Content
02. Key features of VWEM 2019
04. VWEM implementation in Q3/2019 & Q4/2019
03. Operational result of Q1/2019 & Q2/2019
01. Preparation background
National Load Dispatch Center 4
Legal framework
Decision 63/2013/QĐ-TTg: Decision on the roadmap, conditions and sector structure for
establishment and development of power market grades in Vietnam
Decision 8266/QĐ-BCT: Approval of the detailed design of Vietnam's competitive
wholesale electricity market
Decision No. 3038 / QD-BCT dated August 10, 2018 of the Minister of Industry and Trade
on the plan to operate the wholesale electricity market in 2019.
National Load Dispatch Center 5
Regulatory framework
Cost regulation (cross-subsidizing) between PCs
According to Decision 8266/QĐ-BCT: cost regulation (cross-subsidizing) between PCs through
a balance account or equivalent mechanism. This appeared to be new mechanism that needs
to be researched carefully.
In 2019: the cost regulation between the PCs will continue to be implemented through the
Bulk Supply Tariff mechanism of EVN.
Contract allocation
According to Decision 8266/QĐ-BCT: allocate all existing contracts (CfD) between EVN and
Generation company to PCs.
In 2019, only a number of contracts will be allocated to PCs due to the absence of a regulatory
mechanism between the PCs through the Balance Account.
In 2019, EVN will continue to perform the spot electricity payment function until NLDC is
accounted independently and the mechanism of separating payment of CFD contracts and
spot market is established.
National Load Dispatch Center 6
VWEM 2019 objectives
Implement the operation of VWEM 2019 under Decision 8266/QD-BCT subjects to the
constraints on apparent conditions;
Improve mechanisms to participate in electricity market for generation company;
Evaluate the mechanisms of VWEM 2019; completing the legal framework, IT
infrastructure to gradually implement VWEM under Decision 8266/QD-BCT.
National Load Dispatch Center 8
The operating mechanism
Generators: participate in electricity market similar to the on-going generation market;
PCs:
Purchase a part of the electricity consumption (off-take from the grid) on the electricity
market. The rest of the electricity consumption is purchased from EVN under the mechanism
of BST;
Continue to implement the contract allocation of Phu My 1 and Phu My 4 power plants with
the same mechanism as 2018;
Directly sign PPAs with 04 new power plants (go into operation in 2018 and 2019).
National Load Dispatch Center 9
Signing contracts with new power plants participating in VWEM
In 2019, there are expected to be 04 new power plants participating in the power market
to sign contracts directly with the PCs: Thai Binh 1, Vinh Tan 4, Duyen Hai 3 MR, Vinh Tan 4
MR (From the first day of the month following the month of COD).
Principles of negotiation and signing contract:
EVN negotiates with 05 PCs as regulated in Circular 56/2014/TT-BCT and Circular 13/2017/TT-
BCT of the Ministry of Industry and Trade and other Circulars (if any).
Each new power plant signs 05 contracts with 05 PCs. The contract quantity (Qc) of the power
plant with a PC is directly proportional to the power consumption (load) of the PC. The
contract price is the negotiated price agreed between 06 parties.
National Load Dispatch Centre 10
Current VWEM Arrangements under Circular No. 45 (for 2019)
Generation
Indirect Trading Generators
scheduled by SMO
Scheduled by SMO
Direct Trading
Generators
PV Power
TKV
EVN GENCO 1
EVN GENCO 2
EVN GENCO 3
SMHPs
Equitised EVN
GENCOs
BOTs
Single Buyer
Electric Power Trading
Company (EPTC)
SPPA (CfD)
SPPA (CfD)
SPPA (CfD)
SPPA (CfD)
SPPA (CfD)
SPPA (CfD)
PPA
Hanoi PC
Northern PC
Central PC
Southern PC
HCM PC
BST
BST
BST
BST
BST
Non Contestable Customers
Tariff
Tariff
Tariff
Tariff
Tariff
Spot Market
Sp
ot
reve
nu
e
Spot costsSMO
Prices
Bids
Dispatch
Dispatch
Transmission DistributionPower Power Power
HPC End User
NPC End User
CPC End User
HCMPC End User
SPC End User
IPPsSPPA (CfD)
A limited number of PPAs have been signed between PCs and EVN’s Generators in 2019
National Load Dispatch Centre 12
Generation Installed Capacity & Energy Production for First 6 months
96 direct trading power plants; 25549;
48%
110 indirect trading power plants; 15146;
28%
11 strategic hydro power plants; 8442;
16%
Other; 4467;
8%
Generation Installed Capacity by Market Participation Status
96 direct trading power plants 110 indirect trading power plants
11 strategic hydro power plants Other
Hydro26%
Coal52%
Oil&Gas20%
Others2%
CategoryEnergy production
(bil. kWh)(%)
Hydro 30.3 26 %
Coal 59.6 52 %
Oil & Gas 22.8 20 %
Others 1.98 2 %
Total 114.7 100%
National Load Dispatch Centre 13
Operational results - System
System Operation difficulty
The rate of load growth is still high (approximately 10% annually)
The installation of plants and grid is slow and inconsistent. It does not meet proposed
schedule causing overload and electricity shortage on the power system.
Uncertainty of hydro power plant with many constraints in operation and irrigation
Limited fuel for electricity generation (coal, gas…)
National Load Dispatch Centre 15
Renewable Energy
By the end of June 2019, the total number of renewable power plants in operation was 91
(including 82 solar power plants, 06 wind power plants and some other biomass) with a
total installed capacity of 4900 MW.
1,5
36
3,0
94
4,9
04
6 8 10 1013
16 16
29
57
91
0
10
20
30
40
50
60
70
80
90
100
0
500
1,000
1,500
2,000
2,500
3,000
3,500
4,000
4,500
5,000
1/9/2018 1/10/2018 1/11/2018 1/12/2018 1/1/2019 1/2/2019 1/3/2019 1/4/2019 1/5/2019 1/6/2019
No
. of
pla
nts
MW
82
6
3
0 20 40 60 80 100
Điện mặt trời
Điện gió
Điện sinh khối
No. of plants
4463.74 MW, 91%
270.8 MW, 6%
169 MW, 3%
INSTALLED CAPACITY
Biomass
Wind
Solar
National Load Dispatch Centre 16
Renewable Energy
The total renewable power production reached about 607 billion kwh (about 20.23 million
kwh per day), contributed 2.8 percent of the total power production of national power
system.
13,608 28,977 46,750
77,286
191,720
483,743
596,689 635,944
579,967
558,515 550,806
560,489
-
100,000
200,000
300,000
400,000
500,000
600,000
700,000
800,000
1 2 3 4 5 6 7 8 9 10 11 12
MW
h
Month
Biomass Wind Solar
National Load Dispatch Centre 18
MonthSMP
(VNĐ/kWh)CAN
(VNĐ/kWh)No. of hour reach
Celling priceFMP
(VNĐ/kWh)CFMP
(VNĐ/kWh)Max thermal bid
(VNĐ/kWh)
January 868 130 52 998 1017 1285
February 884 126 172 1010 1038 1345
March 1152 133 423 1285 1392 1345
April 1085 138 312 1222 1257 1347
May 1089 140 311 1229 1258 1394
June 1177 152 331 1329 1350 1418
1425 1295 2255 1986 2282 2347
868 8841152 1085 1089 1177
998 1010
1285 1222 12291329
1017 1038
13921257 1258
1350
0
500
1000
1500
2000
2500
0
500
1000
1500
2000
2500
3000
3500
4000
4500
January February March April May June
Bill
ion
VN
D
VN
D/k
Wh Spot payment
CFMP
FMP
SMP
Operational results – Full market Price
National Load Dispatch Centre 19
Contract Quantity (Qc) versus Metered Quantity (Qm)
Qc Qm
785.6 774.8
1,045.4
2,868.12,972.3
876.0 846.9
1,170.6
3,046.2
3,251.5
0.0
500.0
1,000.0
1,500.0
2,000.0
2,500.0
3,000.0
3,500.0
CPC HANOI HCMPC NPC SPC
Mill
ion k
Wh
National Load Dispatch Center 20
Operating results
The capability of PCs and market participants in the VWEM has been significantly
improved
CfD contracts, market settlement mechanism;
Improve knowledge of electrical system operation and skills through training and practical
operations.
Demand forecasting ability has been developed
The load forecast is noticeably improved, leaving only a few unstable moments due to the
large proportion of the residential load, affected by unpredictable factors such as weather,
especially in abnormal weather periods.
Complete the collection, publication and checking of metered data: with over 99% of
accurate data collected by NLDC
Information technology infrastructure operates stably, meeting operation requirements
National Load Dispatch Centre 22
Electricity production for 2nd half of 2019
Electricity (bil.kWh)
2nd half of 2018Plan of MOIT for 2nd half of
2019
Updated Schedule
Hydro 44.6 45.7 (3%) 36.5 (-18%)
Coal 42.9 55.9 (30%) 61.4 (43%)
Gas turbine 18.5 20.5 (11%) 20.7 (12%)
Oil (DO & FO) 0.0 - 1.6
Renewable 0.3 1.9 (537%) 3.9 (1232%)
Total 106.3 124.0 (17%) 124.2 (17%)
44.6 45.7 36.5
42.9 55.9
61.4
18.5
20.5 20.7 0.0
- 1.6
0.3
1.9 3.9
-
20.0
40.0
60.0
80.0
100.0
120.0
140.0
6 months late of 2018 Plan of MOIT 2019 Updated schedule
Tỷ k
Wh
Hydro Coal Gas turbine Oil (DO & FO) Renewable
National Load Dispatch Centre 23
Forecast market price and spot payment
2576
1884
2500
1734
22691939
1490 1460 1456 1485 15131428
0
200
400
600
800
1000
1200
1400
1600
0
500
1000
1500
2000
2500
3000
7 8 9 10 11 12
VN
D/k
Wh
Bill
ion
VN
D
Spot payment CFMP
National Load Dispatch Centre 24
Contract Quantity (Qc) versus Expected Metered Quantity (Qm)
705 747945
2745 2723
785 8311053
3058 3036
0
500
1000
1500
2000
2500
3000
3500
CPC HANOI HCMPC NPC SPC
Qc Qm
National Load Dispatch Centre 25
Shorten the trading and dispatching interval from 60 min to 30 min
5,800
6,000
6,200
6,400
6,600
16:00
17:00
18:00
19:00
Luzo
n D
eman
d (M
W)
Hour of Day
30-min 30-min 30-min 30-min 30-min 30-min
30 min load forecast
Secured system
Secured system Secured system
Secured system
Secured system
Error between load forecast and actual source
Ancillary services required