Upload
amal-herring
View
13
Download
0
Tags:
Embed Size (px)
DESCRIPTION
Work summary. Zhibin Sun Feb/19/2010. Outline. Part 1: Coding Part 2: MAB EOF for EL and (U,V) current for coarse grid Part 3: GOM oscillator analysis: gomn117_noassim_noptb_n?wn_41: 02 to 62 Part 4: GOM oscillator analysis: gomn117_noassim_noptb_n?wn_nogd_tprni0.05_c10_41. - PowerPoint PPT Presentation
Citation preview
Outline
• Part 1: Coding
• Part 2: MAB EOF for EL and (U,V) current for coarse grid
• Part 3: GOM oscillator analysis: gomn117_noassim_noptb_n?wn_41: 02 to 62
• Part 4: GOM oscillator analysis: gomn117_noassim_noptb_n?wn_nogd_tprni0.05_c10_41
Part 1: coding for MAB
• Coarse grid run1. continue ua*3.0 to year 20082. new one with correct tidal data3. new one with correct tidal data and ccmp3 wind
• Fine grid run1. new one from above 22. new one from above 3
Part 3: GOM
• gomn117_noassim_noptb_n?wn_41: 02 to 62• Composite for eddy days
• 1998/11 to 2003/11
• No wind (shown last week), with wind
Movies (every 5 days)
• 1998• 1999• 2000• 2001• 2002• 2003
Part 4: GOM oscillator
• gomn117_noassim_noptb_n?wn_nogd_tprni0.05_c10_41
• determine eddy days
• 1999 to 2006