outfalling into

Drain No. 8 at RD

210000-L

50th M 119.48 32.00 25 % 87.48 43.74 43.74 Work in

Progress.

JHAJJAR JWS

CIRCLE

JHAJJAR

Agenda for repair

and rehabilitation of

existing Pumps,

Motors, Control

Panels and allied

accessories and

Transformer at

Rewari Road Pump

House in W.S.

Mech. Division,

Jhajjar for the year

2018-19.

50th M 17.07 0.00 0 % 17.08 8.54 8.54 Estimate

stands

sanctioned.

Tender will

be called

shortly.

BADLI JWS

CIRCLE

JHAJJAR

Agenda note for

constructing of

Khudan Drain from

RD o to 4000

outfalling

at RD 17000-R

Zahidpur Minor (By

lift)

50th M 60.97 16.40 30 % 44.58 22.29 22.29 Work in

Progress.

35 0.00 YTS

36 0.00 IP

37 0.00 IP

38 0.00 IP

39 0.00 YTS

40 0.00 IP

89

Page 93: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Name of

Constitue

ncy

Name of

Irrigation

Circle

Name of Work Appvd.

in

meeting

of

HSFCB

(S/M/L) Est. Cost Expdt.

booked

during

year

Phy.

Prog.

Total Bal

Req.

Remarks

2020-21 2021-22

Annexure 5.4

Head:Flood Protection Works

Status: In Progress,Yet To Start,(Rs. in lacs)

Sr.

No

Requriments of funds Status

Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

2022-23

BADLI JWS

CIRCLE

JHAJJAR

Constructing

underground

pressurized

Subana Link Drain

from KM 0 to 7.210

out falling at KM

2.300-R of outfall

drain no. 8.

48th L 454.74 0.00 10 % 454.73 154.61 150.06 Work in

Progress.

District Total 1720.01 119.59 1600.46 889.48 560.90

NARNAUL JLN WS

CIRCLE

NARNAU

L

Agenda note

construction D.R

Bridge at K.M

2.238 and 2.410

Guide Bund cum

Drain.

49th M 88.65 11.24 50 % 77.42 38.71 38.71 1. Case for

permission

to construct

DR Bridge

at km 2.410

stands

submitted

to NHAI

Authority,

Bhiwani.

2. Work of

DR Bridge

at km 2.238

is 100%

completed

District Total 88.65 11.24 77.42 38.71 38.71

ISRANA YWS

CIRCLE

ROHTAK

Reconstruction of

V.R. Bridge at RD

40200 Nai Nallah

drain.

48th M 132.00 51.28 85 % 80.72 40.36 40.36 Work in

progress

ROHTAK YWS

CIRCLE

ROHTAK

Agenda note for

Procurement of

New Pump Sets for

flood protection

works in W.S.

Mech. Division,

Rohtak.

49th M 33.00 0.00 0 % 33.00 16.50 16.50 The

material will

be procured

by

SE/Worksh

op, Circle,

karnal.

Indent

placed by

XEN, Mech.

Rohtak to

XEN, Proc.,

Panchkula.

41 150.06 IP

150.06

MAHENDRAGARH

42 0.00 IP

0.00

ROHTAK

43 0.00 IP

44 0.00 IP

90

Page 94: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Name of

Constitue

ncy

Name of

Irrigation

Circle

Name of Work Appvd.

in

meeting

of

HSFCB

(S/M/L) Est. Cost Expdt.

booked

during

year

Phy.

Prog.

Total Bal

Req.

Remarks

2020-21 2021-22

Annexure 5.4

Head:Flood Protection Works

Status: In Progress,Yet To Start,(Rs. in lacs)

Sr.

No

Requriments of funds Status

Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

2022-23

ROHTAK YWS

CIRCLE

ROHTAK

Agenda Note for

Purchasing 1 No.

Excavator Loader

and 1 No.

Mahindra maxi

Truck for Rohtak

WS Dvn Rohtak.

50th M 64.00 0.00 50 % 64.00 32.00 32.00 Mahindra

Maxi Truck

has been

received at

site and

indent for 1

No.

Excavator

chain type

replace

long boom

with

stander

boom

length has

been

placed by

DGSandD

Haryana on

dated

20.05.2019.

ROHTAK YWS

CIRCLE

ROHTAK

Agenda Note for

Renovation of VR

Bridge at RD

112300 at Lakhan

Majra Link Drain.

50th M 40.00 0.35 0 % 39.66 19.83 19.83 Tender rate

approved

letter of

acceptance

issued to

agency.

Work will

be started

after recepit

of direction

from NGT.

GOHANA YWS

CIRCLE

ROHTAK

Agenda Note for

Restoring the bank

of Tributary Drain

No.4 from RD

51500 to 53000

around village

Kasanda and RD

53600 to 54200

and 57000 to

57500 along

Village Kasandi.(

CM Announcement

Code 23605 dated

17.09.2018 and

23940 dated

12.10.2018)

50th M 18.94 0.00 50 % 18.94 9.47 9.47 50% work

has been

completed

in village

Kasandi

and

remaining

work will be

completed

shortly.

45 0.00 IP

46 0.00 YTS

47 0.00 IP

91

Page 95: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Name of

Constitue

ncy

Name of

Irrigation

Circle

Name of Work Appvd.

in

meeting

of

HSFCB

(S/M/L) Est. Cost Expdt.

booked

during

year

Phy.

Prog.

Total Bal

Req.

Remarks

2020-21 2021-22

Annexure 5.4

Head:Flood Protection Works

Status: In Progress,Yet To Start,(Rs. in lacs)

Sr.

No

Requriments of funds Status

Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

2022-23

GOHANA YWS

CIRCLE

ROHTAK

Agenda Note for

Purchase and

supply of special T

and P Machine i.e.

1 No. JCB

JS205LR with

Excavator

(Pocklain) for use

in Gohana WS

division, Gohana.

50th M 73.29 0.00 0 % 73.30 36.65 36.65 Indent

placed to

procuremen

t division

vide

XEN/Gohan

a No. 210/6-

M dated

11.03.2019.

The case is

with

DSandD

and tender

were called

only single

agency

come the

mater of

retendering

in process

with

DSandD

Chandigarh

.

ROHTAK YWS

CIRCLE

ROHTAK

Agenda Note for

Procurement of

New Electric

Pannels for Flood

Protection Works in

WS Mech Division,

Rohtak

50th M 76.00 0.00 0 % 76.00 38.00 38.00 Quantity

submitted

to CE/LCU

vide this

office letter

no.

643/180/6

W dated

18.03.2019.

ROHTAK YWS

CIRCLE

ROHTAK

Agenda Note for

Procurement of

New Electric Pump

Sets for Flood

Protection Works in

WS Mech Division,

Rohtak

50th M 50.00 0.00 0 % 50.00 25.00 25.00 Indent

placed to

XEN/Procur

ement/PKL.

MEHAM YWS

CIRCLE

ROHTAK

Agenda Note for

Improving Capacity

by widening of Civil

structure (Pump

House) at RD-100

Left Meham Drain

Pump House

Village Bharan in

WS Mech Division,

Rohtak

50th M 64.64 0.00 0 % 64.64 32.32 32.32 Estimate

under

process in

division

office.

48 0.00 YTS

49 0.00 YTS

50 0.00 IP

51 0.00 YTS

92

Page 96: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Name of

Constitue

ncy

Name of

Irrigation

Circle

Name of Work Appvd.

in

meeting

of

HSFCB

(S/M/L) Est. Cost Expdt.

booked

during

year

Phy.

Prog.

Total Bal

Req.

Remarks

2020-21 2021-22

Annexure 5.4

Head:Flood Protection Works

Status: In Progress,Yet To Start,(Rs. in lacs)

Sr.

No

Requriments of funds Status

Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

2022-23

MEHAM YWS

CIRCLE

ROHTAK

Revised Agenda

note for

constructing tail

regulator at RD 50

at Mehem Drain

out-falling into

Drain No. 8 at RD

177550 (Est. amt.

aproved in 49th

meeting was Rs.

484.00 lac and

amt. now revised in

50th meeting=

645.00).

49th L 645.00 0.00 40 % 645.00 219.30 212.85 Work in

progress.

The

estimated

cost

increased

to Rs.

645.00 lac

against Rs.

484.00

lacs)

GARHI

SAMPLA -

KALOI

YWS

CIRCLE

ROHTAK

Agenda Note for

Re-placement of

Pipe Culvert into

VR Bridge at RD

35000 of Rohtak

Link Drain.

50th L 27.23 0.00 0 % 27.24 9.26 8.99 Estimate

sanctioned.

Tender

called and

to be

opened on

12.12.2019.

GARHI

SAMPLA -

KALOI

YWS

CIRCLE

ROHTAK

Agenda Note for

Construction of

RCC Truff of

Baland Pump

House Link Drain

from RD 0 to 3500.

50th L 164.10 0.00 0 % 164.09 55.79 54.15 Work will

be start

after

harvesting

of Kharif

Crop.

ROHTAK YWS

CIRCLE

ROHTAK

Agenda Note for

Construction of

One Side Vertical

wall on Left Side

from RD 99400 to

102900 and laying

interlocking tiles for

service road from

RD 99400 to

100760 Meham

Drain (up to Pump

House)

50th L 272.00 0.00 0 % 272.00 92.48 89.76 Estimate

under

process.

KALANAU

R

YWS

CIRCLE

ROHTAK

Constructing

Sundana pipeline

pump house link

drain from RD 0 to

5950 and Bhutian

Minor tail to Drain

No. 8 pipe link

drain from RD 0 to

7250 outfall at RD

202000-L Drain No.

8 (Supplementary

Scheme).

50th L 376.23 0.00 0 % 376.24 127.92 124.16 1st part

work tender

called and

to be

opened on

12.12.2019.

2nd part

work

estimate

submitted

to higher

authority for

approval.

District Total 2036.43 51.63 1984.83 754.88 740.03

52 212.85 IP

53 8.99 YTS

54 54.15 YTS

55 89.76 YTS

56 124.16 YTS

489.90

SONIPAT

93

Page 97: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Name of

Constitue

ncy

Name of

Irrigation

Circle

Name of Work Appvd.

in

meeting

of

HSFCB

(S/M/L) Est. Cost Expdt.

booked

during

year

Phy.

Prog.

Total Bal

Req.

Remarks

2020-21 2021-22

Annexure 5.4

Head:Flood Protection Works

Status: In Progress,Yet To Start,(Rs. in lacs)

Sr.

No

Requriments of funds Status

Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

2022-23

BARODA YWS

CIRCLE

ROHTAK

Reconstruction of

V.R. Bridges at RD

13000, 15780 of

Chhapra Drain

49th M 248.52 0.00 0 % 248.52 124.26 124.26 Tender

rates

approved

and work

will be

started

shortly..

BARODA YWS

CIRCLE

ROHTAK

Agenda Note for

constructing cross

drainage work i.e.

aqueduct at RD

8300 on Dubheta

Drain

49th M 21.07 0.00 0 % 21.08 10.54 10.54 Estimate

sanctioned.

Tender

rates

approved.

Work will

be started

shortly.

Agreement

done on

08.03.2019.

Notice has

been given

to the

agency.

BARODA YWS

CIRCLE

ROHTAK

Agenda note for

reconstruction of

V.R. Bridges at RD

3050, 8870, 10180,

14100, 12780,

15400 and Bhawar

link drain.

49th M 60.00 0.00 0 % 60.00 30.00 30.00 Drawing

approved.

Estimate

sanctioned.

Tender

rates

approved.

Agreement

done on

28.06.2019.

GOHANA YWS

CIRCLE

ROHTAK

Agenda Note for

Construction of 07

Nos. Civil

Structures (Sump

Wells) for Flood

Protection Works

at Various Flood

Sites in WS Mech.

Division, Rohtak.

50th M 49.00 0.00 0 % 49.00 24.50 24.50 Drawing

approved

for sump

wall.

GOHANA YWS

CIRCLE

ROHTAK

Agenda Note for

procurement of

New Pump for

Flood Protection

works at Various

Flood sites in WS

Mech. Division,

Rohtak.

50th L 283.00 0.00 0 % 283.00 96.22 93.39 Qty.

submitted

to CE/LCU

vide this

office letter

no.

644/180/6

W dated

18.03.2019

District Total 661.59 0.00 661.60 285.52 282.69

Unit Total 4930.68 271.51 4659.27 2209.57 1716.29

57 0.00 YTS

58 0.00 YTS

59 0.00 YTS

60 0.00 YTS

61 93.39 YTS

93.39

733.36

PROJECT,

ENVIRONMENT AND KARNAL

94

Page 98: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Name of

Constitue

ncy

Name of

Irrigation

Circle

Name of Work Appvd.

in

meeting

of

HSFCB

(S/M/L) Est. Cost Expdt.

booked

during

year

Phy.

Prog.

Total Bal

Req.

Remarks

2020-21 2021-22

Annexure 5.4

Head:Flood Protection Works

Status: In Progress,Yet To Start,(Rs. in lacs)

Sr.

No

Requriments of funds Status

Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

2022-23

KARNAL WORKSH

OP

CIRCLE

KARNAL

Purchase of 40

number electric

pumping sets of 5

cs. capacity for

distt. Karnal and

Jind as inventory

for utilization in

emergency

dewatering.

50th M 171.00 0.00 10 % 171.00 85.50 85.50 Finalization

of rates will

be done by

DS and D

in coming

HPPC

meeting.

KARNAL WORKSH

OP

CIRCLE

KARNAL

Procurement of

tempo excel pick

up and truck tata

407 in replacement

of condemned

vehicles.

50th M 25.50 0.00 10 % 25.50 12.75 12.75 indent

received on

21/05/2019.

sent to DS

and D

Haryana

on

12/06/2019

and DS and

D asked for

proprietary

certificate

,accordingly

indentor

was asked

for

supplying

the same

for

submission

to DS and

D Haryana.

The same

has been

received on

07.11.2019

and same

has been

sent to DS

and D by

XEN/Procur

ement and

Disposal

Division,

Pkl. The

case is now

pending

with

DSandD.

62 0.00 IP

63 0.00 IP

95

Page 99: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Name of

Constitue

ncy

Name of

Irrigation

Circle

Name of Work Appvd.

in

meeting

of

HSFCB

(S/M/L) Est. Cost Expdt.

booked

during

year

Phy.

Prog.

Total Bal

Req.

Remarks

2020-21 2021-22

Annexure 5.4

Head:Flood Protection Works

Status: In Progress,Yet To Start,(Rs. in lacs)

Sr.

No

Requriments of funds Status

Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

2022-23

KARNAL WORKSH

OP

CIRCLE

KARNAL

Replacement/Reno

vation of pumping

sets with allied

accessories in

district JIND .

50th M 78.27 0.00 10 % 78.28 39.14 39.14 The tender

rates has

been

approved

by Chief

Engineer

Project in

favour of

M/s KRP

Engineering

Pvt. Ltd.

vide letter

No. 453-

54/6/F-

11/Tender/

XEN(works)

/P dated

20.09.2019.

The

agreement

has been

executed

with the

agency by

XEN/W.S.

(M)

Division,

Karnal and

letter for

proceeding

of work has

been

issued to

the Firm on

20.09.2019.

District Total 274.77 0.00 274.78 137.39 137.39

Unit Total 274.77 0.00 274.78 137.39 137.39

TOSHAM YWS

CIRCLE

BHIWANI

Flood Agenda for

Purchase of New

Machinery for

Flood Protection

Works During 2018-

19

49th S 44.00 14.00 30 % 30.00 30.00 0.00 D.G Set

Received.

Regarding

20 EP sets

(3 Cs), the

case will be

discussed

in the

upcoming

HPPC

meeting on

dated

23.12.2019

for

approval.

64 0.00 IP

0.00

0.00

YWS(N)

BHIWANI

65 0.00 IP

96

Page 100: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Name of

Constitue

ncy

Name of

Irrigation

Circle

Name of Work Appvd.

in

meeting

of

HSFCB

(S/M/L) Est. Cost Expdt.

booked

during

year

Phy.

Prog.

Total Bal

Req.

Remarks

2020-21 2021-22

Annexure 5.4

Head:Flood Protection Works

Status: In Progress,Yet To Start,(Rs. in lacs)

Sr.

No

Requriments of funds Status

Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

2022-23

BHIWANI YWS

CIRCLE

BHIWANI

Procurement of

New Earth Moving

Machine for

internal clearance

of drains and bank

strengthening of

canal/drain

(Supplementary

Agenda).

49th S 110.00 70.00 65 % 40.00 40.00 0.00 H-

Excavator

Received.

Tenders for

the balance

work has

been called

twice but no

bid

received.

Now

DSandD

has been

requested

for calling

tender

again on

dated

04.12.2019.

BHIWANI YWS

CIRCLE

BHIWANI

Agenda for

Providing sump

well, gates and

gearing on Bhiwani

Ghaggar drain from

RD. 28345-165600

out-falling at RD

384000-L Hisar

Ghaggar Drain

50th M 331.66 220.74 85 % 110.92 55.46 55.46 Work in

progress

and will be

complete

by

31.12.2019

66 0.00 IP

67 0.00 IP

97

Page 101: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Name of

Constitue

ncy

Name of

Irrigation

Circle

Name of Work Appvd.

in

meeting

of

HSFCB

(S/M/L) Est. Cost Expdt.

booked

during

year

Phy.

Prog.

Total Bal

Req.

Remarks

2020-21 2021-22

Annexure 5.4

Head:Flood Protection Works

Status: In Progress,Yet To Start,(Rs. in lacs)

Sr.

No

Requriments of funds Status

Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

2022-23

BHIWANI YWS

CIRCLE

BHIWANI

AGENDA FOR

PURCHASE OF

NEW MACHINERY

FOR FLOOD

PROTECTION

WORKS DURING

2019-20, 1 No.

AXIAL FLOW VT

PUMP 20 CS WITH

MOTOR AND

DELIVERY PIPE

WITH STARTER

PANEL, 7 NO`S.

AXIAL FLOW VT

PUMP 10 CS WITH

MOTOR AND

DELIVERY PIPE

WITH STARTER

PANEL, 7 NO.

AXIAL FLOW VT

PUMP 5 CS WITH

MOTOR AND

DELIVERY PIPE

WITH STARTER

PANEL AND 6

NO. DIESEL

PUMPING SETS

WITH ENGINE 10

HP AND PUMP OF

SIZE 4`X4`.

50th M 150.00 0.00 0 % 150.00 75.00 75.00 Regarding

VT pump

20 Cs 01

no., VT

pump 10

Cs 07 no.,

VT pump 5

Cs 07 no.-

supply

order has

been

issued to

firm on

dated

13.09.2019

and the

material will

be supplied

by the firm

within four

months.

Regarding

DP sets 2

Cs 06 no.

tenders has

been called

and the

case will be

discussed

in the

upcoming

HPPC

meeting on

dated

23.12.2019

for

approval.

BAWANI

KHERA

YWS

CIRCLE

BHIWANI

Extension of 1-L

talu link drain form

rd 10198- 14050

outfalling at rd

26277- L siwana

talu link Drain (if

shareholders agree

to give land at

collectors rate)

49th L 142.15 0.00 0 % 142.15 48.33 46.91 8.34 Acres

land

acquisition

is involved.

Shareholde

rs are not

interested

to give their

land on

collector

rate.

BAWANI

KHERA

YWS

CIRCLE

BHIWANI

Agenda for

Dewatering fields

of village Badesra

by constructing

Badesra Drain no.

1 from RD 0 to

4500 and providing

sumpwell for lifting

of flood water

50th L 182.70 0.00 0 % 182.70 62.12 60.29 Alignment

approved

on

28.05.2019.

Survey

work and

3.58 Acres

Land

purchase

process in

progress.

District Total 960.51 304.74 655.77 310.91 237.66

68 0.00 IP

69 46.91 YTS

70 60.29 YTS

107.20

JIND

98

Page 102: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Name of

Constitue

ncy

Name of

Irrigation

Circle

Name of Work Appvd.

in

meeting

of

HSFCB

(S/M/L) Est. Cost Expdt.

booked

during

year

Phy.

Prog.

Total Bal

Req.

Remarks

2020-21 2021-22

Annexure 5.4

Head:Flood Protection Works

Status: In Progress,Yet To Start,(Rs. in lacs)

Sr.

No

Requriments of funds Status

Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

2022-23

SAFIDON YWS

CIRCLE

JIND

Flood agenda note

for construction of

Head Regulator at

RD 354760/R

B.M.L., Hansi

Branch , Butana

Branch, M.P.L.C.

and Inlet at RD

61000/R Hansi

Branch including

bringing to design

section of New Nai

Nallah Abondoned

Drain from RD 0 to

3600.

49th S 322.79 234.38 75 % 88.41 88.41 0.00 work in

progress

and will be

completed

by

31/01/2020

JULANA YWS

CIRCLE

JIND

Agenda for

increasing capacity

of Padana Bass

Link Drain from RD

0 to RD 49900 and

its structure out

falling at RD

155580-L Bass

Multipurpose

Channel

50th M 335.00 150.00 50 % 185.00 92.50 92.50 Tender

Approved.

Work in

Progress

and will be

completed

by

31.03.2020.

JULANA YWS

CIRCLE

JIND

Agenda for

increasing capacity

of Karela Pump

House from 60 cs

to 120 cs.

50th M 160.00 0.00 5 % 160.00 80.00 80.00 Regarding

04 no. 20

Cs VT

pump -

Supply

order

issued to

Firm on

Dated

19/9/2019

and work

will be

completed

by

31.03.2020.

SAFIDON YWS

CIRCLE

JIND

Agenda for

Increasing capacity

of Padana Drain

from RD 0 to RD

52000 and bringing

to Design Section

from RD 52000 to

92000 including Re-

Construction of 1

No Bridge

50th M 268.00 180.00 95 % 88.00 44.00 44.00 Tender

rates

approved.

Work in

progress

and will be

completed

by

31/12/2019.

71 0.00 IP

72 0.00 IP

73 0.00 IP

74 0.00 IP

99

Page 103: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Name of

Constitue

ncy

Name of

Irrigation

Circle

Name of Work Appvd.

in

meeting

of

HSFCB

(S/M/L) Est. Cost Expdt.

booked

during

year

Phy.

Prog.

Total Bal

Req.

Remarks

2020-21 2021-22

Annexure 5.4

Head:Flood Protection Works

Status: In Progress,Yet To Start,(Rs. in lacs)

Sr.

No

Requriments of funds Status

Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

2022-23

SAFIDON YWS

CIRCLE

JIND

Agenda for laying

RCC Pipe Line

from fields of

village Bhagkhera,

Bangru and

Siwanamal

including

constructing of

Pump House at RD

81400-L Padana

Drain

50th M 91.23 38.20 60 % 53.04 26.52 26.52 Tenders

rates

approved.B

alance

Work will

be restarted

after Rabi

Season and

will be

completed

by

30.06.2020.

SAFIDON YWS

CIRCLE

JIND

Agenda for laying

RCC Pipe Line

NP2 from fields of

village Gangoli

including

constructing of

Pump House at RD

18500-L Hadwa

Gangoli Link Drain

50th M 53.97 0.00 10 % 53.98 26.99 26.99 Work is in

Progress.W

ork will be

restarted

after Rabi

Season and

will be

completed

by

30.06.2020.

SAFIDON YWS

CIRCLE

JIND

Agenda for Laying

RCC Pipe Line for

De-watering of

Lake/Dabbar Area

of Agricultural land

of village

Siwanamal

including

constructing of

Temporary Pump

House at RD

81400-L Padana

Drain

50th M 110.00 55.00 60 % 55.00 27.50 27.50 Tender

rates

approved

and Work

will be

restarted

after Rabi

Season and

will be

completed

by

30.06.2020.

SAFIDON YWS

CIRCLE

JIND

Agenda for

increasing capacity

of Pump House at

Outfall of Padana

Drain at Shamlo

Pump House at RD

70000-R Sunder

Sub Branch from

120 Cs to 240 Cs

including Civil work

50th M 300.00 0.00 5 % 300.00 150.00 150.00 Regarding

10 No. 20

Cs VT

pump-

Supply

order

issued to

Firm on

Dated

19/9/2019

and Work

will be

completed

upto

31.03.2020.

District Total 1640.99 657.58 983.43 535.92 447.50

75 0.00 IP

76 0.00 IP

77 0.00 IP

78 0.00 IP

0.00

KARNAL

100

Page 104: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Name of

Constitue

ncy

Name of

Irrigation

Circle

Name of Work Appvd.

in

meeting

of

HSFCB

(S/M/L) Est. Cost Expdt.

booked

during

year

Phy.

Prog.

Total Bal

Req.

Remarks

2020-21 2021-22

Annexure 5.4

Head:Flood Protection Works

Status: In Progress,Yet To Start,(Rs. in lacs)

Sr.

No

Requriments of funds Status

Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

2022-23

KARNAL YWS

CIRCLE

KARNAL

Agenda for

connecting main

drain no. 1 (Choti

Yamuna) to main

drain no. 2 at RD

68000 (CM

announcement

code no. 148960).

48th L 969.74 3.38 25 % 966.36 328.56 318.90 Work in

Progress

and will be

completed

by

30/06/2020

District Total 969.74 3.38 966.36 328.56 318.90

PANIPAT

RURAL

YWS

CIRCLE

KARNAL

Protection of village

pond, agriculture

land and abadi of

village Mehrana

from flood in

Mehrana Drain at

existing alignment

from RD 0 to 3900

48th S 13.05 0.00 0 % 13.05 13.05 0.00 Work

started at

site but

suspended

due to court

case stay.

SAMALKH

A

YWS

CIRCLE

KARNAL

Purchase and

supply of Special

TandP Machine i.e.

1 No. Tata Hitachi

EX200 Super Fitted

Pocklain and 1 No.

Tata Hitachi Model

TH76 Excavator

cum Bachoke

Loader fitted with

standard

attachment and 1

No. Bolero Camper

(Pick-Up) for use in

Panipat Water

Services Division,

Panipat

49th S 87.50 25.20 30 % 62.30 62.30 0.00 1. Bolero

Camper

has been

purchased.

2. The ALE

Backhoe

Loader of

ACE

Company

has been

delivered in

this office.

3. 1 No.

Tata Hitachi

Model

TH76

Excavator

cum

Bachoke

Loader.Tec

hnical

specificatio

n has been

approved in

STC

meeting.

Tender has

been called

and the

case will be

put up in

the

upcoming

HPPC

meeting for

approval.

79 318.90 IP

318.90

PANIPAT

80 0.00 IP

81 0.00 IP

101

Page 105: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Name of

Constitue

ncy

Name of

Irrigation

Circle

Name of Work Appvd.

in

meeting

of

HSFCB

(S/M/L) Est. Cost Expdt.

booked

during

year

Phy.

Prog.

Total Bal

Req.

Remarks

2020-21 2021-22

Annexure 5.4

Head:Flood Protection Works

Status: In Progress,Yet To Start,(Rs. in lacs)

Sr.

No

Requriments of funds Status

Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

2022-23

SAMALKH

A

YWS

CIRCLE

KARNAL

Providing

protection to River

Yamuna

embankment in

reach RD 18910 to

27410 in

Pathargarh

Complex by

providing lining

50th M 212.53 0.00 5 % 212.54 106.27 106.27 Work in

progress

and will be

completed

upto

31.03.2020.

PANIPAT

CITY

YWS

CIRCLE

KARNAL

Bringing to design

section and

strengthening of

banks of Main

Drain No. 2, Munak

escape drain and

old Munak drain for

safe passage of

design discharge.

50th M 64.42 12.29 65 % 52.14 26.07 26.07 Work in

Progress

and will be

completed

by

31/01/2020.

ISRANA YWS

CIRCLE

KARNAL

Replacement/const

ruction of syphon at

RD 4670 of Shera

Link crossing

Madlauda Minor

and replacement of

bridge at RD 2750

on Shera Link

Drain`

50th M 23.51 0.00 10 % 23.52 11.76 11.76 Work in

Progress

and will be

completed

by

31/03/2020.

ISRANA YWS

CIRCLE

KARNAL

Separation of

village pond from

flood and waste

water flowing in

Idyana Link Drain

and protection to

village abadi in

village Idyana

50th M 45.68 0.00 10 % 45.68 22.84 22.84 Work in

Progress

and will be

completed

by

31/03/2020.

ISRANA YWS

CIRCLE

KARNAL

Separation of

village pond from

flood and waste

chemical water

flowing in Try.

Drain No. 4 and

protection to village

abadi in village

Chamrara

50th M 96.55 0.00 45 % 96.56 48.28 48.28 Work in

Progress

and will be

completed

by

31/03/2020

District Total 543.24 37.49 505.79 290.57 215.20

JAGADHRI HKB

CIRCLE

JAGADH

RI

Work of repair of

damaged portion of

Hathnikund

Barrage.

48th S 1800.00 622.00 45 % 1178.00 1178.00 0.00 45% work

completed

and

balance

work will be

competed

upto

30.04.2020.

SADHAUR

A

HKB

CIRCLE

JAGADH

RI

Construction of

Bridges on

Chautang Nallah

from RD 0 to

136400.

49th M 50.00 0.00 30 % 50.00 25.00 25.00 Work in

Progress

and will be

completed

by

31.03.2020.

District Total 1850.00 622.00 1228.00 1203.00 25.00

82 0.00 IP

83 0.00 IP

84 0.00 IP

85 0.00 IP

86 0.00 IP

0.00

YAMUNANAGAR

87 0.00 IP

88 0.00 IP

0.00

102

Page 106: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Name of

Constitue

ncy

Name of

Irrigation

Circle

Name of Work Appvd.

in

meeting

of

HSFCB

(S/M/L) Est. Cost Expdt.

booked

during

year

Phy.

Prog.

Total Bal

Req.

Remarks

2020-21 2021-22

Annexure 5.4

Head:Flood Protection Works

Status: In Progress,Yet To Start,(Rs. in lacs)

Sr.

No

Requriments of funds Status

Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

2022-23

Unit Total 5964.48 1625.19 4339.35 2668.96 1244.26

TIGAON YWS

CIRCLE

FARIDAB

AD

Construction of

Sehatpur Drain

with Brick lining

with M.S Railing to

Carry storm water

from RD 11000 to

19000 and

remodeling katcha

reach from RD 0 to

11000.

48th M 795.00 507.24 90 % 287.76 143.88 143.88 work likely

to be

completed

upto

31.12.2018

BADKHAL YWS

CIRCLE

FARIDAB

AD

Construction of CC

open drain from RD

0 to 2000 and

laying of RCC

hume pipe from RD

2000 to 6000 of

Badhkal escape

channel for

disposal of flood

water and storm

water of village

Badhkal and

Aakhir.

50th M 283.37 117.45 70 % 165.92 82.96 82.96

PRITHLA YWS

CIRCLE

FARIDAB

AD

Reconstruction of £

no. bridges at RD

201500 , 191000

and 208500 of

Gaunchi main

drain.

50th M 271.15 178.58 80 % 92.58 46.29 46.29

District Total 1349.52 803.27 546.26 273.13 273.13

PUNHANA YWS

CIRCLE

FARIDAB

AD

RE-PLACEMENT

OF 03 NOS. V.R.

BRIDGES AT RD

6250, RD 10750

AND RD 14850 OF

MARYAKA DRAIN

IN DISTRICT NUH

CONNECTING

VILLAGES (I) NAI

TO SHINGAR (II)

JHAROKHARI TO

SHINGAR (III)

MARYAKA TO

SHINGAR

RESPECTIVELY.

49th S 53.32 36.74 90 % 16.58 16.58 0.00 Work in

progress

and likely to

be

completed

upto

31.12.2019.

PUNHANA YWS

CIRCLE

FARIDAB

AD

Internal Clearance

and bringing upto

design section

(inner) from

RD.22600 to

112600 of Ujina

Drain.

49th S 199.00 78.75 95 % 120.25 120.25 0.00 Work

completed

FIROZEPU

R JHIRKA

YWS

CIRCLE

FARIDAB

AD

Flood agenda for

replacement of V.R

Bridge at RD 5700

of Ferozpur Jhirka

Link Drain.

50th S 34.00 0.00 20 % 34.00 34.00 0.00 In progress

426.10

YWS(S)

FARIDABAD

89 0.00 IP

90 0.00 IP

91 0.00 IP

0.00

MEWAT

92 0.00 IP

93 0.00 IP

94 0.00 IP

103

Page 107: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Name of

Constitue

ncy

Name of

Irrigation

Circle

Name of Work Appvd.

in

meeting

of

HSFCB

(S/M/L) Est. Cost Expdt.

booked

during

year

Phy.

Prog.

Total Bal

Req.

Remarks

2020-21 2021-22

Annexure 5.4

Head:Flood Protection Works

Status: In Progress,Yet To Start,(Rs. in lacs)

Sr.

No

Requriments of funds Status

Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

2022-23

PUNHANA YWS

CIRCLE

FARIDAB

AD

Flood Agenda for

Re-construction of

D.R. Bridge on

Ujina Drain at RD.

79266 for crossing

from village

Bhadas to

Punhana

50th M 394.50 0.00 10 % 394.50 197.25 197.25 In progress

PUNHANA YWS

CIRCLE

FARIDAB

AD

Agenda for re-

construction of V.R.

Bridge at Km

24.885 (from

village Nai to

Nunera) of Ujina

Diversion Drain in

Distt. Nuh

50th M 320.74 160.20 90 % 160.54 80.27 80.27 In progress

NUH YWS

CIRCLE

FARIDAB

AD

Flood agenda for

Re-construction of

V.R. Bridge at RD.

37150 of Nuh Drain

50th M 127.00 0.00 5 % 127.00 63.50 63.50 In Progress

NUH YWS

CIRCLE

FARIDAB

AD

Flood agenda for

Re-construction of

V.R. Bridge at RD.

58145 of Nuh Drain

50th M 171.36 0.00 10 % 171.36 85.68 85.68 Work is in

progress

District Total 1299.92 275.69 1024.23 597.53 426.70

PUNHANA YWS

CIRCLE

FARIDAB

AD

RE-PLACEMENT

OF 04 NO. V.R.

BRIDGES AT RD

KM 12.208, KM

15.080, KM 18.935

AND KM 21.953

OF UJINA

DIVERSION DRAIN

IN DISTRICT

PALWAL AND

NUH

CONNECTING

VILLAGES (I)

BHULWANA TO

UMRALA (II)

HODAL GARHI

PATTI TO LALPUR

(III) BICHHOR TO

LALPR (IV)

BICHHOR TO

NUNERA

RESPECTIVELY.

49th S 1238.26 513.32 50 % 724.94 724.94 0.00 Work under

progress of

VRB km

15.080. and

Tender rate

of VRB

12.280 has

been

approved

and work

will be

started

shortly.

Work of

VRB km

18.935 and

21.953 is

under

progress.

HATHIN YWS

CIRCLE

FARIDAB

AD

utilisation of flood

water by

constructing of

hump and pump

house on gaunchi

main drain at RD

97500 to augment

the hathin disty. to

feed tail reach

villages.

50th M 193.21 0.67 10 % 192.54 96.27 96.27 In progress

95 0.00 IP

96 0.00 IP

97 0.00 IP

98 0.00 IP

0.00

PALWAL

99 0.00 IP

100 0.00 IP

104

Page 108: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Name of

Constitue

ncy

Name of

Irrigation

Circle

Name of Work Appvd.

in

meeting

of

HSFCB

(S/M/L) Est. Cost Expdt.

booked

during

year

Phy.

Prog.

Total Bal

Req.

Remarks

2020-21 2021-22

Annexure 5.4

Head:Flood Protection Works

Status: In Progress,Yet To Start,(Rs. in lacs)

Sr.

No

Requriments of funds Status

Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

2022-23

HODAL YWS

CIRCLE

FARIDAB

AD

Agenda for

replacement of 2

Nos. V.R. Bridge at

RD. 10300 and RD.

12000 of Gaunchi

Main Drain.

50th M 392.00 0.00 10 % 392.00 196.00 196.00 In progress

District Total 1823.47 513.99 1309.48 1017.21 292.27

Unit Total 4472.91 1592.95 2879.97 1887.87 992.10

Grand Total 25882.95 5521.02 20362.21 10952.63 6998.55

101 0.00 IP

2410.88

0.00

0.00

105

Page 109: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Name of

Constitue

ncy

Name of

Irrigation

Circle

Name of Work Appvd.

in

meeting

of

HSFCB

(S/M/L) Est. Cost Expdt.

booked

during

year

Phy.

Prog.

Total Bal

Req.

Remarks

2020-21 2021-22

AMBALA

CITY

SYL

CIRCLE

AMBALA

Constructing

Retaining wall in

the side of three

Nos. Air field drain

in front of King

Fisher Resort

Ambala City

(Deposit Work of

Haryana Tourism

Corporation )

(120.00 Lakh)

50th L 120.00 0.00 0 % 120.00 40.80 39.60 Deposit

work

(120.00

Lakh)

Amount to

be

deposited

by Haryana

Tourism

Corporation

.

District Total 120.00 0.00 120.00 40.80 39.60

HISSAR BWS

CIRCLE

HISAR

CONSTRUCTION

OF SATROD

MIRKA DRAIN RD

0 TO 6450 AND

DABRA LINK

DRAIN RD 0 TO

7525(DEPOSITE

WORK OF HUDA).

46th S 983.05 657.44 90 % 325.61 325.61 0.00 Work will

be

completed

upto

31.03.2020.

Subject the

condition

that the

funds will

be provided

by HUDA.

District Total 983.05 657.44 325.61 325.61 0.00

THANESA

R

SYL

CIRCLE

AMBALA

Constg. of RCC

rectangular open

drain of size

5.50`X2.75` parallel

to Saraswati Creak

for sewerage water

disposal work

Sector-13, U.E.

Kurukshetra and 7`

X3.50` from Public

Health STP point to

siphon Narwana

Branch,Jyotisar.

Funds are to be

provided by HUDA

and PHED.

45th L 4070.00 4039.21 100 % 30.79 10.47 10.16 Flood

Protection

Work...

District Total 4070.00 4039.21 30.79 10.47 10.16

Unit Total 5173.05 4696.65 476.40 376.88 49.76

BADSHAP

UR

CONSTR

UCTION

CIRCLE

GURGAO

N

Construction of

RCC open Trough

for channelisation

of Badshahpur

Drain K to L

(Dhankot road to

Njafgarh Drain)

47th M 4837.00 0.00 0 % 4837.00 2418.50 2418.50 Work

proposed to

be dropped

as funds

not

provided by

HSVP.

District Total 4837.00 0.00 4837.00 2418.50 2418.50

Unit Total 4837.00 0.00 4837.00 2418.50 2418.50

ROHTAK

0.00

LCU

4 0.00 Droppe

d

0.00

CONSTRUCTION

GURGAON

10.16

49.76

KURUKSHETRA

3 10.16 Comple

ted

2 0.00 IP

0.00

39.60

HISAR

AMBALA

1 39.60 YTS

2022-23

BWS

Annexure 6.1Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

Head:8443-Irrigation Department Deposit Works (Rs. in lacs)

Sr.

No

Requriments of funds Status

106

Page 110: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Name of

Constitue

ncy

Name of

Irrigation

Circle

Name of Work Appvd.

in

meeting

of

HSFCB

(S/M/L) Est. Cost Expdt.

booked

during

year

Phy.

Prog.

Total Bal

Req.

Remarks

2020-21 2021-22 2022-23

Annexure 6.1Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

Head:8443-Irrigation Department Deposit Works (Rs. in lacs)

Sr.

No

Requriments of funds Status

BAHADUR

GARH

YWS

CIRCLE

ROHTAK

Increasing capacity

of Sarai

Aurangabad

Kassar Link Drain

from RD 0 to 34052

out falling into KCB

Drain at RD 8103-L

including its

extension and

Sump Well Pump

House

47th M 404.18 0.00 0 % 404.18 202.09 202.09 Deposit

work of

HUDA and

HSIDC.

Amount not

deposited

by HUDA

and HSIDC.

L-section

and

drawing

approved.

HUDA need

to deposit

146.98 lacs

and HSIDC

need to

deposit

257.20

lacs.

Necessary

written

letter to

CE/LCY,

PKL

regarding

clarification

vide this

office letter

no. 2004/70-

W dated

20.08.2019

District Total 404.18 0.00 404.18 202.09 202.09

Unit Total 404.18 0.00 404.18 202.09 202.09

PANIPAT

RURAL

YWS

CIRCLE

KARNAL

Providing lining and

railing of panipat

drain from RD

55673-27000. total

cost of the scheme

RS. 44.08 crore

fund is to be

provided by HUDA.

45th S 3780.00 2900.00 100 % 880.00 880.00 0.00 DEPOSIT

WORK OF

HUDA.

HUDA HAS

NOT

DEPOSITE

D THE

BALANCE

AMOUNT

OF RS.8.80

CRORE

FOR

EXECUTIO

N OF THE

SCHEME .

6 0.00 Comple

ted

YWS(N)

PANIPAT

0.00

0.00

5 0.00 YTS

107

Page 111: gfj;k.kk jkT; lw[kk jkgr ,oa ck

Name of

Constitue

ncy

Name of

Irrigation

Circle

Name of Work Appvd.

in

meeting

of

HSFCB

(S/M/L) Est. Cost Expdt.

booked

during

year

Phy.

Prog.

Total Bal

Req.

Remarks

2020-21 2021-22 2022-23

Annexure 6.1Districtwise Details of Ongoing Schemes(Short,Medium, Long) Approved upto 50th meeting or HSDR & FCB

Head:8443-Irrigation Department Deposit Works (Rs. in lacs)

Sr.

No

Requriments of funds Status

PANIPAT

RURAL

YWS

CIRCLE

KARNAL

Remodelling of

panipat drain by

providing lining and

replacing of pucca

structure from RD

55673 to 64400

(phase-2 costing

rs. 13.55 crore).

46th S 1355.00 0.00 0 % 1355.00 1355.00 0.00 deposite

work of MC

panipat/UL

B.MC/PANI

PAThas not

deposited

the required

amount to

execute the

work.Now

this work is

under CM

announcem

ent and is

being dealt

seperately.

District Total 5135.00 2900.00 2235.00 2235.00 0.00

Unit Total 5135.00 2900.00 2235.00 2235.00 0.00

BALABGA

RH

YWS

CIRCLE

FARIDAB

AD

PROVIDING

LINING OF

GAUNCHI DRAIN

FROM RD 0-

15534. TOTAL

COST OF THE

PROJECT RS.

1510.0 LACS

BEING SHARED

BY HUDA

MUNICIPAL

CORP.

FARIDABADD,URB

AN LOCAL

BODIES,

IRRIGATION

DEPARTMENT .

AMOUNT SHARED

BY VARIOUS

DEPARTMENTS.

HUDA 250.00

LACS, MCF-255.00

LACS,

IRRIGATION-

250.00.

45th S 1420.00 1325.00 95 % 95.00 95.00 0.00

THE

BALANCED

AMOUNT

TO THE

TUNE OF

RS. 95.00

LACS IS

PENDING

WITH MCF.

SHARE

ALREADY

RECEIVED

HUDA-

250.00 ,

MCF-70.00

LACS, ULB-

755.00

LACS,

IWRD-

250.00

LACS.

District Total 1420.00 1325.00 95.00 95.00 0.00

Unit Total 1420.00 1325.00 95.00 95.00 0.00

Grand Total 16969.23 8921.65 8047.58 5327.47 2670.35

0.00

49.76

8 0.00 IP

0.00

YWS(S)

FARIDABAD

0.00

0.00

7 0.00 YTS

108