14
Wake Transit Update 10-16-2015 WakeTransit.com @waketransit #waketransit

Wake Transit Update 10-16-2015 #waketransit

Embed Size (px)

DESCRIPTION

Summer 2015 Community Input Technical and Financial Work Elected Official Input Advisory Committee Core Design Retreat Recommended Transit Plan Fall 2015 Winter 2016 Transit Plan Development Process

Citation preview

Page 1: Wake Transit Update 10-16-2015 #waketransit

Wake Transit Update10-16-2015WakeTransit.com @waketransit #waketransit

Page 2: Wake Transit Update 10-16-2015 #waketransit

waketransit.com @waketransit

Page 3: Wake Transit Update 10-16-2015 #waketransit

Summer 2015Community

Input

Technical and

Financial Work

Elected Official Input

Advisory Committee

Core Design Retreat

Recommended Transit Plan

Fall 2015

Winter 2016

Transit Plan Development Process

Page 4: Wake Transit Update 10-16-2015 #waketransit

• 255 + Outreach Events • 25 Specific Option Input

Sessions (250+ Responses)• Online Poll (400+ Responses)• Statistically Valid Phone Survey

(550+ Responses)• Small Focus Group Meetings

waketransit.com @waketransit

Public Involvement

Page 5: Wake Transit Update 10-16-2015 #waketransit

• Public Outreach Events in all 12 Municipalities

• Specific conversations with every municipality (elected officials, administration, staff)

waketransit.com @waketransit

Municipal Involvement

Page 6: Wake Transit Update 10-16-2015 #waketransit

• A Connected Network• The Importance of Frequency• The Hard Choices (Spectrums)• Ridership versus Coverage• Infrastructure versus Service

waketransit.com @waketransit

Important Concepts still Central

Page 7: Wake Transit Update 10-16-2015 #waketransit

Choices for Our Community

waketransit.com @waketransit

More Ridership

More Infrastructur

e

More Coverage

More Service

?

Page 8: Wake Transit Update 10-16-2015 #waketransit

Supporting Bus Network• Strong and consistent support for

much improved overall bus network.

Focused on employment, education and access

Focused on where we will actually use the system

waketransit.com @waketransit

Page 9: Wake Transit Update 10-16-2015 #waketransit

RRT – Rail Rapid Transit• Compounding Issues

Public input on trade-offs (no mandate)

Technical Concerns Timing Concerns

waketransit.com @waketransit

Page 10: Wake Transit Update 10-16-2015 #waketransit

RRT – Rail Rapid TransitOnline Survey – First Responses

BRT – Ridership 23%BRT – Coverage 24%RRT – Ridership 28%RRT – Coverage 25%

waketransit.com @waketransit

Page 11: Wake Transit Update 10-16-2015 #waketransit

“Rail”• Strong but “shallow” support

No strong support for a specific corridor or project

Desire for “new”, “different”, “cool” References to quality and status Mixed on trade-offs

waketransit.com @waketransit

Page 12: Wake Transit Update 10-16-2015 #waketransit

BRT – Bus Rapid TransitModerate but shallow concern about BRT viability.• Will the system actually work as

promised?• Can we overcome the perception

issues on buses?• Is this enough change (cool

enough)?

waketransit.com @waketransit

Page 13: Wake Transit Update 10-16-2015 #waketransit

Municipal and Local Area support and services• Call for connections to and

services within all municipalities and within some commercial areas Focused on medical appointments, shopping

and jobs Different timeframes for implementation Potential for local support of local services

waketransit.com @waketransit

Page 14: Wake Transit Update 10-16-2015 #waketransit

Summer 2015Community

Input

Technical and

Financial Work

Elected Official Input

Advisory Committee

Core Design Retreat

Recommended Transit Plan

Fall 2015

Winter 2016

Transit Plan Development Process