CRONOGRAMA VALORIZADO DE AVANCE DE OBRA - DESCRIPCIÓN Apr-14 May-14 PUENTE TRABAJOS PRELIMINARES MOVILIZACION Y DESMOVILIZACION DE EQUIPOS 40,243.11 36,348.61 TRAZO Y REPLANTEO 656.92 735.76 DESBROCE Y LIMPIEZA 2,398.19 ACCESO A CANTERAS, FUENTES DE AGUA DME 2,013.85 MANTENIMIENTO DE TRANSITO Y SEGURIDAD VIAL 3,833.30 3,462.33 CISTERNA DE 12M3 8,128.64 ESTRIBOS EXCAVACION PARA ESTRUCTURAS EN MATERIAL COMUN, EN SECO 8,162.56 ENCOFRADO Y DESENCOFRADO CARA NO VISTO 31,304.82 ACERO DE REFUERZO f'y=4200 Kg/cm2 107,464.00 53,732.00 ENCOFRADO Y DESENCOFRADO CARA VISTO 10,441.42 14,617.99 CONCRETO f'c=210 kg/cm2 EN SECO 237,576.91 RELLENO DE ESTRUCTURAS CON MATERIAL PROPIO TRANSPORTE Y ELIMINACION DE MATERIAL EXCEDENTE PILARES EXCAVACION PARA ESTRUCTURAS EN MATERIAL COMUN, EN SECO 3,264.00 ENCOFRADO Y DESENCOFRADO CARA NO VISTO 5,577.00 ACERO DE REFUERZO f'y=4200 Kg/cm2 2,890.26 52,024.74 ENCOFRADO Y DESENCOFRADO CARA VISTO 8,797.19 1,759.44 CONCRETO f'c=210 kg/cm2 EN SECO 45,295.64 RELLENO DE ESTRUCTURAS CON MATERIAL PROPIO TRANSPORTE Y ELIMINACION DE MATERIAL EXCEDENTE VIGAS DE CONCRETO PREESFORZADO FALSO PUENTE ENCOFRADO Y DESENCOFRADO CARA VISTO ENCOFRADO Y DESENCOFRADO CARA NO VISTO ACERO DE REFUERZO f'y=4200 Kg/cm2 ACERO PRETENSADO fo=320 TN CONCRETO f'c=280 kg/cm2 LOSA DE CONCRETO ENCOFRADO Y DESENCOFRADO CARA NO VISTO ENCOFRADO Y DESENCOFRADO CARA VISTO ACERO DE REFUERZO f'y=4200 Kg/cm2 CONCRETO f'c=280 kg/cm2 LOSA DE APROXIMACION ENCOFRADO Y DESENCOFRADO CARA VISTO ACERO DE REFUERZO f'y=4200 Kg/cm2 CONCRETO f'c=210 kg/cm2 SELLANTE PLASTICO DETALLE DE TABLERO JUNTA DE EXPANSIÓN BRUÑAS ROMPA AGUA EN LOSA C O N SO R C IO RMG

Valorización Junio 2014 Final Final

Embed Size (px)

DESCRIPTION

VALORIZACION DE OBRA: PUENTE ANTAJARANI - PUNO

Citation preview

Page 1: Valorización Junio 2014 Final Final

CRONOGRAMA VALORIZADO DE AVANCE DE OBRA - CONSTRUCCIÓN DEL PUENTE ANTAJARANI Y ACCESOS

DESCRIPCIÓN Apr-14 May-14 Jun-14PUENTETRABAJOS PRELIMINARES

MOVILIZACION Y DESMOVILIZACION DE EQUIPOS 40,243.11 36,348.61 40,243.11TRAZO Y REPLANTEO 656.92 735.76 814.59DESBROCE Y LIMPIEZA 2,398.19ACCESO A CANTERAS, FUENTES DE AGUA DME 2,013.85MANTENIMIENTO DE TRANSITO Y SEGURIDAD VIAL 3,833.30 3,462.33 3,833.30CISTERNA DE 12M3 8,128.64ESTRIBOS

8,162.56ENCOFRADO Y DESENCOFRADO CARA NO VISTO 31,304.82ACERO DE REFUERZO f'y=4200 Kg/cm2 107,464.00 53,732.00ENCOFRADO Y DESENCOFRADO CARA VISTO 10,441.42 14,617.99CONCRETO f'c=210 kg/cm2 EN SECO 237,576.91 12,504.05RELLENO DE ESTRUCTURAS CON MATERIAL PROPIO 19,058.16TRANSPORTE Y ELIMINACION DE MATERIAL EXCEDENTE 3,109.31PILARES

3,264.00ENCOFRADO Y DESENCOFRADO CARA NO VISTO 5,577.00ACERO DE REFUERZO f'y=4200 Kg/cm2 2,890.26 52,024.74ENCOFRADO Y DESENCOFRADO CARA VISTO 8,797.19 1,759.44CONCRETO f'c=210 kg/cm2 EN SECO 45,295.64 40,766.07RELLENO DE ESTRUCTURAS CON MATERIAL PROPIO 8,464.06TRANSPORTE Y ELIMINACION DE MATERIAL EXCEDENTE 952.05VIGAS DE CONCRETO PREESFORZADO

FALSO PUENTE 114,698.06ENCOFRADO Y DESENCOFRADO CARA VISTO

ENCOFRADO Y DESENCOFRADO CARA NO VISTO

ACERO DE REFUERZO f'y=4200 Kg/cm2

ACERO PRETENSADO fo=320 TN

CONCRETO f'c=280 kg/cm2

LOSA DE CONCRETO

ENCOFRADO Y DESENCOFRADO CARA NO VISTO

ENCOFRADO Y DESENCOFRADO CARA VISTO

ACERO DE REFUERZO f'y=4200 Kg/cm2

CONCRETO f'c=280 kg/cm2

LOSA DE APROXIMACION

ENCOFRADO Y DESENCOFRADO CARA VISTO

ACERO DE REFUERZO f'y=4200 Kg/cm2

CONCRETO f'c=210 kg/cm2

SELLANTE PLASTICO

DETALLE DE TABLERO

JUNTA DE EXPANSIÓN

BRUÑAS ROMPA AGUA EN LOSA

VEREDA ALIGERADA

ACABADO ENDURECIDO EN VEREDA ALIGERADA

TUBOS DE DRENAJE

DISPOSITIVOS DE APOYO EN ESTRIBOS

EXCAVACION PARA ESTRUCTURAS EN MATERIAL COMUN, EN SECO

EXCAVACION PARA ESTRUCTURAS EN MATERIAL COMUN, EN SECO

CONSORCIO RMG

Page 2: Valorización Junio 2014 Final Final

DISPOSITIVOS DE APOYO EN PILARES 9,368.56TOPES LATERALES EN ESTRIBO Y PILARES 2,954.80TOPES LATERALES EN VIGAS

BARANDAS METALICAS INCLUYE PINTADO

RIEGO DE LIGA

CARPETA ASFALTICA EN FRIO

COSNTRUCCION DE LSO ACCESOS

TRABAJOS PRELIMINARES

TRAZO Y REPLANTEO

DESBROCE Y LIMPIEZA

MOVIMIENTO DE TIERRAS

EXCAVACION EN EXPLANACIONES EN MATERIAL COMUN

CONFORMACION DE TERRAPLENES

BANQUETAS PARA RELLENOS

TRANSPORTE Y ELIMINACION DE MATERIAL EXCEDENTE

PAVIMENTOS

PERFILADO Y COMPACTADO DE SUBRASANTE

AFIRMADO

CUNETAS REVESTIDAS

OBRAS DE ARTE Y DRENAJE

ALCANTARILLA D24" KM 28+430

EXCAVACION PARA ESTRUCTURAS EN MATERIAL COMUN SECO

ENCOFRADO Y DESENCOFRADO CARA NO VISTO

ENCOFRADO Y DESENCOFRADO CARA VISTO

TUBERIA CORRUGADO DE 24"

CONCRETO CICLOPEO f'c= 175 kg/cm2 +30% de PM

RELLENO DE ESTRUCTURAS EN MATERIAL COMUN EN SECO

EMBOQUILLADO DE PIEDRA E=0.15M

TRANSPORTE Y ELIMINACION DE MATERIAL EXCEDENTE

TUBERIA CR DE 12" KM 28+583

ALC. CR B=0.4 KM 28+294

EXCAVACION PARA ESTRUCTURAS EN MATERIAL COMUN SECO

ENCOFRADO Y DESENCOFRADO CARA NO VISTO

ENCOFRADO Y DESENCOFRADO CARA VISTO

ACERO DE REFUERZO f'y=4200 Kg/cm2

CONCRETO f'c=175 kg/cm2

EMBOQUILLADO DE PIEDRA E=0.15M

TRANSPORTE Y ELIMINACION DE MATERIAL EXCEDENTE

SEÑALIZACION

SEÑALES PREVENTIVAS (0.75M x 0.75M)

SEÑALES INFORMATIVAS

MARCAS EN EL PAVIMENTO

ESTRUCTURA DE SOPORTE

BARRERA DE SEGURIDAD METALICA P3-BORDE LATERAL

SEÑALES REGLAMENTARIAS

CONSTRUCCION E LAS DEFENZAS RIBEREÑAS

ORBRAS DE PROTECCION

LIMPIEZA Y RECONFORMACION DE CAUCE 50,400.92 61,357.64 2,191.3436,824.8310,217.15

ENROCADO 167,321.66RELLENO DE ESTRUCTURAS CON MATERIAL PROPIO 79,251.72RELLENO DE ESTRUCTURAS CON MATERIAL DE PRESTAMO

TRANSPORTE Y ELIMINACION DE MATERIAL EXCEDENTE

OBRAS D MITIGACION E IMPACTO AMBIENTAL

PROGRAMA DE MONITOREO AMBIENTAL

MONITOREO DE LA CALIDAD DEL AGUA 492.45 444.79 492.45

EXCAVACION PARA ESTRUCTURAS EN MATERIAL COMUN BAJO AGUAEXCAVACION PARA ESTRUCTURAS EN MATERIAL COMUN EN SECO

Page 3: Valorización Junio 2014 Final Final

MONITOREO DE CALIDAD DEL AIRE 492.45 444.79 492.45MONITOREO DE RUIDOS 239.40 216.23 239.40PROGRAMA DE ABANDONO DE OBRA

SUBPROGRAMA DE MANEJO DE INSTALACIONES AUXILIARES

RETIRO DEL TOP SOIL

REACONDICIONAMIENTO DE MATERIAL EXCEDENTE

REACONDICIONAMIENTO DE CANTERA

REACONDICIONAMIENTO DE PLANTA CONCRETERA

REACONDICIONAMIENTO DELA REA DE CAMPAMENTO

REACONDICIONAMIENTO DE PATIO DE MAQUINAS

REFORESTACION DEL DME

REFORESTACION AMBAS MARGENES DEL RIO

COSTO DIRECTO 286,800.48 508,016.87 553,797.12

GASTOS GENERALES VARIABLES (21.3622001440266%) 61,266.89 108,523.58 118,303.25

GASTOS GENERALES FIJOS (2.83211697125451%) 8,122.53 14,387.63 15,684.18

UTILIDAD (10%) 28,680.05 50,801.69 55,379.71

SUBTOTAL 384,869.95 681,729.77 743,164.26

IMPUESTO (IGV 18%) 69,276.59 122,711.36 133,769.57

TOTAL PRESUPUESTO DE OBRA (S/.) 454,146.54 804,441.13 876,933.83

AVANCE MENSUAL 6.45% 11.42% 12.45%

AVANCE ACUMULADO 6.45% 17.86% 30.31%

5.16% 14.29% 24.25%

SUB PROGRAMA DE COMPENSACION POR USO DE INSTALACIONES AUXILIARES

Page 4: Valorización Junio 2014 Final Final

CRONOGRAMA VALORIZADO DE AVANCE DE OBRA - CONSTRUCCIÓN DEL PUENTE ANTAJARANI Y ACCESOS

Jul-14 Aug-14 set-14 Oct-14 Nov-14 TOTAL

38,944.94 40,243.11 38,944.94 40,243.13 27,261.46 302,472.41788.31 131.38 3,126.96

2,398.192,013.85

3,709.64 3,833.30 3,709.63 3,833.30 2,349.44 28,564.248,128.64

8,162.5631,304.82

161,196.0025,059.41

250,080.9619,058.16

3,109.31

3,264.005,577.00

54,915.0010,556.6386,061.71

8,464.06952.05

5,213.55 119,911.6138,074.54 38,074.5452,097.36 52,097.3660,669.00 60,669.00

141,772.80 354,432.00 496,204.8070,482.42 17,620.61 88,103.03

16,240.22 20,300.28 36,540.5017,272.24 58,293.80 75,566.04

11,453.49 85,901.17 37,223.84 134,578.50164,240.62 164,240.62

1,413.44 1,413.448,746.50 8,746.50

12,617.28 12,617.281,066.75 1,066.75

4,363.49 4,363.49398.53 1,345.03 1,743.56

11,993.80 17,990.70 29,984.504,124.12 4,124.12

4,271.76 4,271.765,664.56 5,664.56

Page 5: Valorización Junio 2014 Final Final

9,368.562,954.80

3,445.36 3,445.36109,217.36 109,217.36

4,396.39 4,396.3925,985.23 25,985.23

2,629.07 7,170.20 6,094.67 15,893.941,652.08 1,652.08

0.006,170.77 6,170.77

633,413.56 633,413.561,004.29 1,004.29

6,826.47 6,826.47

6,386.41 6,386.4138,091.11 38,091.1119,623.60 14,717.70 34,341.30

65.79 65.791,737.79 1,737.79

856.01 856.014,849.11 4,849.113,152.10 3,152.101,150.51 1,150.51

818.60 818.6078.13 78.13

2,139.36 2,139.36

505.34 505.342,141.57 2,141.57

369.26 369.26790.97 790.97

2,108.31 2,108.316,057.04 6,057.04

600.10 600.10

2,619.72 2,619.721,710.30 1,710.30

373.69 373.694,423.88 4,423.88

185,499.72 185,499.721,571.14 1,571.14

113,949.9036,824.8310,217.15

78,739.61 246,061.2779,251.72 81,893.45 18,492.07 258,888.96

128,684.67 39,164.90 167,849.5731,181.13 31,181.13

476.56 492.45 476.56 492.45 238.29 3,606.00

Page 6: Valorización Junio 2014 Final Final

476.56 492.45 476.56 492.45 238.29 3,606.00231.68 239.40 231.68 239.40 115.85 1,753.04

10,440.00 10,440.0027,785.67 27,785.6716,893.33 33,786.67 50,680.00

408.00 408.001,740.00 1,740.00

348.00 348.00

3,078.49 3,078.494,155.96 4,155.96

604,839.68 1,309,677.96 323,495.22 603,343.62 259,817.01 4,449,787.96

129,207.06 279,776.03 69,105.70 128,887.47 55,502.63 950,572.61

17,129.77 37,091.61 9,161.76 17,087.40 7,358.32 126,023.20

60,483.97 130,967.80 32,349.52 60,334.36 25,981.70 444,978.80

811,660.48 1,757,513.39 434,112.20 809,652.85 348,659.66 5,971,362.57

146,098.89 316,352.41 78,140.20 145,737.51 62,758.74 1,074,845.26

957,759.36 2,073,865.81 512,252.40 955,390.36 411,418.40 7,046,207.83

13.59% 29.43% 7.27% 13.56% 5.84% 100.00%

43.90% 73.33% 80.60% 94.16% 100.00%

35.12% 58.67% 64.48% 75.33% 80.00% 0.00%

0.54

Page 7: Valorización Junio 2014 Final Final

RESUMEN DE METRADOS - VALORIZACIÓN DE OBRA N° 03 - JUNIO 2,014

OBRA : CONSTRUCCIÓN DEL PUENTE ANTAJARANI Y ACCESOS

ENTIDAD : PROVIAS DEPARTAMENTAL

CONTRATISTA : C&C CONSUL EJEC. CONTRATISTAS GRALES SRL

N° DE CONTRATO : Nº 269-2013-MTC/21, 18 DE DICIEMBRE 2013

SUPERVISIÓN : CONSORCIO RMG

N° DE CONTRATO : Nº 101-2013-MTC/21, 10 DE MAYO 2013

UBICACIÓN : DEPARTAMENTO : PUNO PROVINCIA: HUANCANE DISTRITO: VILQUECHICO

ITEM DESCRIPCIÓN Und. Metrado

´01 CONSTRUCCIÓN DEL PUENTE01.01 TRABAJOS PRELIMINARES

01.01.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS glb 1.00 0.17 0.06 0.7701.01.02 TRAZO Y REPLANTEO m2 1,212.00 1,212.00 0.00 0.0001.01.03 DESBROCE Y LIMPIEZA ha 0.90 0.90 0.00 0.0001.01.04 ACCESO A CANTERAS, FUENTES DE AGUA DME km 0.57 0.57 0.00 0.0001.01.05 mes 8.00 1.00 1.00 6.0001.01.06 CISTERNA DE 12M3 und 2.00 0.00 2.00 0.00

01.02 ESTRIBOS01.02.01 m2 1,275.40 754.36 472.91 48.1301.02.02 ENCOFRADO Y DESENCOFRADO CARA NO VISTO kg 420.99 0.00 0.00 420.9901.02.03 ACERO DE REFUERZO f'y=4200 Kg/cm2 m2 30,704.00 5,519.84 0.00 25,184.1601.02.04 ENCOFRADO Y DESENCOFRADO CARA VISTO m3 283.67 0.00 0.00 283.6701.02.05 CONCRETO f'c=210 kg/cm2 EN SECO m3 463.80 0.00 0.00 463.8001.02.06 m3 866.28 0.00 0.00 866.2801.02.07 m3 409.12 409.12 0.00 0.00

01.03 PILARES01.03.01 m3 510.00 484.50 25.50 0.0001.03.02 ENCOFRADO Y DESENCOFRADO CARA NO VISTO m2 75.00 0.00 37.50 37.5001.03.03 ACERO DE REFUERZO f'y=4200 Kg/cm2 kg 10,460.00 4,479.00 0.00 5,981.0001.03.04 ENCOFRADO Y DESENCOFRADO CARA VISTO m2 119.50 0.00 0.00 119.5001.03.05 CONCRETO f'c=210 kg/cm2 EN SECO m3 159.61 0.00 0.00 159.6101.03.06 m3 384.73 0.00 0.00 384.7301.03.07 m3 125.27 125.27 0.00 0.00

01.04 VIGAS DE CONCRETO PREESFORZADO01.04.01 FALSO PUENTE m 91.00 0.00 0.00 91.0001.04.02 ENCOFRADO Y DESENCOFRADO CARA VISTO m2 431.00 0.00 0.00 431.0001.04.03 ENCOFRADO Y DESENCOFRADO CARA NO VISTO m2 700.61 0.00 0.00 700.6101.04.04 ACERO DE REFUERZO f'y=4200 Kg/cm2 kg 11,556.00 0.00 0.00 11,556.0001.04.05 ACERO PRETENSADO fo=320 TN t/m 116,480.00 0.00 0.00 116,480.0001.04.06 CONCRETO f'c=280 kg/cm2 m3 131.80 0.00 0.00 131.80

01.05 LOSA DE CONCRETO01.05.01 ENCOFRADO Y DESENCOFRADO CARA NO VISTO m2 491.40 0.00 0.00 491.4001.05.02 ENCOFRADO Y DESENCOFRADO CARA VISTO m2 855.40 0.00 0.00 855.4001.05.03 ACERO DE REFUERZO f'y=4200 Kg/cm2 kg 25,634.00 0.00 0.00 25,634.0001.05.04 CONCRETO f'c=280 kg/cm2 m3 245.70 0.00 0.00 245.70

01.06 LOSA DE APROXIMACION01.06.01 ENCOFRADO Y DESENCOFRADO CARA VISTO m2 16.00 0.00 0.00 16.0001.06.02 ACERO DE REFUERZO f'y=4200 Kg/cm2 kg 1,666.00 0.00 0.00 1,666.0001.06.03 CONCRETO f'c=210 kg/cm2 m3 23.40 0.00 0.00 23.4001.06.04 SELLANTE PLASTICO m 14.40 0.00 0.00 14.40

01.07 DETALLE DE TABLERO01.07.01 JUNTA DE EXPANSIÓN m 14.40 0.00 0.00 14.4001.07.02 BRUÑAS ROMPA AGUA EN LOSA m 182.00 0.00 0.00 182.0001.07.03 VEREDA ALIGERADA m 182.00 0.00 0.00 182.0001.07.04 ACABADO ENDURECIDO EN VEREDA ALIGERADA m 182.00 0.00 0.00 182.0001.07.05 TUBOS DE DRENAJE und 36.00 0.00 0.00 36.0001.07.06 DISPOSITIVOS DE APOYO EN ESTRIBOS und 8.00 0.00 0.00 8.0001.07.07 DISPOSITIVOS DE APOYO EN PILARES und 8.00 0.00 0.00 8.0001.07.08 TOPES LATERALES EN ESTRIBO Y PILARES und 8.00 0.00 0.00 8.00

Metrado Anterior

Metrado Actual

Saldo de Metrado

MANTENIMIENTO DE TRANSITO Y SEGURIDAD VIAL

EXCAVACION PARA ESTRUCTURAS EN MATERIAL COMUN, EN SECO

RELLENO DE ESTRUCTURAS CON MATERIAL PROPIOTRANSPORTE Y ELIMINACION DE MATERIAL EXCEDENTE

EXCAVACION PARA ESTRUCTURAS EN MATERIAL COMUN, EN SECO

RELLENO DE ESTRUCTURAS CON MATERIAL PROPIOTRANSPORTE Y ELIMINACION DE MATERIAL EXCEDENTE

Mz. "H" Lt. 21 URB. DEL INGENIERO I - CHICLAYOTEL. 074-208078 979907878 RPM #343586

E-mail : [email protected] LAMBAYEQUE – PERU

CONSORCIO RMG

Page 8: Valorización Junio 2014 Final Final

01.07.09 TOPES LATERALES EN VIGAS und 8.00 0.00 0.00 8.00

ITEM DESCRIPCIÓN Und. Metrado

01.07.10 BARANDAS METALICAS INCLUYE PINTADO m 202.00 0.00 0.00 202.0001.07.11 RIEGO DE LIGA m2 655.20 0.00 0.00 655.2001.07.12 CARPETA ASFALTICA EN FRIO m2 655.20 0.00 0.00 655.20

02 CONSTRUCCIÓN DE LOS ACCESOS02.01 TRABAJOS PRELIMINARES

02.01.01 TRAZO Y REPLANTEO m2 6,160.44 1,300.00 1,780.26 3,080.1802.01.02 DESBROCE Y LIMPIEZA ha 0.62 0.20 0.42 0.00

2.02 MOVIMIENTO DE TIERRAS02.02.01 m3 898.22 0.00 90.00 808.2202.02.02 CONFORMACION DE TERRAPLENES m3 15,505.84 0.00 1,111.02 14,394.8202.02.03 BANQUETAS PARA RELLENOS m3 78.83 0.00 0.00 78.8302.02.04 m3 898.22 0.00 90.00 808.22

02.03 PAVIMENTOS02.03.01 PERFILADO Y COMPACTADO DE SUBRASANTE m2 1,744.92 0.00 0.00 1,744.9202.03.02 AFIRMADO m3 869.66 0.00 0.00 869.6602.03.03 CUNETAS REVESTIDAS m 315.00 0.00 0.00 315.00

02.04 OBRAS DE ARTE Y DRENAJE02.04.01 ALCANTARILLA D24" KM 28+430

02.04.01.01 m3 10.28 0.00 0.00 10.2802.04.01.02 ENCOFRADO Y DESENCOFRADO CARA NO VISTO m2 23.37 0.00 0.00 23.3702.04.01.03 ENCOFRADO Y DESENCOFRADO CARA VISTO m2 9.69 0.00 0.00 9.6902.04.01.04 TUBERIA CORRUGADO DE 24" m 14.87 0.00 0.00 14.8702.04.01.05 m3 8.06 0.00 0.00 8.0602.04.01.06 m3 20.41 0.00 0.00 20.4102.04.01.07 EMBOQUILLADO DE PIEDRA E=0.15M m2 10.67 0.00 0.00 10.6702.04.01.08 m3 10.28 0.00 0.00 10.2802.04.01.09 TUBERIA CR DE 12" KM 28+583 m 24.00 0.00 0.00 24.00

02.04.02 ALC. CR B=0.4 KM 28+29402.04.02.01 m3 78.96 0.00 0.00 78.9602.04.02.02 ENCOFRADO Y DESENCOFRADO CARA NO VISTO m2 28.80 0.00 0.00 28.8002.04.02.03 ENCOFRADO Y DESENCOFRADO CARA VISTO m2 4.18 0.00 0.00 4.1802.04.02.04 ACERO DE REFUERZO f'y=4200 Kg/cm2 kg 150.66 0.00 0.00 150.6602.04.02.05 CONCRETO f'c=175 kg/cm2 m3 4.18 0.00 0.00 4.1802.04.02.06 EMBOQUILLADO DE PIEDRA E=0.15M m2 78.95 0.00 0.00 78.9502.04.02.07 m3 78.96 0.00 0.00 78.96

02.05 SEÑALIZACION02.05.01 SEÑALES PREVENTIVAS (0.75M x 0.75M) und 4.00 0.00 0.00 4.0002.05.02 SEÑALES INFORMATIVAS und 2.00 0.00 0.00 2.0002.05.03 MARCAS EN EL PAVIMENTO m2 24.25 0.00 0.00 24.2502.05.04 ESTRUCTURA DE SOPORTE und 2.00 0.00 0.00 2.0002.05.05 m 567.00 0.00 0.00 567.0002.05.06 SEÑALES REGLAMENTARIAS und 2.00 0.00 0.00 2.00

03 CONSTRUCCIÓN E LAS DEFENSAS RIBEREÑAS03.01 ORBRAS DE PROTECCION

03.01.01 LIMPIEZA Y RECONFORMACION DE CAUCE m3 15,870.46 14,663.75 0.00 1,206.7103.01.02 m3 3,191.06 0.00 0.00 3,191.0603.01.03 m3 1,596.43 0.00 0.00 1,596.4303.01.04 ENROCADO m3 2,026.53 0.00 0.00 2,026.5303.01.05 m3 11,767.68 10,610.68 0.00 1,157.0003.01.06 m3 2,977.64 2,115.00 0.00 862.6403.01.07 m3 4,102.78 3,052.07 0.00 1,050.71

04 OBRAS DE MITIGACIÓN E IMPACTO AMBIENTAL04.01 PROGRAMA DE MONITOREO AMBIENTAL

04.01.01 MONITOREO DE LA CALIDAD DEL AGUA und 2.00 0.00 0.00 2.0004.01.02 MONITOREO DE CALIDAD DEL AIRE und 2.00 0.00 0.00 2.0004.01.03 MONITOREO DE RUIDOS und 8.00 0.00 0.00 8.00

04.02 PROGRAMA DE ABANDONO DE OBRA04.02.01

04.02.01.01 RETIRO DEL TOP SOIL m2 6,000.00 0.00 0.00 6,000.0004.02.01.02 m3 5,624.63 5,443.80 0.00 180.8304.02.01.03 REACONDICIONAMIENTO DE CANTERA m2 14,000.00 0.00 0.00 14,000.0004.02.01.04 m2 150.00 0.00 0.00 150.0004.02.01.05 m2 1,000.00 0.00 0.00 1,000.0004.02.01.06 m2 200.00 0.00 0.00 200.00

04.02.02 0.00

Metrado Anterior

Metrado Actual

Saldo de Metrado

EXCAVACION EN EXPLANACIONES EN MATERIAL COMUN

TRANSPORTE Y ELIMINACION DE MATERIAL EXCEDENTE

EXCAVACION PARA ESTRUCTURAS EN MATERIAL COMUN SECO

CONCRETO CICLOPEO f'c= 175 kg/cm2 +30% de PM

RELLENO DE ESTRUCTURAS EN MATERIAL COMUN EN SECO

TRANSPORTE Y ELIMINACION DE MATERIAL EXCEDENTE

EXCAVACION PARA ESTRUCTURAS EN MATERIAL COMUN SECO

TRANSPORTE Y ELIMINACION DE MATERIAL EXCEDENTE

BARRERA DE SEGURIDAD METALICA P3-BORDE LATERAL

EXCAVACION PARA ESTRUCTURAS EN MATERIAL COMUN BAJO AGUAEXCAVACION PARA ESTRUCTURAS EN MATERIAL COMUN EN SECO

RELLENO DE ESTRUCTURAS CON MATERIAL PROPIORELLENO DE ESTRUCTURAS CON MATERIAL DE PRESTAMOTRANSPORTE Y ELIMINACION DE MATERIAL EXCEDENTE

SUBPROGRAMA DE MANEJO DE INSTALACIONES AUXILIARES

REACONDICIONAMIENTO DE MATERIAL EXCEDENTE

REACONDICIONAMIENTO DE PLANTA CONCRETERAREACONDICIONAMIENTO DELA REA DE CAMPAMENTOREACONDICIONAMIENTO DE PATIO DE MAQUINAS

SUB PROGRAMA DE COMP. POR USO DE INST. AUX.

Page 9: Valorización Junio 2014 Final Final

04.02.02.01 REFORESTACION DEL DME ha 0.60 0.00 0.00 0.6004.02.02.02 REFORESTACION AMBAS MARGENES DEL RIO ha 0.81 0.00 0.00 0.81

Page 10: Valorización Junio 2014 Final Final

OBRA : CONSTRUCCIÓN DEL PUENTE ANTAJARANI Y ACCESOS

CLIENTE PROVIAS DEPARTAMENTAL

CONTRATISTAC&C CONSUL EJEC. CONTRATISTAS GRALES SRL

CONTRATO N° 269-2013-MTC/21, del 18 de diciembre del 2013

SUPERVISION RMG INGENIEROS

CONTRATO N° 101-2013-MTC/21, del 10 de mayo del 2013

UBICACIÓN PUNO - HUANCANE - VILQUECHICO

PLANILLA DE VALORIZACIÓN DE OBRA PRINCIPAL Nº 03 - AL 30 DE JUNIO DEL 2,014

ITEM DESCRIPCION Und. Metrado P.U S/. Parcial S/.ACUMULADO ANTERIOR VALORIZACION ACTUAL - JUNIO 2014 ACUMULADO ACTUAL SALDO

METRADO IMPORTE % AVANCE METRADO IMPORTE %AVANCE METRADO IMPORTE %AVANCE METRADO IMPORTE %AVANCE

´01 CONSTRUCCION DEL PUENTE

01.01 TRABAJOS PRELIMINARES 346,704.29 62,529.84 18.04% 29,847.51 8.61% 92,377.35 26.64% 254,326.94 73.36%

01.01.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS glb 1.00 302,472.41 302,472.41 0.17 51,420.31 17.00% 0.060 18,148.34 6.00% 0.230 69,568.65 23.00% 0.77 232,903.76 77.00%

01.01.02 TRAZO Y REPLANTEO m2 1,212.00 2.58 3,126.96 1,212.00 3,126.96 100.00% 0.00 0.00 0.00% 1,212.00 3,126.96 100.00% 0.00 0.00 0.00%

01.01.03 DESBROCE Y LIMPIEZA ha 0.90 2,664.65 2,398.19 0.90 2,398.19 100.00% 0.00 0.00 0.00% 0.90 2,398.19 100.00% 0.00 0.00 0.00%

01.01.04 ACCESO A CANTERAS, FUENTES DE AGUA DME km 0.57 3,533.07 2,013.85 0.57 2,013.85 100.00% 0.00 0.00 0.00% 0.57 2,013.85 100.00% 0.00 0.00 0.00%

01.01.05 MANTENIMIENTO DE TRANSITO Y SEGURIDAD VIAL mes 8.00 3,570.53 28,564.24 1.00 3,570.53 12.50% 1.00 3,570.53 12.50% 2.00 7,141.06 25.00% 6.00 21,423.18 75.00%

01.01.06 CISTERNA DE 12M3 und 2.00 4,064.32 8,128.64 0.00 0.00 0.00% 2.00 8,128.64 100.00% 2.00 8,128.64 100.00% 0.00 0.00 0.00%

01.02 ESTRIBOS 497,971.22 36,916.37 7.41% 3,026.62 0.61% 39,943.00 8.02% 458,028.22 91.98%

01.02.01 EXCAVACION PARA ESTRUCTURAS EN MATERIAL COMUN, EN SECO m2 1,275.40 6.40 8,162.56 754.36 4,827.90 59.15% 472.91 3,026.62 37.08% 1,227.27 7,854.53 96.23% 48.13 308.03 3.77%

01.02.02 ENCOFRADO Y DESENCOFRADO CARA NO VISTO kg 420.99 74.36 31,304.82 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 420.99 31,304.82 100.00%

01.02.03 ACERO DE REFUERZO f'y=4200 Kg/cm2 m2 30,704.00 5.25 161,196.00 5,519.84 28,979.16 17.98% 0.00 0.00 0.00% 5,519.84 28,979.16 17.98% 25,184.16 132,216.84 82.02%

01.02.04 ENCOFRADO Y DESENCOFRADO CARA VISTO m3 283.67 88.34 25,059.41 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 283.67 25,059.41 100.00%

01.02.05 CONCRETO f'c=210 kg/cm2 EN SECO m3 463.80 539.20 250,080.96 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 463.80 250,080.96 100.00%

01.02.06 RELLENO DE ESTRUCTURAS CON MATERIAL PROPIO m3 866.28 22.00 19,058.16 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 866.28 19,058.16 100.00%

01.02.07 TRANSPORTE Y ELIMINACION DE MATERIAL EXCEDENTE m3 409.12 7.60 3,109.31 409.12 3,109.31 100.00% 0.00 0.00 0.00% 409.12 3,109.31 100.00% 0.00 0.00 0.00%

01.03 PILARES 169,790.45 27,567.60 16.24% 2,951.70 1.74% 30,519.30 17.97% 139,271.15 82.03%

01.03.01 EXCAVACION PARA ESTRUCTURAS EN MATERIAL COMUN, EN SECO m3 510.00 6.40 3,264.00 484.50 3,100.80 95.00% 25.50 163.20 5.00% 510.00 3,264.00 100.00% 0.00 0.00 0.00%

01.03.02 ENCOFRADO Y DESENCOFRADO CARA NO VISTO m2 75.00 74.36 5,577.00 0.00 0.00 0.00% 37.50 2,788.50 50.00% 37.50 2,788.50 50.00% 37.50 2,788.50 50.00%

01.03.03 ACERO DE REFUERZO f'y=4200 Kg/cm2 kg 10,460.00 5.25 54,915.00 4,479.00 23,514.75 42.82% 0.00 0.00 0.00% 4,479.00 23,514.75 42.82% 5,981.00 31,400.25 57.18%

01.03.04 ENCOFRADO Y DESENCOFRADO CARA VISTO m2 119.50 88.34 10,556.63 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 119.50 10,556.63 100.00%

01.03.05 CONCRETO f'c=210 kg/cm2 EN SECO m3 159.61 539.20 86,061.71 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 159.61 86,061.71 100.00%

01.03.06 RELLENO DE ESTRUCTURAS CON MATERIAL PROPIO m3 384.73 22.00 8,464.06 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 384.73 8,464.06 100.00%

01.03.07 TRANSPORTE Y ELIMINACION DE MATERIAL EXCEDENTE m3 125.27 7.60 952.05 125.27 952.05 100.00% 0.00 0.00 0.00% 125.27 952.05 100.00% 0.00 0.00 0.00%

01.04 VIGAS DE CONCRETO PREESFORZADO 855,060.34 0.00 0.00% 0.00 0.00% 0.00 0.00% 855,060.34 100.00%

01.04.01 FALSO PUENTE m 91.00 1,317.71 119,911.61 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 91.00 119,911.61 100.00%

01.04.02 ENCOFRADO Y DESENCOFRADO CARA VISTO m2 431.00 88.34 38,074.54 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 431.00 38,074.54 100.00%

01.04.03 ENCOFRADO Y DESENCOFRADO CARA NO VISTO m2 700.61 74.36 52,097.36 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 700.61 52,097.36 100.00%

01.04.04 ACERO DE REFUERZO f'y=4200 Kg/cm2 kg 11,556.00 5.25 60,669.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 11,556.00 60,669.00 100.00%

01.04.05 ACERO PRETENSADO fo=320 TN t/m 116,480.00 4.26 496,204.80 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 116,480.00 496,204.80 100.00%

01.04.06 CONCRETO f'c=280 kg/cm2 m3 131.80 668.46 88,103.03 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 131.80 88,103.03 100.00%

01.05 LOSA DE CONCRETO 410,925.66 0.00 0.00% 0.00 0.00% 0.00 0.00% 410,925.66 100.00%

01.05.01 ENCOFRADO Y DESENCOFRADO CARA NO VISTO m2 491.40 74.36 36,540.50 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 491.40 36,540.50 100.00%

01.05.02 ENCOFRADO Y DESENCOFRADO CARA VISTO m2 855.40 88.34 75,566.04 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 855.40 75,566.04 100.00%

01.05.03 ACERO DE REFUERZO f'y=4200 Kg/cm2 kg 25,634.00 5.25 134,578.50 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 25,634.00 134,578.50 100.00%

01.05.04 CONCRETO f'c=280 kg/cm2 m3 245.70 668.46 164,240.62 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 245.70 164,240.62 100.00%

01.06 LOSA DE APROXIMACION 23,843.97 0.00 0.00% 0.00 0.00% 0.00 0.00% 23,843.97 100.00%

01.06.01 ENCOFRADO Y DESENCOFRADO CARA VISTO m2 16.00 88.34 1,413.44 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 16.00 1,413.44 100.00%

01.06.02 ACERO DE REFUERZO f'y=4200 Kg/cm2 kg 1,666.00 5.25 8,746.50 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1,666.00 8,746.50 100.00%

01.06.03 CONCRETO f'c=210 kg/cm2 m3 23.40 539.20 12,617.28 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 23.40 12,617.28 100.00%

01.06.04 SELLANTE PLASTICO m 14.40 74.08 1,066.75 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 14.40 1,066.75 100.00%

01.07 DETALLE DE TABLERO 205,519.69 0.00 0.00% 0.00 0.00% 0.00 0.00% 205,519.69 100.00%

01.07.01 JUNTA DE EXPANSIÓN m 14.40 303.02 4,363.49 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 14.40 4,363.49 100.00%

01.07.02 BRUÑAS ROMPA AGUA EN LOSA m 182.00 9.58 1,743.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 182.00 1,743.56 100.00%

01.07.03 VEREDA ALIGERADA m 182.00 164.75 29,984.50 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 182.00 29,984.50 100.00%

01.07.04 ACABADO ENDURECIDO EN VEREDA ALIGERADA m 182.00 22.66 4,124.12 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 182.00 4,124.12 100.00%

01.07.05 TUBOS DE DRENAJE und 36.00 118.66 4,271.76 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 36.00 4,271.76 100.00%

01.07.06 DISPOSITIVOS DE APOYO EN ESTRIBOS und 8.00 708.07 5,664.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 8.00 5,664.56 100.00%

01.07.07 DISPOSITIVOS DE APOYO EN PILARES und 8.00 1,171.07 9,368.56 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 8.00 9,368.56 100.00%

01.07.08 TOPES LATERALES EN ESTRIBO Y PILARES und 8.00 369.35 2,954.80 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 8.00 2,954.80 100.00%

01.07.09 TOPES LATERALES EN VIGAS und 8.00 430.67 3,445.36 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 8.00 3,445.36 100.00%

01.07.10 BARANDAS METALICAS INCLUYE PINTADO m 202.00 540.68 109,217.36 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 202.00 109,217.36 100.00%

01.07.11 RIEGO DE LIGA m2 655.20 6.71 4,396.39 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 655.20 4,396.39 100.00%

01.07.12 CARPETA ASFALTICA EN FRIO m2 655.20 39.66 25,985.23 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 655.20 25,985.23 100.00%

02 CONSTRUCCION DE LOS ACCESOS 771,199.92 3,886.93 0.50% 52,399.69 6.79% 56,286.62 7.30% 714,913.30 92.70%

02.01 TRABAJOS PRELIMINARES 17,546.02 3,886.93 22.15% 5,712.22 32.56% 9,599.15 54.71% 7,946.86 45.29%

CONSORCIO RMG

Mz. "H" Lt. 21 URB. DEL INGENIERO I - CHICLAYOTEL. 074208078 979907878 RPM # 343586

E-mail : [email protected] LAMBAYEQUE – PERU

Page 11: Valorización Junio 2014 Final Final

02.01.01 TRAZO Y REPLANTEO m2 6,160.44 2.58 15,893.94 1,300.00 3,354.00 21.10% 1,780.26 4,593.07 28.90% 3,080.26 7,947.07 50.00% 3,080.18 7,946.86 50.00%

02.01.02 DESBROCE Y LIMPIEZA ha 0.62 2,664.65 1,652.08 0.20 532.93 32.26% 0.42 1,119.15 67.74% 0.62 1,652.08 100.00% 0.00 0.00 0.00%

ITEM DESCRIPCION Und. Metrado P.U S/. Parcial S/.ACUMULADO ANTERIOR VALORIZACION ACTUAL - JUNIO 2014 ACUMULADO ACTUAL SALDO

METRADO IMPORTE % AVANCE METRADO IMPORTE %AVANCE METRADO IMPORTE %AVANCE METRADO IMPORTE %AVANCE

2.02 MOVIMIENTO DE TIERRAS 647,415.09 0.00 0.00% 46,687.47 7.21% 46,687.47 7.21% 600,727.63 92.79%

02.02.01 EXCAVACION EN EXPLANACIONES EN MATERIAL COMUN m3 898.22 6.87 6,170.77 0.00 0.00 0.00% 90.00 618.30 10.02% 90.00 618.30 10.02% 808.22 5,552.47 89.98%

02.02.02 CONFORMACION DE TERRAPLENES m3 15,505.84 40.85 633,413.56 0.00 0.00 0.00% 1,111.02 45,385.17 7.17% 1,111.02 45,385.17 7.17% 14,394.82 588,028.40 92.83%

02.02.03 BANQUETAS PARA RELLENOS m3 78.83 12.74 1,004.29 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 78.83 1,004.29 100.00%

02.02.04 TRANSPORTE Y ELIMINACION DE MATERIAL EXCEDENTE m3 898.22 7.60 6,826.47 0.00 0.00 0.00% 90.00 684.00 10.02% 90.00 684.00 10.02% 808.22 6,142.47 89.98%

02.03 PAVIMENTOS 78,818.82 0.00 0.00% 0.00 0.00% 0.00 0.00% 78,818.82 100.00%

02.03.01 PERFILADO Y COMPACTADO DE SUBRASANTE m2 1,744.92 3.66 6,386.41 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1,744.92 6,386.41 100.00%

02.03.02 AFIRMADO m3 869.66 43.80 38,091.11 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 869.66 38,091.11 100.00%

02.03.03 CUNETAS REVESTIDAS m 315.00 109.02 34,341.30 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 315.00 34,341.30 100.00%

02.04 OBRAS DE ARTE Y DRENAJE 27,419.99 0.00 0.00% 0.00 0.00% 0.00 0.00% 27,419.99 100.00%

02.04.01 ALCANTARILLA TMC D24" KM 28+430 14,847.40 0.00 0.00% 0.00 0.00% 0.00 0.00% 14,847.40 100.00%

02.04.01.01 EXCAVACION PARA ESTRUCTURAS EN MATERIAL COMUN SECO m3 10.28 6.40 65.79 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 10.28 65.79 100.00%

02.04.01.02 ENCOFRADO Y DESENCOFRADO CARA NO VISTO m2 23.37 74.36 1,737.79 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 23.37 1,737.79 100.00%

02.04.01.03 ENCOFRADO Y DESENCOFRADO CARA VISTO m2 9.69 88.34 856.01 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 9.69 856.01 100.00%

02.04.01.04 TUBERIA CORRUGADO DE 24" m 14.87 326.10 4,849.11 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 14.87 4,849.11 100.00%

02.04.01.05 CONCRETO CICLOPEO f'c= 175 kg/cm2 +30% de PM m3 8.06 391.08 3,152.10 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 8.06 3,152.10 100.00%

02.04.01.06 RELLENO DE ESTRUCTURAS EN MATERIAL COMUN EN SECO m3 20.41 56.37 1,150.51 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 20.41 1,150.51 100.00%

02.04.01.07 EMBOQUILLADO DE PIEDRA E=0.15M m2 10.67 76.72 818.60 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 10.67 818.60 100.00%

02.04.01.08 TRANSPORTE Y ELIMINACION DE MATERIAL EXCEDENTE m3 10.28 7.60 78.13 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 10.28 78.13 100.00%

02.04.01.09 TUBERIA CR DE 12" KM 28+583 m 24.00 89.14 2,139.36 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 24.00 2,139.36 100.00%

02.04.02 ALC. CR B=0.4 KM 28+294 12,572.59 0.00 0.00% 0.00 0.00% 0.00 0.00% 12,572.59 100.00%

02.04.02.01 EXCAVACION PARA ESTRUCTURAS EN MATERIAL COMUN SECO m3 78.96 6.40 505.34 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 78.96 505.34 100.00%

02.04.02.02 ENCOFRADO Y DESENCOFRADO CARA NO VISTO m2 28.80 74.36 2,141.57 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 28.80 2,141.57 100.00%

02.04.02.03 ENCOFRADO Y DESENCOFRADO CARA VISTO m2 4.18 88.34 369.26 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.18 369.26 100.00%

02.04.02.04 ACERO DE REFUERZO f'y=4200 Kg/cm2 kg 150.66 5.25 790.97 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 150.66 790.97 100.00%

02.04.02.05 CONCRETO f'c=175 kg/cm2 m3 4.18 504.38 2,108.31 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.18 2,108.31 100.00%

02.04.02.06 EMBOQUILLADO DE PIEDRA E=0.15M m2 78.95 76.72 6,057.04 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 78.95 6,057.04 100.00%

02.04.02.07 TRANSPORTE Y ELIMINACION DE MATERIAL EXCEDENTE m3 78.96 7.60 600.10 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 78.96 600.10 100.00%

02.05 SEÑALIZACION 196,198.45 0.00 0.00% 0.00 0.00% 0.00 0.00% 196,198.45 100.00%

02.05.01 SEÑALES PREVENTIVAS (0.75M x 0.75M) und 4.00 654.93 2,619.72 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 4.00 2,619.72 100.00%

02.05.02 SEÑALES INFORMATIVAS und 2.00 855.15 1,710.30 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 1,710.30 100.00%

02.05.03 MARCAS EN EL PAVIMENTO m2 24.25 15.41 373.69 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 24.25 373.69 100.00%

02.05.04 ESTRUCTURA DE SOPORTE und 2.00 2,211.94 4,423.88 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 4,423.88 100.00%

02.05.05 BARRERA DE SEGURIDAD METALICA P3-BORDE LATERAL m 567.00 327.16 185,499.72 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 567.00 185,499.72 100.00%

02.05.06 SEÑALES REGLAMENTARIAS und 2.00 785.57 1,571.14 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 1,571.14 100.00%

03 CONSTRUCCION DE DEFENZAS RIBEREÑAS 864,972.81 481,138.97 55.62% 0.00 0.00% 481,138.97 55.62% 383,833.85 44.38%

03.01 OBRAS DE PROTECCION 864,972.81 481,138.97 55.62% 0.00 0.00% 481,138.97 55.62% 383,833.85 44.38%

03.01.01 LIMPIEZA Y RECONFORMACION DE CAUCE m3 15,870.46 7.18 113,949.90 14,663.75 105,285.73 92.40% 0.00 0.00 0.00% 14,663.75 105,285.73 92.40% 1,206.71 8,664.18 7.60%

03.01.02 EXCAVACION PARA ESTRUCTURAS EN MATERIAL COMUN BAJO AGUA m3 3,191.06 11.54 36,824.83 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 3,191.06 36,824.83 100.00%

03.01.03 EXCAVACION PARA ESTRUCTURAS EN MATERIAL COMUN EN SECO m3 1,596.43 6.40 10,217.15 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1,596.43 10,217.15 100.00%

03.01.04 ENROCADO m3 2,026.53 121.42 246,061.27 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2,026.53 246,061.27 100.00%

03.01.05 RELLENO DE ESTRUCTURAS CON MATERIAL PROPIO m3 11,767.68 22.00 258,888.96 10,610.68 233,434.96 90.17% 0.00 0.00 0.00% 10,610.68 233,434.96 90.17% 1,157.00 25,454.00 9.83%

03.01.06 RELLENO DE ESTRUCTURAS CON MATERIAL DE PRESTAMO m3 2,977.64 56.37 167,849.57 2,115.00 119,222.55 71.03% 0.00 0.00 0.00% 2,115.00 119,222.55 71.03% 862.64 48,627.02 28.97%

03.01.07 TRANSPORTE Y ELIMINACION DE MATERIAL EXCEDENTE m3 4,102.78 7.60 31,181.13 3,052.07 23,195.73 74.39% 0.00 0.00 0.00% 3,052.07 23,195.73 74.39% 1,050.71 7,985.40 25.61%

04 OBRAS DE MITIGACION DE IMPACTO AMBIENTAL 107,601.16 26,892.37 24.99% 0.00 0.00% 26,892.37 24.99% 80,708.79 75.01%

04.01 PROGRAMA DE MONITOREO AMBIENTAL 8,965.04 0.00 0.00% 0.00 0.00% 0.00 0.00% 8,965.04 100.00%

04.01.01 MONITOREO DE LA CALIDAD DEL AGUA und 2.00 1,803.00 3,606.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 3,606.00 100.00%

04.01.02 MONITOREO DE CALIDAD DEL AIRE und 2.00 1,803.00 3,606.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 2.00 3,606.00 100.00%

04.01.03 MONITOREO DE RUIDOS und 8.00 219.13 1,753.04 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 8.00 1,753.04 100.00%

04.02 PROGRAMA DE ABANDONO DE OBRA 98,636.12 26,892.37 27.26% 0.00 0.00% 26,892.37 27.26% 71,743.75 72.74%

04.02.01 SUBPROGRAMA DE MANEJO DE INSTALACIONES AUXILIARES 91,401.67 26,892.37 29.42% 0.00 0.00% 26,892.37 29.42% 64,509.30 70.58%

04.02.01.01 RETIRO DEL TOP SOIL m2 6,000.00 1.74 10,440.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 6,000.00 10,440.00 100.00%

04.02.01.02 REACONDICIONAMIENTO DE MATERIAL EXCEDENTE m3 5,624.63 4.94 27,785.67 5,443.80 26,892.37 96.79% 0.00 0.00 0.00% 5,443.80 26,892.37 96.79% 180.83 893.30 3.21%

04.02.01.03 REACONDICIONAMIENTO DE CANTERA m2 14,000.00 3.62 50,680.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 14,000.00 50,680.00 100.00%

04.02.01.04 REACONDICIONAMIENTO DE PLANTA CONCRETERA m2 150.00 2.72 408.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 150.00 408.00 100.00%

04.02.01.05 REACONDICIONAMIENTO DELA REA DE CAMPAMENTO m2 1,000.00 1.74 1,740.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 1,000.00 1,740.00 100.00%

04.02.01.06 REACONDICIONAMIENTO DE PATIO DE MAQUINAS m2 200.00 1.74 348.00 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 200.00 348.00 100.00%

04.02.02 SUB PROGRAMA DE COMPENSACION POR USO DE INSTALACIONES AUXILIARES 7,234.45 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00% 7,234.45 100.00%

04.02.02.01 REFORESTACION DEL DME ha 0.60 5,130.82 3,078.49 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.60 3,078.49 100.00%

04.02.02.02 REFORESTACION AMBAS MARGENES DEL RIO ha 0.81 5,130.82 4,155.96 0.00 0.00 0.00% 0.00 0.00 0.00% 0.00 0.00 0.00% 0.81 4,155.96 100.00%

TOTAL COSTO DIRECTO S/. 4,449,787.96 638,932.08

14.3

6%

88,225.52

1.98

%

727,157.61

16.3

4%

3,722,630.34

83.6

6%

GASTOS GENERALES VARIABLES 21.36220014% S/. 950,572.61 136,489.95 18,846.91 155,336.86 795,235.74

GASTOS GENERALES FIJOS 2.83211697% 126,023.20 18,095.30 2,498.65 20,593.95 105,429.25

UTILIDAD 10.00000000% S/. 444,978.80 63,893.21 8,822.55 72,715.76 372,263.03

SUB-TOTAL S/. 5,971,362.57 857,410.54 118,393.63 975,804.18 4,995,558.37

I.G.V : 18.00 % 18.0000000% S/. 1,074,845.26 154,333.90 21,310.85 175,644.75 899,200.51

TOTAL PRESUPUESTO S/. 7,046,207.83 1,011,744.44 139,704.48 1,151,448.93 5,894,758.88

Page 12: Valorización Junio 2014 Final Final

document.xlsPOLINÓMICA

OBRA : CONSTRUCCIÓN DEL PUENTE ANTAJARANI Y ACCESOS

ENTIDAD : PROVIAS DEPARTAMENTAL

CONTRATISTA : C&C CONSUL EJEC. CONTRATISTAS GRALES SRL

N° DE CONTRATO : Nº 269-2013-MTC/21, 18 DE DICIEMBRE 2013

SUPERVISIÓN : CONSORCIO RMG

N° DE CONTRATO : Nº 101-2013-MTC/21, 10 DE MAYO 2013

UBICACIÓN : DEPARTAMENTO : PUNO PROVINCIA: HUANCANE DISTRITO: VILQUECHICO

FÓRMULA POLINÓMICA

FECHA PRESUPUESTO : Junio 2013

K = 0.170 * (Jr / Jo) + 0.125 * (CMr / CMo) + 0.072 * (Ar / Ao) + 0.125 * (Dr /Do) + 0.241 * (EQr / EQo) + 0.267 * (GGr / GGo)

MONOMIO FACTOR PORCENTAJE SÍMBOLO ÍNDICE DESCRIPCIÓN

1 0.170 100.000 J 47 MANO DE OBRA INCLUIDO LEYES SOCIALES

2 0.125 72.800 CM 21 CEMENTO PORTLAND TIPO I

27.200 43 MADERA NACIONAL PARA ENCOFOFRADO Y CARPINTERÍA

3 0.072 100.000 A 03 ACERO DE CONSTRUCCION CORRUGADO

4 0.125 100.000 D 30 DÓLAR (GENERAL PONDERADO)

5 0.241 100.000 EQ 49 MAQUINARIA Y EQUIPO IMPORTADO

6 0.267 100.000 GG 39 ÍNDICE GENERAL DE PRECIOS AL COSUMIDOR

CONSORCIO RMG

Mz. "H" Lt. 21 URB. DEL INGENIERO I - CHICLAYOTEL. 074208078 979907878 RPM # 343586

E-mail : [email protected] LAMBAYEQUE – PERU

Page 13: Valorización Junio 2014 Final Final

document.xlsFACTOR K

CÁLCULO DEL COEFICIENTE "K" DE REAJUSTE

FECHA PRESUPUESTO : Junio 2013

K = 0.170 * (Jr / Jo) + 0.125 * (CMr / CMo) + 0.072 * (Ar / Ao) + 0.125 * (Dr /Do) + 0.241 * (EQr / EQo) + 0.267 * (GGr / Ggo)

SÍMBOLO I.U. DESCRIPCION COEF.BASE

INDICES UNIFICADOS DE PRECIOS (I.U.P.)

ABR. 2,014 MAY. 2,014 JUN. 2,014 JUL. 2,014 AGO. 2,014 SEP. 2,014 OCT. 2,014 NOV. 2,014

J 47 MANO DE OBRA INC. LEYES SOCIALES 0.170 100.000% 471.44 498.10 498.10 498.10 0.00 0.00 0.00 0.00 0.00

0.170 0.180 0.180 0.180 0.000 0.000 0.000 0.000 0.000

21 CEMENTO PORTLAND TIPO I 0.125 72.800% 410.96 410.96 410.96 410.96 0.00 0.00 0.00 0.00 0.00

CM

43 MADERA NACIONAL P/ENCOFRADO Y CARP. 27.200% 856.32 870.17 876.04 872.59 0.00 0.00 0.00 0.00 0.00

0.125 0.126 0.126 0.126 0.000 0.000 0.000 0.000 0.000

A 3 ACERO DE CONSTRUCCION CORRUGADO 0.072 100.000% 463.77 477.82 470.04 473.03 0.00 0.00 0.00 0.00 0.00

0.072 0.074 0.073 0.073 0.000 0.000 0.000 0.000 0.000

D 30 DÓLAR GENERAL PONDERADO 0.125 100.000% 372.66 383.93 384.75 385.05 0.00 0.00 0.00 0.00 0.00

0.125 0.129 0.129 0.129 0.000 0.000 0.000 0.000 0.000

EQ 49 MAQUINARIA Y EQUIPO IMPORTADO 0.241 100.000% 243.07 249.75 248.50 248.06 0.00 0.00 0.00 0.00 0.00

0.241 0.248 0.246 0.246 0.000 0.000 0.000 0.000 0.000

GG 39 INDICE GENERAL DE PRECIOS CONSUMIDOR 0.267 100.000% 387.61 397.88 399.44 400.34 0.00 0.00 0.00 0.00 0.00

0.267 0.274 0.275 0.276 0.000 0.000 0.000 0.000 0.000

COEFICIENTE DE REAJUSTE ( K ) 1.000 1.031 1.029 1.030 0.000 0.000 0.000 0.000 0.000

INCIDENCIA ESPECÍFICA

CONSORCIO RMG

Mz. "H" Lt. 21 URB. DEL INGENIERO I - CHICLAYOTEL. 074208078 979907878 E-mail : [email protected]

LAMBAYEQUE – PERU

Page 14: Valorización Junio 2014 Final Final

document.xlsREAJUSTE

CÁLCULO DE REAJUSTE DE LA VALORIZACIÓN Nº 03 - JUNIO 2,014

OBRA : CONSTRUCCIÓN DEL PUENTE ANTAJARANI Y ACCESOS

CONTRATISTA : C&C CONSUL EJEC. CONTRATISTA GRALES SRL

PROPIETARIO : PROVIAS DEPARTAMENTAL - MTC

SUPERVISION : CONSORCIO RMG

CONTRATO Nº : 101-2013-MTC/21, de 10 de mayo del 2013

UBICACIÓN : PUNO - HUANCANE- VILQUECHICO

DESCRIPCIÓN VALORIZACIÓN MENSUAL (V) K R = V * (K - 1)

VALORIZACION N° 03 118,393.63 1.030 3,551.81

118,393.63 TOTAL REAJUSTE S/. 3,551.81

Dónde:

R = Reajuste del componente en S/. de la Valorización mensual.

V = Monto del componente en S/. de la valorización mensual.

K = Coeficiente de reajuste obtenido por la aplicación de la fórmula polinómica.

CONSORCIO RMG

Mz. "H" Lt. 21 URB. DEL INGENIERO I - CHICLAYOTEL. 074208078 979907878 E-mail : [email protected]

LAMBAYEQUE – PERU

Page 15: Valorización Junio 2014 Final Final

OBRA : CONSTRUCCION DEL PUENTE ANTAJARANI Y ACCESOS

CLIENTE : PROVIAS DEPARTAMENTAL - MTC

CONTRATISTA : C&C CONSUL EJEC. CONTRATISTA GRALES SRL

N° DE CONTRATO : 269-2013-MTC/21, del 18 de diciembre del 2013

SUPERVISIÓN : CONSORCIO RMG

N° DE CONTRATO : 101-2013-MTC/21, de 10 de mayo del 2013

UBICACIÓN : DEPARTAMENTO : PUNO PROVINCIA: HUANCANE DISTRITO: VILQUECHICO

1) REGULARIZACIÓN REAJUSTE DE LA VALORIZACIÓN Nº 01 - ABRIL 2,014

Rr = Vn * ( K - 1 ) - Rn

DONDE: Rr = Regularización del reajuste del componente en S/. de la Valorización anterior

Vn = Monto del componente en S/. de la valorización anterior.

K = Coeficiente de reajuste obtenida por la aplicación de la fórmula polinómica.

Rn = Reajuste del componente en S/. de la Valorización anterior.

Vn = 308,786.22K = 1.029

Rn = 9,572.37

Rr = -617.57

2) REGULARIZACIÓN REAJUSTE DE LA VALORIZACIÓN Nº 02 - MAYO 2,014

Rr = Vn * ( K - 1 ) - Rn

CONSORCIO RMG

Mz. "H" Lt. 21 URB. DEL INGENIERO I - CHICLAYOTEL. 074208078 979907878 E-mail : [email protected]

LAMBAYEQUE – PERU

Page 16: Valorización Junio 2014 Final Final

DONDE: Rr = Regularización del reajuste del componente en S/. de la Valorización anteriorVn = Monto del componente en S/. de la valorización anterior.K = Coeficiente de reajuste obtenida por la aplicación de la fórmula polinómica.Rn = Reajuste del componente en S/. de la Valorización anterior.

Vn = 548,624.33K = 1.030

Rn = 15,910.11

Rr = 548.62

Page 17: Valorización Junio 2014 Final Final

OBRA : CONSTRUCCION DEL PUENTE ANTAJARANI Y ACCESOS

CLIENTE : PROVIAS DEPARTAMENTAL - MTC

CONTRATISTA : C&C CONSUL EJEC. CONTRATISTA GRALES SRL

N° DE CONTRATO : 269-2013-MTC/21, del 18 de diciembre del 2013

SUPERVISIÓN : CONSORCIO RMG

N° DE CONTRATO : 101-2013-MTC/21, de 10 de mayo del 2013

UBICACIÓN : DEPTO : PUNO PROV: HUANCANE DIST: VILQUECHICO

CONTROL DE REAJUSTES

VALORIZACIÓN FECHA

FACTOR REAJUSTE REAJUSTEREAJUSTE RECONOCIDO

K PROGRAMADO (1) x (K-1) EJECUTADO (2) x (K-1)

(1) (2) (3) PARCIAL ACUMULADO PARCIAL ACUMULADO PARCIAL ACUMULADO

01 Apr-14 384,869.95 308,786.22 1.029 11,161.23 11,161.23 8,954.80 8,954.80 8,954.80 8,954.80

02 May-14 681,729.77 548,624.33 1.030 20,451.89 31,613.12 16,458.73 25,413.53 16,458.73 25,413.53

03 Jun-14 743,164.26 118,393.63 1.030 22,294.93 53,908.05 3,551.81 28,965.34 3,551.81 28,965.34

04 Jul-14 811,660.48

05 Aug-14 1,757,513.39

06 Sep-14 434,112.20

07 Oct-14 809,652.85

08 Nov-14 348,659.66

Acumulado : 53,908.05 28,965.34 28,965.34

AVANCE PROGRAMADO

AVANCE EJECUTADO

CONSORCIO RMG

Mz. "H" Lt. 21 URB. DEL INGENIERO I - CHICLAYOTEL. 074208078 979907878 E-mail : [email protected]

LAMBAYEQUE – PERU

Page 18: Valorización Junio 2014 Final Final

ACUMULADO

Page 19: Valorización Junio 2014 Final Final

OBRA : CONSTRUCCION DEL PUENTE ANTAJARANI Y ACCESOS

CLIENTE : PROVIAS DESCENTRALIZADO

CONTRATISTA : C&C CONSUL EJEC. CONTRATISTA GRALES SRL

N° DE CONTRATO : 269-2013-MTC/21, del 18 de diciembre del 2013

SUPERVISIÓN : CONSORCIO RMG

N° DE CONTRATO : 101-2013-MTC/21, de 10 de mayo del 2013

UBICACIÓN : DEPTO : PUNO PROV: HUANCANE DIST: VILQUECHICO

PLANILLA DE CÁLCULO DE AMORTIZACIÓN DEL ADELANTO DIRECTO

ADELANTO DIRECTO (c/IGV) 1,409,241.57 Presupuesto Referencial (con IGV)ADELANTO DIRECTO (s/IGV) 1,194,272.51 Presupuesto Referencial (sin IGV)

FECHA VALORIZACIÓN MONTO VALORIZADO (MV)

S/. 1,194,272.51 30.04.2014 1 308,786.22 S/. 61,757.24

31.05.2014 2 548,624.33 S/. 109,724.87

30.06.2014 3 118,393.63 S/. 23,678.73

975,804.18 195,160.84

NOTA: Los montos indicados no incluyen I.G.V

% AVANCE DE OBRA: 16.34%

ADELANTO OTORGADO S/. (AO)

AMORTIZACIÓN MV* AO/SV

CONSORCIO RMG

Mz. "H" Lt. 21 URB. DEL INGENIERO I - CHICLAYOTEL. 074208078 979907878 E-mail : [email protected]

LAMBAYEQUE – PERU

Page 20: Valorización Junio 2014 Final Final

DIST: VILQUECHICO

PLANILLA DE CÁLCULO DE AMORTIZACIÓN DEL ADELANTO DIRECTO

7,046,207.83

5,971,362.57

1,132,515.27

1,022,790.40

999,111.67

999,111.67

SALDO POR AMORTIZAR

Mz. "H" Lt. 21 URB. DEL INGENIERO I - CHICLAYOTEL. 074208078 979907878 E-mail : [email protected]

LAMBAYEQUE – PERU

Page 21: Valorización Junio 2014 Final Final

OBRA : CONSTRUCCION DEL PUENTE ANTAJARANI Y ACCESOS

CLIENTE : PROVIAS DESCENTRALIZADO

CONTRATISTA : C&C CONSUL EJEC. CONTRATISTA GRALES SRL

N° DE CONTRATO : 269-2013-MTC/21, del 18 de diciembre del 2013

SUPERVISIÓN : CONSORCIO RMG

N° DE CONTRATO : 101-2013-MTC/21, de 10 de mayo del 2013

UBICACIÓN : DEPTO : PUNO PROV: HUANCANE DIST: VILQUECHICO

DEDUCCIÓN DEL REAJUSTE GENERADO POR EL ADELANTO DIRECTO

VALORIZACIÓN DE OBRA N° 03 - JUNIO 2,014

D = ( A * V / C ) * ( K / Ka - 1 )

DONDE: D = Regularización de la deducción del reajuste generado por el adelanto directo.A = Monto del adelanto en efectivo concedido al Contratista V = Monto del componente en S/. de la valorización mensualK = Coeficiente de reajuste que corresponde al mes de la valorización de obraC = Saldo del contrato por valorizar a la fecha de pago del adelanto Ka = Coeficiente reajuste que corresponde al mes en que se pagó adelanto directo

A = 1,194,272.51V = 118,393.63K = 1.030C = 5,971,362.57Ka = 1.020

Dr = 232.14

CONSORCIO RMG

Page 22: Valorización Junio 2014 Final Final

document.xlsD.R.Q.N.C.V. ANTERIOR

OBRA : CONSTRUCCION DEL PUENTE ANTAJARANI Y ACCESOS

CLIENTE : PROVIAS DESCENTRALIZADO

CONTRATISTA : C&C CONSUL EJEC. CONTRATISTA GRALES SRL

N° DE CONTRATO : 269-2013-MTC/21, del 18 de diciembre del 2013

SUPERVISIÓN : CONSORCIO RMG

N° DE CONTRATO : 101-2013-MTC/21, de 10 de mayo del 2013

UBICACIÓN : DEPTO : PUNO PROV: HUANCANE DIST: VILQUECHICO

REGULARIZACION DE LA DEDUCCIÓN DEL REAJUSTE GENERADO POR EL ADELANTO DIRECTO

VALORIZACIÓN Nº 02 (MAYO 2,014)

D = ( A * Vn / C ) * ( K / Ka - 1 ) - Dn

DONDE: Dr = Regularización de la deducción del reajuste generado por el adelanto directo.A = Monto del adelanto en efectivo concedido al Contratista Vn = Monto del componente en S/. de la valorización anteriorK = Coeficiente de reajuste que corresponde al mes de la valorización de obraC = Saldo del contrato por valorizar a la fecha de pago del adelanto Ka= Coeficiente reajuste que corresponde al mes en que se pagó adelanto directo Dn= Deducción del reajuste de la valorización anterior

A = 1,194,272.51Vn = 548,624.33K = 1.030C = 5,971,362.57Ka = 1.020Dn = 968.16

Dr = 107.57

CONSORCIO RMG

Mz. "H" Lt. 21 URB. DEL INGENIERO I - CHICLAYOTEL. 074-208078 979907878 RPM #343586

E-mail : [email protected] LAMBAYEQUE – PERU

Page 23: Valorización Junio 2014 Final Final

document.xlsD.R.Q.N.C.V. ANTERIOR

OBRA : CONSTRUCCION DEL PUENTE ANTAJARANI Y ACCESOS

CLIENTE : PROVIAS DESCENTRALIZADO

CONTRATISTA : C&C CONSUL EJEC. CONTRATISTA GRALES SRL

N° DE CONTRATO : 269-2013-MTC/21, del 18 de diciembre del 2013

SUPERVISIÓN : CONSORCIO RMG

N° DE CONTRATO : 101-2013-MTC/21, de 10 de mayo del 2013

UBICACIÓN : DEPTO : PUNO PROV: HUANCANE DIST: VILQUECHICO

REGULARIZACION DE LA DEDUCCIÓN DEL REAJUSTE GENERADO POR EL ADELANTO DIRECTO

VALORIZACIÓN Nº 01 (ABRIL 2,014)

D = ( A * Vn / C ) * ( K / Ka - 1 ) - Dn

DONDE: Dr = Regularización de la deducción del reajuste generado por el adelanto directo.A = Monto del adelanto en efectivo concedido al Contratista Vn = Monto del componente en S/. de la valorización anteriorK = Coeficiente de reajuste que corresponde al mes de la valorización de obraC = Saldo del contrato por valorizar a la fecha de pago del adelanto Ka= Coeficiente reajuste que corresponde al mes en que se pagó adelanto directo Dn= Deducción del reajuste de la valorización anterior

A = 1,194,272.51Vn = 308,786.22K = 1.029C = 5,971,362.57Ka = 1.020Dn = 666.01

Dr = -121.09

CONSORCIO RMG

Mz. "H" Lt. 21 URB. DEL INGENIERO I - CHICLAYOTEL. 074-208078 979907878 RPM #343586

E-mail : [email protected] LAMBAYEQUE – PERU

Page 24: Valorización Junio 2014 Final Final

document.xlsRESUMEN

OBRA : CONSTRUCCION DEL PUENTE ANTAJARANI Y ACCESOS

CLIENTE : PROVIAS DESCENTRALIZADO

CONTRATISTA : C&C CONSUL EJEC. CONTRATISTA GRALES SRL

N° DE CONTRATO : 269-2013-MTC/21, del 18 de diciembre del 2013

SUPERVISIÓN : CONSORCIO RMG

N° DE CONTRATO : 101-2013-MTC/21, de 10 de mayo del 2013

UBICACIÓN : PUNO - HUANCANE - VILQUECHICO

RESUMEN DE LA VALORIZACIÓN DE OBRA Nº 03 - JUNIO 2,014

CONCEPTO S/.

Monto valorizado en el presente mes : 118,393.63 . Valorización Nº 03 118,393.63

Reajustes de las Valorizaciones : 3,482.86 . Reajuste de la valorización Nº 03 3,551.81 . Regularizacion del Reajuste Valorización Nº 02 548.62 . Regularizacion del Reajuste Valorización Nº 01 (617.57)

Amortización en el presente mes de adelantos otorgad (23,678.73) . Del adelanto directo (23,678.73) . Del adelanto para materiales 0.00

Deducción del reajuste que no corresponde : -218.63 . Por adelanto directo en la Val. Nº 03 -232.14 . Por adelanto directo en la Val. Nº 02 -107.57 . Por adelanto directo en la Val. Nº 01 121.09

Otros 0.00 Multa por atraso de obra 0.00

I .- MONTO FACTURABLE (Sin I.G.V.) 97,979.13

Monto retenido por Fondo de Garantía 0.00 . Fondo G. Valorización No. 03 0.00 . Fondo G. Reajuste de la valorización Nº 01 0.00 . Fondo G. Regul.Reajuste de la valorización Nº 01 0.00

Otros 0.00 Otros (Servicios) 0.00

II .- TOTAL RETENCIÓN 0.00

II .- MONTO LÍQUIDO A PAGAR ( I ) 97,979.13

III .- I.G.V. ( 18,00% DE I ) 17,636.24

IV .- MONTO A FACTURAR ( I + III ) 115,615.37

CONSORCIO RMG