FIJV Yogi Magnetite Project Hydrogeological Assessment: Test Pumping Locations \ghdnet.internal\ghd\au\perth\projects\61\37117\Tech\Hydrogeo Map Projection: Universal Transverse Mercator Horizontal Datum: Geocentric Datum of Australia 1994 Grid: Map Grid of Australia, Zone 50 Project No. Revision No. Date 6137117 - 18/12/2018 Paper Size A3 Data source: DWER, GHD,. Created by: AO Exploration/Monitoring Bore 2019 Aircore Investigation Bore (2019) Monitoring Bore (2019) Test Production Bore (2019) Test Pumping Location (2019) Yogi Pit Extent (2019) Yogi Project Area (2019) Figure 10 - 10

Yogi-Magnetite Project Hydrogeological Assessment · 2020-04-14 · Yogi-Magnetite Project Hydrogeological Assessment Groundwater Drawdown - Year 5 \ghdnet.internal\ghd\AU\Perth\Projects\61\37117\GIS\Maps\Working

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Yogi-Magnetite Project Hydrogeological Assessment · 2020-04-14 · Yogi-Magnetite Project Hydrogeological Assessment Groundwater Drawdown - Year 5 \ghdnet.internal\ghd\AU\Perth\Projects\61\37117\GIS\Maps\Working

FIJV Yogi Magnetite Project

Hydrogeological Assessment:Test Pumping Locations

\ghdnet.internal\ghd\au\perth\projects\61\37117\Tech\Hydrogeo

Map Projection: Universal Transverse MercatorHorizontal Datum: Geocentric Datum of Australia 1994

Grid: Map Grid of Australia, Zone 50

Project No.Revision No.

Date

6137117-18/12/2018

Paper Size A3

Data source: DWER, GHD,. Created by: AO

Exploration/Monitoring Bore 2019

Aircore Investigation Bore (2019)

Monitoring Bore (2019)

Test Production Bore (2019)

Test Pumping Location (2019)

Yogi Pit Extent (2019)

Yogi Project Area (2019)

Figure 10 - 10

Page 2: Yogi-Magnetite Project Hydrogeological Assessment · 2020-04-14 · Yogi-Magnetite Project Hydrogeological Assessment Groundwater Drawdown - Year 5 \ghdnet.internal\ghd\AU\Perth\Projects\61\37117\GIS\Maps\Working

FI Joint Venture Pty LtdYogi-Magnetite Project Hydrogeological Assessment

Groundwater Drawdown - Year 5

\ghdnet.internal\ghd\AU\Perth\Projects\61\37117\GIS\Maps\Working

Map Projection: Universal Transverse MercatorHorizontal Datum: Geocentric Datum of Australia 1994

Grid: Map Grid of Australia, Zone 50

Project No.Revision No.

Date

61-37117020/05/2019

Paper Size A3

Data source: GHD, DWER, FIJV. Created by: AO

Yalgoo Town Water SupplyBores

Test Production Bore

Monitoring Bore

Stock Bore/Well

Ecosystem Reliant onGroundwater

Public Drinking Water SourceArea

Proposed Pit Outline Rivers/StreamYogi Project Area

Groundwater Licence

100,000 to 5,000,000 kL/yr

10,000 to 1,000,000 kL/yr

<10,000 kL/yr

SimulatedPumping BoreDrawdown Contour (1, 2, 5,

10, 20, 50, 100, 200m)

Figure 10 - 11

Page 3: Yogi-Magnetite Project Hydrogeological Assessment · 2020-04-14 · Yogi-Magnetite Project Hydrogeological Assessment Groundwater Drawdown - Year 5 \ghdnet.internal\ghd\AU\Perth\Projects\61\37117\GIS\Maps\Working

FI Joint Venture Pty LtdYogi-Magnetite Project Hydrogeological Assessment

Groundwater Drawdown - Year 10

\ghdnet.internal\ghd\AU\Perth\Projects\61\37117\GIS\Maps\Working

Map Projection: Universal Transverse MercatorHorizontal Datum: Geocentric Datum of Australia 1994

Grid: Map Grid of Australia, Zone 50

Project No.Revision No.

Date

61-37117020/05/2019

Paper Size A3

Data source: GHD, DWER, FIJV. Created by: AO

Yalgoo Town Water SupplyBores

Test Production Bore

Monitoring Bore

Stock Bore/Well

Ecosystem Reliant onGroundwater

Public Drinking Water SourceArea

Proposed Pit Outline Rivers/StreamYogi Project Area

Groundwater Licence

100,000 to 5,000,000 kL/yr

10,000 to 1,000,000 kL/yr

<10,000 kL/yr

SimulatedPumping BoreDrawdown Contour (1, 2, 5,

10, 20, 50, 100, 200m)

Figure 10 - 12

Page 4: Yogi-Magnetite Project Hydrogeological Assessment · 2020-04-14 · Yogi-Magnetite Project Hydrogeological Assessment Groundwater Drawdown - Year 5 \ghdnet.internal\ghd\AU\Perth\Projects\61\37117\GIS\Maps\Working

FI Joint Venture Pty LtdYogi-Magnetite Project Hydrogeological Assessment

Groundwater Drawdown - Year 21 (End of Mining)

\ghdnet.internal\ghd\AU\Perth\Projects\61\37117\GIS\Maps\Working

Map Projection: Universal Transverse MercatorHorizontal Datum: Geocentric Datum of Australia 1994

Grid: Map Grid of Australia, Zone 50

Project No.Revision No.

Date

61-37117020/05/2019

Paper Size A3

Data source: GHD, DWER, FIJV. Created by: AO

Yalgoo Town Water SupplyBores

Test Production Bore

Monitoring Bore

Stock Bore/Well

Ecosystem Reliant onGroundwater

Public Drinking Water SourceArea

Proposed Pit Outline Rivers/StreamYogi Project Area

Groundwater Licence

100,000 to 5,000,000 kL/yr

10,000 to 1,000,000 kL/yr

<10,000 kL/yr

SimulatedPumping BoreDrawdown Contour (1, 2, 5,

10, 20, 50, 100, 200m)

Figure 10 - 13

Page 5: Yogi-Magnetite Project Hydrogeological Assessment · 2020-04-14 · Yogi-Magnetite Project Hydrogeological Assessment Groundwater Drawdown - Year 5 \ghdnet.internal\ghd\AU\Perth\Projects\61\37117\GIS\Maps\Working

FI Joint Venture Pty LtdYogi-Magnetite Project Hydrogeological Assessment

Groundwater Drawdown - Year 21 (End of MiningSensitivity Scenario

\ghdnet.internal\ghd\AU\Perth\Projects\61\37117\GIS\Maps\Working

Map Projection: Universal Transverse MercatorHorizontal Datum: Geocentric Datum of Australia 1994

Grid: Map Grid of Australia, Zone 50

Project No.Revision No.

Date

61-37117020/05/2019

Paper Size A3

Data source: GHD, DWER, FIJV. Created by: AO

Yalgoo Town Water SupplyBores

Test Production Bore

Monitoring Bore

Stock Bore/Well

Ecosystem Reliant onGroundwater

Public Drinking Water SourceArea

Proposed Pit Outline Rivers/StreamYogi Project Area

Groundwater Licence

100,000 to 5,000,000 kL/yr

10,000 to 1,000,000 kL/yr

<10,000 kL/yr

SimulatedPumping BoreDrawdown Contour (1, 2, 5,

10, 20, 50, 100, 200m)

Figure 10 - 14

Page 6: Yogi-Magnetite Project Hydrogeological Assessment · 2020-04-14 · Yogi-Magnetite Project Hydrogeological Assessment Groundwater Drawdown - Year 5 \ghdnet.internal\ghd\AU\Perth\Projects\61\37117\GIS\Maps\Working

FI Joint Venture Pty LtdYogi-Magnetite Project Hydrogeological Assessment

Groundwater Drawdown - Year 100 after closure

\ghdnet.internal\ghd\AU\Perth\Projects\61\37117\GIS\Maps\Working

Map Projection: Universal Transverse MercatorHorizontal Datum: Geocentric Datum of Australia 1994

Grid: Map Grid of Australia, Zone 50

Project No.Revision No.

Date

61-37117020/05/2019

Paper Size A3

Data source: GHD, DWER, FIJV. Created by: AO

Yalgoo Town Water SupplyBores

Test Production Bore

Monitoring Bore

Stock Bore/Well

Ecosystem Reliant onGroundwater

Public Drinking Water SourceArea

Proposed Pit Outline Rivers/StreamYogi Project Area

Groundwater Licence

100,000 to 5,000,000 kL/yr

10,000 to 1,000,000 kL/yr

<10,000 kL/yr

SimulatedPumping BoreDrawdown Contour (1, 2, 5,

10, 20, 50, 100, 200m)

Figure 10 - 15

Page 7: Yogi-Magnetite Project Hydrogeological Assessment · 2020-04-14 · Yogi-Magnetite Project Hydrogeological Assessment Groundwater Drawdown - Year 5 \ghdnet.internal\ghd\AU\Perth\Projects\61\37117\GIS\Maps\Working

FI Joint Venture Pty LtdYogi-Magnetite Project Hydrogeological Assessment

Groundwater Drawdown - Year 500 after closure

\ghdnet.internal\ghd\AU\Perth\Projects\61\37117\GIS\Maps\Working

Map Projection: Universal Transverse MercatorHorizontal Datum: Geocentric Datum of Australia 1994

Grid: Map Grid of Australia, Zone 50

Project No.Revision No.

Date

61-37117020/05/2019

Paper Size A3

Data source: GHD, DWER, FIJV. Created by: AO

Yalgoo Town Water SupplyBores

Test Production Bore

Monitoring Bore

Stock Bore/Well

Ecosystem Reliant onGroundwater

Public Drinking Water SourceArea

Proposed Pit Outline Rivers/StreamYogi Project Area

Groundwater Licence

100,000 to 5,000,000 kL/yr

10,000 to 1,000,000 kL/yr

<10,000 kL/yr

SimulatedPumping BoreDrawdown Contour (1, 2, 5,

10, 20, 50, 100, 200m)

Figure 10 - 16

Page 8: Yogi-Magnetite Project Hydrogeological Assessment · 2020-04-14 · Yogi-Magnetite Project Hydrogeological Assessment Groundwater Drawdown - Year 5 \ghdnet.internal\ghd\AU\Perth\Projects\61\37117\GIS\Maps\Working

FI Joint Venture Pty LtdYogi-Magnetite Project Hydrogeological Assessment

Proposed Groundwater Monitoring Locations -Regional Areas

\ghdnet.internal\ghd\AU\Perth\Projects\61\37117\GIS\Maps\Working

Map Projection: Universal Transverse MercatorHorizontal Datum: Geocentric Datum of Australia 1994

Grid: Map Grid of Australia, Zone 50

Project No.Revision No.

Date

61-37117020/05/2019

Paper Size A3

Data source: GHD, DWER, FIJV. Created by: AO

Pumping Bore

ProposedMonitoring Bore

Groundwater Licence Stock Bore/Well

Project Features

GDE

Public Drinking WaterSource Area

Rivers

Yogi Project Area

Figure 10 - 17

Page 9: Yogi-Magnetite Project Hydrogeological Assessment · 2020-04-14 · Yogi-Magnetite Project Hydrogeological Assessment Groundwater Drawdown - Year 5 \ghdnet.internal\ghd\AU\Perth\Projects\61\37117\GIS\Maps\Working

FI Joint Venture Pty LtdYogi-Magnetite Project Hydrogeological Assessment

Proposed Groundwater Monitoring Locations -Operational Areas

\ghdnet.internal\ghd\AU\Perth\Projects\61\37117\GIS\Maps\Working

Map Projection: Universal Transverse MercatorHorizontal Datum: Geocentric Datum of Australia 1994

Grid: Map Grid of Australia, Zone 50

Project No.Revision No.

Date

61-37117020/05/2019

Paper Size A3

Data source: GHD, DWER, FIJV. Created by: AO

Pumping Bore

ProposedMonitoring Bore

Groundwater Licence Stock Bore/Well

Project FeaturesPublic Drinking WaterSource Area Rivers

Yogi Project Area

Figure 10 - 18