Zublin Precast Factory Malaysia Facts Project Description Construction of precast factory comprising 1 unit 2 storey office building, 1 unit canteen, 1 unit praying room, 2 unit guard houses at Jalan Lukut 4, Lukut Industrial Area, Kota Tinggi, Johor, Malaysia. Altogether 200 piles are installed to support the steel structure of the 10 m x 80m factory building. The factory will have three production lines: one for Jacking Pipes and two for other precast elements including tunnel segments. The facilities are located only 45 km away from Singapore and were constructed on a land area of 50,000 m². The factory has 11,00 m² of covered space for the production activities in three production bays. The production facility has a state-of-the-art equipment such as automatic cage welding machines, automatic stirrup bending machine, vacuum segment handling System, steam curing facilities and a 50 m³/h capacity batching plant as well as high-tech materials laboratory. The projected annual production will be 4,000 tunnel rings and 2,000 pipes. City/Country Kota Tinggi / Malaysia Client Zublin Precast Industries Sdn Bhd, Kota Tinggi Architect Walter & Jo Architect Associates Contract Value € 8,00 Mio. Construction Period 04/2014 - 11/2014 (8 Months) .

Zublin Precast Factory Malaysia - dywidag.dedywidag.de/databases/internet/_public/content.nsf...unit praying room, 2 unit guard houses at Jalan Lukut 4, Lukut Industrial Area, Kota

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

  • Zublin Precast Factory Malaysia

    Facts Project DescriptionConstruction of precast factory comprising 1 unit 2 storey office building, 1 unit canteen, 1unit praying room, 2 unit guard houses at Jalan Lukut 4, Lukut Industrial Area, Kota Tinggi,Johor, Malaysia.Altogether 200 piles are installed to support the steel structure of the 10 m x 80m factorybuilding. The factory will have three production lines: one for Jacking Pipes and two forother precast elements including tunnel segments.The facilities are located only 45 km away from Singapore and were constructed on a landarea of 50,000 m². The factory has 11,00 m² of covered space for the production activitiesin three production bays. The production facility has a state-of-the-art equipment such asautomatic cage welding machines, automatic stirrup bending machine, vacuum segmenthandling System, steam curing facilities and a 50 m³/h capacity batching plant as well ashigh-tech materials laboratory.The projected annual production will be 4,000 tunnel rings and 2,000 pipes.

    City/Country

    Kota Tinggi / Malaysia

    Client

    Zublin Precast Industries Sdn Bhd, KotaTinggi

    Architect

    Walter & Jo Architect Associates

    Contract Value

    € 8,00 Mio.

    Construction Period

    04/2014 - 11/2014 (8 Months)

    .