West Corridor Monthly Progress Report April, 2009
Monthly Progress Report Page i April 2009
List of Acronyms ....................................................................................... ii
Project Update ......................................................................................... 1
Corridor Map ............................................................................................ 2
Project Description .................................................................................. 3
Discipline Summaries .............................................................................. 4
Utilities ......................................................................................... 4
ROW ............................................................................................. 5
Structural Construction .............................................................. 7
Civil Construction ........................................................................ 8
Systems ....................................................................................... 9
Quality Management ............................................................................. 10
Public Information ................................................................................. 11
Risk Management .................................................................................. 12
Summary ................................................................................... 12
Project Dashboard .................................................................... 13
Contingency Drawdown ............................................................ 14
Risk Register ............................................................................. 15
DBE Participation ................................................................................... 17
Cost ......................................................................................................... 18
Project Budget........................................................................................ 19
Summary ................................................................................... 19
Sources...................................................................................... 20
Budget vs. Commitment vs. Actual .......................................... 21
Major Contracts ........................................................................ 22
Detail ......................................................................................... 23
Cost Status Detail ..................................................................... 25
Allowances Status ..................................................................... 26
Concurrent Non-Projected Activities ..................................................... 28
Project Schedule .................................................................................... 35
Early Construction ..................................................................... 35
Construction .............................................................................. 37
Civil Construction ...................................................................... 40
LRV Vehicle Procurement ......................................................... 43
Early Construction Cost Curve .................................................. 44
TABLE OF CONTENTS
Monthly Progress Report Page ii April 2009
CCD City and County of Denver
CDOT Colorado Department of Transportation
CEI Cost Effectiveness Threshold
CMGC Construction Manager/General Contractor
CNPA Concurrent Non Project Activity
COL City of Lakewood
CPUC Colorado Public Utilities Commission
CPV Central Platte Valley
CSP Construction Safety Program
DEA David Evans and Associates
DBE/SBE Disadvantaged Business Enterprise/Small Business Enterprise
DTCG Denver Transit Construction Group
EA Environmental Assessment
EOL End of Line
FD Final Design
FDC Final Design Consultant
FFGA Full-Funding Grant Agreement
FMV Fair Market Value
FONSI Finding of No Significant Impact
FRA Federal Railroad Administration
FRSC Front Range Systems Consultant
FTA Federal Transit Administration
GMP Guaranteed Maximum Price
GSA Governmental Services Administration
IGA Inter-governmental Agreement
LONP Letter of No Prejudice
LRT Light Rail Transit
LRV Light Rail Vehicle
NFPA National Fire Prevention Association
NTP Notice to Proceed
OCS Overhead Contact System
PE Preliminary Engineering
PI Public Involvement
PIC Public Information Consultant
PSC Program Support Consultant
PMOC Project Management Oversight Contractor
PMP Project Management Plan
PPI Public-Private Initiative
QA/QC Quality Assurance / Quality Control
QMC Quality Management Consultant
QMO Quality Management Oversight
QMP Quality Management Plan
QPRM Quarterly Progress Review Meeting
LIST OF ACRONYMS
Monthly Progress Report Page iii April 2009
RA Risk Assessment
RAMP Real Estate Acquisition and Management Plan
RFQ Request for Qualifications
RFP Request for Proposals
RFMP Rail Fleet Management Plan
ROCIP Rolling Owner’s Controlled Insurance Program
ROD Record of Decision
ROW Right of Way
RTD Regional Transportation District
SCC Standard Cost Categories
SCP Safety Certification Program
SSOA State Safety Oversight Agency
SSMP System Safety Management Plan
SSPP System Safety Program Plan
SSPS System Safety Program Standards
SSWG System Safety Working Group
TEM Technical Evaluation Memorandum
TOD Transit Orientated Development
TPC Transitional Period Construction
T-REX Transportation Expansion Project
UDFCD Urban Drainage Flood Control District
VE Value Engineering
WBS Work Breakdown Structure
LIST OF ACRONYMS (Continued)
Monthly Progress Report Page 1 April 2009
PROJECT UPDATE
DTCG and RTD are working on final negotiations of the Construction Services Agreement and intend to
sign a contract and issue Notice to Proceed by close of business, June 10, 2009.
Design efforts are being completed for close out of stakeholder comments. ROW transfer IGAs are
being completed with the city and county of Denver and the City of Lakewood.
Public Utility Commission applications have been submitted for grade separations and at grade
crossings.
RTD, the City of Lakewood and GSA are finalizing design for the multi-modal center at the Denver
Federal Center site to include a surface lot of a thousand spaces, 16 bus bays, transition plaza to the
station and regional storm water detention.
Transitional Period Construction work is still in progress, with drainage work, box culverts, and two
steel bridge fabrications and on going utility relocations.
Monthly Progress Report Page 2 April 2009
CORRIDOR MAP
Monthly Progress Report Page 3 April 2009
PROJECT DESCRIPTION
The West Corridor is a 12.1 mile light rail alignment that begins at the relocation of an existing station
at the Auraria Higher Education Campus, a station on the existing C line that terminates at Denver
Union Station. It then proceeds south over the UP and BNSF consolidated mainline; turns due west
and proceeds along an old rail alignment across the Platte River and on to Associated Rail alignment
that was purchased by RTD and proceeds west through two parks and an open space that is in the
City and County of Denver. Continuing west, the corridor passes into the City of Lakewood through a
minor industrial area into three miles of a tight ROW with established residential neighborhoods on
each side and parallels 13th Avenue through Lakewood to Oak Street. The alignment continues west
through the Lakewood Industrial Park, turning south on to the old Remington Arms spur over US6 and
into the Denver Federal Center (DFC) proceeding south to a multimodal transfer station and then
north out of the DFC. The corridor then turns west in CDOT right-of-way south of US6 proceeding west
to the fly over at US6 at Indiana. From the flyover, the corridor continues on the north side of US6 in
CDOT ROW to the end-of-line at the Jefferson County Government Center.
The alignment gains ridership and provides mass transit for the citizens of the City and County of Den-
ver, the City of Lakewood, Jefferson County and the City of Golden. Its expected opening day daily rid-
ership in 2013 is 19,279 and 2030 daily ridership is 29,698. The West Corridor is double track from
the Auraria Station through the DFC station and single track past DFC to the Jefferson County Govern-
ment Center.
The West Corridor has many interesting attributes; twelve stations: the end-of line station at the Jeffer-
son County Government Center that has a ground and two level 700+ space parking structure; Red
Rocks Station, a walk–up that services Red Rocks Community College; a multi modal center at the
Denver Federal Center that has a combined 1,000 space surface and parking structure along with an
18 bus bay transfer facility; Oak Street Station with 100+ surface lot parking facility and a four bus
bay transfer facility; Garrison Street Station a neighborhood walk-up station; an elevated station at
Wadsworth Boulevard that has 1000 space four level parking structure; Lamar Street Station, a walk-
up station; Sheridan Boulevard Station with an 800 space three level parking structure; Perry Street
Station, a walk-up neighborhood station; Knox Court Station, a walk-up neighborhood station; Federal
Boulevard Station with a leased 1,900 space parking facility; and the relocated Auraria Station that
services the Auraria Higher Education Center, with 30,000 student enrollment. This is where the
West Corridor connects with the existing C&E Lines and continues on to Denver Union Station (DUS) -
a multi-modal regional station.
Other West Corridor attributes include its many bridges. Starting from the west there is a five span
LRT over US40; A top down accelerated bridge construction at I-70 – LRT under I-70; an eleven span
reverse curve LRT over US6 and Indiana intersection that moves the LRT from the north side of US6 to
the south side of US6; a top down construction LRT under Union Boulevard bridge; a unique tied-
basket handle arch bridge over US6; a single span LRT over Kipling Street; an LRT over Wadsworth
Boulevard, a three span bridge with a station on the bridge; a three span Sheridan Boulevard Bridge,
a state highway over the LRT; two LRT bridges over the Lakewood Gulch in an open space; the Fed-
eral Boulevard Bridge, a state highway over the LRT; the Decatur Street bridge, a structure over drain-
age improvements, the LRT bridge over the Gulch; the LRT over the Platte River Bridge and the finally
the LRT five span bridge over the heavy rail central main line. There are also three pedestrian bridges
that carry the public over the LRT through the open space and parks in the City and County of Denver.
The West Corridor is unique to RTD’s facilities in that the other LRT facilities are adjacent to major
highways or freight rail systems; the west corridor runs through (west to east) open land adjacent to
US6, into the Denver Federal Center, through Lakewood’s Industrial Park, through a tight corridor with
established neighborhoods on either side for three miles, open space, parks and finally industrial area
before reaching the Auraria Higher Education Center.
Monthly Progress Report Page 4 April 2009
UTILITIES
Design Overview
RTD staff has prepared 205 work orders for utility relocations to be completed by the utility owners.
The estimated total number of utility owner work orders for this project is 245. The estimated total
number of dry utility work orders for this project is 185.
All known dry utilities requiring relocation design will be completed by June of 2009.
Construction
Xcel continues to relocate the overhead electric facilities located along 13th Avenue from Upham to
Sheridan. Xcel Energy-Electric will complete all known electric relocation construction by December of
2009 with the exception of electric construction that requires coordination with DTCG construction.
Xcel Energy-Gas Operations will complete all known gas relocation construction by August of 2009
with the exception of gas construction that requires coordination with DTCG construction.
Qwest is in phase two of the relocation construction which consists of the pulling of copper cable,
fiber optic cable and cold splicing of all copper and fiber optic facilities. Qwest Communication will
complete all known communications relocation construction by December of 2009 with the exception
of communication construction that requires construction coordination with DTCG and the relocation
along 13th Avenue from Independence to Wadsworth.
Comcast continues to relocate their overhead facilities along 13th Avenue from Independence to
Harlan. Comcast will complete all known relocation construction by July of 2009 if necessary to ac-
commodate the LRT construction.
Consolidated Mutual Water Company will complete all known utility relocation construction by
December 2009 with the exception of water line construction that requires construction coordination
with DTCG.
The project still has 6 towers to relocate that are located along the Lakewood Gulch between Decatur
and the Platte River which are currently in the design phase.
Level 3 will complete all known relocation construction by May of 2009 if necessary to accommodate
LRT construction.
Adesta will complete all known relocation construction by December of 2009 if necessary to accom-
modate LRT construction.
As of April 31, 2009 the project has completed 48 percent of the Dry Utility Relocation Construction
for the West Corridor.
FORCASTED WORK
ORDERS
TOTAL # WO
WRITTEN
TOTAL # NEGOTI-
ATED
WO DE-SIGNED
STARTED*
WO DESIGN
COMPLETE
WO CONSTRUCTION
START
WO CON-STRUCTION COMPLETE
% DESIGN
STARTED
% CONSTUC-
TION STARTED
185 170 136 136 114 88 79 74% 48%
Monthly Progress Report Page 5 April 2009
RIGHT OF WAY This Month:
Property Acquisition and Relocation
Parcels Impacts (Total Acquisition) – Closing and/or Immediate Possession has occurred on nineteen
(19) of the properties. Final offer pending on the remaining total acquisition.
Parcels Impacts (Total Acquisition) – Relocation consultants are completing the determination of
eligibility for relocation assistance for tenants and/or owners related to parcels currently owned or
being acquired by RTD and assisting residents with eligibility for relocation benefits.
Parcel Impacts (Partial Acquisition) – Offers are being made to the property owners and relocation
assistance has been initiated. The negotiation process begins at the time the offer is made.
Provide information regarding project status and activities to property owners, legal representatives,
internal staff, and media, as required.
Appraisals and value findings to be submitted for approval prior to presenting the offer to the
owner(s).
Property Management
Consultant services are providing property management services for properties now owned by RTD.
Next Month:
RTD will continue appraisals and value findings for acquisitions.
RTD will continue offers and negotiations.
On-going scheduling discussion with internal and CMGC staff.
Monthly Progress Report Page 6 April 2009
RIGHT OF WAY (Continued) Acquisition Tables
Areas of Concern
The appraisal process requires the appraiser to determine whether remainder parcels are considered
“uneconomic”. If the remainder is found uneconomic, additional relocations may result. We have
identified a handful of property with this potential for additional relocation. The properties are mostly
single family residential type lots.
If additional stake holder design wishes are considered, the schedule could be impacted.
Each design change impacts the right of way process.
# of Parcel Impacts (Total Acquisition)
# of Parcels Certified
# of Appraisals In Process
# of Appraisals Completed
FMV Determinations
Acceptance Ready for Construction
20 20 0 20 20 19 15
# of Parcel Impacts (Owned by Government Entities)
# of Parcels Certified
IGAs are pending
Acceptance Ready for Construction
52 52
# of Parcel Impacts (Partial Acquisition)
# of Parcels Certified
# of Appraisals or Value Findings in Process
# of Appraisals or Value Findings Completed
FMV Determinations or Value Findings Approved
Acceptance Ready for Construction
243 243 140 103 95 0
TOTAL # of Parcel Impacts
TOTAL # of Parcels Certified
TOTAL # of Appraisals or Value Findings in Process
TOTAL # of Appraisals or Value Findings Completed
TOTAL # of FMV Determinations or Value Findings Approved
TOTAL # of Acceptance
TOTAL # Ready for Construc-tion
319 319 140 123 115 19 15
# of Parcel Impacts (Owned by Railroad Companies)
# of Parcels Certified
Agreements are pending
Acceptance Ready for Construction
4 4
Monthly Progress Report Page 7 April 2009
STRUCTURAL CONSTRUCTION
This Month:
Panel and backfill placement have been completed on C-2. Contractor continues to place pre-cast
MSE wall panels and backfill on the west side of the Kipling bridge. The MSE walls that are currently
under construction are B-17, B-19, and B-20. This work includes the wire retaining wall at abutment
#1 on the Kipling structure.
Steel members have been welded together for the pedestrian bridge super structures of Tennyson
and Hazel at Big R’s shop in Greeley Colorado.
The 6th avenue bridge fabrication continues at Fought in Oregon.
The fabrication has begun on the Platte River super structure in San Angelo, Texas. A pre-
construction quality meeting was held with the contractor and a representative from RTD.
Floor slab and walls have been completed on the Pike View pedestrian tunnel.
Next Month:
Continue MSE wall construction at the west approach to the Kipling structure.
Continue fabrication of the 6th avenue bridge at the steel shop in Oregon.
Completion and delivery to the project site of the pedestrian bridges for Tennyson and Hazel.
Continue construction of the Pike View pedestrian tunnel east of Kipling avenue.
Continue Fabrication of the Platte River bridge in San Angelo, Texas.
Areas of Concern:
None
Monthly Progress Report Page 8 April 2009
CIVIL CONSTRUCTION This Month:
Lamar (» STA 1465+00) and Pierce (» 1452+00) Streets – Substantially completed correction of non-
conforming/deficient driveways, curb & gutter and walkways at these locations.
Jefferson County Government Center – Substantially completed installation of 8”/12” waterline with
hydrants, valves, and other appurtenances and removal of storm sewer scheduled for abandonment
at this location.
Lakewood Gulch (» STA 1551+00 to 1556+00) – Continued channel realignment activities in this
area. Primary activities initiated during the period: construction of Drop Structure 2; placement of soil
rip rap for new channel bottom/slopes; and construction of head/wing walls for 48” low flow RCP
pipe.
Knox Court (» STA 1567+00)
Completed relocation of 30” Denver Water Conduit No. 3.
Initiated construction of the new triple box culvert.
60” ADARC Pipeline (» STA 1209) – Initiated installation of pipeline segment under Union Blvd.
27” MWRD Sanitary Sewer (STA 1541 to 1555) – Completed removal of roadway pavement and
trackway within construction limits and staged pipe/materials in preparation for installation of new
sanitary sewer.
Design, planning, coordination, and permitting – Continue these activities for upcoming construction
of concrete box culverts (Lena Gulch, North Ave., and Richey Park) and demolition/site clearance of
miscellaneous acquired properties.
Next Month:
Lakewood Gulch (» STA 1551+00 to 1556+00) – Continue channel realignment activities in this area.
Knox Court (» STA 1567+00) – Continue construction of the new triple box culvert at this location.
60” ADARC Pipeline (» STA 1209) – Continue installation of pipeline segment under Union Blvd.
27” MWRD Sanitary Sewer (STA 1541 to 1555) – Initiate installation of new sanitary sewer piping and
manholes at this location.
Design, planning, coordination, and permitting – Continue these preparatory activities for upcoming
construction of concrete box culverts (Lena Gulch, North Ave., and Richey Park) and demolition/site
clearance of miscellaneous acquired properties.
Areas of Concern
Inadequate attention by CM/GC to stormwater management and erosion control issues for Lakewood
Gulch channel realignment and Knox Court triple box culvert work areas.
Monthly Progress Report Page 9 April 2009
SYSTEMS
Due to a third-party encroachment on an easement belonging to Xcel Energy, the location of Traction
Power Substation 60 will change. It had been RTD’s intent to simply move TPSS 60 to the other side
of the alignment, a location which would have minimized site redesign costs. However, RTD has been
advised by the GSA that this site will not be made available. For this reason, RTD has initiated a re-
design of the TPSS site plan, ductbank and DC feeder system which will allow the placement of TPSS
60 west of the Federal Center Station. Xcel Energy has agreed assist RTD in recouping costs associ-
ated with this move from the encroaching party.
Work continues on the review of signals submittals for the project. The QMO database system used
for submittal review and tracking has undergone considerable improvement over the past few
months, and now provides a means for paperless submittal and review. Most signals submittals are
referred to the signals design contractor for review. Hardware items which are presently used on the
RTD system are granted automatic approval when the construction contractor provides proof of the
previous approval.
Changes which allow the use of hard-drawn copper contact wire (in place of the previously specified
bronze alloy) have been made to all drawings and specifications.
Monthly Progress Report Page 10 April 2009
QUALITY MANAGEMENT
This Month:
The RTD FasTracks team has implemented a systematic quality management oversight (QMO)
program based on the FTA Quality Assurance/Quality Control Guidelines, and the international
standard for quality systems, ISO 9001. RTD’s Quality Management system is described in the RTD
FasTracks Quality Assurance Program Plan. Specific processes are further described in the Quality
Management Oversight Program Manual, and accompanying procedures.
The weekly Quality Team meetings and verification inspections of the contractor’s early construction
work continued in April in accordance with the RTD Quality Management Oversight Program Manual;
results of RTD verification inspections are communicated to the contractor, and tracked within RTD’s
Quality Management Oversight database to ensure any non-conformances are corrected to RTD’s
satisfaction and closed.
Kumar and Associates continued split sampling/testing of concrete and soil backfill and
embankment. They are also auditing material testing data entered into the Quality Records
Database (QRD) for the project.
RTD Quality staff met on April 24th and discussed possible statistical analysis to be performed for
elements of the project. It was agreed statistical analysis will include air entrainment and
compressive strength for concrete as well as wall backfill compaction and soil proctor selection.
DTCG completed their internal review of an updated Quality Management Plan and provided the
document to RTD for review on April 27th. This new plan is intended to replace the currently
approved Quality Management Plan.
RTD Quality Oversight staff visited the Evraz rail production facility on April 30th. No concerns were
discovered and a report was prepared detailing observations and recommendations resulting from
the visit.
RTD and DTCG scheduled training for stakeholders to introduce the quality management systems
being used on the West Corridor LRT Project.
Next Month:
Conduct RTD Quality Philosophy training with stakeholders.
Complete RTD review of DTCG’s updated Quality Management Plan.
Areas of Concern:
None
Monthly Progress Report Page 11 April 2009
PUBLIC INFORMATION
This Month
April 2 – Beth Jacobs High School
April 7 – RTD Board Tour of West Corridor
April 9 – Lakewood Interdepartmental Work Group
April 10 –Stakeholders Partnering meeting
April 10 – Lakewood Noise Wall Meeting
April 14 – Presentation Golden Optimist Club
April 14 – Small Stakeholders monthly meeting
April 21 – Distribute Public Meeting Notices Mountainside Estates
April 21 – Distribute Door Hangers – 12th Avenue Construction
April 23 – Administration Tour of West Corridor
April 24 – PI Orientation for DTCG Employees
April 27 – Meeting with Bill Spriggs – art opportunities
Next Month
May 6 – Presentation Mountainside Estates Public Meeting
May 6 – Presentation Federal Blvd Beautification Committee
May 7 – Lakewood Interdepartmental Work Group
May 8 – Elected Officials Briefing
May 12 – Small Stakeholders monthly meeting
May 15 – AACE Tour of West Corridor
May 19- Presentation Green Mountain Optimist Club
May 20 – Presentation Sun Valley Neighborhood
Monthly Progress Report Page 12 April 2009
RISK MANAGEMENT SUMMARY In collaboration with he FTA and PMOC , RTD has established a Risk Management Program which
includes implementing the Risk Management Plan (RMP) and Contingency Management Plan (CMP).
With these strategies. the West Corridor Risk Management Team (RMT) has developed procedures to
identify, analyze, implement mitigation, and manage risk.
The Contingency Drawdown Chart on the following page, shows the West Corridor has spent $4.1M (9%)
of the total project contingency account of $44,282,416, which includes $1,520,000 of CNPA
contingency. Currently the West Corridor is 63% above the minimum contingency requirement of
$24,698,630, and within the appropriate contingency limits.
The Risk Register, on page 25, shows that the West Corridor has identified 20 Risks.
* Based on likelihood to occur, cost impact, schedule impact
Newly Identified Risks
There are no new risks to the West Corridor this month
Focused Risks
The RMT continues to focus it’s efforts on ROW Risk, both as a schedule impact (SCC60-6) and as a cost
impact (SCC60-08). Meetings are held weekly to monitor progress and mitigate where possible any slips
to the schedule. The contractor is kept up to date on any schedule changes to utilize any work-arounds
in the construction process.
Geotechnical investigation in the BYL area will begin in May 2009. RMT will then have better information
to assess the potential risk for Hazmat in the area (SCC 40-25)
Risks Mitigated
T&C-27 Stormwater /drainage issues impact the DFC Parking Facility: This risk has been removed from
the Risk Register. The scope of the work will be included in the WC Project and is being included in the
DFC Parking Facility Change Order to be issued to DTCG.
# of Low Risk # of Medium Risk # of High Risk
5 11 4
Quarterly Progress Report Page 13 April 2009
RISK MANAGEMENT — PROJECT DASHBOARD
Quarterly Progress Report Page 14 April 2009
RISK MANAGEMENT — CONTINGENCY DRAWDOWN
In collaboration with the FTA and PMOC , RTD is designing a Risk Management Program which includes
the Risk Management Plan (RMP) and Contingency Management Plan (CMP) . Part of this management
includes the Risk Register and the Contingency Drawdown Chart to display the cumulative contingency
maximum/minimum range drawdown, as the project progresses. These tools provide for the close
management of risk and adherence to the West Corridor Budget.
The West Corridor is maintaining the allowable contingency at 56% above the minimum contingency.
Monthly Progress Report Page 15 April 2009
RISK MANAGEMENT — RISK REGISTER
Monthly Progress Report Page 16 April 2009
RISK MANAGEMENT — RISK REGISTER (Continued)
Monthly Progress Report Page 17 April 2009
DBE PARTICIPATION
Firm DBE Goal Actual for
April 2009
David Evans & Associates 21% 17%
FRSC 10% 12%
Denver Transit Construction
Group (DTCG) 13% Pre-Construction 13%
Denver Transit Construction
Group (DTCG) 18% Construction 9%
Monthly Progress Report Page 18 April 2009
COST SUMMARY
As of April 2009, the status of Change Control is as follows:
Change Orders executed in the month ending April 2009 with costs in excess of $100,000.
Pending Changes in review in the month of April 2009 with costs in excess of $100,000.
Note: Executed construction change orders (CCO) are primarily for GMP work scope
prior to full NTP.
TYPES OF CHANGES AMOUNT
· Design Work Orders: 0
· Design Change Orders (DCO): 20
· Design Pending Change Orders: 0
· Construction Work Orders: 0
· Construction Change Orders (CCO): 30
· Construction Pending Change Orders: 16
· Systems Work Orders: 0
· Systems Change Orders (SCO): 1
· Systems Pending Change Orders: 1
PCN DESCRIPTION
CCO#22 Kipling Earthwork—Early Const. $ 315,105.20
CCO#27 MSE Wall Arch. Option 2 $ 501,238.76
CCO# Early Const. for Walls D43 & D70 $ 141,612.93
CCO# Jeffco Water Main Modification $ 163,020.44
CCO#50 Full Civil Const. Award (nte) $ 346,246,968.00
SCO#02 Systems IFC Design Changes $ 2,654,106.45
PCN DESCRIPTION AMOUNT
CCO#35 Meza Additional Bridge Work $ 261,835
DCO#20 Complete IFC Design, Design During Const. $ 2,660,802
Monthly Progress Report Page 19 April 2009
PROJECT BUDGET — SUMMARY
Monthly Progress Report Page 20 April 2009
PROJECT BUDGET — Sources
$3
,55
4,6
20
$1
,74
6,6
44
$0
$1
3,0
77
,20
6
$0
$1
4,6
20
,02
4
$0
$3
,53
2,4
96
$9
50
,00
0$
9,7
77
,25
7$
0$
0
$2
,06
4,4
56
$0
$2
,02
9,0
00
$0
$2
,65
6,3
98
$5
70
,00
0
$1
57
,70
3,1
64
$5
7,9
59
,04
0$
2,0
00
,00
0
$1
28
,41
4,2
64
$7
8,5
63
,61
6
$5
4,8
51
,47
6
$7
1,1
50
,09
0$
85
,89
0,1
26
$1
6,4
78
,41
6
10
Gu
ide
way
&
Trac
k El
em
en
ts2
0 S
tati
on
s, S
top
s,
Term
inal
s3
0 S
up
po
rt F
acili
ties
40
Sit
ew
ork
&
Spe
cial
Co
ndi
tion
s5
0 S
yste
ms
60
RO
W, L
and
, Ex
isti
ng
Imp
rove
men
ts
70
Ve
hic
les
80
Pro
fess
ion
al
Serv
ice
s9
0 U
nal
loca
ted
Co
nti
nge
ncy
Pro
ject
Bu
dge
t So
urc
es
CN
PA
RTD
Bu
dge
tC
NP
A b
y O
the
rs B
ud
get
(YO
E$)
Bas
elin
e B
ud
get
Monthly Progress Report Page 21 April 2009
PROJECT BUDGET — BUDGET VS COMMITMENT VS ACTUAL
$0
$5
0,0
00
,00
0
$1
00
,00
0,0
00
$1
50
,00
0,0
00
$2
00
,00
0,0
00
$2
50
,00
0,0
00
(YO
E$)
Bas
elin
e B
ud
get
CN
PA
by
Oth
ers
Bu
dge
t
CN
PA
RTD
Bu
dge
t
Allo
cate
d C
on
tin
gen
cy
Ap
pro
ved
Ch
ange
s
Ap
pro
ved
Bu
dge
t (B
UD
)
Ap
pro
pri
ate
d/
Fun
de
d
Co
mm
itte
d t
o D
ate
% C
om
mit
ted
Act
ual
to D
ate
Est.
at
Co
mp
leti
on
(EA
C)
Monthly Progress Report Page 22 April 2009
PROJECT BUDGET — MAJOR CONTRACTS
Monthly Progress Report Page 23 April 2009
PROJECT BUDGET — DETAIL
Monthly Progress Report Page 24 April 2009
PROJECT BUDGET — DETAIL (Continued)
Monthly Progress Report Page 25 April 2009
PROJECT BUDGET — COST STATUS DETAIL
157.7
0
57.9
6
2.0
0
128.4
1
78.5
6
54.8
5
71.1
5
85.8
9
16.4
8
653.0
1
56.8
2
$0.0
0$100.0
0$200.0
0$300.0
0$400.0
0$500.0
0$600.0
0$700.0
0
10
20
30
40
50
60
70
80
90
tota
l
100
Millions
70006 W
C F
edera
l Pro
ject -Cost
Deta
il b
y S
CC
Actu
al
to D
ate
Appro
ved b
udget
Dis
pla
yed
in M
illio
ns
Monthly Progress Report Page 26 April 2009
PROJECT BUDGET — ALLOWANCES STATUS
SC
C
Description
C
onting
ency
Allo
cation
D
TC
G B
id
Allo
wances
Bud
get
Actu
als
R
em
ain
ing
40.0
8
Gra
ffiti R
em
oval
150,0
00.0
0
150,0
00.0
0
40.0
8
Tem
pora
ry E
asem
ents
500,0
00.0
0
500,0
00.0
0
1,0
00,0
00.0
0
40.0
8
Part
nerin
g
150,0
00.0
0
150,0
00.0
0
300,0
00.0
0
40.0
4
En
v.
& A
rch.
Mitig
ation
1,0
00,0
00.0
0
1,1
93,5
07.0
0
153,0
84.3
6
2,0
40,4
22.6
4
40.0
3
Sub
ex. R
em
. W
alls
& C
ais
sons
4,0
00,0
00.0
0
4,1
75,6
87.0
0
141,4
13.3
6
8,0
34,2
73.6
4
10.0
2
Wate
r T
aps F
ees
250,0
00.0
0
250,0
00.0
0
40.0
1
Build
ing D
em
olit
ion
1,0
00,0
00.0
0 1
,00
0,0
00.0
0
968,7
95.2
9
1,0
31,2
04.7
1
40.0
6
Fence G
roun
din
g
80,0
00.0
0
80,0
00.0
0
40.0
8
Tra
ffic
Schedu
le I
ncentive
0.0
0
40.0
8
Railr
oad
Fla
gg
ing
200,0
00.0
0
200,0
00.0
0
10.0
8
LR
T S
hutd
ow
ns
0.0
0
80.0
6
Perm
its &
Lic
enses
1,2
00,0
00.0
0
1,2
00,0
00.0
0
7,3
30,0
00.0
0 1
,65
0,0
00.0
0 6
,56
9,1
94.0
0 1
,26
3,2
93.0
1 1
4,2
85,9
00.9
9
Monthly Progress Report Page 27 April 2009
PROJECT BUDGET — ALLOWANCES STATUS (Continued)
0.0
0
1,0
00
,00
0.0
0
2,0
00
,00
0.0
0
3,0
00
,00
0.0
0
4,0
00
,00
0.0
0
5,0
00
,00
0.0
0
6,0
00
,00
0.0
0
7,0
00
,00
0.0
0
8,0
00
,00
0.0
0
9,0
00
,00
0.0
0
Graffiti Removal
Temporary Easements
Partnering
Env. & Arch. Mitigation
Subex. Rem. Walls & Caissons
Water Taps Fees
Building Demolition
Fence Grounding
Traffic Schedule Incentive
Railroad Flagging
LRT Shutdowns
Permits & Licenses
40
.08
40
.08
40
.08
40
.04
40
.03
10
.02
40
.01
40
.06
40
.08
40
.08
10
.08
80
.06
Co
nti
ng
en
cy
All
oc
ati
on
DT
CG
Bid
All
ow
an
ce
s
Bu
dg
et
Ac
tua
ls
Re
ma
inin
g
Monthly Progress Report Page 28 April 2009
CONCURRENT NON-PROJECT ACTIVITIES — STATUS DETAIL
Monthly Progress Report Page 29 April 2009
CONCURRENT NON-PROJECT ACTIVITIES — (CONTINUED)
Monthly Progress Report Page 30 April 2009
CONCURRENT NON-PROJECT ACTIVITIES — (CONTINUED)
$3.5
5
$1.7
5
$0.0
0
$13.0
8
$0.0
0
$14.6
2
$0.0
0
$3.5
3
$0.0
0
$0.9
5
$37.4
8
$0.0
0
$0.0
0$5.0
0$10.0
0$15.0
0$20.0
0$25.0
0$30.0
0$35.0
0$40.0
0
10
20
30
40
50
60
70
80
90
90
tota
l
100
Millions
70027 C
NPA
by R
TD
-Cost
Deta
il b
y S
CC
Appro
ved b
udget
Actu
al
to D
ate
Dis
pla
yed
in M
illio
ns
Monthly Progress Report Page 31 April 2009
CONCURRENT NON-PROJECT ACTIVITIES — (CONTINUED)
Monthly Progress Report Page 32 April 2009
CONCURRENT NON-PROJECT ACTIVITIES — (CONTINUED)
Monthly Progress Report Page 33 April 2009
CONCURRENT NON-PROJECT ACTIVITIES — (CONTINUED)
2000000
4000000
6000000
8000000
10000000
12000000
14000000
16000000
18000000
10
20
30
40
50
60
70
80
90
90
tota
l
100
70028 C
NPA
by O
thers
-Cost
Deta
il b
y S
CC
Appro
ved b
udget
Actu
al
to D
ate
Invoic
e to D
ate
Receiv
ed to d
ate
Monthly Progress Report Page 34 April 2009
PROJECT SCHEDULE — SUMMARY Completed Work This Month:
Tree Removal for Early Work Areas 30Apr09
On Going Work:
Pedestrian Bridges:
Dry Gulch West: remaining work Water proofing /Epoxy Coating, forecast finish 6May09
Dry Gulch East: Remaining work, Install Drop Structure #4, forecast finish 4May09
Tennyson and Hazel: Will complete when the concrete deck is poured 12May09
Kipling Walls will complete 23Jul09
Gulch Grading and Channelization forecast finish 17Aug09
Work Started This Month:
60” Agricultural Ditch at Union start date: 13Apr09, forecast finish 6Aug09
Knox Box Culvert: started 06Apr09, forecast finish 09Oct09
GSA Security Fencing started 8Apr09, forecast finish 18May09
WC Earned Value to date: 24.o6%
Forecast for DTCG’s Schedule: 29Jun09
Monthly Progress Report Page 35 April 2009
PROJECT SCHEDULE
Monthly Progress Report Page 36 April 2009
PROJECT SCHEDULE — (Continued)
Monthly Progress Report Page 37 April 2009
PROJECT SCHEDULE — (Continued)
Monthly Progress Report Page 38 April 2009
PROJECT SCHEDULE — (Continued)
Monthly Progress Report Page 39 April 2009
PROJECT SCHEDULE — (Continued)
Monthly Progress Report Page 40 April 2009
PROJECT SCHEDULE — (Continued)
Monthly Progress Report Page 41 April 2009
PROJECT SCHEDULE — (Continued)
Monthly Progress Report Page 42 April 2009
PROJECT SCHEDULE — (Continued)
Monthly Progress Report Page 43 April 2009
PROJECT SCHEDULE — (Continued)
Monthly Progress Report Page 44 April 2009
PROJECT SCHEDULE — (Continued)