Using ERP in aLean Manufacturing environment

Andy Barnes

Operations Manager

Snell & Wilcox Ltd

Page 2: Using ERP in a Lean Manufacturing environment Andy Barnes Operations Manager Snell & Wilcox Ltd

Outline Agenda

• About S&W

• Supply Process Improvement

• MFG Pro in a Lean Environment

Page 3: Using ERP in a Lean Manufacturing environment Andy Barnes Operations Manager Snell & Wilcox Ltd

About Snell & Wilcox

Page 4: Using ERP in a Lean Manufacturing environment Andy Barnes Operations Manager Snell & Wilcox Ltd

History• 1973: founded by Roderick Snell and Joe Wilcox

– To focus on the preservation and improvement of the television image

• 1988: Joe Wilcox retires, 24 employees

• 1993: Introduction of Alchemist with ‘Ph.C’

• 1994: Acquired CEL Ltd

• 1996: MPEG (Moving Picture Experts Group) activities began

• 1999: MXF (Material Exchange Format) work starts

• 2001: Acquired Post Impressions and PSP

• 2005: Turnover ~£36m, 350 employees worldwide

Page 5: Using ERP in a Lean Manufacturing environment Andy Barnes Operations Manager Snell & Wilcox Ltd

Products- IQ Modular

Page 6: Using ERP in a Lean Manufacturing environment Andy Barnes Operations Manager Snell & Wilcox Ltd

Products- Switchers

Page 7: Using ERP in a Lean Manufacturing environment Andy Barnes Operations Manager Snell & Wilcox Ltd

Award winning record

• Four technical Emmys- Phase correlation motion compensation (Ph.C) - the

key to superior standards conversion

- Prefix MPEG pre-processing - saves storage and transmission costs

- DEFT 3:2 cadence detection and repair - improves Hollywood workflow efficiency

- HD up and down conversion - for flexibility in production and broadcast

• Many other awards:- Eight Queens Awards

- First to win two IABM Peter Wayne Technology and

Innovation Awards

Page 8: Using ERP in a Lean Manufacturing environment Andy Barnes Operations Manager Snell & Wilcox Ltd

Customers including...

Page 9: Using ERP in a Lean Manufacturing environment Andy Barnes Operations Manager Snell & Wilcox Ltd

Locations

Southleigh Park

HQ, R&D, ManufacturingSouthleigh Park, Havant

R&D, ManufacturingSaffron Walden

R&DNewbury, Liss, Montreal

Sales and ServiceUK, France, Germany, Russia,USA, Hong Kong, China, Japan, India, Lebanon

Page 10: Using ERP in a Lean Manufacturing environment Andy Barnes Operations Manager Snell & Wilcox Ltd

Supply Process Improvement

Page 11: Using ERP in a Lean Manufacturing environment Andy Barnes Operations Manager Snell & Wilcox Ltd

Historical Process

• Forecast driven batch build process (push)• Long lead times ~4-6wks• Poor levels of customer service - OTD

~55%• High levels of inventory - stock turns

~4/annum• Quality issues highlighted late in build

process - Rework

Page 12: Using ERP in a Lean Manufacturing environment Andy Barnes Operations Manager Snell & Wilcox Ltd

Objective

Improve historical levels of on time

delivery, lead time and quality to world

class levels:S&W Target

On time 55% >98%

Response 4-6 wks <5 days

Quality ??? ppm

Page 13: Using ERP in a Lean Manufacturing environment Andy Barnes Operations Manager Snell & Wilcox Ltd

Time for Change- Spring 2004

• Established a full time multi-functional team

• Capability through intensive training

• External support - Cranfield Consultants

• Pilot project using simple product family - Kudos+

Page 14: Using ERP in a Lean Manufacturing environment Andy Barnes Operations Manager Snell & Wilcox Ltd

TheSevenWastes

Energy Untapped human resources By-products Inappropriate IT support

OtherCommonWastes

Types of Waste

Motion Transportation Waiting time Overproduction Inventory Processing time Defects

Page 15: Using ERP in a Lean Manufacturing environment Andy Barnes Operations Manager Snell & Wilcox Ltd

Value Stream Mapping- 1U Gateway Card

Monthly

W eekly

Solder Paste

C/T - 30C/O -FTT - 100%U/T - 100%OPS - 1

SurfaceMount

C/T - 183C/O -FTT -U/T -OPS - 3

Flow Solder

C/T - 330C/O - 0FTT -U/T -OPS - 1

Roving Probe

C/T - 60C/O -FTT -U/T -OPS - 1

Hand Build

C/T - 1447C/O -FTT -U/T -OPS -

Program m ingDownload

C/T - 1200C/O - 396FTT - 89%U/T -OPS - 1

Prim ary Test

C/T - 540C/O -FTT -U/T -OPS - 1

Mech Assy

C/T - 3120C/O -FTT -U/T -OPS - 3

SecondaryTest

C/T - 4620C/O -FTT -U/T -OPS - 1

24 HourSoak

C/T - 86400C/O -FTT -U/T - 100%OPS - 1

Conform anceTest

C/T - 4500C/O -FTT -U/T -OPS - 1

Packing &Shipping

C/T - 300C/O -FTT -U/T -OPS -

63

CUSTOMER

Sales O ffice

Packaging

Shipping

SOP & PLANNING

DAILYMRP

30 Day Forecast

Daily Orders

SUPPLIERS

Monthly Orders

W eekly Orders

Receiving

Distribution

17.530 183 330 60

10.81447

4.11200

3.8900 3120

6.39300 86400 5400 300

39 15 14

10

13

Test

S hopF loor

ocessTimesPr

dtomerdemanbasedoncusLeadTime(

102730 S econds28.53 H ours

(E xclud ing 24h Soak 4 .5 H ours)

42.5 D ays o f S tock = 2.8% VA(is 1020 H ours)

TA KT T im e=72U nits/20

=3.6U nits P er D ay1 E V E R Y 2 H ours

B ased on 36.25/5 N E Thours

VALUE STREAM MAP FOR THE GATEW AYCARD USED IN KUDOS+ PRODUCTS

Page 16: Using ERP in a Lean Manufacturing environment Andy Barnes Operations Manager Snell & Wilcox Ltd

Batches

Space Transport / handling problems (damage)

Time to make batch - some of which aren’t needed

Page 17: Using ERP in a Lean Manufacturing environment Andy Barnes Operations Manager Snell & Wilcox Ltd

The Problem with Batches

SMTRobotasFlow Solder

ElectricalAssembly

Mechanical Assembly

TestSoak

Distance travelled between remote “silos” = 470mEach ‘silo’ making batches independentlyDelays and difficult to align production to actual orders – customer lead time 4-6 weeks

Pushing Batches Through• Cycle time to make whole batch – not just what customer ordered• Waiting for other batches• “Pinching” from one batch to fulfil “more urgent” order• High inventory everywhere• Response time = time for complete batch to move through complete process, queuing behind other batches

Inventory

Customer Lead Time

Page 18: Using ERP in a Lean Manufacturing environment Andy Barnes Operations Manager Snell & Wilcox Ltd

Pull / Flow

SMTRobotasFlow Solder

Cell: Elec/Mech/Test/Soak

Distance travelled between shared resources and cell = 70m (85% reduction)Customer lead time down to final process time <5 days (subject to volume)

Pull only what the customer orders• Cycle time to make quantity actually needed (x) • Flex capacity by moving operators / adding work-stations• No waiting for other batches• No “Pinching” to fulfil “more urgent” order• Only tactical inventory that is not committed to any specific order• Response time = time for each unit required to move through the final process only

Tactical Inventory – Part-built in kanbans &Uncommitted to orders

Customer Demand = x

Customer Lead Time

Page 19: Using ERP in a Lean Manufacturing environment Andy Barnes Operations Manager Snell & Wilcox Ltd

Work Content

GatewayRear

InterconnectAssy

Mega CardAssy

Front PanelAssy

TestMechanical

AssyFinalTest

Customer

SurfaceM ount

SurfaceM ount

Robotas

3270 m ins

1419 m ins

2660 m ins4465 m ins

7600 m ins 6000 m ins

8700 = m ins ava ilab le pe rpe rson pe r m on th

KANBAN BINS

W ORK STATIONS

T im es show n a re in m inu tes and rep resen tcapac ity o f the w orks ta tion , based on pas tcus tom er dem and o f 80 un its pe r m on th

24hoursoak

Draft Capacity/W orkstation Layout

Page 20: Using ERP in a Lean Manufacturing environment Andy Barnes Operations Manager Snell & Wilcox Ltd

Actual Cell layout

Gat

eway

LED

Ass

yIQ

Fro

nt P

ane

l

Rea

r P

anel

PS

U A

ssy

Fro

nt P

anel

A

Fro

nt P

anel

B

450

550

600

180

M echan ica l B ox B u ild

P rim ay/F ina l Test

C onform ance Test

P C B A ssy B ench A

P C B A ssy B ench B

5062 m ins

5379 m ins

9486 m ins

3708 m ins

5396 m ins

5674 m ins (w ithgateway & f/p )

24hr

P C B 's From S M T& R obotas

= K anban P art B ins

P ack & S hip

Page 21: Using ERP in a Lean Manufacturing environment Andy Barnes Operations Manager Snell & Wilcox Ltd

Before After

ClutteredPoor LightingPoor VentilationSearch for tools & parts

OrganisedBrightCleanEverything to hand

Page 22: Using ERP in a Lean Manufacturing environment Andy Barnes Operations Manager Snell & Wilcox Ltd

PCB Before

Page 23: Using ERP in a Lean Manufacturing environment Andy Barnes Operations Manager Snell & Wilcox Ltd

PCB After

Page 24: Using ERP in a Lean Manufacturing environment Andy Barnes Operations Manager Snell & Wilcox Ltd

Test Before

Page 25: Using ERP in a Lean Manufacturing environment Andy Barnes Operations Manager Snell & Wilcox Ltd

Test After

Page 26: Using ERP in a Lean Manufacturing environment Andy Barnes Operations Manager Snell & Wilcox Ltd

Kudos+ Workstation

Parts for the build

Build Instruction

Clean & clear place to build the product

Page 27: Using ERP in a Lean Manufacturing environment Andy Barnes Operations Manager Snell & Wilcox Ltd

Build Instructions

MANUAL No DESCRIPTION 1U Rear Panel Interconnect PCB

ASSY No. SAAN RCIC1U2Z LOCATION ZCELLK A DATE 23/ 08/ 04

10 RMK7 P2RA39 RMK0 0731 RMK6 P1040 RMK0 19

31

40

39

10

STEP – 2Solder components to PCB in thefollowing order:-Item Cct Ref10 CN1039 CN931 CN840 CN7

Numbers in build instruction match those

on the part bins

Page 28: Using ERP in a Lean Manufacturing environment Andy Barnes Operations Manager Snell & Wilcox Ltd

2 Bin Kanban System

Numbers in build instruction match those

on the part bins

Page 29: Using ERP in a Lean Manufacturing environment Andy Barnes Operations Manager Snell & Wilcox Ltd

Signal to Build

Empty space is the signal to build

Page 30: Using ERP in a Lean Manufacturing environment Andy Barnes Operations Manager Snell & Wilcox Ltd

Bin Replenishment

Refilled bins are placed here by stores

Empty bins are placed here for stores to collect

Page 31: Using ERP in a Lean Manufacturing environment Andy Barnes Operations Manager Snell & Wilcox Ltd

ATE Test Jig

Product can be tested by the person who made it in the cell

Page 32: Using ERP in a Lean Manufacturing environment Andy Barnes Operations Manager Snell & Wilcox Ltd

Benefits - Kudos+ KPI’s

KUDOS+ PRODUCT CELLWEEKLY KPI'S - OUTPUT

0

5

10

15

20

25

30

35

40

WEEK COMMENCING

LE

AD

TIM

E (

DA

YS

) /

NU

MB

ER

OF

O

RD

ER

S

0%

20%

40%

60%

80%

100%

120%

OT

D %

LEADTIME

NO. OFITEMS

ON TIMEDELIVERY

Page 33: Using ERP in a Lean Manufacturing environment Andy Barnes Operations Manager Snell & Wilcox Ltd

Extra Benefits

• Improving the process has uncovered more ‘opportunities’ that were hidden

• Helped identify key training requirements within the cell

• Improved floor space utilisation• New Kanban philosophy• Transactions reduced• Continuous improvement ‘culture’ developing

Page 34: Using ERP in a Lean Manufacturing environment Andy Barnes Operations Manager Snell & Wilcox Ltd

Benefits - Reduced WIP

132 Units

~£400 Each

£52,800

Page 35: Using ERP in a Lean Manufacturing environment Andy Barnes Operations Manager Snell & Wilcox Ltd

Benefits - Space

274.125m2

20% Overall Reduction

Page 36: Using ERP in a Lean Manufacturing environment Andy Barnes Operations Manager Snell & Wilcox Ltd

Lean Projects Roadmap

• Kudos+ cell - Completed July 04• IQ Modular - 80% complete

– Box build cell– PCB build & test cell– Box configuration & conformance test cell

• Kahuna cell - 90% complete• Other product cells - December 05• Surface Mount line - 2006

Page 37: Using ERP in a Lean Manufacturing environment Andy Barnes Operations Manager Snell & Wilcox Ltd

MFG Pro in a Lean Environment

Page 38: Using ERP in a Lean Manufacturing environment Andy Barnes Operations Manager Snell & Wilcox Ltd

History

• 1994: Introduced Release 7.1 on a UNIX operating system

• 1996: Upgraded to 7.4

• 2002: Upgraded to eb

• 2005: Still bloody character screens!

Page 39: Using ERP in a Lean Manufacturing environment Andy Barnes Operations Manager Snell & Wilcox Ltd

Supply Process- Pre Lean

SOP

MPS

MRP

WORK

ORDERS

PURCHASE

ORDERS

MRP Planned Orders

determine what we

ACTUALLY

Purchase (PO’s)

and

Manufacture (WO’s)

Page 40: Using ERP in a Lean Manufacturing environment Andy Barnes Operations Manager Snell & Wilcox Ltd

Supply Process- Post Lean

SOP

MPS

MRP

CRP

VENDOR

SCHEDULES

MRP Planned Ordersdetermine what weMIGHTPurchase (VS)andManufacture (CRP)

Demand Pull (SO,Kanban, Faxban)determines what weACTUALLY Purchase& Manufacture

Page 41: Using ERP in a Lean Manufacturing environment Andy Barnes Operations Manager Snell & Wilcox Ltd

Supply Process- Vendor Schedules

Delivery Schedule

TOBY ELECTRONICS LTD

Deliver To:

TOBY ELECTRONICS LTD Snell & Wilcox Ltd

BEAUMONT ROAD IND EST Southleigh Park House

BANBURY Eastleigh Road

OXON Havant

OX16 1TU PO9 2PE

GREAT BRITAIN GREAT BRITAIN

Purchase Order:VS00005

Week Commencing...

ItemFab Auth

Raw Auth

RMG9 ELM5/04 0 0 0 F 0 F 0 F 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0

RMG9 ELM5/10 0 0 0 F 0 F 0 F 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0

RMK0 10WMTSW105 0 0 0 F 0 F 0 F 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0

RMK0 10WMTSW110 0 0 0 F 0 F 22 F 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0

RMK0 20017AR-16G2 0 0 0 F 0 F 500 F 1000 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0

RMK0 24WBOXED 0 0 0 F 0 F 0 F 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0

RMK0 399R/A 0 0 0 F 0 F 0 F 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0

RMK0 BBS10 0 0 0 F 0 F 0 F 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0

RMK0 HW0511GS 0 0 0 F 0 F 450 F 0 P 900 P 1584 P 744 P 0 P 0 P 336 P 336 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0

RMK0 QTE02003 0 0 0 F 0 F 278 F 0 P 0 P 0 P 144 P 72 P 0 P 0 P 180 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0

RMK0 QTE02005 0 0 0 F 0 F 100 F 96 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 198 P 0 P 0 P 0 P 0 P 0 P 0 P 0

RMK0 TSW1914TD 0 0 0 F 0 F 0 F 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0

RMK1 17 0 0 0 F 0 F 0 F 0 P 77 P 28 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0

RMK1 1712001SD 0 0 0 F 0 F 0 F 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0

RMK1 1712002SDLC 0 0 0 F 0 F 0 F 0 P 0 P 0 P 0 P 36 P 0 P 0 P 70 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0

RMK1 1713001SD 0 0 0 F 0 F 13 F 0 P 0 P 8 P 0 P 6 P 0 P 0 P 12 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0

RMK1 1713002SDLC 0 0 0 F 0 F 0 F 0 P 0 P 17 P 0 P 0 P 0 P 0 P 24 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0

RMK1 19 0 0 0 F 0 F 0 F 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0

RMK1 20 0 0 0 F 0 F 4 F 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0

RMK1 BSW-10204-G-S 0 0 0 F 0 F 0 F 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0

RMK1 M22-6120822 0 0 0 F 0 F 16 F 0 P 0 P 0 P 1 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0

RMK1 QSE02001 0 0 0 F 0 F 0 F 35 P 0 P 240 P 0 P 240 P 0 P 240 P 176 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0

RMK1 SFML130T2S 0 0 0 F 0 F 39 F 0 P 0 P 0 P 48 P 0 P 16 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0

RMK1 SQT11203FD 0 0 0 F 0 F 0 F 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0

RMK1 SSQ12001 0 0 0 F 0 F 0 F 0 P 0 P 4 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0

RMK1 SSQ13201 0 0 0 F 0 F 0 F 0 P 0 P 1 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0

RMK1 TFML13002 0 0 0 F 0 F 206 F 0 P 68 P 124 P 0 P 68 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0

RMK6 SFM105-01 0 0 0 F 0 F 0 F 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0

RMK8 14 0 0 0 F 0 F 29 F 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0

RMK8 16 0 0 0 F 0 F 50 F 0 P 0 P 0 P 25 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0

RMK8 20 0 0 0 F 0 F 0 F 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0

RMK8 24/.3 0 0 0 F 0 F 0 F 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0

RMK8 28 0 0 0 F 0 F 280 F 168 P 168 P 238 P 154 P 168 P 196 P 0 P 210 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0

RMK8 32.6 0 0 0 F 0 F 0 F 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0

RMK8 6PDIL 0 0 0 F 0 F 0 F 345 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0

RMK8 8PDIL 0 0 0 F 0 F 0 F 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0

RMKA 24/.3SMT 0 0 0 F 0 F 0 F 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0

RMKA FTSH10501 0 0 0 F 0 F 500 F 250 P 375 P 0 P 250 P 250 P 0 P 250 P 375 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0

RMKA TFM10522S 0 0 0 F 0 F 0 F 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0

RMKA TFM12022S 0 0 0 F 443 F 0 F 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0

RMKA SFM12002S 0 0 0 F 0 F 0 F 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0

RMW4 7642430A 0 0 0 F 0 F 0 F 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0

RMK3 RCAJACK 0 0 0 F 0 F 0 F 0 P 0 P 0 P 21 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0

RMK0 34 0 0 0 F 0 F 0 F 0 P 0 P 12 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0

RMK5 16 0 0 0 F 0 F 0 F 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0 P 0

01/05/06 05/06/06 03/07/0602/01/06 06/02/06 06/03/06 03/04/0605/12/05 12/12/05 19/12/05 26/12/0507/11/05 14/11/05 21/11/05 28/11/05Prior 17/10/05 24/10/05 31/10/05

Page 42: Using ERP in a Lean Manufacturing environment Andy Barnes Operations Manager Snell & Wilcox Ltd

Supply Process- CRP

Page 43: Using ERP in a Lean Manufacturing environment Andy Barnes Operations Manager Snell & Wilcox Ltd

Supply Process- Sales Order Processing

PRE LEAN

MPS ATP

POST LEAN

Finite Capacity SchedulingFGAN IQH1S-RC-BMOD-1U FRAME+BLANK F/P +SO41539 - Line 2FGADG 3768050AARC20:20S ASPECT RATIOSO41345 - Line 1FGAN IQHSBOXRCAPBMOD-1U REMOTE SHOEBOXSO41274 - Line 11

FGAN IQHSBOXRCAPBMOD-1U REMOTE SHOEBOXSO41274 - Line 11

FGAN IQH1S-RC-BMOD-1U FRAME+BLANK F/P +SO41284 - Line 1

FGAN IQH1S-RC-BMOD-1U FRAME+BLANK F/P +SO41243 - Line 3

FGACZ 3598000BMACH:1 PHASE4 Msc MOTIONSO41270 - Line 1

FGAN IQH1S-RC-BMOD-1U FRAME+BLANK F/P +SO41403 - Line 2

FGAN IQH1S-RC-BMOD-1U FRAME+BLANK F/P +SO41284 - Line 1

FGACU 3548310BTBS180AV ADVANC TIMEBASESO41202 - Line 8

FGACZ 3598000BMACH:1 PHASE4 Msc MOTIONSO41270 - Line 1

FGAN IQH1S-RC-BMOD-1U FRAME+BLANK F/P +SO41402 - Line 2

FGAN IQH1S-RC-BMOD-1U FRAME+BLANK F/P +SO41229 - Line 2

FGACU 3548310BTBS180AV ADVANC TIMEBASESO41202 - Line 8

FGACZ 3598000BMACH:1 PHASE4 Msc MOTIONSO41270 - Line 1

FGAN IQH1S-RC-AP-BMOD-1U FRAME+ACTIVE F/P+SO41326 - Line 1

FGAN IQHSBOXRCAPBMOD-1U REMOTE SHOEBOXSO41158 - Line 2

FGACU 3548300BTBS180 ADVANCED TIMEBASESO41162 - Line 7

FGACZ 3598000BMACH:1 PHASE4 Msc MOTIONSO41270 - Line 1

FGAN IQHSBOXRCAPBMOD-1U REMOTE SHOEBOXSO41321 - Line 13

FGACZ 3598300BCVR250 ACTIVE F/P 10-BITSO41273 - Line 1

FGAN IQHSBOXRCAPBMOD-1U REMOTE SHOEBOXSO41158 - Line 2

FGACU 3548500BNRS70 ACTIVE F/P 1RUSO41162 - Line 6

FGACU 3548410BTBS185AV ADVANC TBC WITHSO41545 - Line 1

FGACZ 3598000BMACH:1 PHASE4 Msc MOTIONSO41270 - Line 1

FGAN IQHSBOXRCAPBMOD-1U REMOTE SHOEBOXSO41321 - Line 13

24/10/05 25/10/05 26/10/05 27/10/05 28/10/05 31/10/05 01/11/05 02/11/05 03/11/05M T W T F M T W T

Page 44: Using ERP in a Lean Manufacturing environment Andy Barnes Operations Manager Snell & Wilcox Ltd

Supply Process- Material Transactions

PRE LEAN• MRP Planned Orders Report (23.12)

• Check for shortages (13.8.18)

• Firm Plan Work Order (16.1)

• Release Work Order (16.6)

• Kit Work Order (16.10)

• Make Product / Assembly

• Receipt Work Order into stock (16.11)

POST LEAN• Make Product / Assembly

• Advanced Repetitive Backflush Product / Assembly (18.22.13):

– Cumulative Work Order– Consume materials– Consume labour @ standard– Receipt into stock

Page 45: Using ERP in a Lean Manufacturing environment Andy Barnes Operations Manager Snell & Wilcox Ltd

ANY QUESTIONS?