Whitfield State School Master Plan2021
TPG Architects
1/124 Collins Ave Edge Hill 4870
t (07) 4032 1944
Whitfield State School Masterplan October 2021
Contents
Introduction & Vision Statement
Existing Site Plan
Site Analysis + Design Priorities
Master Plan
Master Plan Approach
Performing Arts & Music Floor Plan Ground - Seating/Performance Mode
Performing Arts & Music Floor Plan Ground - Flexible Learning Mode (seating retracted)
Performing Arts & Music Floor Plan Level 1
Performing Arts & Music Illustrations
OSHC Floor Plan
OSHC Illustrations
Multipurpose Hall Floor Plan
Multipurpose Hall Illustrations
2
3
4
5
6
7
8
9
10
11
Located within Whitfield amongst an established residential area Whitfield State School has a ‘village’ feel much valued by parents, students and the school community. The green, open grounds, established trees and on site ‘Forest’ are assets the Master Plan seeks to celebrate and preserve as the moves toward the future.
The existing buildings predominately date from the 70s, are in fair condition, generally oriented East-West and connected via low height outdoor covered pathways. The character is generally 70s and 80’s utilitarian with a mix of blockwork and transportable structures.
The Master Plan seeks to carefully add new buildings whilst maintaining as much as possible the existing site layout and infrastructure. The new works where possible seek to improve access, visibility and connection with the wider community.Key themes and ideas informing the design approach are:
Public Interface and Arrival
• A stronger street presence to McManus Street for the school generally. The new Performing Arts building provides a prominent visual cue.
• Clearly delineate a public entry connection to the Performing Arts centre separate from the school grounds.
• Address lack of public car parking and provide increased staff parking.
Celebrate the existing Site
• Retain as much as possible existing infrastructure whilst providing enhanced experience and amenity
• Any additional works are to be planned around the existing trees on the site.
• Celebrate the existing ‘Forest’ on site by increasing accessibility to it.
Amenity, Environment and Play
• Expand facilities keeping in mind opportunities for incidental uses between buildings
• Imaginative nature play spaces and breakout spaces.
• Nature and Environmental access and learning.
16°54'34"S 145°43'39"E 16°54'34"S 145°43'55"E
16°54'46"S 145°43'39"E 16°54'46"S 145°43'55"E
Legend located on next page
Scale: 1:1500
Printed at: A3
Print date: 12/10/2021
Datum: Geocentric Datum of Australia 1994
Projection: Web Mercator EPSG 102100
For more information, visit https://qldglobe.information.qld.gov.au/help-info/Contact-
us.html
Includes material © State of Queensland 2021. You are responsible for ensuring that
the map is suitable for your purposes. The State of Queensland makes no
representation or warranties in relation to the map contents and disclaims all liability.
If imagery is displayed, imagery includes material © CNES reproduced under license
from Airbus DS, all rights reserved © 21AT © Earth-i, all rights reserved, 2019
Department of Resources
A product of
0 25 metres
Introduction & Vision Statement
This Master Plan sets out a vision for Whitfield State School that incorporates three new buildings each targeted to service increased need and to expand
Whitfield State School’s capacity to deliver tailored performing arts, music, environmental and sporting experiences for their students and the wider community.
This document opens a dialogue to show what is feasible and to what extent new projects may sit within the existing school facilities.
M C
M A
N U
S
S T
R E
E T
M A R I N O S T R E E TC
ATH
Y ST
JOH
NSO
N S
T
CAMPEF BUILDING
LEARNING RESOURCE
CENTRE
BLOCK 17
BLOCK 15
ADMIN
BLOCK 5
COVERED PLAYGROUND
AMENITIES
AMENITIESPREP
AMENITIESSENIOR
TUCKSHOP
BLOCK 1
ENTRY
ENTRY
DRAIN
DR
AIN
ENTRY
BLOCK 2
BLOCK 6
BLOCK 14
GLA
BLOCK 12
BLOCK 13
OSHC
OVAL
MAINTENANCE
SHEDS
CAR PARK
GRAVEL ACCESS ROAD
BLOCK 7
BLOCK 8BLOCK 9
BLOCK 10
BLOCK 11
2 Whitfield State SchoolMaster Plan October 2021
Existing Site Plan 2021Scale 1:1000
GRAVEL ACCESS ROAD
STAFF
PREP SHED
COVERED
AREA
COVERED
SHADE AREA
PLAYGROUNDBLOCK 3
BLOCK 16
BLOCK 4
JOH
NS
ON
ST
M C
M A
N U
S
S T
R E
E T
M A R I N O S T R E E TC
ATH
Y ST
JOH
NSO
N S
T
CAMPEF BUILDING
LEARNING RESOURCE
CENTRE
BLOCK 17
BLOCK 15
ADMIN
BLOCK 5
COVERED PLAYGROUND
AMENITIES
AMENITIESPREP
AMENITIESSENIOR
TUCKSHOP
BLOCK 1
ENTRY
ENTRY
DRAIN
DR
AIN
ENTRY
BLOCK 2
BLOCK 6
BLOCK 14
GLA
BLOCK 12
BLOCK 13
OSHC
OVAL
MAINTENANCE
SHEDS
CAR PARK
GRAVEL ACCESS ROAD
BLOCK 7
BLOCK 8BLOCK 9
BLOCK 10
BLOCK 11
GRAVEL ACCESS ROAD
STAFF
PREP SHED
COVERED
AREA
COVERED
SHADE AREA
PLAYGROUNDBLOCK 3
BLOCK 16
BLOCK 4
ENTRY
1 Maintain Existing Entries
2 Increase street presence to McManus St
3 Relocate Block 10
4 Maintain clearances to future building
5 Maintain clearances to existing trees
6 Formalise road/pathway to new building
7 Increase carparking capacity
8 Link new OSHC to Admin precinct
9 Relocate maintenance zone
10 Formalise link to Forest
11 Formalise access road
12 Create new environmental/sports precint
3
Site Analysis + Design PrioritiesScale 1:1000
Whitfield State SchoolMaster Plan October 2021
1
3
2
5
4
6
7
8
9
10
11
12
4
Master PlanScale 1:1000
JOH
NS
ON
ST
Whitfield State SchoolMaster Plan October 2021
M C
M A
N U
S
S T
R E
E T
M A R I N O S T R E E T
CAMPEF BUILDING
LEARNING RESOURCE
CENTRE
BLOCK 17
BLOCK 15
ADMIN
BLOCK 5
COVERED PLAYGROUND
AMENITIES
AMENITIESPREP
AMENITIESSENIOR
TUCKSHOP
BLOCK 1
DRAIN
DR
AIN
BLOCK 2
BLOCK 6
BLOCK 14GLA
BLOCK 12
BLOCK 13
OVAL
BLOCK 7
BLOCK 8BLOCK 9
PREP SHED
COVERED
AREA
COVERED
SHADE AREA
PLAYGROUNDBLOCK 3
BLOCK 16
BLOCK 4
2
1
1 New Performing Arts & Music (PAC)
2 New carpark and access to PAC
3 New OSHC & nature play
4 Maintenance Zone
5 New Multipurpose Hall
6 New gravel pathway to Forest
7 New Access Road compacted roadbase
8 Environmental Learning area
9 New Oval marking
10 Relocated Block 10
10
3
4
5 7
6
9
8
55
The new OSHC provides for a capacity of 75 students and includes amenities, kitchenette, storage and staff area and outdoor nature play. The siting takes into consideration the existing tree and pathway layout adjacent the Administration and Staff areas allowing for passive security. Access pathway connections are provided via Administration and the existing entry located at Marino Street.
The existing Maintenance sheds and new access road are formalised for ease of access from Marino Street. The existing lcoation is maintained with new fencing and gates provided for additional separation from the new Sports and Environmental precinct.
The new Multipurpose Hall provides semi enclosed sporting facility with amenities and store for multiple sports including; netball, bas-ketball, volleyball, badminton and indoor soccer. The building is sited to maximise connection to the adjacent oval.
An informal pathway and vegetation connecting the junior school precinct to the ‘Forest’ and environmental learning area. The path acts as a soft landscaping threshold between the sporting and environmental learning areas.
New landscaping elements added to create an immersive environmental learning area to take advantage of the existing site conditions.
New formalised access road to complete pathway connections and provide vehicle entry to the Northern school zone.
3 OSHC
4 Maintenance Zone
5 Multipurpose Hall
6 Nature walk
7 Environmental Learning
8 Access Road
Master Plan
2 Carparking
The new carparking arrangement draws upon the general planning of the existing carpark with the new masterplan attempting minor modification to maximise increased capacity. The existing drop of ring road is maintained and carparking capacity is increased generally from existing 45 spaces to 88 new spaces. The footprint is increased in North, East and Southern directions yet the existing vegetation to McManus street is maintained. A new ring road is added to service the new Performing Arts building and new pathway connection provided adjacent Block 3 for pedestrian access to the Arts precinct.
1 Performing Arts & Music PAC
The new Performing Arts & Music building provides a new prominent frontage to McManus Street promoting Whitfield State School to the local community. The building provides for multiple flexible uses for both the school and wider community use with facilities including; performance stage, green room, storage, indoor and outdoor flexible learning areas, fixed and retractable seating capacity of approximately 480 patrons and accessible amenities. The siting of the building takes advantage of the existing entry and pathway locations, formalising public entry under the existing raintree via a ring road for loading and unloading of large equipment.
Master Plan Approach
Whitfield State SchoolMaster Plan October 2021
5 7
8
6
4
3
1
2
66
Performing Arts & Music
Performing Arts & Music Floor Plan Ground - Seating/Performance Mode Scale 1:250
Whitfield State SchoolMaster Plan October 2021
1 Ring road access2 Pedestrian pathway link3 Connection to existing pathways4 New pathway connection to existing entry
AREAS
5 Entry foyer 126m2 6 Flexible learning area/community use 39m27 Public amenities 36m28 Storage/Services 79m29 Stage 104m210 Ground level circulation 39m211 Green rooms 23m212 Back of stage accessible amenities 11m213 Back of stage FLA/practice room 92m214 Outdoor Covered courtyard 79m215 Ground level flexible learning area (refer plan p.7) 208m216 Level 1 Circulation (refer level 1 plan p.8) 24m217 Level 1 fixed tiered seating (refer level 1 plan p.8) 102m218 Level 1 Plant room & Store (refer level 1 plan p.8) 140m2
TOTAL GFA 1102m2
The new Performing Arts & Music building provides a new prominent frontage to McManus Street promoting Whitfield State School to the local community. The building provides for multiple flexible uses for both the school and wider community use with facilities including; performance stage, green room, storage, indoor and outdoor flexible learning areas, fixed and retractable seating capacity of approximately 480 patrons and accessible amenities. The siting of the building takes advantage of the existing entry and pathway locations, formalising public entry under the existing raintree via a ring road for loading and unloading of large equipment.
Retractable seating
Fixed wall to house retractable seating
BLOCK 3
BLOCK 16
BLOCK 9
11
11
10
10
10
12
6
1
13
4
2
3
9
8
57
14
15
8
812
10
77
Performing Arts & Music
Performing Arts & Music Floor Plan Ground - Flexible Learning Mode (seating retracted)Scale 1:250
Whitfield State SchoolMaster Plan October 2021
Fixed wall to house retractable seating
BLOCK 3
BLOCK 16
BLOCK 9
11
11
10
12
6
1
13
4
2
3
9
8
57
14
8
812
15
10
10
10
88
Performing Arts & Music
Performing Arts & Music Floor Plan Level 1 Scale 1:250
Whitfield State SchoolMaster Plan October 2021
BLOCK 3
BLOCK 16
BLOCK 9
Retractable seating
Level 1 fixed tiered seating
16
17
18
18
99
Performing Arts & Music
Performing Arts & Music Illustrations
Whitfield State SchoolMaster Plan October 2021
1010
Performing Arts & Music
Performing Arts & Music Illustrations
Whitfield State SchoolMaster Plan October 2021
1111
Performing Arts & Music
Performing Arts & Music Illustrations
Whitfield State SchoolMaster Plan October 2021
1212
OSHC
OSHC Floor PlanScale 1:250
Whitfield State SchoolMaster Plan October 2021
The new OSHC provides for a capacity of 75 students and includes amenities, kitchenette, storage and staff area and outdoor nature play. The siting takes into consideration the existing tree and pathway layout adjacent the Administration and Staff areas allowing for passive security. Access pathway connections are provided via Administration and the existing entry located at Marino Street.
1 Entry via existing entry at Marino St2 Entry gate into OSHC outdoor area3 Existing tree4 Entry via existing pathway adjacent Administration precinct5 Sandpit
AREAS
6 Kitchenette 14m2 7 Office 9m28 Amenities 13m29 Store 14m210 Indoor learning area 243m211 Outdoor covered area 45m2 TOTAL GFA 338m2
12 Outdoor area & nature play 730m2
ADMIN
STAFF BLOCK 1
BLOCK 12
1
8
6
7
5
2
3
11
12
4
9
10
1313
OSHC Illustrations
OSHC
Whitfield State SchoolMaster Plan October 2021
1414
Multipurpose Hall
Multipurpose Hall Floor PlanScale 1:500
Whitfield State SchoolMaster Plan October 2021
The new Multipurpose Hall provides semi enclosed sporting facility for multiple sports including; netball, basketball, volleyball, badminton and indoor soccer. The building is sited to maximise connec-tion to the adjacent oval.
An informal pathway and vegetation connecting the junior school pre-cinct to the ‘Forest’ and environmental learning area. The path acts as a soft landscaping threshold between the sporting and environmental learning areas.
1 New landscape2 New compacted roadbase access road3 New concrete pathway connection
AREAS
4 Multipurpose Hall 1040m25 Covered outdoor area 185m26 M/F Amenities & Accessible WC 49m27 Store 82m2
TOTAL GFA 1356m2
1
2
3
4
7
7
5
6
1515
Multipurpose Hall Illustrations
Whitfield State SchoolMaster Plan October 2021
Multipurpose Hall
1616
Multipurpose Hall Illustrations
Whitfield State SchoolMaster Plan October 2021
Multipurpose Hall