Volume: XII Chapter: 5 Page No: 265
Comprehensive CAT Plan of Satluj River Basin
Chapter 5: Estimates & Cost Models
Per Hac. cost Model for Replinishment/Enrichment planting
Sr. No
Name Area Rate Non Tribal
Tribal
1 Survey and demarcation of plantation and area I/C marking of seditions, path preparation of map. 1 hac 1500 1500.00 1875.00
2 Cutting and preparation of wooden posts 1.8 mtr and 8 to 10 CM dia I/C debarking and fashioning the top 15 cm in conical shape
80 Nos 949.9 759.92 949.90
3 Carriage of fence posts upto 2 mtr long and 8 to 10 cm dia over distance 0.5 KM 80 Nos 499.95 per % per KM 199.98 249.98
4 Preparation and digging of holes 20-30 cm dia & 45 cm deep 80 Nos 665.1 per % 532.08 665.10
5 Fixing of wooden posts I/C strutting 80 Nos 510.45 per % 408.36 510.45
6 Carriage of barbed wire bundles up hill over an overage distance of 1 km 1.36 qtls. 125.10 per qtl per Km.
170.10 212.60
7 Streching and fixing of barbed wire with U-stapple in each strand (4 strand) 960 Rmt. 3.45 per Rmt. 3312.00 4140.00
8 Interlacing of thorny bushes with barbed wire obtained from planting side 240 Rmt. 3.00 per Rmt 0.00 0.00
9 Preparation of inspection path 60 cm wide 35 Rmt. 7.95 per Rmt 278.25 347.81
10 Layout of pits/patches 124.9 124.90 156.13
11 Digging of pits (30x30x30) cm 200 No. 350 per % 700.00 875.00
12 Digging of pits (45x45x45) cm 500 No. 699.9 per % 3499.50 4374.38
13 Filling of pits (30x30x30) cm 200 No. 139.95 per % 279.90 249.88
14 Filling of pits (45x45x45) cm 500 No. 200.50 per % 1002.50 1253.13
15 Carriage of Plants in P/bags from Nursery site over an average distance of 0.5 Km. 700 No. 133.25 per % per Km.
466.38 582.97
16 Planting of entire Plants I/C ramming raised in P/bages 700 No. 160.05 per % 1120.35 1400.44
17 Cost of B/Wire/U-nail 1.36 qtls. 5500 7480.00 9350.00
18 Nursery Cost of P/bags raised Plants 700 No. 5 per plant 3500.00 4375.00
19 100 Trenches (Size 1x.30x.30m) 100 Nos 6.30 per Rm 630.00 787.50
20 Weeding hoeing 1 Hac L/S 2000.00 2500.00
G.Total 27964.22 34855.26
Or Say 27900.00 35000.00
Volume: XII Chapter: 5 Page No: 266
Comprehensive CAT Plan of Satluj River Basin
Per Hac. cost Model for Grazing Land
Sr. No
Name Area Rate Non Tribal
Tribal
1 Survey and demarcation of plantation and area I/C marking of seditions path & preparation of map. 1 hac 1500 1500.00 1875.00
2 Cutting and preparation of wooden posts 1.8 mtr and 8 to 10 CM dia I/C debarking and fashioning the top 15 cm in conical shape
60 Nos 949.9 569.94 712.43
3 Carriage of fence posts upto 2 mtr long and 8 to 10 cm dia over distance 0.3 KM 60 Nos 499.95 per % per KM
99.99 124.99
4 Preparation and digging of holes 20-30 cm dia & 45 cm deep 60 Nos 665.1 per % 399.06 498.83
5 Fixing of wooden posts I/C strutting 60 Nos 510.45 per % 306.27 382.84
6 Carriage of barbed wire bundles up hill over an overage distance of 1 km 1.08 qtls.
125.10 per qtl per Km.
135.11 169.00
7 Streching and fixing of barbed wire with U-stapple in 4 strand 720 Rmt.
3.45 per Rmt. 2484.00 3105.00
8 Interlacing of thorny bushes with barbed wire obtained from planting side 240 Rmt.
3.00 per Rmt 720.00 900.00
9 Preparation of inspection path 60 cm wide 35 Rmt.
7.95 per Rmt 278.25 347.81
10 Preparation of gradoni treanchies 30x30 200 Rmt.
9.90 Rmt. 1980.00 2475.00
11 Layout of pits/patches Ha 124.9 124.90 156.13
12 Digging of pits (45x45x45) cm 200 No.
699.90 per % 1399.80 1749.75
13 Filling of pits (45x45x45) cm 200 No.
200.50 per % 401.00 501.25
14 Carriage of Plants in P/bags from Nursery site over an average distance of 0.3 Km. 200 No.
139.95 per % per Km.
93.30 116.63
15 Planting of entire Plants I/C ramming raised in P/bages 200 No.
160.05 per % 320.10 400.13
16 Planting of grass tufts in gradoni structure/treanchies over ridge 2000 No.
2.20 per % 44.00 55.00
17 Cost of B/Wire/U-nail 1.08qtl 5500.00 prt qtl 7480.00 9350.00
18 Nursery Cost of P/bags raised Plants 200 No.
5.00 per plant 1000.00 1250.00
19 Cost of grass tufts 2000 No.
0.80 per % 1600.00 2000.00
20 contingencies 800 1000
G.Total 21735.72 27169.76
Or Say 21700.00 27000.00
Volume: XII Chapter: 5 Page No: 267
Comprehensive CAT Plan of Satluj River Basin
LIVE HEDGE ESTIMATE
Item No Unit Quantity Unit Cost
Preparation of furrows for live hedge fencing Rms 1 0.95
Planting of live hedge plant species in furrows Rms 1 8.65
Total 9.6
BRUSHWOOD ESTIMATE
Item No Unit Quantity Unit Cost
Brushwood Check dams Rms 1 31.8
Add 96.08% increase on above i.e. on Rs 31.8 Rms 1 30.55
Total 62.35
Or Say 62
Volume: XII Chapter: 5 Page No: 268
Comprehensive CAT Plan of Satluj River Basin
CHECK DAM ESTIMATE
Item No No Length Breadth Depth Quantity Rate Unit Amount Say Per
Rm
Check Dam Gabion Providing & laying steel
Gabions or equivalent type of required section
including boxes made of mechanically woven,
double Twisted , hexagonal shaped steel wire
mesh Gabions as per En standards mesh type 10
x 12 as per EN 10223 , edges are to be
mechanically selvedge made of heavily ( Zn+PVC)
coated G.I. wire as per B.S. 443 mesh wire 3 mm
die & edge wire dia 3.9mm dia of maccaferri type
or equivalent type & filled with 20 to 50 kg weight
trap Stones ,including conveying with all leads &
lifts and required placing at required places in
required line , level, slope, section as directed. etc
complete under tidal condition. Gabions of Size -
1.5X1.5M
a) Excavation 1 1 2 0.5 1
1 1 2 0.3 0.6
1.6 198.6 m3 317.76
b) Gabion Structure 1 1 1 1 1
1 1 1.5 0.5 0.75
1 1 2 0.5 1
c) Apron 1 1 2 0.3 0.6
3.35 2900 m3 9715
Total 10032.76 10033
Volume: XII Chapter: 5 Page No: 270
Comprehensive CAT Plan of Satluj River Basin
CHECK DAM ESTIMATE
Item No No Length Breadth Depth Quantity Rate Unit Amount Say Per
Rm
Check Dam Gabion Providing & laying steel
Gabions or equivalent type of required section
including boxes made of mechanically woven,
double Twisted , hexagonal shaped steel wire
mesh Gabions as per En standards mesh type 10
x 12 as per EN 10223 , edges are to be
mechanically selvedge made of heavily ( Zn+PVC)
coated G.I. wire as per B.S. 443 mesh wire 3 mm
die & edge wire dia 3.9mm dia of maccaferri type
or equivalent type & filled with 20 to 50 kg weight
trap Stones ,including conveying with all leads &
lifts and required placing at required places in
required line , level, slope, section as directed.
etc complete under tidal condition. Gabions of
Size -2X2.5M
a) Excavation 1 1 2.5 0.5 1.25
1 1 3.5 0.3 1.05
2.3 198.6 m3 456.78
b) Gabion Structure 1 1 1 1 1
1 1 1.5 1 1.5
1 1 2 0.5 1
1 1 2.5 0.5 1.25
c) Apron 1 1 3.5 0.3 1.05
5.8 2900 m3 16820
Total 17276.78 17277
Volume: XII Chapter: 5 Page No: 272
Comprehensive CAT Plan of Satluj River Basin
CHECK DAM ESTIMATE
Item No No Length Breadth Depth Quantity Rate Unit Amount Say Per
Rm
Check Dam Gabion Providing & laying steel
Gabions or equivalent type of required section
including boxes made of mechanically woven,
double Twisted , hexagonal shaped steel wire
mesh Gabions as per En standards mesh type 10
x 12 as per EN 10223 , edges are to be
mechanically selvedge made of heavily ( Zn+PVC)
coated G.I. wire as per B.S. 443 mesh wire 3 mm
die & edge wire dia 3.9mm dia of maccaferri type
or equivalent type & filled with 20 to 50 kg weight
trap Stones ,including conveying with all leads &
lifts and required placing at required places in
required line , level, slope, section as directed.
etc complete under tidal condition. Gabions of
Size - 2.5X3M
a) Excavation 1 1 2.5 0.5 1.25
1 1 3.5 0.3 1.05
2.3 198.6 m3 456.78
b) Gabion Structure 1 1 1 1 1
1 1 1.5 1 1.5
1 1 2 1 2
1 1 2.5 0.5 1.25
c) Apron 1 1 3.5 0.3 1.05
6.8 2900 m3 19720
Total 20176.78 20177
Volume: XII Chapter: 5 Page No: 274
Comprehensive CAT Plan of Satluj River Basin
CHECK DAM ESTIMATE
Item No No Length Breadth Depth Quantity Rate Unit Amount Say Per
Rm
Check Dam Gabion Providing & laying steel
Gabions or equivalent type of required section
including boxes made of mechanically woven,
double Twisted , hexagonal shaped steel wire
mesh Gabions as per En standards mesh type 10
x 12 as per EN 10223 , edges are to be
mechanically selvedge made of heavily ( Zn+PVC)
coated G.I. wire as per B.S. 443 mesh wire 3 mm
die & edge wire dia 3.9mm dia of maccaferri type
or equivalent type & filled with 20 to 50 kg weight
trap Stones ,including conveying with all leads &
lifts and required placing at required places in
required line , level, slope, section as directed. etc
complete under tidal condition.Gabions of Size -
3X4M
a) Excavation 1 1 3 0.5 1.5
1 1 4.5 0.3 1.35
2.85 198.6 m3 566.01
b) Gabion Structure 1 1 1 1 1
1 1 1.5 1 1.5
1 2 2 1 2
1 1 2.5 1 2.5
1 1 3 0.5 1.5
c) Apron 1 1 4.5 0.3 1.35
9.85 2900 m3 28565
Total 29131.01 29131
Volume: XII Chapter: 5 Page No: 276
Comprehensive CAT Plan of Satluj River Basin
RETAINING WALL ESTIMATE
Item No No Length Breadth Depth Quantity Rate Unit Amount Say Per
Rm
Check Wall/ Retaining Wall in Gabion Providing &
laying steel Gabions or equivalent type of required
section including boxes made of mechanically
woven, double Twisted , hexagonal shaped steel
wire mesh Gabions as per En standards mesh type
10 x 12 as per EN 10223 , edges are to be
mechanically selvedge made of heavily ( Zn+PVC)
coated G.I. wire as per B.S. 443 mesh wire 3 mm
die & edge wire dia 3.9mm dia of maccaferri type or
equivalent type & filled with 20 to 50 kg weight trap
Stones ,including conveying with all leads & lifts
and required placing at required places in required
line , level, slope, section as directed. etc complete
under tidal condition. Gabions of Size - 1.5X1.5M
a) Excavation 1 1 2 0.5 1
1 1 2 0.3 0.6
1.6 198.6 m3 317.76
b) Gabion Structure 1 1 1 1 1
1 1 1.5 0.5 0.75
1 1 2 0.5 1
c) Apron 1 1 2 0.3 0.6
3.35 2900 m3 9715
Total 10032.76 10033
Volume: XII Chapter: 5 Page No: 278
Comprehensive CAT Plan of Satluj River Basin
RETAINING WALL ESTIMATE
Item No No Length Breadth Depth Quantity Rate Unit Amount Say Per
Rm
Check Wall/ Retaining Wall in Gabion Providing &
laying steel Gabions or equivalent type of
required section including boxes made of
mechanically woven, double Twisted , hexagonal
shaped steel wire mesh Gabions as per En
standards mesh type 10 x 12 as per EN 10223 ,
edges are to be mechanically selvedge made of
heavily ( Zn+PVC) coated G.I. wire as per B.S.
443 mesh wire 3 mm die & edge wire dia 3.9mm
dia of maccaferri type or equivalent type & filled
with 20 to 50 kg weight trap Stones ,including
conveying with all leads & lifts and required
placing at required places in required line , level,
slope, section as directed. etc complete under
tidal condition. Gabions of Size -2X2.5M
a) Excavation 1 1 2.5 0.5 1.25
1 1 3.5 0.3 1.05
2.3 198.6 m3 456.78
b) Gabion Structure 1 1 1 1 1
1 1 1.5 1 1.5
1 1 2 0.5 1
1 1 2.5 0.5 1.25
c) Apron 1 1 3.5 0.3 1.05
5.8 2900 m3 16820
Total 17276.78 17277
Volume: XII Chapter: 5 Page No: 280
Comprehensive CAT Plan of Satluj River Basin
RETAINING WALL ESTIMATE
Item No No Length Breadth Depth Quantity Rate Unit Amount Say Per
Rm
Check Wall/ Retaining Wall in Gabion Providing &
laying steel Gabions or equivalent type of
required section including boxes made of
mechanically woven, double Twisted , hexagonal
shaped steel wire mesh Gabions as per En
standards mesh type 10 x 12 as per EN 10223 ,
edges are to be mechanically selvedge made of
heavily ( Zn+PVC) coated G.I. wire as per B.S.
443 mesh wire 3 mm die & edge wire dia 3.9mm
dia of maccaferri type or equivalent type & filled
with 20 to 50 kg weight trap Stones ,including
conveying with all leads & lifts and required
placing at required places in required line , level,
slope, section as directed. etc complete under
tidal condition. Gabions of Size - 2.5X3M
a) Excavation 1 1 2.5 0.5 1.25
1 1 3.5 0.3 1.05
2.3 198.6 m3 456.78
b) Gabion Structure 1 1 1 1 1
1 1 1.5 1 1.5
1 1 2 1 2
1 1 2.5 0.5 1.25
c) Apron 1 1 3.5 0.3 1.05
6.8 2900 m3 19720
Total 20176.78 20177
Volume: XII Chapter: 5 Page No: 282
Comprehensive CAT Plan of Satluj River Basin
RETAINING WALL ESTIMATE
Item No No Length Breadth Depth Quantity Rate Unit Amount Say Per
Rm
Check Wall/ Retaining Wall in Gabion Providing &
laying steel Gabions or equivalent type of required
section including boxes made of mechanically
woven, double Twisted , hexagonal shaped steel
wire mesh Gabions as per En standards mesh type
10 x 12 as per EN 10223 , edges are to be
mechanically selvedge made of heavily ( Zn+PVC)
coated G.I. wire as per B.S. 443 mesh wire 3 mm
die & edge wire dia 3.9mm dia of maccaferri type or
equivalent type & filled with 20 to 50 kg weight trap
Stones ,including conveying with all leads & lifts
and required placing at required places in required
line , level, slope, section as directed. etc complete
under tidal condition. Gabions of Size - 3X4M
a) Excavation 1 1 3 0.5 1.5
1 1 4.5 0.3 1.35
2.85 198.6 m3 566.01
b) Gabion Structure 1 1 1 1 1
1 1 1.5 1 1.5
1 1 2 1 2
1 1 2.5 1 2.5
1 1 3 0.5 1.5
c) Apron 1 1 4.5 0.3 1.35
9.85 2900 m3 28565
Total 29131.01 29131
Volume: XII Chapter: 5 Page No: 284
Comprehensive CAT Plan of Satluj River Basin
SPUR ESTIMATE
Item No No Length Breadth Depth Quantity Rate Unit Amount Say Per
Rm
Deflecting Spur Gabions of Size – 1.5X2M
a) Excavation 1 1 2 1 2
1 1 3 0.3 0.9
2.9 198.6 m3 575.94
b) Gabion Structure 1 1 1 1 1
1 1 1.5 1 1.5
1 1 2 1 2
c) Apron 1 1 3 0.3 0.9
5.4 2900 m3 15660
Total 16235.94 16236
Volume: XII Chapter: 5 Page No: 286
Comprehensive CAT Plan of Satluj River Basin
SPUR ESTIMATE
Item No No Length Breadth Depth Quantity Rate Unit Amount
Say Per
Rm
Gabions of Size – 2X3.5M
a) Excavation 1 1 3 1 3
1 1 4 0.3 1.2
4.2 198.6 m3 834.12
b) Gabion Structure 1 1 1 1 1
1 1 1.5 1 1.5
1 1 2 1 2
1 1 2.5 0.5 1.25
1 1 3 1 3
c) Apron 1 1 4 0.3 1.2
9.95 2900 m3 28855
Total 29689.12 29689
Volume: XII Chapter: 5 Page No: 288
Comprehensive CAT Plan of Satluj River Basin
SPUR ESTIMATE
Item No No Length Breadth Depth Quantity Rate Unit Amount Say Per
Rm
Deflecting Spur Gabions of Size – 2X3M 1 1 2.5 1 2.5
a) Excavation 1 1 4 0.3 1.2
3.7 198.6 m3 734.82
b) Gabion Structure 1 1 1 1 1
1 1 1.5 1 1.5
1 1 2 1 2
1 1 2.5 1 2.5
c) Apron 1 1 4 0.3 1.2
8.2 2900 m3 23780
Total 24514.82 24515
Volume: XII Chapter: 5 Page No: 290
Comprehensive CAT Plan of Satluj River Basin
DROP STRUCTURE ESTIMATE
Item No No Length Breadth Depth Quantity Rate Unit Amount Say Per
Rm
Drop Structure Gabion Gabions of Size – 3X4M
a) Excavation 1 1 3 1 3
1 1 5 0.5 2.5
5.5 198.6 m3 1092.3
b) Gabion Structure 5 1 3 1 15
d) Apron 1 1 5 0.5 2.5
17.5 2900 m3 50750
Total 51842.3 51842
Volume: XII Chapter: 5 Page No: 292
Comprehensive CAT Plan of Satluj River Basin
DROP STRUCTURE ESTIMATE
Item No No Length Breadth Depth Quantity Rate Unit Amount Say Per
Rm
Drop Structure Gabion Gabions of Size – 4X5M
a) Excavation 1 1 3 1 3
1 1 5 0.5 2.5
5.5 198.6 m3 1092.3
b) Gabion Structure 5 1 3 1 15
d) Apron 1 1 5 0.5 2.5
17.5 2900 m3 50750
Total 51842.3 51842
Volume: XII Chapter: 5 Page No: 294
Comprehensive CAT Plan of Satluj River Basin
SILT DETENTION DAMS ESTIMATE
Item No No Length Breadth Depth Quantity Rate Unit Amount Say
Per Rm
Silt Detention Dams in Gabion Gabions of
Size - 2X3M
a) Excavation 1 1 2.5 0.5 1.25
1 1 3.5 0.3 1.05
2.3 198.6 m3 456.78
b) Gabion Structure 1 1 1 1 1
1 1 1.5 1 1.5
1 1 2 1 2
1 1 2.5 0.5 1.25
c) Apron 1 1 3.5 0.3 1.05
6.8 2900 m3 19720
Total 20176.78 20177
Volume: XII Chapter: 5 Page No: 296
Comprehensive CAT Plan of Satluj River Basin
SILT DETENTION DAMS ESTIMATE
Item No No Length Breadth Depth Quantity Rate Unit Amount Say Per
Rm
Silt Detention Dams in Gabion Gabions of
Size - 3X4M
a) Excavation 1 1 3 0.5 1.5
1 1 4.5 0.3 1.35
2.85 198.6 m3 566.01
b) Gabion Structure 1 1 1 1 1
1 1 1.5 1 1.5
1 1 2 1 2
1 1 2.5 1 2.5
1 1 3 0.5 1.5
c) Apron 1 1 4.5 0.3 1.35
9.85 2900 m3 28565
Total 29131.01 29131
Volume: XII Chapter: 5 Page No: 298
Comprehensive CAT Plan of Satluj River Basin
WATER HARVESTING STRUCTURE ESTIMATE
Item No No Length Breadth Depth Quantity Rate Unit Amount Say Per
Rm
Water Harvesting Structure Gabions of Size - 2X4M
a) Excavation 2 1 3 1 6
1 1 2 0.5 1
7 198.6 m3 1390.2
b) Gabion Structure 2 1 1 1 2
2 1 1.5 1 3
2 1 2 1 4
2 1 2.5 1 5
2 1 3 1 6
c) Apron 1 1 2 0.5 1
21 2900 m3 60900
Total 62290.2 62290
Volume: XII Chapter: 5 Page No: 300
Comprehensive CAT Plan of Satluj River Basin
WATER HARVESTING STRUCTURE ESTIMATE
Item No No Length Breadth Depth Quantity Rate Unit Amount Say Per Rm
Water Harvesting Structure Gabions of Size - 3X4M
a) Excavation 2 1 3 1 6
1 1 3 0.5 1.5
7.5 198.6 m3 1489.5
b) Gabion Structure 2 1 1 1 2
2 1 1.5 1 3
2 1 2 1 4
2 1 2.5 1 5
2 1 3 1 6
c) Apron 1 1 3 0.5 1.5
21.5 2900 m3 62350
Total 63839.5 63840
Volume: XII Chapter: 5 Page No: 302
Comprehensive CAT Plan of Satluj River Basin
WATER HARVESTING STRUCTURE ESTIMATE
Item No No Length Breadth Depth Quantity Rate Unit Amount Say
Per Rm
Water Harvesting Structure Gabions of Size -
3X5M
a) Excavation 2 1 3.5 1 7
1 1 3 0.5 1.5
8.5 198.6 m3 1688.1
b) Gabion Structure 2 1 1 1 2
2 1 1.5 1 3
2 1 2 1 4
2 1 2.5 1 5
2 1 3 1 6
2 1 3.5 1 7
c) Apron 1 1 3 0.5 1.5
28.5 2900 m3 82650
Total 84338.1 84338
Volume: XII Chapter: 5 Page No: 304
Comprehensive CAT Plan of Satluj River Basin
WATER HARVESTING STRUCTURE ESTIMATE
Item No No Length Breadth Depth Quantity Rate Unit Amount Say Per
Rm
Water Harvesting Structure Gabions of Size -
4X5M
a) Excavation 2 1 3.5 1 7
1 1 4 0.5 2
9 198.6 m3 1787.4
b) Gabion Structure 2 1 1 1 2
2 1 1.5 1 3
2 1 2 1 4
2 1 2.5 1 5
2 1 3 1 6
2 1 3.5 1 7
c) Apron 1 1 4 0.5 2
29 2900 m3 84100
Total 85887.4 85887
Volume: XII Chapter: 5 Page No: 306
Comprehensive CAT Plan of Satluj River Basin
WATER HARVESTING STRUCTURE ESTIMATE
Item No No Length Breadth Depth Quantity Rate Unit Amount Say
Per Rm
Water Harvesting Structure Gabions of Size - 4X6M
a) Excavation 2 1 4 1 8
1 1 4 0.5 2
10 198.6 m3 1986
b) Gabion Structure 2 1 1 1 2
2 1 1.5 1 3
2 1 2 1 4
2 1 2.5 1 5
2 1 3 1 6
2 1 3.5 1 7
2 1 4 1 8
c) Apron 1 1 4 0.5 2
37 2900 m3 107300
Total 109286 109286
Volume: XII Chapter: 5 Page No: 308
Comprehensive CAT Plan of Satluj River Basin
DROP STRUCTURE ESTIMATE
Item No No Length Breadth Depth Quantity Rate Unit Amount Say Per
Rm
Drop Structure Gabion Gabions of Size – 3X3M
a) Excavation 1 1 3 1 3
1 1 4 0.5 2
5 198.6 m3 993
b) Gabion Structure 4 1 3 1 12
d) Apron 1 1 4 0.5 2
14 2900 m3 40600
Total 41593 41593
Volume: XII Chapter: 5 Page No: 310
Comprehensive CAT Plan of Satluj River Basin
Spill Way in Gabion ESTIMATE
Item No No Length Breadth Depth Quantity Rate Unit Amount Say Per
Rm
Spill Way in Gabion Gabions of Size – 5X3M
a) Excavation 2 1 2.5 1 5.00
1 1 5 0.5 2.50
7.50 198.6 m3 993
b) Gabion Structure 2 1 1 1 2.00
2 1 1.5 1 3.00
2 1 2 1 4.00
2 1 2.5 1 5.00
d) Apron 1 1 5 0.5 2.50
16.50 2900 m3 47850.00
Total 49339.50 49340
Volume: XII Chapter: 5 Page No: 312
Comprehensive CAT Plan of Satluj River Basin
Toe Wall Gabion ESTIMATE
Item No No Length Breadth Depth Quantity Rate Unit Amount Say Per
Rm
Toe Wall Gabion Gabions of Size – 4X6M
a) Excavation 1 1 4 1 4.00
1 1 5 0.3 1.50
5.50 198.6 m3 993
b) Gabion Structure 1 1 1 1 1.00
1 1 1.5 1 1.50
1 1 2 1 2.00
1 1 2.5 1 2.50
1 1 3 1 3.00
1 1 4 1 4.00
d) Apron 1 1 5 0.3 1.50
15.50 2900 m3 44950.00
Total 46042.30 46042.00