1
13 12 10 09 08 07 06 05 04 03 02 01 F E C A D 14 2 1020 2 1020 1009 2 1009 1 1008 1 1008 2 B SPORTS HALL SPINE STORE - SH CLRS BLEACHER SEATING GYM - STORE GYM - COACH GYM - CNG 8580 3125 2875 20150 CNG AM CNG AF CNG CM CNG CF STORE - WMM STORE - BIKE REPAIR ST WC STORE- BELPARK STORE - ARCHERY EXIT CNG ACC LIFT 8700 13600 9500 3000 8790 8615 8625 8625 8625 2415 8625 8625 8625 ARRIVE AND WAIT STORE - ORWELL WHEELERS FA STORE - MULTI STORE - SH AWC STAFF ROOM STAFF CNG LOBBY ADMIN GYMNASTICS TURBO BIKES 57.37 m² STORE - TRACK EMERGENCY ACCESS RECEPTION CLUB MEETING YARD BIKE STAND CARGO ACCESS WC MAIN ENTRANCE 1 1020 1 1020 PLANT ROOM 11 FFL 134.00 m FFL 134.00 m 34730 106370 FFL 134.00 m RUNNING TRACK 1 1021 1 1021 20224 3101 2984 7850 66 405 8875 2500 8490 34490 28340 11705 4400 3083 3038 3033 3033 3083 3083 SPRINT TRACK STEPPED LANDSCAPED SPECTATOR SEATING FLOOD LIGHT FLOOD LIGHT FFL 135.00 m FFL 135.00 m FFL 134.00 m FFL 134.00 m FFL 134.00 m FFL 134.00 m LANDSCAPED BANK Check all dimensions on site and notify of all and any discrepancies Do not scale off this drawing All drawings to be read in conjunction with Architects specification and all relevant contract documents This drawing should be printed in colour for clarity This drawing and its content is copyright to O'Brien Finucane Architects Ltd. This drawing shall not be copied, reproduced or otherwise used without the consent of O'Brien Finucane Architects Ltd. 1 Johnson Place Dublin 2 D02 HW 58 Ireland www.obfa.ie [email protected] + 353 1 685 4586 DRAWING NUMBER: DRAWING: PROJECT: CLIENT: PROJECT STAGE: DATE SCALE SHEET CHECKED DRAWN KEY PLAN: A1 NOTES: REV. DATE DESCRIPTIONS DRAWN CHKD REV C:\Users\yeuyeung\Documents\[email protected] 1 : 200 C 11/04/2019 12:16:12 1909-OBFA-MA-00-DR-A-PL-ALP-1005 YN COB PLANNING - GROUND FLOOR PLAN 1909_DSDAC_ATHLETICS CENTRE DSDAC FOR PLANNING 6 19/04/05 PLANNING PART VIII SUBMISSION YN YN 5 19/04/02 DRAFT PLANNING YN YN 4 19/03/22 DRAWING ADJUSTMENT FOR PLANNING YN YN N 0 10 Metres 5 Scale 1:200 PC/PKS/01/19

U:obfa 20191909 DSDAC ATHLETICS CENTRE (JAN19)D BIMD3 ... · store -sh clrs bleacher seating gym -store 8580 3125 2875 20150 gym -coach gym -cng cng am cng af cng cm cng cf store

  • Upload
    others

  • View
    7

  • Download
    0

Embed Size (px)

Citation preview

Page 1: U:obfa 20191909 DSDAC ATHLETICS CENTRE (JAN19)D BIMD3 ... · store -sh clrs bleacher seating gym -store 8580 3125 2875 20150 gym -coach gym -cng cng am cng af cng cm cng cf store

131210090807060504030201

F

E

C

A

D

14

21020

21020

1009

2

10091

1008

1

1008 2

B

SPORTS HALL

SPINE

STORE - SH CLRS BLEACHER SEATING GYM - STOREGYM - COACH GYM - CNG

8580

3125

2875

2015

0

CNG AM

CNG AF

CNG CM

CNG CF

STORE - WMM

STORE - BIKE REPAIR

ST

WC

STORE- BELPARK

STORE - ARCHERY

EXIT

CNG ACC

LIFT

8700 13600 9500 3000 8790 8615 8625 8625 8625 2415 8625 8625 8625

ARRIVE AND WAIT

STORE - ORWELLWHEELERS

FA

STORE - MULTI

STORE - SH

AWC

STAFF ROOMSTAFF CNG

LOBBYADMIN

GYMNASTICS

TURBO BIKES

57.37 m²STORE - TRACK

EMERGENCYACCESS

RECEPTION

CLUB MEETINGYARDBIKE STAND

CARGO ACCESS

WCMAIN ENTRANCE

11020

11020

PLANT ROOM

11

FFL 134.00 m

FFL 134.00 m

3473

0

106370

FFL 134.00 m

RUNNING TRACK

11021

11021

2022

431

0129

8478

5066

405

8875 2500 8490 34490 28340

1170

544

0030

8330

3830

3330

3330

8330

83

SPRINT TRACK

STEPPED LANDSCAPED SPECTATOR SEATING

FLOOD LIGHT FLOOD LIGHTFFL 135.00 m

FFL 135.00 m

FFL 134.00 m

FFL 134.00 m

FFL 134.00 m

FFL 134.00 m

LANDSCAPED BANK

Check all dimensions on site and notify of all and any discrepancies Do not scale off this drawing

All drawings to be read in conjunction with Architects specification and all relevant contract documents

This drawing should be printed in colour for clarity

This drawing and its content is copyright to O'Brien Finucane Architects Ltd.

This drawing shall not be copied, reproduced or otherwise used without the consent of O'Brien Finucane Architects Ltd. 1 Johnson Place

Dublin 2 D02 HW 58

Ireland

www.obfa.ie

[email protected]

+ 353 1 685 4586

DRAWINGNUMBER:

DRAWING:

PROJECT:

CLIENT:

PROJECT STAGE:

DATE

SCALE

SHEET

CHECKED

DRAWN

KEY PLAN:

A1

NOTES: REV. DATE DESCRIPTIONS DRAWN CHKD

REV

C:\Users\yeuyeung\Documents\[email protected]

1 : 200

C

11/04/2019 12:16:12

1909-OBFA-MA-00-DR-A-PL-ALP-1005

YN

COB

PLANNING - GROUND FLOOR PLAN

1909_DSDAC_ATHLETICS CENTRE

DSDAC

FOR PLANNING6 19/04/05 PLANNING PART VIII SUBMISSION YN YN5 19/04/02 DRAFT PLANNING YN YN4 19/03/22 DRAWING ADJUSTMENT FOR PLANNING YN YN

N 0 10 Metres5

Scale 1:200

PC/PKS/01/19