Name : Two Phase Flow Regime CalculationVersion: 1.1Description This spreadsheet calculates two phase flow mixture parameters and
specifies the flow regime by marking the system operating point on vertical and horizontal flow regime maps
Producer: Saeid Rahimi M.Publishing Date: 6-Sep-2011Publisher:
No of sheets: 4Content:
AboutFlow Regime CalculationFlow Regime Map in Horizontal PipeFlow Regime Map in Vertical pipe
Reference:Gas/Liquid Separator - Type Selection and Design Rules, DEP 31.22.05.11,December 2007What Two Phase Flow Regime Maps Narrate, Published on chemwork.org
Revision History :Version Description of Changes Date 1.0 Produced for personal library 5-Oct-20101.1 Modified for publishing on web 6-Sep-2011
Contact:
www.chemwork.org
Please visit www.linkedin.com/groups/chemwork-3822450 should you have any comment, question or feedback or feel free to contact [email protected].
This spreadsheet is copyright 2011, The Chemwork Spreadsheet Page, www.chermwork.org. The information contained herein may not be retransmitted, copied, or electronically posted without the expressed written consent of its owner. You may use this spreadsheet for personal or professional use only.
PROJECT : DATE :
PROJ. NO.: BY : S.Rahimi
CLIENT : REV : 0
UNIT : DOC NO.:
Two Phse Flow Regime Calculation
Input Data Gas Water Liquid HC
Mass Flow Rate kg/hr 100000.00 10000.00 600.00
Mass Density kg/m³ 5.76 988.33 780.60
Pipe I.D m 0.610
Flow Regime
Oil Volumetric Flow m³/hr 0.77
Water Volumetric Flow m³/hr 10.12
Gas Volumetric Flow m³/hr 17376.19
Gas Superficial Velocity m/s 16.52
Liquid Superficial Velocity m/s 0.01
Water Weight Fraction - 0.94
Oil Weight Fraction - 0.06
Liquid Mixture Density kg/m³ 973.66
Gas Froude No (FrG) - 5.2E-01
Liquid Froude No (FrL) - 4.2E-03
Mixed Phase Specification
Water weight fraction - 0.09
Oil weight fraction - 0.01
Gas weight fraction - 0.90
Mixture Density kg/m³ 6.36
Mixture Velocity m/sec 16.53
Notes
green cells: input datablue cells :fixed/textwhite cells: calculation results
www.chemwork.orgS.Rahimi06-Sep-2011
PROJECT : DATE :
PROJ. NO.: BY : S.Rahimi
CLIENT : REV : 0
UNIT : DOC NO.:
Flow Regime for Horizontal Pipe
1.0E-03 1.0E-02 1.0E-01 1.0E+00 1.0E+01 1.0E+02 1.0E+03 1.0E+041.0E-05
1.0E-04
1.0E-03
1.0E-02
1.0E-01
1.0E+00
1.0E+01
1.0E+02
1.0E+03
green cells: input datablue cells :fixed/textwhite cells: calculation results
www.chemwork.orgS.Rahimi06-Sep-2011
PROJECT : DATE :
PROJ. NO.: BY : S.Rahimi
CLIENT : REV : 0
UNIT : DOC NO.:
Flow Regime for Vertical Pipe
1.0E-03 1.0E-02 1.0E-01 1.0E+00 1.0E+01 1.0E+02 1.0E+03 1.0E+041.0E-05
1.0E-04
1.0E-03
1.0E-02
1.0E-01
1.0E+00
1.0E+01
1.0E+02
1.0E+03
green cells: input datablue cells :fixed/textwhite cells: calculation results
www.chemwork.orgS.Rahimi06-Sep-2011