WBS-

Embed Size (px)

Citation preview

  • 8/19/2019 WBS-

    1/1

    LIS - 02

    PACKAGE LIS-02

    IMPLEMENTATION

    0

    LIS - 02.1

    GENERAL

    0

    LIS - 02.1.1

    CONTRACTUAL

    MILESTONES

    0

    LIS - 02.1.2

    SITE PREPRATIONS

    & UTILITY

    0

    LIS - 02.1.3

    INTERFACE ISSUES

    0

    LIS - 02.1.4

    PERMITTING &

    APPROVALS

    0

    LIS - 02.1.5

    OFFICES &

    TEMPORARY

    0

    LIS - 02.1.6

    INSURANCES

    0

    LIS - 02.1.7

    BONDS AND

    GUARANTEES

    0

    LIS - 02.1.8

    PROJECT

    ASSURANCES

    0

    LIS - 02.1.9

    METHOD

    STATEMENTS

    0

    LIS - 02.1.10

    OVERALL TESTING

    AND

    0

    LIS - 02.1.11

    OTHER

    CONTRACTUAL

    0

    LIS - 02.2

    PROCUREMENT-GEN

    0

    LIS - 02.2.1

    MATERIALS

    0

    LIS - 02.2.2

    PLANT & EQUIPMENT

    0

    LIS - 02.2.3

    SUB CONTRACTORS

    0

    LIS - 02.2.3.1

    GEOTECHNICAL

    INVESTIGATION

    0

    LIS - 02.2.3.2

    PRE & POST SURVEY

    WORKS

    0

    LIS - 02.2.3.3

    MATERIAL T ESTING

    LABORATORY

    0

    LIS - 02.2.3.4

    UTILITY DIVERSION

    WORKS

    0

    LIS - 02.2.3.5

    TEMPORARY

    WORKS

    0

    LIS - 02.2.4

    PRECAST

    SEGMENTS

    0

    LIS - 02.3

    EXECUTION

    0

    LIS - 02.3.1

    EXECUTION-GENERA

    0

    LIS - 02.3.1.1

    COORDINATION AND

    DATA CO LLECTION

    0

    LIS - 02.3.1.2

    SURVEY WORKS

    AND

    0

    LIS - 02.3.1.3

    DESIGN CRITERIA &

    OTHER GENERAL

    0

    LIS - 02.3.2

    DRIVE 01-ALL LINES

    UPSTREAM OF SH 32

    0

    LIS - 02.3.2.1

    TEMPORARY WORK

    SHAFTS0

    LIS - 02.3.2.2

    PIPE JACKING

    0

    LIS - 02.3.2.3

    MANHOLE

    0

    LIS - 02.3.3

    DRIVE 02-FROM SH

    32 TO SH 21

    0

    LIS - 02.3.3.1

    TEMPORARY WORK

    SHAFTS

    0

    LIS - 02.3.3.2

    PIPE JACKING

    0

    LIS - 02.3.3.3

    MANHOLE

    0

    LIS - 02.3.4

    DRIVE 03-FROM SH

    21 TO SH 11

    0

    LIS - 02.3.4.1

    TEMPORARY WORK

    SHAFTS

    0

    LIS - 02.3.4.2

    PIPE JACKING

    0

    LIS - 02.3.4.3

    MANHOLE

    0

    LIS - 02.3.5

    DRIVE 04-FROM SH

    11 TO WS 07 & SH

    0

    LIS - 02.3.5.1

    TEMPORARY WORK

    SHAFTS

    0

    LIS - 02.3.5.2

    PIPE JACKING

    0

    LIS - 02.3.5.3

    MANHOLE

    0

    LIS - 02.4

    SUBSTANTIAL

    COMPLETION

    0

    LIS - 02.4.1

    MISCELLANEOUS

    WORKS

    0

    LIS - 02.4.2

    DESIGN

    -PERMANENT

    0

    LIS - 02.4.3

    PERMANENT ROUTE

    MARKER

    0

    LIS - 02.4.4

    FLOW METER

    INSTALLATION

    0

    LIS - 02.4.5

    SNAGLIST

    CLEARENCE

    0

    LIS - 02.4.6

    AS BUILT DRAWING

    0

    LIS - 02.5

    MAINTENANCE

    PERIOD

    0

    LIS - 02.5.1

    FINAL HAND OVER

    0

    WBS CodeWBS Name

    At Completion Labor