US CMS DOE/NSF Review: May 8-10, 2001 1 WBS 6.3.3 Conductor Procurement WBS 6.3.3 Conductor Procurement Rich Smith DOE/NSF Review 8 May 2001

WBS 6.3.3 Conductor Procurement

  • Upload
    milly

  • View
    45

  • Download
    0

Embed Size (px)

DESCRIPTION

WBS 6.3.3 Conductor Procurement. Rich Smith DOE/NSF Review 8 May 2001. WBS 6.3.3 Conductor Procurement. Fermilab – ETHZ -- CERN Conductor Component Procurement Superconducting Strand (~$2212K) Aluminum Alloy Reinforcement (~$701K) Pure Aluminum Stabilizer (~$973K) - PowerPoint PPT Presentation

Citation preview

Page 1: WBS 6.3.3 Conductor Procurement

US CMS DOE/NSF Review: May 8-10, 2001 1

WBS 6.3.3 Conductor ProcurementWBS 6.3.3 Conductor ProcurementWBS 6.3.3 Conductor ProcurementWBS 6.3.3 Conductor Procurement

Rich Smith

DOE/NSF Review

8 May 2001

Page 2: WBS 6.3.3 Conductor Procurement

US CMS DOE/NSF Review: May 8-10, 2001 2

WBS 6.3.3 Conductor ProcurementWBS 6.3.3 Conductor ProcurementWBS 6.3.3 Conductor ProcurementWBS 6.3.3 Conductor Procurement

Fermilab – ETHZ -- CERN

• Conductor Component Procurement

- Superconducting Strand (~$2212K)

- Aluminum Alloy Reinforcement (~$701K)

- Pure Aluminum Stabilizer (~$973K)

• Independent QC Verification

Page 3: WBS 6.3.3 Conductor Procurement

US CMS DOE/NSF Review: May 8-10, 2001 3

Conductor ConfigurationConductor ConfigurationConductor ConfigurationConductor Configuration

Magnet Conductor Twenty + One 2550 m lengths required

Conductor Ic = 55.6 kA at 4.2 K, 5 Tesla

1.28 mm Strand, Cu:SC Ratio = 1.1

32 Strand Rutherford

Superconducting Cable

High Purity Aluminum

Structural Aluminum

EB Weld Zone

22.0 mm

64.0 mm

Structural Aluminum

EB Weld Zone

Page 4: WBS 6.3.3 Conductor Procurement

US CMS DOE/NSF Review: May 8-10, 2001 4

Superconducting StrandSuperconducting StrandSuperconducting StrandSuperconducting Strand

Procurement Progress60% order placed on Outokumpu (Finland) July 08, 1999

40% order placed on Intermagnetics General Corp (USA) July 08, 1999

IGC, OKSC Contracts to be completed Jun/Oct 2000

1st OKSC Article (one cable) On Time Oct 29, 1999

OKSC 1st Article (Quality Very Good) Accepted by CMS Dec 13, 1999

1st IGC Article (one cable) 15 wks late Feb 15, 2000

IGC 1st Article Accepted (Quality very Poor) by Fermilab Apr 12, 2000

IGC 2nd Article (one cable) Completed (Quality Apparently OK) Nov 15, 2000

IGC Unable to Complete prior to Feb 2002, Contract Cancelled Oct 20, 2000

Balance of Work awarded to OKSC Dec 01, 2000

OKSC Modified Contract to be completed Oct 30, 2001

OKSC Quality Excellent, Presently Running ~ 1 month late

Page 5: WBS 6.3.3 Conductor Procurement

US CMS DOE/NSF Review: May 8-10, 2001 5

Strand Detailed DesignStrand Detailed DesignStrand Detailed DesignStrand Detailed Design

Page 6: WBS 6.3.3 Conductor Procurement

US CMS DOE/NSF Review: May 8-10, 2001 6

Strand Critical CurrentStrand Critical CurrentStrand Critical CurrentStrand Critical Current

OKSC First 8 x 32 Unit Lengths(1925 Amperes Minimum Specified)

0

2

4

6

8

10

12

14

16

1960 1980 2000 2020 2040 2060 2080 2100 2120

Ic (4.2K, 5.0 T) [Amperes]

Nu

mb

er o

f S

po

ol

Hea

ds,

Tai

ls

Page 7: WBS 6.3.3 Conductor Procurement

US CMS DOE/NSF Review: May 8-10, 2001 7

Strand Cu:SC RatioStrand Cu:SC RatioStrand Cu:SC RatioStrand Cu:SC Ratio

OKSC First 8 x 32 Unit Lengths1.1 +/- 0.1 Ratio Specified

0

5

10

15

20

25

0.97 0.99 1.01 1.03 1.05 1.07 1.09 1.11 1.13

Cu:nonCu Area Ratio

Nu

mb

er o

f S

po

ol

Hea

ds,

Tai

ls

Page 8: WBS 6.3.3 Conductor Procurement

US CMS DOE/NSF Review: May 8-10, 2001 8

Strand Copper Stabilizer RRRStrand Copper Stabilizer RRRStrand Copper Stabilizer RRRStrand Copper Stabilizer RRR

OKSC 1st 8 x 32 Unit Lengths100 RRR Minimum Specified

0

5

10

15

20

25

30

140 145 150 155 160 165 170 175 180 185

Cu RRR

Nu

mb

er o

f S

po

ol

Hea

ds,

Tai

ls

Page 9: WBS 6.3.3 Conductor Procurement

US CMS DOE/NSF Review: May 8-10, 2001 9

Strand Ic n-value (5 T)Strand Ic n-value (5 T)Strand Ic n-value (5 T)Strand Ic n-value (5 T)

OKSC First 8 x 32 Unit Lengths40 n-value Minimum Specified

0

5

10

15

20

25

30

39 40 41 42 43 44 45 46 47 48 49 50

Ic n-value (5T)

Nu

mb

er o

f S

po

ol

Hea

ds,

Tai

ls

Page 10: WBS 6.3.3 Conductor Procurement

US CMS DOE/NSF Review: May 8-10, 2001 10

High Purity Aluminum StabilizerHigh Purity Aluminum StabilizerHigh Purity Aluminum StabilizerHigh Purity Aluminum Stabilizer

Procurement StatusOrder placed on Sumitomo (Japan) Aug 12, 1999

Contract (2782 billets & caps) to be completed Feb 01, 2001

First Article (27 tons) Completed On Time Nov 01, 1999

Second Article (20 tons) Completed On Time Feb 01, 2000

Third Article (20 tons) Completed On Time May 30, 2000

Fourth Article (20 tons) Completed On Time Oct 06, 2000

Fifth Article (20 tons) Completed On Time Feb 01, 2001

Page 11: WBS 6.3.3 Conductor Procurement

US CMS DOE/NSF Review: May 8-10, 2001 11

99.998% Al Purity Verification99.998% Al Purity Verification99.998% Al Purity Verification99.998% Al Purity Verification

Resistivity Ratio Testing – ETHZ, UGE

Page 12: WBS 6.3.3 Conductor Procurement

US CMS DOE/NSF Review: May 8-10, 2001 12

HP Al Extrusion Billets & CapsHP Al Extrusion Billets & CapsHP Al Extrusion Billets & CapsHP Al Extrusion Billets & Caps

Finished CMS High Purity Aluminum Extrusion BilletFinished CMS High Purity Aluminum Extrusion Billet(190 mm Ø x 480 mm L -- 40 kg), and Cap(190 mm Ø x 480 mm L -- 40 kg), and Cap

Page 13: WBS 6.3.3 Conductor Procurement

US CMS DOE/NSF Review: May 8-10, 2001 13

Aluminum Alloy ReinforcementAluminum Alloy ReinforcementAluminum Alloy ReinforcementAluminum Alloy Reinforcement

Aluminum Alloy Procurement Progress

Contract (~125 tons) Awarded to Alusuisse Swiss Aluminum Mar 13, 2000

Contract (10 test bars, 40 production bars) to be Completed Jun 30, 2001

1st Article (2 300 m short bars) On Time June 08, 2000

2nd Article (6 2650 m commissioning bars) On Time Sept 01, 2000

3rd Article (2 1100 m test bars) On Time Sept 01, 2000

4th Article (20 production bars) In progress, 8 weeks late Mar 01, 2001

5th Article (20 production bars) To be Completed June 30, 2001

Page 14: WBS 6.3.3 Conductor Procurement

US CMS DOE/NSF Review: May 8-10, 2001 14

Where Do These Components Go?Where Do These Components Go?Where Do These Components Go?Where Do These Components Go?

EB Welding (ETHZ/CERN, not USCMS CP)

Page 15: WBS 6.3.3 Conductor Procurement

US CMS DOE/NSF Review: May 8-10, 2001 15

Where Do These Things Go?Where Do These Things Go?Where Do These Things Go?Where Do These Things Go?

Conductor Straightening, Prebending at Ansaldo (INFN/CERN)

Page 16: WBS 6.3.3 Conductor Procurement

US CMS DOE/NSF Review: May 8-10, 2001 16

ConclusionsConclusionsConclusionsConclusions

• Loss of 2nd Vendor for Superconducting Strand Removes Luxury of Generous Slack in Strand Procurement Schedule; Remaining slack now ~ 3 months

• 1st Vendor’s Superconducting Strand is of Excellent Quality; Responsive to Increased Order

• Pure Aluminum Quality Excellent; Contingent Quantity to be Ordered Soon

• Aluminum Alloy Quality Excellent, Vendor Responsive; Expected to Complete Successfully; Schedule has ~8 months slack