13
ULTRA meeting: Turin 24-25 th Jan 2002 Gino. Gugliotta@ IASF. PA. CNR. IT 1 I A S F Sez.Palermo ULTRA Uv Light Transmission and Reflection in Atmosphere DAQ of BABY some considerations on ULTRA telemetry Activity also supported by Italian INFN. ULTRA

ULTRA meeting: Turin 24-25 th Jan 2002 Gino. IASF. PA. CNR. IT 1 I A S F Sez.Palermo ULTRA U v L ight…

Embed Size (px)

DESCRIPTION

ULTRA meeting: Turin th Jan 2002 Gino. IASF. PA. CNR. IT 3 I A S F Sez.Palermo ULTRA 100 or 1000 pF set sensitivity to 10 or 1 mV/pC Sampling at 1MS/s constant rate (10MS/s w/ external clk) Offset suppression using a second Op.Amp 1 Q/C step represents the average V due to a single p.e. Charge Integrator Unit

Citation preview

Page 1: ULTRA meeting: Turin 24-25 th Jan 2002 Gino. IASF. PA. CNR. IT 1 I A S F Sez.Palermo ULTRA U v L ight…

ULTRA meeting: Turin 24-25th Jan 2002 Gino. Gugliotta@ IASF. PA. CNR. IT 1

I A S FSez.Palermo

ULTRA

Uv Light Transmission and Reflection in Atmosphere

DAQ of BABY some considerations on ULTRA telemetry

Activity also supported by Italian INFN.

ULTRA

Page 2: ULTRA meeting: Turin 24-25 th Jan 2002 Gino. IASF. PA. CNR. IT 1 I A S F Sez.Palermo ULTRA U v L ight…

ULTRA meeting: Turin 24-25th Jan 2002 Gino. Gugliotta@ IASF. PA. CNR. IT 2

I A S FSez.Palermo

ULTRABABY: block diagram

• 4 channels Integration Unit in NIM module• 4 channels Count Unit in NIM module• 8 channels Memory Unit w/ host interface (NIM)• Head Unit: HV, controls and housekeeping(NIM)• Host: Pentium(red. speed 75MHz w/o fan) + Pressurized H/Ds case

Page 3: ULTRA meeting: Turin 24-25 th Jan 2002 Gino. IASF. PA. CNR. IT 1 I A S F Sez.Palermo ULTRA U v L ight…

ULTRA meeting: Turin 24-25th Jan 2002 Gino. Gugliotta@ IASF. PA. CNR. IT 3

I A S FSez.Palermo

ULTRA

• 100 or 1000 pF set sensitivity to 10 or 1 mV/pC• Sampling at 1MS/s constant rate (10MS/s w/ external clk)• Offset suppression using a second Op.Amp• 1 Q/C step represents the average V due to a single p.e.

Charge Integrator Unit

Page 4: ULTRA meeting: Turin 24-25 th Jan 2002 Gino. IASF. PA. CNR. IT 1 I A S F Sez.Palermo ULTRA U v L ight…

ULTRA meeting: Turin 24-25th Jan 2002 Gino. Gugliotta@ IASF. PA. CNR. IT 4

I A S FSez.Palermo

ULTRA

• Bipolar threshold and polarity selection• Sampling at 1MS/s constant rate (10MS/s w/ external clock)• 1 count corresponds to 1 single p.e. over threshold• 0.1 mV threshold step in ± 1 V range

Single photon counting unit

Page 5: ULTRA meeting: Turin 24-25 th Jan 2002 Gino. IASF. PA. CNR. IT 1 I A S F Sez.Palermo ULTRA U v L ight…

ULTRA meeting: Turin 24-25th Jan 2002 Gino. Gugliotta@ IASF. PA. CNR. IT 5

I A S FSez.Palermo

ULTRA

• Input Data Mem Buffer

• Filter&Tag Data Processor

• Filtered&Tagged Data Mem

• Inter-units synchronization

• I/O port

= 128kW, 8MW/s r/w access

= 8 MW/s

= 64 kW, 8MW/s r/w access

= Yes

= Parallel std IEEE1284-EPP

Memory unit features

Page 6: ULTRA meeting: Turin 24-25 th Jan 2002 Gino. IASF. PA. CNR. IT 1 I A S F Sez.Palermo ULTRA U v L ight…

ULTRA meeting: Turin 24-25th Jan 2002 Gino. Gugliotta@ IASF. PA. CNR. IT 6

I A S FSez.Palermo

ULTRA

• At the same time (change A and B each time window):– input A data stored in memory buffer A– old B data filtered & tagged in filtered&tagged buffer B– filtered & tagged memory buffer A read from PC

Memory operational sequences

Page 7: ULTRA meeting: Turin 24-25 th Jan 2002 Gino. IASF. PA. CNR. IT 1 I A S F Sez.Palermo ULTRA U v L ight…

ULTRA meeting: Turin 24-25th Jan 2002 Gino. Gugliotta@ IASF. PA. CNR. IT 7

I A S FSez.Palermo

ULTRAUV scope block diagram

Page 8: ULTRA meeting: Turin 24-25 th Jan 2002 Gino. IASF. PA. CNR. IT 1 I A S F Sez.Palermo ULTRA U v L ight…

ULTRA meeting: Turin 24-25th Jan 2002 Gino. Gugliotta@ IASF. PA. CNR. IT 8

I A S FSez.Palermo

ULTRA

• Self consistent electronics for each channel (PC excluded)

• Both single photoelectron count and charge integration in the same module

• 10 ns double pulse discrimination• 14 bit ADC• 100 ns resolution time• Pre-processing before storing data• Re-programmable processing and control logic

UV scope new features

Page 9: ULTRA meeting: Turin 24-25 th Jan 2002 Gino. IASF. PA. CNR. IT 1 I A S F Sez.Palermo ULTRA U v L ight…

ULTRA meeting: Turin 24-25th Jan 2002 Gino. Gugliotta@ IASF. PA. CNR. IT 9

I A S FSez.Palermo

ULTRA

Telemetry : wireless network 0

1

2 3

7

6 5

4

Page 10: ULTRA meeting: Turin 24-25 th Jan 2002 Gino. IASF. PA. CNR. IT 1 I A S F Sez.Palermo ULTRA U v L ight…

ULTRA meeting: Turin 24-25th Jan 2002 Gino. Gugliotta@ IASF. PA. CNR. IT 10

I A S FSez.Palermo

ULTRA

Telemetry needs

• Programming or changing parameters• Monitoring station health• Quick look of data• Rough synchronization• < 2kbytes/s per station of data traffic (rough

estimation)

Page 11: ULTRA meeting: Turin 24-25 th Jan 2002 Gino. IASF. PA. CNR. IT 1 I A S F Sez.Palermo ULTRA U v L ight…

ULTRA meeting: Turin 24-25th Jan 2002 Gino. Gugliotta@ IASF. PA. CNR. IT 11

I A S FSez.Palermo

ULTRA

Simple isofrequency Tx- and Rx-ceivers

• Low cost• 19200bps-100kbps

• Extra electronics needed• Legacy problems• Unknown site frequency usage

(interference possibility)

Page 12: ULTRA meeting: Turin 24-25 th Jan 2002 Gino. IASF. PA. CNR. IT 1 I A S F Sez.Palermo ULTRA U v L ight…

ULTRA meeting: Turin 24-25th Jan 2002 Gino. Gugliotta@ IASF. PA. CNR. IT 12

I A S FSez.Palermo

ULTRA

Radio modems• PC connection thru a standard RS232 interface• Use of old fashioned Op. System (if needed)• Power Supply 30..9 Vdc• Max 19200 baud available, limiting the whole data

traffic to 2kbytes/s• Legacy problems for higher frequency and power

Page 13: ULTRA meeting: Turin 24-25 th Jan 2002 Gino. IASF. PA. CNR. IT 1 I A S F Sez.Palermo ULTRA U v L ight…

ULTRA meeting: Turin 24-25th Jan 2002 Gino. Gugliotta@ IASF. PA. CNR. IT 13

I A S FSez.Palermo

ULTRA

• 11Mbps (up to 108) of network speed

• Web based management• PCI boards, USB and

PCMCIA modules• Full remote control• Windows like O.S.’s• Legacy

Wireless LAN