12
Technical Session Building Gen Y To Lead Project Tengku Fauzan Tengku Anua Facilities Improvement Project Manager Petrofac (PM 304) Limited Open

UPEC 2018 TS 5 - 4 Fauzan PETROFAC FINALicep.com.my/.../UPEC-2018-TS-5-4-Fauzan-Petrofac-FINAL.pdf&RS\ULJKW 83(& ,QWURGXFWLRQ ,Q ± 2LO DQG *DV XSVWUHDP SURMHFWV ZHUH VHYHUHO\ KLW

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: UPEC 2018 TS 5 - 4 Fauzan PETROFAC FINALicep.com.my/.../UPEC-2018-TS-5-4-Fauzan-Petrofac-FINAL.pdf&RS\ULJKW 83(& ,QWURGXFWLRQ ,Q ± 2LO DQG *DV XSVWUHDP SURMHFWV ZHUH VHYHUHO\ KLW

Technical SessionBuilding Gen Y To Lead Project

Tengku Fauzan Tengku AnuaFacilities Improvement Project ManagerPetrofac (PM 304) Limited

Open

Page 2: UPEC 2018 TS 5 - 4 Fauzan PETROFAC FINALicep.com.my/.../UPEC-2018-TS-5-4-Fauzan-Petrofac-FINAL.pdf&RS\ULJKW 83(& ,QWURGXFWLRQ ,Q ± 2LO DQG *DV XSVWUHDP SURMHFWV ZHUH VHYHUHO\ KLW

Copyright UPEC 2018

Topic outline:• Introduction• Who is Gen Y ?• Gen Y perspective• Development approaches• Achievements • Recognitions• Conclusion

Open

Page 3: UPEC 2018 TS 5 - 4 Fauzan PETROFAC FINALicep.com.my/.../UPEC-2018-TS-5-4-Fauzan-Petrofac-FINAL.pdf&RS\ULJKW 83(& ,QWURGXFWLRQ ,Q ± 2LO DQG *DV XSVWUHDP SURMHFWV ZHUH VHYHUHO\ KLW

Copyright UPEC 2018

Introduction• In 2015 – 2017, Oil and Gas upstream projects were severely hit by a

lower oil prices across the globe.• Project team reorganization exercise. • Minimal workforce within the project team organization. • Majority of workforce are Gen Y (Graduate Engineers from local

universities with 0 – 1 year experience). • Develop the Gen Y to lead project.• Critical role to progress the projects. • Maintain safety & integrity, reliability and productivity of the facilities.

Open

Page 4: UPEC 2018 TS 5 - 4 Fauzan PETROFAC FINALicep.com.my/.../UPEC-2018-TS-5-4-Fauzan-Petrofac-FINAL.pdf&RS\ULJKW 83(& ,QWURGXFWLRQ ,Q ± 2LO DQG *DV XSVWUHDP SURMHFWV ZHUH VHYHUHO\ KLW

Copyright UPEC 2018

Who Is Gen Y ?Gen Y a.k.a Millennial a.k.a Generation Next

Born between : 1982 – 1993

Source: PMI org.

• The most educated generation• Constantly wanting feedback

• The most empowered• The most independent

• The most radical and ethnically diverse.

Open

Page 5: UPEC 2018 TS 5 - 4 Fauzan PETROFAC FINALicep.com.my/.../UPEC-2018-TS-5-4-Fauzan-Petrofac-FINAL.pdf&RS\ULJKW 83(& ,QWURGXFWLRQ ,Q ± 2LO DQG *DV XSVWUHDP SURMHFWV ZHUH VHYHUHO\ KLW

Copyright UPEC 2018

Gen Y Perspective • Team development

– Generational conflicts– Long term value creation to project organization

• Attitudes and expectations– Value and attitudes among other generations– Motivational tools, reward and recognition– Leadership

• Work perspective– Work environment– Project type

Open

Page 6: UPEC 2018 TS 5 - 4 Fauzan PETROFAC FINALicep.com.my/.../UPEC-2018-TS-5-4-Fauzan-Petrofac-FINAL.pdf&RS\ULJKW 83(& ,QWURGXFWLRQ ,Q ± 2LO DQG *DV XSVWUHDP SURMHFWV ZHUH VHYHUHO\ KLW

Copyright UPEC 2018

Mentorship

Feedback and Recognition

Flexibility

Wellness and BalanceGrowth

Principle of Project Management

Development Approaches

Open

Page 7: UPEC 2018 TS 5 - 4 Fauzan PETROFAC FINALicep.com.my/.../UPEC-2018-TS-5-4-Fauzan-Petrofac-FINAL.pdf&RS\ULJKW 83(& ,QWURGXFWLRQ ,Q ± 2LO DQG *DV XSVWUHDP SURMHFWV ZHUH VHYHUHO\ KLW

Copyright UPEC 2018

Development Approaches (cont’d)• Project Cycle (What, When and Why)• Compliance and requirementsProject Management

• Track and commenting progress• Working with a purpose

Feedback and Recognition

• Provide range of options.• Find way to desired results.Flexibility

• Lesson from generations past • Value an open-mindedWellness and Balance

• Opportunity to continue learning• Building skillsGrowth

Open

Page 8: UPEC 2018 TS 5 - 4 Fauzan PETROFAC FINALicep.com.my/.../UPEC-2018-TS-5-4-Fauzan-Petrofac-FINAL.pdf&RS\ULJKW 83(& ,QWURGXFWLRQ ,Q ± 2LO DQG *DV XSVWUHDP SURMHFWV ZHUH VHYHUHO\ KLW

Copyright UPEC 2018

Gen Y in Action• Opportunities to lead projects.

– Brownfield projects– Shutdown projects– Facilities improvement

• Area of interest.– Engineering– Fabrication yard– Offshore assignment

• Continuous guidance– Two senior staffs (Total 75 Years experience)

• Risk Assessment– Control of Work– Safety requirements

Open

Page 9: UPEC 2018 TS 5 - 4 Fauzan PETROFAC FINALicep.com.my/.../UPEC-2018-TS-5-4-Fauzan-Petrofac-FINAL.pdf&RS\ULJKW 83(& ,QWURGXFWLRQ ,Q ± 2LO DQG *DV XSVWUHDP SURMHFWV ZHUH VHYHUHO\ KLW

Copyright UPEC 2018

Achievements• Safely and successfully delivered:-

– FDP projects involving infill drilling interface Facilities– Subsea riser

• Meeting KPI– Safe man-hours, ZERO LTI– Quality– Within budget and schedule

• PETRONAS and Petrofac Global recognition– Bold Award– EVE Award

Open

Page 10: UPEC 2018 TS 5 - 4 Fauzan PETROFAC FINALicep.com.my/.../UPEC-2018-TS-5-4-Fauzan-Petrofac-FINAL.pdf&RS\ULJKW 83(& ,QWURGXFWLRQ ,Q ± 2LO DQG *DV XSVWUHDP SURMHFWV ZHUH VHYHUHO\ KLW

Copyright UPEC 2018

Recognition from PETRONAS

Mohd Naim Zulkifli won the prestigious Bold Award from PETRONAS for Subsea Riser project

Open

Page 11: UPEC 2018 TS 5 - 4 Fauzan PETROFAC FINALicep.com.my/.../UPEC-2018-TS-5-4-Fauzan-Petrofac-FINAL.pdf&RS\ULJKW 83(& ,QWURGXFWLRQ ,Q ± 2LO DQG *DV XSVWUHDP SURMHFWV ZHUH VHYHUHO\ KLW

Copyright UPEC 2018

Recognition from Petrofac Global

Ivan Low Wai Mun won the prestigious Petrofac EVE Award for Remote Reset project

Open

Page 12: UPEC 2018 TS 5 - 4 Fauzan PETROFAC FINALicep.com.my/.../UPEC-2018-TS-5-4-Fauzan-Petrofac-FINAL.pdf&RS\ULJKW 83(& ,QWURGXFWLRQ ,Q ± 2LO DQG *DV XSVWUHDP SURMHFWV ZHUH VHYHUHO\ KLW

Copyright UPEC 2018

Conclusion• Future leader of the project world.• Ready to highly contribute to the projects.

– Communicate requirements and work-load – Planning process– Roadmaps and methods

• Recognize differences. – Adapt new approaches – Empowerment– Trust

Open