Vertical Axis Wind Turbine Project Report

Embed Size (px)

Citation preview

  • 7/25/2019 Vertical Axis Wind Turbine Project Report

    1/18

    Running head: WIND TURBINE REPORT 1

    Vertical Axis Wind Turbine Project Report

    Jace Thompson and Derrick Sietien

    ENGR 196-1AH

    Dr. M. Hall

    Ivy Tech Community College of Indiana

    December 14, 2015

  • 7/25/2019 Vertical Axis Wind Turbine Project Report

    2/18

    WIND TURBINE REPORT 2

    Table of Contents

    Objectives ....................................................................................................................................... 3

    Theory of Operation ........................................................................................................................ 4

    Diagrams and Photographs ............................................................................................................. 5

    Bill of Materials .............................................................................................................................. 7

    Description of the Design Process .................................................................................................. 9

    Electrical System ......................................................................................................................... 9

    Blade Structure .......................................................................................................................... 10

    Mechanical Load Bearing Structure .......................................................................................... 10

    Narrative of the Build and Testing Process .................................................................................. 11

    Discussion of Features included (and not included) in the Product.............................................. 13

    Measurements, including Graphs and Illustrations ....................................................................... 15

    Measurements of Prototype Turbine ......................................................................................... 15

    Measurements of Final Turbine ................................................................................................ 16

    Summary, Conclusions, and Next Steps ....................................................................................... 18

  • 7/25/2019 Vertical Axis Wind Turbine Project Report

    3/18

    WIND TURBINE REPORT 3

    Objectives

    The purpose of this project was to build a working wind powered generator from basic

    components under the constraints of assembly time and cost effectiveness. Additionally, the

    following objectives were included from the project description:

    1. Solve an engineering problem by incrementally developing solutions

    2. Apply CAD software skills and electronics knowledge to develop a product.

    3. Apply math and physics principles to a real-world situation.

    4. Understand the basics of electrical generation and wind turbines.

    5.

    Work in a team, coordinating development and responsibilities.

    6. Document your results in a notebook and a formal written report.

    7. Deliver an oral presentation on your project.

  • 7/25/2019 Vertical Axis Wind Turbine Project Report

    4/18

    WIND TURBINE REPORT 4

    Theory of Operation (Abstract)

    Our vertical axis wind turbine (VAWT) works by capturing energy from the wind

    through its blades. The vertical orientation allows the device to be driven from any standard

    direction of the wind. The blades turn a rotor assembly that has powerful neodymium magnets

    adhered to the bottom. Underneath these magnets lies coils arrayed so that they break the most

    lines of flux from the magnets.

    The coils are wired in 3 phases, and the phases are connected in a pattern known as a 3-

    phase Wye configuration(figures 4, 5, 9). The Wye configuration allows for a higher voltage to

    be produced relative to other configurations of coils in 3 phases. The higher voltage at lower

    revolutions per minute allows for our turbine to reach the break in voltage necessary to charge a

    battery earlier than other coil configurations.

    Three phase power has several advantages over single phase power. In single phase,

    power output falls to zero three times per cycle, in 3 phase power output never drops to zero. In

    three phase, the power delivered to the load is the same at any instant. Additionally in three

    phase, the conductors need to be only 75% of the size of conductors for equivalent single phase

    power output.

  • 7/25/2019 Vertical Axis Wind Turbine Project Report

    5/18

    WIND TURBINE REPORT 5

    Diagrams and Photographs

    Figure 2

    Figure 1

    Figure 3

    Figure 4Hugh Piggott

    Figure 6 Cal-EPower

    Figure 5

    Figure 7Hugh Piggott

  • 7/25/2019 Vertical Axis Wind Turbine Project Report

    6/18

    WIND TURBINE REPORT 6

    Figure 8

    Figure 9

    Figure 10 Figure 11

  • 7/25/2019 Vertical Axis Wind Turbine Project Report

    7/18

    WIND TURBINE REPORT 7

    Bill of Materials

    Qty Cost * Qty

    1 2' x 2' x .25" particle board salvaged

    1 3/8" OD 24" drive shaft $13.76

    2 3/8" ID Fafnir S3PP ball bearing $61 1" painters tape salvaged

    1 plastic foam project panel $5

    1 electrical tape salvaged

    1 hot glue + hot glue gun Dr. Hall

    1 JB Weld epoxy salvaged

    1 Gorilla brand tape salvaged

    1 Kraft paper roll salvaged

    3 Nuvo newspaper salvaged

    1 roll of 2' wire mesh salvaged

    1 leatherworking needle salvaged

    1 spool of leatherworking thread salvaged

    1 holepunch salvaged

    1 miter box + saw Dr. Hall

    1 drill + bitset salvaged

    6 unopened soup cans salvaged

    1 compass (magnetic) salvaged

    1 compass (drafting) salvaged

    1 3 in 1 silicon oil salvaged

    1 roll of paper towels salvaged

    8 1" x .25"neodymium magnets Dr. Hall

    8 PVC retaining rings (PVC pipe) salvaged8 1" OD fender washers $1.36

    1 oscilloscope Dr. Hall

    1 digital multimeter Dr. Hall

    6 silicon diodes Dr. Hall

    * resistors - for measurement Dr. Hall

    1 coping saw salvaged

    2 triangles Dr. Hall

    1 Sharpie salvaged

    1 jumper wire salvaged

    10 index card shims salvaged

    1 Sta-Flo starch salvaged

    1 Elmer's Glue-All salvaged

    Continued on next page

  • 7/25/2019 Vertical Axis Wind Turbine Project Report

    8/18

    WIND TURBINE REPORT 8

    8 quarters $2.00

    1 heatgun salvaged

    1 1 ton press salvaged

    coil winding rig

    1 vice salvaged

    1 hand drill salvaged1 1" OD socket salvaged

    2 circular foam board cutouts salvaged

    1.5 rolls of magnet wire Dr. Hall

    frame

    1 2" x 2" x 1' piece of wood salvaged

    4 mild steel tabs with hole salvaged

    2 ~2' mild steel angle iron salvaged

    1 welder salvaged

    2 wood screws salvaged

    2 bolts salvaged

    2 washers salvaged

    2 nuts salvaged

    1 spool of thin cord salvaged

    4 screw eyes salvaged

    Total Spent: $28.12

  • 7/25/2019 Vertical Axis Wind Turbine Project Report

    9/18

    WIND TURBINE REPORT 9

    Description of the Design Process

    A preliminary model was constructed to provide a baseline understanding of a simple

    vertical axis wind turbine and accompanying alternator (see figure 1).

    It was apparent from the preliminary model that the design had three basic components:

    the electrical system; the blade structure; and the mechanical load bearing structure. The design

    also needed to maximize the score of the grading rubric. Tradeoffs were inevitable.

    Electrical System

    Several designs for the electrical system were considered. One of our earlier designs

    involved using the housing from a ceiling fan to contain the electrical system. This design was

    rejected for the following reasons: it required a coupler, lack of a ceiling fan, and poor

    compatibility with the given magnets.

    After we read sections from Hugh PiggottsA Wind Turbine Recipe Bookand hisPMG

    Construction Manual,we decided that an axial flux permanent magnet alternator wired in a 3-

    phase Wye configuration would be the best fit for our turbine.

    The 3-phase Wye (figures 4, 7) was chosen because according to our research, it allows for

    more efficient power delivery, and the Wye configuration allows for less resistance that our rotor

    and blade assembly would have to overcome during start up. This was more of a concern because

    our blades are Darrieus style (compare figures 1, Savonius, figure 2, Darrius).

    The final consideration of our electrical system involved minimizing the airgap between

    the coils and the magnets. A smaller airgap results in increased power output. The axial flux

    permanent magnet alternator design fits this requirement.

  • 7/25/2019 Vertical Axis Wind Turbine Project Report

    10/18

    WIND TURBINE REPORT 10

    Blade Structure

    Our research into the blade structure of our turbine consisted of Abraham and Plourdes

    Small Scale Windpower and Caleb Engineerings videos on VAWTs available on YouTube. An

    early design, inspired by a minidocumentary on California Energy and Power (figure 6),

    involved a concentrator and Savonius style blades. We decided on a 3 bladed Darrieus style

    structure. This is because Darrieus style blades operate using lift and not drag, and are more

    efficient in harnessing the winds energy. We chose 3 blades because according to Caleb

    Engineering, an odd number is easier to balance and diminishing returns occur when more blades

    are added to a design (figures 2, 8).

    Mechanical Load Bearing Structure

    The primary design consideration of our mechanical load bearing structure was to

    eliminate excess weight, and extraneous motion in non-productive directions. The design

    manifested itself as a steel drive shaft, which doesnt rotate, mounted to a frame that can tolerate

    the vibration produced from a rotor that is not precision balanced. The coupling of rotor to drive

    shaft is accomplished through ball bearings that are held up by a thin layer of tape adhered to the

    shaft. Another consideration was to keep the magnets from flying off due to centrifugal force.

    This was accomplished using PVC retaining rings that were adhered to the rotor with JB Weld.

    The overall assembly was placed along the diagonal axis of the particle board base to

    maximize room for an optional concentrator (figure 5).

  • 7/25/2019 Vertical Axis Wind Turbine Project Report

    11/18

    WIND TURBINE REPORT 11

    Narrative of the Build and Testing Process

    The construction of individual components as well as anything that had contact with the

    mechanical load bearing structure took place primarily off campus at Jaces residence. The

    assembly of completed components took place during common lab hours. The reasons for this

    include: first, maximizing the time available when team members were together; second,

    increased access to tools and temporary rigging; third, this allowed for night time work to be

    done on components; fourth, the increased time for component construction allowed for a calmer

    pace, resulting in increased safety during construction and higher quality components.

    The turbine was frequently transported between Jaces residence and the classroom,

    which influenced the design of the turbine, and the build process due to the possibility of

    mechanical damage during transport.

    The build occurred as follows:

    1. Cut wood and drilled holes for first frame.

    2. Assembled and adhered first frame to base using hot glue on wood.

    3.

    Sculpted two sets of blades forms by hand from wire mesh.

    a. Sculpted Darrieus or lift type forms.

    b. Sculpted Savonius or drag type forms.

    4. Sculpted form of concentrator. (unused, see figure 5)

    5. Adhered paper mache using Sta-Flo starch to Darrieus type forms and concentrator.

    6. Adhered muslin cloth using Elmers Glue-All to Savonius type forms (built as a backup)

    7. Cut and sanded shape of plastic-foam rotors.

    8. Press fit a PVC jacket to each bearing (to avoid having to use adhesives directly on the

    bearings)

  • 7/25/2019 Vertical Axis Wind Turbine Project Report

    12/18

    WIND TURBINE REPORT 12

    9. Adhered bearing to center of plastic foam rotors using JB Weld, hot glue, and PVC electrical

    tape

    10.Cut magnet retaining rings from 1 inner diameter PVC pipe.

    11.Adhered retaining rings and washers for magnets using JB Weld.

    12.Put magnets into retaining rings.

    13.Preliminary assembly of above components.

    14.Catastrophic failure of wood and glue frame due to accidental drop.

    15.Welded new frame from angle iron and iron tabs

    16.

    Drilled holes and bolted frame to base with bolts, nuts, washers.

    17.Screwed rod holder to top of frame using wood screws.

    18.Reassembled rod, rotors, and frame.

    19.Aligned rotors using soup cans.

    20.Balanced rotors with stack of quarters.

    21.Stitched tops of Darrieus style blades to upper rotor

    22.

    Gorilla-taped bottoms of Darrieus style blade to lower rotor

    23.Wound coils using homebrew winder (see figure 3)

    24.Adhered coils to base using Gorilla-tape and index card shims (to minimize airgap).

    25.Routed coils into desired 3-phase Wye configuration with electrical tape and jumper wire.

    26.Wrapped tape to couple rotors to rod at correct height.

    27.Adjusted airgap by shimming coils with index cards

  • 7/25/2019 Vertical Axis Wind Turbine Project Report

    13/18

    WIND TURBINE REPORT 13

    Discussion of Features included (and not included) in the Product

    Notable features of our wind turbine include a lightweight blade and rotor assembly. The

    paper mache blades were built with three layers of Kraft packing paper adhered to wire mesh.

    The wire mesh was removed to decrease the weight of the overall structure, which resulted in an

    increased speed of the rotor.

    The design of frame that holds the shaft was carefully considered so that the rotor and

    blade assembly could be removed to allow for later modification; the improvement of

    components; and the inevitable assembly error.

    Due to the modifiable design of our turbine, we were able to risk using Darrieus style

    blades. The risk was that these blades are difficult to start relative to their Savonius counterparts.

    An additional set of Savonius blades were made to cover the contingency of the Darrieus style

    blades being unable to start.

    Our design features two Fafnir S3PP ball bearings mounted to a drive shaft. The shaft

    allows for the design to be modular in that there are a variety of mechanical devices that are

    designed to mount to a precision drive shaft. Standard ball bearings are designed to accept force

    in two directions. However, we needed our ball bearings to accept a third direction, the

    downward force from the weight of the blade and rotor assembly. After researching terminology,

    we found that angular contact ball bearings were able to fit this requirement. The S3PP has an

    additional steel case that keeps enables the bearing to tolerate force in a third direction.

    We opted not to use a gear system because in an axial flux PMA (permanent magnet

    alternator) the gearing is accomplished by having a larger diameter rotor, and mounting the

    magnets at the end of the rotor. Factors affecting power generation include: the speed of the

  • 7/25/2019 Vertical Axis Wind Turbine Project Report

    14/18

    WIND TURBINE REPORT 14

    magnets relative to the coils, and the airgap between magnets and coils. Like a gear system, our

    system behaves like a lever, without losses due to friction between gears. In a full size VAWT, a

    gear system may be more efficient due to material and space constraints.

    The S3PPs were press fit into a segment of PVC pipe so that they could later be reused

    in other projects without the potential of being rendered inoperable by adhesives.

    The electricity produced by our turbine can be rectified and potentially used to charge a

    single battery cell.

    A prominent features that was not included in our final product was a concentrator

    (figures 5, 6). A concentrator is a parabolic surface that protects the return side of the blade while

    channeling an increased amount of air from the test fan onto the productive side of the turbines

    blades. This feature was not included in the final test because 1) the designers felt it was too

    risky to include an untested component that could result in unforeseen results; 2) a concentrator

    eliminates the VAWTs ability to be rotated by the wind from all directions; 3) the test fan was

    able to be positioned only on the productive side of the blades; however additional airflow is

    unable to be redirected productively.

    We were unable to include a rectifier because our output waveform was not sinusoidal,

    and thus our output was not usable.

  • 7/25/2019 Vertical Axis Wind Turbine Project Report

    15/18

    WIND TURBINE REPORT 15

    Measurements, including Graphs and Illustrations

    Measurements of Prototype Turbine

    Artists representation of a chair seatsine wave

    Our baseline turbine was able to output 20.7 milliwatts at 0.593 Vrms. Due to a small

    misalignment between magnets and coils, our output waveform was a chair seat, as depicted

    above. A chair seat is characterized by its long rise and short fall, with the nominal seat

    occurring during the rise of the wave.

  • 7/25/2019 Vertical Axis Wind Turbine Project Report

    16/18

    WIND TURBINE REPORT 16

    Measurements of Final Turbine

    Combined waveform and measurement of all 3 phases.

  • 7/25/2019 Vertical Axis Wind Turbine Project Report

    17/18

    WIND TURBINE REPORT 17

    Waveforms of phases 1, yellow, and 3, blue

    Power output for our 3 phase Wye configuration was calculated with the following equation:

    =3

    2

    Where R is the sum of the resistance of two phases and V is the voltagermsmeasured

    across those two phases.

    The measurement of our rebuilt wind turbine was 114 milliwatts at 1.75 Vrms. The

    designers assume that several coils were installed incorrectly. The resulting rectified 3 phase

    waveform should have resembled figure 11; the separate phases plotted together should have

    looked like figure 10.

  • 7/25/2019 Vertical Axis Wind Turbine Project Report

    18/18

    WIND TURBINE REPORT 18

    Summary, Conclusions, and Next Steps

    Summary: We were successfully able to build a desktop vertical axis wind turbine. We

    used instructor-supplied magnets and wire, salvaged supplies, and $28.12 of mechanical devices

    to create an effective system to harness small scale wind power.

    Each team member gained an in-depth knowledge of new engineering concepts during

    the secondary research phase from books and videos authored by experts. The research was

    naturally motivated from our assigned task of designing a requirements-driven wind turbine. We

    also participated in primary research during the assembly stages of our project.

    If time permitted, our next step would be to fix the installation of the coils, and retake our

    measurements. After that, we would install our simple rectifier and measure what our DC output

    would be. If the output was adequate to charge a small cell, then we would attempt to do so using

    a simple circuit to regulate the charging of our cell. It would then be feasible to use our wind

    turbine to power a small device at a remote location.