Visu 1 - 4 May, 1995 Mission Hills Khaoyai Golf Club Kanchanaburi Thailand Project Case Work on Integrated Pollution Prevention and Control Organized by: Dr. C. Visvanathan Environmental Engineering Division Asian Institute of Technology Bangkok, Thailand Funded by: Carl Duisberg Gesellschaft (CDG) South East Asia Program Office Bangkok, Thailand Next

Visu 1 - 4 May, 1995 Mission Hills Khaoyai Golf Club Kanchanaburi Thailand Project Case Work on Integrated Pollution Prevention and Control Organized by:

Embed Size (px)

Citation preview

Page 1: Visu 1 - 4 May, 1995 Mission Hills Khaoyai Golf Club Kanchanaburi Thailand Project Case Work on Integrated Pollution Prevention and Control Organized by:

Visu

1 - 4 May, 1995Mission Hills

Khaoyai Golf ClubKanchanaburi

Thailand

Project Case Work on Integrated Pollution Prevention and Control

Organized by:

Dr. C. Visvanathan Environmental Engineering DivisionAsian Institute of TechnologyBangkok,Thailand

Funded by:

Carl Duisberg Gesellschaft (CDG)South East Asia Program OfficeBangkok,Thailand

Next

Page 2: Visu 1 - 4 May, 1995 Mission Hills Khaoyai Golf Club Kanchanaburi Thailand Project Case Work on Integrated Pollution Prevention and Control Organized by:

Visu

PCW Training Crew

Next

Page 3: Visu 1 - 4 May, 1995 Mission Hills Khaoyai Golf Club Kanchanaburi Thailand Project Case Work on Integrated Pollution Prevention and Control Organized by:

Visu

CDG-SEAPO/EEP – AIT Training Workshop on

IPPC 1- 4 May, 1995

Next

Page 4: Visu 1 - 4 May, 1995 Mission Hills Khaoyai Golf Club Kanchanaburi Thailand Project Case Work on Integrated Pollution Prevention and Control Organized by:

Visu

Project Case Work Approach

PCW Training Clips

Integrated

Waste

Management

A peek from the conference hall

Trainers

Page 5: Visu 1 - 4 May, 1995 Mission Hills Khaoyai Golf Club Kanchanaburi Thailand Project Case Work on Integrated Pollution Prevention and Control Organized by:

Visu

Multidisciplinary Participants

• 25 graduate students from various fields of study (AIT);

– Environmental Engineering ( 5 students)

– Energy Technology ( 5 students)

– School of Management ( 5 students)

– Industrial Engineering ( 5 students)

– Human Settlement Division ( 5 students)

Next

Page 6: Visu 1 - 4 May, 1995 Mission Hills Khaoyai Golf Club Kanchanaburi Thailand Project Case Work on Integrated Pollution Prevention and Control Organized by:

Visu

Student Selection Criteria

• Different academic background (to represent an

industry)

• Different Nationality

• Gender Balance

• Interview by the Funding Agency (CDG)

Next

Page 7: Visu 1 - 4 May, 1995 Mission Hills Khaoyai Golf Club Kanchanaburi Thailand Project Case Work on Integrated Pollution Prevention and Control Organized by:

Visu

Role of Trainer

• Serves more as;

– Facilitator

– Technical advisor

– Catalyst of learning

• Rather than;

– Lecturers

– Story-tellers

– Instructors

Next

Page 8: Visu 1 - 4 May, 1995 Mission Hills Khaoyai Golf Club Kanchanaburi Thailand Project Case Work on Integrated Pollution Prevention and Control Organized by:

Visu

Group 1 Group 2 Group 3 Group 4

Presentations

Presentations

Brain Storming

Trainer Evaluation & Consultancy

Restructuring

Q & A

Trainer Evaluation & Consultancy Q & A

Group 1 Group 2 Group 3 Group 4

Baseline information Problem Statement

Solution

PC

W A

pp

roach

Back

Page 9: Visu 1 - 4 May, 1995 Mission Hills Khaoyai Golf Club Kanchanaburi Thailand Project Case Work on Integrated Pollution Prevention and Control Organized by:

Visu

Integrated Waste Management Education Through Project

Case Work Approach

•Rapid Industrialization

•Limited assimilative capacity of the receiving body

•Industrial Pollution

•Cradle–to–Grave Responsibility

Introduction

Next

Page 10: Visu 1 - 4 May, 1995 Mission Hills Khaoyai Golf Club Kanchanaburi Thailand Project Case Work on Integrated Pollution Prevention and Control Organized by:

Visu

Integrated Approach

• Traditional Approach > EOP Waste Treatment

• Even, Pollution Prevention/ CP > No Total Elimination

• Integrated Approach: EOP + CP > Appropriate Solution

• In need of Integrated Approach

Next

Page 11: Visu 1 - 4 May, 1995 Mission Hills Khaoyai Golf Club Kanchanaburi Thailand Project Case Work on Integrated Pollution Prevention and Control Organized by:

Visu

Training of Integrated Approach

• Multidisciplinary approach

• Multidisciplinary inputs

• Real life situation/ should revolve near real life situation

• Working under pressure to solve a problem

• Working under a team: Handling Idea Generators/ Killer/

Implementers

Next

Page 12: Visu 1 - 4 May, 1995 Mission Hills Khaoyai Golf Club Kanchanaburi Thailand Project Case Work on Integrated Pollution Prevention and Control Organized by:

Visu

Case Study

• Management committee of Super Shine Thai Ltd. Faces an

unrelenting threat from Pollution Control Department (PCD).

• Their industrial license will be cancelled within two months unless its

wastewater meets Industrial Wastewater Discharge (IWD) discharge

standards, i.e. ‘Electroplating shop has to be closed down within a

period of two months’.

• Management committee in panic situation and calls for their senior

staff consisting of;

Chief Executive Officer, Plant Manager, Environmental Manager,

Chief Engineer, Veteran Electroplater, Utility and Energy Manager

– They were given three days to solve the problem: This is the

background of the presented PCW training Next

Page 13: Visu 1 - 4 May, 1995 Mission Hills Khaoyai Golf Club Kanchanaburi Thailand Project Case Work on Integrated Pollution Prevention and Control Organized by:

Visu

List of Games

• Plant layout Game– The group with the best layout in terms of improved production

efficiency and reduced environmental impact will be the winner.

• Degreasing Solvent Selection Game– The group with the best washing efficiency and the best washing

efficiency will be the winner.

• Rinsing Game– The group carrying out the best quality rinsing with the least cost

will be the winner.

Next

Page 14: Visu 1 - 4 May, 1995 Mission Hills Khaoyai Golf Club Kanchanaburi Thailand Project Case Work on Integrated Pollution Prevention and Control Organized by:

Visu

Sample of PCW Training Schedule (Day 2)

Morning: • Video on Electroplating Process• Assessing Plant information (Collect available data and inspect site, Establish Priorities

and problem area)• Group Work• Material Balance and Identifying IPPC Options (Material balance methodology, Generate

options, Screen options, Balancing Pollution Prevention and Pollution Control)• Video: Competitive edge• Group WorkAfternoon:• Interim Presentation by each group on Material Balance Exercise• Pollution Control and Material Recovery Technologies• Video: Money Down the Drain• Group work + Software Demonstration: Waste Reduction Advisory System by USEPA• Management Issues in IPPC- Time and Motion Studies, Line Balancing Techniques etc.• Group WorkPost Dinner Session:• Pollution Prevention Game 2 – Oily Washers Game

Menu

Page 15: Visu 1 - 4 May, 1995 Mission Hills Khaoyai Golf Club Kanchanaburi Thailand Project Case Work on Integrated Pollution Prevention and Control Organized by:

Visu

Problem statement and baseline information

Q & A session after presentation

Demonstration of electroplating mechanism

PCW Training Clips

Teamwork ‘ Different Strategy’

Back to AIT

Final Presentations

Lighter moments

Intermediate Presentations

Midnight Strategic Planning

Prize distributionMenu

Page 16: Visu 1 - 4 May, 1995 Mission Hills Khaoyai Golf Club Kanchanaburi Thailand Project Case Work on Integrated Pollution Prevention and Control Organized by:

Visu

Demonstrating the Electroplating Process

Various Processes Involved

Environmental Hazards

Waste Minimization Options

Common Problems Involved

Dr. C. Visvanathan

PCW Clips

Page 17: Visu 1 - 4 May, 1995 Mission Hills Khaoyai Golf Club Kanchanaburi Thailand Project Case Work on Integrated Pollution Prevention and Control Organized by:

Visu

Teamwork

Highly Educative and Enjoyable

Group 1

Group 2

Learning by Doing ‘Different Strategy’

Click & Watch

Next

Page 18: Visu 1 - 4 May, 1995 Mission Hills Khaoyai Golf Club Kanchanaburi Thailand Project Case Work on Integrated Pollution Prevention and Control Organized by:

Visu

Learning by Doing ‘Different Strategy’

Pressure of time

Near to real life scenario

Group 3

Group 4

Click & Watch

PCW Clips

Page 19: Visu 1 - 4 May, 1995 Mission Hills Khaoyai Golf Club Kanchanaburi Thailand Project Case Work on Integrated Pollution Prevention and Control Organized by:

Visu

Baseline information about:

Present scenarios

Pollutions Preventions

Cleaner Production

EOP waste treatment

PCW Clips

Page 20: Visu 1 - 4 May, 1995 Mission Hills Khaoyai Golf Club Kanchanaburi Thailand Project Case Work on Integrated Pollution Prevention and Control Organized by:

Visu

Training of trainers

Dr. C. Visvanathan Environmental Engineering DivisionAsian Institute of TechnologyBangkok,Thailand

Prof. P. ModakIndian Institute of TechnologyMumbai,India

Lead Trainers:

Watch

Watch

Watch

Menu

Page 21: Visu 1 - 4 May, 1995 Mission Hills Khaoyai Golf Club Kanchanaburi Thailand Project Case Work on Integrated Pollution Prevention and Control Organized by:

Visu

Q & A Session After Presentation

PCW Clips

Page 22: Visu 1 - 4 May, 1995 Mission Hills Khaoyai Golf Club Kanchanaburi Thailand Project Case Work on Integrated Pollution Prevention and Control Organized by:

Visu

Final Presentations

Click & Watch

Next

Page 23: Visu 1 - 4 May, 1995 Mission Hills Khaoyai Golf Club Kanchanaburi Thailand Project Case Work on Integrated Pollution Prevention and Control Organized by:

Visu

PCW Clips

Final Presentations

Click & Watch

Page 24: Visu 1 - 4 May, 1995 Mission Hills Khaoyai Golf Club Kanchanaburi Thailand Project Case Work on Integrated Pollution Prevention and Control Organized by:

Visu

Midnight Strategic Planning

PCW Clips

Page 25: Visu 1 - 4 May, 1995 Mission Hills Khaoyai Golf Club Kanchanaburi Thailand Project Case Work on Integrated Pollution Prevention and Control Organized by:

Visu

Trainer: Prof. P. Modak

Back

Page 26: Visu 1 - 4 May, 1995 Mission Hills Khaoyai Golf Club Kanchanaburi Thailand Project Case Work on Integrated Pollution Prevention and Control Organized by:

Visu

A Peek From Conference Hall

Menu

PCW Training wishes an Idyllic and Serene Environment

Page 27: Visu 1 - 4 May, 1995 Mission Hills Khaoyai Golf Club Kanchanaburi Thailand Project Case Work on Integrated Pollution Prevention and Control Organized by:

Visu

Lighter Moments

PCW Clips

Page 28: Visu 1 - 4 May, 1995 Mission Hills Khaoyai Golf Club Kanchanaburi Thailand Project Case Work on Integrated Pollution Prevention and Control Organized by:

Visu

Intermediate Presentations

Next

Click & Watch

Page 29: Visu 1 - 4 May, 1995 Mission Hills Khaoyai Golf Club Kanchanaburi Thailand Project Case Work on Integrated Pollution Prevention and Control Organized by:

Visu

Intermediate Presentations

PCW Clips

Click & Watch

Page 30: Visu 1 - 4 May, 1995 Mission Hills Khaoyai Golf Club Kanchanaburi Thailand Project Case Work on Integrated Pollution Prevention and Control Organized by:

Visu

Prize Distribution

PCW Clips

Page 31: Visu 1 - 4 May, 1995 Mission Hills Khaoyai Golf Club Kanchanaburi Thailand Project Case Work on Integrated Pollution Prevention and Control Organized by:

Visu

Training of Trainers

BackOne Dimensional Learning Universities to Three Dimensional Learning of PCW

Page 32: Visu 1 - 4 May, 1995 Mission Hills Khaoyai Golf Club Kanchanaburi Thailand Project Case Work on Integrated Pollution Prevention and Control Organized by:

Visu

Trainer: Dr. C. Visvanathan

Back

Page 33: Visu 1 - 4 May, 1995 Mission Hills Khaoyai Golf Club Kanchanaburi Thailand Project Case Work on Integrated Pollution Prevention and Control Organized by:

Visu

Photo Session