„The sole responsibility for the content of this presentation lies with the authors. It does not necessarily reflect the opinion of the European Union. Neither the EACI nor the European Commission are responsible for any use that may be made of the information contained therein.“ WP2 – Design of case studies Kaj Wågdahl Climate Protection Agency Sweden

WP2 – Design of c ase studies

  • Upload
    tirzah

  • View
    35

  • Download
    0

Embed Size (px)

DESCRIPTION

WP2 – Design of c ase studies. Kaj Wågdahl Climate Protection Agency Sweden. WP2 – Design of case studies. The aim of the work package Review of the State of the Art Present good examples in the form of Case studies. State of the Art Report. EU policies, programmes and projects - PowerPoint PPT Presentation

Citation preview

Page 1: WP2  –  Design of  c ase studies

„The sole responsibility for the content of this presentation lies with the authors. It does not necessarily reflect the opinion of the European Union. Neither the EACI nor the European Commission are responsible for any use that may be made of the information contained therein. “

WP2 – Design of case studies

Kaj WågdahlClimate Protection Agency Sweden

Page 2: WP2  –  Design of  c ase studies

WP2 – Design of case studies

The aim of the work package

• Review of the State of the Art• Present good examples in the form

of Case studies

Page 3: WP2  –  Design of  c ase studies

State of the Art Report

• EU policies, programmes and projects• DSP strategies• TRAILBLAZER case studies• Conclusions and recommendations• The report can be downloaded from the project

website – update by the end of the project

Page 4: WP2  –  Design of  c ase studies

Case Studies

• Sutton• Croydon• Borlänge• Heathrow• Bristol• Regensburg

• Lucca• Bordeaux• Aalborg• TfL Palestra• Vercelli• Zagreb

• Växjö• Eskilstuna• Berlin

Page 5: WP2  –  Design of  c ase studies

Case studies - overview

Page 6: WP2  –  Design of  c ase studies

Conclusions from the case studies

• Range of project owners and involvement of stakeholders

• Range of investment in infrastructure (buildings, ICT, vehicles etc)

• Range of technical level/complexity. Both Low-tech and High-tech solutions

Page 7: WP2  –  Design of  c ase studies

Conclusions from the case studies

• Most cities/organizations have combined solutions and strategies

• Consolidation is a key element in several cases – direct or indirect

• New solutions are continuously developed

Page 8: WP2  –  Design of  c ase studies

Success factors

• Co-operation between actors• Political support• Willingness to act in favor of a general purpose • Economy, environment and social aspects in balance• Look for a combination of measures• Periodic data collection is essential• Fair and trustworthy information