41
Work summary Zhibin Sun Jan/15/2010

Work summary

  • Upload
    ganit

  • View
    20

  • Download
    0

Embed Size (px)

DESCRIPTION

Work summary. Zhibin Sun Jan/15/2010. Outline. Part 1: MAB Part 2: GOM. Part 1: MAB. Period: 1993 to 1999. Mean V at bottom level. K=kb-1, kb-2 Monthly Whole. month #2. Kb-1. Kb-2. month #5. Kb-1. Kb-2. month #8. Kb-1. Kb-2. month #11. Kb-1. Kb-2. whole. Kb-1. Kb-2. - PowerPoint PPT Presentation

Citation preview

Page 1: Work summary

Work summary

Zhibin SunJan/15/2010

Page 2: Work summary

Outline

• Part 1: MAB• Part 2: GOM

Page 3: Work summary

Part 1: MAB

• Period: 1993 to 1999

Page 4: Work summary

Mean V at bottom level

• K=kb-1, kb-2• Monthly• Whole

Page 5: Work summary

month #2

Kb-1

Kb-2

Page 6: Work summary

month #5

Kb-1

Kb-2

Page 7: Work summary

month #8

Kb-1

Kb-2

Page 8: Work summary

month #11

Kb-1

Kb-2

Page 9: Work summary

whole

Kb-1

Kb-2

Page 10: Work summary

Mean SSH and V(k=13)

• K=13 is about sigma=0.5 (mid level)

Page 11: Work summary

month #2

SSH

T(k=13)

Page 12: Work summary

month #5

SSH

T(k=13)

Page 13: Work summary

month #8

SSH

T(k=13)

Page 14: Work summary

month #11

SSH

T(k=13)

Page 15: Work summary

whole

SSH

T(k=13)

Page 16: Work summary

T at -50m and -500m

• interpolation

Page 17: Work summary

month #2

T(-50m)

T(-500m)

Page 18: Work summary

month #5

T(-50m)

T(-500m)

Page 19: Work summary

month #8

T(-50m)

T(-500m)

Page 20: Work summary

month #11

T(-50m)

T(-500m)

Page 21: Work summary

whole

T(-50m)

T(-500m)

Page 22: Work summary

Section Volume transport (U) from shelf to isobaths

• 60m• 100m• 200m

Page 23: Work summary

Fine Grid Domain

Page 24: Work summary

1993 to 1999

Page 25: Work summary

winter

autumn

summer

spring

Page 26: Work summary

Volume transport at sections (Savidge)

C

B

A

AN

Page 27: Work summary
Page 28: Work summary
Page 29: Work summary
Page 30: Work summary
Page 31: Work summary

Part 2: GOM assimilation using Kathy’s SSHa observations

• 6 cases: (1 day assimilation time interval)• Case A: Assimssh• Case B: Assimssh + Kathy’s obs (immediately)• Case C: Assimssh + Kathy’s obs (0.5 day later)• Case D: AssimEnoi• Case E: AssimEnoi + Kathy’s obs (immediately)• Case F: AssimEnoi + Kathy’s obs (0.5 day later)

Page 32: Work summary

Domain and obs time coverage

• 2003-4-9 to 2004-3-26

Page 33: Work summary

Case BSpatial CC Temporal CC

Page 34: Work summary

Compare Satellite and Kathy’s obs

• Exclude data point where spatial CC < 0.7

Page 35: Work summary

Case B

Before exclude

After exclude

Page 36: Work summary

Case A

Before exclude

After exclude

Page 37: Work summary

Case C

Before exclude

After exclude

Page 38: Work summary

Case D

Before exclude

After exclude

Page 39: Work summary

Case E

Before exclude

After exclude

Page 40: Work summary

Case F

Before exclude

After exclude

Page 41: Work summary

Part 2 conclusions

• Difference between satellite and Kathy’s observation does affect assimilation significantly.

• Difference lasts longer, results are much worse.

• The region of low temporal CC is related to the difference between satellite and Kathy’s observation.