Construc)on system Enclosure system Shell or envelope (Roof, exterior walls, windows and doors). Structural system Founda)on of a building Columns, beams, and loadbearing walls Service system Provide essen)al services (e.g. Water supply, hea)ng, and electrical system Francis D.K.CHING, Building Construc)on Illustrated,4 th edn WEEK 1

week 1and 2 logbook

Embed Size (px)

DESCRIPTION

week 1 and 2 logbook submissions the university of Melbourne

Citation preview

Construc)on  system                                         wEnclosure  system �Shell  or  envelope (Roof,  exterior  walls,  windows  and  doors).

wStructural  system           �Founda)on  of  a  building            �Columns,  beams,  and  loadbearing  walls  

wService  system �Provide  essen)al  services    (e.g.  Water  supply,  hea)ng,  and  electrical  system  Francis  D.K.CHING,  Building  Construc)on  Illustrated,4th  edn  

         

WEEK  1

Studio task  1.In  the  group  of  3-­‐4  build  a  tower  as  high  as  possible  and  the  tower  must  be  able  to  accommodate  the  object  that  provide  by  tutor.    2.  The  prepara)on:          this  idea  comes  form  Colosseo.  start  with  the  base  that  build  with  concrete,  in  order  to  give  us  a  stable  founda)on.  The  shape  provide  enough  space  for  the  object.    

3.  our  group  start  it  over.  This  )me  we  follow  the  same  idea  and  structure,  but  use  different  material.  (running  out  of  concrete)  

4.  Our  group  built  up  to  about  40cm  tall.  Unfortunately,  we  did  not  build  a  tower  as  required.  Because  we  were  trying  to  figure  out  how  to  create  a  path(or  a  door)  for  the  object  to  go  through.  First  we  tried  to  build  like  the  picture  shown  below,  but  we  

end  up  with  collapse  and  the  )me  is  up.  So  we  just  stopped  there  .  

This    one  is  similar  to  my  original  thought.  Build  as  high  as  possible  The  structure  like  this  is  not  easy  to  collapse  As  they  remove  the  bricks,  we  could  know  this  is  a  stable  structure,  because  they  can  remove  most  of  the  bricks  without  collapse.

The  door  they  built  is  what  are  we  trying  to  do.

     WEEK  2  3  types  of  joints          Fixed  joint                      As  known  as  can)lever  

 Roller  joint                      if  you  place  an  object  on  this  roller,  the  object  will  move  horizontally    

 Pin  joint                          

Efficiency  of  materials  

STRENGTH    Such  as  steel  stronger  than  concrete                    

STIFFNESS  V  FLEXIBLE        Plas)c  V  rubber  

Studio  task Use  the  balsa  which  was  cut  into  40  pieces.  In  the  group  3-­‐4,  build  a  stable  tower  tall  enough  to  reach  the  ceiling.    1.  Our  group  member  has  made  a  

mistake  in  cu`ng  the  balsa,  so  the  balsa  get  thin  and  flexible    

2.  We  use  the  most  stable  structure  –  triangle  to  build  the  tower  

3.  We  bond  each  of  the  individual  triangles  together,  in  order  to  make  the  tower  as  tall  as  possible.  

4.  Our  group’s  tower  is  about  195cm          but  because  of  the  material,  the  tower        keeps    falling  down.

5.  We  add  some  more  brace  on  the  bofom  trying  to  make  it  stand  by  itself  and  more  stable    

The  tower  form  other  groups     This  is  stable  and  well  structured    Also  tall  enough  to  reach  the  ceiling  

This  is  interes)ng,  because  they  just  bond  balsa  as  tall  as  they  can.  it  is  not  a  part  of  the  structure,  but  this  is  also  tall  enough  to  reach  the  ceiling.