Upload
khangura9
View
220
Download
0
Embed Size (px)
Citation preview
8/7/2019 TRADE WASTE APPLICATION
http://slidepdf.com/reader/full/trade-waste-application 1/7
Discharge application
8/7/2019 TRADE WASTE APPLICATION
http://slidepdf.com/reader/full/trade-waste-application 2/7
Details o proposedpretreatment system.The wastewater treatment system
should be designed to consider a
number o actors including:
• Is screening o the wastewater required?
• Will settlement be required to retain
silt or similar material?
• At what temperature will the
wastewater be?
• Will there be large volumes o
wastewater discharged?
• Will there be silt or similar material in
the wastewater?
• Will oil and/or grease be present in the
wastewater?
• Will the pH o the waste be acidic or
alkaline?
• What solvent/chemicals will there be in
the wastewater?
Details o proposedcross connectioncontrol and backow
prevention.Connections to SA Water’s water supply
system are to comply with the
requirements o Australian/New Zealand
Standard AS/NZS 3500 as amended.
Properties responsible or commercial and
industrial activities are required to protect
the water supply rom contamination.
Make a summary listo the process whichproduces wastewater
or discharge to thesewer. The summary should include:
The type o business activity
(e.g. restaurant, launderette, light
engineering, repairs etc.)
The scale and type o business operation
that generates the liquid wastewater
(e.g. number o meals prepared per day,
number o chickens cooked per day,
quantity o garments laundered per day,
number o vehicles detailed per day etc.)
A list o equipment used in the business
that produces wastewater (e.g.
commercial dishwasher, steam cleaner,
number o washing machines etc.)
The location o where the business
activity will be conducted (e.g. in a rooed,
unrooed washbay, within buildings etc.)
Important information
for applicant
8/7/2019 TRADE WASTE APPLICATION
http://slidepdf.com/reader/full/trade-waste-application 3/7
Details o wastewaterdischarge.
This inormation is essential to determine
the suitability o the proposed treatmentsystem and the capabilities o the
receiving sewer.
• Gravity or pumped reers to how
the wastewater will be discharged to
the sewer.
• Peak ow rate must be expressed in
litres per second (L/sec) which may be
calculated by combining the maximum
wastewater discharge rom the business
activities.
• Duration is the maximum time theproposed discharge will occur
(e.g. 1 - 2 hours).
Trade Waste permitprocess.No work is to commence prior to
completing the application and receivinga Trade Waste Discharge Permit.
The Trade Waste Discharge permit will be
issued to acilitate the proposed activity
and to ensure compliance with trade
waste discharge conditions and or the
eective management o the pretreatment
system pertaining to this application.
A review and verifcation o the suitability
o the pretreatment system will be carried
out prior to the end o the term stated
within the Trade Waste Discharge Permit
which may include the examination o maintenance records relevant to the
pretreatment system.
Where the installation meets the ull
requirement o SA Water, the Trade Waste
Discharge Permit will be subsequently
extended. Should the outcome o the
review not meet these requirements,
amendments to the pretreatment system
or its maintenance will be necessary prior
to the Trade Waste Discharge Permit being
extended.
Copies o the Trade Waste Discharge
Permits will be retained by SA Water or
recording as required under Regulation
35 o the Sewerage Act.
Compliance audit ees. The discharge o trade waste to the
sewerage system is assessed in terms o
risk to SA Water’s inrastructure and is
assigned a minimum number o
compliance audit visits each year related
to that risk. A low risk trade waste
business will normally only receive one
compliance audit visit per year. A ee is
levied to each o these visits.
This ee together with the application ee
is reviewed annually.
I you have any queries or need assistance,
please contact us on (08) 7424 1336.
Applicant’sresponsibilitiesBeore completing the attached
application, please read the ollowing
instructions.
Applicant’s responsibilities:
• Completed applications are requiredto provide ull details and accurate
inormation.
• A plan showing details o the plumbing
and waste pretreatment layout must
accompany this application.
• Any intended variations to
this application will require
resubmission o a new application.
• The appropriate ee must accompany
this application.
Please note: By completing the
ollowing sections in ull, it will assist or
your application to be processed.
8/7/2019 TRADE WASTE APPLICATION
http://slidepdf.com/reader/full/trade-waste-application 4/7
Please print
Name o proprietor and address where discharge to sewer will occur
Name o proprietor
Trading name o business Type o business
Contact person
Phone Fax Mobile
Street number Shop number
Street name Suburb Postcode
Application to discharge Trade Waste
The undersigned hereby makes application to SA Water
or authorisation to discharge trade waste rom the
premises described hereunder into SA Water’s sewer.
Proprietor’s name, postal and or email address or return correspondence
Name
Address Suburb
Email address
Signature/s
Date o application / /
Copy o the permit to be orwarded to the consultant/plumber/property owner (where required)
Name
Postal address
Phone Mobile Fax
Ofce use only
Application No
Receipt No
Customer No
Date Received / /
Authorising Ofcer
Date Authorised / /
Note applicant’s responsibilities:
This application must be signed by the proprietor (or and authorised person) or i the application is or a Company or Incorporated Body, by the Manager
or Secretary or similar authorised ofcer on behal o the Company or Incorporated Body.
Or
SA Water account number(For business site) number located on ront o bill
Water Meter number Account inquiries
Phone 1300 650 950
Important Inormation which must be completed
T e a r a l o n g d
o t t e d l
i n e
8/7/2019 TRADE WASTE APPLICATION
http://slidepdf.com/reader/full/trade-waste-application 5/7
Details o proposed pretreatment systems (eg solids sett ling, pH correction, grease arrester)
Pretreatment
Devices
Type Size Cover Vent Location
Grease Arrester
Silt Trap
DAF Unit
Settling Pit
Neutraliser
Oil Arrester
Oil Plate Separator
Solids Trap
Channel and or Pump Sump
Other
Gravity Peak ow rate L/sec Duration
Pumped Peak ow rate L/sec Duration
When your application has been completed, send it together with the appropriate ee to:
SA Water GPO Box 1751 Adelaide SA 5001 or ax to Trade Waste on (08) 7003 3366
Details o proposed cross connection control and backow prevention
Backow Number o Type Location Size
Registered break tank
Reduced pressure zone device
Double check valve assembly
Atmospheric vacuum breaker
Vented double check valve
Residential dual check
Hose connection vacuum breaker
Air Gap
Other
Details o wastewater discharge
8/7/2019 TRADE WASTE APPLICATION
http://slidepdf.com/reader/full/trade-waste-application 6/7
This application relates to: (Please tick appropriate box)
Existing discharge Proposed/new discharge Variation to an existing discharge
Details o the proposed activity
Make a summary list o the process which produces wastewater or discharge to sewer:
Waste fxtures
and appliances
Number o Waste fxtures
and appliances
Number o Type
Wash Troughs Steam Ovens
Sinks Deep Fryers
Pot Sinks Pasta Cooker
Basins Griller
Hot Plate Rotisserie
Food Waste Unit
Disposal Unit
Steamer
Potato Peeler Pot Sink
Bain Marie Dish Washer Commercial
Domestic
Wok Cooker Prover
Other
Business hours Estimated number
o meals
Max seating capacity
Processes Other proposed activity commercial or industrial
Flow Rate
Ofce use only