Upload
others
View
7
Download
0
Embed Size (px)
Citation preview
LIMA SEMPURNAWELANG SEHAT
LIMA SEMPURNAWELANG SEHAT INDONESIA HEALTHY
RIVERS CHALLENGE 2020
A Masterpiece for Welang River
Our Vision
Basic
Problem
Problem
Checked
Transform the Welang Watershed intoa healthy watershed with 5 pillars ofthe C-Mile version:
Resilient Clean andHelthy
Society-Empowered Culture Value Technology
Approach
Sustainability
Flood
Sedimentation
Landuse Change
River Polution
Waste
11
2
3
2 3 4
4
RIVER DREDGING
RIVER DREDGING
INTEGRATED WATERRESOURCE MANAGEMENT
INTEGRATED WASTEMANAGEMENT
COMMUNAL WWTP
TPS 3R+REDUCE REUCE RECYCLE
SEKOLAH SUNGAI
COMMUNITYEDUCATION
EARLY WARNING SYSTEM
ENFORCEMENTREFGULATION
MEDIA
AWSAWLR PurwodadiAWLR SelowongkoAWLR Dompo15 Rain Station
TRMM
PILOT PROJECT
Sub District Office12 Village Office120 RW Office
INTEGRATED WATERRESOURCE MANAGEMENT
INTEGRATED WASTEMANAGEMENT
SUPPORTING TOOLSAND SYSTEM
SUPPORTING TOOLSAND SYSTEM
Upstream: Kec. Lawang Kec. Tosari Kec. Tutur Kec. Prigen Kec. Purwodadi Kec. Purwosari Kec. Pasrepan
Midstream: Kec. Kejayan Kec. Sukorejo Kec. Wonorejo
Downstream: Kec. Rembang Kec. Kraton Kec. Pohjentrek Kec. Gadingrejo
1
2
3
4
5
6
7
8
Drought
Land use change
Flood
Sedimentation for brick usage
Narrowing river
Waste
Sedimentation
Tide
3
3
4
7
1
1
2
5
8
Concept of The IdeaThe concept of this idea is to increase the long storage capacity of the river so the volume of the flood that overflows to the land area can be reduced.
Green Upstream (BGI Based Society)The concept of absorption rainwater into the soil with sustainable community empowerment by applying a simple system: Infiltration well, biophore, reboitation and open green space.
Waste water treatment processTo conduct the further process of wastewater treatment among local community, especially in Sidogiri Boarding School.
Comply waste water standardFollow the Domestic WasteWater Standard based on PerMenLH No. 68 year 2016 in pH, BOD, COD, TSS, Oil and Grease, Ammonia, Total Coliform, and Discharge parameters.
Reuse, Reduce, RecycleWaste separation, composting, cooperating with company that do bottle recycling as EPR, self recycling / upcycling, send to collector, send to recycle company, and end residue to TPA.
1. Provide facilitator for each TPS 3R2. Community Empowerment3. Every waste that collected will be exchange with money
Raising environmental awareness and cultivate behavior so the entire programs will proceed sustainable
To re-enforce the implementation of regulation and raise community awareness about what must and must not do
Engage journalist and influencer to spread awareness, information, and current situation in Welang River
Potential members:East Java government institutions such as : BAPPEDA Dinas PUSDA Dinas Lingkungan Hidup Baperwil III
Ÿ Nongovernmental organization along Welang Watershed
Ÿ Local communityŸ Companies around the Welang RiverŸ Local government institutions in Malang Regency,
Pasuruan Regency, and Pasuruan City that handle: Planning and development Water resource management Spatial planning Residential areas Environment Public comunication Education
Their dutiesŸ Planning flood management programs Ÿ Harmonizing interests between sectors, regions and
stakeholders Ÿ Planning community development Ÿ Creating a clear cut between stakeholders in the
Welang WatershedŸ As an advisor for the governor of the East Java
Province
Digitalization to support the solutions through the integration of telemetry data from AWLR, AWS, rain station, and TRMM.
This might have benefits for the village, such as:
Ÿ Village GardenŸ BozemŸ Empower the community towards the
green upstream program
Reducing flood, Recharge Groundwater, Ecopark, and Economic Growth
Flood control, supply water to fishpond, and research area
Utilization of embankments, beautifying the landscape, increasing public awareness of the river, growing the economy by providing public space
Sediment trap for sentra bata
Target MaterialThe target material is the soil / sediment itself and the waste in the river.
The sedimentation material can be disposed to the temporary disposal area or can be used as embankment material.
target volume : 300.000 m3assuming the flood height is about 1 mthe area that can be save is about 30 ha.
1 Infiltration well
Government Stakeholders
Reduce
TPS 3R+
COMMUNALWWTP
Surface run-off from upstream
80%
3 Biopore
5 Vegetation
$$$ BUMDES
EMBUNG JERUK
EMBUNG TIDU
EMBUNG PULOKERTO
POLDER SEMARE
Riverfront
Welang River FloodManagement Team
Welang Flood Early WarningSystem
Supply water to D.I. DomasV=10000 m3
Supply water to D.I. KlosodV=5000 m3
Supply water to D.I. Klosod & FishpondV=5000 m3
V=5000 m3
Supply water to D.I. KlosodV=2000 m3
Supply water to D.I. DomasV=12000 m3
V=10000 m3
EMBUNG SAMBISIRAH
LONG STORAGEPLINGGISAN
CASCADING RESERVOIR
Fathiya MufidahAnggie Aqidahtun Nisa Brawijaya University
Bandung Institute of TechnologyUniversity of Muhammadiyah Malang
Diponegoro UniversityGadjah Mada University
Perum Jasa Tirta 1Ria Verensia
Mohammad DPuguhMuhammad Dwi NFadel
Rheyza Gigih Prakoso
FORECASTING
INFORMATION WARNING
RESPONSE
Real Time Data
BMKG
RESULTTOTAL VOLUME=
47060 m3
River education and clean up competition for students from all school in Welang Watershed.
There are 1031 schools in Welang Watershed with more than 10.000 students that will contribute in Welang Clean Up Event.
Coordinating with Adiwiyata Program.
TASKFORCE
LIMA SEMPURNAWELANG SEHAT
LIMA SEMPURNAWELANG SEHAT INDONESIA HEALTHY
RIVERS CHALLENGE 2020
A Masterpiece for Welang River
Visi
Permasalahan
Problem
Dasar
Checked
Menciptakan Daerah Aliran Sungai (DAS) Welang menjadiDAS sehat berdasarkan lima (5) prinsip:
Tanggun Bersih danSehat
PemberdayaanMasyarakat Berbudaya Berbasis
Teknologi
Keberlanjuatan
Banjir
Sedimentasi
Perubahan TatagunaLahan
Polusi sungai
Sampah
11
2
3
2 3 4
4
PENGERUKAN SUNGAI
PENGERUKAN SUNGAI
PENGOLAHAN SUMBERAIR TERINTEGRASI
PENGOLAHAN SAMPAHTERINTEGRASI
IPAL KOMUNAL
TPS 3R+REDUCE REUCE RECYCLE
SEKOLAH SUNGAI
PENDIDIKANKOMUNITAS
SISTEM PERINGATAN DINI
PENEGAKAN EDUKASI
MEDIA
AWSAWLR PurwodadiAWLR SelowongkoAWLR Dompo15 Rain Station
TRMM
PILOT PROJECT
Kantor Camat12 Kantor Kepala Desa
120 Kantor RW
PENGOLAHAN SUMBERAIR TERINTEGRASI
PENGOLAHAN SAMPAHTERINTEGRASI
TEKNOLOGI DANSISTEM PENUNJANG
TEKNOLOGI DANSISTEM PENUNJANG
Hulu: Kec. Lawang Kec. Tosari Kec. Tutur Kec. Prigen Kec. Purwodadi Kec. Purwosari Kec. Pasrepan
Tengah: Kec. Kejayan Kec. Sukorejo Kec. Wonorejo
Hilir: Kec. Rembang Kec. Kraton Kec. Pohjentrek Kec. Gadingrejo
1
2
3
4
5
6
7
8
Kekeringan
Perubahan tata guna lahan
Banjir
Sedimentasi untuk sentra bata
Penyempitan sungai
Sampah
Sedimentasi
Pasang air laut
3
3
4
7
1
1
2
5
8
Konsep IdeMeningkatkan kapasitas sungai
Hijau Hulu Konsep penyerapan airhujan ke dalam tanah melalu komunitas yang secara berlanjut mengaplikasikan/menerapkan sumur resapan, biopore, dan penghijauan
Proses pengolahan air limbahUntuk melakukan proses pengolahan air limbah lebih lanjut di kalangan masyarakat lokal, khususnya di Pondok Pesantren Sidogiri
Memenuhi standar air limbeMengikuti Standar Air Limbah Domestik berdasarkan PerMenLH No. 68 tahun 2016 pada parameter pH, BOD, COD, TSS, Oli dan Gemuk, Amoniak, Total Coliform, dan Discharge.
Penggunan ulang, Pengurangan, Daur UlangPemilahan sampah, pengomposan, bekerja sama dengan perusahaan yang melakukan daur ulang botol plastik sebagai EPR, daur ulang mandiri, kirim ke pengumpul, kirim ke perusahaan daur ulang, kirim residu ke
1. TPA menyediakan fasilitator di setiap TPA2. Pemberdayaan masyarakat3. Setiap sampah yang dikumpulkan akan ditukar dengan uang
Pendidikan dan kompetisi pembersihan sungai untuk siswa dari seluruh sekolah di DAS Welang.
Terdapat 1031 sekolah di DAS Welang dengan lebih dari 10.000 siswa yang akan berkontribusi dalam Kegiatan Pembersihan Welang.
Bekerja sama dengan Program Adiwiyata.
Meningkatkan kesadaran lingkungan dan menumbuhkan perilaku sehingga seluruh program akan berjalan secara berkelanjutan
Untuk menegakkan kembali implementasi regulasi dan meningkatkan kesadaran masyarakat tentang apa yang harus dan tidak boleh dilakukan
Melibatkan jurnalis dan influencer untuk menyebarkan kesadaran, informasi, dan situasi terkini di Sungai Welang
Anggota:East Java government institutions such as : BAPPEDA Dinas PUSDA Dinas Lingkungan Hidup Baperwil III
Ÿ Lembaga swadaya masyarakat di sepanjang DAS Welang
Ÿ Komunitas lokalŸ Perusahaan di sekitar Sungai WelangŸŸ Instansi pemerintah daerah di Kabupaten Malang,
Kabupaten Pasuruan, dan Kota Pasuruan yang menangani:
Perencanaan dan pengembangan Pengelolaan sumber daya air Perencanaan tata ruang Area pemukiman Lingkungan Hidup Komunikasi publik
PekerjaanŸ Merencanakan program pengelolaan banjirŸ Harmonisasi kepentingan antar sektor, wilayah dan
pemangku kepentinganŸ Merencanakan pengembangan masyarakatŸ Menciptakan jurang pemisah antar pemangku
kepentingan di DAS WelangŸ Sebagai penasehat Gubernur Provinsi Jawa Timur
Pendidikan
Digitalisasi untuk mendukung solusi melalui integrasi data telemetri dari AWLR, AWS, stasiun hujan, dan TRMM.
Hal ini akan memberikan keuntungan, seperti:
Ÿ Taman DesaŸ BozemŸ Mendorong komunitas terhadap
program hijau hulu
Mengurangi banjir, Mengisi Ulang Air Tanah, Ecopark, dan Pertumbuhan Ekonomi
Pengendalian banjir, Penyediaan air untuk kolam ikan, dan area penelitian
Pemanfaatan tanggul, mempercantik badan sungai, meningkatkan kesadaran masyarakat tentang sungai, menumbuhkan perekonomian dengan menyediakan ruang publik
penangkap sedimen untuk sentra bata
Target MaterialMaterial yang. Digunakan adalah tanah / sedimen hasil pengerukan dan limbah di sungai.Material sedimentasi dapat dibuang ke tempat pembuangan sementara atau dapat digunakan sebagai material tanggul.
Volume : 300.000 m3Banjir diasumsikan setinggi 1 mLuas yang bisa di hemat sekitar 30 ha.
1 Sumur Resapan
Pemerintah Stakeholders
Mengurangi
TPS 3R+
WWTPKOMUNAL
limpasan permukaan dari hulu
80%
3 Biopore
5 Penghijauan
$$$ BUMDES
EMBUNG JERUK
EMBUNG TIDU
EMBUNG PULOKERTO
POLDER SEMARE
HASILTOTAL VOLUME=
47060 m3
Riverfront
Tim Manajemen BanjirSungai Welang
Sistem Peringatan DiniBanjir Welang
Pasokan air ke D.I. DomasV=10000 m3
Pasokan air ke D.I. KlosodV=5000 m3
Pasokan air ke D.I. Klosod & FishpondV=5000 m3
V=5000 m3
Pasokan air ke D.I. KlosodV=2000 m3
Pasokan air ke D.I. DomasV=12000 m3
V=3000 m3
EMBUNG SAMBISIRAH
PENAMPUNGANPANJANG
PLINGGISAN
EMBUNG BERTINGKAT
Fathiya MufidahAnggie Aqidahtun Nisa Universitas Brawijaya
Institut Teknologi BandungUniversitas Muhammadiyah Malang
Universitas DiponegoroUniversitas Gadjah Mada
Perum Jasa Tirta 1Ria Verensia
Mohammad DPuguhMuhammad Dwi NFadel
Rheyza Gigih Prakoso
TASKFORCE
Peramalan
Peringatan Informasi
Respon
Data Real Time
BMKG