31

Village: BHITBUDRAKVillage: BHITBUDRAK Taluka: UCHHALTaluka: UCHHAL District: SURATDistrict: SURAT State: GUJARATState: GUJARAT Country: INDIACountry:

Embed Size (px)

Citation preview

Page 1: Village: BHITBUDRAKVillage: BHITBUDRAK Taluka: UCHHALTaluka: UCHHAL District: SURATDistrict: SURAT State: GUJARATState: GUJARAT Country: INDIACountry:
Page 2: Village: BHITBUDRAKVillage: BHITBUDRAK Taluka: UCHHALTaluka: UCHHAL District: SURATDistrict: SURAT State: GUJARATState: GUJARAT Country: INDIACountry:

• Village: BHITBUDRAKVillage: BHITBUDRAK• Taluka: UCHHALTaluka: UCHHAL• District: SURATDistrict: SURAT• State: GUJARATState: GUJARAT• Country: INDIACountry: INDIA

Page 3: Village: BHITBUDRAKVillage: BHITBUDRAK Taluka: UCHHALTaluka: UCHHAL District: SURATDistrict: SURAT State: GUJARATState: GUJARAT Country: INDIACountry:

Jilla /TalukaPanchayatSurat

Bhint BudrakVillage

Page 4: Village: BHITBUDRAKVillage: BHITBUDRAK Taluka: UCHHALTaluka: UCHHAL District: SURATDistrict: SURAT State: GUJARATState: GUJARAT Country: INDIACountry:
Page 5: Village: BHITBUDRAKVillage: BHITBUDRAK Taluka: UCHHALTaluka: UCHHAL District: SURATDistrict: SURAT State: GUJARATState: GUJARAT Country: INDIACountry:
Page 6: Village: BHITBUDRAKVillage: BHITBUDRAK Taluka: UCHHALTaluka: UCHHAL District: SURATDistrict: SURAT State: GUJARATState: GUJARAT Country: INDIACountry:

Presently most of the Biogas plants installed traditionally are either defunct or working unsatisfactorily and inefficiently.

The studies reveal following reasons for the above status:

1. The Digester loadings such as cattle dung and water are

not thoroughly mixed which results into either non-generation of gas or lesser quantity gas production.

2. Due to the quality and pressure of the gas produced is being insufficient, it cannot be transported to far of houses with required pressure.

Page 7: Village: BHITBUDRAKVillage: BHITBUDRAK Taluka: UCHHALTaluka: UCHHAL District: SURATDistrict: SURAT State: GUJARATState: GUJARAT Country: INDIACountry:

The above constraints and defects were rectified and corrected by Gram Vikas Trust.

The mixture of cattle dung and water are stirred in required proportion uniformly and thoroughly by a mixing mechanism with proper air circulation.

This results into maximum generation of the gas and utilization of the plant capacity.

As such, with the help of pressure regulating tank and mechanism, the gas can be distributed to individual households with uniform pressure as is done in case of CNG in major cities.

Page 8: Village: BHITBUDRAKVillage: BHITBUDRAK Taluka: UCHHALTaluka: UCHHAL District: SURATDistrict: SURAT State: GUJARATState: GUJARAT Country: INDIACountry:
Page 9: Village: BHITBUDRAKVillage: BHITBUDRAK Taluka: UCHHALTaluka: UCHHAL District: SURATDistrict: SURAT State: GUJARATState: GUJARAT Country: INDIACountry:

Recently, Gram Vikas Trust, introduced GOBAR BANK concept and has manufactured, installed and commissioned 2 Gobargas Plants in Bhintbudrak village in Uchhal Taluka, Dist. Surat.

The plants are of 85 M3 capacity each totaling to 170 M3 of biogas generation per day.

The gas is further purified and distributed satisfactorily to 121 houses through pipeline. The design of the plant emphasizes the use of minimum motive power as compared to plant total power output.

Apart from the above application, the purified biogas with maximum content of Methane can be used to generate electricity through gas generators and also can be bottled and used to run the vehicles. The gas purification systems are developed by Gram Vikas Trust.

Page 10: Village: BHITBUDRAKVillage: BHITBUDRAK Taluka: UCHHALTaluka: UCHHAL District: SURATDistrict: SURAT State: GUJARATState: GUJARAT Country: INDIACountry:

(1) Loading Platform

• The Gobar Bank members bring the dung everyday to the community biogas plant which is weighed and accounted for in their pass books.

Page 11: Village: BHITBUDRAKVillage: BHITBUDRAK Taluka: UCHHALTaluka: UCHHAL District: SURATDistrict: SURAT State: GUJARATState: GUJARAT Country: INDIACountry:

(2) Slurry Preparation

• The cattle dung taken from dung loading platform area is delivered to feed preparation tank section.

• The fed dung is mixed with water for maintaining ratio of 1:1 for fresh cattle dung and 1:1.25 for stale (hard) cattle dung.

• The mixture is then mechanically mixed to have homogeneous slurry.

Page 12: Village: BHITBUDRAKVillage: BHITBUDRAK Taluka: UCHHALTaluka: UCHHAL District: SURATDistrict: SURAT State: GUJARATState: GUJARAT Country: INDIACountry:

(3) Anaerobic Digestion

• Anaerobic digestion tank (biogas digester) creates an anaerobic condition to generate methane gas by methanogenic bacteria.

• The digester employed here is mostly KVIC model with floating dome & water jacket.

• The water jacket helps in curbing the methane leakage and wastage.

Page 13: Village: BHITBUDRAKVillage: BHITBUDRAK Taluka: UCHHALTaluka: UCHHAL District: SURATDistrict: SURAT State: GUJARATState: GUJARAT Country: INDIACountry:

(4) Common Collecting Tank

An intermediate gas storage before Pressure regulating tank for distribution to concerned beneficiaries.

Page 14: Village: BHITBUDRAKVillage: BHITBUDRAK Taluka: UCHHALTaluka: UCHHAL District: SURATDistrict: SURAT State: GUJARATState: GUJARAT Country: INDIACountry:

(5) Pressure Regulating Tank

• Gas is compressed by blower and fed to the pressure regulating tank where gas is upgraded due to the passage of pressure

Page 15: Village: BHITBUDRAKVillage: BHITBUDRAK Taluka: UCHHALTaluka: UCHHAL District: SURATDistrict: SURAT State: GUJARATState: GUJARAT Country: INDIACountry:

ENVIRONMENTAL NUISANCE – SMOKE FROM WOOD BURNING

EARLIER

Page 16: Village: BHITBUDRAKVillage: BHITBUDRAK Taluka: UCHHALTaluka: UCHHAL District: SURATDistrict: SURAT State: GUJARATState: GUJARAT Country: INDIACountry:

An happy villager with her biogas connection and equipment

NOW

Page 17: Village: BHITBUDRAKVillage: BHITBUDRAK Taluka: UCHHALTaluka: UCHHAL District: SURATDistrict: SURAT State: GUJARATState: GUJARAT Country: INDIACountry:

The Slurry being transported to composting pits.

Page 18: Village: BHITBUDRAKVillage: BHITBUDRAK Taluka: UCHHALTaluka: UCHHAL District: SURATDistrict: SURAT State: GUJARATState: GUJARAT Country: INDIACountry:

The Compost.

Page 19: Village: BHITBUDRAKVillage: BHITBUDRAK Taluka: UCHHALTaluka: UCHHAL District: SURATDistrict: SURAT State: GUJARATState: GUJARAT Country: INDIACountry:

The slurry generated by these biogas plants are being converted into Vermi-Compost for Organic Farming.

This Compost is very good fertilizer for the agriculture having rich nutrient values.

Page 20: Village: BHITBUDRAKVillage: BHITBUDRAK Taluka: UCHHALTaluka: UCHHAL District: SURATDistrict: SURAT State: GUJARATState: GUJARAT Country: INDIACountry:

Vermi- Compost Unit

Page 21: Village: BHITBUDRAKVillage: BHITBUDRAK Taluka: UCHHALTaluka: UCHHAL District: SURATDistrict: SURAT State: GUJARATState: GUJARAT Country: INDIACountry:

Entrepreneurship Models on Biogas for Rural AreasLarge Scale/ Community level Biogas Enterprises for Cooking needs- Pipeline supply and Rural Sanitation and bio manure production

I. Size of Biogas Plant- 85 m3/day• No. of families Beneficiaries—50• Cow dung required—2 Tons/day- Rs 250/Ton• A complex of 20 community toilets• Gas utilization—Cooking• If for Cooking – 2 hrs. morning & 2 hrs. evening(1.5

m3/family per day)• Pipeline length—up to 1km. distance• Pipe quality—HDPE, pressurize system—0.3

kg./cm2(Rs. 2.5 lacs cost)• Gas charge—150/month-family

Page 22: Village: BHITBUDRAKVillage: BHITBUDRAK Taluka: UCHHALTaluka: UCHHAL District: SURATDistrict: SURAT State: GUJARATState: GUJARAT Country: INDIACountry:

II. Raw material—Cow dung+ Toilet (community-20 toilets costs 1.5lacs)

III. Slurry Management—Biogas digested slurry

Four options-

1.     Liquid slurry

2.     Recycle water (upto 40 to 50% only)

3.     Dry slurry

4.     Semi dry

750 kg semi dry slurry @ Rs 2/- per kg costs Rs 1500/day

•Local consumption of slurry is advised

•Quality of slurry should be maintained

Page 23: Village: BHITBUDRAKVillage: BHITBUDRAK Taluka: UCHHALTaluka: UCHHAL District: SURATDistrict: SURAT State: GUJARATState: GUJARAT Country: INDIACountry:

Cost

• Plant Cost – Rs 4,50,000/-• Pipe Line Cost – Rs 1,50,000• Appliances 50*400 – Rs 20,000• Pressurizing System – Rs 2,00,000• Manpower ( Mechanic – 5000, Helper -3000 ) – 96,000Income- • Gas – 150*50 – Rs 7500/ month = Rs 90,000/yr• Slurry – Rs 1500/day = Rs 5,00,000/yr• CDM Benefits – Rs 71,000/yr

Page 24: Village: BHITBUDRAKVillage: BHITBUDRAK Taluka: UCHHALTaluka: UCHHAL District: SURATDistrict: SURAT State: GUJARATState: GUJARAT Country: INDIACountry:

Cost estimates• Non- recurring cost—Rs. 8,20,000 ($ 20,500)• Recurring/ Variable cost—Rs. 2,12,000 ($

5300)• Manpower-- Rs.96,000 ($ 2400)• Depreciation—Rs.80,000 ($ 2000)• Sum of recurring cost- 3,88,000 ($ 9700)• Revenue generation- 5,90,000-3,88,000=

Rs.2,02,000 (& 5050)Note- In addition to this Carbon credit benefit to

the tune of Rs.71,000/yr. ($ 1775) will also be available.

Page 25: Village: BHITBUDRAKVillage: BHITBUDRAK Taluka: UCHHALTaluka: UCHHAL District: SURATDistrict: SURAT State: GUJARATState: GUJARAT Country: INDIACountry:

2. Large Scale/ Community level Biogas Enterprises for Electricity Generation and supply for domestic consumption, water supply and community consumption and Rural sanitation

• 15 KVA Power Generating System from - 85 m3/day Biogas Plant

• No. of families Beneficiaries—50• No. of Animals—200 • Cow dung required—2 Tons/day- Rs 250/Ton• Gas utilization— Electricity• Domestic connection—2CFL, 1 Fan= 100

Wt.*50=5000Wt.• Water supply connection—4000 Wt.• Community Hall—2 CFL, 2 Fan & 1 TV.= 500 Wt.

Page 26: Village: BHITBUDRAKVillage: BHITBUDRAK Taluka: UCHHALTaluka: UCHHAL District: SURATDistrict: SURAT State: GUJARATState: GUJARAT Country: INDIACountry:

Cost

A. Non recurringPlant Cost – Rs 4,50,000Electricity distribution cost – Rs 2,00,000/-Genset Cost – 15 kW – Rs 1,00,000Genset Room Cost – Rs 1,00,000Sum - Rs 8,50,000

B. Recurring Manpower ( mechanic – 5000, helper – 3000) – Rs 90,000Raw Material – 1,62,000Miscellaneous – 50,000Depreciation – 85,000Sum = 3,87,000

Page 27: Village: BHITBUDRAKVillage: BHITBUDRAK Taluka: UCHHALTaluka: UCHHAL District: SURATDistrict: SURAT State: GUJARATState: GUJARAT Country: INDIACountry:

Cost estimatesA. Non recurringSum =8,50,000 ($ 21,250)B. RecurringSum=3,87,000 ($ 9675)Income—Electricity supply 130 unit @ Rs.6 per unit *365 =

Rs.2,84,700/yr. ($ 7117)Slurry—Rs.1500/day= Rs.5,00,000/yr. ($ 12,500)CDM benefits – Rs.71,000/yr. ($ 1775)Sum= Rs.7,84,000 ($ 19,600)Surplus—Rs. 7,84,000-3,87,000= Rs. 3,97,000 ($ 9925)

Page 28: Village: BHITBUDRAKVillage: BHITBUDRAK Taluka: UCHHALTaluka: UCHHAL District: SURATDistrict: SURAT State: GUJARATState: GUJARAT Country: INDIACountry:

Cylindering of methane available from biogas plant for tractors and rural vehicles and production of bio manure

Feasibility analysis for a community biogas plant of 300 M3 per day capacity with biogas enrichment and bottling plant has been shown below. Dung requirement -For 300 cum. Biogas Plant = 6000 Kgs.Assuming cost of Dung = 0.20 Rs/kg.Cost of Dung for Biogas plant = 1200 Rs. per day. CAPITAL COST –1. Bio Gas Plant (Digester) Provided by Buyer (@Rs. 3000/- per cubic meter capacity, for 300 cubic meter capacity Rs. 900000/-)2. Cost of Scrubbing unit Rs. 6,00,000.003. Cost of Compressor Rs. 6,00,000.004. C.N.G. cylinders Rs. 2,00,000.005. Storage tank Rs. 1,00,000.006. Installation Exp. Rs. 2,00,000.00Total Rs. 17,00,000.00

Page 29: Village: BHITBUDRAKVillage: BHITBUDRAK Taluka: UCHHALTaluka: UCHHAL District: SURATDistrict: SURAT State: GUJARATState: GUJARAT Country: INDIACountry:

OPERATION COST -A. Fixed operational cost-1. Interest on capital @ 10% per annum= 0.1x 14,00,000 = Rs. 1,40,000 per annum2. Depreciation @ 5% per annum = 0.05x 42,50,000= Rs.70,000 per annum. Total cost = 2,10,000 per annum B. Annual Running (Operational) Cost: -1. Dung cost 1200x350 = Rs. 4,20,000 P.A.2. Labors Cost (1 skilled and 2 unskilled labors) 300x 350 = Rs. 1,05,000 P.A.3. Electricity cost (10 kWh x12 hr) 360x350 @3/- unit = Rs. 1,26,000 P.A.4. Repair and Maintenance@ 2% capital cost on 14,00000 = Rs. 28,000 P.A. Total cost = 6,79,000 per annum Sum of Fixed Operation cost and annual running cost: =6,79,000+2,10,000 = 8,89,000.00

Page 30: Village: BHITBUDRAKVillage: BHITBUDRAK Taluka: UCHHALTaluka: UCHHAL District: SURATDistrict: SURAT State: GUJARATState: GUJARAT Country: INDIACountry:

Cylindering of methane available from biogas plant for tractors and rural vehicles and production of bio manure

• Biogas plant of 300 M3 per day capacity with enrichment and bottling

• CAPITAL COST – Rs. 28,00,000.00 ($ 70,000)• OPERATION COST – • A. Fixed operational cost-3,00,000 per annum ($ 7500)• B. Annual Running (Operational) Cost: -12,00,000 per

annum • Total cost of Operation = Rs. 15,00,000 /- ($ 37,500)• Income:- • income generate by selling CBG and slurry = Rs. 22,00,000/-

($ 55,000)

• Profit = Rs. 7,00,000/- ($ 17,500)• Payback Period = 4 years

Page 31: Village: BHITBUDRAKVillage: BHITBUDRAK Taluka: UCHHALTaluka: UCHHAL District: SURATDistrict: SURAT State: GUJARATState: GUJARAT Country: INDIACountry: