Egypt - Norway Technology Days
February 12-13, 2017 - Cairo
Bjørn Kahrs – Business Development
Subsea construction
https://www.youtube.com/watch?v=C_5Y12sSn-Q
Edda FreyaMaersk Connector
Confidential – Not for Public Dissemination
The DeepOcean Locations and Operations
www.deepoceangroup.com 2
www.deepoceangroup.com
VolantisRem Forza Deep Vision
Edda Flora Edda FaunaHavila Phoenix Rem Ocean
Subsea Umbilical,
Risers and
Flowlines -
Subsea
Construction
SURF
Power Cables
and Umbilicals
Structures
Module
replacement
Life of Field
Seismic cables
6 owned vessel
10 long term
charter vessels
Survey, inspect
and map terrain
prior to the
installation of
new subsea
systems
More than 90
000 km
pipeline
surveyed
Water depth
to 2100 m
ROV, AUV,
and vessel
based
PRM
capability
38 Work and
obs ROV’s
1 ROTV
Leading provider
of subsea
trenching and
protection services
Global leader
Largest portfolio of
seventeen
trenching assets
30 000 km of
product installed
Fleet of 16
trenching assets:
5 x Jet Trenching
ROVs
2 x Mechanical
Tractors
Cable Ploughs
Subsea Installation
SURF
TrenchingSurvey and
Seabed
Mapping
DeepOcean is
one of the largest
subsea IMR
service provider
in the Greater
North Sea
More than 1200
vessel days per
year
500 call-offs
per year
Long term
service
contracts
Extended IMR
scopes
Frame
Agreements
with oil&gas
majors
Inspection,
Maintenance
and Repair
(IMR)
ROV based
subsea
decommissioning
• EPRD
• Main and sub-
contractor on
subsea
decomm.
projects
Decommissioning
www.deepoceangroup.com 3
Service lines
Engineering
and Studies
Engineering
and study
capacity
More than 120
engineers in
Haugesund,
Stavanger,
Darlington and
Aberdeen
40 Survey
engineers
Engineering
Agreements
Renewable
Offshore
wind
Renewable
offshore wind
and cable lay
Power Cables
and
Umbilicals
Shore-to
shore
Shore-to
offshore
Inter-
connector
Experienced Engineering Teams
Dedicated in-house engineering teams focused on providing engineering and design support for the planning and execution of installation projects, also including FEED, etc:
• Front end engineering and design studies• Installation analysis and calculations• Seabed and soil geo-analysis • Route designs and optimisation• Cable design and manufacturing support
• Vessel and equipment layout planning• Design and manufacturing support for installation• equipment & subsea equipment
In the delivery of the above services, Engineers use a wealth of advanced software in-house including: • Finite Element Analysis (FEA• Dynamic/Installation Analysis (Orcaflex)• Makai Submarine Cable Software
Orcaflex pull-in analysis
Submarine Power Cable Credentials
Western HVDC Link Interconnector burial
Walney Extension OWFExport cable installation
Robin Rigg OWFArray cable installation
Wave HubSubsea hub & export cable
installation
Race Bank OWFArray cable installation
Export cable burial
Sheringham Shoal OWFWalk-to-Work
Greater Gabbard OWFExport cable installation
Nemo HVDC LinkInterconnector installation
Bligh Bank OWFArray cable installation
Walney Ormonde OWFExport cable burial
Egmond Aan Zee OWFExport cable repair
Hornsea 1 OWFArray cable installation
Skaggerak4 InterconnectorPre-cut trenching
Alpha Ventus OWFArray cable repairExport cable burial
DolWin 1 PlatformExport cable burial
DolWin Alpha Platform Export cable repair
Global Tech 1 OWFArray cable trenching
DolWin Beta PlatformWalk-to-Work
Gode Wind Walk-to-Work
800kmInstalled
1400 km InstalledBy 2019
2250km Trenched
By 2019
0-2000mWater Depths
3mTrench Depths
East Anglia OneExport cable installation
More than 8 000 IMR vessel days year in Greater
North Sea
Close to 100 000km of
subsea product surveyed in
water depths to 2100m
CABLE LAY VESSEL - MAERSK CONNECTOR
6
Next Generation
• LENGTH 138M X 27.5M BEAM• 7000TE CAROUSEL - CABLE HANDLING EQUIPMENT• DP2 AND 7 POINT MOORING – CAPABLE OF GROUNDING FULLY LOADED• 2200M2 DECK AREA, 9200TE DECK LOAD, 20TE/M² DECK STRENGTH • PCP POWER CABLE PLOUGH - 125HP WORK CLASS ROV• 60TE A-FRAME & 50TE AHC SUBSEA CRANE• Can “park” on seabed during landfall pull-in
Deepwater X-tree installation
Client: Tullow Ghana Ltd.
Location: Offshore Ghana, Jubilee and TEN field
Year: 2013-2016
W.Depth: 1000-1500 mtr
Product: X-mast trees 50-60T/air, 4m x 4,5m x 3,7m
Scope: Provide rigging, engineer lift plans, offshore operations,
load out, ship-to-ship, Commissioning and project management.
Vessel: Rem Forza, Dina Star
Assets: Constructor and Supporter WROV
• Installed more than 10 trees, both Injection trees and production
trees.
• Require high degree of co-ordination by both marine and
construction crew..
Flexible riser lay down and abandonment
Client: Tullow Ghana Ltd.
Location: Offshore Ghana, Jubilee and TEN field
Year: 2015
W.Depth: 1000 mtr
Product: Flexible riser, OD: 379mm, approx 150T tension
in crane wire
Scope: Execute offshore operations, lay down, cutting
and abandonment, project management.
Vessel: Rem Forza
Assets: 2 x Supporter 3000 WROV
• Requires skilled ROV crew
• Critical production still on line on FPSO
• Working in close proximity of turret
15.02.2017 10Not for Public Distribution
Riser work – Kristin
Replacement of 10 inch P-101 production riser
Replacement of DEH riser, OD 199 / 218 mm
Installation of Umbilical Riser, OD 245 mm
Pliant wave configuration
www.deepoceangroup.com 13
Innovation
Pipeline
Visual mode - 615 km 3.1 km/h (0,85 m/s)
Acoustic mode - 1900 km 5.3 km/h (1.50 m/s)
(Several sections of 7.5 km/h ( 2.0 m/s) ~50km)
Route Survey
Pipeline Route - 285km 4.4 km/h (1.2 m/s)
Average 17km long lines - Max speed 5.25 km/h
Clients saving 1,5 day per every 15 days campaign
https://www.youtube.com/watch?v=1ndeC1Ky90M#t=37.6958111
World leader 2
14 different trenches and ploughs
Trenching and Ploughing
The UT-1 is the world’s most powerful jetting ROV with 2.1MW of total power
https://deepoceangroup.com/assets/trenchers-ploughs/
AMP500
https://www.youtube.com/watch?v=00BInc
Design, Fabrication and Operation – Subsea innovation
Clamp Handling Frame, Machining Unit and ROV Extension Arms
• Complex IMR-project performed for Statoil in 2015
• Subsea machining (milling & cutting)
• Innovative solutions developed, to avoid taking the Snorre-platform to shore
Running Tool for Choke and SM Replacement
• Cost efficient and reliable
• 12 weeks lead time
• MNOK 4,4
Innovation – Bolt tie-in tool
Remote bolt Tie-in tool (Innovation by 4C Solution)
• System has been used at the Norne location – 380 meter water depth
• Replace divers and large and heavy tie-in tools like “Big Brother” etc.
• Half tie-in time at large bore compared to divers tie-in or other remote tools.
• Can be re-used for same pipe OD
• H-frame or similar alignment tool
Innovation – Bolt tie-in tool
• Pre-installed torque
tool
• Bolt initiation at swivel
flange (one end)