Transmission Expansion Planning Policy Committee

Scott Cauchois

Chair, TEPPC

April 29, 2009

Page 2: Transmission Expansion Planning Policy Committee Scott Cauchois Chair, TEPPC April 29, 2009

Topics

● 2008 Annual Report – Recommendation for board approval

● DOE 2009 Congestion Study

● 2009 Study Plan

● Regional Planning Task Force

Page 3: Transmission Expansion Planning Policy Committee Scott Cauchois Chair, TEPPC April 29, 2009

3

2008 Annual Report

Report Objectives In accordance with a Synchronized Study

Plan, identify economically beneficial transmission expansion needs and information that would be useful in the conception and design of new projects

Study Plan results from stakeholder requests and prioritization of requests with significant implications for interconnection.

Page 4: Transmission Expansion Planning Policy Committee Scott Cauchois Chair, TEPPC April 29, 2009

Study Themes

● 2008 study themes Higher penetration of renewables (w/ &

w/o higher conservation) - 2017 Implications of carbon emissions

reduction using carbon adder – 2017 Update of production cost data base

and gas price sensitivity analysis – 2012 Completion of analysis of 2007 actual

and scheduled flows on major paths

Page 5: Transmission Expansion Planning Policy Committee Scott Cauchois Chair, TEPPC April 29, 2009

Study Framework

● Try to achieve consistent improvement in data, models, & methodology

● 2008 study is the first full blown study building on pilot studies conducted in 2007.

● Major advance: use of NREL meso-scale wind & solar data to locate and profile resources

Page 6: Transmission Expansion Planning Policy Committee Scott Cauchois Chair, TEPPC April 29, 2009

Study Results

Relative to 2017 base case:

● 15 % renewables scenario 5% reduction in CO2 emissions 18% reduction in gas use

● 15% renewables/20% energy efficiency results in further 17% reduction in C02 44% in gas use 5% reduction in coal Increased congestion east to west

Page 7: Transmission Expansion Planning Policy Committee Scott Cauchois Chair, TEPPC April 29, 2009

Study Results, contd.

● 15% renewables/20% energy efficiency/$20/ton C02 adder Further 3% reduction in CO2 Further 8% reduction in gas generation 50 % increase in production costs 5 paths were consistently congested

across cases; similar to historical analysis

Page 8: Transmission Expansion Planning Policy Committee Scott Cauchois Chair, TEPPC April 29, 2009

Transmission Paths

Flow on selected transmission paths, particularly those that connect regions, were compared between cases

8

TOT 3PATH CTOT 2ATOT 2BTOT 2CFOUR CORNERS 345/500 kVEAST OF COLORADO RIVER (EOR)WEST OF COLORADO RIVER (WOR)MIDWAY - LOS BANOSNORTHWEST – CANADACOIPACIFIC DC INTERTIE (PDCI)MONTANA – NORTHWESTALBERTA – BRITISH COLUMBIAIDAHO – NORTHWESTTOT 4A

## Path NamePath Name

362031

78&7935234946153

666581

1437

Page 9: Transmission Expansion Planning Policy Committee Scott Cauchois Chair, TEPPC April 29, 2009

Caveats re: 2017 cases

● Coal & gas prices held constant

● CO2 reductions sensitive to order in which renewables, energy efficiency, CO2 applied

● Congestion dependent on location of assumed new renewables, and conventional generation

● Renewables marginal cost = 0. Capital costs to be incorporated next cycle

Page 10: Transmission Expansion Planning Policy Committee Scott Cauchois Chair, TEPPC April 29, 2009

Motion: Approve 2008 Annual Report of the Transmission Expansion Planning Policy committee

Page 11: Transmission Expansion Planning Policy Committee Scott Cauchois Chair, TEPPC April 29, 2009

DOE 2009 Congestion Study

● DOE’s 2006 study resulted in designation of NIETCs. DOE received significant input from WCATF. DOE meeting of W-I and E-I in March, 2009 examined Congestion metrics Results from WECC/DOE funded historical

path analysis Featured WECC/TEPPC/SPG transmission

planning process.

● DOE to “update,” no new corridors

Page 12: Transmission Expansion Planning Policy Committee Scott Cauchois Chair, TEPPC April 29, 2009

2009 Study Plan

● 23 study requests from 9 organizations received in November 1, 2008 – January 31, 2009 open request window

● Themes continue to expand upon aggressive renewable programs and greenhouse gas reduction polices

● Also impacts of specific transmission line proposals. Final study plan to be adopted in June.

Page 13: Transmission Expansion Planning Policy Committee Scott Cauchois Chair, TEPPC April 29, 2009

Proposed Major TransmissionProjects in WECC

13

Proposed Transmission Projects Proposed Transmission Projects in the Western Interconnectionin the Western Interconnection

Note: This plot includes selected projects from Note: This plot includes selected projects from Table 3.2 of 2008 TEPPC Study Plan(v7) Table 3.2 of 2008 TEPPC Study Plan(v7)

Projects have been grouped Projects have been grouped to simplify coding.to simplify coding.

Sea Breeze Projects

TransCanada Projects

Gateway & Other NTTG Projects

Columbia Grid Projects

TransWest Express

LS Power & Great Basin Projects

WY-CO Intertie Project

High Plains Express

Sun-ZIA

Canada/PacNW-NoCalif

Central CA Clean Energy (C3ET)

Green Path North

Devers-Palo Verde 2

Navajo Transmission Project

Page 14: Transmission Expansion Planning Policy Committee Scott Cauchois Chair, TEPPC April 29, 2009

Regional Planning Task Force

● RPTF formed by TEPPC on March 19 to oversee development of a white paper which conceptualizes enhanced western transmission planning and to prepare for, and respond to a Funding opportunity Announcement (FOA) expected from DOE in response to the America Recovery and Reinvestment Act.

Page 15: Transmission Expansion Planning Policy Committee Scott Cauchois Chair, TEPPC April 29, 2009

Requested Board Guidance

● Support for WECC/TEPPC response to the DOE funding request according to guidelines adopted by TEPPC Flexibility to address specific requirements in

the funding request WECC staff required to support the response

process

Page 16: Transmission Expansion Planning Policy Committee Scott Cauchois Chair, TEPPC April 29, 2009

Regional Planning Discussion

Tom Schneider

Bradley Nickell

April 29, 2009

Page 17: Transmission Expansion Planning Policy Committee Scott Cauchois Chair, TEPPC April 29, 2009

Topics

● Stimulus Bill

● Renewable Planning Whitepaper

● Scenario Based Planning

● Next Steps

Page 18: Transmission Expansion Planning Policy Committee Scott Cauchois Chair, TEPPC April 29, 2009

Stimulus Bill Language

That for the purpose of facilitating the development of regional transmission plans, the Office of Electricity Delivery and Energy Reliability within the Department of Energy is provided $80,000,000 within the available funds to conduct a resource assessment and an analysis of future demand and transmission requirements after consultation with the Federal Energy Regulatory Commission: Provided further, That the Office of Electricity Delivery and Energy Reliability in coordination with the Federal Energy Regulatory Commission will provide technical assistance to the North American Electric Reliability Corporation, the regional reliability entities, the States, and other transmission owners and operators for the formation of interconnection-based transmission plans for the Eastern and Western Interconnections and ERCOT: Provided further, That such assistance may include modeling, support to regions and States for the development of coordinated State electricity policies, programs, laws, and regulations:…”

Page 19: Transmission Expansion Planning Policy Committee Scott Cauchois Chair, TEPPC April 29, 2009

Stimulus Bill Synopsis

Calls for DOE to:● Conduct a resource assessment and an

analysis of future demand and transmission requirements (with consultation from FERC)

● Provide Assistance to NERC, WECC, States, Transmission entities To form interconnection-based transmission

plans assistance may include modeling, support to

regions and States for the development of coordinated State electricity policies, programs, laws, and regulations

Page 20: Transmission Expansion Planning Policy Committee Scott Cauchois Chair, TEPPC April 29, 2009

Stimulus Bill Synopsis

The language does NOT:

● Require a single transmission plan (master plan) be created

● Give authority to any entity to take action on any product created from this funding

● Change any governance structure for the Western Interconnection

Page 21: Transmission Expansion Planning Policy Committee Scott Cauchois Chair, TEPPC April 29, 2009

DOE Identified Needs

● A body of analysis that identifies new or greatly-upgraded lines required under a wide range of potential futures

● Analyses must be transparent, and produced through collaboration among industry experts and representatives from states, federal agencies, and key NGOs

● Collaboration is essential to achieving results that key stakeholders will regard as objective and sufficient.

Page 22: Transmission Expansion Planning Policy Committee Scott Cauchois Chair, TEPPC April 29, 2009

Status of DOE Execution

● Request for proposal not out yet

● Funding period is 5 years Money out of DOE by end of FY 2010 Cost Sharing Requirement Activity must be perpetual

● Have to show how they would coordinate their work with other entities (e.g., WGA, NREL)

Page 23: Transmission Expansion Planning Policy Committee Scott Cauchois Chair, TEPPC April 29, 2009

Proposal Inclusions (from DOE)

● The body of work that should be done over the first 5-year period

● An organizational framework for accomplishing it

● Schedule for the work● Funds required from DOE and other sources● Other inputs required from DOE or other

federal sources● How the transition to non-federal funding

would be managed

Page 24: Transmission Expansion Planning Policy Committee Scott Cauchois Chair, TEPPC April 29, 2009

Regional Planning Whitepaper

Purpose● Provide a framework for the WECC/TEPPC

response to provisions relating to interconnection-wide transmission planning

● Inform stakeholders about efforts to prepare a response to an anticipated DOE request for proposal

● Seek stakeholder involvement in these efforts so that the Western Interconnection is ready to submit a comprehensive funding request

Page 25: Transmission Expansion Planning Policy Committee Scott Cauchois Chair, TEPPC April 29, 2009

Regional Planning Whitepaper

Status

● First meeting of task force to discuss details and solicit verbal feedback

● Drafting continues (3rd round)

● Next draft will be released for wider distribution

Page 26: Transmission Expansion Planning Policy Committee Scott Cauchois Chair, TEPPC April 29, 2009

Regional Planning Whitepaper

Guiding Principles1. Does not require institutional changes2. Process will be FERC Order 890 compliant3. WECC TEPPC will provide expertise, guidance, analysis,

and options to project sponsors, Sub-Regional Groups, and stakeholder requests that come in through the WECC/TEPPC/SPG planning processes

4. WECC/TEPPC will not prescribe the specific facilities to be built, but rather will provide the critical intelligence to state and federal decision-makers about overall west-wide needs and solutions

5. The planning process will include extensive outreach opportunities for stakeholders to participate, interact and comment throughout plan development.

26

Page 27: Transmission Expansion Planning Policy Committee Scott Cauchois Chair, TEPPC April 29, 2009

Scenario Based Regional Planning

● Instead of trying to predict the future, we quantify needs under potential futures Quantify effects of policy, societal values,

economy on the electric power industry

● Look for common solutions among many needs

● Decision support for policy activities

Page 28: Transmission Expansion Planning Policy Committee Scott Cauchois Chair, TEPPC April 29, 2009

Scenario Planning Paradigm

28

Page 29: Transmission Expansion Planning Policy Committee Scott Cauchois Chair, TEPPC April 29, 2009

What will change

● Increase the breadth and depth of TEPPC regional planning activities

● Breadth Many more generation/load scenarios Additional tools and study methodologies More involved parties

● Depth Direct tie back to policy decisions Total cost comparisons

Page 30: Transmission Expansion Planning Policy Committee Scott Cauchois Chair, TEPPC April 29, 2009

What will NOT change

● Evolving TEPPC coordination with other committees

● Process compliance with FERC 890

● Role of subregional planning groups

● No endorsement of specific projects

Page 31: Transmission Expansion Planning Policy Committee Scott Cauchois Chair, TEPPC April 29, 2009

Next Steps

● Support for WECC/TEPPC response to the DOE funding request according to guidelines adopted by TEPPC Flexibility to address specific requirements in

the funding request WECC staff required to support the response

process

●Continue drafting process Incorporate today’s discussion

31

Page 32: Transmission Expansion Planning Policy Committee Scott Cauchois Chair, TEPPC April 29, 2009

32

Questions

Bradley NickellRenewable Integration DirectorWestern Electricity Coordinating [email protected]

Tom SchneiderManaging Director – Planning & StandardsWestern Electricity Coordinating [email protected]