Welcome to El Dorado Hills

Goals of Presentation

• Summarize growth, traffic, and road network stateaffecting planning in EDH

- Especially where not easily evident from the perspectiveof Sacramento County and its cities

• Focus in on implications for Connector alignmentin the El Dorado Hills area

• Offer recommendations, including two conceptsto improve through traffic routing

Topics for the Connector in EDH

• Regional connections & through traffic

• Demand for road network capacity (traffic volume)

• Problems with through traffic on White Rock Road

• Available road network capacity

• Concepts for alternative Connector alignments

El Dorado Hills as a “traffic lens”Between two regions

•E/W through traffic limited to US 50 and Green Valley

El Dorado Hills as a “traffic lens”Between two regions

•E/W through traffic limited to US 50 and Green Valley•Very low arterial density in comparison with Sac County

Road System Demand:population growth

1999 2000 2001 2002 2003 2004 2005 2006 2007 20080

5,000

10,000

15,000

20,000

25,000

County GrowthEDH Growth

Actual EDH growth probably is closer to EDH 50% of County growth, not 88%.Data sets are based on different assumptions for housing occupancy.

Population growth as% of 1999 base year population

1999 2000 2001 2002 2003 2004 2005 2006 2007 20080.0%

10.0%20.0%30.0%40.0%50.0%60.0%70.0%80.0%90.0%

100.0%

County % growthEDH % growth

Demand for road system capacity:El Dorado County Population Growth

Projections dating from the 2004 General Plan debate

ActualGrowth

Planned road system capacity growthcompared to population growth

Centerline miles before 2018

Centerline miles planned, total

New lane miles before 2018

New lane miles planned, total

Population growth, 2018

Population growth, 2025 GP

Population growth, buildout

0.0%20.0%

40.0%60.0%

80.0%

100.0%

120.0%

140.0%

160.0%

180.0%

Percent increase

Population estimates are for entire West Slope

El Dorado Hills,the 2010 CDP

…with a highlight over the County Line

Existing EDHroad network

Future EDHroad network

additions

as currently planned Silva Valley interchange

Empire Ranch Road

Saratoga

Silver Springs

Country Club

Connector

Existing traffic levels (2008)

Average Daily Trips ± 2,50030,00025,00020,00015,00010,000 5,000Less than 2,500

93,000

68,000 61,000

Traffic countchange rate

change depicted by colored markers, percent increase or

percent decrease since 2004.

Time range covered is lesswhere insufficient data exists

+30% or more+20% to +30%+10% to +20%0% to +10%-10% to 0%-20% to -10%-20% or more

+36%

+42%

New, then -9%

New, then +16%

+211%

+47%

+42%+122%

+138%

New, then +15%

-21%

-27%

White Rock Corridor2008 traffic counts

6,408

8,523

13,708

9,328

29,228

24,742

2006 or 2007 traffic counts

18,144

8,817

Traffic count trendsAverage Daily Trips

2004 2005 2006 2007 20080

5,000

10,000

15,000

20,000

25,000

30,000

35,000

40,000

El Dorado Hills Blvd @ Saratoga

Latrobe Rd @ White Rock, north side of intersection

Latrobe Rd@ Golden Foothill

White Rock @ county line

White Rock @ Latrobe, west side of intersection

White Rock @ Latrobe, east side of intersection

No Data2007, 2008

White Rock CorridorAn issue for regionalThrough traffic:Traffic Signals

+ 2 more existing signals

Likely later

Likely, Folsom SOI

Likely later

*

Connector/US 50 traffic balance in EDH & Folsom

• The Connector will divert traffic from US 50• US 50 will divert traffic from the Connector• US 50 and Connector traffic will be independent• Each may occur at different times

Which of these will be true?

Peak risk of congestion is in the afternoon peak period. Even with US 50 LOS F jams such as the one on the title slide, White Rock may be slower for through traffic.

Future EDH road network, currently planned

Future EDH road network, Connector suggestion #1

Future EDH road network, Connector suggestion #2

Alternative alignment concepts dismissed as unlikely to be viable

• Direct diagonal connection for through traffic across Folsom SOI Not planned by City of Folsom, City is very unlikely to replan SOI land use and circulation

• 2-mile tunnel below EDH for through traffic to bypass EDH surface streetsHighly unlikely to be economically feasible

Recommendations• Keep regional through traffic off of White Rock Road in EDH

– Growth in through traffic plus local traffic will be a problem for both.

• Escalate joint planning among multiple agencies – especially for coordinated EDH/Folsom road network development .

• Specifically review need for arterials/feeders west of the EDH Business Park, including the eastern Folsom SOI area.

• In El Dorado County: Undertake substantial revision of planning to avoid future road network overloads

Agencies: Connector JPA, El Dorado/Folsom JPA, City of Folsom, El Dorado County Transportation Commission, County of El Dorado, County of Sacramento, possibly Caltrans

Not the end of traffic issuesBut nearly the exit for this presentation…