21
Update on Regulatory Developments to Support Solar Park Concept 28 October 2010 Upington, South Africa [email protected] 1

Update on Regulatory Developments to Support Solar Park Concept 28 October 2010 Upington, South Africa [email protected] 1

Embed Size (px)

Citation preview

Page 1: Update on Regulatory Developments to Support Solar Park Concept 28 October 2010 Upington, South Africa ompi.aphane@energy.gov.za 1

Update on Regulatory Developments to

Support Solar Park Concept

28 October 2010Upington, South Africa

[email protected]

1

Page 2: Update on Regulatory Developments to Support Solar Park Concept 28 October 2010 Upington, South Africa ompi.aphane@energy.gov.za 1

Contents

Regulatory provisions for new generation capacity

Integrated Resource Plan

Solar Park Opportunity

Conclusion

2

Page 3: Update on Regulatory Developments to Support Solar Park Concept 28 October 2010 Upington, South Africa ompi.aphane@energy.gov.za 1

Regulatory provisions for new generation capacity

3

Planning (IRP)Determination by Minister

Power purchase agreement

Grid connection

• Balancing supply/demand simultaneously as meeting other objectives- Carbon- Supply adequacy- Water- price

• Minister commissions feasibility study, with outcomes relating to:• allocation of

financial, technical and operational risk between buyer and generator

• Whether appropriate generator should be Eskom or an IPP

• In consultation with Regulator – on licensing matters

• Concurrence with National Treasury – buyer support

• Standardized provisions in relation to certain risk allocation

• Regulator to ensure that buyer able to recover full amount of costs incurred by buyer over PPA term

• Eskom will be required to enter into PPA with buyer that meets requirements set out

• Buying function to be undertaken initially by ring-fenced entity within Eskom, ultimately separated out

• Non-discriminatory access

• NTC and the Regulator to timeously provide assistance as Minister may require for purposes of developing and monitoring the implementation of an IRP

- evacuation corridors

Public consultation process to commence soon

Page 4: Update on Regulatory Developments to Support Solar Park Concept 28 October 2010 Upington, South Africa ompi.aphane@energy.gov.za 1

Integrated Resource Plan

• IRP2010 has been completed and published for public comments

• The final draft will be published, taking into account the inputs from the stakeholders

4

Page 5: Update on Regulatory Developments to Support Solar Park Concept 28 October 2010 Upington, South Africa ompi.aphane@energy.gov.za 1

No reserve margin

period of high risk

power cuts

Restoring the requisite reserve

margin

The need to replace the

old fleet

Data source Eskom

5

Resolving Capacity constraintsResolving Capacity constraintsLong Term – IP 2010Medium Term – National Emergency Response and Business Continuity Plan

Country Electricity Plan (IRP2010)

This Presentation

National Emergency Response and Business Continuity

Plan

Page 6: Update on Regulatory Developments to Support Solar Park Concept 28 October 2010 Upington, South Africa ompi.aphane@energy.gov.za 1

Medium Term RiskMedium Term RiskAll Indicators predict long and hard storms ahead

ACURRENT REALITY

CSTRATEGY

DIMPLEMENTATION

BOBJECTIVES

Uncertainties

0

1000

2000

3000

4000

01 J

an

uary 2

010

05 J

an

uary 2

010

09 J

an

uary 2

010

13 J

an

uary 2

010

17 J

an

uary 2

010

21 J

an

uary 2

010

25 J

an

uary 2

010

29 J

an

uary 2

010

02 F

ebruary 2

010

06 F

ebruary 2

010

10 F

ebruary 2

010

14 F

ebruary 2

010

18 F

ebruary 2

010

22 F

ebruary 2

010

26 F

ebruary 2

010

02 M

arch

2010

06 M

arch

2010

10 M

arch

2010

14 M

arch

2010

18 M

arch

2010

22 M

arch

2010

26 M

arch

2010

30 M

arch

2010

03 A

pril 2

010

07 A

pril 2

010

11 A

pril 2

010

15 A

pril 2

010

19 A

pril 2

010

23 A

pril 2

010

27 A

pril 2

010

01 M

ay 2

010

05 M

ay 2

010

09 M

ay 2

010

13 M

ay 2

010

17 M

ay 2

010

21 M

ay 2

010

25 M

ay 2

010

MW

h

Utilisation of Emergency Generators 2010

Daily Gas Turbine Usage Daily ILS Usage

0

0.5

1

1.5

2

2.5

3

3.5

01

/0

1/2

01

0

04

/0

1/2

01

0

07

/0

1/2

01

0

10

/0

1/2

01

0

13

/0

1/2

01

0

16

/0

1/2

01

0

19

/0

1/2

01

0

22

/0

1/2

01

0

25

/0

1/2

01

0

28

/0

1/2

01

0

31

/0

1/2

01

0

03

/0

2/2

01

0

06

/0

2/2

01

0

09

/0

2/2

01

0

12

/0

2/2

01

0

15

/0

2/2

01

0

18

/0

2/2

01

0

21

/0

2/2

01

0

24

/0

2/2

01

0

27

/0

2/2

01

0

02

/0

3/2

01

0

05

/0

3/2

01

0

08

/0

3/2

01

0

11

/0

3/2

01

0

14

/0

3/2

01

0

17

/0

3/2

01

0

20

/0

3/2

01

0

23

/0

3/2

01

0

26

/0

3/2

01

0

29

/0

3/2

01

0

01

/0

4/2

01

0

04

/0

4/2

01

0

07

/0

4/2

01

0

10

/0

4/2

01

0

13

/0

4/2

01

0

16

/0

4/2

01

0

19

/0

4/2

01

0

22

/0

4/2

01

0

25

/0

4/2

01

0

28

/0

4/2

01

0

Under Fequency Alarms

-2,100

-1,900

-1,700

-1,500

-1,300

-1,100

-900

-700

-500

-300

-100

100

300

500

700

900

1,100

1,300

1,500

1,700

1,900

2,100

2,300

2,500

2,700

2,900

3,100

3,300

1Ja

n

3Ja

n

5Ja

n

7Ja

n

9Ja

n

11

Ja

n

13

Ja

n

15

Ja

n

17

Ja

n

19

Ja

n

21

Ja

n

23

Ja

n

25

Ja

n

27

Ja

n

29

Ja

n

31

Ja

n

2F

eb

4F

eb

6F

eb

8F

eb

10

Fe

b

12

Fe

b

14

Fe

b

16

Fe

b

18

Fe

b

20

Fe

b

22

Fe

b

24

Fe

b

26

Fe

b

28

Fe

b

2M

ar

4M

ar

6M

ar

8M

ar

10

Ma

r

12

Ma

r

14

Ma

r

16

Ma

r

18

Ma

r

20

Ma

r

22

Ma

r

24

Ma

r

26

Ma

r

28

Ma

r

30

Ma

r

1A

pr

3A

pr

5A

pr

7A

pr

9A

pr

11

Ap

r

13

Ap

r

15

Ap

r

17

Ap

r

19

Ap

r

21

Ap

r

23

Ap

r

25

Ap

r

27

Ap

r

29

Ap

r

1M

ay

3M

ay

5M

ay

7M

ay

9M

ay

11

Ma

y

13

Ma

y

15

Ma

y

17

Ma

y

19

Ma

y

21

Ma

y

MW

Actual Daily Operating Reserve (Excludes Emergency Reserves)

Actal Operating Reserve in MW

Linear (Actal Operating Reserve in MW)

Use of Emergency generators

Increasing

Under Frequency Alarms

Increasing

Daily operating reserves

Reducing

0

500

1000

1500

2000

2500

3000

3500

4000

4500

5000

5500

6000

01-J

an-1

0

08-J

an-1

0

15-J

an-1

0

22-J

an-1

0

29-J

an-1

0

05-F

eb-1

0

12-F

eb-1

0

19-F

eb-1

0

26-F

eb-1

0

05-M

ar

-10

12-M

ar

-10

19-M

ar

-10

26-M

ar

-10

02-A

pr-10

09-A

pr-10

16-A

pr-10

23-A

pr-10

30-A

pr-10

07-M

ay-10

14-M

ay-10

21-M

ay-10

MW

Eskom Generation Daily Actial Unplanned Outages

Partial Load LossesFull Load Losses

Daily Unplanned capacity losses

Increasing

Page 7: Update on Regulatory Developments to Support Solar Park Concept 28 October 2010 Upington, South Africa ompi.aphane@energy.gov.za 1

IRP 2010 - Balancing Competing ObjectivesIRP 2010 - Balancing Competing Objectives

Low Cost

Low Carbon

Security ofSupply

Low Water

Page 8: Update on Regulatory Developments to Support Solar Park Concept 28 October 2010 Upington, South Africa ompi.aphane@energy.gov.za 1

BalancedScenario

Scenarios are not plansScenarios are not plansThey are simple glimpses of extreme futures used to evaluate trade-offs between competing objectives

-3000

-2000

-1000

0

1000

2000

3000

4000

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030

Other renewables

Solar

Wind

Peaking - Pumped Storage

Peaking - OCGT

Mid-merit Gas

Import gas

Import hydro

Import coal

FBC Coal

Nuclear

PF Coal

-3000

-2000

-1000

0

1000

2000

3000

4000

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030

Other renewables

Solar

Wind

Peaking - Pumped Storage

Peaking - OCGT

Mid-merit Gas

Import gas

Import hydro

Import coal

FBC Coal

Nuclear

PF Coal

-3000

-2000

-1000

0

1000

2000

3000

4000

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030

Other renewables

Solar

Wind

Peaking - Pumped Storage

Peaking - OCGT

Mid-merit Gas

Import gas

Import hydro

Import coal

FBC Coal

Nuclear

PF Coal

0.0

0.1

0.2

-3000

-2000

-1000

0

1000

2000

3000

4000

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030

Other renewables

Solar

Wind

Peaking - Pumped Storage

Peaking - OCGT

Mid-merit Gas

Import gas

Import hydro

Import coal

FBC Coal

Nuclear

PF Coal

-3000

-2000

-1000

0

1000

2000

3000

4000

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030

Other renewables

Solar

Wind

Peaking - Pumped Storage

Peaking - OCGT

Mid-merit Gas

Import gas

Import hydro

Import coal

FBC Coal

Nuclear

PF Coal

-3000

-2000

-1000

0

1000

2000

3000

4000

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030

Other renewables

Solar

Wind

Peaking - Pumped Storage

Peaking - OCGT

Mid-merit Gas

Import gas

Import hydro

Import coal

FBC Coal

Nuclear

PF Coal

0.0

0.1

0.2

Reducing Uncertainty

Scenarios

Risk AdjustedPlan Policy

AdjustedPlan

-3000

-2000

-1000

0

1000

2000

3000

4000

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030

Other renewables

Solar

Wind

Peaking - Pumped Storage

Peaking - OCGT

Mid-merit Gas

Import gas

Import hydro

Import coal

FBC Coal

Nuclear

PF Coal

-3000

-2000

-1000

0

1000

2000

3000

4000

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030

Other renewables

Solar

Wind

Peaking - Pumped Storage

Peaking - OCGT

Mid-merit Gas

Import gas

Import hydro

Import coal

FBC Coal

Nuclear

PF Coal

-3000

-2000

-1000

0

1000

2000

3000

4000

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030

Other renewables

Solar

Wind

Peaking - Pumped Storage

Peaking - OCGT

Mid-merit Gas

Import gas

Import hydro

Import coal

FBC Coal

Nuclear

PF Coal

0.0

0.1

0.2

-3000

-2000

-1000

0

1000

2000

3000

4000

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030

Other renewables

Solar

Wind

Peaking - Pumped Storage

Peaking - OCGT

Mid-merit Gas

Import gas

Import hydro

Import coal

FBC Coal

Nuclear

PF Coal

-3000

-2000

-1000

0

1000

2000

3000

4000

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030

Other renewables

Solar

Wind

Peaking - Pumped Storage

Peaking - OCGT

Mid-merit Gas

Import gas

Import hydro

Import coal

FBC Coal

Nuclear

PF Coal

-3000

-2000

-1000

0

1000

2000

3000

4000

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030

Other renewables

Solar

Wind

Peaking - Pumped Storage

Peaking - OCGT

Mid-merit Gas

Import gas

Import hydro

Import coal

FBC Coal

Nuclear

PF Coal

0.0

0.1

0.2

-3000

-2000

-1000

0

1000

2000

3000

4000

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030

Other renewables

Solar

Wind

Peaking - Pumped Storage

Peaking - OCGT

Mid-merit Gas

Import gas

Import hydro

Import coal

FBC Coal

Nuclear

PF Coal

-3000

-2000

-1000

0

1000

2000

3000

4000

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030

Other renewables

Solar

Wind

Peaking - Pumped Storage

Peaking - OCGT

Mid-merit Gas

Import gas

Import hydro

Import coal

FBC Coal

Nuclear

PF Coal

-3000

-2000

-1000

0

1000

2000

3000

4000

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030

Other renewables

Solar

Wind

Peaking - Pumped Storage

Peaking - OCGT

Mid-merit Gas

Import gas

Import hydro

Import coal

FBC Coal

Nuclear

PF Coal

0.0

0.1

0.2

-3000

-2000

-1000

0

1000

2000

3000

4000

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030

Other renewables

Solar

Wind

Peaking - Pumped Storage

Peaking - OCGT

Mid-merit Gas

Import gas

Import hydro

Import coal

FBC Coal

Nuclear

PF Coal

-3000

-2000

-1000

0

1000

2000

3000

4000

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030

Other renewables

Solar

Wind

Peaking - Pumped Storage

Peaking - OCGT

Mid-merit Gas

Import gas

Import hydro

Import coal

FBC Coal

Nuclear

PF Coal

-3000

-2000

-1000

0

1000

2000

3000

4000

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030

Other renewables

Solar

Wind

Peaking - Pumped Storage

Peaking - OCGT

Mid-merit Gas

Import gas

Import hydro

Import coal

FBC Coal

Nuclear

PF Coal

0.0

0.1

0.2

-3000

-2000

-1000

0

1000

2000

3000

4000

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030

Other renewables

Solar

Wind

Peaking - Pumped Storage

Peaking - OCGT

Mid-merit Gas

Import gas

Import hydro

Import coal

FBC Coal

Nuclear

PF Coal

-3000

-2000

-1000

0

1000

2000

3000

4000

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030

Other renewables

Solar

Wind

Peaking - Pumped Storage

Peaking - OCGT

Mid-merit Gas

Import gas

Import hydro

Import coal

FBC Coal

Nuclear

PF Coal

-3000

-2000

-1000

0

1000

2000

3000

4000

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030

Other renewables

Solar

Wind

Peaking - Pumped Storage

Peaking - OCGT

Mid-merit Gas

Import gas

Import hydro

Import coal

FBC Coal

Nuclear

PF Coal

0.0

0.1

0.2

-3000

-2000

-1000

0

1000

2000

3000

4000

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030

Other renewables

Solar

Wind

Peaking - Pumped Storage

Peaking - OCGT

Mid-merit Gas

Import gas

Import hydro

Import coal

FBC Coal

Nuclear

PF Coal

-3000

-2000

-1000

0

1000

2000

3000

4000

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030

Other renewables

Solar

Wind

Peaking - Pumped Storage

Peaking - OCGT

Mid-merit Gas

Import gas

Import hydro

Import coal

FBC Coal

Nuclear

PF Coal

-3000

-2000

-1000

0

1000

2000

3000

4000

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030

Other renewables

Solar

Wind

Peaking - Pumped Storage

Peaking - OCGT

Mid-merit Gas

Import gas

Import hydro

Import coal

FBC Coal

Nuclear

PF Coal

0.0

0.1

0.2

-3000

-2000

-1000

0

1000

2000

3000

4000

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030

Other renewables

Solar

Wind

Peaking - Pumped Storage

Peaking - OCGT

Mid-merit Gas

Import gas

Import hydro

Import coal

FBC Coal

Nuclear

PF Coal

-3000

-2000

-1000

0

1000

2000

3000

4000

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030

Other renewables

Solar

Wind

Peaking - Pumped Storage

Peaking - OCGT

Mid-merit Gas

Import gas

Import hydro

Import coal

FBC Coal

Nuclear

PF Coal

-3000

-2000

-1000

0

1000

2000

3000

4000

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030

Other renewables

Solar

Wind

Peaking - Pumped Storage

Peaking - OCGT

Mid-merit Gas

Import gas

Import hydro

Import coal

FBC Coal

Nuclear

PF Coal

0.0

0.1

0.2

-3000

-2000

-1000

0

1000

2000

3000

4000

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030

Other renewables

Solar

Wind

Peaking - Pumped Storage

Peaking - OCGT

Mid-merit Gas

Import gas

Import hydro

Import coal

FBC Coal

Nuclear

PF Coal

-3000

-2000

-1000

0

1000

2000

3000

4000

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030

Other renewables

Solar

Wind

Peaking - Pumped Storage

Peaking - OCGT

Mid-merit Gas

Import gas

Import hydro

Import coal

FBC Coal

Nuclear

PF Coal

-3000

-2000

-1000

0

1000

2000

3000

4000

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030

Other renewables

Solar

Wind

Peaking - Pumped Storage

Peaking - OCGT

Mid-merit Gas

Import gas

Import hydro

Import coal

FBC Coal

Nuclear

PF Coal

0.0

0.1

0.2

-3000

-2000

-1000

0

1000

2000

3000

4000

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030

Other renewables

Solar

Wind

Peaking - Pumped Storage

Peaking - OCGT

Mid-merit Gas

Import gas

Import hydro

Import coal

FBC Coal

Nuclear

PF Coal

-3000

-2000

-1000

0

1000

2000

3000

4000

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030

Other renewables

Solar

Wind

Peaking - Pumped Storage

Peaking - OCGT

Mid-merit Gas

Import gas

Import hydro

Import coal

FBC Coal

Nuclear

PF Coal

-3000

-2000

-1000

0

1000

2000

3000

4000

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030

Other renewables

Solar

Wind

Peaking - Pumped Storage

Peaking - OCGT

Mid-merit Gas

Import gas

Import hydro

Import coal

FBC Coal

Nuclear

PF Coal

0.0

0.1

0.2

-3000

-2000

-1000

0

1000

2000

3000

4000

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030

Other renewables

Solar

Wind

Peaking - Pumped Storage

Peaking - OCGT

Mid-merit Gas

Import gas

Import hydro

Import coal

FBC Coal

Nuclear

PF Coal

-3000

-2000

-1000

0

1000

2000

3000

4000

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030

Other renewables

Solar

Wind

Peaking - Pumped Storage

Peaking - OCGT

Mid-merit Gas

Import gas

Import hydro

Import coal

FBC Coal

Nuclear

PF Coal

-3000

-2000

-1000

0

1000

2000

3000

4000

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030

Other renewables

Solar

Wind

Peaking - Pumped Storage

Peaking - OCGT

Mid-merit Gas

Import gas

Import hydro

Import coal

FBC Coal

Nuclear

PF Coal

0.0

0.1

0.2

-3000

-2000

-1000

0

1000

2000

3000

4000

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030

Other renewables

Solar

Wind

Peaking - Pumped Storage

Peaking - OCGT

Mid-merit Gas

Import gas

Import hydro

Import coal

FBC Coal

Nuclear

PF Coal

-3000

-2000

-1000

0

1000

2000

3000

4000

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030

Other renewables

Solar

Wind

Peaking - Pumped Storage

Peaking - OCGT

Mid-merit Gas

Import gas

Import hydro

Import coal

FBC Coal

Nuclear

PF Coal

-3000

-2000

-1000

0

1000

2000

3000

4000

2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030

Other renewables

Solar

Wind

Peaking - Pumped Storage

Peaking - OCGT

Mid-merit Gas

Import gas

Import hydro

Import coal

FBC Coal

Nuclear

PF Coal

0.0

0.1

0.2

Page 9: Update on Regulatory Developments to Support Solar Park Concept 28 October 2010 Upington, South Africa ompi.aphane@energy.gov.za 1

15 Scenarios created and evaluated15 Scenarios created and evaluated3x Low Cost, 8x Low Carbon, 2x Reduced Demand, 2x Regional Development

Scenario Constraints KusileBase Case 0.0 Limited regional development options

No externalities (incl carbon tax) or climate change targetsCommitted

Base Case 0.1 As above ExcludedBase Case 0.2 As above Committed, but 24 month

delay; and 12 month delay for Medupi

Emission Limit 1.0 (EM1) Annual limit imposed on CO2 emissions from electricity industry of 275MT CO2-eq

Committed

Emission Limit 1.1 As above ExcludedEmission Limit 2.0 (EM2) Annual limit imposed on CO2 emissions from electricity

industry of 275MT CO2-eq, imposed only from 2025Committed

Emission Limit 2.1 As above ExcludedEmission Limit 3.0 (EM3) Annual limit imposed on CO2 emissions from electricity

industry 220MT CO2-eq, imposed from 2020Committed

Emission Limit 3.1 As above ExcludedCarbon Tax 0.0 (CT) Imposing carbon tax as per LTMS values (escalated to 2010

ZAR)Committed

Carbon Tax 0.1 As above ExcludedRegional Development 0.0 (RD)

Inclusion of additional regional projects as options Committed

Regional Development 0.1

As above Excluded

Enhanced DSM 0.0 (EDSM)

Additional DSM committed to extent of 6TWh energy equivalent in 2015

Committed

Enhanced DSM 0.1 As above Excluded

Page 10: Update on Regulatory Developments to Support Solar Park Concept 28 October 2010 Upington, South Africa ompi.aphane@energy.gov.za 1

From Scenarios to the planFrom Scenarios to the planScenario Constraints Kusile

Balanced Scenarios

Balancing • Annual CO2 emissions •Price path peak (R/MWh)•Water Supply Uncertainty•Localisation potential & Regional development

NB: Adequacy of Security of Supply is equalized for all scenarios

Committed, but 24 month delay; and 12 month delay for Medupi

Policy adjusted IRP

Development of the Policy-adjusted IRP can commence as soon as the stakeholder consultation completed.

Page 11: Update on Regulatory Developments to Support Solar Park Concept 28 October 2010 Upington, South Africa ompi.aphane@energy.gov.za 1

Baseload - Coal48%

Baseload -Nuclear

14%

Baseload -Import hydro

2%

Mid-merit Gas5%

Peaking -OCGT

9%

Peaking -Pumped

Storage, Hydro6%

Renewables16%

Total capacity (2030)

Baseload - Coal72%

Baseload -Nuclear

2%

Baseload - Import hydro

3%

Mid-merit Gas4%

Peaking - OCGT9%

Peaking -Pumped Storage,

Hydro7%

Renewables3%

Total capacity (2030)

Diversify Generation Mix – By 2030Diversify Generation Mix – By 2030Balancing Risk, Cost and Carbon

Low Cost Scenario

Balanced Scenario

Baseload - Coal36%

Baseload -Nuclear

12%Baseload - Import

hydro1%

Mid-merit Gas4%

Peaking - OCGT10%

Peaking -Pumped Storage,

Hydro5%

Renewables32%

Total capacity (2030)Low Carbon Scenario

New Capacity AllocationTechnology Allocation

Renewables 33%Baseload - Nuclear 25%Peaking - OCGT 14%Mid-merit Gas 11%Baseload - Coal 9%Baseload - Import hydro 4%Peaking - Pumped Storage 4%

Page 12: Update on Regulatory Developments to Support Solar Park Concept 28 October 2010 Upington, South Africa ompi.aphane@energy.gov.za 1

0.40

0.60

0.80

1.00

1.20

1.40

1.60

2010

2011

2012

2013

2014

2015

2016

2017

2018

2019

2020

2021

2022

2023

2024

2025

2026

2027

2028

2029

2030

Pric

e (R

/kW

h) Real

Indicative Price Paths

Affordability/PriceAffordability/PriceIndicative Price Paths

Low Carbon

Low Cost Scenario

Balanced

Page 13: Update on Regulatory Developments to Support Solar Park Concept 28 October 2010 Upington, South Africa ompi.aphane@energy.gov.za 1

RSA beneficiating competitivenessRSA beneficiating competitivenessIndustrial electricity pricing comparison (2010-2020)

Source: XTA Commissioned Frost and Sullivan Model

If we do not balanceRSA loses competitiveness

Page 14: Update on Regulatory Developments to Support Solar Park Concept 28 October 2010 Upington, South Africa ompi.aphane@energy.gov.za 1

Balancing Affordability, Price & CarbonBalancing Affordability, Price & CarbonDiminishing returns on carbon reduction

Low Cost, 75,400

Balanced, 81,675

Low Carbon, 97,259

150

170

190

210

230

250

270

290

310

330

350

370

390

410

430

700,000 800,000 900,000 1,000,000 1,100,000 1,200,000 1,300,000 1,400,000

Carb

on E

mm

isio

ns in

met

ric t

ons p

er a

nnum

Funding Required in present value terms Rbn

Value of Key Factor by 2030

Bubble Six ~ Total MW Installed

Low Carbon needs ~22GW more installed than Low Cost

Diminishing Returns!

Page 15: Update on Regulatory Developments to Support Solar Park Concept 28 October 2010 Upington, South Africa ompi.aphane@energy.gov.za 1

210

230

250

270

290

310

330

350

370

2010

2011

2012

2013

2014

2015

2016

2017

2018

2019

2020

2021

2022

2023

2024

2025

2026

2027

2028

2029

2030

Wat

er c

onsu

mpti

on

(Ml)

Water usage

WaterWaterTotal water consumption trends

Low Carbon

Low Cost Scenario

Balanced

Page 16: Update on Regulatory Developments to Support Solar Park Concept 28 October 2010 Upington, South Africa ompi.aphane@energy.gov.za 1

Solar Park OpportunitySolar Park Opportunity

Opportunity

Page 17: Update on Regulatory Developments to Support Solar Park Concept 28 October 2010 Upington, South Africa ompi.aphane@energy.gov.za 1

Funding ConsiderationsFunding Considerations

• Funding remains a serious issue.

• The majority of projects can be privately funded – removes the risk from the Govt.

• Certainly expect the renewable energy tranche to be private sector funded

Page 18: Update on Regulatory Developments to Support Solar Park Concept 28 October 2010 Upington, South Africa ompi.aphane@energy.gov.za 1

Summary conclusionsSummary conclusionsFrom Scenarios evaluation

Cost/Price/

• Obligation to protect the environment prohibit the lowest cost

• Growth and job creation demand RSA protects competitiveness

Carbon/Affordability

• We cannot afford Copenhagen but,

• We can get to LTMS by 2025

Security of Supply

• All scenarios equalized adequacy of Security of Supply

Page 19: Update on Regulatory Developments to Support Solar Park Concept 28 October 2010 Upington, South Africa ompi.aphane@energy.gov.za 1

Summary RecommendationsSummary Recommendations

The public consultation process continuing

The “Balanced Scenario” represents the best fit of the realities of known

physical constraints, prescribed specific objectives or desired future conditions.

Inherent uncertainties can be reduced (but never eliminated) by repeating the

IRP planning process going forward as and when new information becomes

available.

Page 20: Update on Regulatory Developments to Support Solar Park Concept 28 October 2010 Upington, South Africa ompi.aphane@energy.gov.za 1

No reserve margin

period of high risk

power cuts

Restoring the requisite reserve

margin

The need to replace the

old fleet

Data source Eskom

20

Way ForwardWay ForwardIRP 2010 - Proceed with Balanced Scenario to complete ASAPNational Emergency Response and Business Continuity Plan – Launch ASAP

Country Electricity Plan (IRP2010)

National Emergency Response and

Business Continuity Plan

Under ControlProceed with Balanced Scenario to complete ASAP

CRITICAL and URGENTAttention Required

Page 21: Update on Regulatory Developments to Support Solar Park Concept 28 October 2010 Upington, South Africa ompi.aphane@energy.gov.za 1

21