Upload
katherine-warner
View
217
Download
0
Tags:
Embed Size (px)
Citation preview
www.ramkumarsjava.com
Fundamentals of Computer System &
Estimation
www.ramkumarsjava.com
Fundamentals of Computer System
www.ramkumarsjava.com
1. A mother board is sometimes called .
a) circuit board b) terminal board c) system board d) none of these
Ans. (C)
www.ramkumarsjava.com
2. Some kind of expansion cards are video cards, sound cards etc. (True/False)
Ans. True
www.ramkumarsjava.com
3. ___________ is a technology based on the memory subsystem of your computer.
a)GUI b) Caching c) Fetching d)none of these
Ans. (b)
www.ramkumarsjava.com
4. is used for bulk storage data and other information.
Ans. Secondary Memory
www.ramkumarsjava.com
5. Dynamic RAM can be periodically refreshed? (True /False)
Ans. True
www.ramkumarsjava.com
6. The input/output device and the secondary storage unit of a computer is called .
a) protocols b) CPU c) computer peripherals d)control unit
Ans. (c)
www.ramkumarsjava.com
7. controls the flow and manipulation of data and information.
a)ALU b) CPU c) control unit d)expansion card
Ans. (c)
www.ramkumarsjava.com
8. is a combination of 4 bits.
a) byte b) nibble c) terabyte d) none of these
Ans. (b)
www.ramkumarsjava.com
9.Retrieval time is in primary memory as compared to secondary memory.(Less /More)
Ans. Less
www.ramkumarsjava.com
10.Range of level 2 cache is .
a) 256 KB-512 KB b) 1 MB-8 MB c) 8MB-16 MB d) 2 KB-64 KB
Ans. (a)
www.ramkumarsjava.com
11. is a small amount of fast memory used by the CPU to store the most frequently used data.
a) RAM b) ROM c) Cache memory d) Secondary Memory
Ans. (c)
www.ramkumarsjava.com
Networking
www.ramkumarsjava.com
1.The OSI Layer responsible for delivery of messages from source to destination. (A) Network Layer(B) Transport Layer(C) Data link Layer
Ans. (B)
www.ramkumarsjava.com
2.Individual networks are joined into inter-networks by using devices like- (A) Switches(B) Routers(C) Hub
Ans. (B)
www.ramkumarsjava.com
3.The Network that is Privately Owned (A) LAN(B) MAN(C) WAN
Ans. (A)
www.ramkumarsjava.com
4.Topology that describes a multipoint configuration and the devices are linked by a long cable. (A) Ring Topology(B) Bus Topology(C) Tree Toplogy(D) Star Topology
Ans. (B)
www.ramkumarsjava.com
5.The Topology in which it is easy to add and delete a device (A) Ring Topology(B) Bus Topology(C) Star Topology
Ans. Ring
www.ramkumarsjava.com
6. The number of physical channels a fully connected mesh Network has is (A) n(n-1)(B) n(C) n(n-1)/2
Ans. (C)
www.ramkumarsjava.com
7. A computer that stores and manages files for multiple users on a network (A) Application Server(B) Web Server(C) File Server
Ans. (C)
www.ramkumarsjava.com
8. is a central controller device in a star Topology. -Router-Switch-Hub
Ans. Hub
www.ramkumarsjava.com
9.User Support Layers are- (A) Session Layer, Presentation Layer, Application Layer (B) Physical Layer, Data link Layer, Network Layer(C) Session Layer, Data link Layer, Application Layer
Ans. (A)
www.ramkumarsjava.com
10. The Layer Responsible for Data Formatting and Encryption (A) Application Layer(B) Presentation Layer(C) Session Layer
Ans. (B)
www.ramkumarsjava.com
11. OSI Stands for:- (A) Open Standard Interconnection(B) Open Systems Interconnection(C) Open Standard Intercommunication
Ans. (B)
www.ramkumarsjava.com
Estimation: Module 1 & 2
www.ramkumarsjava.com
1. Estimation determines the effort and time management.(True/False)
Ans. True
www.ramkumarsjava.com
2. Under Staffing and De Scoping is the impact of .
Ans. Underestimation
www.ramkumarsjava.com
3. and are the negative impacts which results in client dissatisfaction.
Ans. Underestimating and Overestimating
www.ramkumarsjava.com
4. Using a practical project planning approach is the element of bad estimate.True or False?
Ans. False
www.ramkumarsjava.com
5. What are the elements of a good estimate ?
(A)Design estimate to fit your culture.(B)Estimate is an exact no.(C)Estimate created early in project.(D)Targets are dictated by management or customer.
Ans. (A)
www.ramkumarsjava.com
6. Functional size is size of software derived by quantifying business requirement. (True/false)
Ans. True
www.ramkumarsjava.com
7. Which is the predominant recognized ISO standards for functionally sizing software? a) COSMIC-FFP b) IFPUG FPA c) Gartner FFPA d) NESMA FPA Method
Ans. (B) International Function Point User Group
www.ramkumarsjava.com
8. FP is used as input in which of the following? a)Production fixing b)Software Upgrade Projects c)Any project which has a requirement for conversion of data. d)Team Test Projects
Ans. (C)
www.ramkumarsjava.com
9. In Performance Tuning i.e. to improve the throughput time of a set of transactions, function points are used . (True/False)
Ans. False
www.ramkumarsjava.com
10. Displaying Employee Average Pay Report to the user is an example of : a) External Input b) External Output c) External Inquiry
Ans. (B)
www.ramkumarsjava.com
Estimation: Module 3
(ADM Estimating Models Overview)
www.ramkumarsjava.com
Introduction:
- ADM Estimating Model- ADM Estimators- Selecting appropriate estimator- Basic Estimating Model Process
www.ramkumarsjava.com
1. The ADM Estimator is template that helps in and of historical data from multiple projects.
(A) Collection and dispay.(B) Estimation and analysing.(C) Modification and calculation.
Ans. (B)
www.ramkumarsjava.com
2. Who develops and maintain the ADM Estimators ?
(A) Global Delivery Estimating Team. (B) Global Delivery Excellence Team. (C) Global Data Excellence Team. (D) Global Delivery Execution Team.
Ans. (B)
www.ramkumarsjava.com
3. When are the foll. estimators used:-
1. Top down Estimates(High Level)2. Bottom Up Estimates (Detailed)3. Small Project(Design Build- Test)
A. When enough estimating input is available.B. During early stages of engagement.C. Highly accurate estimates for design and build tasks
Ans. 1-(B); 2-(A); 3-(C)
www.ramkumarsjava.com
4. Technology used for :
1. High Level-2. Detailed-3. Small Project- Hint: Generic or .NET, Java& Host-Based
GenericGeneric
.NET,Java & Host-Based
www.ramkumarsjava.com
5. Which is the best ADM Estimator ?
(A) Top Down Estimator/High Level.(B) Bottom-Up Estimators/Detailed.(C) Design Build Test Estimator/Small Project.(D) Combination of all of the above.
Ans. (D)
www.ramkumarsjava.com
THANK YOU !!
ALL THE BEST !!