WBS 6.3.3 Conductor Procurement. Rich Smith DOE/NSF Review 8 May 2001. WBS 6.3.3 Conductor Procurement. Fermilab – ETHZ -- CERN Conductor Component Procurement Superconducting Strand (~$2212K) Aluminum Alloy Reinforcement (~$701K) Pure Aluminum Stabilizer (~$973K) - PowerPoint PPT Presentation
Citation preview
US CMS DOE/NSF Review: May 8-10, 2001 1
WBS 6.3.3 Conductor ProcurementWBS 6.3.3 Conductor ProcurementWBS 6.3.3 Conductor ProcurementWBS 6.3.3 Conductor Procurement
Rich Smith
DOE/NSF Review
8 May 2001
US CMS DOE/NSF Review: May 8-10, 2001 2
WBS 6.3.3 Conductor ProcurementWBS 6.3.3 Conductor ProcurementWBS 6.3.3 Conductor ProcurementWBS 6.3.3 Conductor Procurement
Fermilab – ETHZ -- CERN
• Conductor Component Procurement
- Superconducting Strand (~$2212K)
- Aluminum Alloy Reinforcement (~$701K)
- Pure Aluminum Stabilizer (~$973K)
• Independent QC Verification
US CMS DOE/NSF Review: May 8-10, 2001 3
Conductor ConfigurationConductor ConfigurationConductor ConfigurationConductor Configuration
Magnet Conductor Twenty + One 2550 m lengths required
Conductor Ic = 55.6 kA at 4.2 K, 5 Tesla
1.28 mm Strand, Cu:SC Ratio = 1.1
32 Strand Rutherford
Superconducting Cable
High Purity Aluminum
Structural Aluminum
EB Weld Zone
22.0 mm
64.0 mm
Structural Aluminum
EB Weld Zone
US CMS DOE/NSF Review: May 8-10, 2001 4
Superconducting StrandSuperconducting StrandSuperconducting StrandSuperconducting Strand
Procurement Progress60% order placed on Outokumpu (Finland) July 08, 1999
40% order placed on Intermagnetics General Corp (USA) July 08, 1999
IGC, OKSC Contracts to be completed Jun/Oct 2000
1st OKSC Article (one cable) On Time Oct 29, 1999
OKSC 1st Article (Quality Very Good) Accepted by CMS Dec 13, 1999
1st IGC Article (one cable) 15 wks late Feb 15, 2000
IGC 1st Article Accepted (Quality very Poor) by Fermilab Apr 12, 2000
IGC 2nd Article (one cable) Completed (Quality Apparently OK) Nov 15, 2000
IGC Unable to Complete prior to Feb 2002, Contract Cancelled Oct 20, 2000
Balance of Work awarded to OKSC Dec 01, 2000
OKSC Modified Contract to be completed Oct 30, 2001
OKSC Quality Excellent, Presently Running ~ 1 month late
US CMS DOE/NSF Review: May 8-10, 2001 5
Strand Detailed DesignStrand Detailed DesignStrand Detailed DesignStrand Detailed Design
US CMS DOE/NSF Review: May 8-10, 2001 6
Strand Critical CurrentStrand Critical CurrentStrand Critical CurrentStrand Critical Current
OKSC First 8 x 32 Unit Lengths(1925 Amperes Minimum Specified)
0
2
4
6
8
10
12
14
16
1960 1980 2000 2020 2040 2060 2080 2100 2120
Ic (4.2K, 5.0 T) [Amperes]
Nu
mb
er o
f S
po
ol
Hea
ds,
Tai
ls
US CMS DOE/NSF Review: May 8-10, 2001 7
Strand Cu:SC RatioStrand Cu:SC RatioStrand Cu:SC RatioStrand Cu:SC Ratio
OKSC First 8 x 32 Unit Lengths1.1 +/- 0.1 Ratio Specified
0
5
10
15
20
25
0.97 0.99 1.01 1.03 1.05 1.07 1.09 1.11 1.13
Cu:nonCu Area Ratio
Nu
mb
er o
f S
po
ol
Hea
ds,
Tai
ls
US CMS DOE/NSF Review: May 8-10, 2001 8
Strand Copper Stabilizer RRRStrand Copper Stabilizer RRRStrand Copper Stabilizer RRRStrand Copper Stabilizer RRR
OKSC 1st 8 x 32 Unit Lengths100 RRR Minimum Specified
0
5
10
15
20
25
30
140 145 150 155 160 165 170 175 180 185
Cu RRR
Nu
mb
er o
f S
po
ol
Hea
ds,
Tai
ls
US CMS DOE/NSF Review: May 8-10, 2001 9
Strand Ic n-value (5 T)Strand Ic n-value (5 T)Strand Ic n-value (5 T)Strand Ic n-value (5 T)
OKSC First 8 x 32 Unit Lengths40 n-value Minimum Specified
0
5
10
15
20
25
30
39 40 41 42 43 44 45 46 47 48 49 50
Ic n-value (5T)
Nu
mb
er o
f S
po
ol
Hea
ds,
Tai
ls
US CMS DOE/NSF Review: May 8-10, 2001 10
High Purity Aluminum StabilizerHigh Purity Aluminum StabilizerHigh Purity Aluminum StabilizerHigh Purity Aluminum Stabilizer
Procurement StatusOrder placed on Sumitomo (Japan) Aug 12, 1999
Contract (2782 billets & caps) to be completed Feb 01, 2001
First Article (27 tons) Completed On Time Nov 01, 1999
Second Article (20 tons) Completed On Time Feb 01, 2000
Third Article (20 tons) Completed On Time May 30, 2000
Fourth Article (20 tons) Completed On Time Oct 06, 2000
Fifth Article (20 tons) Completed On Time Feb 01, 2001
US CMS DOE/NSF Review: May 8-10, 2001 11
99.998% Al Purity Verification99.998% Al Purity Verification99.998% Al Purity Verification99.998% Al Purity Verification
Resistivity Ratio Testing – ETHZ, UGE
US CMS DOE/NSF Review: May 8-10, 2001 12
HP Al Extrusion Billets & CapsHP Al Extrusion Billets & CapsHP Al Extrusion Billets & CapsHP Al Extrusion Billets & Caps
Finished CMS High Purity Aluminum Extrusion BilletFinished CMS High Purity Aluminum Extrusion Billet(190 mm Ø x 480 mm L -- 40 kg), and Cap(190 mm Ø x 480 mm L -- 40 kg), and Cap
US CMS DOE/NSF Review: May 8-10, 2001 13
Aluminum Alloy ReinforcementAluminum Alloy ReinforcementAluminum Alloy ReinforcementAluminum Alloy Reinforcement
Aluminum Alloy Procurement Progress
Contract (~125 tons) Awarded to Alusuisse Swiss Aluminum Mar 13, 2000
Contract (10 test bars, 40 production bars) to be Completed Jun 30, 2001
1st Article (2 300 m short bars) On Time June 08, 2000
2nd Article (6 2650 m commissioning bars) On Time Sept 01, 2000
3rd Article (2 1100 m test bars) On Time Sept 01, 2000
4th Article (20 production bars) In progress, 8 weeks late Mar 01, 2001
5th Article (20 production bars) To be Completed June 30, 2001
US CMS DOE/NSF Review: May 8-10, 2001 14
Where Do These Components Go?Where Do These Components Go?Where Do These Components Go?Where Do These Components Go?
EB Welding (ETHZ/CERN, not USCMS CP)
US CMS DOE/NSF Review: May 8-10, 2001 15
Where Do These Things Go?Where Do These Things Go?Where Do These Things Go?Where Do These Things Go?
Conductor Straightening, Prebending at Ansaldo (INFN/CERN)
US CMS DOE/NSF Review: May 8-10, 2001 16
ConclusionsConclusionsConclusionsConclusions
• Loss of 2nd Vendor for Superconducting Strand Removes Luxury of Generous Slack in Strand Procurement Schedule; Remaining slack now ~ 3 months
• 1st Vendor’s Superconducting Strand is of Excellent Quality; Responsive to Increased Order
• Pure Aluminum Quality Excellent; Contingent Quantity to be Ordered Soon
• Aluminum Alloy Quality Excellent, Vendor Responsive; Expected to Complete Successfully; Schedule has ~8 months slack