University of South Florida Health Center – MDL Building 114

Reroofing USF Project No. PF154317843202

Bid Documents Project Manual

July 21, 2017

Page 2: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing
Page 3: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

July 21, 2017

Project Manual Bid Documents For

University of South Florida Health Center MDL Building 114 Reroofing USF Project No. PF543117843202

Architect ROWE ARCHITECTS INCORPORATED Florida Registration No. AAC002172 100 Madison Street, Suite 200 Tampa, Florida 33602 813.221.8771

Electrical Engineering Consultant Anston-Greenlees, Inc. 1315 West Fletcher Avenue, Suite A Tampa, Florida 33612 813.963.1919

Copyright © 2017 Rowe Architects Incorporated, All rights reserved.

Page 4: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing
Page 5: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

TABLE OF CONTENTS TOC - 1

Technical Specifications

Table of Contents Division 00 Procurement and Contracting Requirements 00 31 19 Existing Condition Information

Division 01 General Requirements 01 10 00 Summary 01 10 01 University Special Project Procedures 01 25 00 Substitution Procedures 01 26 00 Contract Modification Procedures 01 29 00 Payment Procedures 01 31 00 Project Management and Coordination 01 32 00 Construction Progress Documentation 01 33 00 Submittal Procedures 01 40 00 Quality Requirements 01 42 00 References 01 50 00 Temporary Facilities and Controls 01 60 00 Product Requirements 01 73 00 Execution 01 77 00 Closeout Procedures 01 78 23 Maintenance Data 01 78 39 Project Record Documents

Division 02 Existing Conditions 02 41 19 Selective Demolition

Division 05 Metals 05 40 00 Cold-Formed Metal Framing 05 50 00 Metal Fabrications 05 52 13 Pipe and Tube Railings

Division 06 Wood, Plastics, and Composites 06 10 53 Miscellaneous Rough Carpentry

Division 07 Thermal and Moisture Protection 07 52 13 APP-Modified Bituminous Membrane Roofing 07 57 00 Coated Foamed Roofing 07 59 10 Preparation for Reroofing 07 62 00 Sheet Metal Flashing and Trim 07 72 00 Roof Accessories

Division 23 Heating, Ventilating, and Air Conditioning (HVAC) 23 05 93 Testing & Balancing of HVAC Systems

Division 26 Electrical 26 41 13 Lightning Protection System

END OF TABLE OF CONTENTS

Page 6: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing
Page 7: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

EXISTING CONDITION INFORMATION 003119 - 1

DOCUMENT 00 31 19 - EXISTING CONDITION INFORMATION

1.1 EXISTING CONDITION INFORMATION

A. This Document with its referenced attachments is part of the Procurement and Contracting Requirements for Project. They provide Owner's information for Bidders' convenience and are intended to supplement rather than serve in lieu of the Bidders' own investigations. They are made available for Bidders' convenience and information, but are not a warranty of existing conditions. This Document and its attachments are not part of the Contract Documents.

B. Existing drawings that include information on existing conditions including previous construction at Project site are available from the Architect in PDF format.

END OF DOCUMENT 00 31 19

Page 8: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing
Page 9: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

SUMMARY 01 10 00 - 1

SECTION 01 10 00 - SUMMARY

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes: 1. Project information. 2. Work covered by Contract Documents. 3. Coordination with occupants. 4. Specification and drawing conventions.

B. Related Requirements: 1. Section 01 10 01 "University Special Project Procedures" for limitations and procedures

governing temporary use of Owner's facilities. 2. Section 01 10 01 "University Special Project Procedures" for limitations and procedures

governing access to the site. 3. Section 01 10 01 "University Special Project Procedures" for work (job) restrictions.

1.3 PROJECT INFORMATION

A. Project Identification: Health Center – MDL Building 114 Reroofing

B. Owner: University of South Florida 1. Owner's Representative: Daoud Georgis.

Physical Plant Division Facilities Enhancement Department 4202 East Fowler Avenue, OMP100 Tampa, Florida 33620-7550

C. Architect: Rowe Architects Incorporated 100 East Madison Street, Suite 200 Tampa, Florida 33602

D. Architect's Consultants: The Architect has retained the following design professionals who have prepared designated portions of the Contract Documents: 1. Electrical Engineer: Anston-Greenlees, Inc.

1315 West Fletcher Avenue, Suite A Tampa, Florida 33612

1.4 WORK COVERED BY CONTRACT DOCUMENTS

A. The Work of Project is defined by the Contract Documents and consists of the following: 1. Replacement of the roofing, roof insulation and lightning protection system.

B. Type of Contract: 1. Project will be constructed under a single prime contract.

Page 10: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

SUMMARY 01 10 00 - 2

1.5 COORDINATION WITH OCCUPANTS

A. Full Owner Occupancy: Owner will occupy site and existing and adjacent buildings during entire construction period. Cooperate with Owner during construction operations to minimize conflicts and facilitate Owner usage. Perform the Work so as not to interfere with Owner's day-to-day operations. Maintain existing exits unless otherwise indicated. 1. Maintain access to existing walkways, corridors, and other adjacent occupied or used

facilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from Owner and approval of authorities having jurisdiction.

2. Notify Owner not less than 72 hours in advance of activities that will affect Owner's operations.

3. See Section 01 10 01 "University Special Project Procedures" for additional requirements for coordination with the building occupants.

1.6 SPECIFICATION AND DRAWING CONVENTIONS

A. Specification Content: The Specifications use certain conventions for the style of language and the intended meaning of certain terms, words, and phrases when used in particular situations. These conventions are as follows: 1. Imperative mood and streamlined language are generally used in the Specifications. The

words "shall," "shall be," or "shall comply with," depending on the context, are implied where a colon (:) is used within a sentence or phrase.

2. Specification requirements are to be performed by Contractor unless specifically stated otherwise.

B. Division 01 General Requirements: Requirements of Sections in Division 01 apply to the Work of all Sections in the Specifications.

C. Drawing Coordination: Requirements for materials and products identified on Drawings are described in detail in the Specifications. One or more of the following are used on Drawings to identify materials and products: 1. Terminology: Materials and products are identified by the typical generic terms used in

the individual Specifications Sections. 2. Abbreviations: Materials and products are identified by abbreviations published as part of

the U.S. National CAD Standard and scheduled on Drawings. 3. Keynoting: Materials and products are identified by reference keynotes referencing

Specification Section numbers found in this Project Manual.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 01 10 00

Page 11: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

UNIVERSITY SPECIAL PROJECT PROCEDURES 01 10 01 - 1

SECTION 01 10 01 – UNIVERSITY SPECIAL PROJECT PROCEDURES

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes: 1. General restrictions on access to use of site and surroundings, and security procedures

for tools, materials, and individuals within the workforce. 2. Work Sequences 3. Contractor Use of Premises and University Occupancy 4. Job Conditions 5. Access to Site 6. OSHA Conditions 7. Transportation Facilities 8. Security 9. Personnel Rules 10. Tools and Materials 11. Life Safety Systems

1.3 QUALITY ASSURANCE

A. Promptly upon award of the Contract, notify all pertinent construction related personnel regarding the requirements of this Section.

1.4 WORK SEQUENCES

A. Work shall be executed to minimize disruption of activities at the project site or building. Contractor shall submit to the Architect and the University’s Construction Coordinator a written plan for staging of work, material staging areas, dust prevention, tree preservation barricading, and any required outages within seven (7) calendar days from the Notice to Proceed date. The Plan shall be reviewed, revised as required and approved by the University prior to initiation of work at site.

B. Forty-eight (48) hours prior to any utility, communication device(s), and building HVAC system cut-off, to all or any portion of the project site and/or adjacent university sites, required by the progress of the Work, the Contractor shall notify the University’s Construction Coordinator in writing. The notification shall include, but not be limited to, service(s) to be cut-off and the anticipated duration of the cut-off.

1.5 CONTRACTOR USE OF PREMISES AND UNIVERSITY OCCUPANCY

A. Use of the University’s premises by Contractor will be limited to the area identified within the “Project Limits” as established within the Construction Documents, temporary facilities, and reasonable access thereto. Space for staging work and related operations of Contractor and Contractor’s employees will be provided, subject to availability. Coordinate use of premises under direction of the University’s Project Director. Develop plan of staging of work, locations for storage areas, layout areas, and temporary offices and submit for approval by the University’s Construction Coordinator within seven (7) calendar days prior to the Notice to Proceed.

Page 12: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing
Page 13: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

UNIVERSITY SPECIAL PROJECT PROCEDURES 01 10 01 - 2

B. Contractor will have limited use of premises during course of work during designated work times (8:00 a.m. to 5:00 p.m.), Monday through Friday; and must coordinate use of surrounding building areas with the University’s Construction Coordinator. Use of site areas for staging or other purposes must be preapproved by University’s Project Director.

C. The Contractor will not be allowed to work within teaching buildings during the week of University established “Finals Week” unless with prior written approval of the University’s Construction Coordinator. This scheduled stoppage of the Work has been included as a part of the Contract Time and no further adjustment of Contract Time shall be allowed.

D. The Contractor is advised that all necessary provisions shall be taken to assure the safety of the students, University employees, visitors, and other contractors day and night. The Contractor shall at all times conduct his operations as to insure the least inconvenience and the greatest amount of safety and security for the students, the University’s use of other nearby areas, University employees, and the general public.

E. Provide and erect before any work begins, and maintain during the progress of the Work, all necessary protective barriers, warning signals, signs and lights. The extent of this work and details of construction shall be in accordance with the requirements of all Federal, State, University and local ordinances, codes and requirements; and shall be to the approval of authorities having jurisdiction.

F. Exercise the utmost care to protect from damage to existing equipment, furniture, building finishes, trees to be preserved, etc.

G. Any portion of the existing buildings or existing utility services not included as part of the Work of this Contract or any portion of the Work damaged because of failure to provide the protection required, shall be removed and replaced with new materials and construction at the Contractor’s expense. The work shall be accomplished subject to the University’s approval.

H. If Contractor makes arrangements for closure of a corridor, hallway, egress route, etc. that provides access to other floor areas, Contractor shall make provisions for alternative access to such other nearby areas which are acceptable to the University’s Construction Coordinator.

I. The University will occupy the building during the entire period of the Work of this Contract to conduct its normal operations. Cooperate with University in all construction operations to minimize conflict, and to facilitate University usage.

1.6 JOB CONDITIONS

A. When staging material in or on the structure and during applications, ensure that overloading of the staging area and/or structure does not occur. Keep all premises free from accumulation of waste material and rubbish, and remove it from the project site daily

B. All areas within the project are designated as NO SMOKING areas. The Contractor shall not allow any workers, vendors, visitors, or other persons, to smoke within University buildings.

A. If any utilities, local and University provided, are required which are not readily available at the project site, the Contractor shall pay for the temporary installation of such utility and monthly charges, as determined by usage.

B. Guard against damage or loss to the property of the University or other contractors or vendors working at the University; replace or repair any such loss or damage. The University may withhold payment or make such deductions as deemed necessary to insure reimbursement or replacement for loss or damaged property through negligence of the Contractor or its agents. Replace, at no cost to the Owner, any trees, shrubs, lawns or plantings damaged by the Contractor or its agents during the Work of this project within two (2) weeks of occurrence. Grassed and planting areas generally have irrigation systems below grade; verify location of these systems and all other underground utilities in Work or staging areas prior to the start of construction. Repair and pay all costs associated with damaged utilities. Any existing irrigation affecting adjacent areas must be kept operating during construction and may not be left in shutdown condition for more than two (2) days, without University approval.

Page 14: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

UNIVERSITY SPECIAL PROJECT PROCEDURES 01 10 01 - 3

1.7 ACCESS TO SITE

A. Contractor shall access to the site through a single point approved by the University’s Construction Coordinator. Random access to and from site will not be permitted. Fixed times for arrival and departure of most construction forces as a group should be established by mutual agreement between Contractor and the University’s Construction Coordinator. Changes and additions to normal working schedules shall be communicated to the University representative, when applicable, 72 hours in advance through the University’s Project Director.

B. The University will endeavor to notify Contractor as soon as possible if a situation exists which may preclude timely access to or use of the project site.

C. The Contractor shall not work at the project site on any day New University of Florida is officially closed, unless the University Police is made aware of such construction and a University Construction representative is on call to handle any emergencies.

1.8 OSHA CONDITIONS

A. The Contractor shall conform to OSHA and other safety requirements during this project.

1.9 TRANSPORTATION FACILITIES

A. Provide adequate protection for curbs and sidewalks over which trucks and equipment pass to reach the project site(s). Repair/replace all damaged areas joint to joint, at no cost to the Owner. Barricade the drip line area of existing trees to be preserved. No parking under drip line/canopy of trees.

B. Contractor’s Vehicles 1. Parking permits are required for all personnel and business vehicles, except when parked

inside Contractor’s construction fencing. 2. Do not permit such vehicles to park on any street or other area of the University’s

property except in the area(s) so designated by the University’s Project Director and the University’s Parking Services Division.

3. Secure all required Parking Decals and/or permits as required by the University. 4. No off-site parking will be provided as part of this contract, except as provided by permit

in designated University parking areas.

1.10 SECURITY

A. Any construction site located on any of the University of South Florida campuses fall under the jurisdiction of the University of South Florida Police Department. Any incident requiring police service should be reported immediately to the University Police (813-974-2628). 1. For all life-threatening fire or medical emergencies dial 911.

B. Restrict the access of all persons entering upon the University’s property in connection with the Work to the agreed upon access route and to the actual site of the Work.

C. Restrict activities of employees to authorized areas. Employees shall not be allowed to mingle in student or public areas. Do not enter other University buildings unless it is directly related to the Work of this project.

D. Contractor’s Construction Fencing: Contractor shall be responsible to install and maintain all fencing in a secure manner. Contractors shall supply all locks and chains.

E. Campus Police are state certified law enforcement officers and as such are authorized to take appropriate search actions as may be dictated by the specific probable cause and necessary in the judgment of the officer.

F. The University may seize items that may pose a danger to the safety and security of faculty, staff, or students.

Page 15: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

UNIVERSITY SPECIAL PROJECT PROCEDURES 01 10 01 - 4

G. Provide the University’s Project Director and the University Police keys to all construction gates and building entrances.

H. Post project contact list, to include 24-hour telephone numbers, for all key project staff members. Post list at major access points to the project site(s) and outside at the project office. Update as necessary.

1.11 PERSONNEL RULES

A. Identification of Personnel 1. Provide all construction related personnel Photo Badge Identification and/or uniform with

company and employee names easily identifiable. Photo identification badges must be worn in plain sight at all times.

2. All Contractors shall provide the University Police Department the University’s Construction Coordinator with a list of the names and phone numbers (including beepers and pagers) of supervisors of construction at the project site(s).

B. Association with students, staff and faculty: 1. Association with students, staff and faculty is not permitted. In case of inappropriate

conduct offenders shall be removed from job site. 2. Trafficking or trading in goods with students is not permitted. 3. Students, staff, and faculty of the University are not to be disturbed or in any way

disrupted in their pursuits. Construction employees are to refrain from unsavory or unwanted comments or gestures towards students, staff, or faculty, particularly female students, staff, or faculty.

C. Do not bring items which are not required for performance of work; neither in personal vehicles nor on one’s person. Pets are not permitted on construction site.

D. Alcoholic beverages, weapons of any kind, and non-prescription drugs are not allowed on site, in vehicles, on person, or in trailers. Persons caught introducing illegal or banned items onto the University grounds will be prosecuted.

E. Construction employers are required to take adequate measures to ensure that the employees they send to the project site on campus are not wanted for criminal offenses. All contractors who employ WORK RELEASE employees shall notify the University Police Department of such practice and provide the names of all persons employed under the Work Release Program.

F. Contractors and their employees are to obey all state and local laws as well as rules of the University of South Florida when they are on University property.

G. Meals 1. Workers should bring their lunch, use Contractor provided services or leave the

University to obtain meals. Food services for construction workers will not be provided at the University, unless approved by the University’s Construction Coordinator.

2. If vending machines are available in construction area, they will be identified at the Pre-construction meeting.

H. Visitors: On-site visitors of construction workers are prohibited. Persons not working on the Project are required to first seek approval of the University’s Project Director before visiting site.

1.12 TOOLS AND MATERIALS

A. Contractor shall endeavor to introduce only necessary tools into the project site, and in the least possible number.

B. Construction companies and their employees are requested to secure all property as much as feasible to reduce theft or damage to equipment or property.

Page 16: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

UNIVERSITY SPECIAL PROJECT PROCEDURES 01 10 01 - 5

C. Do not give or loan tools or supplies to students. Do not accept anything from students. Do not permit students access to Construction Documents and related papers. Report thefts immediately.

1.13 LIFE SAFETY SYSTEMS

A. Any life safety, security system, energy management system, etc., that has been deenergized, disconnected or disabled due to the construction process shall be reenergized, reconnected or enabled prior to the Contractor leaving the site at the end of the day.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 01 10 01

Page 17: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

SUBSTITUTION PROCEDURES 01 25 00 - 1

SECTION 01 25 00 - SUBSTITUTION PROCEDURES

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes administrative and procedural requirements for substitutions.

B. Related Requirements: 1. Section 01 60 00 "Product Requirements" for requirements for submitting comparable

product submittals for products by listed manufacturers.

1.3 DEFINITIONS

A. Substitutions: Changes in products, materials, equipment, and methods of construction from those required by the Contract Documents and proposed by Contractor. 1. Substitutions for Cause: Changes proposed by Contractor that are required due to

changed Project conditions, such as unavailability of product, regulatory changes, or unavailability of required warranty terms.

2. Substitutions for Convenience: Changes proposed by Contractor or Owner that are not required in order to meet other Project requirements but may offer advantage to Contractor or Owner.

1.4 ACTION SUBMITTALS

A. Substitution Requests: Submit an electronic copy of each request for consideration. Identify product or fabrication or installation method to be replaced. Include Specification Section number and title and Drawing numbers and titles. 1. Documentation: Show compliance with requirements for substitutions and the following,

as applicable: a. Statement indicating why specified product or fabrication or installation cannot be

provided, if applicable. b. Coordination information, including a list of changes or revisions needed to other

parts of the Work that will be necessary to accommodate proposed substitution. c. Detailed comparison of significant qualities of proposed substitution with those of

the Work specified. Include annotated copy of applicable Specification Section. Significant qualities may include attributes such as performance, weight, size, durability, visual effect, sustainable design characteristics, warranties, and specific features and requirements indicated. Indicate deviations, if any, from the Work specified.

d. Product Data, including drawings and descriptions of products and fabrication and installation procedures.

e. Samples, where applicable or requested. f. Certificates and qualification data, where applicable or requested. g. List of similar installations for completed projects with project names and

addresses and names and addresses of architects and owners, if requested. h. Material test reports from a qualified testing agency indicating and interpreting test

results for compliance with requirements indicated. i. Research reports evidencing compliance with building code in effect for Project.

Page 18: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

SUBSTITUTION PROCEDURES 01 25 00 - 2

j. Detailed comparison of Contractor's construction schedule using proposed substitution with products specified for the Work, including effect on the overall Contract Time. If specified product or method of construction cannot be provided within the Contract Time, include letter from manufacturer, on manufacturer's letterhead, stating date of receipt of purchase order, lack of availability, or delays in delivery.

k. Cost information, including a proposal of change, if any, in the Contract Sum. l. Contractor's certification that proposed substitution complies with requirements in

the Contract Documents except as indicated in substitution request, is compatible with related materials, and is appropriate for applications indicated.

m. Contractor's waiver of rights to additional payment or time that may subsequently become necessary because of failure of proposed substitution to produce indicated results.

2. Architect's Action: If necessary, Architect will request additional information or documentation for evaluation within seven days of receipt of a request for substitution. Architect will notify Contractor of acceptance or rejection of proposed substitution within 15 days of receipt of request, or seven days of receipt of additional information or documentation, whichever is later. a. Forms of Acceptance: Change Order, Construction Change Directive, or

Architect's Supplemental Instructions for minor changes in the Work. b. Use product specified if Architect does not issue a decision on use of a proposed

substitution within time allocated.

1.5 QUALITY ASSURANCE

A. Compatibility of Substitutions: Investigate and document compatibility of proposed substitution with related products and materials. Engage a qualified testing agency to perform compatibility tests recommended by manufacturers.

1.6 PROCEDURES

A. Coordination: Revise or adjust affected work as necessary to integrate work of the approved substitutions.

PART 2 - PRODUCTS

2.1 SUBSTITUTIONS

A. Substitutions for Cause: Submit requests for substitution immediately on discovery of need for change, but not later than 15 days prior to time required for preparation and review of related submittals. 1. Conditions: Architect will consider Contractor's request for substitution when the

following conditions are satisfied. If the following conditions are not satisfied, Architect will return requests without action, except to record noncompliance with these requirements: a. Requested substitution is consistent with the Contract Documents and will produce

indicated results. b. Substitution request is fully documented and properly submitted. c. Requested substitution will not adversely affect Contractor's construction schedule. d. Requested substitution has received necessary approvals of authorities having

jurisdiction. e. Requested substitution is compatible with other portions of the Work. f. Requested substitution has been coordinated with other portions of the Work. g. Requested substitution provides specified warranty.

Page 19: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

SUBSTITUTION PROCEDURES 01 25 00 - 3

h. If requested substitution involves more than one trade contractor, requested substitution has been coordinated with other portions of the Work, is uniform and consistent, is compatible with other products, and is acceptable to all trade contractors involved.

B. Substitutions for Convenience: Architect will consider requests for substitution if received within 60 days after the Notice to Proceed. Requests received after that time may be considered or rejected at discretion of Architect. 1. Conditions: Architect will consider Contractor's request for substitution when the

following conditions are satisfied. If the following conditions are not satisfied, Architect will return requests without action, except to record noncompliance with these requirements: a. Requested substitution offers Owner a substantial advantage in cost, time, energy

conservation, or other considerations, after deducting additional responsibilities Owner must assume. Owner's additional responsibilities may include compensation to Architect for redesign and evaluation services, increased cost of other construction by Owner, and similar considerations.

b. Requested substitution does not require extensive revisions to the Contract Documents.

c. Requested substitution is consistent with the Contract Documents and will produce indicated results.

d. Substitution request is fully documented and properly submitted. e. Requested substitution will not adversely affect Contractor's construction schedule. f. Requested substitution has received necessary approvals of authorities having

jurisdiction. g. Requested substitution is compatible with other portions of the Work. h. Requested substitution has been coordinated with other portions of the Work. i. Requested substitution provides specified warranty. j. If requested substitution involves more than one trade contractor, requested

substitution has been coordinated with other portions of the Work, is uniform and consistent, is compatible with other products, and is acceptable to all trade contractors involved.

PART 3 - EXECUTION (Not Used)

END OF SECTION 01 25 00

Page 20: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing
Page 21: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

CONTRACT MODIFICATION PROCEDURES 01 26 00 - 1

SECTION 01 26 00 - CONTRACT MODIFICATION PROCEDURES

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes administrative and procedural requirements for handling and processing Contract modifications.

B. Related Requirements: 1. Division 1 Section "Substitution Procedures" for administrative procedures for handling

requests for substitutions made after the Contract award.

1.3 MINOR CHANGES IN THE WORK

A. Architect will issue through Contractor supplemental instructions authorizing minor changes in the Work, not involving adjustment to the Contract Sum or the Contract Time, on the Architect's Supplemental Instructions.

1.4 CONTRACTOR’S REQUEST FOR INFORMATION (RFI’s)

A. The Contractor may, after exercising due diligence to locate required information, request from the Architect clarification or interpretation of the requirements of the Contract Documents. The Architect shall, with reasonable promptness, respond to such Contractor’s request for clarification or interpretation. However, if the information requested by the Contractor is apparent from field observations, is contained in the Contract Documents or is reasonably inferred from them, the Contractor shall be responsible to the Owner for all reasonable cost charged by the Architect to the Owner for the Additional Services required to provide such information.

B. The Architect’s response to the Contractor’s request for clarification or interpretation shall NOT constitute direction to make changes to the work that will increase the Contract Sum or Contract Time. 1. The Architect’s response shall be on the Architect’s Supplemental Instructions form or

directly on the Contractors Request for Information form, in which case it is the Architect’ opinion that any Change in the Work is minor and not involving adjustment to the Contract Sum or the Contract Time.

2. If the Architect determines that the response requires a change involving an adjustment to the Contract Sum or the Contract Time, the response will be issued in the form of a Proposal Request.

1.5 PROPOSAL REQUESTS

A. Owner-Initiated Proposal Requests: Architect will issue a detailed description of proposed changes in the Work that may require adjustment to the Contract Sum or the Contract Time. If necessary, the description will include supplemental or revised Drawings and Specifications. 1. Work Change Proposal Requests issued by Architect are not instructions either to stop

work in progress or to execute the proposed change. 2. Within time specified in Proposal Request after receipt of Proposal Request, submit a

quotation estimating cost adjustments to the Contract Sum and the Contract Time necessary to execute the change.

Page 22: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

CONTRACT MODIFICATION PROCEDURES 01 26 00 - 2

a. Include a list of quantities of products required or eliminated and unit costs, with total amount of purchases and credits to be made. If requested, furnish survey data to substantiate quantities.

b. Indicate applicable taxes, delivery charges, equipment rental, and amounts of trade discounts.

c. Include costs of labor and supervision directly attributable to the change. d. Include an updated Contractor's construction schedule that indicates the effect of

the change, including, but not limited to, changes in activity duration, start and finish times, and activity relationship. Use available total float before requesting an extension of the Contract Time.

B. Contractor-Initiated Proposals: If latent or changed conditions require modifications to the Contract, Contractor may initiate a claim by submitting a request for a change to Architect. 1. Include a statement outlining reasons for the change and the effect of the change on the

Work. Provide a complete description of the proposed change. Indicate the effect of the proposed change on the Contract Sum and the Contract Time.

2. Include a list of quantities of products required or eliminated and unit costs, with total amount of purchases and credits to be made. If requested, furnish survey data to substantiate quantities.

3. Indicate applicable taxes, delivery charges, equipment rental, and amounts of trade discounts.

4. Include costs of labor and supervision directly attributable to the change. 5. Include an updated Contractor's construction schedule that indicates the effect of the

change, including, but not limited to, changes in activity duration, start and finish times, and activity relationship. Use available total float before requesting an extension of the Contract Time.

6. Comply with requirements in Division 1 Section "Substitution Procedures" if the proposed change requires substitution of one product or system for product or system specified.

1.6 CHANGE ORDER PROCEDURES

A. On Owner's approval of a Work Changes Proposal Request, Architect will issue a Change Order for signatures of Owner and Contractor on the Architect’s form.

1.7 CONSTRUCTION CHANGE DIRECTIVE

A. Construction Change Directive: Architect may issue a Construction Change Directive which instructs Contractor to proceed with a change in the Work, for subsequent inclusion in a Change Order. 1. Construction Change Directive contains a complete description of change in the Work. It

also designates method to be followed to determine change in the Contract Sum or the Contract Time.

B. Documentation: Maintain detailed records on a time and material basis of work required by the Construction Change Directive. 1. After completion of change, submit an itemized account and supporting data necessary

to substantiate cost and time adjustments to the Contract.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 01 26 00

Page 23: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

PAYMENT PROCEDURES 01 29 00 - 1

SECTION 01 29 00 - PAYMENT PROCEDURES

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes administrative and procedural requirements necessary to prepare and process Applications for Payment.

B. Related Requirements: 1. Section 01 26 00 "Contract Modification Procedures" for administrative procedures for

handling changes to the Contract. 2. Section 01 32 00 "Construction Progress Documentation" for administrative requirements

governing the preparation and submittal of Contractor's construction schedule.

1.3 DEFINITIONS

A. Schedule of Values: A statement furnished by Contractor allocating portions of the Contract Sum to various portions of the Work and used as the basis for reviewing Contractor's Applications for Payment.

1.4 SCHEDULE OF VALUES

A. Coordination: Coordinate preparation of the schedule of values with preparation of Contractor's construction schedule. 1. Coordinate line items in the schedule of values with other required administrative forms

and schedules, including the following: a. Application for Payment forms with continuation sheets. b. Submittal schedule. c. Items required to be indicated as separate activities in Contractor's construction

schedule. 2. Submit the schedule of values to Architect at earliest possible date, but no later than

fifteen days before the date scheduled for submittal of initial Applications for Payment. 3. Sub-schedules for Separate Elements of Work: Where the Contractor's construction

schedule defines separate elements of the Work, provide sub-schedules showing values coordinated with each element.

B. Format and Content: Use Project Manual table of contents as a guide to establish line items for the schedule of values. Provide at least one line item for each Specification Section. 1. Identification: Include the following Project identification on the schedule of values:

a. Project name and location. b. Name of Architect. c. Architect's project number. d. Contractor's name and address. e. Date of submittal.

2. Arrange schedule of values consistent with format of AIA Document G703.

Page 24: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

PAYMENT PROCEDURES 01 29 00 - 2

3. Arrange the schedule of values in tabular form with separate columns to indicate the following for each item listed: a. Related Specification Section or Division. b. Description of the Work. c. Name of subcontractor. d. Name of manufacturer or fabricator. e. Name of supplier. f. Change Orders (numbers) that affect value. g. Dollar value of the following, as a percentage of the Contract Sum to nearest one-

hundredth percent, adjusted to total 100 percent. 1) Labor. 2) Materials. 3) Equipment.

4. Provide a breakdown of the Contract Sum in enough detail to facilitate continued evaluation of Applications for Payment and progress reports. Coordinate with Project Manual table of contents. Provide multiple line items for principal subcontract amounts in excess of five percent of the Contract Sum.

5. Round amounts to nearest whole dollar; total shall equal the Contract Sum. 6. Purchase Contracts: Provide a separate line item in the schedule of values for each

purchase contract. Show line-item value of purchase contract. Indicate owner payments or deposits, if any, and balance to be paid by Contractor.

7. Each item in the schedule of values and Applications for Payment shall be complete. Include total cost and proportionate share of general overhead and profit for each item. a. Temporary facilities and other major cost items that are not direct cost of actual

work-in-place may be shown either as separate line items in the schedule of values or distributed as general overhead expense, at Contractor's option.

8. Schedule Updating: Show approved Change Orders (CO) or Construction Change Directives (CCD) as separate line items. Show each CO and CCD Items as spate line items.

1.5 APPLICATIONS FOR PAYMENT

A. Each Application for Payment following the initial Application for Payment shall be consistent with previous applications and payments as certified by Architect and paid for by Owner. 1. Initial Application for Payment, Application for Payment at time of Substantial Completion,

and final Application for Payment involve additional requirements.

B. Payment Application Times: Submit Application for Payment to Architect by the 25th of the month. The period covered by each Application for Payment is one month, ending on the 15th day of the month. 1. Submit draft copy of Application for Payment seven days prior to due date for review by

Architect.

C. Application for Payment Forms: Use the Owner’s “Certificate of Partial Payment” form and AIA Document G703, or a reasonable facsimile thereof, as form for Applications for Payment.

D. Application Preparation: Complete every entry on form. Notarize and execute by a person authorized to sign legal documents on behalf of Contractor. Architect will return incomplete applications without action. 1. Entries shall match data on the schedule of values and Contractor's construction

schedule. Use updated schedules if revisions were made. 2. Include amounts for work completed following previous Application for Payment, whether

or not payment has been received. Include only amounts for work completed at time of Application for Payment.

Page 25: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

PAYMENT PROCEDURES 01 29 00 - 3

3. Include amounts of Change Orders and Construction Change Directives issued before last day of construction period covered by application.

4. Indicate separate amounts for work being carried out under Owner-requested project acceleration.

E. Stored Materials: Include in Application for Payment amounts applied for materials or equipment purchased or fabricated and stored, but not yet installed. Differentiate between items stored on-site and items stored off-site. 1. Provide certificate of insurance, evidence of transfer of title to Owner, and consent of

surety to payment, for stored materials. 2. Provide supporting documentation that verifies amount requested, such as paid invoices.

Match amount requested with amounts indicated on documentation; do not include overhead and profit on stored materials.

3. Provide summary documentation for stored materials indicating the following: a. Value of materials previously stored and remaining stored as of date of previous

Applications for Payment. b. Value of previously stored materials put in place after date of previous Application

for Payment and on or before date of current Application for Payment. c. Value of materials stored since date of previous Application for Payment and

remaining stored as of date of current Application for Payment.

F. Transmittal: Submit three signed and notarized original copies of each Application for Payment to Architect. One copy shall include waivers of lien and similar attachments if required. 1. Transmit each copy with a transmittal form listing attachments and recording appropriate

information about application.

G. Waivers of Mechanic's Lien: With each Application for Payment, submit waivers of mechanic's liens from subcontractors, sub-subcontractors, and suppliers for construction period covered by the previous application. 1. Submit partial waivers on each item for amount requested in previous application, after

deduction for retainage, on each item. 2. When an application shows completion of an item, submit conditional final or full waivers. 3. Owner reserves the right to designate which entities involved in the Work must submit

waivers. 4. Submit final Application for Payment with or preceded by conditional final waivers from

every entity involved with performance of the Work covered by the application who is lawfully entitled to a lien.

5. Waiver Forms: Submit executed waivers of lien on forms, acceptable to Owner.

H. Initial Application for Payment: Administrative actions and submittals that must precede or coincide with submittal of first Application for Payment include the following: 1. List of subcontractors. 2. Schedule of values. 3. Contractor's construction schedule (preliminary if not final). 4. Products list (preliminary if not final). 5. Schedule of unit prices. 6. Submittal schedule (preliminary if not final). 7. List of Contractor's staff assignments. 8. List of Contractor's principal consultants. 9. Copies of building permits. 10. Copies of authorizations and licenses from authorities having jurisdiction for performance

of the Work. 11. Initial progress report.

Page 26: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

PAYMENT PROCEDURES 01 29 00 - 4

12. Report of preconstruction conference. 13. Certificates of insurance and insurance policies. 14. Performance and payment bonds. 15. Data needed to acquire Owner's insurance.

I. Application for Payment at Substantial Completion: After Architect issues the Certificate of Substantial Completion, submit an Application for Payment showing 100 percent completion for portion of the Work claimed as substantially complete. 1. Include documentation supporting claim that the Work is substantially complete and a

statement showing an accounting of changes to the Contract Sum. 2. This application shall reflect Certificate(s) of Substantial Completion issued previously for

Owner occupancy of designated portions of the Work.

J. Final Payment Application: After completing Project closeout requirements, submit final Application for Payment with releases and supporting documentation not previously submitted and accepted, including, but not limited, to the following: 1. Evidence of completion of Project closeout requirements. 2. Insurance certificates for products and completed operations where required and proof

that taxes, fees, and similar obligations were paid. 3. Updated final statement, accounting for final changes to the Contract Sum. 4. AIA Document G706, "Contractor's Affidavit of Payment of Debts and Claims." 5. AIA Document G706A, "Contractor's Affidavit of Release of Liens." 6. AIA Document G707, "Consent of Surety to Final Payment." 7. Evidence that claims have been settled. 8. Final meter readings for utilities, a measured record of stored fuel, and similar data as of

date of Substantial Completion or when Owner took possession of and assumed responsibility for corresponding elements of the Work.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 012 90 0

Page 27: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

PROJECT MANAGEMENT AND COORDINATION 01 31 00 - 1

SECTION 01 31 00 - PROJECT MANAGEMENT AND COORDINATION

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following: 1. General coordination procedures. 2. Requests for Information (RFIs). 3. Project meetings.

B. Related Requirements: 1. Section 01 32 00 "Construction Progress Documentation" for preparing and submitting

Contractor's construction schedule. 2. Section 01 73 00 "Execution" for procedures for coordinating general installation and

field-engineering services, including establishment of benchmarks and control points. 3. Section 01 77 00 "Closeout Procedures" for coordinating closeout of the Contract.

1.3 DEFINITIONS

A. RFI: Request from Contractor seeking information required by or clarifications of the Contract Documents.

1.4 INFORMATIONAL SUBMITTALS

A. Subcontract List: Prepare a written summary identifying individuals or firms proposed for each portion of the Work, including those who are to furnish products or equipment fabricated to a special design. Include the following information in tabular form: 1. Name, address, and telephone number of entity performing subcontract or supplying

products. 2. Number and title of related Specification Section(s) covered by subcontract. 3. Drawing number and detail references, as appropriate, covered by subcontract.

B. Key Personnel Names: Within 15 days of starting construction operations, submit a list of key personnel assignments, including superintendent and other personnel in attendance at Project site. Identify individuals and their duties and responsibilities; list addresses and telephone numbers, including home, office, and cellular telephone numbers and e-mail addresses. Provide names, addresses, and telephone numbers of individuals assigned as alternates in the absence of individuals assigned to Project. 1. Post copies of list in project meeting room, in temporary field office, and by each

temporary telephone. Keep list current at all times.

1.5 GENERAL COORDINATION PROCEDURES

A. Coordination: Coordinate construction operations included in different Sections of the Specifications to ensure efficient and orderly installation of each part of the Work. Coordinate construction operations, included in different Sections, that depend on each other for proper installation, connection, and operation.

Page 28: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

PROJECT MANAGEMENT AND COORDINATION 01 31 00 - 2

1. Schedule construction operations in sequence required to obtain the best results where installation of one part of the Work depends on installation of other components, before or after its own installation.

2. Coordinate installation of different components to ensure maximum performance and accessibility for required maintenance, service, and repair.

3. Make adequate provisions to accommodate items scheduled for later installation.

B. Prepare memoranda for distribution to each party involved, outlining special procedures required for coordination. Include such items as required notices, reports, and list of attendees at meetings. 1. Prepare similar memoranda for Owner and separate contractors if coordination of their

Work is required.

C. Administrative Procedures: Coordinate scheduling and timing of required administrative procedures with other construction activities to avoid conflicts and to ensure orderly progress of the Work. Such administrative activities include, but are not limited to, the following: 1. Preparation of Contractor's construction schedule. 2. Preparation of the schedule of values. 3. Installation and removal of temporary facilities and controls. 4. Delivery and processing of submittals. 5. Progress meetings. 6. Preinstallation conferences. 7. Project closeout activities. 8. Startup and adjustment of systems.

D. Conservation: Coordinate construction activities to ensure that operations are carried out with consideration given to conservation of energy, water, and materials. Coordinate use of temporary utilities to minimize waste.

1.6 REQUESTS FOR INFORMATION (RFIs)

A. General: Immediately on discovery of the need for additional information or interpretation of the Contract Documents, Contractor shall prepare and submit an RFI. 1. Architect will return RFIs submitted to Architect by other entities controlled by Contractor

with no response. 2. Coordinate and submit RFIs in a prompt manner so as to avoid delays in Contractor's

work or work of subcontractors.

B. Content of the RFI: Include a detailed, legible description of item needing information or interpretation and the following: 1. Project name. 2. Project number. 3. Date. 4. Name of Contractor. 5. Name of Architect and Contractor. 6. RFI number, numbered sequentially. 7. RFI subject. 8. Specification Section number and title and related paragraphs, as appropriate. 9. Drawing number and detail references, as appropriate. 10. Field dimensions and conditions, as appropriate. 11. Contractor's suggested resolution. If Contractor's suggested resolution impacts the

Contract Time or the Contract Sum, Contractor shall state impact in the RFI. 12. Contractor's signature.

Page 29: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

PROJECT MANAGEMENT AND COORDINATION 01 31 00 - 3

13. Attachments: Include sketches, descriptions, measurements, photos, Product Data, Shop Drawings, coordination drawings, and other information necessary to fully describe items needing interpretation. a. Include dimensions, thicknesses, structural grid references, and details of affected

materials, assemblies, and attachments on attached sketches.

C. Architect's Action: Architect will review each RFI, determine action required, and respond. Allow seven working days for Architect's response for each RFI. RFIs received by Architect after 1:00 p.m. will be considered as received the following working day. 1. The following Contractor-generated RFIs will be returned without action:

a. Requests for approval of submittals. b. Requests for approval of substitutions. c. Requests for approval of construction means and methods. d. Requests for coordination information already indicated in the Contract

Documents. e. Requests for adjustments in the Contract Time or the Contract Sum. f. Requests for interpretation of Architect's actions on submittals. g. Incomplete RFI’s or inaccurately prepared RFIs. h. Architect's action may include a request for additional information, in which case

Architect's time for response will date from time of receipt of additional information. 2. Architect's action on RFI’s that may result in a change to the Contract Time or the

Contract Sum may be eligible for Contractor to submit Change Proposal according to Section 012600 "Contract Modification Procedures." a. If Contractor believes the RFI response warrants change in the Contract Time or

the Contract Sum, notify Architect in writing within 10 days of receipt of the RFI response.

D. RFI Log: Prepare, maintain, and submit a tabular log of RFIs organized by the RFI number.

E. On receipt of Architect's action, update the RFI log and immediately distribute the RFI response to affected parties. Review response and notify Architect within seven days if Contractor disagrees with response. 1. Identification of related Field Order, Work Change Directive, and Proposal Request, as

appropriate.

1.7 PROJECT MEETINGS

A. General: Contractor will schedule and conduct meetings and conferences at Project site unless otherwise indicated. 1. Attendees: Inform participants and others involved, and individuals whose presence is

required, of date and time of each meeting. Notify Owner and Architect of scheduled meeting dates and times.

2. Agenda: Prepare the meeting agenda. Distribute the agenda to all invited attendees. 3. Minutes: Entity responsible for conducting meeting will record significant discussions and

agreements achieved. Distribute the meeting minutes to everyone concerned, including Owner and Architect, within three days of the meeting.

B. Preconstruction Conference: Contractor will schedule and conduct a preconstruction conference before starting construction, at a time convenient to Owner and Architect, but no later than 15 days after execution of the Agreement. 1. Conduct the conference to review responsibilities and personnel assignments. 2. Attendees: Authorized representatives of Owner, Owner's Commissioning Authority,

Architect, and their consultants; Contractor and its superintendent; subcontractors; suppliers; and other concerned parties shall attend the conference. Participants at the conference shall be familiar with Project and authorized to conclude matters relating to the Work.

Page 30: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

PROJECT MANAGEMENT AND COORDINATION 01 31 00 - 4

3. Agenda: Discuss items of significance that could affect progress, a. Minutes: Entity responsible for conducting meeting will record and distribute

meeting minutes.

C. Preinstallation Conferences: Conduct a preinstallation conference at Project site before each construction activity that requires coordination with other construction. 1. Attendees: Installer and representatives of manufacturers and fabricators involved in or

affected by the installation and its coordination or integration with other materials and installations that have preceded or will follow, shall attend the meeting. Advise Architect, and Owner of scheduled meeting dates.

2. Agenda: Review progress of other construction activities and preparations for the particular activity under consideration. a. Record significant conference discussions, agreements, and disagreements,

including required corrective measures and actions. 3. Reporting: Distribute minutes of the meeting to each party present and to other parties

requiring information. 4. Do not proceed with installation if the conference cannot be successfully concluded.

Initiate whatever actions are necessary to resolve impediments to performance of the Work and reconvene the conference at earliest feasible date.

D. Project Closeout Conference: Contractor will schedule and conduct a project closeout conference, at a time convenient to Owner and Architect, but no later than 90 days prior to the scheduled date of Substantial Completion. 1. Conduct the conference to review requirements and responsibilities related to Project

closeout. 2. Attendees: Authorized representatives of Owner, Owner's Commissioning Authority,

Architect, and their consultants; major subcontractors; suppliers; and other concerned parties shall attend the meeting. Participants at the meeting shall be familiar with Project and authorized to conclude matters relating to the Work.

3. Agenda: Discuss items of significance that could affect or delay Project closeout. a. Minutes: Entity conducting meeting will record and distribute meeting minutes.

E. Progress Meetings: Contractor will conduct progress meetings at weekly intervals. 1. Coordinate dates of meetings with preparation of payment requests. 2. Attendees: In addition to representatives of Owner, Owner's Commissioning Authority

and Architect, each contractor, subcontractor, supplier, and other entity concerned with current progress or involved in planning, coordination, or performance of future activities shall be represented at these meetings. All participants at the meeting shall be familiar with Project and authorized to conclude matters relating to the Work.

3. Agenda: Review and correct or approve minutes of previous progress meeting. Review other items of significance that could affect progress. Include topics for discussion as appropriate to status of Project. a. Minutes: Entity responsible for conducting the meeting will record and distribute

the meeting minutes to each party present and to parties requiring information.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 01 31 00

Page 31: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

CONSTRUCTION PROGRESS DOCUMENTATION 01 32 00 - 1

SECTION 01 32 00 - CONSTRUCTION PROGRESS DOCUMENTATION

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes administrative and procedural requirements for documenting the progress of construction during performance of the Work, including the following: 1. Startup construction schedule. 2. Contractor's construction schedule. 3. Construction schedule updating reports. 4. Daily construction reports. 5. Site condition reports. 6. Special reports.

B. Related Requirements: 1. Section 01 33 00 "Submittal Procedures" for submitting schedules and reports. 2. Section 01 40 00 "Quality Requirements" for submitting a schedule of tests and

inspections.

1.3 INFORMATIONAL SUBMITTALS

A. Format for Submittals: Submit required submittals in the following format: 1. Working electronic copy of schedule file, where indicated. 2. PDF electronic file.

B. Contractor's Construction Schedule: Initial schedule, of size required to display entire schedule for entire construction period. 1. Immediately following contract award, the Contractor shall prepare a construction

progress schedule covering all divisions of the work and shall submit copies of this schedule to all sub-contractors.

2. The final schedule, shall be submitted to the Architect. Following approval by the Owner, the final schedule shall be distributed to all interested parties.

3. The schedule shall be broken down to a degree, which will permit proper and complete coordination of all trades in each division of the work.

4. Tentative dates for interruption of utilities services shall be incorporated into the schedule.

C. Construction Schedule Updating Reports: Submit with Applications for Payment.

D. Site Condition Reports: Submit at time of discovery of differing conditions.

E. Special Reports: Submit at time of unusual event.

1.4 COORDINATION

A. Coordinate preparation and processing of schedules and reports with performance of construction activities and with scheduling and reporting of separate contractors.

Page 32: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

CONSTRUCTION PROGRESS DOCUMENTATION 01 32 00 - 2

PART 2 - PRODUCTS

2.1 CONTRACTOR'S CONSTRUCTION SCHEDULE, GENERAL

A. Time Frame: Extend schedule from date established for Notice to Proceed to date of final completion. 1. Contract completion date shall not be changed by submission of a schedule that shows

an early completion date, unless specifically authorized by Change Order.

B. Activities: Treat each separate area as a separate numbered activity for each main element of the Work. Comply with the following: 1. Activity Duration: Define activities so no activity is longer than 30 days, unless

specifically allowed by Architect. 2. Procurement Activities: Include procurement process activities for the following long lead

items and major items, requiring a cycle of more than 30 days, as separate activities in schedule. Procurement cycle activities include, but are not limited to, submittals, approvals, purchasing, fabrication, and delivery.

3. Submittal Review Time: Include review and resubmittal times indicated in Section 01 33 00"Submittal Procedures" in schedule. Coordinate submittal review times in Contractor's construction schedule with submittal schedule.

4. Substantial Completion: Indicate completion in advance of date established for Substantial Completion, and allow time for Architect's administrative procedures necessary for certification of Substantial Completion.

5. Punch List and Final Completion: Include not more than 30 days for completion of punch list items and final completion.

C. Milestones: Include milestones indicated in the Contract Documents in schedule, including, but not limited to, the Notice to Proceed, Substantial Completion, and final completion.

D. Recovery Schedule: When periodic update indicates the Work is 14 or more calendar days behind the current approved schedule, submit a separate recovery schedule indicating means by which Contractor intends to regain compliance with the schedule. Indicate changes to working hours, working days, crew sizes, and equipment required to achieve compliance, and date by which recovery will be accomplished.

2.2 CONTRACTOR'S CONSTRUCTION SCHEDULE (GANTT CHART)

A. Gantt-Chart Schedule: Submit a comprehensive, fully developed, horizontal, Gantt-chart-type, construction immediately following contract award. Base schedule on the startup construction schedule and additional information received since the start of Project. 1. The final schedule, bearing the approval signature of all prime contractors, shall be

submitted in quadruplicate to the Architect. Following approval by the University, copies of the final schedule shall be distributed to all interested parties. The schedule shall be broken down to a degree, which will permit proper and complete coordination of all trades in each division of the work. Tentative dates for interruption of utilities services shall be incorporated.

B. Preparation: Indicate each significant construction activity separately. Identify first workday of each week with a continuous vertical line. 1. For construction activities that require three months or longer to complete, indicate an

estimated completion percentage in 10 percent increments within time bar.

2.3 REPORTS

A. Daily Construction Reports: Prepare a daily construction report recording the following information concerning events at Project site: 1. List of subcontractors at Project site. 2. List of separate contractors at Project site.

Page 33: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

CONSTRUCTION PROGRESS DOCUMENTATION 01 32 00 - 3

3. Approximate count of personnel at Project site. 4. Equipment at Project site. 5. Material deliveries. 6. High and low temperatures and general weather conditions, including presence of rain. 7. Accidents. 8. Meetings and significant decisions. 9. Unusual events (see special reports). 10. Stoppages, delays, shortages, and losses. 11. Meter readings and similar recordings. 12. Emergency procedures. 13. Orders and requests of authorities having jurisdiction. 14. Change Orders received and implemented. 15. Construction Change Directives received and implemented. 16. Services connected and disconnected. 17. Equipment or system tests and startups. 18. Partial completions and occupancies. 19. Substantial Completions authorized.

B. Site Condition Reports: Immediately on discovery of a difference between site conditions and the Contract Documents, prepare and submit a detailed report. Submit with a Request for Information. Include a detailed description of the differing conditions, together with recommendations for changing the Contract Documents.

2.4 SPECIAL REPORTS

A. General: Submit special reports directly to Owner within one day(s) of an occurrence. Distribute copies of report to parties affected by the occurrence.

PART 3 - EXECUTION

3.1 CONTRACTOR’S CONSTRUCTION SCHEDULE

A. Contractor's Construction Schedule Updating: At monthly intervals, update schedule to reflect actual construction progress and activities. 1. Revise schedule immediately after each meeting or other activity where revisions have

been recognized or made. Issue updated schedule concurrently with the report of each such meeting.

2. Include a report with updated schedule that indicates every change, including, but not limited to, changes in logic, durations, actual starts and finishes, and activity durations.

3. As the Work progresses, indicate final completion percentage for each activity.

B. Distribution: Distribute copies of approved schedule to Architect, Owner, separate contractors, testing and inspecting agencies, and other parties identified by Contractor with a need-to-know schedule responsibility. 1. Post copies in Project meeting rooms and temporary field offices. 2. When revisions are made, distribute updated schedules to the same parties and post in

the same locations. Delete parties from distribution when they have completed their assigned portion of the Work and are no longer involved in performance of construction activities.

END OF SECTION 01 32 00

Page 34: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing
Page 35: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

SUBMITTAL PROCEDURES 01 33 00 - 1

SECTION 01 33 00 - SUBMITTAL PROCEDURES

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes requirements for the submittal schedule and administrative and procedural requirements for submitting Shop Drawings, Product Data, Samples, and other submittals.

B. Related Requirements: 1. Section 01 29 00 "Payment Procedures" for submitting Applications for Payment and the

schedule of values. 2. Section 01 32 00 "Construction Progress Documentation" for submitting schedules and

reports, including Contractor's construction schedule. 3. Section 01 78 39 "Project Record Documents" for submitting record Drawings, record

Specifications, and record Product Data. 4. Section 01 78 23 "Operation and Maintenance Data" for submitting operation and

maintenance manuals.

1.3 DEFINITIONS

A. Action Submittals: Written and graphic information and physical samples that require Architect's and Contractor's responsive action. Action submittals are those submittals indicated in individual Specification Sections as "action submittals."

B. Informational Submittals: Written and graphic information and physical samples that do not require Architect's and Contractor's responsive action. Submittals may be rejected for not complying with requirements. Informational submittals are those submittals indicated in individual Specification Sections as "informational submittals."

C. File Transfer Protocol (FTP): Communications protocol that enables transfer of files to and from another computer over a network and that serves as the basis for standard Internet protocols. An FTP site is a portion of a network located outside of network firewalls within which internal and external users are able to access files.

D. Portable Document Format (PDF): An open standard file format licensed by Adobe Systems used for representing documents in a device-independent and display resolution-independent fixed-layout document format.

1.4 ACTION SUBMITTALS

A. Submittal Schedule: Submit a schedule of submittals, arranged in chronological order by dates required by construction schedule. Include time required for review, ordering, manufacturing, fabrication, and delivery when establishing dates. Include additional time required for making corrections or revisions to submittals noted by Architect and additional time for handling and reviewing submittals required by those corrections. 1. Coordinate submittal schedule with list of subcontracts, the schedule of values, and

Contractor's construction schedule. 2. Initial Submittal: Submit concurrently with startup construction schedule. Include

submittals required during the first 60 days of construction. List those submittals required to maintain orderly progress of the Work and those required early because of long lead time for manufacture or fabrication.

Page 36: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

SUBMITTAL PROCEDURES 01 33 00 - 2

3. Final Submittal: Submit concurrently with the first complete submittal of Contractor's construction schedule. a. Submit revised submittal schedule to reflect changes in current status and timing

for submittals. 4. Format: Arrange the following information in a tabular format:

a. Scheduled date for first submittal. b. Specification Section number and title. c. Submittal category: Action; informational. d. Name of subcontractor. e. Description of the Work covered. f. Scheduled date for Architect's and Contractor's final release or approval. g. Scheduled date of fabrication.

1.5 SUBMITTAL ADMINISTRATIVE REQUIREMENTS

A. General: Submit submittals with Submittal Transmittal when possible in Adobe Portable Document Format (PDF) to Architect for review.

B. Architect's Digital Data Files: Electronic digital data files of the Contract Drawings will be provided by Architect for Contractor's use in preparing submittals. 1. Architect will furnish Contractor one set of digital data drawing files of the Contract

Drawings for use in preparing Shop Drawings. a. Architect makes no representations as to the accuracy or completeness of digital

data drawing files as they relate to the Contract Drawings. b. Digital Drawing Software Program: The Contract Drawings are available in

AutoCAD dwg file format. c. Data contained on the Architect/Engineers electronic files are part of the

Architect/Engineers instruments of service and shall not be used for any purpose other than as a convenience in the preparation of shop drawings for this project. Any use or reuse by any party will be at their sole risk and without liability or legal exposure to the Architect or Engineer. The Users of these electronic file agree to make no claim and waiver, to the fullest extent permitted by law, any claim or cause of action of any nature against the Architect or Engineer, there officers, directors, employees, agents or subcontractors that may arise out of or in connection with the use of the electronic files.

d. The Users of the electronic files shall, to the fullest extent allowed by law, indemnify and hold the Architect and/or Engineer harmless against all damages, liabilities or costs, including reasonable attorneys’ fees and defense costs, arising out of or resulting from the use of these electronic files.

e. The Users of these electronic files acknowledge that they are NOT construction documents. Difference may exist between these electronic files and the corresponding hard-copy construction documents. The Architect/Engineer makes no representation regarding the accuracy or completeness of the electronic files we provide.

f. The use of these electronic files does not relieve the Users of their duty to fully comply with the Contract Documents, including, and without limitation, the need to check, confirm and coordinate all dimensions and details, take field measurements, verify field conditions and coordinate your work with that of other contractors for the project.

g. Because information presented on the electronic files can be modified, unintentionally or otherwise, the Architect/Engineers reserve the right to remove all indicia of ownership and/or involvement from each electronic file.

h. The Architect/Engineer reserves the right to require a written acknowledgement to these conditions prior to delivery of the electronic files.

Page 37: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

SUBMITTAL PROCEDURES 01 33 00 - 3

i. Delivery of the electronic files shall NOT be deemed a sale. The Architect/Engineer make no warranties, either express or implied, of merchantability and fitness for any particular purpose. In no event shall the Architect/Engineer be liable for any loss of profit or any consequential damage as a result of you use of these electronic files.

C. Coordination: Coordinate preparation and processing of submittals with performance of construction activities. 1. Coordinate each submittal with fabrication, purchasing, testing, delivery, other submittals,

and related activities that require sequential activity. 2. Submit all submittal items required for each Specification Section concurrently unless

partial submittals for portions of the Work are indicated on approved submittal schedule. 3. Submit action submittals and informational submittals required by the same Specification

Section as separate packages under separate transmittals. 4. Coordinate transmittal of different types of submittals for related parts of the Work so

processing will not be delayed because of need to review submittals concurrently for coordination. a. Architect and Contractor reserve the right to withhold action on a submittal

requiring coordination with other submittals until related submittals are received. b. Submit color selection data as a single package. Color selections will be made at

the same time. Architect will return color selections on a schedule.

D. Processing Time: Allow time for submittal review, including time for resubmittals, as follows. Time for review shall commence on Architect's receipt of submittal. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing, including resubmittals. 1. Initial Review: Allow 15 days for initial review of each submittal. Allow additional time if

coordination with subsequent submittals is required. Architect will advise Contractor when a submittal being processed must be delayed for coordination.

2. Intermediate Review: If intermediate submittal is necessary, process it in same manner as initial submittal.

3. Resubmittal Review: Allow 15 days for review of each resubmittal. 4. Concurrent Consultant Review: Where the Contract Documents indicate that submittals

may be transmitted simultaneously to Architect and to Architect's consultants, allow 15 days for review of each submittal. Submittal will be returned to Contractor, through Architect, before being returned to Contractor.

E. Paper Submittals: NOT PERMITTED. Paper submittals will not be reviewed by the Architect. 1. Paper submittals will be destroyed and the Contractor so notified.

F. Electronic Submittals: Identify and incorporate information in each electronic submittal file as follows: 1. Assemble complete submittal package into a single indexed file incorporating submittal

requirements of a single Specification Section and transmittal form with links enabling navigation to each item.

2. Name file with submittal number or other unique identifier, including revision identifier. a. File name shall use project identifier and Specification Section number followed by

a decimal point and then a sequential number (e.g., NCFCL - 06100.01). Resubmittals shall include an alphabetic suffix after another decimal point (e.g., NCFCL - 06100.01.A).

3. Provide means for insertion to permanently record Contractor's review and approval markings and action taken by Architect and Contractor.

Page 38: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

SUBMITTAL PROCEDURES 01 33 00 - 4

4. Transmittal Form for Electronic Submittals: Use electronic form containing the following information: a. Project name. b. Date. c. Name of Architect. d. Name of Contractor. e. Name of Installer. f. Name of firm or entity that prepared submittal. g. Names of subcontractor, manufacturer, and supplier. h. Category and type of submittal. i. Specification Section number and title. j. Specification paragraph number or drawing designation and generic name for each

of multiple items. k. Drawing number and detail references, as appropriate. l. Location(s) where product is to be installed, as appropriate. m. Related physical samples submitted directly. n. Submittal and transmittal distribution record. o. Remarks.

G. Options: Identify options requiring selection by Architect.

H. Deviations and Additional Information: On an attached separate sheet, prepared on Installer’s letterhead, record relevant information, requests for data, revisions other than those requested by Architect and Contractor on previous submittals, and deviations from requirements in the Contract Documents, including minor variations and limitations. Include same identification information as related submittal.

I. Resubmittals: Make resubmittals in same form and number of copies as initial submittal. 1. Note date and content of previous submittal. 2. Note date and content of revision in label or title block and clearly indicate extent of

revision. 3. Resubmit submittals until they are marked with approval notation from Architect's and

Contractor's action stamp.

J. Distribution: Furnish copies of final submittals to manufacturers, subcontractors, suppliers, fabricators, installers, authorities having jurisdiction, and others as necessary for performance of construction activities. Show distribution on transmittal forms.

K. Use for Construction: Retain complete copies of submittals on Project site. Use only final action submittals that are marked with approval notation from Architect's and Contractor's action stamp.

PART 2 - PRODUCTS

2.1 SUBMITTAL PROCEDURES

A. General Submittal Procedure Requirements: Prepare and submit submittals required by individual Specification Sections. Types of submittals are indicated in individual Specification Sections. 1. Submit electronic submittals via email as PDF electronic files.

a. Architect will return annotated file. Annotate and retain one copy of file as an electronic Project record document file.

2. Certificates and Certifications Submittals: Provide a statement that includes signature of entity responsible for preparing certification. Certificates and certifications shall be signed by an officer or other individual authorized to sign documents on behalf of that entity.

Page 39: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

SUBMITTAL PROCEDURES 01 33 00 - 5

B. Product Data: Collect information into a single submittal for each element of construction and type of product or equipment. 1. If information must be specially prepared for submittal because standard published data

are not suitable for use, submit as Shop Drawings, not as Product Data. 2. Mark each copy of each submittal to show which products and options are applicable. 3. Include the following information, as applicable:

a. Manufacturer's catalog cuts. b. Manufacturer's product specifications. c. Standard color charts. d. Statement of compliance with specified referenced standards. e. Testing by recognized testing agency. f. Application of testing agency labels and seals. g. Notation of coordination requirements. h. Availability and delivery time information.

4. For equipment, include the following in addition to the above, as applicable: a. Wiring diagrams showing factory-installed wiring. b. Printed performance curves. c. Operational range diagrams. d. Clearances required to other construction, if not indicated on accompanying Shop

Drawings. 5. Submit Product Data before or concurrent with Samples. 6. Submit Product Data in the following format:

a. PDF electronic file.

C. Shop Drawings: Prepare Project-specific information, drawn accurately to scale. Do not base Shop Drawings on reproductions of the Contract Documents or standard printed data unless submittal based on Architect's digital data drawing files is otherwise permitted. 1. Preparation: Fully illustrate requirements in the Contract Documents. Include the

following information, as applicable: a. Identification of products. b. Schedules. c. Compliance with specified standards. d. Notation of coordination requirements. e. Notation of dimensions established by field measurement. f. Relationship and attachment to adjoining construction clearly indicated. g. Seal and signature of professional engineer if specified.

2. Submit Shop Drawings in the following format: a. PDF electronic file.

D. Samples: Submit Samples for review of kind, color, pattern, and texture for a check of these characteristics with other elements and for a comparison of these characteristics between submittal and actual component as delivered and installed. 1. Transmit Samples that contain multiple, related components such as accessories

together in one submittal package. 2. Identification: Attach label on unexposed side of Samples that includes the following:

a. Generic description of Sample. b. Product name and name of manufacturer. c. Sample source. d. Number and title of applicable Specification Section. e. Specification paragraph number and generic name of each item.

Page 40: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

SUBMITTAL PROCEDURES 01 33 00 - 6

3. For projects where electronic submittals are required, provide corresponding electronic submittal of Sample transmittal, digital image file illustrating Sample characteristics, and identification information for record.

4. Disposition: Maintain sets of approved Samples at Project site, available for quality-control comparisons throughout the course of construction activity. Sample sets may be used to determine final acceptance of construction associated with each set. a. Samples that may be incorporated into the Work are indicated in individual

Specification Sections. Such Samples must be in an undamaged condition at time of use.

b. Samples not incorporated into the Work, or otherwise designated as Owner's property, are the property of Contractor.

5. Samples for Initial Selection: Submit manufacturer's color charts consisting of units or sections of units showing the full range of colors, textures, and patterns available. a. Number of Samples: Submit one full set(s) of available choices where color,

pattern, texture, or similar characteristics are required to be selected from manufacturer's product line. Architect, through Contractor, will return submittal with options selected.

6. Samples for Verification: Submit full-size units or Samples of size indicated, prepared from same material to be used for the Work, cured and finished in manner specified, and physically identical with material or product proposed for use, and that show full range of color and texture variations expected. Samples include, but are not limited to, the following: partial sections of manufactured or fabricated components; small cuts or containers of materials; complete units of repetitively used materials; swatches showing color, texture, and pattern; color range sets; and components used for independent testing and inspection. a. Number of Samples: Submit three sets of Samples. Architect and Contractor will

retain two Sample sets; remainder will be returned. Mark up and retain one returned Sample set as a project record sample. 1) Submit a single Sample where assembly details, workmanship, fabrication

techniques, connections, operation, and other similar characteristics are to be demonstrated.

2) If variation in color, pattern, texture, or other characteristic is inherent in material or product represented by a Sample, submit at least three sets of paired units that show approximate limits of variations.

E. Product Schedule: As required in individual Specification Sections, prepare a written summary indicating types of products required for the Work and their intended location. Include the following information in tabular form: 1. Type of product. Include unique identifier for each product indicated in the Contract

Documents or assigned by Contractor if none is indicated. 2. Manufacturer and product name, and model number if applicable. 3. Number and name of room or space. 4. Location within room or space. 5. Submit product schedule in the following format:

a. PDF electronic file.

F. Contractor's Construction Schedule: Comply with requirements specified in Division 1 Section "Construction Progress Documentation."

G. Test and Inspection Reports and Schedule of Tests and Inspections Submittals: Comply with requirements specified in Division 1 Section "Quality Requirements."

H. Closeout Submittals and Maintenance Material Submittals: Comply with requirements specified in Division 1 Section "Closeout Procedures."

Page 41: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

SUBMITTAL PROCEDURES 01 33 00 - 7

I. Maintenance Data: Comply with requirements specified in Division 1 Section " Closeout Procedures."

J. Qualification Data: Prepare written information that demonstrates capabilities and experience of firm or person. Include lists of completed projects with project names and addresses, contact information of architects and owners, and other information specified.

K. Installer Certificates: Submit written statements on manufacturer's letterhead certifying that Installer complies with requirements in the Contract Documents and, where required, is authorized by manufacturer for this specific Project.

L. Manufacturer Certificates: Submit written statements on manufacturer's letterhead certifying that manufacturer complies with requirements in the Contract Documents. Include evidence of manufacturing experience where required.

M. Product Certificates: Submit written statements on manufacturer's letterhead certifying that product complies with requirements in the Contract Documents.

N. Material Certificates: Submit written statements on manufacturer's letterhead certifying that material complies with requirements in the Contract Documents.

O. Material Test Reports: Submit reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting test results of material for compliance with requirements in the Contract Documents.

P. Product Test Reports: Submit written reports indicating that current product produced by manufacturer complies with requirements in the Contract Documents. Base reports on evaluation of tests performed by manufacturer and witnessed by a qualified testing agency, or on comprehensive tests performed by a qualified testing agency.

Q. Research Reports: Submit written evidence, from a model code organization acceptable to authorities having jurisdiction, that product complies with building code in effect for Project. Include the following information: 1. Name of evaluation organization. 2. Date of evaluation. 3. Time period when report is in effect. 4. Product and manufacturers' names. 5. Description of product. 6. Test procedures and results. 7. Limitations of use.

R. Preconstruction Test Reports: Submit reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting results of tests performed before installation of product, for compliance with performance requirements in the Contract Documents.

S. Compatibility Test Reports: Submit reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting results of compatibility tests performed before installation of product. Include written recommendations for primers and substrate preparation needed for adhesion.

T. Field Test Reports: Submit written reports indicating and interpreting results of field tests performed either during installation of product or after product is installed in its final location, for compliance with requirements in the Contract Documents.

2.2 DELEGATED-DESIGN SERVICES

A. Performance and Design Criteria: Where professional design services or certifications by a design professional are specifically required of Contractor by the Contract Documents, provide products and systems complying with specific performance and design criteria indicated.

Page 42: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

SUBMITTAL PROCEDURES 01 33 00 - 8

B. Delegated-Design Services Certification: In addition to Shop Drawings, Product Data, and other required submittals, submit digitally signed PDF electronic file of certificate, signed and sealed by the responsible design professional, for each product and system specifically assigned to Contractor to be designed or certified by a design professional. 1. Indicate that products and systems comply with performance and design criteria in the

Contract Documents. Include list of codes, loads, and other factors used in performing these services.

PART 3 - EXECUTION

3.1 CONTRACTOR'S REVIEW

A. Action and Informational Submittals: Review each submittal and check for coordination with other Work of the Contract and for compliance with the Contract Documents. Note corrections and field dimensions. Mark with approval stamp before submitting to Contractor.

B. Project Closeout and Maintenance Material Submittals: See requirements in Division 1 Section "Closeout Procedures."

C. Approval Stamp: Stamp each submittal with a uniform, approval stamp. Include Project name and location, submittal number, Specification Section title and number, name of reviewer, date of Contractor's approval, and statement certifying that submittal has been reviewed, checked, and approved for compliance with the Contract Documents.

3.2 ARCHITECT'S ACTION

A. Action Submittals: Architect will review each submittal, make marks to indicate corrections or revisions required, and return it. Architect will stamp each submittal with an action stamp and will mark stamp appropriately to indicate action.

B. Informational Submittals: Architect will review each submittal and will not return it, or will return it if it does not comply with requirements. Architect will forward each submittal to appropriate party.

C. Partial submittals prepared for a portion of the Work will be reviewed when use of partial submittals has received prior approval from Architect.

D. Incomplete submittals are unacceptable, will be considered nonresponsive, and will be returned for resubmittal without review.

E. Submittals not required by the Contract Documents may be returned by the Architect without action.

END OF SECTION 01 33 00

Page 43: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

QUALITY REQUIREMENTS 01 40 00 - 1

SECTION 01 40 00 - QUALITY REQUIREMENTS

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes administrative and procedural requirements for quality assurance and quality control.

B. Testing and inspecting services are required to verify compliance with requirements specified or indicated. These services do not relieve Contractor of responsibility for compliance with the Contract Document requirements. 1. Specific quality-assurance and -control requirements for individual construction activities

are specified in the Sections that specify those activities. Requirements in those Sections may also cover production of standard products.

2. Specified tests, inspections, and related actions do not limit Contractor's other quality-assurance and -control procedures that facilitate compliance with the Contract Document requirements.

3. Requirements for Installers to provide quality-assurance and -control services required by Architect, Owner, Contractor, or authorities having jurisdiction are not limited by provisions of this Section.

C. Related Requirements: 1. Divisions 2 through 26 Sections for specific test and inspection requirements.

1.3 DEFINITIONS

A. Quality-Assurance Services: Activities, actions, and procedures performed before and during execution of the Work to guard against defects and deficiencies and substantiate that proposed construction will comply with requirements.

B. Quality-Control Services: Tests, inspections, procedures, and related actions during and after execution of the Work to evaluate that actual products incorporated into the Work and completed construction comply with requirements. Services do not include contract enforcement activities performed by Architect or Construction Manager.

C. Preconstruction Testing: Tests and inspections performed specifically for Project before products and materials are incorporated into the Work, to verify performance or compliance with specified criteria.

D. Product Testing: Tests and inspections that are performed by an NRTL, an NVLAP, or a testing agency qualified to conduct product testing and acceptable to authorities having jurisdiction, to establish product performance and compliance with specified requirements.

E. Source Quality-Control Testing: Tests and inspections that are performed at the source, e.g., plant, mill, factory, or shop.

F. Field Quality-Control Testing: Tests and inspections that are performed on-site for installation of the Work and for completed Work.

G. Testing Agency: An entity engaged to perform specific tests, inspections, or both. Testing laboratory shall mean the same as testing agency.

Page 44: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

QUALITY REQUIREMENTS 01 40 00 - 2

H. Installer/Applicator/Erector: Entity engaged by the Contractor as a Subcontractor, or Sub-subcontractor, to perform a particular construction operation, including installation, erection, application, and similar operations. 1. Use of trade-specific terminology in referring to a trade or entity does not require that

certain construction activities be performed by accredited or unionized individuals, or that requirements specified apply exclusively to specific trade(s).

I. Experienced: When used with an entity or individual, "experienced" means having successfully completed a minimum of five previous projects similar in nature, size, and extent to this Project; being familiar with special requirements indicated; and having complied with requirements of authorities having jurisdiction.

1.4 CONFLICTING REQUIREMENTS

A. Referenced Standards: If compliance with two or more standards is specified and the standards establish different or conflicting requirements for minimum quantities or quality levels, comply with the most stringent requirement. Refer conflicting requirements that are different, but apparently equal, to Architect for a decision before proceeding.

B. Minimum Quantity or Quality Levels: The quantity or quality level shown or specified shall be the minimum provided or performed. The actual installation may comply exactly with the minimum quantity or quality specified, or it may exceed the minimum within reasonable limits. To comply with these requirements, indicated numeric values are minimum or maximum, as appropriate, for the context of requirements. Refer uncertainties to Architect for a decision before proceeding. 1. Provide axonometric drawings for conditions difficult to illustrate in two dimensions.

1.5 INFORMATIONAL SUBMITTALS

A. Testing Agency Qualifications: For testing agencies specified in "Quality Assurance" Article to demonstrate their capabilities and experience. Include proof of qualifications in the form of a recent report on the inspection of the testing agency by a recognized authority.

B. Schedule of Tests and Inspections: Prepare in tabular form and include the following: 1. Specification Section number and title. 2. Entity responsible for performing tests and inspections. 3. Description of test and inspection. 4. Identification of applicable standards. 5. Identification of test and inspection methods. 6. Number of tests and inspections required. 7. Time schedule or time span for tests and inspections. 8. Requirements for obtaining samples. 9. Unique characteristics of each quality-control service.

1.6 REPORTS AND DOCUMENTS

A. Test and Inspection Reports: Prepare and submit certified written reports specified in other Sections. Include the following: 1. Date of issue. 2. Project title and number. 3. Name, address, and telephone number of testing agency. 4. Dates and locations of samples and tests or inspections. 5. Names of individuals making tests and inspections. 6. Description of the Work and test and inspection method.

Page 45: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

QUALITY REQUIREMENTS 01 40 00 - 3

7. Identification of product and Specification Section. 8. Complete test or inspection data. 9. Test and inspection results and an interpretation of test results. 10. Record of temperature and weather conditions at time of sample taking and testing and

inspecting. 11. Comments or professional opinion on whether tested or inspected Work complies with

the Contract Document requirements. 12. Name and signature of laboratory inspector. 13. Recommendations on retesting and reinspecting.

B. Manufacturer's Technical Representative's Field Reports: Prepare written information documenting manufacturer's technical representative's tests and inspections specified in other Sections. Include the following: 1. Name, address, and telephone number of technical representative making report. 2. Statement on condition of substrates and their acceptability for installation of product. 3. Statement that products at Project site comply with requirements. 4. Summary of installation procedures being followed, whether they comply with

requirements and, if not, what corrective action was taken. 5. Results of operational and other tests and a statement of whether observed performance

complies with requirements. 6. Statement whether conditions, products, and installation will affect warranty. 7. Other required items indicated in individual Specification Sections.

C. Factory-Authorized Service Representative's Reports: Prepare written information documenting manufacturer's factory-authorized service representative's tests and inspections specified in other Sections. Include the following: 1. Name, address, and telephone number of factory-authorized service representative

making report. 2. Statement that equipment complies with requirements. 3. Results of operational and other tests and a statement of whether observed performance

complies with requirements. 4. Statement whether conditions, products, and installation will affect warranty. 5. Other required items indicated in individual Specification Sections.

D. Permits, Licenses, and Certificates: For Owner's records, submit copies of permits, licenses, certifications, inspection reports, releases, jurisdictional settlements, notices, receipts for fee payments, judgments, correspondence, records, and similar documents, established for compliance with standards and regulations bearing on performance of the Work.

1.7 QUALITY ASSURANCE

A. General: Qualifications paragraphs in this article establish the minimum qualification levels required; individual Specification Sections specify additional requirements.

B. Manufacturer Qualifications: A firm experienced in manufacturing products or systems similar to those indicated for this Project and with a record of successful in-service performance, as well as sufficient production capacity to produce required units.

C. Fabricator Qualifications: A firm experienced in producing products similar to those indicated for this Project and with a record of successful in-service performance, as well as sufficient production capacity to produce required units.

Page 46: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

QUALITY REQUIREMENTS 01 40 00 - 4

D. Installer Qualifications: A firm or individual experienced in installing, erecting, or assembling work similar in material, design, and extent to that indicated for this Project, whose work has resulted in construction with a record of successful in-service performance.

E. Testing Agency Qualifications: An NRTL, an NVLAP, or an independent agency with the experience and capability to conduct testing and inspecting indicated, as documented according to ASTM E 329; and with additional qualifications specified in individual Sections; and, where required by authorities having jurisdiction, that is acceptable to authorities. 1. NRTL: A nationally recognized testing laboratory according to 29 CFR 1910.7. 2. NVLAP: A testing agency accredited according to NIST's National Voluntary Laboratory

Accreditation Program.

F. Manufacturer's Technical Representative Qualifications: An authorized representative of manufacturer who is trained and approved by manufacturer to observe and inspect installation of manufacturer's products that are similar in material, design, and extent to those indicated for this Project.

G. Factory-Authorized Service Representative Qualifications: An authorized representative of manufacturer who is trained and approved by manufacturer to inspect installation of manufacturer's products that are similar in material, design, and extent to those indicated for this Project.

1.8 QUALITY CONTROL

A. Owner Responsibilities: Where quality-control services are indicated as Owner's responsibility, Owner will engage a qualified testing agency to perform these services. 1. Owner will furnish Contractor with names, addresses, and telephone numbers of testing

agencies engaged and a description of types of testing and inspecting they are engaged to perform.

2. Costs for retesting and reinspecting construction that replaces or is necessitated by work that failed to comply with the Contract Documents will be charged to Installer, and the Contract Sum will be adjusted by Change Order.

B. Contractor’s Responsibilities: Tests and inspections not explicitly assigned to Owner are Contractor's responsibility. Perform additional quality-control activities required to verify that the Work complies with requirements, whether specified or not. 1. Unless otherwise indicated, provide quality-control services specified and those required

by authorities having jurisdiction. Perform quality-control services required of Contractor by authorities having jurisdiction, whether specified or not.

2. Where services are indicated as Contractor's responsibility, engage a qualified testing agency to perform these quality-control services. a. Contractor shall not employ same entity engaged by Owner, unless agreed to in

writing by Owner. 3. Notify testing agencies at least 24 hours in advance of time when Work that requires

testing or inspecting will be performed. 4. Where quality-control services are indicated as Construction Magagerr's responsibility,

submit a certified written report, in duplicate, of each quality-control service. 5. Testing and inspecting requested by Installer and not required by the Contract

Documents are Installer's responsibility. 6. Submit additional copies of each written report directly to authorities having jurisdiction,

when they so direct.

C. Manufacturer's Field Services: Where indicated, engage a factory-authorized service representative to inspect field-assembled components and equipment installation, including service connections. Report results in writing as specified in Division 1 Section "Submittal Procedures."

Page 47: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

QUALITY REQUIREMENTS 01 40 00 - 5

D. Manufacturer's Technical Services: Where indicated, engage a manufacturer's technical representative to observe and inspect the Work. Manufacturer's technical representative's services include participation in preinstallation conferences, examination of substrates and conditions, verification of materials, observation of Installer activities, inspection of completed portions of the Work, and submittal of written reports.

E. Retesting/Reinspecting: Regardless of whether original tests or inspections were Contractor’s responsibility, provide quality-control services, including retesting and reinspecting, for construction that replaced Work that failed to comply with the Contract Documents.

F. Testing Agency Responsibilities: Cooperate with Architect, Contractor, and Installer in performance of duties. Provide qualified personnel to perform required tests and inspections. 1. Notify Architect, Contractor, and Installer promptly of irregularities or deficiencies

observed in the Work during performance of its services. 2. Determine the location from which test samples will be taken and in which in-situ tests

are conducted. 3. Conduct and interpret tests and inspections and state in each report whether tested and

inspected work complies with or deviates from requirements. 4. Submit a certified written report, in duplicate, of each test, inspection, and similar quality-

control service through the Contractor. 5. Do not release, revoke, alter, or increase the Contract Document requirements or

approve or accept any portion of the Work. 6. Do not perform any duties of Contractor or Installer.

G. Associated Services: Cooperate with agencies performing required tests, inspections, and similar quality-control services, and provide reasonable auxiliary services as requested. Notify agency sufficiently in advance of operations to permit assignment of personnel. Provide the following: 1. Access to the Work. 2. Incidental labor and facilities necessary to facilitate tests and inspections. 3. Adequate quantities of representative samples of materials that require testing and

inspecting. Assist agency in obtaining samples. 4. Facilities for storage and field curing of test samples. 5. Security and protection for samples and for testing and inspecting equipment at Project

site.

H. Coordination: Coordinate sequence of activities to accommodate required quality-assurance and -control services with a minimum of delay and to avoid necessity of removing and replacing construction to accommodate testing and inspecting. 1. Schedule times for tests, inspections, obtaining samples, and similar activities.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION

3.1 TEST AND INSPECTION LOG

A. Test and Inspection Log: Prepare a record of tests and inspections. Include the following: 1. Date test or inspection was conducted. 2. Description of the Work tested or inspected. 3. Date test or inspection results were transmitted to Architect. 4. Identification of testing agency or special inspector conducting test or inspection.

Page 48: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

QUALITY REQUIREMENTS 01 40 00 - 6

B. Maintain log at Project site. Post changes and revisions as they occur. Provide access to test and inspection log for Architect's reference during normal working hours.

3.2 REPAIR AND PROTECTION

A. General: On completion of testing, inspecting, sample taking, and similar services, repair damaged construction and restore substrates and finishes. 1. Provide materials and comply with installation requirements specified in other

Specification Sections or matching existing substrates and finishes. Restore patched areas and extend restoration into adjoining areas with durable seams that are as invisible as possible. Comply with the Contract Document requirements for cutting and patching in Division 1 Section "Execution."

B. Protect construction exposed by or for quality-control service activities.

C. Repair and protection are Installer's responsibility, regardless of the assignment of responsibility for quality-control services.

END OF SECTION 01 40 00

Page 49: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

REFERENCES 01 42 00 - 1

SECTION 01 42 00 - REFERENCES

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 DEFINITIONS

A. General: Basic Contract definitions are included in the Conditions of the Contract.

B. "Approved": When used to convey Architect's action on Contractor's submittals, applications, and requests, "approved" is limited to Architect's duties and responsibilities as stated in the Conditions of the Contract.

C. "Directed": A command or instruction by Architect. Other terms including "requested," "authorized," "selected," "required," and "permitted" have the same meaning as "directed."

D. "Indicated": Requirements expressed by graphic representations or in written form on Drawings, in Specifications, and in other Contract Documents. Other terms including "shown," "noted," "scheduled," and "specified" have the same meaning as "indicated."

E. "Regulations": Laws, ordinances, statutes, and lawful orders issued by authorities having jurisdiction, and rules, conventions, and agreements within the construction industry that control performance of the Work.

F. "Furnish": Supply and deliver to Project site, ready for unloading, unpacking, assembly, installation, and similar operations.

G. "Install": Unload, temporarily store, unpack, assemble, erect, place, anchor, apply, work to dimension, finish, cure, protect, clean, and similar operations at Project site.

H. "Provide": Furnish and install, complete and ready for the intended use.

I. "Project Site": Space available for performing construction activities. The extent of Project site is shown on Drawings and may or may not be identical with the description of the land on which Project is to be built.

1.3 INDUSTRY STANDARDS

A. Applicability of Standards: Unless the Contract Documents include more stringent requirements, applicable construction industry standards have the same force and effect as if bound or copied directly into the Contract Documents to the extent referenced. Such standards are made a part of the Contract Documents by reference.

B. Publication Dates: Comply with standards in effect as of date of the Contract Documents unless otherwise indicated.

C. Copies of Standards: Each entity engaged in construction on Project should be familiar with industry standards applicable to its construction activity. Copies of applicable standards are not bound with the Contract Documents. 1. Where copies of standards are needed to perform a required construction activity, obtain

copies directly from publication source.

Page 50: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

REFERENCES 01 42 00 - 2

1.4 ABBREVIATIONS AND ACRONYMS

A. Industry Organizations: Where abbreviations and acronyms are used in Specifications or other Contract Documents, they shall mean the recognized name of the entities indicated in Gale's "Encyclopedia of Associations: National Organizations of the U.S." or in Columbia Books' "National Trade & Professional Associations of the United States."

B. Code Agencies: Where abbreviations and acronyms are used in Specifications or other Contract Documents, they shall mean the recognized name of the entities in the following list. This information is believed to be accurate as of the date of the Contract Documents. 1. FBC – Florida Building Code 2. ICC - International Code Council; www.iccsafe.org. 3. ICC-ES - ICC Evaluation Service, LLC; www.icc-es.org.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 01 42 00

Page 51: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

TEMPORARY FACILITIES AND CONTROLS 01 50 00 - 1

SECTION 01 50 00 - TEMPORARY FACILITIES AND CONTROLS

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes requirements for temporary utilities, support facilities, and security and protection facilities.

B. Related Requirements: 1. Section 01 10 00 "Summary" and Section 01 10 01 “University Special Project

Procedures” for limitations on work restrictions and utility interruptions.

1.3 USE CHARGES

A. General: Installation and removal of and use charges for temporary facilities shall be included in the Contract Sum unless otherwise indicated. Allow other entities to use temporary services and facilities without cost, including, but not limited to, Owner's construction forces, Architect, testing agencies, and authorities having jurisdiction.

B. Water Service from Existing System: Water from Owner's existing water system is available for use without metering and without payment of use charges. Provide connections and extensions of services as required for construction operations.

C. Electric Power Service from Existing System: Electric power from Owner's existing system is available for use without metering and without payment of use charges. Provide connections and extensions of services as required for construction operations.

1.4 INFORMATIONAL SUBMITTALS

A. Site Utilization Plan: Show temporary facilities, utility hookups, staging areas, and parking areas for construction personnel.

B. Fire-Safety Program: Show compliance with requirements of NFPA 241 and authorities having jurisdiction. Indicate Contractor personnel responsible for management of fire-prevention program.

1.5 QUALITY ASSURANCE

A. Electric Service: Comply with NECA, NEMA, and UL standards and regulations for temporary electric service. Install service to comply with NFPA 70.

PART 2 - PRODUCTS

2.1 MATERIALS

A. Chain-Link Fencing: Minimum 2-inch, 0.148-inch thick, galvanized-steel, chain-link fabric fencing; minimum 6 feet high with galvanized-steel pipe posts; minimum 2-3/8-inch OD line posts and 2-7/8-inch OD corner and pull posts, with 1-5/8-inch- OD top rails . 1. Signs: Provide “No Trespassing” signs, which meet OSHA requirements. 2. Gate Security: All gates shall be double locked with an Owner’s security padlock and the

Contractor’s padlock in a manner that will allow access by unlocking either padlock. The Owner’s security padlock shall be obtained from, and returned to, the University’s Project Coordinator.

Page 52: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

TEMPORARY FACILITIES AND CONTROLS 01 50 00 - 2

2.2 TEMPORARY FACILITIES

A. Storage and Fabrication Sheds: Provide sheds sized, furnished, and equipped to accommodate materials and equipment for construction operations. 1. Store combustible materials apart from building.

2.3 EQUIPMENT

A. Fire Extinguishers: Portable, UL rated; with class and extinguishing agent as required by locations and classes of fire exposures.

PART 3 - EXECUTION

3.1 INSTALLATION, GENERAL

A. Locate facilities where they will serve Project adequately and result in minimum interference with performance of the Work. Relocate and modify facilities as required by progress of the Work. 1. Locate facilities to limit site disturbance as specified in Section 01 10 00 "Summary."

B. Provide each facility ready for use when needed to avoid delay. Do not remove until facilities are no longer needed or are replaced by authorized use of completed permanent facilities.

3.2 TEMPORARY UTILITY INSTALLATION

A. General: Install temporary service or connect to existing service. 1. Arrange with utility company, Owner, and existing users for time when service can be

interrupted, if necessary, to make connections for temporary services.

B. Water Service: Connect to Owner's existing water service facilities. Clean and maintain water service facilities in a condition acceptable to Owner. At Substantial Completion, restore these facilities to condition existing before initial use.

C. Sanitary Facilities: Provide temporary toilets, wash facilities, and drinking water for use of construction personnel. Comply with requirements of authorities having jurisdiction for type, number, location, operation, and maintenance of fixtures and facilities.

D. Isolation of Work Areas in Occupied Facilities: Prevent dust, fumes, and odors from entering occupied areas. 1. Prior to commencing work, isolate the HVAC system in area where work is to be

performed according to coordination drawings. a. Disconnect supply and return ductwork in work area from HVAC systems servicing

occupied areas. b. Maintain negative air pressure within work area using HEPA-equipped air-filtration

units, starting with commencement of temporary partition construction, and continuing until removal of temporary partitions is complete.

2. Maintain dust partitions during the Work. Use vacuum collection attachments on dust-producing equipment. Isolate limited work within occupied areas using portable dust-containment devices.

3. Perform daily construction cleanup and final cleanup using approved, HEPA-filter-equipped vacuum equipment.

E. Electric Power Service: Connect to Owner's existing electric power service. Maintain equipment in a condition acceptable to Owner.

F. Lighting: Provide temporary lighting with local switching that provides adequate illumination for construction operations, observations, inspections, and traffic conditions.

G. Telephone Service: Provide superintendent with cellular telephone.

Page 53: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

TEMPORARY FACILITIES AND CONTROLS 01 50 00 - 3

3.3 SUPPORT FACILITIES INSTALLATION

A. Traffic Controls: Comply with requirements of authorities having jurisdiction. 1. Protect existing site improvements to remain including curbs, pavement, and utilities. 2. Maintain access for fire-fighting equipment and access to fire hydrants.

B. Parking: Use designated areas of Owner's existing parking areas for construction personnel.

C. Waste Disposal Facilities: Provide waste-collection containers in sizes adequate to handle waste from construction operations. Comply with requirements of authorities having jurisdiction. Comply with progress cleaning requirements in Section 01 70 00 "Execution."

D. Lifts and Hoists: Provide facilities necessary for hoisting materials and personnel. 1. Truck cranes and similar devices used for hoisting materials are considered "tools and

equipment" and not temporary facilities.

E. Existing Elevator Use: Use of Owner's existing elevators will NOT be permitted.

3.4 SECURITY AND PROTECTION FACILITIES INSTALLATION

A. Protection of Existing Facilities: Protect existing vegetation, equipment, structures, utilities, and other improvements at Project site and on adjacent properties, except those indicated to be removed or altered. Repair damage to existing facilities.

B. Environmental Protection: Provide protection, operate temporary facilities, and conduct construction as required to comply with environmental regulations and that minimize possible air, waterway, and subsoil contamination or pollution or other undesirable effects. 1. Comply with work restrictions specified in Section 01 10 00 "Summary."

C. Tree and Plant Protection: Install temporary fencing located as indicated or outside the drip line of trees to protect vegetation from damage from construction operations. Protect tree root systems from damage, flooding, and erosion.

D. Site Enclosure Fence: Before construction operations begin, furnish and install a six foot high site enclosure fence in a manner that will prevent people and animals from easily entering site except by entrance gates. 1. Extent of Fence: As required to enclose portion of the site as determined sufficient to

accommodate construction operations. 2. Maintain security by limiting number of keys and restricting distribution to authorized

personnel. Furnish one set of keys to Owner. 3. Provide “No Trespassing” signs, which meet OSHA requirements. 4. Except during working hours, gates shall be kept locked by the Contractor at all times. 5. All gates shall be double locked with a University security padlock and the Contractor’s

padlock in a manner that will allow access by unlocking either padlock. Other prime contractors may install their own padlocks if it is determined that they will require access to the area at a time other than regular working hours. The University security padlock shall be obtained from, and returned to, the University Construction Coordinator.

6. Weed Control: Contractor shall cut the weeds inside and along the construction fence as often as necessary to maintain a neat appearance at the project site.

E. Barricades, Warning Signs, and Lights: Comply with requirements of authorities having jurisdiction for erecting structurally adequate barricades, including warning signs and lighting.

F. Temporary Fire Protection: Install and maintain temporary fire-protection facilities of types needed to protect against reasonably predictable and controllable fire losses. Comply with NFPA 241; manage fire-prevention program. 1. Prohibit smoking in construction areas. 2. Supervise welding operations, combustion-type temporary heating units, and similar

sources of fire ignition according to requirements of authorities having jurisdiction.

Page 54: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

TEMPORARY FACILITIES AND CONTROLS 01 50 00 - 4

3. Develop and supervise an overall fire-prevention and -protection program for personnel at Project site. Review needs with local fire department and establish procedures to be followed. Instruct personnel in methods and procedures. Post warnings and information.

4. Provide temporary standpipes and hoses for fire protection. Hang hoses with a warning sign stating that hoses are for fire-protection purposes only and are not to be removed. Match hose size with outlet size and equip with suitable nozzles.

G. Temporary Partitions: Provide floor-to-ceiling dustproof partitions to limit dust and dirt migration and to separate areas occupied by Owner from fumes and noise. 1. Construct dustproof partitions with 5/8” thick gypsum wallboard with joints taped on

occupied side, and gypsum wallboard with joints taped or fire-retardant-treated plywood on construction operations side.

2. Where fire-resistance-rated temporary partitions are indicated or are required by authorities having jurisdiction, construct partitions according to the rated assemblies.

3. Insulate partitions to control noise transmission to occupied areas. 4. Seal joints and perimeter. Equip partitions with gasketed dustproof doors and security

locks where openings are required. 5. Protect air-handling equipment.

3.5 OPERATION, TERMINATION, AND REMOVAL

A. Supervision: Enforce strict discipline in use of temporary facilities. To minimize waste and abuse, limit availability of temporary facilities to essential and intended uses.

B. Termination and Removal: Remove each temporary facility when need for its service has ended, when it has been replaced by authorized use of a permanent facility, or no later than Substantial Completion. Complete or, if necessary, restore permanent construction that may have been delayed because of interference with temporary facility. Repair damaged Work, clean exposed surfaces, and replace construction that cannot be satisfactorily repaired. 1. Materials and facilities that constitute temporary facilities are property of Contractor.

Owner reserves right to take possession of Project identification signs. 2. At Substantial Completion, repair, renovate, and clean permanent facilities used during

construction period. Comply with final cleaning requirements specified in Section 01 77 00 "Closeout Procedures."

END OF SECTION 01 50 00

Page 55: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

PRODUCT REQUIREMENTS 01 60 00 - 1

SECTION 01 60 00 - PRODUCT REQUIREMENTS

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes administrative and procedural requirements for selection of products for use in Project; product delivery, storage, and handling; manufacturers' standard warranties on products; special warranties; and comparable products.

B. Related Requirements: 1. Section 01 23 00 "Alternates" for products selected under an alternate. 2. Section 01 25 00 "Substitution Procedures" for requests for substitutions. 3. Section 01 42 00 "References" for applicable industry standards for products specified.

1.3 DEFINITIONS

A. Products: Items obtained for incorporating into the Work, whether purchased for Project or taken from previously purchased stock. The term "product" includes the terms "material," "equipment," "system," and terms of similar intent. 1. Named Products: Items identified by manufacturer's product name, including make or

model number or other designation shown or listed in manufacturer's published product literature that is current as of date of the Contract Documents.

2. New Products: Items that have not previously been incorporated into another project or facility. Products salvaged or recycled from other projects are not considered new products.

3. Comparable Product: Product that is demonstrated and approved through submittal process to have the indicated qualities related to type, function, dimension, in-service performance, physical properties, appearance, and other characteristics that equal or exceed those of specified product.

B. Basis-of-Design Product Specification: A specification in which a specific manufacturer's product is named and accompanied by the words "basis-of-design product," including make or model number or other designation, to establish the significant qualities related to type, function, dimension, in-service performance, physical properties, appearance, and other characteristics for purposes of evaluating comparable products of additional manufacturers named in the specification.

1.4 ACTION SUBMITTALS

A. Comparable Product Requests: Submit request for consideration of each comparable product. Identify product or fabrication or installation method to be replaced. Include Specification Section number and title and Drawing numbers and titles. 1. Include data to indicate compliance with the requirements specified in "Comparable

Products" Article. 2. Architect's Action: If necessary, Architect will request additional information or

documentation for evaluation within one week of receipt of a comparable product request. Architect will notify Contractor of approval or rejection of proposed comparable product request within 15 days of receipt of request, or seven days of receipt of additional information or documentation, whichever is later. a. Form of Approval: As specified in Section 01 33 00 "Submittal Procedures."

Page 56: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

PRODUCT REQUIREMENTS 01 60 00 - 2

b. Use product specified if Architect does not issue a decision on use of a comparable product request within time allocated.

B. Basis-of-Design Product Specification Submittal: Comply with requirements in Section 01 33 00 "Submittal Procedures." Show compliance with requirements.

1.5 QUALITY ASSURANCE

A. Compatibility of Options: If Contractor is given option of selecting between two or more products for use on Project, select product compatible with products previously selected, even if previously selected products were also options. 1. Each Installer responsible for providing products and construction methods compatible

with products and construction methods of other contractors. 2. If a dispute arises between contractors over concurrently selectable but incompatible

products, Architect will determine which products shall be used.

1.6 PRODUCT DELIVERY, STORAGE, AND HANDLING

A. Deliver, store, and handle products using means and methods that will prevent damage, deterioration, and loss, including theft and vandalism. Comply with manufacturer's written instructions.

B. Delivery and Handling: 1. Schedule delivery to minimize long-term storage at Project site and to prevent

overcrowding of construction spaces. 2. Coordinate delivery with installation time to ensure minimum holding time for items that

are flammable, hazardous, easily damaged, or sensitive to deterioration, theft, and other losses.

3. Deliver products to Project site in an undamaged condition in manufacturer's original sealed container or other packaging system, complete with labels and instructions for handling, storing, unpacking, protecting, and installing.

4. Inspect products on delivery to determine compliance with the Contract Documents and to determine that products are undamaged and properly protected.

C. Storage: 1. Store products to allow for inspection and measurement of quantity or counting of units. 2. Store materials in a manner that will not endanger Project structure. 3. Store products that are subject to damage by the elements, under cover in a weathertight

enclosure above ground, with ventilation adequate to prevent condensation. 4. Protect foam plastic from exposure to sunlight, except to extent necessary for period of

installation and concealment. 5. Comply with product manufacturer's written instructions for temperature, humidity,

ventilation, and weather-protection requirements for storage. 6. Protect stored products from damage and liquids from freezing. 7. Provide a secure location and enclosure at Project site for storage of materials and

equipment by Owner's construction forces. Coordinate location with Owner.

1.7 PRODUCT WARRANTIES

A. Warranties specified in other Sections shall be in addition to, and run concurrent with, other warranties required by the Contract Documents. Manufacturer's disclaimers and limitations on product warranties do not relieve Contractor of obligations under requirements of the Contract Documents. 1. Manufacturer's Warranty: Written warranty furnished by individual manufacturer for a

particular product and specifically endorsed by manufacturer to Owner.

Page 57: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

PRODUCT REQUIREMENTS 01 60 00 - 3

2. Special Warranty: Written warranty required by the Contract Documents to provide specific rights for Owner.

B. Special Warranties: Prepare a written document that contains appropriate terms and identification, ready for execution. 1. Manufacturer's Standard Form: Modified to include Project-specific information and

properly executed. 2. Specified Form: When specified forms are included with the Specifications, prepare a

written document using indicated form properly executed. 3. See other Sections for specific content requirements and particular requirements for

submitting special warranties.

C. Submittal Time: Comply with requirements in Section 01 77 00 "Closeout Procedures."

PART 2 - PRODUCTS

2.1 PRODUCT SELECTION PROCEDURES

A. General Product Requirements: Provide products that comply with the Contract Documents, are undamaged and, unless otherwise indicated, are new at time of installation. 1. Provide products complete with accessories, trim, finish, fasteners, and other items

needed for a complete installation and indicated use and effect. 2. Standard Products: If available, and unless custom products or nonstandard options are

specified, provide standard products of types that have been produced and used successfully in similar situations on other projects.

3. Owner reserves the right to limit selection to products with warranties not in conflict with requirements of the Contract Documents.

4. Where products are accompanied by the term "as selected," Architect will make selection.

5. Descriptive, performance, and reference standard requirements in the Specifications establish salient characteristics of products.

6. Or Equal: For products specified by name and accompanied by the term "or equal," or "or approved equal," or "or approved," comply with requirements in "Comparable Products" Article to obtain approval for use of an unnamed product.

B. Product Selection Procedures: 1. Product: Where Specifications name a single manufacturer and product, provide the

named product that complies with requirements. Comparable products or substitutions for Contractor's convenience will not be considered.

2. Manufacturer/Source: Where Specifications name a single manufacturer or source, provide a product by the named manufacturer or source that complies with requirements. Comparable products or substitutions for Contractor's convenience will not be considered.

3. Products: a. Restricted List: Where Specifications include a list of names of both

manufacturers and products, provide one of the products listed that complies with requirements. Comparable products or substitutions for Contractor's convenience will not be considered.

b. Nonrestricted List: Where Specifications include a list of names of both available manufacturers and products, provide one of the products listed, or an unnamed product, that complies with requirements. Comply with requirements in "Comparable Products" Article for consideration of an unnamed product.

Page 58: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

PRODUCT REQUIREMENTS 01 60 00 - 4

4. Manufacturers: a. Restricted List: Where Specifications include a list of manufacturers' names,

provide a product by one of the manufacturers listed that complies with requirements. Comparable products or substitutions for Contractor's convenience will not be considered.

b. Nonrestricted List: Where Specifications include a list of available manufacturers, provide a product by one of the manufacturers listed, or a product by an unnamed manufacturer, that complies with requirements. Comply with requirements in "Comparable Products" Article for consideration of an unnamed manufacturer's product.

5. Basis-of-Design Product: Where Specifications name a product, or refer to a product indicated on Drawings, and include a list of manufacturers, provide the specified or indicated product or a comparable product by one of the other named manufacturers. Drawings and Specifications indicate sizes, profiles, dimensions, and other characteristics that are based on the product named. Comply with requirements in "Comparable Products" Article for consideration of an unnamed product by one of the other named manufacturers.

C. Visual Selection Specification: Where Specifications include the phrase "as selected by Architect from manufacturer's full range" or similar phrase, select a product that complies with requirements. Architect will select color, gloss, pattern, density, or texture from manufacturer's product line that includes both standard and premium items.

2.2 COMPARABLE PRODUCTS

A. Conditions for Consideration: Architect will consider Contractor's request for comparable product when the following conditions are satisfied. If the following conditions are not satisfied, Architect may return requests without action, except to record noncompliance with these requirements: 1. Evidence that the proposed product does not require revisions to the Contract

Documents, that it is consistent with the Contract Documents and will produce the indicated results, and that it is compatible with other portions of the Work.

2. Detailed comparison of significant qualities of proposed product with those named in the Specifications. Significant qualities include attributes such as performance, weight, size, durability, visual effect, and specific features and requirements indicated.

3. Evidence that proposed product provides specified warranty. 4. List of similar installations for completed projects with project names and addresses and

names and addresses of architects and owners, if requested. 5. Samples, if requested.

PART 3 - EXECUTION (Not Used)

END OF SECTION 01 60 00

Page 59: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

EXECUTION 01 73 00 - 1

SECTION 01 73 00 - EXECUTION

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes general administrative and procedural requirements governing execution of the Work including, but not limited to, the following: 1. Installation of the Work. 2. Cutting and patching. 3. Progress cleaning. 4. Protection of installed construction.

B. Related Requirements: 1. Section 01 10 01 "University Special Project Procedures" for limits on use of Project site. 2. Section 01 77 00 "Closeout Procedures" for submitting Project Record Documents and

final cleaning. 3. Section 02 41 19 "Selective Demolition" for demolition and removal of selected portions

of the building.

1.3 DEFINITIONS

A. Cutting: Removal of in-place construction necessary to permit installation or performance of other work.

B. Patching: Fitting and repair work required to restore construction to original conditions after installation of other work.

1.4 QUALITY ASSURANCE

A. Cutting and Patching: Comply with requirements for and limitations on cutting and patching of construction elements. 1. Structural Elements: When cutting and patching structural elements, notify Architect of

locations and details of cutting and await directions from Architect before proceeding. Shore, brace, and support structural elements during cutting and patching. Do not cut and patch structural elements in a manner that could change their load-carrying capacity or increase deflection

2. Operational Elements: Do not cut and patch operating elements and related components in a manner that results in reducing their capacity to perform as intended or that results in increased maintenance or decreased operational life or safety.

3. Other Construction Elements: Do not cut and patch other construction elements or components in a manner that could change their load-carrying capacity, that results in reducing their capacity to perform as intended, or that results in increased maintenance or decreased operational life or safety.

4. Visual Elements: Do not cut and patch construction in a manner that results in visual evidence of cutting and patching. Do not cut and patch exposed construction in a manner that would, in Architect's opinion, reduce the building's aesthetic qualities. Remove and replace construction that has been cut and patched in a visually unsatisfactory manner.

Page 60: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

EXECUTION 01 73 00 - 2

PART 2 - PRODUCTS

2.1 MATERIALS

A. General: Comply with requirements specified in other Sections.

B. In-Place Materials: Use materials for patching identical to in-place materials. For exposed surfaces, use materials that visually match in-place adjacent surfaces to the fullest extent possible. 1. If identical materials are unavailable or cannot be used, use materials that, when

installed, will provide a match acceptable to Architect for the visual and functional performance of in-place materials.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Existing Conditions: The existence and location of construction indicated as existing are not guaranteed. Before beginning work, investigate and verify the existence and location of utilities, mechanical and electrical systems, and other construction affecting the Work.

B. Examination and Acceptance of Conditions: Before proceeding with the Work, examine substrates, areas, and conditions, with Installer or Applicator present where indicated, for compliance with requirements for installation tolerances and other conditions affecting performance. Record observations.

C. Written Report: Where a written report listing conditions detrimental to performance of the Work is required by other Sections, include the following: 1. Description of the Work. 2. List of detrimental conditions, including substrates. 3. List of unacceptable installation tolerances. 4. Recommended corrections.

D. Proceed with installation only after unsatisfactory conditions have been corrected. Proceeding with the Work indicates acceptance of surfaces and conditions.

3.2 PREPARATION

A. Field Measurements: Take field measurements as required to fit the Work properly. Recheck measurements before installing each product. Where portions of the Work are indicated to fit to other construction, verify dimensions of other construction by field measurements before fabrication. Coordinate fabrication schedule with construction progress to avoid delaying the Work.

B. Review of Contract Documents and Field Conditions: Immediately on discovery of the need for clarification of the Contract Documents caused by differing field conditions outside the control of Contractor, submit a request for information to Architect according to requirements in Section 013100 "Project Management and Coordination."

3.3 INSTALLATION

A. General: Locate the Work and components of the Work accurately, in correct alignment and elevation, as indicated.

B. Comply with manufacturer's written instructions and recommendations for installing products in applications indicated.

C. Install products at the time and under conditions that will ensure the best possible results. Maintain conditions required for product performance until Substantial Completion.

Page 61: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

EXECUTION 01 73 00 - 3

D. Conduct construction operations so no part of the Work is subjected to damaging operations or loading in excess of that expected during normal conditions of occupancy.

E. Tools and Equipment: Do not use tools or equipment that produce harmful noise levels.

F. Attachment: Provide blocking and attachment plates and anchors and fasteners of adequate size and number to securely anchor each component in place, accurately located and aligned with other portions of the Work. Where size and type of attachments are not indicated, verify size and type required for load conditions.

G. Hazardous Materials: Use products, cleaners, and installation materials that are not considered hazardous.

3.4 CUTTING AND PATCHING

A. Cutting and Patching, General: Employ skilled workers to perform cutting and patching. Proceed with cutting and patching at the earliest feasible time, and complete without delay. 1. Cut in-place construction to provide for installation of other components or performance

of other construction, and subsequently patch as required to restore surfaces to their original condition.

B. Existing Warranties: Remove, replace, patch, and repair materials and surfaces cut or damaged during installation or cutting and patching operations, by methods and with materials so as not to void existing warranties.

C. Temporary Support: Provide temporary support of work to be cut.

D. Protection: Protect in-place construction during cutting and patching to prevent damage. Provide protection from adverse weather conditions for portions of Project that might be exposed during cutting and patching operations.

E. Adjacent Occupied Areas: Where interference with use of adjoining areas or interruption of free passage to adjoining areas is unavoidable, coordinate cutting and patching according to requirements in Section 01 10 01 " University Special Project Procedures."

F. Existing Utility Services and Mechanical/Electrical Systems: Where existing services/systems are required to be removed, relocated, or abandoned, bypass such services/systems before cutting to prevent interruption to occupied areas.

G. Cutting: Cut in-place construction by sawing, drilling, breaking, chipping, grinding, and similar operations, including excavation, using methods least likely to damage elements retained or adjoining construction. If possible, review proposed procedures with original Installer; comply with original Installer's written recommendations. 1. In general, use hand or small power tools designed for sawing and grinding, not

hammering and chopping. Cut holes and slots neatly to minimum size required, and with minimum disturbance of adjacent surfaces. Temporarily cover openings when not in use.

2. Finished Surfaces: Cut or drill from the exposed or finished side into concealed surfaces. 3. Concrete and Masonry: Cut using a cutting machine, such as an abrasive saw or a

diamond-core drill. 4. Mechanical and Electrical Services: Cut off pipe or conduit in walls or partitions to be

removed. Cap, valve, or plug and seal remaining portion of pipe or conduit to prevent entrance of moisture or other foreign matter after cutting.

5. Proceed with patching after construction operations requiring cutting are complete.

H. Patching: Patch construction by filling, repairing, refinishing, closing up, and similar operations following performance of other work. Patch with durable seams that are as invisible as practicable. Provide materials and comply with installation requirements specified in other Sections, where applicable. 1. Inspection: Where feasible, test and inspect patched areas after completion to

demonstrate physical integrity of installation.

Page 62: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

EXECUTION 01 73 00 - 4

2. Exposed Finishes: Restore exposed finishes of patched areas and extend finish restoration into retained adjoining construction in a manner that will minimize evidence of patching and refinishing. a. Clean piping, conduit, and similar features before applying paint or other finishing

materials. b. Restore damaged pipe covering to its original condition.

3. Exterior Building Enclosure: Patch components in a manner that restores enclosure to a weathertight condition and ensures thermal and moisture integrity of building enclosure.

I. Cleaning: Clean areas and spaces where cutting and patching are performed. Remove paint, mortar, oils, putty, and similar materials from adjacent finished surfaces.

3.5 PROGRESS CLEANING A. General: Clean Project site and work areas daily, including common areas. Enforce

requirements strictly. Dispose of materials lawfully. 1. Comply with requirements in NFPA 241 for removal of combustible waste materials and

debris. 2. Do not hold waste materials more than seven days during normal weather or three days if

the temperature is expected to rise above 80 deg F. 3. Containerize hazardous and unsanitary waste materials separately from other waste.

Mark containers appropriately and dispose of legally, according to regulations. a. Use containers intended for holding waste materials of type to be stored.

4. Coordinate progress cleaning for joint-use areas where Contractor and other contractors are working concurrently.

B. Site: Maintain Project site free of waste materials and debris. C. Work Areas: Clean areas where work is in progress to the level of cleanliness necessary for

proper execution of the Work. 1. Remove liquid spills promptly. 2. Where dust would impair proper execution of the Work, broom-clean or vacuum the

entire work area, as appropriate. D. Installed Work: Keep installed work clean. Clean installed surfaces according to written

instructions of manufacturer or fabricator of product installed, using only cleaning materials specifically recommended. If specific cleaning materials are not recommended, use cleaning materials that are not hazardous to health or property and that will not damage exposed surfaces.

E. Waste Disposal: Do not bury or burn waste materials on-site. Do not wash waste materials down sewers or into waterways.

F. During handling and installation, clean and protect construction in progress and adjoining materials already in place. Apply protective covering where required to ensure protection from damage or deterioration at Substantial Completion.

G. Limiting Exposures: Supervise construction operations to assure that no part of the construction, completed or in progress, is subject to harmful, dangerous, damaging, or otherwise deleterious exposure during the construction period.

3.6 PROTECTION OF INSTALLED CONSTRUCTION A. Provide final protection and maintain conditions that ensure installed Work is without damage or

deterioration at time of Substantial Completion. B. Comply with manufacturer's written instructions for temperature and relative humidity.

END OF SECTION 01 73 00

Page 63: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

CLOSEOUT PROCEDURES 01 77 00 - 1

SECTION 01 77 00 - CLOSEOUT PROCEDURES

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes administrative and procedural requirements for contract closeout, including, but not limited to, the following: 1. Substantial Completion procedures. 2. Final completion procedures. 3. Warranties. 4. Final cleaning. 5. Repair of the Work.

B. Related Requirements: 1. Section 01 70 00 "Execution" for progress cleaning of Project site. 2. Section 01 78 23 "Operation and Maintenance Data" for operation and maintenance

manual requirements. 3. Section 01 78 39 "Project Record Documents" for submitting record Drawings, record

Specifications, and record Product Data.

1.3 ACTION SUBMITTALS

A. Contractor's List of Incomplete Items: Initial submittal at Substantial Completion.

B. Certified List of Incomplete Items: Final submittal at Final Completion.

1.4 CLOSEOUT SUBMITTALS

A. Certificates of Release: From authorities having jurisdiction.

B. Certificate of Insurance: For continuing coverage.

1.5 MAINTENANCE MATERIAL SUBMITTALS

A. Schedule of Maintenance Material Items: For maintenance material submittal items specified in other Sections.

1.6 SUBSTANTIAL COMPLETION PROCEDURES

A. Contractor's List of Incomplete Items: Prepare and submit a list of items to be completed and corrected (Contractor's punch list), indicating the value of each item on the list and reasons why the Work is incomplete.

B. Submittals Prior to Substantial Completion: Complete the following a minimum of 10 days prior to requesting inspection for determining date of Substantial Completion. List items below that are incomplete at time of request. 1. Certificates of Release: Obtain and submit releases from authorities having jurisdiction

permitting Owner unrestricted use of the Work and access to services and utilities. Include occupancy permits, operating certificates, and similar releases.

2. Submit test/adjust/balance records. 3. Submit changeover information related to Owner's occupancy, use, operation, and

maintenance.

Page 64: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

CLOSEOUT PROCEDURES 01 77 00 - 2

C. Procedures Prior to Substantial Completion: Complete the following a minimum of 10 days prior to requesting inspection for determining date of Substantial Completion. List items below that are incomplete at time of request. 1. Advise Owner of pending insurance changeover requirements. 2. Make final changeover of permanent locks and deliver keys to Owner. Advise Owner's

personnel of changeover in security provisions. 3. Complete startup and testing of systems and equipment. 4. Perform preventive maintenance on equipment used prior to Substantial Completion. 5. Instruct Owner's personnel in operation, adjustment, and maintenance of products,

equipment, and systems. Submit demonstration and training video recordings specified in Section 01820 "Demonstration and Training."

6. Advise Owner of changeover in HVAC and other utilities. 7. Participate with Owner in conducting inspection and walkthrough with local emergency

responders. 8. Terminate and remove temporary facilities from Project site, along with mockups,

construction tools, and similar elements. 9. Complete final cleaning requirements, including touchup painting. 10. Touch up and otherwise repair and restore marred exposed finishes to eliminate visual

defects.

D. Inspection: Submit a written request for inspection to determine Substantial Completion a minimum of 7 days prior to date the work will be completed and ready for final inspection and tests. On receipt of request, Architect will either proceed with inspection or notify Contractor of unfulfilled requirements. Architect will prepare the Certificate of Substantial Completion after inspection or will notify Contractor of items, either on Contractor's list or additional items identified by Architect, that must be completed or corrected before certificate will be issued. 1. Reinspection: Request reinspection when the Work identified in previous inspections as

incomplete is completed or corrected. 2. Results of completed inspection will form the basis of requirements for final completion.

1.7 FINAL COMPLETION PROCEDURES

A. Submittals Prior to Final Completion: Before requesting final inspection for determining final completion, complete the following: 1. Submit a final Application for Payment according to Section 01290 "Payment

Procedures." 2. Submit closeout submittals specified in other Division 01 Sections, including project

record documents, operation and maintenance manuals, final completion construction photographic documentation, damage or settlement surveys, property surveys, and similar final record information.

3. Submit closeout submittals specified in individual Sections, including specific warranties, workmanship bonds, maintenance service agreements, final certifications, and similar documents.

4. Submit maintenance material submittals specified in individual Sections, including tools, spare parts, extra materials, and similar items, and deliver to location designated by Contractor. Label with manufacturer's name and model number where applicable.

5. Certified List of Incomplete Items: Submit copy of Architect's Substantial Completion inspection list of items to be completed or corrected (punch list), state that each item has been completed or otherwise resolved for acceptance.

6. Certificate of Insurance: Submit evidence of final, continuing insurance coverage complying with insurance requirements.

Page 65: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

CLOSEOUT PROCEDURES 01 77 00 - 3

B. Inspection: Submit a written request for final inspection to determine acceptance a minimum of 7days prior to date the work will be completed and ready for final inspection and tests. On receipt of request, Architect will either proceed with inspection or notify Contractor of unfulfilled requirements. Architect will prepare a final Certificate for Payment after inspection or will notify Contractor of construction that must be completed or corrected before certificate will be issued. 1. Reinspection: Request reinspection when the Work identified in previous inspections as

incomplete is completed or corrected.

1.8 LIST OF INCOMPLETE ITEMS (PUNCH LIST)

A. Organization of List: Include name and identification of each space and area affected by construction operations for incomplete items and items needing correction including, if necessary, areas disturbed by Contractor that are outside the limits of construction. 1. Organize list of spaces in sequential order, starting with exterior areas first and

proceeding from lowest floor to highest floor. 2. Organize items applying to each space by major element, including categories for ceiling,

individual walls, floors, equipment, and building systems. 3. Include the following information at the top of each page:

a. Project name. b. Date. c. Name of Architect. d. Name of Contractor. e. Page number.

4. Submit list of incomplete items in the following format: a. MS Excel electronic file. Architect, will return annotated PDF file.

1.9 SUBMITTAL OF PROJECT WARRANTIES

A. Time of Submittal: Submit written warranties on request of Architect for designated portions of the Work where commencement of warranties other than date of Substantial Completion is indicated, or when delay in submittal of warranties might limit Owner's rights under warranty.

B. Partial Occupancy: Submit properly executed warranties within 15 days of completion of designated portions of the Work that are completed and occupied or used by Owner during construction period by separate agreement with Contractor.

C. Organize warranty documents into an orderly sequence based on the table of contents of Project Manual. 1. Bind warranties and bonds in heavy-duty, three-ring, vinyl-covered, loose-leaf binders,

thickness as necessary to accommodate contents, and sized to receive 8-1/2-by-11-inch paper.

2. Provide heavy paper dividers with plastic-covered tabs for each separate warranty. Mark tab to identify the product or installation. Provide a typed description of the product or installation, including the name of the product and the name, address, and telephone number of Installer.

3. Identify each binder on the front and spine with the typed or printed title "WARRANTIES," Project name, and name of Contractor.

4. Warranty Electronic File: Scan warranties and bonds and assemble complete warranty and bond submittal package into a single indexed electronic PDF file with links enabling navigation to each item. Provide bookmarked table of contents at beginning of document.

D. Provide additional copies of each warranty to include in operation and maintenance manuals.

Page 66: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

CLOSEOUT PROCEDURES 01 77 00 - 4

PART 2 - PRODUCTS

2.1 MATERIALS

A. Cleaning Agents: Use cleaning materials and agents recommended by manufacturer or fabricator of the surface to be cleaned. Do not use cleaning agents that are potentially hazardous to health or property or that might damage finished surfaces.

PART 3 - EXECUTION

3.1 FINAL CLEANING

A. General: Perform final cleaning. Conduct cleaning and waste-removal operations to comply with local laws and ordinances and Federal and local environmental and antipollution regulations.

B. Cleaning: Employ experienced workers or professional cleaners for final cleaning. Clean each surface or unit to condition expected in an average commercial building cleaning and maintenance program. Comply with manufacturer's written instructions. 1. Complete the following cleaning operations before requesting inspection for certification

of Substantial Completion for entire Project or for a designated portion of Project: a. Clean Project site, yard, and grounds, in areas disturbed by construction activities,

including landscape development areas, of rubbish, waste material, litter, and other foreign substances.

b. Sweep paved areas broom clean. Remove petrochemical spills, stains, and other foreign deposits.

c. Rake grounds that are neither planted nor paved to a smooth, even-textured surface.

d. Remove tools, construction equipment, machinery, and surplus material from Project site.

e. Clean exposed interior hard-surfaced finishes to a dirt-free condition, free of stains, films, and similar foreign substances. Restore reflective surfaces to their original condition.

f. Remove debris and surface dust from limited access spaces, including roofs, plenums, shafts, trenches, equipment vaults, manholes, attics, and similar spaces.

g. Sweep concrete floors broom clean in unoccupied spaces. h. Vacuum carpet and similar soft surfaces, removing debris and excess nap; clean

according to manufacturer's recommendations if visible soil or stains remain. i. Clean transparent materials, including mirrors and glass in doors and windows.

Remove glazing compounds and other noticeable, vision-obscuring materials. Polish mirrors and glass, taking care not to scratch surfaces.

j. Remove labels that are not permanent. k. Wipe surfaces of mechanical and electrical equipment, and similar equipment.

Remove excess lubrication, paint and mortar droppings, and other foreign substances.

l. Replace disposable air filters and clean permanent air filters. Clean exposed surfaces of diffusers, registers, and grills.

m. Clean ducts, blowers, and coils if units were operated without filters during construction or that display contamination with particulate matter on inspection.

n. Clean light fixtures, lamps, globes, and reflectors to function with full efficiency. o. Leave Project clean and ready for occupancy.

C. Construction Waste Disposal: Comply with waste disposal requirements in Section 015000 "Temporary Facilities and Controls."

Page 67: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

CLOSEOUT PROCEDURES 01 77 00 - 5

3.2 REPAIR OF THE WORK

A. Complete repair and restoration operations before requesting inspection for determination of Substantial Completion.

B. Repair or remove and replace defective construction. Repairing includes replacing defective parts, refinishing damaged surfaces, touching up with matching materials, and properly adjusting operating equipment. Where damaged or worn items cannot be repaired or restored, provide replacements. Remove and replace operating components that cannot be repaired. Restore damaged construction and permanent facilities used during construction to specified condition. 1. Remove and replace chipped, scratched, and broken glass, reflective surfaces, and other

damaged transparent materials. 2. Touch up and otherwise repair and restore marred or exposed finishes and surfaces.

Replace finishes and surfaces that that already show evidence of repair or restoration. a. Do not paint over "UL" and other required labels and identification, including

mechanical and electrical nameplates. Remove paint applied to required labels and identification.

3. Replace parts subject to operating conditions during construction that may impede operation or reduce longevity.

4. Replace burned-out bulbs, bulbs noticeably dimmed by hours of use, and defective and noisy starters in fluorescent and mercury vapor fixtures to comply with requirements for new fixtures.

END OF SECTION 01 77 00

Page 68: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing
Page 69: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

OPERATION AND MAINTENANCE DATA 01 78 23 - 1

SECTION 01 78 23 - MAINTENANCE DATA

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes administrative and procedural requirements for preparing operation and maintenance manuals, including the following: 1. Maintenance documentation directory. 2. Product maintenance manuals. 3. Systems and equipment maintenance manuals.

B. Related Requirements: 1. Section 01 33 00 "Submittal Procedures" for submitting copies of submittals for operation

and maintenance manuals.

1.3 DEFINITIONS

A. System: An organized collection of parts, equipment, or subsystems united by regular interaction.

B. Subsystem: A portion of a system with characteristics similar to a system.

1.4 CLOSEOUT SUBMITTALS

A. Manual Content: Operations and maintenance manual content is specified in individual Specification Sections to be reviewed at the time of Section submittals. Submit reviewed manual content formatted and organized as required by this Section. 1. Architect will comment on whether content of operations and maintenance submittals are

acceptable. 2. Where applicable, clarify and update reviewed manual content to correspond to revisions

and field conditions.

B. Format: Submit operations and maintenance manuals in the following format: 1. PDF electronic file. Assemble each manual into a composite electronically indexed file.

Submit on digital media acceptable to Architect. a. Name each indexed document file in composite electronic index with applicable

item name. Include a complete electronically linked operation and maintenance directory.

b. Enable inserted reviewer comments on draft submittals. 2. Three paper copies. Include a complete operation and maintenance directory. Enclose

title pages and directories in clear plastic sleeves. Architect will return two copies.

C. Initial Manual Submittal: Submit draft copy of each manual at least 30 days before commencing demonstration and training. Architect will comment on whether general scope and content of manual are acceptable.

Page 70: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

OPERATION AND MAINTENANCE DATA 01 78 23 - 2

D. Final Manual Submittal: Submit each manual in final form prior to requesting inspection for Substantial Completion and at least 15 days before commencing demonstration and training. Architect will return copy with comments. 1. Correct or revise each manual to comply with Architect's comments. Submit copies of

each corrected manual within 15 days of receipt of Architect's comments and prior to commencing demonstration and training.

PART 2 - PRODUCTS

2.1 MAINTENANCE DOCUMENTATION DIRECTORY

A. Directory: Prepare a single, comprehensive directory of emergency, operation, and maintenance data and materials, listing items and their location to facilitate ready access to desired information. Include a section in the directory for each of the following: 1. List of documents. 2. List of systems. 3. List of equipment. 4. Table of contents.

B. List of Systems and Subsystems: List systems alphabetically. Include references to operation and maintenance manuals that contain information about each system.

C. List of Equipment: List equipment for each system, organized alphabetically by system. For pieces of equipment not part of system, list alphabetically in separate list.

D. Tables of Contents: Include a table of contents for each emergency, operation, and maintenance manual.

E. Identification: In the documentation directory and in each operation and maintenance manual, identify each system, subsystem, and piece of equipment with same designation used in the Contract Documents. If no designation exists, assign a designation according to ASHRAE Guideline 4, "Preparation of Operating and Maintenance Documentation for Building Systems."

2.2 REQUIREMENTS FOR MAINTENANCE MANUALS

A. Format for Manuals: Manuals shall consist of manufacturers’ typed or printed operation instructions and maintenance data, shop drawings or catalog cuts, and other data listed herein; all bound in 8 ½” x 11” hard-back binder. Organize each manual into a separate section for each system and subsystem, and a separate section for each piece of equipment not part of a system. Material shall be assembled as follows: 1. Inside Cover: Title of job, New University of Florida, address, date of submittal, name of

contractor and name of manufacturer. 2. Second Page: Table of Contents 3. Third Page: Introduction to first section containing a complete written description of the

equipment or system 4. First Section: Written description of system contents, where equipment is located in

building, how each part functions individually and how system works as a whole, concluded with a list of items requiring service and the service needed or reference to the manufacturer’s data in the binder which describes proper service.

5. Second Section: A copy of each shop drawing with an index at the beginning of the section.

6. Third Section: A list of all equipment incorporated into job, contractor’s purchase order numbers, supplier’s name and address.

Page 71: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

OPERATION AND MAINTENANCE DATA 01 78 23 - 3

B. Table of Contents: List each product included in manual, identified by product name, indexed to the content of the volume, and cross-referenced to Specification Section number in Project Manual. 1. If maintenance documentation requires more than one volume to accommodate data,

include comprehensive table of contents for all volumes in each volume of the set. C. Manual Contents: Organize into sets of manageable size. Arrange contents alphabetically by

system, subsystem, and equipment. If possible, assemble instructions for subsystems, equipment, and components of one system into a single binder.

D. Manuals, Electronic Files: Submit manuals in the form of a multiple file composite electronic PDF file for each manual type required. 1. Electronic Files: Use electronic files prepared by manufacturer where available. Where

scanning of paper documents is required, configure scanned file for minimum readable file size.

2. File Names and Bookmarks: Enable bookmarking of individual documents based on file names. Name document files to correspond to system, subsystem, and equipment names used in manual directory and table of contents. Group documents for each system and subsystem into individual composite bookmarked files, then create composite manual, so that resulting bookmarks reflect the system, subsystem, and equipment names in a readily navigated file tree. Configure electronic manual to display bookmark panel on opening file.

E. Manuals, Paper Copy: Submit manuals in the form of hard copy, bound and labeled volumes. 1. Binders: Heavy-duty, three-ring, vinyl-covered, loose-leaf binders, in thickness

necessary to accommodate contents, sized to hold 8-1/2-by-11-inch paper; with clear plastic sleeve on spine to hold label describing contents and with pockets inside covers to hold folded oversize sheets. a. If two or more binders are necessary to accommodate data of a system, organize

data in each binder into groupings by subsystem and related components. Cross-reference other binders if necessary to provide essential information for proper operation or maintenance of equipment or system.

b. Identify each binder on front and spine, with printed title " MAINTENANCE MANUAL," Project title or name, and subject matter of contents. Indicate volume number for multiple-volume sets.

2. Dividers: Heavy-paper dividers with plastic-covered tabs for each section of the manual. Mark each tab to indicate contents. Include typed list of products and major components of equipment included in the section on each divider, cross-referenced to Specification Section number and title of Project Manual.

3. Protective Plastic Sleeves: Transparent plastic sleeves designed to enclose diagnostic software storage media for computerized electronic equipment.

4. Supplementary Text: Prepared on 8-1/2-by-11-inch white bond paper. 5. Drawings: Attach reinforced, punched binder tabs on drawings and bind with text.

a. If oversize drawings are necessary, fold drawings to same size as text pages and use as foldouts.

b. If drawings are too large to be used as foldouts, fold and place drawings in labeled envelopes and bind envelopes in rear of manual. At appropriate locations in manual, insert typewritten pages indicating drawing titles, descriptions of contents, and drawing locations.

2.3 PRODUCT MAINTENANCE MANUALS

A. Content: Organize manual into a separate section for each product, material, and finish. Include source information, product information, maintenance procedures, repair materials and sources, and warranties and bonds, as described below.

Page 72: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

OPERATION AND MAINTENANCE DATA 01 78 23 - 4

B. Source Information: List each product included in manual, identified by product name and arranged to match manual's table of contents. For each product, list name, address, and telephone number of Installer or supplier and maintenance service agent, and cross-reference Specification Section number and title in Project Manual and drawing or schedule designation or identifier where applicable.

C. Product Information: Include the following, as applicable: 1. Product name and model number. 2. Manufacturer's name. 3. Color, pattern, and texture. 4. Material and chemical composition. 5. Reordering information for specially manufactured products.

D. Maintenance Procedures: Include manufacturer's written recommendations and the following: 1. Inspection procedures. 2. Types of cleaning agents to be used and methods of cleaning. 3. List of cleaning agents and methods of cleaning detrimental to product. 4. Schedule for routine cleaning and maintenance. 5. Repair instructions.

E. Repair Materials and Sources: Include lists of materials and local sources of materials and related services.

F. Warranties and Bonds: Include copies of warranties and bonds and lists of circumstances and conditions that would affect validity of warranties or bonds. 1. Include procedures to follow and required notifications for warranty claims.

2.4 SYSTEMS AND EQUIPMENT MAINTENANCE MANUALS

A. Content: For each system, subsystem, and piece of equipment not part of a system, include source information, manufacturers' maintenance documentation, maintenance procedures, maintenance and service schedules, spare parts list and source information, maintenance service contracts, and warranty and bond information, as described below.

B. Source Information: List each system, subsystem, and piece of equipment included in manual, identified by product name and arranged to match manual's table of contents. For each product, list name, address, and telephone number of Installer or supplier and maintenance service agent, and cross-reference Specification Section number and title in Project Manual and drawing or schedule designation or identifier where applicable.

C. Manufacturers' Maintenance Documentation: Manufacturers' maintenance documentation including the following information for each component part or piece of equipment: 1. Standard maintenance instructions and bulletins. 2. Drawings, diagrams, and instructions required for maintenance, including disassembly

and component removal, replacement, and assembly. 3. Identification and nomenclature of parts and components. 4. List of items recommended to be stocked as spare parts.

D. Maintenance Procedures: Include the following information and items that detail essential maintenance procedures: 1. Test and inspection instructions. 2. Troubleshooting guide. 3. Precautions against improper maintenance. 4. Disassembly; component removal, repair, and replacement; and reassembly instructions. 5. Aligning, adjusting, and checking instructions.

Page 73: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

OPERATION AND MAINTENANCE DATA 01 78 23 - 5

6. Demonstration and training video recording, if available.

E. Maintenance and Service Schedules: Include service and lubrication requirements, list of required lubricants for equipment, and separate schedules for preventive and routine maintenance and service with standard time allotment. 1. Scheduled Maintenance and Service: Tabulate actions for daily, weekly, monthly,

quarterly, semiannual, and annual frequencies. 2. Maintenance and Service Record: Include manufacturers' forms for recording

maintenance.

F. Spare Parts List and Source Information: Include lists of replacement and repair parts, with parts identified and cross-referenced to manufacturers' maintenance documentation and local sources of maintenance materials and related services.

G. Maintenance Service Contracts: Include copies of maintenance agreements with name and telephone number of service agent.

H. Warranties and Bonds: Include copies of warranties and bonds and lists of circumstances and conditions that would affect validity of warranties or bonds. 1. Include procedures to follow and required notifications for warranty claims.

PART 3 - EXECUTION

3.1 MANUAL PREPARATION

A. Operation and Maintenance Documentation Directory: Prepare a separate manual that provides an organized reference to emergency, operation, and maintenance manuals.

B. Product Maintenance Manual: Assemble a complete set of maintenance data indicating care and maintenance of each product, material, and finish incorporated into the Work. 1. Engage a factory-authorized service representative to assemble and prepare information

for each system, subsystem, and piece of equipment not part of a system. 2. Prepare a separate manual for each system and subsystem, in the form of an

instructional manual for use by Owner's operating personnel.

C. Manufacturers' Data: Where manuals contain manufacturers' standard printed data, include only sheets pertinent to product or component installed. Mark each sheet to identify each product or component incorporated into the Work. If data include more than one item in a tabular format, identify each item using appropriate references from the Contract Documents. Identify data applicable to the Work and delete references to information not applicable. 1. Prepare supplementary text if manufacturers' standard printed data are not available and

where the information is necessary for proper operation and maintenance of equipment or systems.

D. Drawings: Prepare drawings supplementing manufacturers' printed data to illustrate the relationship of component parts of equipment and systems and to illustrate control sequence and flow diagrams. Coordinate these drawings with information contained in record Drawings to ensure correct illustration of completed installation. 1. Do not use original project record documents as part of operation and maintenance

manuals. 2. Comply with requirements of newly prepared record Drawings in Section 01 78 39

"Project Record Documents."

E. Comply with Section 01 77 00 "Closeout Procedures" for schedule for submitting operation and maintenance documentation.

END OF SECTION 01 78 23

Page 74: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing
Page 75: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

PROJECT RECORD DOCUMENTS 01 78 39 - 1

SECTION 01 78 39 - PROJECT RECORD DOCUMENTS

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes administrative and procedural requirements for project record documents, including the following: 1. As-Built Drawings. 2. As-Built Specifications. 3. As-Built Product Data. 4. Miscellaneous record submittals.

B. Related Requirements: 1. Section 01 77 00 "Closeout Procedures" for general closeout procedures. 2. Section 01 78 23 "Maintenance Data" for operation and maintenance manual

requirements.

1.3 CLOSEOUT SUBMITTALS

A. As-Built Drawings: Comply with the following: 1. Number of Copies: Submit one set(s) of marked-up as-built prints.

B. As-Built Specifications: Submit one paper copy or annotated PDF electronic files of Project's Specifications, including addenda and contract modifications.

C. As-Built Product Data: Submit annotated PDF electronic files and directories of each submittal. 1. Where As-Built Product Data are required as part of operation and maintenance

manuals, submit duplicate marked-up Product Data as a component of manual.

D. Miscellaneous Record Submittals: See other Specification Sections for miscellaneous record-keeping requirements and submittals in connection with various construction activities. Submit annotated PDF electronic files and directories of each submittal.

PART 2 - PRODUCTS

2.1 AS-BUILT DRAWINGS

A. As-Built Prints: Maintain one set of marked-up paper copies of the Contract Drawings and Shop Drawings, incorporating new and revised drawings as modifications are issued. 1. Preparation: Mark record prints to show the actual installation where installation varies

from that shown originally. Require individual or entity who obtained record data, whether individual or entity is Installer, sub-contractor, or similar entity, to provide information for preparation of corresponding marked-up As-Built prints. a. Give particular attention to information on concealed elements that would be

difficult to identify or measure and record later. b. Accurately record information in an acceptable drawing technique. c. Record data as soon as possible after obtaining it. d. Record and check the markup before enclosing concealed installations. e. Cross-reference record prints to corresponding archive photographic

documentation.

Page 76: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

PROJECT RECORD DOCUMENTS 01 78 39 - 2

2. Content: Types of items requiring marking include, but are not limited to, the following: a. Dimensional changes to Drawings. b. Revisions to details shown on Drawings. c. Actual equipment locations. d. Changes made by Change Order or Construction Change Directive. e. Changes made following Architect's written orders. f. Details not on the original Contract Drawings. g. Field records for variable and concealed conditions. h. Record information on the Work that is shown only schematically.

3. Mark the Contract Drawings and Shop Drawings completely and accurately. Use personnel proficient at recording graphic information in production of marked-up As-Built prints.

4. Mark As-Built sets with erasable, red-colored pencil. Use other colors to distinguish between changes for different categories of the Work at same location.

5. Mark important additional information that was either shown schematically or omitted from original Drawings.

6. Note Construction Change Directive numbers, alternate numbers, Change Order numbers, and similar identification, where applicable.

B. Newly Prepared As-Built Drawings: Prepare new Drawings instead of preparing As-Built Drawings where Architect determines that neither the original Contract Drawings nor Shop Drawings are suitable to show actual installation. 1. New Drawings may be required when a Change Order is issued as a result of accepting

an alternate, substitution, or other modification. 2. Consult Architect for proper scale and scope of detailing and notations required to record

the actual physical installation and its relation to other construction. Integrate newly prepared As-Built Drawings into As-Built Drawing sets; comply with procedures for formatting, organizing, copying, binding, and submitting.

C. Format: Identify and date each As-Built Drawing; include the designation "PROJECT AS-BUILT DRAWING" in a prominent location. 1. As-Built Prints: Organize As-Built prints and newly prepared As-Built Drawings into

manageable sets. Bind each set with durable paper cover sheets. Include identification on cover sheets.

2. Identification: As follows: a. Project name. b. Date. c. Designation "PROJECT AS-BUILT DRAWINGS." d. Name of Architect. e. Name of Construction Manager.

2.2 AS-BUILT SPECIFICATIONS

A. Preparation: Mark Specifications to indicate the actual product installation where installation varies from that indicated in Specifications, addenda, and contract modifications. 1. Give particular attention to information on concealed products and installations that

cannot be readily identified and recorded later. 2. Mark copy with the proprietary name and model number of products, materials, and

equipment furnished, including substitutions and product options selected. 3. Record the name of manufacturer, supplier, Installer, and other information necessary to

provide a record of selections made. 4. For each principal product, indicate whether As-Built Product Data has been submitted in

operation and maintenance manuals instead of submitted as As-Built Product Data.

Page 77: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

PROJECT RECORD DOCUMENTS 01 78 39 - 3

5. Note related Change Orders, As-Built Product Data, and As-Built Drawings where applicable.

B. Format: Submit As-Built Specifications as annotated PDF electronic file and a paper copy.

2.3 AS-BUILT PRODUCT DATA A. Preparation: Mark Product Data to indicate the actual product installation where installation

varies substantially from that indicated in Product Data submittal. 1. Give particular attention to information on concealed products and installations that

cannot be readily identified and recorded later. 2. Include significant changes in the product delivered to Project site and changes in

manufacturer's written instructions for installation. 3. Note related Change Orders, As-Built Specifications, and As-Built Drawings where

applicable.

B. Format: Submit As-Built Product Data as annotated PDF electronic file. 1. Include As-Built Product Data directory organized by Specification Section number and

title, electronically linked to each item of As-Built Product Data.

2.4 MISCELLANEOUS RECORD SUBMITTALS A. Assemble miscellaneous records required by other Specification Sections for miscellaneous

record keeping and submittal in connection with actual performance of the Work. Bind or file miscellaneous records and identify each, ready for continued use and reference.

B. Format: Submit miscellaneous record submittals as PDF electronic file or scanned PDF electronic file(s) of marked-up miscellaneous record submittals. 1. Include miscellaneous record submittals directory organized by Specification Section

number and title, electronically linked to each item of miscellaneous record submittals. C. Affidavits, Bonds, and Guarantees: See schedule at the end of this Section for a list of required

affidavits, bonds, and guarantees. Affidavits, bonds, and guarantees not included on this list but required by other Sections of the Specifications are required.

PART 3 - EXECUTION

3.1 RECORDING AND MAINTENANCE A. Recording: Maintain one copy of each submittal during the construction period for project

record document purposes. Post changes and revisions to project record documents as they occur; do not wait until end of Project.

B. Maintenance of As-Built Documents and Samples: Store as-built documents and Samples in the field office apart from the Contract Documents used for construction. Do not use project as-built documents for construction purposes. Maintain as-built documents in good order and in a clean, dry, legible condition, protected from deterioration and loss. Provide access to project as-built documents for Architect's reference during normal working hours. 1. Construction Manager shall maintain at the construction site a set of printed Original

Contracted Construction Documents (drawings and specifications) for the purpose of documenting, with a red pencil or red ink pen, the actual location of any work not included in the original documents and/or any work constructed and/or installed differently than indicated in the original documents.

2. The Construction Manager’s monthly payment will not be approved by the Owner’s representative, if such documentation does not take place in the opinion of the university’s representative on a monthly basis.

3. At the completion of construction, such set of red-marked printed documents shall be known and noted as the “AS-BUILT” Construction Documents Set.

Page 78: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

PROJECT RECORD DOCUMENTS 01 78 39 - 4

4. After final acceptance of the project, the Construction Manager shall submit the as-built set to the Architect.

END OF SECTION 017839

Page 79: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

SELECTIVE DEMOLITION 02 41 19 - 1

SECTION 02 41 19 - SELECTIVE DEMOLITION

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes: 1. Demolition and removal of selected portions of building or structure.

B. Related Requirements: 1. Section 01 10 00 "Summary" for restrictions on the use of the premises, Owner-

occupancy requirements, and phasing requirements. 2. Section 01 73 00 "Execution Requirements" for cutting and patching procedures.

1.3 DEFINITIONS

A. Remove: Detach items from existing construction and legally dispose of them off-site unless indicated to be removed and salvaged or removed and reinstalled.

B. Existing to Remain: Existing items of construction that are not to be permanently removed and that are not otherwise indicated to be removed, removed and salvaged, or removed and reinstalled.

1.4 MATERIALS OWNERSHIP

A. Unless otherwise indicated, demolition waste becomes property of Contractor.

1.5 PREINSTALLATION MEETINGS

A. Predemolition Conference: Conduct conference at Project site. 1. Inspect and discuss condition of construction to be selectively demolished. 2. Review and finalize selective demolition schedule and verify availability of materials,

demolition personnel, equipment, and facilities needed to make progress and avoid delays.

3. Review requirements of work performed by other trades that rely on substrates exposed by selective demolition operations.

4. Review areas where existing construction is to remain and requires protection. 5. Review exiting requirements from the occupied areas.

1.6 INFORMATIONAL SUBMITTALS

A. Schedule of Selective Demolition Activities: Indicate the following: 1. Detailed sequence of selective demolition and removal work, with starting and ending

dates for each activity. Ensure Owner's on-site operations are uninterrupted. 2. Interruption of utility services. Indicate how long utility services will be interrupted. 3. Coordination for shutoff, capping, and continuation of utility services. 4. Use of elevator and stairs. 5. Coordination of Owner's continuing occupancy of portions of existing building and of

Owner's partial occupancy of completed Work.

Page 80: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

SELECTIVE DEMOLITION 02 41 19 - 2

1.7 FIELD CONDITIONS

A. Owner will occupy portions of building immediately adjacent to selective demolition area. Conduct selective demolition so Owner's operations will not be disrupted.

B. Conditions existing at time of inspection for bidding purpose will be maintained by Owner as far as practical.

C. Notify Architect of discrepancies between existing conditions and Drawings before proceeding with selective demolition.

D. Hazardous Materials: It is not expected that hazardous materials will be encountered in the Work. 1. If suspected hazardous materials are encountered, do not disturb; immediately notify

Architect and Owner. Hazardous materials will be removed by Owner under a separate contract.

E. Storage or sale of removed items or materials on-site is not permitted.

F. Utility Service: Maintain existing utilities indicated to remain in service and protect them against damage during selective demolition operations.

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS

A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning selective demolition. Comply with hauling and disposal regulations of authorities having jurisdiction.

B. Standards: Comply with ANSI/ASSE A10.6 and NFPA 241.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Review record documents of existing construction provided by Owner. Owner does not guarantee that existing conditions are same as those indicated in record documents.

B. Survey existing conditions and correlate with requirements indicated to determine extent of selective demolition required.

C. When unanticipated mechanical, electrical, or structural elements that conflict with intended function or design are encountered, investigate and measure the nature and extent of conflict. Promptly submit a written report to Architect.

3.2 UTILITY SERVICES AND MECHANICAL / ELECTRICAL SYSTEMS

A. Existing Services/Systems to Remain: Maintain services/systems indicated to remain and protect them against damage. 1. Comply with requirements for existing services/systems interruptions specified in

Section 011000 "Summary."

3.3 PREPARATION

A. Temporary Facilities: Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain. 1. Provide protection to ensure safe passage of people around selective demolition area

and to and from occupied portions of building. 2. Protect walls, ceilings, floors, and other existing finish work that are to remain or that are

exposed during selective demolition operations.

Page 81: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

SELECTIVE DEMOLITION 02 41 19 - 3

3. Cover and protect furniture, furnishings, and equipment that have not been removed. 4. Comply with requirements for temporary enclosures, dust control, heating, and cooling

specified in Section 015000 "Temporary Facilities and Controls."

3.4 SELECTIVE DEMOLITION, GENERAL A. General: Demolish and remove existing construction only to the extent required by new

construction and as indicated. Use methods required to complete the Work within limitations of governing regulations and as follows: 1. Proceed with selective demolition systematically, from higher to lower level. Complete

selective demolition operations above each floor or tier before disturbing supporting members on the next lower level.

2. Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction to remain or adjoining construction. Use hand tools or small power tools designed for sawing or grinding, not hammering and chopping, to minimize disturbance of adjacent surfaces. Temporarily cover openings to remain.

3. Cut or drill from the exposed or finished side into concealed surfaces to avoid marring existing finished surfaces.

4. Do not use cutting torches. 5. Locate selective demolition equipment and remove debris and materials so as not to

impose excessive loads on supporting walls, floors, or framing. 6. Dispose of demolished items and materials promptly.

B. Existing Items to Remain: Protect construction indicated to remain against damage and soiling during selective demolition. When permitted by Architect, items may be removed to a suitable, protected storage location during selective demolition and cleaned and reinstalled in their original locations after selective demolition operations are complete.

3.5 SELECTIVE DEMOLITION PROCEDURES FOR SPECIFIC MATERIALS A. Roofing: Remove no more existing roofing than what can be covered in one day by new roofing

and so that building interior remains watertight and weathertight. See Section 07 52 13 “APP Modified Bituminous Membrane Roofing" for new roofing requirements. 1. Remove existing roof membrane, flashings, copings, and roof accessories. 2. Remove existing roofing system down to the existing roof deck.

3.6 DISPOSAL OF DEMOLISHED MATERIALS A. General: Except for items or materials indicated to be reused, salvaged, reinstalled, or

otherwise indicated to remain Owner's property, remove demolished materials from Project site. 1. Do not allow demolished materials to accumulate on-site. 2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces

and areas. 3. Remove debris from elevated portions of building by chute, hoist, or other device that will

convey debris to grade level in a controlled descent. B. Burning: Do not burn demolished materials. C. Disposal: Transport demolished materials off Owner's property and legally dispose of them.

3.7 CLEANING A. Clean adjacent structures and improvements of dust, dirt, and debris caused by selective

demolition operations. Return adjacent areas to condition existing before selective demolition operations began.

END OF SECTION 02 41 19

Page 82: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing
Page 83: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

COLD-FORMED METAL FRAMING 05 40 00 - 1

SECTION 05 40 00 - COLD-FORMED METAL FRAMING

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes: 1. Exterior non-load-bearing framing.

1.3 ACTION SUBMITTALS

A. Product Data: For each type of cold-formed steel framing product and accessory.

1.4 QUALITY ASSURANCE

A. Welding Qualifications: Qualify procedures and personnel according to the following: 1. AWS D1.1/D1.1M, "Structural Welding Code - Steel." 2. AWS D1.3/D1.3M, "Structural Welding Code - Sheet Steel."

B. Comply with AISI S230 "Standard for Cold-Formed Steel Framing - Prescriptive Method for One and Two Family Dwellings."

1.5 DELIVERY, STORAGE, AND HANDLING

A. Protect cold-formed steel framing from corrosion, moisture staining, deformation, and other damage during delivery, storage, and handling.

PART 2 - PRODUCTS

2.1 COLD-FORMED STEEL FRAMING, GENERAL

A. Steel Sheet: ASTM A 1003/A 1003M, Structural Grade, Type H, metallic coated, of grade and coating weight as follows: 1. Grade: ST33H. 2. Coating: G90 (Z275) or equivalent.

2.2 EXTERIOR NON-LOAD-BEARING FRAMING

A. Steel Studs: Manufacturer's standard C-shaped steel studs, of web depths indicated, punched, with stiffened flanges, and as follows: 1. Minimum Base-Metal Thickness: 0.0329 inch. 2. Flange Width: 1-3/8 inches.

B. Steel Track: Manufacturer's standard U-shaped steel track, of web depths indicated, unpunched, with unstiffened flanges, and as follows: 1. Minimum Base-Metal Thickness: Matching steel studs. 2. Flange Width: 1-1/4 inches.

2.3 FRAMING ACCESSORIES

A. Fabricate steel-framing accessories from steel sheet, ASTM A 1003/A 1003M, Structural Grade, Type H, metallic coated, of same grade and coating weight used for framing members.

Page 84: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

COLD-FORMED METAL FRAMING 05 40 00 - 2

B. Provide accessories of manufacturer's standard thickness and configuration, unless otherwise indicated, as follows: 1. Supplementary framing. 2. Bracing, bridging, and solid blocking.

2.4 ANCHORS, CLIPS, AND FASTENERS

A. Steel Shapes and Clips: ASTM A 36/A 36M, zinc coated by hot-dip process according to ASTM A 123/A 123M.

B. Power-Actuated Anchors: Fastener system of type suitable for application indicated, fabricated from corrosion-resistant materials, with allowable load capacities calculated according to ICC-ES AC70, greater than or equal to the design load, as determined by testing per ASTM E 1190 conducted by a qualified testing agency.

C. Mechanical Fasteners: ASTM C 1513, corrosion-resistant-coated, self-drilling, self-tapping, steel drill screws. 1. Head Type: Low-profile head beneath sheathing, manufacturer's standard elsewhere.

D. Welding Electrodes: Comply with AWS standards.

2.5 MISCELLANEOUS MATERIALS

A. Galvanizing Repair Paint: SSPC-Paint 20.

B. Shims: Load bearing, high-density multimonomer plastic, and nonleaching; or of cold-formed steel of same grade and coating as framing members supported by shims.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine supporting substrates and abutting structural framing for compliance with requirements for installation tolerances and other conditions affecting performance of the Work.

B. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 INSTALLATION, GENERAL

A. Install cold-formed steel framing according to AISI S200 and to manufacturer's written instructions unless more stringent requirements are indicated.

B. Install cold-formed framing and securely anchor to supporting structure.

C. Install cold-formed steel framing and accessories plumb, square, and true to line, and with connections securely fastened. 1. Cut framing members by sawing or shearing; do not torch cut. 2. Fasten cold-formed steel framing members by welding, screw fastening, clinch fastening,

or riveting. Wire tying of framing members is not permitted. a. Comply with AWS D1.3/D1.3M requirements and procedures for welding,

appearance and quality of welds, and methods used in correcting welding work. b. Locate mechanical fasteners and install according to Shop Drawings, and

complying with requirements for spacing, edge distances, and screw penetration.

D. Do not bridge building expansion joints with cold-formed steel framing. Independently frame both sides of joints.

3.3 EXTERIOR NON-LOAD-BEARING INSTALLATION

A. Install continuous tracks sized to match studs. Align tracks accurately and securely anchor to supporting structure as indicated.

Page 85: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

COLD-FORMED METAL FRAMING 05 40 00 - 3

B. Fasten both flanges of studs to top and bottom track unless otherwise indicated. Space studs as follows: 1. Stud Spacing: 16 inches.

C. Set studs plumb, except as needed for diagonal bracing or warped surfaces and similar requirements.

D. Install miscellaneous framing and connections to provide a complete and stable framing system.

3.4 REPAIRS AND PROTECTION

A. Galvanizing Repairs: Prepare and repair damaged galvanized coatings on fabricated and installed cold-formed steel framing with galvanized repair paint according to ASTM A 780 and manufacturer's written instructions.

END OF SECTION 05 40 00

Page 86: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing
Page 87: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

METAL FABRICATIONS 05 50 00 - 1

SECTION 05 50 00 - METAL FABRICATIONS

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes: 1. Steel framing and supports for mechanical and electrical equipment. 2. Steel framing and supports for applications where framing and supports are not specified

in other Sections.

B. Related Sections: 1. Section 05 52 13 "Pipe and Tube Railings."

1.3 PERFORMANCE REQUIREMENTS

A. Thermal Movements: Allow for thermal movements from ambient and surface temperature changes acting on exterior metal fabrications by preventing buckling, opening of joints, overstressing of components, failure of connections, and other detrimental effects. 1. Temperature Change: 120 deg F, ambient; 180 deg F, material surfaces.

1.4 ACTION SUBMITTALS

A. Shop Drawings: Show fabrication and installation details for metal fabrications. 1. Include plans, elevations, sections, and details of metal fabrications and their

connections. Show anchorage and accessory items.

B. Delegated-Design Submittal: For installed products indicated to comply with performance requirements and design criteria, including analysis data signed and sealed by the qualified professional engineer responsible for their preparation.

1.5 INFORMATIONAL SUBMITTALS

A. Welding certificates.

1.6 QUALITY ASSURANCE

A. Qualification Data: For qualified professional engineer.

B. Welding Qualifications: Qualify procedures and personnel according to the following: 1. AWS D1.1/D1.1M, "Structural Welding Code - Steel." 2. AWS D1.2/D1.2M, "Structural Welding Code - Aluminum."

1.7 PROJECT CONDITIONS

A. Field Measurements: Verify actual locations of walls and other construction contiguous with metal fabrications by field measurements before fabrication.

1.8 COORDINATION

A. Coordinate selection of shop primers with topcoats to be applied over them. Comply with paint and coating manufacturers' written recommendations to ensure that shop primers and topcoats are compatible with one another.

Page 88: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

METAL FABRICATIONS 05 50 00 - 2

B. Coordinate installation of anchorages. Furnish setting drawings, templates, and directions for installing anchorages, including sleeves, concrete inserts, anchor bolts, and items with integral anchors, that are to be embedded in concrete or masonry. Deliver such items to Project site in time for installation.

PART 2 - PRODUCTS

2.1 METALS, GENERAL

A. Metal Surfaces, General: Provide materials with smooth, flat surfaces unless otherwise indicated. For metal fabrications exposed to view in the completed Work, provide materials without seam marks, roller marks, rolled trade names, or blemishes.

2.2 FERROUS METALS

A. Steel Plates, Shapes, and Bars: ASTM A 36/A 36M.

B. Steel Tubing: ASTM A 500, cold-formed steel tubing.

C. Steel Pipe: ASTM A 53/A 53M, standard weight (Schedule 40) unless otherwise indicated.

2.3 NONFERROUS METALS

A. Aluminum Plate and Sheet: ASTM B 209 (ASTM B 209M), Alloy 6061-T6.

B. Aluminum Extrusions: ASTM B 221 (ASTM B 221M), Alloy 6063-T6.

C. Aluminum-Alloy Rolled Tread Plate: ASTM B 632/B 632M, Alloy 6061-T6.

D. Aluminum Castings: ASTM B 26/B 26M, Alloy 443.0-F.

2.4 FASTENERS

A. General: Provide Type 316 stainless-steel fasteners. Select fasteners for type, grade, and class required.

B. General: Unless otherwise indicated, provide Type 316 stainless-steel fasteners for exterior use and zinc-plated fasteners with coating complying with ASTM B 633 or ASTM F 1941 (ASTM F 1941M), Class Fe/Zn 5, at exterior walls. Select fasteners for type, grade, and class required. 1. Provide stainless-steel fasteners for fastening aluminum.

C. Steel Bolts and Nuts: Regular hexagon-head bolts, ASTM A 307, Grade A (ASTM F 568M, Property Class 4.6); with hex nuts, ASTM A 563 (ASTM A 563M); and, where indicated, flat washers.

D. Stainless-Steel Bolts and Nuts: Regular hexagon-head annealed stainless-steel bolts, ASTM F 593 (ASTM F 738M); with hex nuts, ASTM F 594 (ASTM F 836M); and, where indicated, flat washers; Alloy Group 2 (A4).

E. Anchors, General: Anchors capable of sustaining, without failure, a load equal to six times the load imposed when installed in unit masonry and four times the load imposed when installed in concrete, as determined by testing according to ASTM E 488, conducted by a qualified independent testing agency.

F. Post-Installed Anchors: Torque-controlled expansion anchors or chemical anchors. 1. Material: Alloy Group 2 (A4) stainless-steel bolts, ASTM F 593 (ASTM F 738M), and

nuts, ASTM F 594 (ASTM F 836M).

2.5 MISCELLANEOUS MATERIALS

A. Welding Rods and Bare Electrodes: Select according to AWS specifications for metal alloy welded.

Page 89: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

METAL FABRICATIONS 05 50 00 - 3

B. Galvanizing Repair Paint: High-zinc-dust-content paint complying with SSPC-Paint 20 and compatible with paints specified to be used over it.

C. Bituminous Paint: Cold-applied asphalt emulsion complying with ASTM D 1187.

D. Nonshrink, Nonmetallic Grout: Factory-packaged, nonstaining, noncorrosive, nongaseous grout complying with ASTM C 1107. Provide grout specifically recommended by manufacturer for interior and exterior applications.

2.6 FABRICATION, GENERAL

A. Shop Assembly: Preassemble items in the shop to greatest extent possible. Disassemble units only as necessary for shipping and handling limitations. Use connections that maintain structural value of joined pieces. Clearly mark units for reassembly and coordinated installation.

B. Cut, drill, and punch metals cleanly and accurately. Remove burrs and ease edges to a radius of approximately 1/32 inch unless otherwise indicated. Remove sharp or rough areas on exposed surfaces.

C. Form bent-metal corners to smallest radius possible without causing grain separation or otherwise impairing work.

D. Form exposed work with accurate angles and surfaces and straight edges.

E. Weld corners and seams continuously to comply with the following: 1. Use materials and methods that minimize distortion and develop strength and corrosion

resistance of base metals. 2. Obtain fusion without undercut or overlap. 3. Remove welding flux immediately. 4. At exposed connections, finish exposed welds and surfaces smooth and blended so no

roughness shows after finishing.

F. Form exposed connections with hairline joints, flush and smooth, using concealed fasteners or welds where possible. Where exposed fasteners are required, use Phillips flat-head (countersunk) fasteners unless otherwise indicated. Locate joints where least conspicuous.

G. Fabricate seams and other connections that will be exposed to weather in a manner to exclude water. Provide weep holes where water may accumulate.

H. Cut, reinforce, drill, and tap metal fabrications as indicated to receive finish hardware, screws, and similar items.

I. Provide for anchorage of type indicated; coordinate with supporting structure. Space anchoring devices to secure metal fabrications rigidly in place and to support indicated loads. 1. Where units are indicated to be cast into concrete or built into masonry, equip with

integrally welded steel strap anchors, 1/8 by 1-1/2 inches, with a minimum 6-inch embedment and 2-inch hook, not less than 8 inches from ends and corners of units and 24 inches o.c., unless otherwise indicated.

2.7 MISCELLANEOUS FRAMING AND SUPPORTS

A. General: Provide steel framing and supports not specified in other Sections as needed to complete the Work.

B. Fabricate units from steel shapes, plates, and bars of welded construction unless otherwise indicated. Fabricate to sizes, shapes, and profiles indicated and as necessary to receive adjacent construction. 1. Fabricate units from slotted channel framing where indicated. 2. Furnish inserts for units installed after concrete is placed.

C. Galvanize miscellaneous framing and supports.

Page 90: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

METAL FABRICATIONS 05 50 00 - 4

2.8 FINISHES, GENERAL

A. Comply with NAAMM's "Metal Finishes Manual for Architectural and Metal Products" for recommendations for applying and designating finishes.

B. Finish metal fabrications after assembly.

C. Finish exposed surfaces to remove tool and die marks and stretch lines, and to blend into surrounding surface.

2.9 STEEL AND IRON FINISHES

A. Galvanizing: Hot-dip galvanize all ferrous metal items to comply with ASTM A 153/A 153M for steel and iron hardware and with ASTM A 123/A 123M for other steel and iron products.

PART 3 - EXECUTION

3.1 INSTALLATION, GENERAL A. Cutting, Fitting, and Placement: Perform cutting, drilling, and fitting required for installing metal

fabrications. Set metal fabrications accurately in location, alignment, and elevation; with edges and surfaces level, plumb, true, and free of rack; and measured from established lines and levels. 1. Use of ink marking pens on surfaces of any kind of materials is prohibited.

B. Fit exposed connections accurately together to form hairline joints. Weld connections that are not to be left as exposed joints but cannot be shop welded because of shipping size limitations. Do not weld, cut, or abrade surfaces of exterior units that have been hot-dip galvanized after fabrication and are for bolted or screwed field connections.

C. Field Welding: Comply with the following requirements: 1. Use materials and methods that minimize distortion and develop strength and corrosion

resistance of base metals. 2. Obtain fusion without undercut or overlap. 3. Remove welding flux immediately. 4. At exposed connections, finish exposed welds and surfaces smooth and blended so no

roughness shows after finishing and contour of welded surface matches that of adjacent surface.

D. Fastening to In-Place Construction: Provide anchorage devices and fasteners where metal fabrications are required to be fastened to in-place construction. Provide threaded fasteners for use with concrete and masonry inserts, toggle bolts, through bolts, lag screws, wood screws, and other connectors.

E. Corrosion Protection: Coat concealed surfaces of aluminum that will come into contact with grout, concrete, masonry, wood, or dissimilar metals with the following: 1. Cast Aluminum: Heavy coat of bituminous paint. 2. Extruded Aluminum: Two coats of clear lacquer.

3.2 INSTALLING MISCELLANEOUS FRAMING AND SUPPORTS A. General: Install framing and supports to comply with requirements of items being supported,

including manufacturers' written instructions and requirements indicated on Shop Drawings.

3.3 ADJUSTING AND CLEANING A. Galvanized Surfaces: Clean field welds, bolted connections, and abraded areas and repair

galvanizing to comply with ASTM A 780.

END OF SECTION 05 50 00

Page 91: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

PIPE AND TUBE RAILINGS 05 52 13 - 1

SECTION 05 52 13 - PIPE AND TUBE RAILINGS

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes: 1. Aluminum pipe and tube railings.

1.3 PERFORMANCE REQUIREMENTS

A. Delegated Design: Design railings, including comprehensive engineering analysis by a qualified professional engineer, using performance requirements and design criteria indicated.

B. General: In engineering railings to withstand structural loads indicated, determine allowable design working stresses of railing materials based on the following: 1. Aluminum: The lesser of minimum yield strength divided by 1.65 or minimum ultimate

tensile strength divided by 1.95.

C. Structural Performance: Railings shall withstand the effects of gravity loads and the following loads and stresses within limits and under conditions indicated: 1. Top Rails of Guards:

a. Uniform load of 50 lbf/ sq. ft. applied horizontally and concurrently with 100 lbf/ ft. applied vertically downward.

b. Concentrated load of 200 lbf applied at any point and in any direction. c. Uniform and concentrated loads need not be assumed to act concurrently.

D. Thermal Movements: Allow for thermal movements from ambient and surface temperature changes acting on exterior metal fabrications by preventing buckling, opening of joints, overstressing of components, failure of connections, and other detrimental effects. 1. Temperature Change: 120 deg F, ambient; 180 deg F, material surfaces.

E. Control of Corrosion: Prevent galvanic action and other forms of corrosion by insulating metals and other materials from direct contact with incompatible materials.

1.4 ACTION SUBMITTALS

A. Product Data: Manufacturer's data sheets on each product to be used, including: 1. Preparation instructions and recommendations. 2. Storage and handling requirements and recommendations. 3. Installation methods.

B. Shop Drawings: Include plans, elevations, sections, details, anchoring and attachments to other work.

C. Delegated-Design Submittal: For installed products indicated to comply with performance requirements and design criteria, including analysis data signed and sealed by the qualified professional engineer responsible for their preparation.

1.5 INFORMATIONAL SUBMITTALS

A. Qualification Data: For qualified professional engineer.

Page 92: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

PIPE AND TUBE RAILINGS 05 52 13 - 2

1.6 QUALITY ASSURANCE

A. Source Limitations: Obtain each type of railing from single source from single manufacturer.

1.7 DELIVERY, STORAGE, AND HANDLING

A. Materials to be delivered to the job site in good condition and adequately protected against damage as handrails are a finished product.

B. Store products in manufacturer's unopened packaging until ready for installation.

1.8 PROJECT CONDITIONS

A. Field Measurements: Verify actual locations of walls and other construction contiguous with metal fabrications by field measurements before fabrication.

1.9 COORDINATION AND SCHEDULING

A. Coordinate selection of shop primers with topcoats to be applied over them. Comply with paint and coating manufacturers' written recommendations to ensure that shop primers and topcoats are compatible with one another.

B. Coordinate installation of anchorages for railings. Furnish setting drawings, templates, and directions for installing anchorages, including sleeves, concrete inserts, anchor bolts, and items with integral anchors, that are to be embedded in concrete or masonry. Deliver such items to Project site in time for installation.

C. Schedule installation so wall attachments are made only to completed walls. Do not support railings temporarily by any means that do not satisfy structural performance requirements.

PART 2 - PRODUCTS

2.1 MANUFACTURERS

A. Basis of Design Manufacturer: Kee Safety, Inc.;100 Stradtman St., Buffalo, NY 14206; 1. Telephone: (800) 851-5181 2. Fax: (716) 896-5696 3. Web Site: http://www.keeguard.com

2.2 SYSTEM

A. Roof Edge Protection: Provide freestanding KeeGuard Roof Edge Protection System, including pipe railings, uprights, bases, counterweights and fittings. 1. Freestanding counterweighted guardrail system with 42 inch minimum height to provide a

pedestrian egress barrier on the roof to withstand a minimum load of 200 lb in any direction to all components per OSHA Regulation 29 CFR 1910.23.

2. Rails and Posts: 1-1/2 inches diameter. 3. Mounting Bases: Steel bases, galvanized with a rubber pad on underside of the

component. 4. Counterweights: Steel with a rubber pad on the underside of the component. 5. Fasteners: Type 304 stainless steel.

2.3 METALS, GENERAL

A. Metal Surfaces, General: Provide materials with smooth surfaces, without seam marks, roller marks, rolled trade names, stains, discolorations, or blemishes.

Page 93: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

PIPE AND TUBE RAILINGS 05 52 13 - 3

2.4 ALUMINUM

A. Aluminum, General: Provide alloy and temper recommended by aluminum producer and finisher for type of use and finish indicated, and with not less than the strength and durability properties of alloy and temper designated below for each aluminum form required.

B. Extruded Structural Pipe and Round Tubing: ASTM B 429/B 429M, Alloy 6063-T6. 1. Provide Standard Weight (Schedule 40) pipe, unless otherwise indicated.

C. Die and Hand Forgings: ASTM B 247 (ASTM B 247M), Alloy 6061-T6.

D. Castings: ASTM B 26/B 26M, Alloy A356.0-T6.

2.5 FASTENERS

A. General: Provide the following: 1. Aluminum Railings: Type 304 stainless-steel fasteners.

B. Fasteners for Anchoring Railings to Other Construction: Select fasteners of type, grade, and class required to produce connections suitable for anchoring railings to other types of construction indicated and capable of withstanding design loads.

2.6 MISCELLANEOUS MATERIALS

A. Bituminous Paint: Cold-applied asphalt emulsion complying with ASTM D 1187.

2.7 FABRICATION

A. General: Fabricate railings to comply with requirements indicated for design, dimensions, member sizes and spacing, details, finish, and anchorage, but not less than that required to support structural loads.

B. Assemble railings in the shop to greatest extent possible to minimize field splicing and assembly. Disassemble units only as necessary for shipping and handling limitations. Clearly mark units for reassembly and coordinated installation. Use connections that maintain structural value of joined pieces.

C. Cut, drill, and punch metals cleanly and accurately. Remove burrs and ease edges to a radius of approximately 1/32 inch unless otherwise indicated. Remove sharp or rough areas on exposed surfaces.

D. Form work true to line and level with accurate angles and surfaces.

E. Fabricate connections that will be exposed to weather in a manner to exclude water. Provide weep holes where water may accumulate.

F. Cut, reinforce, drill, and tap as indicated to receive finish hardware, screws, and similar items.

G. Connections: Fabricate railings with non-welded connections.

H. Form changes in direction as follows: 1. By inserting prefabricated elbow fittings.

I. Close exposed ends of railing members with prefabricated end fittings.

2.8 FINISHES, GENERAL

A. Comply with NAAMM's "Metal Finishes Manual for Architectural and Metal Products" for recommendations for applying and designating finishes.

B. Protect mechanical finishes on exposed surfaces from damage by applying a strippable, temporary protective covering before shipping.

Page 94: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

PIPE AND TUBE RAILINGS 05 52 13 - 4

2.9 ALUMINUM FINISHES

A. Mechanical Finish: AA-M12 (Mechanical Finish: nonspecular as fabricated).

PART 3 - EXECUTION

3.1 EXAMINATION

A. Do not begin installation until substrates have been properly prepared.

B. B. If substrate preparation is the responsibility of another installer, notify Construction Manager of unsatisfactory preparation before proceeding.

3.2 INSTALLATION, GENERAL

A. Install in accordance with manufacturer's instructions.

B. Fit exposed connections together to form tight, hairline joints.

C. Perform cutting, drilling, and fitting required for installing railings. Set railings accurately in location, alignment, and elevation; measured from established lines and levels and free of rack. 1. Do not cut, or abrade surfaces of railing components that have been coated or finished

after fabrication and that are intended for field connection by mechanical or other means without further cutting or fitting.

2. Set posts plumb within a tolerance of 1/8 inch in 3 feet. 3. Align rails so variations from level for horizontal members and variations from parallel

with rake of steps and ramps for sloping members do not exceed 1/4 inch in 12 feet.

3.3 ADJUSTING AND CLEANING

A. Clean aluminum by washing thoroughly with clean water and soap and rinsing with clean water.

3.4 PROTECTION

A. Protect finishes of railings from damage during construction period with temporary protective coverings approved by railing manufacturer. Remove protective coverings at time of Substantial Completion.

END OF SECTION 05 52 13

Page 95: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

MISCELLANEOUS ROUGH CARPENTRY 06 10 53 - 1

SECTION 06 10 53 - MISCELLANEOUS ROUGH CARPENTRY

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes: 1. Wood blocking and nailers. 2. Plywood backing panels.

1.3 DEFINITIONS

A. Dimension Lumber: Lumber of 2 inches nominal or greater but less than 5 inches nominal in least dimension.

B. Lumber grading agencies, and the abbreviations used to reference them, include the following: 1. SPIB: The Southern Pine Inspection Bureau.

1.4 ACTION SUBMITTALS

A. Product Data: For each type of process and factory-fabricated product. Indicate component materials and dimensions and include construction and application details. 1. Include data for wood-preservative treatment from chemical treatment manufacturer and

certification by treating plant that treated materials comply with requirements. Indicate type of preservative used and net amount of preservative retained.

2. Include data for fire-retardant treatment from chemical treatment manufacturer and certification by treating plant that treated materials comply with requirements. Include physical properties of treated materials based on testing by a qualified independent testing agency.

3. For products receiving a waterborne treatment, include statement that moisture content of treated materials was reduced to levels specified before shipment to Project site.

4. Include copies of warranties from chemical treatment manufacturers for each type of treatment.

1.5 INFORMATIONAL SUBMITTALS

A. Evaluation Reports: For the following, from ICC-ES: 1. Power-driven fasteners. 2. Expansion anchors.

1.6 QUALITY ASSURANCE

A. Testing Agency Qualifications: For testing agency providing classification marking for fire-retardant treated material, an inspection agency acceptable to authorities having jurisdiction that periodically performs inspections to verify that the material bearing the classification marking is representative of the material tested.

1.7 DELIVERY, STORAGE, AND HANDLING

A. Stack lumber flat with spacers beneath and between each bundle to provide air circulation. Protect lumber from weather by covering with waterproof sheeting, securely anchored. Provide for air circulation around stacks and under coverings.

Page 96: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

MISCELLANEOUS ROUGH CARPENTRY 06 10 53 - 2

PART 2 - PRODUCTS

2.1 WOOD PRODUCTS, GENERAL

A. Lumber: DOC PS 20 and applicable rules of grading agencies indicated. If no grading agency is indicated, provide lumber that complies with the applicable rules of any rules-writing agency certified by the ALSC Board of Review. Provide lumber graded by an agency certified by the ALSC Board of Review to inspect and grade lumber under the rules indicated. 1. Factory mark each piece of lumber with grade stamp of grading agency. 2. Where nominal sizes are indicated, provide actual sizes required by DOC PS 20 for

moisture content specified. Where actual sizes are indicated, they are minimum dressed sizes for dry lumber.

3. Provide dressed lumber, S4S, unless otherwise indicated.

B. Maximum Moisture Content of Lumber: 19 percent, unless otherwise indicated.

2.2 WOOD-PRESERVATIVE-TREATED MATERIALS

A. Preservative Treatment by Pressure Process: AWPA U1; Use Category UC3b. 1. Preservative Chemicals: Acceptable to authorities having jurisdiction and containing no

arsenic or chromium.

B. Kiln-dry lumber after treatment to a maximum moisture content of 19 percent. Do not use material that is warped or does not comply with requirements for untreated material.

C. Mark lumber with treatment quality mark of an inspection agency approved by the ALSC Board of Review.

D. Application: Treat all miscellaneous carpentry.

2.3 MISCELLANEOUS LUMBER

A. General: Provide miscellaneous lumber indicated and lumber for support or attachment of other construction.

B. For items of dimension lumber size, provide Standard, Stud, or No. 3 grade lumber and the following species: 1. Mixed southern pine; SPIB.

2.4 PLYWOOD BACKING PANELS

A. Plywood Panels: DOC PS 1, Exterior, C-C Plugged, pressure treated, in thickness indicated or, if not indicated, not less than 1/2-inch nominal thickness.

2.5 FASTENERS

A. General: Provide fasteners of size and type indicated that comply with requirements specified in this article for material and manufacture. 1. Provide fasteners with hot-dip zinc coating complying with ASTM A 153/A 153M or of

Type 304 stainless steel.

B. Nails, Brads, and Staples: ASTM F 1667.

C. Power-Driven Fasteners: NES NER-272.

D. Wood Screws: ASME B18.6.1.

E. Screws for Fastening to Metal Framing: ASTM C 1002, length as recommended by screw manufacturer for material being fastened.

F. Lag Bolts: ASME B18.2.1 (ASME B18.2.3.8M).

Page 97: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

MISCELLANEOUS ROUGH CARPENTRY 06 10 53 - 3

G. Bolts: Steel bolts complying with ASTM A 307, Grade A (ASTM F 568M, Property Class 4.6); with ASTM A 563 (ASTM A 563M) hex nuts and, where indicated, flat washers.

H. Expansion Anchors: Anchor bolt and sleeve assembly of material indicated below with capability to sustain, without failure, a load equal to 6 times the load imposed when installed in unit masonry assemblies and equal to 4 times the load imposed when installed in concrete as determined by testing per ASTM E 488 conducted by a qualified independent testing and inspecting agency. 1. Material for Exterior Locations: Stainless steel with bolts and nuts complying with

ASTM F 593 and ASTM F 594, Alloy Group 1 or 2 (ASTM F 738M and ASTM F 836M, Grade A1 or A4).

PART 3 - EXECUTION

3.1 INSTALLATION, GENERAL

A. Set carpentry to required levels and lines, with members plumb, true to line, cut, and fitted. Fit carpentry to other construction; scribe and cope as needed for accurate fit. Locate nailers, blocking, and similar supports to comply with requirements for attaching other construction.

B. Where wood-preservative-treated lumber is installed adjacent to metal decking, install continuous flexible flashing separator between wood and metal decking.

C. Install plywood backing panels by fastening to studs.

D. Provide blocking and framing as indicated and as required to support facing materials, fixtures, specialty items, and trim.

E. Sort and select lumber so that natural characteristics will not interfere with installation or with fastening other materials to lumber. Do not use materials with defects that interfere with function of member or pieces that are too small to use with minimum number of joints or optimum joint arrangement.

F. Comply with AWPA M4 for applying field treatment to cut surfaces of preservative-treated lumber.

G. Securely attach carpentry work to substrate by anchoring and fastening as indicated, complying with the following: 1. Table 2304.9.1, "Fastening Schedule," in Florida Building Code.

H. Use steel common nails unless otherwise indicated. Select fasteners of size that will not fully penetrate members where opposite side will be exposed to view or will receive finish materials. Make tight connections between members. Install fasteners without splitting wood. Drive nails snug but do not countersink nail heads unless otherwise indicated.

3.2 WOOD BLOCKING, AND NAILER INSTALLATION

A. Install where indicated and where required for attaching other work. Form to shapes indicated and cut as required for true line and level of attached work. Coordinate locations with other work involved.

B. Attach items to substrates to support applied loading. Recess bolts and nuts flush with surfaces unless otherwise indicated.

END OF SECTION 06 10 53

Page 98: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing
Page 99: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

ATACTIC-POLYPROPYLENE (APP) MODIFIED BITUMINOUS MEMBRANE ROOFING 07 52 13 - 1

SECTION 07 52 13 - ATACTIC-POLYPROPYLENE (APP) MODIFIED BITUMINOUS MEMBRANE ROOFING

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes: 1. Atactic-polypropylene (APP)-modified bituminous membrane roofing. 2. Roof insulation.

B. Related Requirements: 1. Section 07 62 00 "Sheet Metal Flashing and Trim" for metal roof flashings and

counterflashings. 2. Section 07 71 00 “Roof Specialties” for metal copings.

1.3 DEFINITIONS

A. Roofing Terminology: Definitions in ASTM D 1079 and glossary of NRCA's "The NRCA Roofing and Waterproofing Manual" apply to Work of this Section.

1.4 PREINSTALLATION MEETINGS

A. Preinstallation Roofing Conference: Conduct conference at Project site. 1. Meet with Owner, Architect, Owner's insurer if applicable, testing and inspecting agency

representative, roofing Installer, roofing system manufacturer's representative, deck Installer, and installers whose work interfaces with or affects roofing, including installers of roof accessories and roof-mounted equipment.

2. Review methods and procedures related to roofing installation, including manufacturer's written instructions.

3. Review and finalize construction schedule, and verify availability of materials, Installer's personnel, equipment, and facilities needed to make progress and avoid delays.

4. Review structural loading limitations of roof deck during and after roofing. 5. Review base flashings, special roofing details, roof drainage, roof penetrations,

equipment curbs, and condition of other construction that affects roofing system. 6. Review governing regulations and requirements for insurance and certificates if

applicable. 7. Review temporary protection requirements for roofing system during and after

installation. 8. Review roof observation and repair procedures after roofing installation.

1.5 ACTION SUBMITTALS

A. Product Data: For each type of product.

B. Shop Drawings: For roofing system. Include plans, elevations, sections, details, and attachments to other work, including: 1. Base flashings and membrane terminations. 2. Crickets, saddles, and tapered edge strips, including slopes. 3. Insulation fastening patterns for corner, perimeter, and field-of-roof locations.

Page 100: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

ATACTIC-POLYPROPYLENE (APP) MODIFIED BITUMINOUS MEMBRANE ROOFING 07 52 13 - 2

1.6 INFORMATIONAL SUBMITTALS

A. Product Approval: For each roofing system provide the following: 1. Proof that the system/products comply with Florida Product Approval Rule 9B-72. 2. Installation instructions showing how the system/products are to be installed.

B. Qualification Data: For Installer and testing agency.

C. Manufacturer Certificates: Signed by roofing manufacturer certifying that roofing system complies with requirements specified in "Performance Requirements" Article.

D. Product Test Reports: For components of roofing system, for tests performed by manufacturer and witnessed by a qualified testing agency.

E. Field quality-control reports.

F. Sample Warranties: For manufacturer's special warranties.

1.7 CLOSEOUT SUBMITTALS

A. Maintenance Data: For roofing system to include in maintenance manuals.

1.8 QUALITY ASSURANCE

A. Installer Qualifications: A qualified firm that is approved, authorized, or licensed by roofing system manufacturer to install manufacturer's product and that is eligible to receive manufacturer's special warranty. 1. Installer shall have a minimum of 5 years experience installing cold-applied adhesive

APP roofing systems. 2. OBSERVATION OF INSTALLATION BY UNIVERSITY PERSONNEL: The University

shall be given two (2) weeks advance notice of intent to start installation of roofing materials. Designated University personnel must be permitted to perform a preinstallation inspection of roofing materials and equipment, to be present throughout roofing installation to observe installation techniques for compliance with specifications and to participate in final inspection.

3. CUTTING OF TEST PANELS: The University reserves the right to cut test panels from the finished roof in order to determine that minimum requirements have been met. The roofer shall repair, at his own expense, the roof where test panels were taken.

4. ROOF MOISTURE SURVEY: Conduct infrared scan before and after completion of existing membrane reroofs.

1.9 DELIVERY, STORAGE, AND HANDLING

A. Deliver roofing materials to Project site in original containers with seals unbroken and labeled with manufacturer's name, product brand name and type, date of manufacture, approval or listing agency markings, and directions for storing and mixing with other components.

B. Store liquid materials in their original undamaged containers in a clean, dry, protected location and within the temperature range required by roofing system manufacturer. Protect stored liquid material from direct sunlight. 1. Discard and legally dispose of liquid material that cannot be applied within its stated shelf

life.

C. Protect roof insulation materials from physical damage and from deterioration by sunlight, moisture, soiling, and other sources. Store in a dry location. Comply with insulation manufacturer's written instructions for handling, storing, and protecting during installation. 1. STORAGE OF MATERIALS: Roofing membranes and insulation shall to be stored in a

dry trailer or inside a dry building. Exterior storage on skids or tarpaulin coverage is unacceptable. Asphalt may be stored outside if kept under a tarpaulin or plastic film.

Page 101: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

ATACTIC-POLYPROPYLENE (APP) MODIFIED BITUMINOUS MEMBRANE ROOFING 07 52 13 - 3

D. Handle and store roofing materials, and place equipment in a manner to avoid permanent deflection of deck.

1.10 FIELD CONDITIONS

A. Weather Limitations: Proceed with installation only when existing and forecasted weather conditions permit roofing system to be installed according to manufacturer's written instructions and warranty requirements.

1.11 WARRANTY

A. Special Warranty: Manufacturer agrees to repair or replace components of roofing system that fail in materials or workmanship within specified warranty period. 1. Special warranty includes membrane roofing, base flashings, roof insulation, fasteners,

roofing accessories, and other components of roofing system. 2. Warranty Period: 20 years from date of Substantial Completion.

B. Special Project Warranty: Submit roofing Installer's warranty, on warranty form at end of this Section, signed by Installer, covering the Work of this Section, including all components of roofing system such as membrane roofing, base flashing, roof insulation, fasteners, cover boards, substrate boards, vapor retarders, walkway products and the sheet metal flashing and trim (specified in Section 076200 “Sheet Metal Flashing And Trim”), for the following warranty period: 1. Warranty Period: Three years from date of Substantial Completion.

PART 2 - PRODUCTS

2.1 MANUFACTURERS

A. Basis-of-Design Product: Subject to compliance with requirements, provide products manufactured by Derbigum Americas, Inc. or comparable product by the following: 1. Johns Manville.

B. Source Limitations: Obtain components including roof insulation fasteners products for roofing system from same manufacturer as membrane roofing or manufacturer approved by membrane roofing manufacturer.

2.2 PERFORMANCE REQUIREMENTS

A. General: Roofing systems/products that are incorporated into the Work shall comply with Florida Product Approval Rule 9B-72.

B. General Performance: Installed roofing and base flashings shall withstand specified uplift pressures, thermally induced movement, and exposure to weather without failure due to defective manufacture, fabrication, installation, or other defects in construction. Roofing and base flashings shall remain watertight. 1. Accelerated Weathering: Roofing system shall withstand 2000 hours of exposure when

tested according to ASTM G 152, ASTM G 154, or ASTM G 155. 2. Impact Resistance: Roofing system shall resist impact damage when tested according to

ASTM D 3746 or ASTM D4272.

C. Material Compatibility: Roofing materials shall be compatible with one another and adjacent materials under conditions of service and application required, as demonstrated by roofing manufacturer based on testing and field experience.

D. Roofing System Design: Tested by a qualified testing agency to resist the uplift pressures indicated on the Drawings.

Page 102: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

ATACTIC-POLYPROPYLENE (APP) MODIFIED BITUMINOUS MEMBRANE ROOFING 07 52 13 - 4

E. Exterior Fire-Test Exposure: ASTM E 108 or UL 790, Class A; for application and roof slopes indicated; testing by a qualified testing agency. Identify products with appropriate markings of applicable testing agency.

F. FM Global Listing: Roofing, base flashings, and component materials shall comply with requirements in FM Global 4450 or FM Global 4470 as part of a roofing system, and shall be listed in FM Global' "RoofNav" for Class 1 or noncombustible construction, as applicable. Identify materials with FM Global markings. 1. Fire/Windstorm Classification: Class 1A-90. 2. FM 1-49 Loss Prevention Data Sheet for Perimeter Flashing. 3. 1-28 Loss Prevention Data Sheet for Wind Loads to Roof Systems and Roof Deck

Securement. 4. FM 1-29 Loss Prevention Data Sheet Above Deck Roof Components.

2.3 ROOFING SHEET MATERIALS

A. Base Ply: ASTM D 6509, APP- Modified Bituminous Base Sheet Materials Using Glass Fiber Reinforcements; smooth surfaced; suitable for application method specified. 1. Basis of Design: Derbigum “Derbibase Ultra” 2. Minimum Thickness: 120 mil

B. Granule-Surfaced Roofing Cap Sheet: ASTM D 6223/D 6223M, Grade G, Type I or II, APP-modified asphalt sheet (reinforced with a combination of polyester fabric and glass fibers); granule surfaced; suitable for application method specified, and as follows: 1. Basis of Design: Derbigum “DerbiColor 2. Minimum Thickness: 140 mil 3. Granule Material: Mineral ceramic coated. 4. Granule Color: White.

2.4 BASE FLASHING SHEET MATERIALS

A. Flashing Base Ply: ASTM D 6509, APP- Modified Bituminous Base Sheet Materials Using Glass Fiber Reinforcements; smooth surfaced; suitable for application method specified. 1. Basis of Design: Derbigum “Derbibase Ultra” 2. Minimum Thickness: 117 mil

B. Granule-Surfaced Roofing Cap Sheet: ASTM D 6223/D 6223M, Grade G, Type I or II, APP-modified asphalt sheet (reinforced with a combination of polyester fabric and glass fibers); granule surfaced; suitable for application method specified, and as follows: 1. Basis of Design: Derbigum “DerbiColor 2. Minimum Thickness: 160 mil 3. Granule Material: Mineral ceramic coated. 4. Granule Color: White.

C. Glass-Fiber Fabric: Woven glass-fiber cloth, treated with asphalt, complying with ASTM D 1668, Type I.

2.5 AUXILIARY ROOFING MATERIALS

A. General: Auxiliary materials recommended by roofing system manufacturer for intended use and compatible with roofing. 1. Liquid-type auxiliary materials shall comply with VOC limits of authorities having

jurisdiction.

B. Asphalt Primer: ASTM D 41/D 41M.

Page 103: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

ATACTIC-POLYPROPYLENE (APP) MODIFIED BITUMINOUS MEMBRANE ROOFING 07 52 13 - 5

C. Cold-Applied Adhesive: Roofing system manufacturer's standard asphalt-based, one- or two-part, asbestos-free, cold-applied adhesive specially formulated for compatibility and use with roofing membrane and base flashings.

D. Mastic Sealant: Polyisobutylene, plain or modified bitumen; nonhardening, nonmigrating, nonskinning, and nondrying.

E. Fasteners: Factory-coated steel fasteners and metal plates complying with corrosion-resistance provisions in FM Global 4470, designed for fastening roofing components to substrate; tested by manufacturer for required pullout strength, and acceptable to roofing system manufacturer.

F. Miscellaneous Accessories: Provide those recommended by roofing system manufacturer.

2.6 ROOF INSULATION

A. General: Preformed roof insulation boards manufactured or approved by roofing manufacturer, selected from manufacturer's standard sizes suitable for application, of thicknesses indicated.

B. Polyisocyanurate Board Insulation: ASTM C 1289, Type II, Class 1, felt or glass-fiber mat facer on both major surfaces. 1. Basis-of-Design Product: Subject to compliance with requirements, provide Derbigum

“Deriboard” or comparable product approved by the roofing membrane manufacturer and listed in the Florida Product Approval.:

C. Tapered Insulation: Provide factory-tapered insulation boards fabricated to slope of 1/8 inch per 12 inches, unless otherwise indicated, to increase the existing structure slope on 1/8 inch per 12 inches to ¼ inch 12 inches.

D. Provide preformed saddles, crickets, tapered edge strips, and other insulation shapes where indicated for sloping to drain. Fabricate to slopes indicated.

2.7 INSULATION ACCESSORIES

A. General: Roof insulation accessories recommended by insulation manufacturer for intended use and compatibility with roofing.

B. Fasteners: Factory-coated steel fasteners and metal plates complying with corrosion-resistance provisions in FM Global 4470, designed for fastening roof insulation to substrate, and acceptable to roofing system manufacturer.

C. Insulation Adhesive: Insulation manufacturer's recommended adhesive formulated to attach roof insulation to substrate or to another insulation layer. 1. Bead-applied, low-rise, one-component or multicomponent urethane adhesive. 2. Full-spread spray-applied, low-rise, two-component urethane adhesive.

D. Cant Strips: Modified bitumen cant strip.

E. Cover Board: ASTM C 1278/C 1278M, cellulosic-fiber-reinforced, water-resistant gypsum substrate, 1/2 inch thick. 1. Basis of Design: USG Corporation; Securock Gypsum-Fiber Roof Board.

2.8 WALKWAYS

A. Walkway Cap-Sheet Strips: ASTM D 6223/D 6223M, Grade G, Type I or II, APP-modified asphalt sheet (reinforced with a combination of polyester fabric and glass fibers); granule surfaced; suitable for application method specified, and as follows: 1. Basis of Design: Derbigum “Derbicolor” 2. Minimum Thickness: 160 mil 3. Granule Material: Mineral. 4. Granule Color: Gray.

Page 104: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

ATACTIC-POLYPROPYLENE (APP) MODIFIED BITUMINOUS MEMBRANE ROOFING 07 52 13 - 6

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine substrates, areas, and conditions, with Installer present, for compliance with requirements and other conditions affecting performance of the Work: 1. Verify that roof openings and penetrations are in place, curbs are set and braced, and

roof-drain bodies are securely clamped in place. 2. Verify that blocking, curbs, and nailers are securely anchored to roof deck at penetrations

and terminations and that nailers match thicknesses of insulation. 3. Verify that deck is securely fastened with no projecting fasteners and with no adjacent

units in excess of 1/16 inch out of plane relative to adjoining deck.

B. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 PREPARATION

A. Clean substrate of dust, debris, moisture, and other substances detrimental to roofing installation according to roofing system manufacturer's written instructions. Remove sharp projections.

B. Prevent materials from entering and clogging roof drains and conductors and from spilling or migrating onto surfaces of other construction. Remove roof-drain plugs when no work is taking place or when rain is forecast.

3.3 INSTALLATION, GENERAL

A. Comply with roofing system manufacturer's written instructions.

B. Substrate-Joint Penetrations: Prevent adhesives from penetrating substrate joints, entering building, or damaging roofing system components or adjacent building construction.

3.4 INSULATION INSTALLATION

A. Cant Strips: Install and secure preformed 45-degree insulation cant strips at junctures of roofing system with vertical surfaces or angle changes greater than 45 degrees.

B. Install insulation with long joints of insulation in a continuous straight line, with end joints staggered between rows, abutting edges and ends between boards. Fill gaps exceeding 1/4 inch with insulation. 1. Cut and fit insulation within 1/4 inch of nailers, projections, and penetrations.

C. Install insulation under area of roofing to achieve required thickness. Install two layers with joints of each succeeding layer staggered from joints of previous layer a minimum of 6 inches in each direction.

D. Trim surface of insulation where necessary at roof drains so completed surface is flush and does not restrict flow of water.

E. Mechanically Fastened and Adhered Insulation: Install first layer of insulation to deck using mechanical fasteners specifically designed and sized for fastening specified board-type roof insulation to deck type. 1. Fasten first layer of insulation to resist uplift pressure at corners, perimeter, and field of

roof. 2. Set each subsequent layer of insulation in ribbons of bead-applied insulation adhesive,

firmly pressing and maintaining insulation in place. 3. Set each subsequent layer of insulation in a uniform coverage of full-spread insulation

adhesive, firmly pressing and maintaining insulation in place.

Page 105: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

ATACTIC-POLYPROPYLENE (APP) MODIFIED BITUMINOUS MEMBRANE ROOFING 07 52 13 - 7

F. Install cover boards over insulation with long joints in continuous straight lines with end joints staggered between rows. Offset joints of insulation below a minimum of 6 inches in each direction. Loosely butt cover boards together and adhere or fasten to insulated substrate. Tape joints if required by roofing system manufacturer. 1. Fasten cover boards to resist uplift pressure at corners, perimeter, and field of roof.

3.5 ROOFING INSTALLATION, GENERAL

A. Install roofing system according to roofing system manufacturer's written instructions and applicable recommendations in ARMA/NRCA's "Quality Control Guidelines for the Application of Polymer Modified Bitumen Roofing" and as follows: 1. Deck Type: I (insulated). 2. Adhering Method: L (cold-applied adhesive). 3. Base Ply: One. 4. Granule-Surfaced Roofing Cap Sheet: One.

B. Start installation of roofing in presence of manufacturer's technical personnel.

C. Install roofing sheets parallel with slope.

D. Coordinate installation of roofing system so insulation and other components of the roofing system not permanently exposed are not subjected to precipitation or left uncovered at the end of the workday or when rain is forecast. 1. Provide tie-offs at end of day's work to cover exposed roofing sheets and insulation with

a course of coated felt set in roofing cement or hot roofing asphalt, with joints and edges sealed.

2. Complete terminations and base flashings, and provide temporary seals to prevent water from entering completed sections of roofing system.

3. Remove and discard temporary seals before beginning work on adjoining roofing.

3.6 BASE-SHEET INSTALLATION

A. Install lapped base-sheet course, extending sheet over and terminating beyond cants. Attach base sheet as follows: 1. Mechanically fasten through the insulation to the metal deck.

3.7 APP-MODIFIED BITUMINOUS MEMBRANE INSTALLATION

A. Install modified bituminous roofing cap sheet according to roofing manufacturer's written instructions, starting at low point of roofing system. Extend roofing sheets over and terminate beyond cants, installing as follows: 1. Adhere to substrate in cold-applied adhesive. 2. Unroll roofing sheets and allow them to relax for minimum time period required by

manufacturer.

B. Laps: Accurately align roofing sheets, without stretching, and maintain uniform side and end laps. Stagger end laps. Completely bond and seal laps, leaving no voids. 1. Repair tears and voids in laps and lapped seams not completely sealed.

C. Install roofing sheets so side and end laps shed water.

3.8 FLASHING AND STRIPPING INSTALLATION

A. Install base flashing over cant strips and other sloping and vertical surfaces, at roof edges, and at penetrations through roof; secure to substrates according to roofing system manufacturer's written instructions and as follows: 1. Prime substrates with asphalt primer if required by roofing system manufacturer.

Page 106: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

ATACTIC-POLYPROPYLENE (APP) MODIFIED BITUMINOUS MEMBRANE ROOFING 07 52 13 - 8

2. Backer-Sheet Application: Adhere backer sheet to substrate in cold-applied adhesive. 3. Flashing-Sheet Application: Torch apply flashing sheet to substrate.

B. Extend base flashing up walls or parapets a minimum of 8 inches above roofing membrane and 4 inches onto field of roofing membrane.

C. Mechanically fasten top of base flashing securely at terminations and perimeter of roofing. 1. Seal top termination of base flashing with a strip of glass-fiber fabric set in asphalt roofing

cement.

D. Install roofing cap-sheet stripping where metal flanges and edgings are set on roofing according to roofing system manufacturer's written instructions.

E. Roof Drains: Set 30-by-30-inch metal flashing in bed of asphaltic adhesive on completed roofing membrane. Cover metal flashing with roofing cap-sheet stripping, and extend a minimum of 9 inches beyond edge of metal flashing onto field of roofing membrane. Clamp roofing membrane, metal flashing, and stripping into roof-drain clamping ring. 1. Install stripping according to roofing system manufacturer's written instructions.

3.9 WALKWAY INSTALLATION

A. Walkway Strips: Torch apply walkway cap-sheet strips over roofing membrane cap sheet.

3.10 FIELD QUALITY CONTROL

A. Testing Agency: Construction Manager shall engage a third party certified operator to provide an audit using infrared imaging or nuclear scanning. Scan shall include photographic or thermographic images of all areas of the roof surface and unexplained anomalies. Where moisture is suspected, the Roofing Installer shall, at his expense, confirm or dismiss the finding by way of sampling and shall make corrections required.

B. Test Cuts: Remove test specimens to evaluate problems observed during quality-assurance inspections of roofing membrane as follows: 1. Determine approximate quantities of components within roofing membrane according to

ASTM D 3617. 2. Examine test specimens for interply voids according to ASTM D 3617 and to comply with

criteria established in Appendix 3 in ARMA/NRCA's "Quality Control Guidelines for the Application of Polymer Modified Bitumen Roofing."

3. Repair areas where test cuts were made according to roofing system manufacturer's written instructions.

C. Final Roof Inspection: Arrange for roofing system manufacturer's technical personnel to inspect roofing installation on completion. 1. Notify Architect and Owner 48 hours in advance of date and time of inspection.

D. Roofing system will be considered defective if it does not pass tests and inspections. 1. Additional testing and inspecting, at Roofing Installer's expense, will be performed to

determine if replaced or additional work complies with specified requirements.

3.11 PROTECTING AND CLEANING

A. Protect roofing system from damage and wear during remainder of construction period. When remaining construction does not affect or endanger roofing, inspect roofing for deterioration and damage, describing its nature and extent in a written report, with copies to Architect and Owner.

B. Correct deficiencies in or remove roofing system that does not comply with requirements, repair substrates, and repair or reinstall roofing system to a condition free of damage and deterioration at time of Substantial Completion and according to warranty requirements.

Page 107: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

ATACTIC-POLYPROPYLENE (APP) MODIFIED BITUMINOUS MEMBRANE ROOFING 07 52 13 - 9

3.12 ROOFING INSTALLER'S WARRANTY

A. WHEREAS _______________________________ of ___________________________, herein called the "Roofing Installer," has performed roofing and associated work ("work") on the following project: 1. Owner: University of South Florida. 2. Address: 3. Building Name/Type: Medical Center Buildings MDC and MDL 4. Address: 5. Area of Work: Entire low slope roof. 6. Acceptance Date: _________________. 7. Warranty Period: Two (2) years. 8. Expiration Date: __________________.

B. AND WHEREAS Roofing Installer has contracted (either directly with Owner or indirectly as a subcontractor) to warrant said work against leaks and faulty or defective materials and workmanship for designated Warranty Period,

C. NOW THEREFORE Roofing Installer hereby warrants, subject to terms and conditions herein set forth, that during Warranty Period he will, at his own cost and expense, make or cause to be made such repairs to or replacements of said work as are necessary to correct faulty and defective work and as are necessary to maintain said work in a watertight condition.

D. This Warranty is made subject to the following terms and conditions: 1. Specifically excluded from this Warranty are damages to work and other parts of the

building, and to building contents, caused by: a. lightning; b. peak gust wind speed exceeding 150 mph; c. fire; d. failure of roofing system substrate, including cracking, settlement, excessive

deflection, deterioration, and decomposition; e. faulty construction of parapet walls, copings, chimneys, skylights, vents, equipment

supports, and other edge conditions and penetrations of the work; f. vapor condensation on bottom of roofing; and g. activity on roofing by others, including construction contractors, maintenance

personnel, other persons, and animals, whether authorized or unauthorized by Owner.

2. When work has been damaged by any of foregoing causes, Warranty shall be null and void until such damage has been repaired by Roofing Installer and until cost and expense thereof have been paid by Owner or by another responsible party so designated.

3. Roofing Installer is responsible for damage to work covered by this Warranty but is not liable for consequential damages to building or building contents resulting from leaks or faults or defects of work.

4. During Warranty Period, if Owner allows alteration of work by anyone other than Roofing Installer, including cutting, patching, and maintenance in connection with penetrations, attachment of other work, and positioning of anything on roof, this Warranty shall become null and void on date of said alterations, but only to the extent said alterations affect work covered by this Warranty. If Owner engages Roofing Installer to perform said alterations, Warranty shall not become null and void unless Roofing Installer, before starting said work, shall have notified Owner in writing, showing reasonable cause for claim, that said alterations would likely damage or deteriorate work, thereby reasonably justifying a limitation or termination of this Warranty.

Page 108: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

ATACTIC-POLYPROPYLENE (APP) MODIFIED BITUMINOUS MEMBRANE ROOFING 07 52 13 - 10

5. During Warranty Period, if original use of roof is changed and it becomes used for, but was not originally specified for, a promenade, work deck, spray-cooled surface, flooded basin, or other use or service more severe than originally specified, this Warranty shall become null and void on date of said change, but only to the extent said change affects work covered by this Warranty.

6. Owner shall promptly notify Roofing Installer of observed, known, or suspected leaks, defects, or deterioration and shall afford reasonable opportunity for Roofing Installer to inspect work and to examine evidence of such leaks, defects, or deterioration.

7. This Warranty is recognized to be the only warranty of Roofing Installer on said work and shall not operate to restrict or cut off Owner from other remedies and resources lawfully available to Owner in cases of roofing failure. Specifically, this Warranty shall not operate to relieve Roofing Installer of responsibility for performance of original work according to requirements of the Contract Documents, regardless of whether Contract was a contract directly with Owner or a subcontract with Owner's General Contractor.

E. IN WITNESS THEREOF, this instrument has been duly executed this ___________ day of ___________________, ________________. 1. Authorized Signature: _______________________________________. 2. Name: ______________________________________. 3. Title: _______________________________________.

END OF SECTION 07 52 13

Page 109: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

COATED FOAMED ROOFING 07 57 00 - 1

SECTION 07 57 00 - COATED FOAMED ROOFING

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes: 1. Spray-applied, coated, polyurethane foam roofing.

1.3 PREINSTALLATION MEETINGS

A. Preinstallation Conference: Conduct conference at Project site. 1. Review methods and procedures related to coated foamed roofing including, but not

limited to, the following: a. Load limitations on in-place roofing. b. Construction schedule. Verify availability of materials, Installer's personnel,

equipment, and facilities needed to make progress and avoid delays. c. Minimum curing period. d. Forecasted weather conditions. e. Special details and sheet flashings. f. Repairs.

1.4 ACTION SUBMITTALS

A. Product Data: For each type of product. 1. Include manufacturer's written instructions for evaluating, preparing, and treating

substrate; technical data; and tested physical and performance properties.

B. Samples for Verification: For coated foamed roofing, prepared on Samples of size indicated below: 1. Samples, 24 by 24 inches, on rigid backing, showing polyurethane foam of thickness

required and stepped coatings in colors required to illustrate buildup of coated foamed roofing.

2. Include Samples of auxiliary materials and accessories to verify color and finish selected.

1.5 INFORMATIONAL SUBMITTALS

A. Qualification Data: For SPFA-qualified Installer and applicators.

B. Product Certificates: For each type of coated foam roofing.

C. Evaluation Reports: For coated foamed roofing, from ICC-ES.

D. Sample Warranty: For special warranty.

1.6 CLOSEOUT SUBMITTALS

A. Maintenance Data: For coated foamed roofing to include in maintenance manuals.

Page 110: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

COATED FOAMED ROOFING 07 57 00 - 2

1.7 QUALITY ASSURANCE

A. Installer Qualifications: A qualified installer who is approved, authorized, or licensed by coating manufacturer for installation of manufacturer's product over polyurethane foam. 1. Engage an installer who participates in and who has fulfilled requirements of the SPFA

Accreditation Program for company accreditation and individual applicator accreditation for personnel assigned to work on Project.

B. Comply with recommendations in SPFA AY-104, "Spray Polyurethane Foam Systems for New and Remedial Roofing."

1.8 DELIVERY, STORAGE, AND HANDLING

A. Deliver materials to Project site with manufacturer's name, product brand name and type, date of manufacture, shelf life, and directions for storing and mixing with other components.

B. Store materials in their original undamaged containers in a clean, dry, protected location and within the temperature range required by manufacturer.

C. Remove and replace material that cannot be applied within its stated shelf life.

1.9 WARRANTY

A. Special Warranty: Manufacturer agrees to repair or replace coated foamed roofing that does not comply with requirements or that does not remain watertight within specified warranty period. 1. Warranty Period: 10 years from date of Substantial Completion.

PART 2 - PRODUCTS

2.1 MATERIALS, GENERAL

A. Material Compatibility: Provide polyurethane foam, coatings, substrate board, and auxiliary materials that are compatible with one another and with substrate under conditions of service and application, as demonstrated by manufacturer based on testing and field experience.

B. Source Limitations for Coated Foamed Roofing System: Obtain coating and polyurethane foam from single source from single manufacturer.

2.2 PERFORMANCE REQUIREMENTS

A. General Performance: Coated foamed roofing shall withstand exposure to weather without failure due to defective manufacture, installation, or other defects in construction. Membrane roofing shall remain watertight.

B. Fire-Test-Response Characteristics: Provide coated foamed roofing with the fire-test-response characteristics indicated, as determined by testing identical systems according to test methods below for deck type and slopes indicated by a qualified testing and inspecting agency that is acceptable to authorities having jurisdiction. 1. Class A roof covering according to ASTM E 108 or UL 790. 2. Surface-Burning Characteristics: Comply with ASTM E 84 or UL 723; testing by a

qualified testing agency. Identify products with appropriate markings of applicable testing agency. a. Flame-Spread Index: 75 or less.

C. Roofing-System Design: Provide a coated foamed roofing system that is identical to systems that have been successfully tested by a qualified testing and inspecting agency to resist uplift pressures indicated on the Drawings.

Page 111: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

COATED FOAMED ROOFING 07 57 00 - 3

2.3 POLYURETHANE FOAM

A. Polyurethane Foam: Rigid, cellular polyurethane; complying with ASTM C 1029, Type III or Type IV; spray applied, with fire retardants as required, and acceptable to coating manufacturer. 1. Manufacturers: Subject to compliance with requirements, provide products by one of the

following: a. BASF Polyurethane Foam Enterprises LLC. b. Elastomeric Roofing Systems, Inc.; an ITW company. c. Gaco Western LLC. d. HydroSeal Polymers, Inc. e. Volatile Free, Inc.

2. In-Place Density: 2.8 to 3.0 lb/cu. ft.; ASTM D 1622. 3. Surface-Burning Characteristics: Comply with ASTM E 84; testing by a qualified testing

agency. Identify products with appropriate markings of applicable testing agency. a. Flame-Spread Index: 75 or less.

2.4 URETHANE COATINGS

A. Urethane Coating: Liquid urethane elastomeric coating system specifically formulated for coating sprayed polyurethane-foam roofing. One-component urethanes shall comply with ASTM D 6947. 1. Manufacturers: Subject to compliance with requirements, provide products by one of the

following: a. Elastomeric Roofing Systems, Inc.; an ITW company. b. Gaco Western LLC. c. HydroSeal Polymers, Inc. d. United Coatings; a subsidiary of Quest Specialty Chemicals. e. Volatile Free, Inc.

2. Base Coat: One- or two-component urethane, color contrasting with topcoat. 3. Topcoat: One- or two-component urethane.

a. Color: White. 4. Tensile Strength: 600 psi minimum according to ASTM D 2370. 5. Elongation: 350 percent minimum according to ASTM D 412 after 1000 hours

accelerated weathering according to ASTM D 4798/D 4798M. 6. Water Absorption: 3 percent maximum by weight according to ASTM D 471. 7. Fungal Resistance: Zero rating according to ASTM G 21. 8. Tear Resistance: 100 lbf/inch minimum according to ASTM D 624. 9. Low-Temperature Flexibility: Pass 0.5-inch mandrel at minus 15 deg F according to

ASTM D 522. 10. Permeance: Minimum 5.0 perms at 20 mils thick according to ASTM E 96/E 96M.

2.5 AUXILIARY MATERIALS

A. Primer: Polyurethane foam manufacturer's standard factory-formulated primer.

B. Mineral Granules: Ceramic-coated roofing granules, No. 11 screen size with 100 percent passing No. 8 sieve and 98 percent of mass retained by No. 40 sieve. 1. Color: Buff white.

C. Reinforcement: Flexible polyester or fiberglass mat of weight, type, and composition recommended by coating manufacturer for embedment in liquid coating.

D. Sealant: ASTM C 920, Class 25, Use NT, Grade NS, Type S, one-component, neutral- or acid-curing silicone, and as recommended by coated foamed roofing manufacturer for substrate and joint conditions and for compatibility with roofing materials.

Page 112: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

COATED FOAMED ROOFING 07 57 00 - 4

E. Sheet Flashing and Accessories: Types recommended by coated foamed roofing manufacturer, provided at locations indicated and as recommended by coated foamed roofing manufacturer.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Verify that related work is complete. Do not install coated foamed roofing until roof openings, curbs, and parapets, if any, are complete and roof drains, vents, and other roof penetrations are in place.

B. Examine substrates, areas, and conditions under which coated foamed roofing will be applied, with Installer present, for compliance with requirements.

C. Proceed with installation only after unsatisfactory conditions have been corrected and substrates are dry.

D. Weather Limitations: Proceed with installation only when existing and forecasted weather conditions permit roofing work to be performed according to manufacturer's written instructions and warranty requirements. 1. Apply materials within the range of ambient and substrate temperatures recommended

by material manufacturers, but not below 50 deg F. 2. Apply materials within range of relative humidity recommended by manufacturer of each

component, but not when relative humidity exceeds 85 percent, or when temperatures are less than 5 deg F above dew point.

3. Do not apply materials to damp or wet surfaces. 4. Do not apply primers, polyurethane foam, or coatings in rain, fog, or mist, or when such

weather conditions are imminent during the application and curing period. 5. Do not apply polyurethane foam when wind conditions result in surface finish textures not

complying with requirements. 6. Do not apply coatings when wind conditions prevent uniform coating application.

3.2 SURFACE PREPARATION

A. General: 1. Clean and prepare substrate according to coated foamed roofing manufacturer's written

instructions. Provide clean, dust-free, dew-free, and dry substrate for coated foamed roofing application.

2. Remove existing coating and insulation as recommended by the manufacturer to provide an acceptable surface for the application of new insulation.

3. Provide new insulation as required to provide a minimum R Value of 20.

B. Remove grease, oil, form-release agents, curing compounds, and other contaminants from substrate.

C. Cover and mask adjoining surfaces not receiving coated foamed roofing to prevent overspray or spillage affecting other construction. Temporarily close off roof drains, removing roof-drain plugs when not doing coated foamed roofing work or when rain is forecast. 1. Remove masking after polyurethane foam application; cover and re-mask adjoining

surfaces before coating polyurethane foam.

D. Fill, cover, or tape joints and cracks in substrate that exceed a width of 1/4 inch. Remove dust and dirt from narrower joints and cracks before applying polyurethane foam.

Page 113: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

COATED FOAMED ROOFING 07 57 00 - 5

3.3 POLYURETHANE FOAM APPLICATION

A. General: Mix and apply polyurethane foam according to ASTM D 5469 and coated foamed roofing manufacturer's written instructions. 1. Fill irregularities and depressions to prevent ponding water. 2. Apply the required full thickness of polyurethane foam in any specific area on same day. 3. Apply only the area of polyurethane foam that can be covered with required base coating

on same day or within 24 hours. 4. Apply polyurethane foam to avoid overspray beyond immediate area of work.

B. Apply polyurethane foam in lift thicknesses not less than 1/2 inch and not more than 1-1/2 inches.

C. Uniformly apply total thickness of polyurethane foam to provide a minimum R value of 20 and with a surface tolerance of plus 1/4 inch and no minus. 1. Fill low spots to achieve minimum 1/4 inch per foot (1:48) slope to drain.

D. Apply polyurethane foam to roof penetrations, terminations, and vertical surfaces as indicated. Unless otherwise indicated, extend polyurethane foam at least 4 inches above elevation of adjacent roof field.

E. Surface Finish: Provide finished surface of polyurethane foam within the following range of surface textures as defined by ASTM D 5469: 1. Texture: Smooth to orange peel.

F. Remove and replace polyurethane foam not complying with surface-texture limitations. Remove defective thickness and prepare and reapply polyurethane foam with acceptable, uniform results.

3.4 COATING APPLICATION

A. Allow polyurethane foam substrate to cure for a minimum of two hours before coating, and apply coating system to polyurethane foam no later than 24 hours after the application of the foam. Remove dust, dirt, water, and other contaminants before applying coating system.

B. Apply coating system to polyurethane foam by spray, roller, or other suitable application method according to coating manufacturer's written instructions.

C. Apply base coat and one or more topcoats to obtain a uniform, seamless membrane free of blisters and pinholes. Apply each coat at right angles to preceding coat, using contrasting color tints for successive coats. 1. Apply topcoat(s) after removing dust, dirt, water, and other contaminants from base coat. 2. Urethane Coating: Apply coating system to a minimum dry film thickness of 30 mils.

D. Height at Terminations: Apply coating system at wall terminations and other vertical surfaces to extend vertically beyond polyurethane foam by a minimum of 4 inches.

E. Mineral Granules: Apply mineral granules over wet topcoat using pressure equipment at the rate of 0.5 lb/sq. ft.. Remove excess granules after topcoat has cured.

F. Sealant: Apply sealant to perimeter and other terminations where indicated on Drawings or required by coated foamed roofing manufacturer.

3.5 FIELD QUALITY CONTROL

A. Testing Agency: The Owner may engage a qualified testing agency to perform tests and inspections. 1. Testing agency will identify, seal, and certify samples of materials taken from Project site,

with Contractor present.

Page 114: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

COATED FOAMED ROOFING 07 57 00 - 6

2. Testing agency will perform tests for product characteristics specified or cited in manufacturer's product data. a. Two core samples will be required for roof areas up to 10,000 sq. ft., and one core

sample will be required for each additional 10,000 sq. ft. or part thereof. 3. Testing agency will verify that surfaces slope to drain.

B. Coated foamed roofing will be considered defective if it does not pass tests and inspections.

C. Refill cores, repair slits, and re-coat test areas.

D. Prepare test and inspection reports.

3.6 REPAIR AND RE-COATING

A. Correct deficiencies in, or remove, foam or coatings that do not comply with requirements; fill and repair substrates and reapply materials.

B. Repair and re-coat coated foamed roofing according to ASTM D 6705 and manufacturer's written instructions.

3.7 CURING, PROTECTING, AND CLEANING

A. Cure coatings according to manufacturer's written instructions, taking care to prevent contamination and damage during application stages and curing. Do not permit traffic on uncured coatings.

B. Protect coated foamed roofing from damage and wear during remainder of construction period.

C. Clean overspray and spillage from adjacent construction using cleaning agents and procedures recommended by manufacturer of affected construction.

END OF SECTION 07 57 00

Page 115: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

PREPARATION FOR REROOFING 07 59 10 - 1

SECTION 07 59 10 - PREPARATION FOR REROOFING

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes: 1. Full tear-off of entire roof. 2. Removal of base flashings.

B. Related Requirements: 1. Section 01 10 00 "Summary" for use of the premises and phasing requirements. 2. Section 01 50 00 "Temporary Facilities and Controls" for temporary construction and

environmental-protection measures for reroofing preparation.

1.3 DEFINITIONS

A. Roofing Terminology: Definitions in ASTM D 1079 and glossary of NRCA's "The NRCA Roofing and Waterproofing Manual" apply to work of this Section.

B. Full Roof Tear-Off: Removal of existing roofing system from deck.

1.4 ACTION SUBMITTALS

A. Product Data: For each type of product.

B. Temporary Roofing Submittal: Product data and description of temporary roofing system. If temporary roof remains in place, include surface preparation requirements needed to receive permanent roof, and submit a letter from roofing manufacturer, stating acceptance of the temporary roof and that its inclusion does not adversely affect the roofing system's resistance to fire and wind.

1.5 INFORMATIONAL SUBMITTALS

A. Qualification Data: For Installer.

B. Fastener pull-out test report.

C. Photographs or Videotape: Show existing conditions of adjoining construction and site improvements, including exterior and interior finish surfaces, that might be misconstrued as having been damaged by reroofing operations. Submit before Work begins.

1.6 QUALITY ASSURANCE

A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning roofing removal. Comply with hauling and disposal regulations of authorities having jurisdiction.

B. Reroofing Conference: Conduct conference at Project site. 1. Meet with Owner; Architect; Owner's insurer if applicable; testing and inspecting agency

representative; roofing system manufacturer's representative; roofing Installer, including project manager, superintendent, and foreman; and installers whose work interfaces with or affects reroofing, including installers of roof deck, roof accessories, and roof-mounted equipment.

Page 116: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

PREPARATION FOR REROOFING 07 59 10 - 2

2. Review methods and procedures related to roofing system tear-off and replacement, including, but not limited to, the following: a. Reroofing preparation, including roofing system manufacturer's written instructions. b. Existing roof drains and roof drainage during each stage of reroofing, and roof-

drain plugging and plug removal. c. Construction schedule and availability of materials, Installer's personnel,

equipment, and facilities needed to avoid delays. d. Existing roof deck conditions requiring notification of Architect. e. Condition and acceptance of existing roof deck for reuse. f. Structural loading limitations of roof deck during reroofing. g. Base flashings, special roofing details, drainage, penetrations, equipment curbs,

and condition of other construction that affect reroofing. h. HVAC shutdown and sealing of air intakes. i. Shutdown of fire-suppression, -protection, and -alarm and -detection systems. j. Asbestos removal and discovery of asbestos-containing materials. k. Governing regulations and requirements for insurance and certificates if

applicable. l. Existing conditions that may require notification of Architect before proceeding.

1.7 FIELD CONDITIONS

A. Existing Roofing System: Built-up coal-tar roofing over rigid fiberglass insulation on metal deck.

B. Owner will occupy portions of building immediately below reroofing area. Conduct reroofing so Owner's operations are not disrupted. Provide Owner with not less than 72 hours' notice of activities that may affect Owner's operations. 1. Coordinate work activities daily with Owner so Owner can place protective dust and

water-leakage covers over sensitive equipment and furnishings, shut down HVAC and fire-alarm or -detection equipment if needed, and evacuate occupants from below work area.

C. Protect building to be reroofed, adjacent buildings, walkways, site improvements, exterior plantings, and landscaping from damage or soiling from reroofing operations.

D. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities.

E. Conditions existing at time of inspection for bidding are maintained by Owner as far as practical. 1. Construction Drawings for existing roofing system are provided for Contractor's

convenience and information, but are not a warranty of existing conditions. They are intended to supplement rather than serve in lieu of Contractor's own investigations. Contractor is responsible for conclusions derived from existing documents.

F. Limit construction loads on roof to 20 lbs for rooftop equipment wheel loads and 20pf for uniformly distributed loads.

G. Weather Limitations: Proceed with reroofing preparation only when existing and forecasted weather conditions permit Work to proceed without water entering existing roofing system or building. 1. Remove only as much roofing in one day as can be made watertight in the same day.

H. Hazardous Materials: It is not expected that hazardous materials, such as asbestos-containing materials, will be encountered in the Work. 1. If materials suspected of containing hazardous materials are encountered, do not disturb;

immediately notify Architect and Owner. Hazardous materials will be removed by Owner under a separate contract.

Page 117: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

PREPARATION FOR REROOFING 07 59 10 - 3

PART 2 - PRODUCTS

2.1 INFILL AND REPLACEMENT MATERIALS

A. Use infill materials matching existing roofing system materials unless otherwise indicated. 1. Infill materials are specified in Section 075213 "Atactic-Polypropylene (APP) Modified

Bituminous Membrane Roofing,” unless otherwise indicated.

B. Wood blocking, curbs, and nailers are specified in Section 061053 "Miscellaneous Rough Carpentry."

2.2 AUXILIARY REROOFING MATERIALS

A. General: Use auxiliary reroofing preparation materials recommended by roofing system manufacturer for intended use and compatible with components of new roofing system.

PART 3 - EXECUTION

3.1 PREPARATION

A. Shut off rooftop utilities and service piping before beginning the Work.

B. Test existing roof drains to verify that they are not blocked or restricted. Immediately notify Architect of any blockages or restrictions.

C. Protect existing roofing system that is not to be reroofed.

D. Coordinate with Owner to shut down air-intake equipment in the vicinity of the Work. Cover air-intake louvers before proceeding with reroofing work that could affect indoor air quality or activate smoke detectors in the ductwork.

E. During removal operations, have sufficient and suitable materials on-site to facilitate rapid installation of temporary protection in the event of unexpected rain.

F. Maintain roof drains in functioning condition to ensure roof drainage at end of each workday. Prevent debris from entering or blocking roof drains and conductors. Use roof-drain plugs specifically designed for this purpose. Remove roof-drain plugs at end of each workday, when no work is taking place, or when rain is forecast. 1. If roof drains are temporarily blocked or unserviceable due to roofing system removal or

partial installation of new roofing system, provide alternative drainage method to remove water and eliminate ponding. Do not permit water to enter into or under existing roofing system components that are to remain.

3.2 ROOF TEAR-OFF

A. Remove loose aggregate from aggregate-surfaced built-up bituminous roofing using a power broom.

B. Full Roof Tear-Off: Remove existing roofing and other roofing system components down to the deck. 1. Remove roof insulation and cover board. 2. Remove wood blocking, curbs, and nailers. 3. Remove excess asphalt from steel deck. A maximum of 15 lb/100 sq. ft. of asphalt is

permitted to remain on steel decks. 4. Remove fasteners from deck.

3.3 DECK PREPARATION

A. Inspect deck after tear-off of roofing system.

Page 118: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

PREPARATION FOR REROOFING 07 59 10 - 4

B. If broken or loose fasteners that secure deck panels to one another or to structure are observed, or if deck appears or feels inadequately attached, immediately notify Architect. Do not proceed with installation until directed by Architect.

C. If deck surface is unsuitable for receiving new roofing or if structural integrity of deck is suspect, immediately notify Architect. Do not proceed with installation until directed by Architect.

3.4 INFILL MATERIALS INSTALLATION

A. Immediately after roof tear-off, and inspection and repair, if needed, of deck, fill in tear-off areas to match existing roofing system construction. 1. Installation of infill materials is specified in Section 07551 "Atactic-Polypropylene (APP)

Modified Bituminous Membrane Roofing." 2. Installation of wood blocking, curbs, and nailers is specified in Section 06105

"Miscellaneous Carpentry."

B. Install new roofing patch over roof infill area. If new roofing is installed the same day tear-off is made, roofing patch is not required.

3.5 BASE FLASHING REMOVAL

A. Remove existing base flashings. Clean substrates of contaminants, such as asphalt, sheet materials, dirt, and debris.

B. Do not damage metal counterflashings that are to remain. Replace metal counterflashings damaged during removal with counterflashings specified in Section 07620 "Sheet Metal Flashing and Trim."

C. Remove stucco from back of parapets. If parapets have deteriorated, immediately notify Architect.

3.6 FASTENER PULL-OUT TESTING

A. Retain independent testing and inspecting agency to conduct fastener pull-out tests according to SPRI FX-1, and submit test report to Architect before installing new roofing system. 1. Obtain Architect's approval to proceed with specified fastening pattern. Architect may

furnish revised fastening pattern commensurate with pull-out test results.

3.7 DISPOSAL

A. Collect demolished materials and place in containers. Promptly dispose of demolished materials. Do not allow demolished materials to accumulate on-site. 1. Storage or sale of demolished items or materials on-site is not permitted.

B. Transport and legally dispose of demolished materials off Owner's property.

END OF SECTION 07 59 10

Page 119: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

SHEET METAL FLASHING AND TRIM 07 62 00 - 1

SECTION 07 62 00 - SHEET METAL FLASHING AND TRIM

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes: 1. Formed roof-drainage sheet metal fabrications. 2. Formed low-slope roof sheet metal fabrications. 3. Formed equipment support flashing.

B. Related Requirements: 1. Section 06 10 53 "Miscellaneous Carpentry" for wood nailers, curbs, and blocking. 2. Section 07 52 13 “Atactic-Polypropylene (APP) Modified Bituminous Membrane Roofing"

for materials and installation of sheet metal flashing and trim integral with roofing.

1.3 COORDINATION

A. Coordinate sheet metal flashing and trim layout and seams with sizes and locations of penetrations to be flashed, and joints and seams in adjacent materials.

B. Coordinate sheet metal flashing and trim installation with adjoining roofing and wall materials, joints, and seams to provide leakproof, secure, and noncorrosive installation.

1.4 PREINSTALLATION MEETINGS

A. Preinstallation Conference: Conduct conference at Project site. 1. Review construction schedule. Verify availability of materials, Installer's personnel,

equipment, and facilities needed to make progress and avoid delays. 2. Review special roof details, roof drainage, roof-penetration flashing, equipment curbs,

and condition of other construction that affect sheet metal flashing and trim. 3. Review requirements for insurance and certificates if applicable. 4. Review sheet metal flashing observation and repair procedures after flashing installation.

1.5 ACTION SUBMITTALS

A. Product Data: For each type of product. 1. Include construction details, material descriptions, dimensions of individual components

and profiles, and finishes for each manufactured product and accessory.

B. Shop Drawings: For sheet metal flashing and trim. 1. Include plans, elevations, sections, and attachment details. 2. Detail fabrication and installation layouts, expansion-joint locations, and keyed details.

Distinguish between shop- and field-assembled work. 3. Include identification of material, thickness, weight, and finish for each item and location

in Project. 4. Include details for forming, including profiles, shapes, seams, and dimensions. 5. Include details for joining, supporting, and securing, including layout and spacing of

fasteners, cleats, clips, and other attachments. Include pattern of seams. 6. Include details of termination points and assemblies.

Page 120: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

SHEET METAL FLASHING AND TRIM 07 62 00 - 2

7. Include details of expansion joints and expansion-joint covers, including showing direction of expansion and contraction from fixed points.

8. Include details of roof-penetration flashing. 9. Include details of special conditions. 10. Include details of connections to adjoining work. 11. Detail formed flashing and trim at scale of not less than 3 inches per 12 inches (1:4).

1.6 INFORMATIONAL SUBMITTALS

A. Product Approval: For each roofing system provide the following: 1. Proof that the system/products comply with Florida Product Approval Rule 9B-72. 2. Installation instructions showing how the system/products are to be installed.

B. Qualification Data: For fabricator.

C. Product Certificates: For each type of coping and roof edge flashing that is SPRI ES-1 tested.

D. Product Test Reports: For each product, for tests performed by a qualified testing agency.

E. Sample Warranty: For special warranty.

1.7 CLOSEOUT SUBMITTALS

A. Maintenance Data: For sheet metal flashing and trim, and its accessories, to include in maintenance manuals.

1.8 QUALITY ASSURANCE

A. Fabricator Qualifications: Employs skilled workers who custom fabricate sheet metal flashing and trim similar to that required for this Project and whose products have a record of successful in-service performance. 1. For copings and roof edge flashings that are SPRI ES-1 tested, shop shall be listed as

able to fabricate required details as tested and approved.

1.9 DELIVERY, STORAGE, AND HANDLING

A. Do not store sheet metal flashing and trim materials in contact with other materials that might cause staining, denting, or other surface damage. Store sheet metal flashing and trim materials away from uncured concrete and masonry.

B. Protect strippable protective covering on sheet metal flashing and trim from exposure to sunlight and high humidity, except to extent necessary for period of sheet metal flashing and trim installation.

1.10 WARRANTY

A. Special Warranty: Manufacturer agrees to repair or replace components of the flashing and sheet metal systems that fail in materials or workmanship within specified warranty period. 1. Warranty Period: 20 years from date of Substantial Completion.

B. Special Project Warranty: The roofing Installer's warranty specified in Section 07 52 13 “Atactic-Polypropylene (APP) Modified Bituminous Membrane Roofing”, shall cover the Work of this Section.

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS

A. General: Sheet metal flashing and trim assemblies shall withstand wind loads, structural movement, thermally induced movement, and exposure to weather without failure due to

Page 121: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

SHEET METAL FLASHING AND TRIM 07 62 00 - 3

defective manufacture, fabrication, installation, or other defects in construction. Completed sheet metal flashing and trim shall not rattle, leak, or loosen, and shall remain watertight.

B. Sheet Metal Standard for Flashing and Trim: Comply with NRCA's "The NRCA Roofing Manual" and SMACNA's "Architectural Sheet Metal Manual" requirements for dimensions and profiles shown unless more stringent requirements are indicated.

C. SPRI Wind Design Standard: Manufacture and install copings and roof edge flashings tested according to SPRI ES-1 and capable of resisting the following design pressure: 1. Design Pressure: As indicated on Drawings.

D. Thermal Movements: Allow for thermal movements from ambient and surface temperature changes to prevent buckling, opening of joints, overstressing of components, failure of joint sealants, failure of connections, and other detrimental effects. Base calculations on surface temperatures of materials due to both solar heat gain and nighttime-sky heat loss. 1. Temperature Change: 120 deg F, ambient; 180 deg F, material surfaces.

2.2 SHEET METALS

A. General: Protect mechanical and other finishes on exposed surfaces from damage by applying strippable, temporary protective film before shipping.

B. Stainless-Steel Sheet: ASTM A 240/A 240M or ASTM A 666, Type 304, dead soft, fully annealed; with smooth, flat surface. 1. Finish: 2D (dull, cold rolled).

2.3 UNDERLAYMENT MATERIALS

A. Felt: ASTM D 226/D 226M, Type II (No. 30), asphalt-saturated organic felt; nonperforated.

B. Self-Adhering, High-Temperature Sheet: Self-healing, minimum 30 mils thick, consisting of a slip-resistant polyethylene- or polypropylene-film top surface laminated to a layer of butyl- or SBS-modified asphalt adhesive, with release-paper backing; specifically designed to withstand high metal temperatures beneath metal roofing. Provide primer according to written recommendations of underlayment manufacturer. 1. Basis of Design Product: Grace Ice and Water Shield Ultra. 2. Thermal Stability: ASTM D 1970; stable after testing at 240 deg F or higher. 3. Low-Temperature Flexibility: ASTM D 1970; passes after testing at minus 20 deg F or

lower.

2.4 MISCELLANEOUS MATERIALS

A. General: Provide materials and types of fasteners, solder, protective coatings, sealants, and other miscellaneous items as required for complete sheet metal flashing and trim installation and as recommended by manufacturer of primary sheet meta unless otherwise indicated.

B. Fasteners: Wood screws, annular threaded nails, self-tapping screws, self-locking rivets and bolts, and other suitable fasteners designed to withstand design loads and recommended by manufacturer of primary sheet metal. 1. General: Blind fasteners or self-drilling screws, neoprene gasketed, with hex-washer

head. a. Exposed Fasteners: Heads matching color of sheet metal using plastic caps or

factory-applied coating. Provide neoprene gasketed washers under heads of exposed fasteners bearing on weather side of metal.

b. Blind Fasteners: High-strength stainless-steel rivets suitable for metal being fastened.

2. Fasteners for Stainless-Steel Sheet: Series 300 stainless steel.

Page 122: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

SHEET METAL FLASHING AND TRIM 07 62 00 - 4

C. Solder: 1. For Stainless Steel: ASTM B 32, Grade Sn96, with acid flux of type recommended by

stainless-steel sheet manufacturer.

D. Sealant Tape: Pressure-sensitive, 100 percent solids, polyisobutylene compound sealant tape with release-paper backing. Provide permanently elastic, nonsag, nontoxic, nonstaining tape 1/2 inch wide and 1/8 inch thick.

E. Elastomeric Sealant: ASTM C 920, elastomeric silyl-terminated polyether (STPE) polymer sealant; of type, grade, class, and use classifications required to seal joints in sheet metal flashing and trim and remain watertight.

F. Bituminous Coating: Cold-applied asphalt emulsion according to ASTM D 1187.

G. Asphalt Roofing Cement: ASTM D 4586, asbestos free, of consistency required for application.

2.5 MANUFACTURED SHEET METAL FLASHING AND TRIM

A. Reglets: Units of type, material, and profile to match existing, formed to provide secure interlocking of separate reglet and counterflashing pieces, and compatible with flashing indicated with factory-mitered and -welded corners and junctions. 1. Material: Stainless steel, 0.019 inch thick. 2. Stucco Type: Provide with upturned fastening flange and extension leg of length to

match thickness of applied finish materials. 3. Accessories:

a. Counterflashing Wind-Restraint Clips: Provide clips to be installed before counterflashing to prevent wind uplift of counterflashing's lower edge.

2.6 FABRICATION, GENERAL

A. General: Custom fabricate sheet metal flashing and trim to comply with details shown and recommendations in cited sheet metal standard that apply to design, dimensions, geometry, metal thickness, and other characteristics of item required. Fabricate sheet metal flashing and trim in shop to greatest extent possible. 1. Fabricate sheet metal flashing and trim in thickness or weight needed to comply with

performance requirements, but not less than that specified for each application and metal.

2. Obtain field measurements for accurate fit before shop fabrication. 3. Form sheet metal flashing and trim to fit substrates without excessive oil canning,

buckling, and tool marks; true to line, levels, and slopes; and with exposed edges folded back to form hems.

4. Conceal fasteners and expansion provisions where possible. Do not use exposed fasteners on faces exposed to view.

B. Fabrication Tolerances: Fabricate sheet metal flashing and trim that is capable of installation to a tolerance of 1/4 inch in 20 feet on slope and location lines indicated on Drawings and within 1/8-inch offset of adjoining faces and of alignment of matching profiles.

C. Expansion Provisions: Form metal for thermal expansion of exposed flashing and trim. 1. Form expansion joints of intermeshing hooked flanges, not less than 1 inch deep, filled

with butyl sealant concealed within joints. 2. Use lapped expansion joints only where indicated on Drawings.

D. Sealant Joints: Where movable, nonexpansion-type joints are required, form metal to provide for proper installation of elastomeric sealant according to cited sheet metal standard.

E. Fabricate cleats and attachment devices from same material as accessory being anchored or from compatible, noncorrosive metal.

Page 123: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

SHEET METAL FLASHING AND TRIM 07 62 00 - 5

F. Seams: Fabricate nonmoving seams with flat-lock seams. Tin edges to be seamed, form seams, and solder.

2.7 ROOF-DRAINAGE SHEET METAL FABRICATIONS

A. Parapet Scuppers: Fabricate scuppers to dimensions required, with closure flange trim to exterior, 4-inch wide wall flanges to interior, and base extending 4 inches beyond cant or tapered strip into field of roof. Fabricate from the following materials: 1. Stainless Steel: 0.019 inch thick.

B. Conductor Heads: Fabricate conductor heads with flanged back and stiffened top edge and of dimensions and shape required, complete with outlet tubes, exterior flange trim, and built-in overflows. Fabricate from the following materials: 1. Stainless Steel: 0.016 inch thick.

2.8 LOW-SLOPE ROOF SHEET METAL FABRICATIONS

A. Roof Edge Flashing (Gravel Stop): Fabricate in minimum 96-inch long, but not exceeding 12-foot long sections. Furnish with 6-inch wide, joint cover plates. Shop fabricate interior and exterior corners. 1. Joint Style: Butted with expansion space and 6-inch wide, concealed backup plate. 2. Fabricate from the Following Materials:

a. Stainless Steel: 0.019 inch thick.

B. Copings: Fabricate in minimum 96-inch long, but not exceeding 12-foot long, sections. Fabricate joint plates of same thickness as copings. Furnish with continuous cleats to support edge of external leg and drill elongated holes for fasteners on interior leg. Miter corners, solder or weld watertight. Shop fabricate interior and exterior corners. 1. Coping Profile: Fig 3-4A (one piece) or Fig 3-4C (two pieces) according to SMACNA's

"Architectural Sheet Metal Manual." 2. Joint Style: Butted with expansion space and 6-inch wide, concealed backup plate. 3. Fabricate from the Following Materials:

a. Stainless Steel: 0.025 inch thick.

C. Roof-to-Wall Transition and Expansion-Joint Covers: Fabricate from the following materials: Shop fabricate interior and exterior corners. 1. Stainless Steel: 0.025 inch thick.

D. Counterflashing: Shop fabricate interior and exterior corners. Fabricate from the following materials: 1. Stainless Steel: 0.019 inch thick.

E. Flashing Receivers: Fabricate from the following materials: 1. Stainless Steel: 0.016 inch thick.

F. Roof-Penetration Flashing: Fabricate from the following materials: 1. Stainless Steel: 0.019 inch thick.

G. Roof-Drain Flashing: Fabricate from the following materials: 1. Lead: 4 pound.

2.9 MISCELLANEOUS SHEET METAL FABRICATIONS

A. Equipment Support Flashing: Fabricate from the following materials: 1. Stainless Steel: .019 inch thick.

Page 124: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

SHEET METAL FLASHING AND TRIM 07 62 00 - 6

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine substrates, areas, and conditions, with Installer present, for compliance with requirements for installation tolerances, substrate, and other conditions affecting performance of the Work. 1. Verify compliance with requirements for installation tolerances of substrates. 2. Verify that substrate is sound, dry, smooth, clean, sloped for drainage, and securely

anchored.

B. Proceed with installation only after unsatisfactory conditions have been corrected.

3.2 UNDERLAYMENT INSTALLATION

A. Self-Adhering Sheet Underlayment: Install self-adhering sheet underlayment, wrinkle free. Prime substrate if recommended by underlayment manufacturer. Comply with temperature restrictions of underlayment manufacturer for installation; use primer for installing underlayment at low temperatures. Apply in shingle fashion to shed water, with end laps of not less than 6 inches staggered 24 inches between courses. Overlap side edges not less than 3-1/2 inches. Roll laps and edges with roller. Cover underlayment within 14 days.

3.3 INSTALLATION, GENERAL

A. General: Anchor sheet metal flashing and trim and other components of the Work securely in place, with provisions for thermal and structural movement. Use fasteners, solder, protective coatings, separators, sealants, and other miscellaneous items as required to complete sheet metal flashing and trim system. 1. Install sheet metal flashing and trim true to line, levels, and slopes. Provide uniform, neat

seams with minimum exposure of solder, welds, and sealant. 2. Install sheet metal flashing and trim to fit substrates and to result in watertight

performance. Verify shapes and dimensions of surfaces to be covered before fabricating sheet metal.

3. Space cleats not more than 12 inches apart. Attach each cleat with at least two fasteners. Bend tabs over fasteners.

4. Install exposed sheet metal flashing and trim with limited oil canning, and free of buckling and tool marks.

5. Torch cutting of sheet metal flashing and trim is not permitted.

B. Metal Protection: Where dissimilar metals contact each other, or where metal contacts pressure-treated wood or other corrosive substrates, protect against galvanic action or corrosion by painting contact surfaces with bituminous coating or by other permanent separation as recommended by sheet metal manufacturer or cited sheet metal standard. 1. Coat concealed side of stainless-steel sheet metal flashing and trim with bituminous

coating where flashing and trim contact wood, ferrous metal, or cementitious construction.

2. Underlayment: Where installing sheet metal flashing and trim directly on cementitious or wood substrates, install underlayment and cover with slip sheet.

C. Expansion Provisions: Provide for thermal expansion of exposed flashing and trim. Space movement joints at maximum of 10 feet with no joints within 24 inches of corner or intersection. 1. Form expansion joints of intermeshing hooked flanges, not less than 1 inch deep, filled

with sealant concealed within joints. 2. Use lapped expansion joints only where indicated on Drawings.

D. Fasteners: Use fastener sizes that penetrate wood blocking or sheathing not less than 1-1/4 inches for nails and not less than 3/4 inch for wood screws.

Page 125: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

SHEET METAL FLASHING AND TRIM 07 62 00 - 7

E. Conceal fasteners and expansion provisions where possible in exposed work and locate to minimize possibility of leakage. Cover and seal fasteners and anchors as required for a water tight installation.

F. Seal joints as required for watertight construction. 1. Use sealant-filled joints unless otherwise indicated. Embed hooked flanges of joint

members not less than 1 inch into sealant. Form joints to completely conceal sealant. When ambient temperature at time of installation is between 40 and 70 deg F, set joint members for 50 percent movement each way. Adjust setting proportionately for installation at higher ambient temperatures. Do not install sealant-type joints at temperatures below 40 deg F.

2. Prepare joints and apply sealants to comply with requirements in Section 07920 "Joint Sealants."

G. Soldered Joints: Clean surfaces to be soldered, removing oils and foreign matter. Pre-tin edges of sheets with solder to width of 1-1/2 inches; however, reduce pre-tinning where pre-tinned surface would show in completed Work. 1. Do not use torches for soldering. 2. Heat surfaces to receive solder, and flow solder into joint. Fill joint completely.

Completely remove flux and spatter from exposed surfaces. 3. Stainless-Steel Soldering: Tin edges of uncoated sheets, using solder for stainless steel

and acid flux. Promptly remove acid flux residue from metal after tinning and soldering. Comply with solder manufacturer's recommended methods for cleaning and neutralization.

3.4 ROOF-DRAINAGE SYSTEM INSTALLATION

A. General: Install sheet metal roof-drainage items to produce complete roof-drainage system according to cited sheet metal standard unless otherwise indicated. Coordinate installation of roof perimeter flashing with installation of roof-drainage system.

B. Conductor Heads: Anchor securely to wall, with elevation of conductor head rim at minimum of 1 inch below scupper discharge.

C. Expansion-Joint Covers: Install expansion-joint covers at locations and of configuration indicated. Lap joints minimum of 4 inches in direction of water flow.

3.5 ROOF FLASHING INSTALLATION

A. General: Install sheet metal flashing and trim to comply with performance requirements, and cited sheet metal standard. Provide concealed fasteners where possible, and set units true to line, levels, and slopes. Install work with laps, joints, and seams that are permanently watertight and weather resistant.

B. Roof Edge Flashing: Anchor to resist uplift and outward forces according to recommendations in cited sheet metal standard unless otherwise indicated. Interlock bottom edge of roof edge flashing with continuous cleat anchored to substrate at staggered 3-inch centers.

C. Copings: Anchor to resist uplift and outward forces according to recommendations in cited sheet metal standard unless otherwise indicated. 1. Interlock exterior bottom edge of coping with continuous cleat anchored to substrate at

16-inch centers. 2. Anchor interior leg of coping with washers and screw fasteners through slotted holes at

24-inch centers.

D. Pipe or Post Counterflashing: Install counterflashing umbrella with close-fitting collar with top edge flared for elastomeric sealant, extending minimum of 4 inches over base flashing. Install stainless-steel draw band and tighten.

Page 126: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

SHEET METAL FLASHING AND TRIM 07 62 00 - 8

E. Counterflashing: Coordinate installation of counterflashing with installation of base flashing. Insert counterflashing in reglets or receivers and fit tightly to base flashing. Extend counterflashing 4 inches over base flashing. Lap counterflashing joints minimum of 4 inches. Secure in waterproof manner by means of anchor and washer at 36-inch centers unless otherwise indicated.

F. Roof-Penetration Flashing: Coordinate installation of roof-penetration flashing with installation of roofing and other items penetrating roof. Seal with elastomeric sealant and clamp flashing to pipes that penetrate roof.

3.6 MISCELLANEOUS FLASHING INSTALLATION

A. Equipment Support Flashing: Coordinate installation of equipment support flashing with installation of roofing and equipment. Weld or seal flashing with elastomeric sealant to equipment support member.

3.7 ERECTION TOLERANCES

A. Installation Tolerances: Shim and align sheet metal flashing and trim within installed tolerance of 1/4 inch in 20 feet on slope and location lines indicated on Drawings and within 1/8-inch offset of adjoining faces and of alignment of matching profiles.

3.8 CLEANING AND PROTECTION

A. Clean exposed metal surfaces of substances that interfere with uniform oxidation and weathering.

B. Clean and neutralize flux materials. Clean off excess solder.

C. Clean off excess sealants.

D. Remove temporary protective coverings and strippable films as sheet metal flashing and trim are installed unless otherwise indicated in manufacturer's written installation instructions. On completion of sheet metal flashing and trim installation, remove unused materials and clean finished surfaces as recommended by sheet metal flashing and trim manufacturer. Maintain sheet metal flashing and trim in clean condition during construction.

E. Replace sheet metal flashing and trim that have been damaged or that have deteriorated beyond successful repair by finish touchup or similar minor repair procedures.

END OF SECTION 07 62 00

Page 127: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

ROOF ACCESSORIES 07 72 00 - 1

SECTION 07 72 00 - ROOF ACCESSORIES

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes: 1. Roof curbs. 2. Equipment supports.

B. Related Sections: 1. Section 07 62 00 "Sheet Metal Flashing and Trim" for shop- and field-formed metal

flashing, copings, roof-drainage systems, roof expansion-joint covers, and miscellaneous sheet metal trim and accessories.

1.3 PERFORMANCE REQUIREMENTS

A. General Performance: Roof accessories shall withstand exposure to weather and resist thermally induced movement without failure, rattling, leaking, or fastener disengagement due to defective manufacture, fabrication, installation, or other defects in construction.

1.4 ACTION SUBMITTALS

A. Product Data: For each type of roof accessory indicated. Include construction details, material descriptions, dimensions of individual components and profiles, and finishes.

B. Shop Drawings: For roof accessories. Include plans, elevations, keyed details, and attachments to other work. Indicate dimensions, loadings, and special conditions. Distinguish between plant- and field-assembled work.

C. Samples: For each exposed product and for each color and texture specified, prepared on Samples of size to adequately show color.

1.5 INFORMATIONAL SUBMITTALS

A. Product Approval: For each roofing system provide the following: 1. Proof that the system/products comply with Florida Product Approval Rule 9B-72. 2. Installation instructions showing how the system/products are to be installed.

1.6 CLOSEOUT SUBMITTALS

A. Operation and Maintenance Data: For roof accessories to include in operation and maintenance manuals.

1.7 COORDINATION

A. Coordinate layout and installation of roof accessories with roofing membrane and base flashing and interfacing and adjoining construction to provide a leakproof, weathertight, secure, and noncorrosive installation.

B. Coordinate dimensions with rough-in information or Shop Drawings of equipment to be supported.

Page 128: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

ROOF ACCESSORIES 07 72 00 - 2

PART 2 - PRODUCTS

2.1 METAL MATERIALS

A. Zinc-Coated (Galvanized) Steel Sheet: ASTM A 653/A 653M, G90 (Z275) coating designation.

B. Aluminum-Zinc Alloy-Coated Steel Sheet: ASTM A 792/A 792M, AZ50 (AZM150) coated.

C. Aluminum Sheet: ASTM B 209 (ASTM B 209M), manufacturer's standard alloy for finish required, with temper to suit forming operations and performance required. 1. Mill Finish: As manufactured.

D. Galvanized-Steel Tube: ASTM A 500, round tube, hot-dip galvanized according to ASTM A 123/A 123M.

2.2 MISCELLANEOUS MATERIALS

A. General: Provide materials and types of fasteners, protective coatings, sealants, and other miscellaneous items required by manufacturer for a complete installation.

B. Wood Nailers: Softwood lumber, pressure treated with waterborne preservatives for aboveground, acceptable to authorities having jurisdiction, containing no arsenic or chromium, and complying with AWPA C2; not less than 1-1/2 inches thick.

C. Bituminous Coating: Cold-applied asphalt emulsion complying with ASTM D 1187.

D. Underlayment: 1. Felt: ASTM D 226, Type II (No. 30), asphalt-saturated organic felt, nonperforated. 2. Polyethylene Sheet: 6-mil thick polyethylene sheet complying with ASTM D 4397. 3. Slip Sheet: Building paper, 3-lb/100 sq. ft. minimum, rosin sized.

E. Fasteners: Roof accessory manufacturer's recommended fasteners suitable for application and metals being fastened. Match finish of exposed fasteners with finish of material being fastened. Provide nonremovable fastener heads to exterior exposed fasteners. Furnish the following unless otherwise indicated: 1. Fasteners for Zinc-Coated or Aluminum-Zinc Alloy-Coated Steel: Series 300 stainless

steel. 2. Fasteners for Aluminum Sheet: Aluminum or Series 300 stainless steel. 3. Fasteners for Stainless-Steel Sheet: Series 300 stainless steel.

F. Gaskets: Manufacturer's standard tubular or fingered design of neoprene, EPDM, PVC, or silicone or a flat design of foam rubber, sponge neoprene, or cork.

G. Elastomeric Sealant: Tripolymer, single component, non-acetic cure elastomeric sealant as recommended by roof accessory manufacturer for installation indicated; low modulus; of type, grade, class, and use classifications required to seal joints and remain watertight. 1. Basis of Design: Geocel 2300 Construction Tripolymer Sealant

H. Asphalt Roofing Cement: ASTM D 4586, asbestos free, of consistency required for application.

2.3 ROOF CURBS

A. Roof Curbs: Internally reinforced roof-curb units capable of supporting superimposed live and dead loads, including equipment loads and other construction indicated on Drawings; with welded or mechanically fastened and sealed corner joints, stepped integral metal cant raised the thickness of roof insulation, and integrally formed deck-mounting flange at perimeter bottom.

B. Size: Coordinate dimensions with roughing-in information or Shop Drawings of equipment to be supported.

C. Loads: Coordinate with equipment to be supported.

Page 129: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

ROOF ACCESSORIES 07 72 00 - 3

D. Material: Zinc-coated (galvanized) or Aluminum-zinc alloy-coated steel sheet, 0.079 inch thick.

E. Construction: 1. Insulation: Factory insulated with 1-1/2-inch thick glass-fiber board insulation. 2. Factory-installed wood nailer at top of curb, continuous around curb perimeter. 3. On ribbed or fluted metal roofs, form deck-mounting flange at perimeter bottom to

conform to roof profile. 4. Fabricate curbs to minimum height of 12 inches above roof surface unless otherwise

indicated. 5. Top Surface: Level around perimeter with roof slope accommodated by sloping the deck-

mounting flange.

2.4 EQUIPMENT SUPPORTS

A. Equipment Supports: Internally reinforced metal equipment supports capable of supporting superimposed live and dead loads, including equipment loads and other construction indicated on Drawings; with welded or mechanically fastened and sealed corner joints stepped integral metal cant raised the thickness of roof insulation, and integrally formed deck-mounting flange at perimeter bottom.

B. Size: Coordinate dimensions with roughing-in information or Shop Drawings of equipment to be supported.

C. Loads: Coordinate with equipment to be supported.

D. Material: Zinc-coated (galvanized) or Aluminum-zinc alloy-coated steel sheet, 0.079 inch thick.

E. Construction: 1. Insulation: Factory insulated with 1-1/2-inch thick glass-fiber board insulation. 2. Factory-installed continuous wood nailers 3-1/2 inches wide at tops of equipment

supports. 3. Metal Counterflashing: Manufacturer's standard, removable, fabricated of same metal

and finish as equipment support. 4. On ribbed or fluted metal roofs, form deck-mounting flange at perimeter bottom to

conform to roof profile. 5. Fabricate curbs to minimum height of 12 inches above roof surface unless otherwise

indicated.

2.5 GENERAL FINISH REQUIREMENTS

A. Comply with NAAMM's "Metal Finishes Manual for Architectural and Metal Products" for recommendations for applying and designating finishes.

B. Appearance of Finished Work: Noticeable variations in same piece are not acceptable. Variations in appearance of adjoining components are acceptable if they are within the range of approved Samples and are assembled or installed to minimize contrast.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine substrates, areas, and conditions, with Installer present, to verify actual locations, dimensions, and other conditions affecting performance of the Work.

B. Verify that substrate is sound, dry, smooth, clean, sloped for drainage, and securely anchored.

C. Verify dimensions of roof openings for roof accessories.

D. Proceed with installation only after unsatisfactory conditions have been corrected.

Page 130: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center - MDL Reroofing

ROOF ACCESSORIES 07 72 00 - 4

3.2 INSTALLATION

A. General: Install roof accessories according to manufacturer's written instructions. 1. Install roof accessories level, plumb, true to line and elevation, and without warping, jogs

in alignment, excessive oil canning, buckling, or tool marks. 2. Anchor roof accessories securely in place so they are capable of resisting indicated

loads. 3. Use fasteners, separators, sealants, and other miscellaneous items as required to

complete installation of roof accessories and fit them to substrates. 4. Install roof accessories to resist exposure to weather without failing, rattling, leaking, or

loosening of fasteners and seals.

B. Metal Protection: Protect metals against galvanic action by separating dissimilar metals from contact with each other or with corrosive substrates by painting contact surfaces with bituminous coating or by other permanent separation as recommended by manufacturer. 1. Coat concealed side of uncoated aluminum roof accessories with bituminous coating

where in contact with wood, ferrous metal, or cementitious construction. 2. Underlayment: Where installing roof accessories directly on cementitious or wood

substrates, install a course of felt underlayment and cover with a slip sheet, or install a course of polyethylene sheet.

3. Bed flanges in thick coat of asphalt roofing cement where required by manufacturers of roof accessories for waterproof performance.

C. Roof Curb Installation: Install each roof curb so top surface is level.

D. Equipment Support Installation: Install equipment supports so top surfaces are level with each other.

E. Pipe Support Installation: Install pipe supports so top surfaces are in contact with and provide equally distributed support along length of supported item.

F. Seal joints with elastomeric sealant as required by roof accessory manufacturer.

3.3 REPAIR AND CLEANING

A. Galvanized Surfaces: Clean field welds, bolted connections, and abraded areas and repair galvanizing according to ASTM A 780.

B. Clean exposed surfaces according to manufacturer's written instructions.

C. Clean off excess sealants.

D. Replace roof accessories that have been damaged or that cannot be successfully repaired by finish touchup or similar minor repair procedures.

END OF SECTION 07 72 00

Page 131: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center – MDL Reroofing

TESTING, BALANCING AND COMMISSIONING OF HVAC SYSTEMS 23 05 93 - 1

SECTION 23 05 93 – TESTING AND BALANCING OF HVAC SYSTEMS

PART 1 - GENERAL

1.1 RELATED DOCUMENTS:

A. Drawings and general provisions of Contract, including General and Supplementary Conditions and other related Specification sections, apply to work of this section.

1.2 TESTING AND BALANCING OF HVAC SYSTEMS:

A. Selection and Scope: Procure the services of, and have a contract with, an independent Test and Balance Agency, which specializes in the balancing and testing of heating, ventilating, and air conditioning systems. The scope shall include all DX equipment and air moving equipment as shown on the drawings. The Agency shall provide a pre-test of all equipment prior to start of construction and a test, adjust, and balance after the equipment is back in place. All equipment shall be balanced to the pre-test values.

B. Prepare a critical schedule and coordinate, so as to accomplish all tasks required of the Agency as scheduled herein.

C. The Agency shall inspect all and report in writing to the Architect any deviations from plans and specifications that will affect the performance of the systems. All correspondence (written, fax, electronic mail, and the like) is to be copied to the Architect.

1.3 AGENCY QUALIFICATIONS:

A. The Agency shall be a member in good standing with The Associated Air Balance Council (AABC) or National Environmental Balancing Bureau (NEBB) and shall provide AABC National Project Certification Performance Guaranty or equivalent to the Owner. The Agency must be totally independent, having no affiliation with any contractor, design engineer, or equipment manufacturer/supplier of HVAC related equipment.

B. The Agency shall provide proof that personnel performing work has successfully completed at least five (5) projects of similar size and scope, with at least three (3) projects with the Owner. A complete list of reference projects, including name and phone number of contacts, shall be submitted with the bid.

C. The Agency shall have a Florida Registered Professional Engineer on its staff.

D. All instruments used shall be accurately calibrated within six months of balancing and maintained in good working order. If requested, the test shall be conducted in the presence of the Architect/Engineer and/or his representative.

1.4 AGENCY SUBMITTALS:

A. The Pre-Construction Test Report, must be received by the Architect and Owner at least one week prior to the removal of the HVAC equipment.

B. The Post-Construction Test Report, with the Engineer’s letter of acceptance, must be received by the Architect and Owner at least one week prior to the proposed date of the substantial completion inspection.

1.5 AGENCY INSPECTIONS AND TESTS:

A. The scope is to test the equipment prior to its removal to determine the existing operating characteristics then retest after the equipment is reinstalled to verify that it operates as well as it did prior to demolition.

B. Perform Testing work associated with the HVAC system as described herein.

Page 132: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center – MDL Reroofing

TESTING, BALANCING AND COMMISSIONING OF HVAC SYSTEMS 23 05 93 - 2

C. A minimum of one after-occupancy inspection shall be made within 90 days of the final test. At this time, any minor adjustments shall be made. Major problems, which will require major readjustments, shall be addressed to the Architect / Engineer prior to any readjustments. Any alterations to the final test report shall be transmitted as a revised report to the Architect and Owner.

1.6 AGENCY GUARANTEE AND REPORTS:

A. Provide AABC National Project Certification Performance Guarantee or equivalent.

B. Provide two copies and a pdf copy of tabulated report in neatly organized typed form with AABC approved minimum data, within fifteen working days after completion of test. Report will include start-up reports and drawings to coincide with the test report. All commissioning tests will be included in a separate report format. In addition, all reports shall incorporate a summary page(s) which shall include: 1. General description of project (building type, system type, equipment description, etc.) 2. A descriptive list of all equipment and test results (sorted building by building) which do

NOT meet the pre-test values. All equipment and test data NOT listed on the above mentioned summary page(s) will be considered to perform within 10% of pre-test values.

3. Copies of reduced plan drawings that uniquely identify and cross reference all equipment tested.

PART 2 - PRODUCTS

Not used.

PART 3 - EXECUTION

3.1 CONTRACTOR’S RESPONSIBILITIES:

A. Pre-testing of the HVAC systems shall be performed as specified above. Be familiar with all the provisions and responsibilities of the Agency, and provide such certification, cooperation, and support required.

B. Final testing of the HVAC systems shall be performed as specified above. Be familiar with all the provisions and responsibilities of the Agency, and provide such certification, cooperation, and support required.

C. Repair all deficiencies noted by the Agency in a timely manner. The Contractor will notify the Agency immediately, in writing, upon completion of the repairs. The cost for extra re-testing by the Agency due to un-repaired items that were certified as ‘repaired’, will not be the responsibility of the Owner.

D. Scope of Work: 1. Allow adequate time in the before and after construction to schedule to perform the

Testing and Balancing work. 2. Notify the Agency prior to commencement of removal of the roof top HVAC system

equipment. Allow for adequate time for the pre-removal testing. 3. Provide test openings as required for testing and balancing HVAC systems. 4. Provide test openings and temporary end caps or otherwise seal off ends of ductwork to

permit leakage testing prior to installation of diffusers, grilles, and similar devices. 5. During the test and balance period, operate all HVAC equipment as necessary to permit

systems to be tested and balanced as fully operating, functional systems. 6. Work harmoniously with the Agency, providing all courtesies normally extended to

professional consultants. 7. Remove and replace ceilings as necessary to permit test and balance operations.

Page 133: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center – MDL Reroofing

TESTING, BALANCING AND COMMISSIONING OF HVAC SYSTEMS 23 05 93 - 3

8. Remove and replace equipment, lights, or other items which obstruct testing and balancing operations. Where equipment, lights, or other items will interfere with future adjustments of the HVAC system, such as equipment, lights, or other items shall be relocated as directed by the Architect / Engineer.

9. Replace belts and drives as required for proper balancing. Drives shall be adjusted and aligned to prevent abnormal belt wear and vibration.

10. Before requesting final testing and balancing, submit signed statement that HVAC systems are installed, adjusted, fully lubricated, operating satisfactorily, and are ready for use.

3.2 AGENCY'S RESPONSIBILITIES:

A. Air Balance: The Agency shall perform the following tests, and balance system in accordance with the following requirements: 1. Record minimum data required by AABC forms. 2. Test and adjust fan rpm. 3. Test and record motor full load amperage/voltage and operating amperage/voltage. 4. Make pitot tube traverse of main supply, return, OA and exhaust ducts and pre-test cfm

at fans. 5. Test and adjust system for design cfm recirculated air. 6. Test and adjust system for design cfm outside air. 7. Test and record system static pressure profile. 8. Adjust all main supply and return air ducts to proper design cfm. 9. Adjust all zones to proper design cfm, supply, return, and exhaust. 10. Provide suggestion/corrective measures pertaining to performance related issues. 11. Test and adjust fan to within 100%-110% of pre-test values.

B. All tested equipment shall be identified and listed.

C. Set adjustments of automatically operated dampers to operate to pre-construction status.

D. Deficiencies: All deficiencies shall be noted by the Agency in a field report and submitted to the Contractor on a daily basis.

E. Upon Correction Of The Deficiency, notify the Agency in writing that the problem is resolved. If the deficiency is not corrected, the Owner will not be responsible for the cost of additional re-testing.

F. Equipment: All information required as shown, but not limited to, shall be compiled in a neat, orderly, itemized format on 8½" x 11" test forms. The following data shall be submitted to the Construction Manager for distribution to the Architect / Engineer and the Owner. This data is the minimum required data except where specified standard (i.e. AABC) requires additional data. In addition, any HVAC equipment, but not indicated below, is required per AABC form.

G. Air Handlers and Condensing units: 1. Mark number 2. Unit manufacturers and model number 3. Total supply air cfm and rpm - specified and actual 4. Return air cfm - specified and actual 5. Outside air cfm - specified and actual 6. Unit static pressure profile, including total fan static 7. Specified total and external static pressure 8. Entering and leaving temps - specified and actual 9. Coil - entering and leaving air DB/°F and WB/°F - specified and actual

Page 134: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center – MDL Reroofing

TESTING, BALANCING AND COMMISSIONING OF HVAC SYSTEMS 23 05 93 - 4

10. Outside air DBF and WBF at time of test 11. Voltage, phase, and cycle specified load conditions 12. Hand calculations of the BTUH at test conditions of total cooling, latent cooling and

Sensible cooling. 13. Btu per hour when converted to specified load conditions

H. Fans: 1. Mark number 2. Manufacturer and model number 3. Total cfm supply and rpm - specified and actual 4. Static pressure (discharge static - suction static) 5. Full load amperage - specified and actual 6. Voltage, phase, and cycles - specified and actual

END OF SECTION 23 05 93

Page 135: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center – MDL Reroofing

LIGHTNING PROTECTION SYSTEMS 26 41 13 - 1

SECTION 26 41 13 - LIGHTNING PROTECTION SYSTEMS

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of Contract, including General and Supplementary Conditions sections, apply to work of this section.

1.2 SCOPE

A. Scope of Work: Provide labor and materials for the replacement of the existing lightning protection system and installation of a complete new building lightning protection system with a UL Master Label. 1. Reuse the existing down conductors and existing building counterpoise system for

connection into the new roof mounted system. 2. Locate all existing down conductors and ground rods and perform testing and verify for

acceptable resistance to ground results. 3. Provide UL Master Label.

B. Types of lightning protection system material and components specified in this section include the following: 1. Air terminals. 2. Bonding plates. 3. Conductors. 4. Connectors. 5. Grounding rods. 6. Rod clamps. 7. Splicers. 8. Wire.

1.3 QUALITY ASSURANCE

A. Manufacturers: Firms regularly engaged in manufacture of lightning protection system components, of types, sizes, and ratings required, and who are Class I manufacturer-members of Lightning Protection Institute, whose products have been in satisfactory use in similar service for not less than three (3) years.

B. Installer's Qualifications: Firm with at least 3 years of successful installation experience with projects utilizing lightning protection systems similar to that required for this project, and who are Class III, installer-members of Lightning Protection Institute.

C. NEC Compliance: Comply with NEC requirements pertaining to lightning protection, grounding, grounding electrodes, and down conductor clearances.

D. NFPA Compliance: Comply with requirements of NFPA No. 780 - 2011, "Lightning Protection Code", as applicable to lightning protection systems for building projects.

E. UL Compliance: Comply with Master Label provisions of UL 96A – Current Edition, "Installation Requirements for Lightning Protection Components". Provide components which are UL 96 listed and labeled.

F. LPI Compliance: Comply with requirements of Lightning Protection Institute (LPI) Standards 175, 176, and 177, pertaining to lightning system material, components, installation and testing procedures.

Page 136: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center – MDL Reroofing

LIGHTNING PROTECTION SYSTEMS 26 41 13 - 2

G. UL Certification: Provide Owner with UL Master Label for overall system which is suitable for fastening to building for display purposes. Comply with UL 96A, "Master Labeled Lightning Protection Systems".

H. OSHA Compliance: The lightning protection system shall comply with all current OSHA requirements, inlcuding the use of blunt, roof mounted air terminals.

I. General: Provide lightning protection system material and components, of types, sizes, ratings, for Class of service indicated, which comply with manufacturer's standard materials, design, and construction in accordance with published product information, and as required for complete installation. Where type components or materials are not otherwise indicated, comply with NFPA 780 and LPI standards.

1.4 SUBMITTALS

A. Product Data: Submit manufacturer's data on lightning protection systems and associated components.

B. Shop Drawings: Submit layout drawings of lightning protection system equipment and components including, but not limited to, conductor routing, connections, and grounding. 1. Shop drawings shall be submitted that are fully engineered and detailed on 24” x 36”

format.

C. UL Certification: Provide Owner with UL Master Label for overall system which is suitable for fastening to building for display purposes. Comply with UL 96A, "Master Labeled Lightning Protection Systems". Provide any required UL or other accepted independent inspections to acquire labeling.

PART 2 - PRODUCTS

2.1 ACCEPTABLE MANUFACTURERS

A. Manufacturers: Subject to compliance with requirements, provide lightning protection components of one of the following: 1. Conductors, Air Terminals and Ground Rods:

a. Heary Brothers Lightning Protection Co., Inc. b. Thompson Lightning Protection, Inc. c. Harger Lightning

2.2 LIGHTNING PROTECTION SYSTEM COMPONENTS

A. General: Provide lightning protection system material and components, of types, sizes, ratings, for Class I service utilizing copper materials, which comply with manufacturer's standard materials, design, and construction in accordance with published product information, and as required for complete installation. Where type components or materials are not otherwise indicated, comply with NFPA 780 and UL standards.

B. In addition to conformance to NFPA-780 and UL 96, the component material requirements are as follows: 1. Conductors: Electrical grade stranded copper or equivalent aluminum where aluminum is

required for compatibility with bonded material. 2. Air terminals: Solid copper, not less than 3/8-inch diameter minimum, with blunt

nickel-plated points, 18 inches minimum, 24 inches maximum. 3. Ground rods (where required): Copperclad steel, not less than 1/2-inch diameter by 8

feet long. 4. Ground plates (where required): Solid copper, not less than 1/16-inch thick.

Page 137: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

USF Health Center – MDL Reroofing

LIGHTNING PROTECTION SYSTEMS 26 41 13 - 3

5. Use connectors that are compatible materials (or approved bi-metal type) with the equipment to be bonded.

C. Anchors and fasteners: Bolt types which are most suitable for the specific anchor and fastener installations. Use adhesive type fastener on coping and other roofing material. Do not penetrate roofing or flashings.

D. Bond all metal structures, roof drains, mechanical equipment and any other metallic equipment required to be bonded to the system per NFPA-780.

PART 3 - EXECUTION

3.1 INSTALLATION OF LIGHTNING PROTECTION SYSTEMS

A. Install lightning protection system to protect the associated structure, in accordance with equipment manufacturer's written instructions, and in compliance with applicable requirements of NEC and NFPA 780 to ensure that lightning protection systems comply with requirements.

B. Coordinate with other work, including electrical wiring and roofing work, as necessary to interface installation of lightning protection system with other work.

C. Install conductors with direct paths from air terminals to ground connections avoiding sharp bends and narrow loops.

D. All conductors shall be concealed from direct view from the ground.

3.2 GROUNDING AND BONDING

A. Provide equipment grounding and bonding connections, sufficiently tight to assure permanent and effective grounds and bonds, for lightning protection connection to all air terminals, devices, equipment and structural components as necessary. All grounding and bonding shall be in compliance with the National Electrical Code - 2008, Section 250 - Grounding and NFPA-780.

B. Provide bond to the existing building service entrance grounding electrode system.

3.3 TESTING

A. Upon completion of installation of lightning protection system, test resistance-to-ground (earthing connection) with resistance tester. Where tests indicate resistance-to-ground is over 5 ohms, take appropriate action to reduce resistance to 5 ohms or less, by driving additional, properly spaced, ground rods, and treating soil in proximity to ground rods with common salt, copper sulfate or magnesium sulfate. Then retest to demonstrate compliance.

B. Testing shall be performed on all grounding electrode installations. Testing shall be 2 point method in accordance with IEEE Standard 81. Submit all ground test readings to the Engineer in tabulated format, indicating each ground rod test location, at substantial completion.

C. Provide all required testing, including any third party inspections services, to provide a UL Master Label.

END OF SECTION 26 41 13

Page 138: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing
Page 139: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing
Page 140: University of South Florida Health Center – MDL Building 114 · July 21, 2017 Project Manual Bid Documents For University of South Florida Health Center MDL Building 114 Reroofing

100 Madison Street, Suite 200, Tampa, Florida 33602.4704www.RoweArchitects.com

813.221.8771AAC002172