1 11/17/14 WKU Facilities Management Snow Plan

WKU Snow Plan 2014It is anticipated that completion of snow removal will be dependent on the total snowfall accumulation and subsequently the mechanical and chemical removal the snow

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: WKU Snow Plan 2014It is anticipated that completion of snow removal will be dependent on the total snowfall accumulation and subsequently the mechanical and chemical removal the snow

1 11/17/14 WKU Facilities Management Snow Plan

Page 2: WKU Snow Plan 2014It is anticipated that completion of snow removal will be dependent on the total snowfall accumulation and subsequently the mechanical and chemical removal the snow

• The Intent of this snow plan is to standardize and document the Standard Operating Procedures taken by Facilities Management to combat a winter snow or ice storm. Every storm is different, with different starting times, temperatures, accumulations and durations. This plan indentifies the general Facilities Management staff resources, equipment resources, areas of responsibility and general strategies for managing any given storm.

• The Director of EHS, WKU Police and the Facilities Management Director along with the Manager of

Campus Services will monitor conditions that will result in communications to the Chief of Police or his designee who will inform the University Provost by 5:15AM regarding weather conditions, so that they can officially designate the school as open, late or officially closed.

• The Facilities Management Director and the Manager of Campus Services will monitor the weather conditions during non-working hours and will call in the necessary grounds personnel as needed. Several products or actions may be used depending on the surface that is effected. This includes: pre-spraying of steps, closing of top floors of parking structures, barricading of entrances until safe.

Procedures for Snow Removal:

2 WKU Facilities Management Snow Plan 11/13/2014 WKU Facilities Management Snow Plan

Page 3: WKU Snow Plan 2014It is anticipated that completion of snow removal will be dependent on the total snowfall accumulation and subsequently the mechanical and chemical removal the snow

It is anticipated that completion of snow removal will be dependent on the total snowfall accumulation and subsequently the mechanical and chemical removal the snow from sidewalks, streets and parking lots. In the event of the following weather conditions:

1. Snow flurries Power Sweep sidewalks and salt only as conditions require (minimum salt application rate)

2. Sleet Power Sweep sidewalks and salt or calcium acetate mixture, minimum salt application rate, reapply as necessary. Use of DFM staff as needed.

3. Freezing rain Manually scrape steps and handrails. Apply salt or acetate as necessary to street intersections, ramps walkways and high traffic corridors.

4. 0” to 2” snowfall accumulation (End of storm)

Power Sweep, plow and shovel as necessary. Apply salt or acetate as necessary to street intersections, ramps walkways and high traffic corridors.

5. 2” to 6” accumulation

Power Sweep, Plow, Shovel to keep roadways and sidewalks open, Salt as necessary. If possible we will wait to salt large areas until snow has ceased. It is important to conserve as much salt as possible to ensure we have adequate stock for following storms. We will keep roads and main walks open, but it is important not to use unnecessary man hours until the storm subsides.DFM staff/essential personnel as needed

3 WKU Facilities Management Snow Plan 11/13/2014 WKU Facilities Management Snow Plan

Page 4: WKU Snow Plan 2014It is anticipated that completion of snow removal will be dependent on the total snowfall accumulation and subsequently the mechanical and chemical removal the snow

11/13/2014

In the event the campus is officially closed:

• In the event that the university is officially closed the following “WEATHER ESSENTIAL PERSONNEL” designated are to report to work. Coordination of this crew will be under the direction of our Facilities Management Director and the Manager of Campus Services and assisted by all other managers. Staff should come prepared and bring the appropriate outdoor clothing, headgear and footwear to work in outside conditions.

– Designated Maintenance and Plant Operations employees – Office employee as designated by FS manager, to direct calls and radio – One employee from the stockroom designated by the FS manager to handle supply issues – All Building Services employees who are already on site.

• If the university is closed before our BSA 4am shift begins, the following employees are designated to report to work:

4 WKU Facilities Management Snow Plan

•Designated Weather Essential Building Services Staff: 3 BSA Supervisors, see below

• Below is a list of designated BSA staff to be identified as weather essential personnel to cover the following buildings : WAB, Potter, Preston, DUC, Knicely Center and Diddle and other duties as needed once they are no longer needed for outside snow removal.

• If there is a scheduled event, BSA’s are to report to work for this event. In the event that any of these scheduled employees cannot report to work safely, they should notify the supervisor/manager and we will use are designated BSA backup list for available personnel.

WKU Facilities Management Snow Plan

Page 5: WKU Snow Plan 2014It is anticipated that completion of snow removal will be dependent on the total snowfall accumulation and subsequently the mechanical and chemical removal the snow

Essential Personnel to be assigned by Manager of Campus Services 1. Kerry Hatchett-270-779-5000 2. Electrician- Adam Garrett-784-7596-991-3601 3. Plumber- Danny Madison-782-9277 4. Carpenter- Steve Croslin-202-6315 5. Auto- Jerry McAdoo-784-3651 6. Energy Tech-Kayla Howard-532-1259 7. Area maintenance Tech Steve Wood 270 991-2441 8. Area maintenance Tech-Ben Spitler-270-996-8537 9. HVAC-Rooks Howard-286-0092/784-5163 10. Office-Kathy Bailey 270-202-4603 11. Stockroom-Phil Kinser270-784-1289 AM BSA Team 1. Candi Boehmer 270-799-5876 2. Charlene Meador 270-991-4089 3. Kim Breakfield 270-438-9164 4. Burdetta Lindsey 270-303-0441 5. Pam Hubbard 270-392-8725 6. Raul Pena 270-991-5249 7. Terri Williams (DSU ONLY) 270-996-7240 PM Team (To be utilized to service our E&G facilities in instances of large call outs due to inclement weather). 1. Rob Bradshaw 270-303-6027 2. Kevin Gutierrez 270-535-9063 3. Bonnie Deitz 270-943-0249 4. Todd Kitchens 270-935-7220 5. Michelle Kitchens 270-799-5783 6. Linda Gann 270-791-6879 7. James Parks 270-996-2983 8. Fred Horn 270-842-2590 9. Otto Finta 707-534-0972 10. Chad Phelps 270-799-7347

11/20/2014 WKU Facilities Management Snow Plan

Page 6: WKU Snow Plan 2014It is anticipated that completion of snow removal will be dependent on the total snowfall accumulation and subsequently the mechanical and chemical removal the snow

11/13/2014

• WKU University Policy • HR Policy #20-160 • Subject: Attendance During Adverse Weather Conditions Reference: University Policy

Application: All Non-Faculty Employees Effective Date: January 3, 2000

• While employees are expected to make every effort to be present and on time for work, it is recognized that hazardous weather conditions can result in tardiness and possible absences. Employees are encouraged to use sound judgment prior to traveling in hazardous weather conditions to prevent safety risks to themselves or others. Supervisors must be notified of anticipated late arrival or absences. During extreme or hazardous conditions, non-exempt employees will not be penalized (no loss of pay or charge to vacation time) for any tardiness up to one (1) hour after their scheduled starting time.

• Employees who are unable to safely arrive at work will be given the option of (1) not receiving pay for the period of absence OR (2) using accumulated vacation time to be charged against the absence OR (3) making up the lost time during the same workweek as approved by their supervisor/department head.

• Occasionally, due to severe weather conditions, the University President will authorize early departure from work. When this occurs, employees shall receive their regular pay for the remainder of their scheduled workday. Due to the critical services of selected departments, essential employees may be required to complete their normal hours. Supervisors/department heads shall determine essential employees. Any non-exempt employees determined to be essential who are required to work following the official closure of the University shall be paid time and one-half for hours worked. Supervisors/department heads should be contacted for appropriate pay provisions for second or third shift employees.

• During times of extremely hazardous conditions, the University President may elect to officially close the institution. All employees who are scheduled to work shall be granted paid administrative leave during the official closure period. Non-exempt employees who are required to work because of their essential responsibilities will be paid time and one-half for hours worked. At the option of the supervisor/department head, time off at the rate of time and one-half may be given in lieu of overtime pay. If time off is awarded in lieu of pay, it must be used by the employee during the same workweek.

• Any employee (exempt or non-exempt) on vacation or medical (sick) leave shall not be required to use accumulated leave for any hours/days when the University is officially closed due to hazardous conditions.

5 WKU Facilities Management Snow Plan WKU Facilities Management Snow Plan

Page 7: WKU Snow Plan 2014It is anticipated that completion of snow removal will be dependent on the total snowfall accumulation and subsequently the mechanical and chemical removal the snow

11/20/2014

Standard Operating Procedures for Snow Removal • All Campus Services personnel are to report to the Grounds Shop. The following assignments/routes

will be given out for the following:

MAIN CAMPUS

Lewis Bohr - #56 F250 salt truck with blade Derrick Carrol -#199 3500 salt truck with blade Doug Price – Campus wide Supervison Billy Breakfield- G1 with Blade Jeff Mcadoo-G2 with Blade Terry Copas-G3 with blade and salt hopper Todd Simmons-G4 with blade and salt hopper Adam Simone – G4 with blade and salt hopper Joe Taylor– Broom2 Brett Shain – Broom3

SOUTH CAMPUS/THE CENTER

Anthony Helson-Deere Plow/back up equipment and shovel Jeremy Bowling- Deere Plow/back up equipment and shovel Terry M-#176 F550 with blade and spreader

6 WKU Facilities Management Snow Plan WKU Facilities Management Snow Plan

Page 8: WKU Snow Plan 2014It is anticipated that completion of snow removal will be dependent on the total snowfall accumulation and subsequently the mechanical and chemical removal the snow

Priority route for Salt Truck 199

• State Street from Regents to College Heights Blvd • College Heights Blvd • Avenue of Champions • Alumni Drive • Hilltop Drive • Faculty House Drive • Ogden Drive • Virginia Garrett Loop

• All essential personnel will and remaining grounds crew will be assigned by Manager of Campus Services and Grounds Supervisor to areas to police and clean all inaccessible, entrances, steps, catwalks and ADA ramps and other areas as assigned

Priority route for Hand Shoveling

11/13/2014 WKU Facilities Management Snow Plan

Page 9: WKU Snow Plan 2014It is anticipated that completion of snow removal will be dependent on the total snowfall accumulation and subsequently the mechanical and chemical removal the snow

11/13/2014

Priority route for Salt Truck 176 • South Campus and The Center

• Plow and salt roads and parking lots • 3 FTE will be stationed at SC and The Center with one Power Broom and one Deere Skid

Priority route for Gator with Spreader

• All slopes and sidewalks on main campus – Areas:

• Heat Plant • Schneider Hall Lot entrance • PS1 and PS2 ramps and entrances • Kentucky Street Lot entrance • North Chestnut Street Lot entrance • Presidents House • 14th Street Lot entrance • HUB Lot entrance • College Hill Lot entrance • WAB Lot entrance

7 WKU Facilities Management Snow Plan

Priority route for John Deere Gators (G1,G2G3,G4) • Structure ramps, Heat Plant ramp, Ky Bldg Parking lot, Incline at Ky St. Lot, 14th St. lot, College Hill lot,

Honors lot, HUB lot, Schneider lot, Gated Hilltop Lot, Alumni and Upper drives, PFT, Zac and Meredith, Presidents House, Centennial Mall, Ransdell Hall Lot, Adams Whitaker Lot and any sidewalks 6’ or wider

WKU Facilities Management Snow Plan

Page 10: WKU Snow Plan 2014It is anticipated that completion of snow removal will be dependent on the total snowfall accumulation and subsequently the mechanical and chemical removal the snow

Priority Areas for Hand Shoveling of steps and sidewalks

Areas by priority that will have to have assigned essential personnel 1. Steps from 14th St, College Hill and Kentucky St. Lots 2. Ogden College Steps 3. VMH fountain steps 4. Residential Commons

11/13/2014

Areas by priority that will be assigned to Campus Services

Andrew Meffert and Darrell Blair -WAB/Potter/CAC/Chapel/Gatton/VMH Leonard Dill and Terry Grosh-DSU/GH/PS1/PS2/DFM/Bates/Mclean Anthony Helson and Bobby Glass- AC/ MMTH/Minton/TPH/GRH Glenn Bolling and Mikey Cowels- Helm/Cravens/FAC/Garrett/GWH/CH Todd Simmons and Chris Sebaugh 1700/EHS/TTAS/FACET/SSB/Honors/Alive/IH/WS Blake Briscoe – As Assigned Danny Smith – As Assigned Jeff Davis– As Assigned Bill Sleeper – As Assigned Dustyn Brooks– As assigned Chris Radus – As assigned

WKU Facilities Management Snow Plan

Page 11: WKU Snow Plan 2014It is anticipated that completion of snow removal will be dependent on the total snowfall accumulation and subsequently the mechanical and chemical removal the snow

11/13/2014

Doug Price Supervisor #60 Billy Breakfield Asst. Supervisor G1 Terry McDonald Group Leader #176 Jeff McAdoo Sr. Groundskeeper G2 Leonard Dill Sr. Groundskeeper As assigned Leah Hopwood Group Leader As assigned Glen Bolling Sr. Groundskeeper As assigned Henry Blair Sr. Groundskeeper South Campus Joseph Taylor Sr. Groundskeeper South Campus Darrell Blair Athletics G3 Derek Carroll Sr. Groundskeeper #199 Adam Simone Sr. Groundskeeper Broom #1 Louis Bohr sr. Groundskeeper #56 James Beasley Groundskeeper As Assigned Michael Cowles Groundskeeper As Assigned Dustyn Brooks Groundskeeper As Assigned Danny Smith Groundskeeper As Assigned Terry Copas Masonry Campus Wide Salt/product Anthony Helson Landscaping As Assigned Todd Simmons Group Leader As Assigned Andrew Meffert Sr. Groundskeeper As Assigned Blake Briscoe Groundskeeper As Assigned Jeremy Bowling Groundskeeper As Assigned Jennifer Comer Groundskeeper As Assigned Bobby Glass Groundskeeper As Assigned Terry Grosh Groundskeeper As Assigned Chris Radus Recycling/Surplus As Assigned Bill Sleeper Recycling/Surplus As Assigned Chris Sebaugh Solid Waste Associate As Assigned

WKU Campus Services Snow Assignments

WKU Facilities Management Snow Plan

Page 12: WKU Snow Plan 2014It is anticipated that completion of snow removal will be dependent on the total snowfall accumulation and subsequently the mechanical and chemical removal the snow

11/13/2014

Assignments for all other DFM departments: All DFM personnel will assist and work in coordination with the Manager of Campus Services, to ensure the overall snow removal efforts for the university. Their purpose will be to assist in snow removal tasks not requiring riding equipment. Our goal is to first clear one walking path to each building, clearing wheelchair accessible routes . Will provide assistance in shoveling and spreading de-icer and/or sand over steps and slippery walkways in their areas. All walks and steps should be shoveled, blown or swept where and when appropriate before de-icer is applied.

Building Services Department • Coordination of the Building Services efforts will be routed through the Building Services Manager to the

Campus Services Manager. The standard procedure for the staff is to start clearing all immediate entrances of all academic building entrances. Cleaning according to standard procedure but more attention to indoor public areas, entries, hallways and stairs.

• Responsible for all entrances using product to melt snow, upon direction of their supervisors • To keep entrance safe and clean. • Assist HRL staff as needed or requested. • Other duties as requested.

NOTE: The university campus will be assessed by the Facilities Management Director and the Campus Services Manager, in the event their assistance is no longer needed for snow removal, employees will be released to go home if the university has officially closed or they will resume their regular assigned duties for this day.

10 WKU Facilities Management Snow Plan WKU Facilities Management Snow Plan

Page 13: WKU Snow Plan 2014It is anticipated that completion of snow removal will be dependent on the total snowfall accumulation and subsequently the mechanical and chemical removal the snow

11/13/2014

Maintenance Services •In coordination with the Maintenance Manager and the Campus Services Manager will be supplied with adequate equipment to assist the grounds crew with snow and ice removal. They will be assigned to specific areas depending on conditions. (i.e. hand work around residence halls, Van Meter hill side) • Trade supervisors will work in conjunction with the Manager of Campus Services and their staff will be assigned to specific areas depending on conditions. i.e. shoveling around residence halls, Van Meter hill side, etc. • Their purpose will be to assist in snow removal tasks not requiring riding equipment. Our goal is to first clear one walking path to each building, clearing wheelchair accessible routes . Will provide assistance in shoveling and spreading ice melt and/or sand over steps and slippery walkways in their areas. All walks and steps should be shoveled, blown or swept where and when appropriate before ice melt is applied.

•Other duties as requested

11 WKU Facilities Management Snow Plan

Housing and Residence Life

• Building Services employees will resume regular duties in residence halls due to buildings being occupied. Duties will also include clearing of all residence halls entrances. •HRL zone techs will assist with entrance clearings around the residence halls. •Other duties as requested

WKU Facilities Management Snow Plan

Page 14: WKU Snow Plan 2014It is anticipated that completion of snow removal will be dependent on the total snowfall accumulation and subsequently the mechanical and chemical removal the snow

11/13/2014

Plant Operations Services •In coordination with the Maintenance Manager and the Campus Services Manager will be supplied with adequate equipment to assist the grounds crew with snow and ice removal. ZONE personnel assist Building Services with entrance clearings and sidewalks as needed.

•Other duties as requested

11 WKU Facilities Management Snow Plan WKU Facilities Management Snow Plan

Page 15: WKU Snow Plan 2014It is anticipated that completion of snow removal will be dependent on the total snowfall accumulation and subsequently the mechanical and chemical removal the snow

11/13/2014

In Summary: The university salt storage facility is located at South Street with a capacity of approximately 100 tons of

salt. The Campus Services Manager and/or the grounds supervisor are responsible to monitor deicing chemicals and order materials as required.

The Manager of Campus Services and the Grounds Supervisor will review deicing chemical usage after snow removal to assist with inventory of supplies and to monitor the efficient and consistent use and application of deicing chemicals.

At the end of each snow event, the Facilities Management Director and the Manager of Campus Services will review procedures taken and provide a summary of events and cost analysis to include both labor and materials.

Consistent with our goals, to continually improve our work processes, we will routinely review the results of this plan and make revisions to improve the effectiveness of our snow and ice control efforts.

12 WKU Facilities Management Snow Plan WKU Facilities Management Snow Plan

Page 16: WKU Snow Plan 2014It is anticipated that completion of snow removal will be dependent on the total snowfall accumulation and subsequently the mechanical and chemical removal the snow

5

1

8

9

7

4

36

28

27

11

2117

15

3723

34

33 31

13

1624

19

18

29

38

36

2032

30

10

AA1

DSU

PS1AA2

JJ

PHAC

AC

PS2

ASG

FAC

NE

GRHHL CH

SW

CEB GHME

EST

HIC

MMTH

SLF II

KH

PH

EBS

MH

GI

VMH

SNH

HP

WAB

CGC

BLH

TFC

CWP

AA3

KYB

GCC

HSB

ZAC

SSB

TCCW

TCNW

CEC

COHH

FSHBRH

SLF I

MCC

AACMCL

IEB

POL

MINGWH

PFT

BCH

RHH

FH

HPL

HB

OBC

FB

EH

1660

31W

STO

CAC

WS

EHS

1536513

CMC

503

PIO

501

HAZ

GRN2GRN1

1702

1700

FLC

STO

GT

22212

25

26

14

35

SNOW REMOVAL MAP SERIES KEY ²11/18/2014

By: Tommy Woodall0 500 1,000250Feet

Page 17: WKU Snow Plan 2014It is anticipated that completion of snow removal will be dependent on the total snowfall accumulation and subsequently the mechanical and chemical removal the snow

DSU

AC

AA2

BRH

SWNE

AA1

MIN

PS1

GT

PS2

²11/18/2014 0 100 20050FeetMAP NUMBER 1

STEPS

Walkways

Page 18: WKU Snow Plan 2014It is anticipated that completion of snow removal will be dependent on the total snowfall accumulation and subsequently the mechanical and chemical removal the snow

HL

FACMH

GCC

CGC

IEB

NE

GH

1536 WS²11/18/2014 0 100 20050FeetMAP NUMBER 2

STEPS

Walkways

Page 19: WKU Snow Plan 2014It is anticipated that completion of snow removal will be dependent on the total snowfall accumulation and subsequently the mechanical and chemical removal the snow

CEB

MMTH

PHAC

HSB

BLH

AC

BCH

POL

GT

²11/18/2014 0 100 20050FeetMAP NUMBER 3

STEPS

Walkways

Page 20: WKU Snow Plan 2014It is anticipated that completion of snow removal will be dependent on the total snowfall accumulation and subsequently the mechanical and chemical removal the snow

SSB

HAZ

²11/18/2014 0 100 20050FeetMAP NUMBER 4

STEPS

Walkways

Page 21: WKU Snow Plan 2014It is anticipated that completion of snow removal will be dependent on the total snowfall accumulation and subsequently the mechanical and chemical removal the snow

HIC

NESW

GHCWP

SPC

²11/18/2014 0 100 20050FeetMAP NUMBER 5

STEPS

Walkways

Page 22: WKU Snow Plan 2014It is anticipated that completion of snow removal will be dependent on the total snowfall accumulation and subsequently the mechanical and chemical removal the snow

PH

VMH

CHGCC

WAB

GWH

FB

CAC CMC

²11/18/2014 0 100 20050FeetMAP NUMBER 6

STEPS

Walkways

Page 23: WKU Snow Plan 2014It is anticipated that completion of snow removal will be dependent on the total snowfall accumulation and subsequently the mechanical and chemical removal the snow

HSB

PHAC

BLH

PFT

BCH

ME

POL

1702

²11/18/2014 0 100 20050FeetMAP NUMBER 7

STEPS

Walkways

Page 24: WKU Snow Plan 2014It is anticipated that completion of snow removal will be dependent on the total snowfall accumulation and subsequently the mechanical and chemical removal the snow

AC

DSU

CEB

SWMMTH

MIN

CWP

GT

²11/18/2014 0 100 20050FeetMAP NUMBER 8

STEPS

Walkways

Page 25: WKU Snow Plan 2014It is anticipated that completion of snow removal will be dependent on the total snowfall accumulation and subsequently the mechanical and chemical removal the snow

²11/18/2014 0 100 20050FeetMAP NUMBER 9

STEPS

Walkways

Page 26: WKU Snow Plan 2014It is anticipated that completion of snow removal will be dependent on the total snowfall accumulation and subsequently the mechanical and chemical removal the snow

FAC

HL

GH

MHNE

CGC

NE

PH

GCC

IEB²11/18/2014 0 100 20050FeetMAP NUMBER 10

STEPS

Walkways

Page 27: WKU Snow Plan 2014It is anticipated that completion of snow removal will be dependent on the total snowfall accumulation and subsequently the mechanical and chemical removal the snow

1790

²11/18/2014 0 100 20050FeetMAP NUMBER 11

STEPS

Walkways

Page 28: WKU Snow Plan 2014It is anticipated that completion of snow removal will be dependent on the total snowfall accumulation and subsequently the mechanical and chemical removal the snow

AC

CEB

MMTH

GRH

HSB

SPC

CWP

SW

MIN

1702

501 ²11/18/2014 0 100 20050FeetMAP NUMBER 12

STEPS

Walkways

Page 29: WKU Snow Plan 2014It is anticipated that completion of snow removal will be dependent on the total snowfall accumulation and subsequently the mechanical and chemical removal the snow

KH

POL

PFT

TFCPHAC

²11/18/2014 0 100 20050FeetMAP NUMBER 13

STEPS

Walkways

Page 30: WKU Snow Plan 2014It is anticipated that completion of snow removal will be dependent on the total snowfall accumulation and subsequently the mechanical and chemical removal the snow

CH

GCC

COHHIEB

HL

GWH

FH

VMHPH

²11/18/2014 0 100 20050FeetMAP NUMBER 14

STEPS

Walkways

Page 31: WKU Snow Plan 2014It is anticipated that completion of snow removal will be dependent on the total snowfall accumulation and subsequently the mechanical and chemical removal the snow

1700

1660

1700

²11/18/2014 0 100 20050FeetMAP NUMBER 15

STEPS

Walkways

Page 32: WKU Snow Plan 2014It is anticipated that completion of snow removal will be dependent on the total snowfall accumulation and subsequently the mechanical and chemical removal the snow

GRH

MMTH

SPC

513

BLH

503

501

1702

HSB

²11/18/2014 0 100 20050FeetMAP NUMBER 16

STEPS

Walkways

Page 33: WKU Snow Plan 2014It is anticipated that completion of snow removal will be dependent on the total snowfall accumulation and subsequently the mechanical and chemical removal the snow

ASG

SLF II

SLF I

AAC

²11/18/2014 0 100 20050FeetMAP NUMBER 17

STEPS

Walkways

Page 34: WKU Snow Plan 2014It is anticipated that completion of snow removal will be dependent on the total snowfall accumulation and subsequently the mechanical and chemical removal the snow

HL CH

EST

GCC

COHH

CGC

IEB

FH

FAC

WS1536

MH

HPL

²11/18/2014 0 100 20050FeetMAP NUMBER 18

STEPS

Walkways

Page 35: WKU Snow Plan 2014It is anticipated that completion of snow removal will be dependent on the total snowfall accumulation and subsequently the mechanical and chemical removal the snow

PHAC

CEB

POL

HSB

AA3

GT

²11/18/2014 0 100 20050FeetMAP NUMBER 19

STEPS

Walkways

Page 36: WKU Snow Plan 2014It is anticipated that completion of snow removal will be dependent on the total snowfall accumulation and subsequently the mechanical and chemical removal the snow

PS1

GI

KYB

HP

MCC

RHH

PIO

²11/18/2014 0 100 20050FeetMAP NUMBER 20

STEPS

Walkways

Page 37: WKU Snow Plan 2014It is anticipated that completion of snow removal will be dependent on the total snowfall accumulation and subsequently the mechanical and chemical removal the snow

ASG

SLF I

AAC

²11/18/2014 0 100 20050FeetMAP NUMBER 21

STEPS

Walkways

Page 38: WKU Snow Plan 2014It is anticipated that completion of snow removal will be dependent on the total snowfall accumulation and subsequently the mechanical and chemical removal the snow

CH

VMH

GWH

COHH

FH

GCC

²11/18/2014 0 100 20050FeetMAP NUMBER 22

STEPS

Walkways

Page 39: WKU Snow Plan 2014It is anticipated that completion of snow removal will be dependent on the total snowfall accumulation and subsequently the mechanical and chemical removal the snow

AA2AA3

OBC

²11/18/2014 0 100 20050FeetMAP NUMBER 23

STEPS

Walkways

Page 40: WKU Snow Plan 2014It is anticipated that completion of snow removal will be dependent on the total snowfall accumulation and subsequently the mechanical and chemical removal the snow

GRH

MMTH SW

HICSPC

CWP²11/18/2014 0 100 20050

FeetMAP NUMBER 24

STEPS

Walkways

Page 41: WKU Snow Plan 2014It is anticipated that completion of snow removal will be dependent on the total snowfall accumulation and subsequently the mechanical and chemical removal the snow

FAC

HL

GH

GCC

PH

MH

CGC

NE

MCL WABFSH

²11/18/2014 0 100 20050FeetMAP NUMBER 25

STEPS

Walkways

Page 42: WKU Snow Plan 2014It is anticipated that completion of snow removal will be dependent on the total snowfall accumulation and subsequently the mechanical and chemical removal the snow

CH

EST

GCC

COHHIEB

FH

HPL

HL

HB

TCCW

WS1536

²11/18/2014 0 100 20050FeetMAP NUMBER 26

STEPS

Walkways

Page 43: WKU Snow Plan 2014It is anticipated that completion of snow removal will be dependent on the total snowfall accumulation and subsequently the mechanical and chemical removal the snow

JJ

ME

ZAC

²11/18/2014 0 100 20050FeetMAP NUMBER 27

STEPS

Walkways

Page 44: WKU Snow Plan 2014It is anticipated that completion of snow removal will be dependent on the total snowfall accumulation and subsequently the mechanical and chemical removal the snow

GHFACNE

FSHBRH

MCL WAB

MH ²11/18/2014 0 100 20050FeetMAP NUMBER 28

STEPS

Walkways

Page 45: WKU Snow Plan 2014It is anticipated that completion of snow removal will be dependent on the total snowfall accumulation and subsequently the mechanical and chemical removal the snow

EST

EBS

TCCW

SNH

COHH

HPL

HB

IEB

WS1536

GRN2GRN1

TCNW

²11/18/2014 0 100 20050FeetMAP NUMBER 29

STEPS

Walkways

Page 46: WKU Snow Plan 2014It is anticipated that completion of snow removal will be dependent on the total snowfall accumulation and subsequently the mechanical and chemical removal the snow

SLF II

CEC

²11/18/2014 0 100 20050FeetMAP NUMBER 30

STEPS

Walkways

Page 47: WKU Snow Plan 2014It is anticipated that completion of snow removal will be dependent on the total snowfall accumulation and subsequently the mechanical and chemical removal the snow

ME

JJ

ZAC

PFT

TFCPOL

²11/18/2014 0 100 20050FeetMAP NUMBER 31

STEPS

Walkways

Page 48: WKU Snow Plan 2014It is anticipated that completion of snow removal will be dependent on the total snowfall accumulation and subsequently the mechanical and chemical removal the snow

KYB

MCC

RHH

PIO

FLC

CMCCAC ²11/18/2014 0 100 20050FeetMAP NUMBER 32

STEPS

Walkways

Page 49: WKU Snow Plan 2014It is anticipated that completion of snow removal will be dependent on the total snowfall accumulation and subsequently the mechanical and chemical removal the snow

JJ

ZAC

ME

²11/18/2014 0 100 20050FeetMAP NUMBER 33

STEPS

Walkways

Page 50: WKU Snow Plan 2014It is anticipated that completion of snow removal will be dependent on the total snowfall accumulation and subsequently the mechanical and chemical removal the snow

EST

EBS

TCCW

TCNWSNH

HPL

HBCOHH

GRN2GRN1

²11/18/2014 0 100 20050FeetMAP NUMBER 34

STEPS

Walkways

Page 51: WKU Snow Plan 2014It is anticipated that completion of snow removal will be dependent on the total snowfall accumulation and subsequently the mechanical and chemical removal the snow

FAC

PH

VMH

FSH

WAB

GWH

GCCCH

FB

CACCMC

MH ²11/18/2014 0 100 20050FeetMAP NUMBER 35

STEPS

Walkways

Page 52: WKU Snow Plan 2014It is anticipated that completion of snow removal will be dependent on the total snowfall accumulation and subsequently the mechanical and chemical removal the snow

GH

PH

FAC

FSH

WABMCL

FB

PS1

CAC

GI

CMC

²11/18/2014 0 100 20050FeetMAP NUMBER 36

STEPS

Walkways

Page 53: WKU Snow Plan 2014It is anticipated that completion of snow removal will be dependent on the total snowfall accumulation and subsequently the mechanical and chemical removal the snow

AA3OBC

²11/18/2014 0 100 20050FeetMAP NUMBER 37

STEPS

Walkways

Page 54: WKU Snow Plan 2014It is anticipated that completion of snow removal will be dependent on the total snowfall accumulation and subsequently the mechanical and chemical removal the snow

AA1

PS1PS2

AA2

AA2

²11/18/2014 0 100 20050FeetMAP NUMBER 38

STEPS

Walkways