Unit # 4 ITDC Balance Points Completion Plan Dated 08-Sep-14 Latest

Embed Size (px)

Citation preview

  • 8/11/2019 Unit # 4 ITDC Balance Points Completion Plan Dated 08-Sep-14 Latest

    1/12

    S No Package Description of Job Status

    1 FD FAN -A Hoist track work balance Completed

    2 FD FAN -B Hoist track work balance Completed

    3 PA FAN-A Hoist track work balance Completed4 GT-4 R phase gravel to be levelled Completed

    5 TRANSFORMER YARD AREA AWU towards U#3, founds not completed Completed

    6 TRANSFORMER YARD AREA Grouting required for AWU base - U#5 side. Completed

    7 TRANSFORMER YARD AREABalance precast RCC cover slabs for drains and cable

    trenchesto be completedCompleted

    8 TRANSFORMER YARD AREA Drain between GT/UT area and CST missing. Not Applicable

    9 TRANSFORMER YARD AREA Pending works of drain along A row to be completed Completed

    10 TRANSFORMER YARD AREA Balance paving adjancent to CST to complete Completed

    11 TRANSFORMER YARD AREACable trench final lift/precast kerb wall and left out

    areas to be completedCompleted

    12 TRANSFORMER YARD AREA Painting of fencing gates to be done. Completed

    13 TRANSFORMER YARD AREATie rods cutting and touch ups for transformer fire

    walls to be done.Completed

    14 TRANSFORMER YARD AREAMooring points: Hooks to be painted. Cover slabs to

    be provided.Completed

    15 TRANSFORMER YARD AREAGravel filling in UAT transformers to be completed

    upto -0.400 ELCompleted

    16 TRANSFORMER YARD AREADrainage free flow from sump pits of transformers to

    common oil pit to be checked.

    Completed

    17 " 0 " M of TG areaBalance ironite flooring along with placing of left out

    conduits in the floor, grouting insert plates.Completed

    18 " 0 " M of TG area Proper fixing & painting of Chequered plate 20-Sep-14

    19 " 0 " M of TG areaBalance brickwork & plaster along C row and Gable

    end.Completed

    20 " 0 " M of TG area Encasement of left out steel columns to be completed. Completed

    Unit # 4 PENDING CIVIL WORKS -M/s ITDC

  • 8/11/2019 Unit # 4 ITDC Balance Points Completion Plan Dated 08-Sep-14 Latest

    2/12

    21 " 0 " M of TG areaProviding floor drain pipes in grade slab and

    connection to C & A row drains.20-Sep-14

    22 " 0 " M of TG areaCovering of cable pits & trenches with Chequered

    plates.Completed

    23 " 0 " M of TG area General painting of walls and structural steel. 25-Sep-14

    24 " 0 " M of TG area CEP pit drain pipe upto CW pit to be checked. Completed

    25 " 0 " M of TG area Swas Room Block: Completed

    26 " 0 " M of TG area Fixing of acid resistant tiles & vitrified tiles. Completed

    27 " 0 " M of TG area False ceiling work 15-Sep-14

    28 " 0 " M of TG area Acid resistant paint & OBD to be completed. Completed

    29 " 0 " M of TG area Drains to be cleaned and connected to main drain Completed

    30 " 0 " M of TG area Windows to be fixed. Completed

    31 " 0 " M of TG area

    Toilet: Balance brickwork, plaster, slab, doors fixing,

    fixtures and fittings, painting etc to be completed.Also septic tank, soak pit and required connection to

    be made.

    30-Sep-14

    32 " 0 " M of TG area LT SWGR room:

    33 " 0 " M of TG areaProper fixing & painting of Chequered plate to be

    done.Completed

    34 " 0 " M of TG area Final painting to be done. Completed

    35 6.90 m floorRCC Kerb walls around all openings(as per dwg) to be

    provided.Completed

    36 6.90 m floor Ironite flooring to be completed. Completed

    37 6.90 m floorCutting off the exposed tie rods of TG columns and

    proper finishing to be done.

    38 6.90 m floorProviding rain water down comers and connecting

    with floor bends (As per dwg)Completed

  • 8/11/2019 Unit # 4 ITDC Balance Points Completion Plan Dated 08-Sep-14 Latest

    3/12

    39 6.90 m floorMLDB Panel room: Proper fixing and painting of

    chequered plates.Completed

    40 6.90 m floor Compleiton of toilet works 28-Sep-14

    41 8.50 m floorAVR room: Fixing of false ceiling and providing grills

    for ventilation duct inletsCompleted

    42 8.50 m floor

    Turbine MCC room: Balance brickwork and plaster,

    Balance window glass fixing and proper fixing ofchequered plate to be done.

    Completed

    43 8.50 m floorProviding rain water down comers and connecting

    floor bends(As per dwg)20-Sep-14

    44 8.0 m floorBalance left out Chequered plates along A row(near

    Rain water pipes).Completed

    45 8.0 m floorWindows W317 & W318 have been eliminated along

    A row

    46 8.0 m floor 1 no door SD 321 has been eliminated

    47 8.0 m floor Left out plastering to be completed Completed48 8.0 m floor Final painting to be done. 20-Sep-14

    49 8.0 m floorProviding rain water down comers and connecting

    with floor bends(As per dwg)20-Sep-14

    50 10 m floor Final painting to be done. Completed

    51 11 m floorProviding rain water down comers and connecting

    with floor bends(As per dwg)25-Sep-14

    52 13.7 m TG floor Ironite flooring to be completed. 30-Sep-14

    53 13.7 m TG floor Granite flooring to be completed. 30-Sep-14

    54 13.7 m TG floor S.S handrailing. 15-Oct-1455 13.7 m TG floor Construction of parapet wall Completed

    56 13.7 m TG floorProviding rain water down comers and connecting

    with floor bends(As per dwg)Completed

    57 13.7 m TG floor

    Construction of toilet block, water supply

    arrangement, Sewerline, Septic tank & soak pit and

    Electrification.

    30-Sep-14

    58 19.0m Floor Ironite flooring to be completed. Completed

    59 19.0m Floor Balance brickwork around openings in AHU room Completed

    60 19.0m Floor Windows to be fixed in AHU room. Completed

    61 19.0m Floor Balance 1no door to be provided. Completed

    62 19.0m Floor Final painting to be done. 25-Sep-14

  • 8/11/2019 Unit # 4 ITDC Balance Points Completion Plan Dated 08-Sep-14 Latest

    4/12

    63 22.0m floor Final painting to be done. Completed

    64 22.0m floor Fixing of window glass incomplete. Completed

    65 26.0 m floor Hardener flooring to start Completed

    66 26.0 m floor Hand railing. Completed

    67 26.0 m floor Roof water treatment. Not in Scope

    68 26.0 m floor Kerb wall and parapet wall to complete. Completed

    69 26.0 m floor Windows along B row to complete. Completed

    70 26.0 m floor AWU towards U#3 not completed Completed

    71 37.6m floor Roof water treatment. Not in Scope

    72 37.6m floor Parpet wall to complete. Completed

    73 BOILER area Completion of balance C row drain, cover slabs. Completed

    74 BOILER area Balance Sewer line Man Holes and connectivity. Completed

    75 BOILER area All columns encasement. Completed

    76 BOILER area Balance paving near TP 4A Completed

    77 BOILER area Bottom ash trench covers. 30-Sep-14

    78 BOILER areaFloor finish and kerb wall at 17m and 54m level to be

    completed in Bunker 4A and 4B30-Sep-14

    79 BOILER area

    Roof treatment works and parapet to complete in

    Bunker 4A and 4B. Not in Scope

    80 BOILER area I/O room final painting to complete. Completed

    81 BOILER area Tipper floor level Toilet to construct.

    82 TURBINE AREA D row cladding to complete Completed

    83 TURBINE AREAPending cladding works of C row, Gable end,B row

    and A row to complete.Completed

    84 TURBINE AREA Closing of openings around roof extractors. Completed

    85 TURBINE AREA Working platforms of CW pit & CEP Pits Completed

    86 LT SWGRFloor concreting finishing work pending in some

    areas.Completed

    87 LT SWGRCable trench dewatering are pending. Permanent

    drain point to be provided.Completed

    88 LT SWGR Temporary holes on the walls to be sealed. Completed

    89 LT SWGRChequered plates to be placed properly and all cable

    trench should be covered.Completed

    90 LT SWGR All windows are to be placed intact. Completed

    91 LT SWGR House keeping to be done. Completed

    92 HT CABLE GALLERY House keeping to be done. Completed

    93 HT CABLE GALLERY Wall opening are not closed 30-Sep-14

    94 HT CABLE GALLERY All windows are to be placed intact. Completed

    95 HT CABLE GALLERY Door key not provided. Completed

  • 8/11/2019 Unit # 4 ITDC Balance Points Completion Plan Dated 08-Sep-14 Latest

    5/12

    96 HT SWGRUpper portion of the wall above SPBD entry opening

    is in open condition .Completed

  • 8/11/2019 Unit # 4 ITDC Balance Points Completion Plan Dated 08-Sep-14 Latest

    6/12

    97 HT SWGR SPBD entry opening in open condition . Completed

    98 HT SWGR opening in the wall not covered. Completed

    99 HT SWGR chequered plate work pending. Completed

    100 BOILER AUX CABLE GALLERY Door not installed. Completed

    101 BOILER AUX CABLE GALLERY windows not closed. Completed

    102 BOILER AUX CABLE GALLERY Door key not provided. Completed

    103 BOILER AUX wall opening are not closed. Completed

    104 BOILER AUX windows not installed. Completed

    105 BOILER AUX Floor concreting work pending ( some parts ) Completed

    106 BOILER AUX Civil waste material should be removed. Completed

    107 TURBINE AUX Windows not fixed. Completed

    108 TURBINE AUX Wall opening not covered. Completed

    109 TURBINE AUX Chequered plates not fixed properly. Completed

    110 BATTERY ROOM Exhaust fan not installed. Completed

    111 BATTERY ROOM Water seepage observed. Completed

    112 MLDB ROOM Wall opening not covered. Completed

    113 MLDB ROOM Door key not provided. Completed

    114 MLDB ROOM Windows not fixed. Completed

    115 TRANSFORMER YARD Painting of wall pending Completed

    116 TRANSFORMER YARD Fencing not proper Completed

    117 TRANSFORMER YARD Cable tray not cover of SAT 25-Sep-14

    118 FD FAN -A Hoist track work balance

    119 FD FAN -B Hoist track work balance

    120 PA FAN-A Hoist track work balance

    121 GT-4 R phase gravel to be levelled

  • 8/11/2019 Unit # 4 ITDC Balance Points Completion Plan Dated 08-Sep-14 Latest

    7/12

    SD Job

    Yes/NoRemarks

    Y

    Y

    YN

    N

    N

    N

    N

    >Not possible due to

    CW Pipe line level

    above drain level.

    N

    N

    N

    N

    N

    N

    N

    N

    N

    NFixing completed,

    Painting balance

    N

    N

    Engineering need to

    review the

    encasement of

    columns up to 300

    mm from floor level. Inlong term it was

    experienced that the

    column bases are

    corroded and weaked

    the bases.

  • 8/11/2019 Unit # 4 ITDC Balance Points Completion Plan Dated 08-Sep-14 Latest

    8/12

    N

    scaffolding materials

    of gammon india to be

    removed

    N

    N Painting in progress

    N

    N

    N

    N

    In this room direct false

    ceiling provided. Above

    this ceiling, pipelines are

    passing. During any

    leakage in the pipes, the

    false ceiling and theequipmen below will get

    damaged. Engg, to review

    to provide CGI sheeting

    below the pipeline.

    N

    N

    N

    N

    N

    NFixing completed,

    Painting balance

    N

    N

    Very important to

    avoid water felling

    over the equipments

    and panel at 0m levelduring operations.

    N

    Y

    N

    Essential to avoid

    water stagnation on

    the floor.

  • 8/11/2019 Unit # 4 ITDC Balance Points Completion Plan Dated 08-Sep-14 Latest

    9/12

    NFixing completed,

    Painting balance

    N

    N

    N

    N

    Essential to avoid

    water stagnation on

    the floor.

    N

    NEliminated as per site

    condition

    NEliminated as per site

    condition

    NN

    N

    Essential to avoid

    water stagnation on

    the floor.

    N

    N

    Essential to avoid

    water stagnation on

    the floor.

    N

    N

    NN

    N

    Essential to avoid

    water stagnation on

    the floor.

    N

    Water supply &

    electrification

    arrangement in not

    under ITDC

    scope,Sewerline

    completed,septic and

    soakpit in not shown

    in the drawing .

    N

    N

    N

    N

    N

  • 8/11/2019 Unit # 4 ITDC Balance Points Completion Plan Dated 08-Sep-14 Latest

    10/12

  • 8/11/2019 Unit # 4 ITDC Balance Points Completion Plan Dated 08-Sep-14 Latest

    11/12

    Nopenings provided are

    as per drawing

  • 8/11/2019 Unit # 4 ITDC Balance Points Completion Plan Dated 08-Sep-14 Latest

    12/12

    N

    N

    N

    N

    N

    N

    N

    N

    N

    N

    N

    N

    N

    N

    N

    N

    N

    N

    N

    N

    N

    Y >Repeat point No: 1

    Y >Repeat point No: 2

    Y >Repeat point No: 3

    N >Repeat Point No: 4