18
ter Leader Conference ruary 4, 2009 “ Building Strong “ 1 Creating the CW Budget Mr. Pete Luisa Mr. Pete Luisa 2 March 2009 2 March 2009 PNWA PNWA

Winter Leader Conference February 4, 2009 “ Building Strong “1 Creating the CW Budget Mr. Pete Luisa 2 March 2009 PNWA

Embed Size (px)

Citation preview

Page 1: Winter Leader Conference February 4, 2009 “ Building Strong “1 Creating the CW Budget Mr. Pete Luisa 2 March 2009 PNWA

Winter Leader Conference February 4, 2009 “ Building Strong “ 1

Creating the CW Budget

Mr. Pete LuisaMr. Pete Luisa2 March 2009 2 March 2009 PNWAPNWA

Page 2: Winter Leader Conference February 4, 2009 “ Building Strong “1 Creating the CW Budget Mr. Pete Luisa 2 March 2009 PNWA

Winter Leader Conference February 4, 2009 “ Building Strong “ 2

• US Ports & Waterways convey > 2B Tons Commerce • Foreign Trade alone creates > $160 B Tax Revenues

Recreation areas 376 M Visitors/yrGenerate $15 B in economic activity,

500,000 jobs

11,000 miles of Commercial Inland

Waterways:½ the cost of rail1/10 the cost of

trucks

400 miles ofShore protection

8500 Miles of Levees

299 Deep Draft Harbors

EmergencyOperations

Stewardship of11.7 Million Acres

Public LandsEnvironmental

Restoration

627 Shallow Draft Harbors

Regulatory

¼ of Nation’s Hydropower: $500 M + in power sales

Civil Works Value to the NationCivil Works Value to the Nation

Page 3: Winter Leader Conference February 4, 2009 “ Building Strong “1 Creating the CW Budget Mr. Pete Luisa 2 March 2009 PNWA

Winter Leader Conference February 4, 2009 “ Building Strong “ 3

CIVIL WORKS BUDGET FORMULATION

TRADITIONAL APPROACH:       By account (Surveys and Design/Construction/O&M, etc.)       Geographic balance considered       Funding shortages spread across nearly all activities BUDGETING BY PERFORMANCE:       By business program (navigation, flood, etc.)       Funding distributed based on outcomes       Highest priority work funded at an efficient rate       Lower priority work may be deferred, even if already started

Page 4: Winter Leader Conference February 4, 2009 “ Building Strong “1 Creating the CW Budget Mr. Pete Luisa 2 March 2009 PNWA

Winter Leader Conference February 4, 2009 “ Building Strong “ 4

PROGRAM STRUCTURE

Business LineNavigation Coastal harbors; Inland WaterwaysFlood Damage Reduction Riverine Floods; Coastal StormsEnvironment Aquatic Ecosystem Restoration Stewardship Formerly Utilized Site Remedial Action HydropowerRecreationWater SupplyEmergency Regulatory

AccountInvestigations Construction Operations & Maintenance Mississippi River & Tribs Regulatory Program Formerly Utilized Sites Remedial Action Program Expenses Flood Control & Coastal Emerg

Page 5: Winter Leader Conference February 4, 2009 “ Building Strong “1 Creating the CW Budget Mr. Pete Luisa 2 March 2009 PNWA

Winter Leader Conference February 4, 2009 “ Building Strong “ 5

Budget Reviewed & Presented to SecArmy

(Jun - Aug )

OMB Passback( Nov )

Budget Submitted to OMB ( Sep )

President’s Budgetto Congress ( Feb )

All Offices DevelopProgram Requirements

( Feb - May )

Appropriations Bills( Jul - Sep )

Cong. Hearings ( Mar - Apr )

President Signs Approp. Bill ( Sep - Oct )

OMB-ASA GUIDANCE ( FEB-MAR )

Funding Alloc. To Field Offices

( Oct - Dec )

Page 6: Winter Leader Conference February 4, 2009 “ Building Strong “1 Creating the CW Budget Mr. Pete Luisa 2 March 2009 PNWA

Winter Leader Conference February 4, 2009 “ Building Strong “ 6

FY 09 PROGRAM PROCESS

Use Performance Measures and Policy Direction Guidance memo to: ·  Rank competing investments in each business program ·  Demonstrate improved outcomes from added increments

Develop amounts based on their own internal performance metrics for: ·  GE; REG; FCCE; REC; ENV Stewardship; FUSRAP

Develop Performance Based program for project competing business lines: ·  Initial level (No new work, phases or contracts, previously budgeted projects only) ·  O&M at 75% of last 5 years budget; Investigations same as PY-1. ·  Categorize and Prioritize CG projects into Priority levels ·  Add Performance Base High Return items and increments for GI and O&M items

Add to the Highest Priority, ongoing projects & contracts to “Final Budget”

Page 7: Winter Leader Conference February 4, 2009 “ Building Strong “1 Creating the CW Budget Mr. Pete Luisa 2 March 2009 PNWA

Winter Leader Conference February 4, 2009 “ Building Strong “ 7

Budgeting Measures

Construction

FRM & NAV & HYDRO - Benefit to Cost Ratio

FRM & NAV - Dam Safety & Seepage Stability

FRM – Construction Flood “Risk” Index

ENR - Loss prevention for significant natural resources

O&MNAV – Tonnage movements

FRM & NAV & HYDRO – “Risk” Assessments

ALLNew/Continuing/Completing/Years to Complete

Watershed Elements

ESA & compliance needs

Safety, Caretaker, Compliance, Subsistence

Page 8: Winter Leader Conference February 4, 2009 “ Building Strong “1 Creating the CW Budget Mr. Pete Luisa 2 March 2009 PNWA

Winter Leader Conference February 4, 2009 “ Building Strong “ 8

PROGRAM COMPARISON($ millions)

FY08 Bud FY08 Appr FY09 Bud FY09 Appr Investigations 90 167 91 168Operation & Maintenance 2471 (2185) 2244 2475 2202Construction 1523 (1809) 2294 1402 2142Miss. River & Tribs. 260 387 240 384Regulatory Program 180 180 180 183Flood Control & Coastal Em. 40 0 40 0F.U.S.R.A.P. 130 140 130 140Expenses 177 175 177 179OASA(CW) (6) 5 6 4.5

Total 4871 5592 4741 5403

FY 2010 BUDGET DELIVERED TO CONGRESS AT $5.1 BILLION

Page 9: Winter Leader Conference February 4, 2009 “ Building Strong “1 Creating the CW Budget Mr. Pete Luisa 2 March 2009 PNWA

Winter Leader Conference February 4, 2009 “ Building Strong “ 9

Budget Arithmetic

• FY09 Civil Works Budget Math $4,800 mil

• Allocate GE, REG, FCCE, REC, FUSRAP… - 900• Allocate Base O&M (~75% of required) - 1,800• Essential Dam Safety - 500• High Performing Construction - 400• Continuing Construction Contracts - 700• Planning Studies - 100

• Minimum Essential Allocation = - $4,400

• Left for all other CW Projects & Programs ~ $ 400 mil*• Use the $400 mil to restore project O&M to prior year levels

Page 10: Winter Leader Conference February 4, 2009 “ Building Strong “1 Creating the CW Budget Mr. Pete Luisa 2 March 2009 PNWA

Winter Leader Conference February 4, 2009 “ Building Strong “ 10

CW Funding Through 09 Budget

$3,000

$3,500

$4,000

$4,500

$5,000

$5,500

$6,000

97 98 99 00 01 02 03 04 05 06 07 08 09 10

Thousands

Budget Request Final Approp.

Page 11: Winter Leader Conference February 4, 2009 “ Building Strong “1 Creating the CW Budget Mr. Pete Luisa 2 March 2009 PNWA

Winter Leader Conference February 4, 2009 “ Building Strong “ 11

FY2009-11 Budgets and Appropriations

• Oct 08 – FY09 Continuing Resolution (CRA) to 6 Mar 09• Feb 09 – ‘American Recovery and Reinvestment Act’• Feb 09 – FY09 Appropriations Act• Mar 09 – ARRA & Appns Act funds issued to field offices• 26 Feb 09 – President presents FY10 Budget Overview• Mar 09 – HQUSACE releases FY11 Budget Guidance to

field offices• Spring 09 – FY10 Budget details released to public• Apr 09 – House/Senate FY10 Budget hearings • May/Jun – Defense Supplemental ?• Early-mid 2010 – Another possible Stimulus Bill?

Page 12: Winter Leader Conference February 4, 2009 “ Building Strong “1 Creating the CW Budget Mr. Pete Luisa 2 March 2009 PNWA

Winter Leader Conference February 4, 2009 “ Building Strong “ 12

ARRA Breakdown by Account

SUMMARY OF APPROPRIATIONS

($Billions)• Investigations $0.025

Construction $2.000• O&M $2.075• MR&T $0.375• Regulatory $0.025• FUSRAP $0.100• TOTAL $4.600

Page 13: Winter Leader Conference February 4, 2009 “ Building Strong “1 Creating the CW Budget Mr. Pete Luisa 2 March 2009 PNWA

Winter Leader Conference February 4, 2009 “ Building Strong “ 13

Stimulus Funding Information CW Eligible Projects

Account Number of Work Packages

Amount

(Millions)

Construction 3,600 $ 7,700

Ops & Maint 6,600 $ 7,000

MR&T 700 $ 700

Total 10,900 $15,400

Page 14: Winter Leader Conference February 4, 2009 “ Building Strong “1 Creating the CW Budget Mr. Pete Luisa 2 March 2009 PNWA

Winter Leader Conference February 4, 2009 “ Building Strong “ 14

Economic Stimulus American Recovery and Reinvestment Act

• $4.6 billion for Corp programs• No cost sharing with Inland Waterways Trust Fund• No cost-share exemption from the HMTF or cost-

shared projects • Significant “transparency” requirements for tracking,

monitoring and reporting of specific metrics• Final selection of projects scheduled for approval in

mid Mar 09 with work allowances to Districts immediately following selection.

• All unobligated funds (except for E&D, S&A and claims) expire 30 Sep 2010.

Page 15: Winter Leader Conference February 4, 2009 “ Building Strong “1 Creating the CW Budget Mr. Pete Luisa 2 March 2009 PNWA

Winter Leader Conference February 4, 2009 “ Building Strong “ 15

Stimulus-Project Selection Criteria

Project selection criteria from Conference Report:

(1) Obligated/executed quickly;

(2) Results in high, immediate employment;

(3) Will have little schedule risk;

(4) Will be executed by contract or direct hire of temporary labor; and

(5) Will complete either a project phase, a project, or will provide a useful service that does not require additional funding.

Page 16: Winter Leader Conference February 4, 2009 “ Building Strong “1 Creating the CW Budget Mr. Pete Luisa 2 March 2009 PNWA

Winter Leader Conference February 4, 2009 “ Building Strong “ 16

Other ARRA Provisions

• Projects are eligible only if funded “heretofore or hereafter”

• Unlimited reprogramming authority• Up to 0.5% to administer the bill • NLT $200M for environmental infrastructure• Section 902 relief• Ceiling relief for Section 14, 205, 206 and

1135 Programs• Funds may be retained after 30 Sep 2010

expiration for E&D, S&A, Claims• WRDA Sec 9006 relief (levee survey limit)

Page 17: Winter Leader Conference February 4, 2009 “ Building Strong “1 Creating the CW Budget Mr. Pete Luisa 2 March 2009 PNWA

Winter Leader Conference February 4, 2009 “ Building Strong “ 17

And for the Out Years …

• Expect a major debate on Federal funding priorities to commence with the FY 11 budget

• We will continue to place a high priority on accurate ‘capability’ estimates

• We will continue to place a high priority on execution of all that is appropriated

• We will seek to improve our budget ‘defense’ of the value to the nation of the water resources infrastructure for which we are responsible

Page 18: Winter Leader Conference February 4, 2009 “ Building Strong “1 Creating the CW Budget Mr. Pete Luisa 2 March 2009 PNWA

Winter Leader Conference February 4, 2009 “ Building Strong “ 18

How We All Contribute

• USACE: – Develop the vision, goals, objectives in an open, collaborative way– Implement the Strategic Plan

• Administration: – “Walk the performance-based budget talk.”

• Stakeholders:– Contribute to vision, Goals, Objectives, Metrics