37
today for tomorrow

today for tomorrow - Anel Group...(TAV/CCC/Arabtec Joint Venture) Employer: ADAC Hamad International Airport Doha, QATAR Airport Electrical and Mechanical 680.000 m2 Employer: NDIA

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: today for tomorrow - Anel Group...(TAV/CCC/Arabtec Joint Venture) Employer: ADAC Hamad International Airport Doha, QATAR Airport Electrical and Mechanical 680.000 m2 Employer: NDIA

today fortomorrow

Page 2: today for tomorrow - Anel Group...(TAV/CCC/Arabtec Joint Venture) Employer: ADAC Hamad International Airport Doha, QATAR Airport Electrical and Mechanical 680.000 m2 Employer: NDIA
Page 3: today for tomorrow - Anel Group...(TAV/CCC/Arabtec Joint Venture) Employer: ADAC Hamad International Airport Doha, QATAR Airport Electrical and Mechanical 680.000 m2 Employer: NDIA

As Anel Group, we improve ourselves and develop others by creating value while respecting people and the environment for more than 30 years.

We unite our strengths in the fields of engineering and technology with our strategic capabilities for a sustainable world from an environmental, social and economic perspective to take innovative initiatives.

The success of our team, which considers customer satisfaction a top priority, will continue to increase in lock step with the satisfaction of our business partners, investor partners and employees.

As we carry Anel Group to the future with the mantra “Today for Tomorrow”, we will continue to work together to create value.

Kind Regards,

Rıdvan Çelikel

Chairman of the Board

Message of the Chairman

Page 4: today for tomorrow - Anel Group...(TAV/CCC/Arabtec Joint Venture) Employer: ADAC Hamad International Airport Doha, QATAR Airport Electrical and Mechanical 680.000 m2 Employer: NDIA

Operation Areas

MEPOperation & Maintenance

MEP(MechanicalElectricalPlumbing)Contracting

Recycling

Renewable Energy

Medium & Low Voltage PanelProduction

Ship Electric &Electronic Systems(Defence Industry)

Page 5: today for tomorrow - Anel Group...(TAV/CCC/Arabtec Joint Venture) Employer: ADAC Hamad International Airport Doha, QATAR Airport Electrical and Mechanical 680.000 m2 Employer: NDIA

Foundation of Anel

Darlık Dam: First Project

Hürriyet Headquarters (a daily newspaper with high circulation in Turkey): Transition to Business Centers with Technological Infrastructure

Istanbul Atatürk Intl Airport: The First Intl Airport Project in Turkey

Marriott Tverskaya Hotel: The First International Project

1991

1986

1999

Milestones

Cairo International Airport Terminal 3: The First Overseas International Airport Project

MİLGEM: The First National Corvette (AnelMarin)

Hamad International Airport

2004

2006

2007

2011

2010

2012

2013

2016

2015

2017

Anel Elektrik’s Public Offering

Lefkosia Solar Power Plant: The First Solar Power Plant In Cyprus

Dimitrovgrad-Troyanovo-Chirpan Solar Power Plants: The First Turkish Solar Power Plant Project Which Was Installed and Invested in Europe

Marmaray BC1: World’s Deepest Submerged Tube Project

BP Head Office: The First Project in Baku

Abu Dhabi Intl Airport Midfield Terminal: The Star Project of Abu Dhabi 2030 Projection

Baku Olympic Stadium: The First Stadium Project

Dubai-I (Bluewaters) Terminal Building: The First Project Award in Dubai

DP World Yarımca Container Terminal: The First Port Project

Qatar Rail Redline South Underground: One Of The Most Important Transportation and Infrastructure Projects of The Gulf Area

The University College London Hospital Proton Beam Therapy Center Phase 4: The First Project Award The United Kingdom

2018 Amsterdam Schiphol Airport Pier A Airside:

The First Project Award in The Netherlands

Page 6: today for tomorrow - Anel Group...(TAV/CCC/Arabtec Joint Venture) Employer: ADAC Hamad International Airport Doha, QATAR Airport Electrical and Mechanical 680.000 m2 Employer: NDIA

Anel is a global engineering company with its expertise in EPC contracting of MEP systems in large scale and challenging projects. We know the dynamics of fast-track schedules and rigorous construction standards, and we know exactly how project team members can best collaborate.Our experience and expertise allows us to undertake projects across a wide variety of sectors around the world including transportation (international airports, tunnels and railways, roads, ports), technological buildings, healthcare facilities, sports facilities, education and culture establishments, commercial buildings, hotels and industrial facilities.

MEP Contracting■ Engineering company for more than 30 years

■ Conduct work in 14 countries in 3 continents

■ 11 International Airports experience with more than 2,5 million m2 in 18 years

■ 4.000+ employees from 20 different nations

■ Ranked 176th International Contractor in ENR Top 250 2018

■ Provided service for more than 200 projects with 117,5 million man-hours in a total area of approximately 13 million m2 since 1986

Why Anel

ContinuitySince 1986, we have constantly strived to develop our expertise by taking on a variety of projects. We were here yesterday, and we intend to be here tomorrow. As a result, we work to foster strong and sustainable relationships with our employees, clients, suppliers and stakeholders.

Powerful Engineering Knowledge and Strategic Human Resources ManagementOur team is comprised of people who have dedicated themselves to projects in ethical and solution-oriented ways. Project leaders are selected from experienced staff members to ensure that each engagement benefits from the variety of skills available at Anel Group. In doing so, we are able to attribute our success in the electrical and mechanical engineering fields to our experienced employees and discerning management.

A Standard of High QualityAt Anel Group, we pride ourselves on abiding by industry regulations and proper documentation procedures. We believe that in doing so, we deliver the highest quality for each project. We track project progress at every step by paying attention to key project performance indicators.

Effective Cost and Management PlanningOur projects benefit from the methodical process brought on by SAP’s supply chain planning system at every step of the way.

SafetyThe well-being and safety of our employees is a top priority at Anel Group. We meticulously execute HSE trainings, risk assessment studies and emergency action plans for each project.

Page 7: today for tomorrow - Anel Group...(TAV/CCC/Arabtec Joint Venture) Employer: ADAC Hamad International Airport Doha, QATAR Airport Electrical and Mechanical 680.000 m2 Employer: NDIA

Operation Map

As we strengthen our presence in the regions where we operate through international

partnerships, we also continue to expand the areas in which we conduct business.

Completed Projects

Ongoing Projects

■ The United Kingdom ■ England

■ Turkey

■ United Arab Emirates

■ Abu Dhabi ■ Dubai

■ Qatar

■ The Netherlands

■ Turkey

■ Qatar

■ Ukraine

■ Azerbaijan

■ Jordan

■ Russia

■ Egypt

■ Bulgaria

■ Georgia

■ Bosnia-Herzegovina

Page 8: today for tomorrow - Anel Group...(TAV/CCC/Arabtec Joint Venture) Employer: ADAC Hamad International Airport Doha, QATAR Airport Electrical and Mechanical 680.000 m2 Employer: NDIA

MEP Contracting ProcessProcurement & Logistics

■ Material Take-off■ Purchase Orders■ Material Delivery■ Storage & On Site Transport

QA/QC & HSE Monitoring

■ Material Inspections■ Installation Inspection■ Progress Documentation■ Safety Inspection & Records

Engineering Works

■ Design Review ■ Calculations■ BIM Modelling & Clash Resolution■ Material Submissions■ Method Statements

Construction

■ Mounting■ Site Mobilization■ Installation Supervision■ Resource Distribution■ Interfacing With Others■ Protection Of The Works

Testing, Commissioning& Handover

■ Factory Inspection Tests (FAT)■ Site Acceptance Tests (FAT)■ As Built Drawings■ Operation & Maintenance Manuals■ Project Handover Document

Human Resources

■ Setting up the organisation structure■ Preparation of the project’s duty matrix with RASCI method■ Training organisation in line with the distribution of the duties

Planning & Cost Control

■ Time Schedule■ Labor Time Keeping■ Progress Monitoring■ Cost Monitoring■ Change Management

ProjectTypes OfFocus

■ Transportation■ Airports■ Roads■ Tunnels and Railway Systems ■ Ports

■ Health Facilities■ Hospitals■ Laboratories■ Pharmaceutical Industries

■ Technological Buildings ■ Data Centers

■ Commercial Buildings ■ Business Centers ■ Shopping Malls

■ Hotels ■ Educational & Cultural Buildings■ Sports Facilities■ Industrial Facilities

Page 9: today for tomorrow - Anel Group...(TAV/CCC/Arabtec Joint Venture) Employer: ADAC Hamad International Airport Doha, QATAR Airport Electrical and Mechanical 680.000 m2 Employer: NDIA

Revenue and Backlog

Revenues - USD* The revenue belongs to Anel Elektrik Proje Taahhüt ve Ticaret Inc.

Backlog - mn USD

International

Domestic

278.466.307

2017

352

356

4

2017

Project completion period; 2-3 years average

Backlog Breakdown by Country

Backlog Breakdown by Project Type

Turkey 1%

Qatar 48%

England 9%

Airports 36%

Business Centers & Mall 1%

Hospital 9%

Roads & Railway Systems & Others54%

UAE 42%

Page 10: today for tomorrow - Anel Group...(TAV/CCC/Arabtec Joint Venture) Employer: ADAC Hamad International Airport Doha, QATAR Airport Electrical and Mechanical 680.000 m2 Employer: NDIA

Occupational Health andSafety

Anel is committed to achieving ‘zero accidents’ across the business and we take this responsibility very seriously. Our number one priority is to provide and maintain safe and healthy workplaces for our staff, and to ensure we respect the environment in which we operate.

Best Subcontractor For Safety Excellence

Best Subcontractor Of The Month-HSE

Best Subcontractor Of The Month-HSE

16 Million Accident Free Man-Hours

Best Subcontractor Of The Month-HSE

1.800.000 Accident Free Man-Hours

Best In Construction Industry-HSE

Best Subcontractor Appreciation Award

Best Subcontractor Of The Month-HSE

15 Million Man-Hours Without LTI

3 Million Man-Hours Without LTI

10 Million Man-Hours Without LTI

RoSPA Silver Award

10 Million Man Hours Without LTI

3.580.000 LTI Free Man-Hours

10 Million Man Hours Without LTI

HSE and Other Awards

Date Award

20122013

2015

2016

2018

Qatar

UAEUAEQatar

UAEAzerbaijan

Qatar

QatarUAEUAE

UAE

Qatar

UAE

QatarQatar

Hyundai Engineering & Construction

TCA-JV

TCA-JV

SOJV

TCA-JV

Tekfen

REDCO Construction Al ManaHyundai Engineering & Construction

Hyundai Engineering & Construction

TCA-JV

TCA-JV

TCA-JV

RLS-JV

The Royal Society for the Prevention of Accidents

TCA-JV

FYAP JV

MMHKT

Hamad Bin Khalifa Medical City

Abu Dhabi International Airport Midfield Terminal Building

Abu Dhabi International Airport Midfield Terminal Building

Hamad International Airport CP18

Abu Dhabi International Airport Midfield Terminal Building

Baku Olympic Stadium

Qatar Research and Development Complex

Hamad Bin Khalifa Medical City

Abu Dhabi International Airport Midfield Terminal Building

Abu Dhabi International Airport Midfield Terminal Building

Abu Dhabi International Airport Midfield Terminal Building

Qatar Rail Red Line South Underground - Metro

Abu Dhabi International Airport Midfield Terminal Building

Qatar Rail Red Line South Elevated and At Grade

Qatar Rail Green Line Stabling Yard

Project Awarder Country

60 millionman-hours without

LTI in total

Until November 2018

Page 11: today for tomorrow - Anel Group...(TAV/CCC/Arabtec Joint Venture) Employer: ADAC Hamad International Airport Doha, QATAR Airport Electrical and Mechanical 680.000 m2 Employer: NDIA

GSAS Service Provider -Construction Management- Certificate

ICT Certificate The Contractors Health and Safety Assessment Scheme Accreditation

Kahramaa Grade A certificate

Certificates

Ashghal “Installation of Street Lights” License

Page 12: today for tomorrow - Anel Group...(TAV/CCC/Arabtec Joint Venture) Employer: ADAC Hamad International Airport Doha, QATAR Airport Electrical and Mechanical 680.000 m2 Employer: NDIA

We transform our projects into living structures. We consider every project as a development opportunity and constantlyrenew ourselves.

Projects

Abu Dhabi Int. Airport Midfield Terminal BuildingAbu Dhabi, UAE

AirportElectrical730.000 m2

2012 - 2019 Main Contractor: TCA JV(TAV/CCC/Arabtec Joint Venture)Employer: ADAC

Hamad International AirportDoha, QATAR

AirportElectrical and Mechanical680.000 m2

Employer: NDIA Steering Committee

CP992013 - 2016 Main Contractor:Six Construct-Midmac JV (SMJV)CP110-CP1112012 - 2015Main Contractor: QIT Imar - Alec JVCP18-CP292007 - 2014Main Contractor: TAISEI - TAV Sky Oryx JV

Amsterdam Schiphol Airport Pier A AirsideAmsterdam, THE NETHERLANDS

AirportElectrical and Mechanical55.000 m2

2018 - Main Contractor: Ballast Nedam-TAV Joint Venture (BN-TAV JV)MEP Contractor: Anel-Ballast Nedam-TAV JV (ABT MEP VOF)Employer: Schiphol Nederland BV

Page 13: today for tomorrow - Anel Group...(TAV/CCC/Arabtec Joint Venture) Employer: ADAC Hamad International Airport Doha, QATAR Airport Electrical and Mechanical 680.000 m2 Employer: NDIA

Atatürk International Airportİstanbul, TURKEY

Esenboğa International AirportAnkara, TURKEY

Adnan MenderesInternational Airportİzmir, TURKEY

AirportElectrical180.000 m2

2005 - 2008 Main Contractor: TAVEmployer: DHMİ(General Directorate of State Airports Authority)

Airport Electrical495.000 m2

1999 - 2010Main Contractor: TAVEmployer: DHMİ(General Directorate of State Airports Authority)

International Terminal Development 326.000 m2

2015 - 2016

AirportElectrical177.000 m2

2005 - 2007Main Contractor: TAV Employer: DHMİ(General Directorate of State Airports Authority)

TbilisiInternational AirportTbilisi, GEORGIA

Batum International AirportBatum, GEORGIA

Al Rayyan RoadDoha, QATAR

AirportElectrical6.000 m2

2006 - 2007Main Contractor:Evrensel GeorgiaEmployer: Georgia Airlines

AirportElectrical 21.500 m2

2006 - 2007 Main Contractor: TAVEmployer: Tbilisi International Airport JSC

TransportationMechanical10,7 km2014 - 2018Main Contractor: Doğuş Onur JVEmployer: Public Works Authority - Ashghal

ProjectsMEP ContractingCairo International Airport Terminal 3Cairo, EGYPT

AirportElectrical220.000 m2

2004 - 2009 Main Contractor: TAVEmployer: Cairo Airport Company

Page 14: today for tomorrow - Anel Group...(TAV/CCC/Arabtec Joint Venture) Employer: ADAC Hamad International Airport Doha, QATAR Airport Electrical and Mechanical 680.000 m2 Employer: NDIA

DP World YarımcaContainer TerminalKocaeli, TURKEY

Marmaray BC1İstanbul, TURKEY

Qatar Rail Redline South Underground MetroDoha, QATAR

Tunnel and Railway SystemElectrical and Mechanical13,6 km74.419 m2

2011 - 2013Project Contractor: TAISEI Gama Nurol JVMain Contractor: TAISEIEmployer: DLH (General Directorate of Construction of Railways, Ports and Airports)

Port Electrical and Mechanical460.000 m2

2015 - 2016Main Contractor: STFA İnşaat A.Ş. Employer: DP World Yarımca Liman İşletmeleri A.Ş.

Tunnel and Railway System Electrical and Mechanical32 km & 142.106 m2 (5 stations)2015 - 2018Main Contractor: QDVC-GS E&C-Al Darwish Eng. JVEmployer: Qatar Rail Company

Qatar Rail Redline South Elevated and At Grade MetroDoha, QATAR

Qatar Rail Green Line Stabling YardDoha, QATAR

The University College London Hospital Proton Beam Therapy Center Phase 4 London, ENGLAND, UK

Tunnel and Railway SystemElectrical and Mechanical 180.000 m2

2017 - 2019Main Contractor: Fujita CorporationEmployer: Qatar Rail Company

Tunnel and Railway System Electrical and Mechanical7,373 km40.346 m2

2016 - 2018Main Contractor: FCC-Yüksel-Archirodon-Petroserv JVEmployer: Qatar Rail Company

Health Facilities Electrical and Mechanical 33.270 m2

2018 - 2020Main Contractor: BOUYGUES UKEmployer: University College London Hospitals NHS Foundation Trust

ProjectsMEP Contracting

Page 15: today for tomorrow - Anel Group...(TAV/CCC/Arabtec Joint Venture) Employer: ADAC Hamad International Airport Doha, QATAR Airport Electrical and Mechanical 680.000 m2 Employer: NDIA

Sidra Medical & Research CenterDoha, QATAR

Hamad Bin KhalifaMedical CityDoha, QATAR

BSK Medline HospitalAntalya, TURKEY

Health FacilityElectrical (Extra Low Voltage)220.000 m2

2011 - 2016Main Contractori:Hyundai Eng. & Const. Employer: Public Works Authority - Ashghal

Health FacilityMechanical Completion Works300.000 m2 (6th, 7th and Roof Floors)2015 - 2017Main Contractor:Midmac - CCC JVContractor: Qatar KENTZ WLLEmployer: Qatar Foundation - Astad

Health FacilityElectrical and Mechanical 10.000 m2

2010 - 2011 Employer: EAG Turizm ve İnşaat

Qatar Foundation Research & Development ComplexDoha, QATAR

Sabancı University Nano Technology Research and Application Centerİstanbul, TURKEY

Central ReferenceLaboratoryTbilisi, GEORGIA

Technological BuildingElectrical and Mechanical 9.000 m2

2010 - 2011Main Contractor: Koray İnşaat Employer: Sabancı Üniversitesi

Technological BuildingElectrical and Mechanical40.000 m2

2013 - 2016Main Contractor: Redco Construction – AlmanaEmployer: Qatar Foundation

Technological BuildingElectrical11.000 m2

2006 - 2009 Main Contractor: Bechtel International Systems

ProjectsMEP Contracting

Page 16: today for tomorrow - Anel Group...(TAV/CCC/Arabtec Joint Venture) Employer: ADAC Hamad International Airport Doha, QATAR Airport Electrical and Mechanical 680.000 m2 Employer: NDIA

Is REIT Tuzla Technology & Operation Centerİstanbul, TURKEY

42 Maslakİstanbul, TURKEY

Commercial BuildingElectrical and Mechanical250.000 m2

2012 - 2017Employer: Bay İnşaat

Technological BuildingElectrical and Mechanical 270.000 m2

2013 - 2016 Main Contractor: Koray İnşaat Employer: İş Gayrimenkul Yatırım Ortaklığı

Turkcell Ankara Söğütözü Data CenterAnkara, TURKEY

Technological BuildingElectrical and Mechanical450 m2

2017 – 2017Main Contractor: Fabrika Mimarlık İnş. Tas. San ve Tic. Ltd. Şti.Employer: Turkcell

Now Bomonti Officeİstanbul, TURKEY

Commercial BuildingElectrical41.600 m2

2016 - 2018Employer: NOW Gayrimenkul

Kosifler Kavacık Showroomİstanbul, TURKEY

BP Head OfficeBaku, AZERBAIJAN

Commercial BuildingElectrical and Mechanical 24.000 m2

2012 - 2014Main Contractor: Lindner LLCEmployer: BP

Commercial BuildingElectrical and Mechanical20.198 m2

2016 - 2017Employer: Kosifler İnşaat

ProjectsMEP Contracting

Page 17: today for tomorrow - Anel Group...(TAV/CCC/Arabtec Joint Venture) Employer: ADAC Hamad International Airport Doha, QATAR Airport Electrical and Mechanical 680.000 m2 Employer: NDIA

Türkiye Finans Participation Bank Head Officeİstanbul, TURKEY

Al Handasa ComplexDoha, QATAR

Commercial BuildingElectrical80.000 m2

2005 - 2008Main Contractor: Baytur İnşaatEmployer: H.H. Shk. Mohamed Khalifa Al Thani

Commercial BuildingElectrical24.500 m2

2016 - 2017Main Contractor: Oğuz Bayazıt Mühendislik İnşaat Sanayi Ltd.Şti.Employer: Türkiye Finans Katılım Bankası

The Ministry of Economic Development of the Russian FederationMoscow, RUSSIA

Commercial BuildingElectrical50.000 m2

2001 - 2003Main Contractor: Koray İnşaatEmployer: Russian Federation

Sun Plazaİstanbul, TURKEY

Commercial BuildingElectrical60.000 m2

2004 - 2006Employer: Sun’i Jüt San. ve Tic. A.Ş.

Vodafone Head Officeİstanbul, TURKEY

Al Reem TowerDoha, QATAR

Commercial BuildingElectrical18.000 m2

2005 - 2007Main Contractor: Baytur İnşaatEmployer: Faisal Bin Mohamad Al Thani

Commercial Building Electrical18.000 m2

2007 - 2008Employer: Sera Yapı

ProjectsMEP Contracting

Page 18: today for tomorrow - Anel Group...(TAV/CCC/Arabtec Joint Venture) Employer: ADAC Hamad International Airport Doha, QATAR Airport Electrical and Mechanical 680.000 m2 Employer: NDIA

Qatar NationalConvention CenterDoha, QATAR

Vehbi Koç Foundation Culture and Community CenterKocaeli, TURKEY

Cultural FacilityElectrical11.000 m2

2010 - 2011Main Contractor: Ark İnşaatEmployer: Vehbi Koç Foundation

Cultural FacilityElectrical120.000 m2

2007 - 2011Main Contractor: Baytur İnşaat Employer: Qatar Foundation

Dubai-I (Bluewaters) Terminal BuildingDubai, UAE

Commercial BuildingElectrical and Mechanical10.000 m2

2016 - 2019Main Contractor: Hyundai Engineering and Construction Employer: MERAAS Development

Garanti Culture Center İstanbul, TURKEY

Cultural FacilityElectrical and Mechanical 9.750 m2

2010 - 2011 Main Contractor: Promim MimarlıkEmployer: Garanti Bank

King’s Academy High SchoolMadaba, JORDAN

Baku Olympic StadiumBaku, AZERBAIJAN

Sport FacilityElectrical and Mechanical496.000 m2

2013 - 2015Main Contractor: Tekfen İnşaat Employer: SOCAR

Cultural FacilityElectrical60.000 m2

2004 - 2006Main Contractor: Koray İnşaatEmployer: Royal Court Engineering Dept.

ProjectsMEP Contracting

Page 19: today for tomorrow - Anel Group...(TAV/CCC/Arabtec Joint Venture) Employer: ADAC Hamad International Airport Doha, QATAR Airport Electrical and Mechanical 680.000 m2 Employer: NDIA

Rosa Khutor Mountain Olympic VillageSochi, RUSSIA

Gazprom Krasnaya Polyana Winter Sports CenterSochi, RUSSIA

Sport FacilityElectrical and Mechanical 200.000 m2

2004 - 2014Main Contractor: Hazinedaroğlu Özkan İnşaat A.Ş.Employer: GAZPROM

Sport FacilityElectrical and Mechanical76.532 m2

2012 - 2014Main Contractor: Hazinedaroğlu Özkan İnşaat A.Ş.Employer: Rosa Khutor

Turkey Jockey Club Hippodromeİzmir, TURKEY

Sport FacilityElectrical40.000 m2

2007 - 2008Employer: Turkey Jockey Club

Sheraton HotelSamsun, TURKEY

Commercial BuildingElectrical46.000 m2

2013 - 2015Main Contractor: Ege YapıEmployer: Tanrıverdi Holding

Wyndham Hotelİstanbul, TURKEY

Shangri La Hotelİstanbul, TURKEY

Commercial BuildingElectrical and Mechanical 42.000 m2

2011 - 2013Main Contractor: Ege Yapı Ltd.

Commercial BuildingElectrical and Mechanical67.000 m2

2011 - 2013Employer: Kılıçbey Turizm İşl. İnşaat ve San. Tic. A.Ş.

ProjectsMEP Contracting

Page 20: today for tomorrow - Anel Group...(TAV/CCC/Arabtec Joint Venture) Employer: ADAC Hamad International Airport Doha, QATAR Airport Electrical and Mechanical 680.000 m2 Employer: NDIA

Four Seasons Hotelİstanbul, TURKEY

Holiday Inn HotelMoscow, RUSSIA

Commercial BuildingElectrical57.000 m2

2005 - 2007Employer: EMT

Commercial BuildingElectrical48.000 m2

2006 - 2008Main Contractor: Yapı Merkezi İnşaat veSanayi A.ŞEmployer: Atik Pasha Turizm A.Ş.

St. Regis Hotelİstanbul, TURKEY

Commercial BuildingElectrical and Mechanical 23.000 m2

2012 - 2015Employer: Demsa

Sochi Marriott Krasnaya HotelSochi, RUSSIA

Commercial BuildingElectrical and Mechanical67.318 m2

2012 - 2013Main Contractor: Koray İnşaat San. ve Tic. A.Ş. Employer: TKS

Les Ottomans Hotelİstanbul, TURKEY

Commercial BuildingElectrical11.050 m2

2003 - 2006Main Contractor: Unit Turizm Yatırımları A.Ş. Employer: Astay Grup

Marriott Tverskaya HotelMoscow, RUSSIA

Commercial BuildingElectrical20.000 m2

1994 - 1997Main Contractor: EMTEmployer: MARRIOT

ProjectsMEP Contracting

Page 21: today for tomorrow - Anel Group...(TAV/CCC/Arabtec Joint Venture) Employer: ADAC Hamad International Airport Doha, QATAR Airport Electrical and Mechanical 680.000 m2 Employer: NDIA

Genjlik MallBaku, AZERBAIJAN

Ramstore 14Moscow, RUSSIA

Commercial BuildingElectrical62.000 m2

2005 - 2006 Main Contractor: ENKAEmployer: RAMSTORE

Commercial BuildingElectrical and Mechanical 120.000 m2

2014 - 2016Employer: Pasha Construction

Mavibahçe Shopping Mallİzmir, TURKEY

Commercial BuildingElectrical and Mechanical 119.000 m2

2015 - 2016Employer: Opera Gayrimenkul

Kuyumcukent Goldsmiths’ Complexİstanbul, TURKEY

Commercial BuildingElectrical400.000 m2

2003 - 2005Main Contractor: Baytur İnşaat A.Ş.Employer: S.S. Kuyumcukent Yapı Koop.

Additional WorkElectrical and Mechanical 170.000 m2

2010 - 2011 Main Contractor: Anel Sera JVEmployer: Kuyaş Kuyumcukent Gayrimenkul Yatırım A.Ş.

Marmara ForumShopping Mallİstanbul, TURKEY

Commercial BuildingElectrical and Mechanical350.000 m2

2010 - 2011 Main Contractor:Yapı Merkezi & Yorum İnşaat Employer: Multi-Turkmall

IKEA Mega Center Shopping MallKazan, RUSSIA

Commercial Building Electrical153.000 m2

2006 - 2007Main Contractor: ENKAEmployer: IKEA

ProjectsMEP Contracting

Page 22: today for tomorrow - Anel Group...(TAV/CCC/Arabtec Joint Venture) Employer: ADAC Hamad International Airport Doha, QATAR Airport Electrical and Mechanical 680.000 m2 Employer: NDIA

Forum İstanbulShopping Mallİstanbul, TURKEY

Ford Automotive Yeniköy Factory (B460)Kocaeli, TURKEY

Industrial FacilityElectrical126.141 m2

2012 - 2014Main Contractor: Ark İnşaatEmployer: Ford Otomotiv

Commercial BuildingElectrical450.000 m2

2008 - 2010Main Contractor: Yorum İnşaatEmployer: Multi-Turkmall

Gaziantep ForumShopping MallGaziantep, TURKEY

Commercial BuildingMechanical145.000 m2

2012 - 2013Main Contractor: Koray İnşaatEmployer: Multi Development

Ford Automotive Gölcük FactoryKocaeli, TURKEY

Industrial FacilityElectrical346.800 m2

2000 - 2007Employer: Ford Otomotiv

Vyksa Steel Production PlantVyksa, RUSSIA

Industrial FacilityElectrical110.000 m2

2007 - 2008 Main Contractor: GAMAEmployer: OMK

Bosch – Rexroth FactoryKocaeli, TURKEY

Tetrapak Packaging FactoryMoscow, RUSSIA

Industrial FacilityElectrical4.000 m2

2008 - 2009Main Contractor: SiemensEmployer: Bosch - Rexroth

Industrial FacilityElectrical22.000 m2

2007 - 2008Main Contractor: Delta Construction Employer: Tetrapak

ProjectsMEP Contracting

Page 23: today for tomorrow - Anel Group...(TAV/CCC/Arabtec Joint Venture) Employer: ADAC Hamad International Airport Doha, QATAR Airport Electrical and Mechanical 680.000 m2 Employer: NDIA

MEP Operation & Maintenance

Facility controls and maintenance must be done in accordance with today’s state of art technologies in order to prevent failures that can cause large financial losses. This is also done to ensure that the equipment we use works to produce the desired performance in an efficient and reliable way. We strive towards the minimum failure between maintenance periods with maximum operating time of all equipment. We offer technical operational maintenance services along with our experience and knowledge of practicing engineering that regulates required design, development, selection, and logistic support plans since 1998.

■ Reduces costs.

■ Increases efficiency and quality.

■ Provides operational sustainability.

■ Realizes prepared operational programs.

■ Ensures increasing rate of capacity utilization.

■ Prolongs the life of all kinds of plants, machines,

and equipment, thus increasing the efficiency of the operation.

■ Turkcell (32 Facilities)■ Anel Business Center■ Mobil Service 24/7 Fault Response(6 Housings)■ Superonline Esentepe General Directorate Building, Dudullu Data Center■ 42 Maslak■ Baku Olympic Stadium■ Socar İstanbul Headquarters■ Socar Aliağa İzmir S Building

■ Socar Tower Baku Headquarters Building■ General Electric Marmara Technology Center■ Global Bilgi (11 Buildings)■ Doğuş Teknoloji Maslak■ Digiturk (beIN) Beşiktaş General Directorate Building and 4 Facilities■ DP World Yarımca Container Terminal

Why is operation andmaintenance important?

References

Page 24: today for tomorrow - Anel Group...(TAV/CCC/Arabtec Joint Venture) Employer: ADAC Hamad International Airport Doha, QATAR Airport Electrical and Mechanical 680.000 m2 Employer: NDIA

Medium and Low Voltage Panel Production & Special ApplicationsAnelSis at aGlance

■ Over 27 years of experience■ 2.450 m2 production plant■ Siemens Alpha and Sivacon partner■ Schneider Prisma and Blockset partner■ Experience in infrastructure sector, especially in airports, sewage and generating plants■ Wide experience in buildings such as malls, hotels, business centers etc.■ Sole producer of rail systems approved by Alstom Transport in Turkey■ Panel producer for military and commercial ships■ Authorized panel producer of all Opet gas stations in Turkey■ Customary, special solutions■ 24/7 technical service

Production conforming international standards

Our company, which is a “Sivacon Technology Partner”, “Alpha Partner”, “Schneider Blockset and Prisma Partner” makes production up to IP54 protection level and up to Form4B forming in conformity with IEC 61439-1, IEC 61641

(Internal arc test), and IEC 60068 (Seismic requirements) standards. At the same time, we offer panels in other types and brands according to your needs without sacrificing quality.

■ Main distribution panels up to 7400A current value ■ MCC panels■ Wall type auxiliary switchboards ■ Compensation panels■ Automation panels■ Military and commercial ship panels■ Gas station panels■ ADSL cabinets ■ Transformer fan panels ■ LV exproof panels■ RTU, Pabx, AC-DC, MDF, PLC, and telecommunication panels

Low Voltage Panels■ MV Switch<40kV

■ Compact substation systems

■ Reactive power compensation systems

■ Energy saving systems

■ GIS panels

■ RMU cells

Medium Voltage Panels

Page 25: today for tomorrow - Anel Group...(TAV/CCC/Arabtec Joint Venture) Employer: ADAC Hamad International Airport Doha, QATAR Airport Electrical and Mechanical 680.000 m2 Employer: NDIA

Kars Airport(Kars, Turkey, 2013)

Hamad International Airport(Doha, Qatar, 2007)

Batum International Airport(Batum, Georgia, 2006)

Tbilisi Airport(Tbilisi, Georgia, 2006)

Esenboğa International Airport (Ankara, Turkey, 2005)

Adnan Menderes International Airport (İzmir, Turkey, 2005)

Atatürk International Airport (İstanbul, Turkey, 2000)

İstanbul Airport(İstanbul, Turkey, 2017)

Airports

Tunnels & Railways

Hotels

Marmaray BC1(İstanbul, Turkey, 2013)

Alstom Transport, Signalization Panels(Kütahya, Turkey, 2015)

Alstom Transport, Lusail Signalization Panels(Qatar, 2018)

Sheraton Hotel (Samsun, Turkey, 2014)

St. Regis Hotel(İstanbul, Turkey, 2013)

Shangri La Hotel(İstanbul, Turkey, 2013)

Hilton Garden Inn (4 different cities in Turkey) 2010-2011

Four Seasons Hotel(İstanbul, Turkey, 2007)

Park Hyatt(İstanbul, Turkey, 2007)

Sofa Hotel(İstanbul, Turkey, 2006)

Les Ottomans(İstanbul, Turkey, 2004)

Jasmin Resort Hotel(Antalya, Turkey, 2004)

Industrial Facilities

Panel Production Projects

Iraqi Treatment Plant - Degremont(Iraq, 2007)

Sibiu Treatment Plant (Romania, 2007)

Sedele Printing(İstanbul, Turkey, 2006)

Lineadecor(Gebze, Turkey, 2006)

Sumitomo Densetsu Co. Dolphin Project (Qatar, 2005-2006)

Kaşmir Carpet Factory(İstanbul, Turkey, 2005)

Ford Otosan Samandıra Plant(İstanbul, Turkey, 2005)

APS Tekstil(Merzifon, Turkey, 2005)

Gülsan A.Ş. Nappy Factory(Gaziantep, Turkey, 2004)Beksa A.Ş.(Adapazarı, Turkey, 2004)

ToyotoSA Welding, Pressing,Resin and Paint Buildings (İzmit, Turkey, 2005-2006)

Petkim(İzmit, Turkey, 2004)

Novartis Pharmaceutical Factory (İstanbul, Turkey, 2003)

Gül Enerji Cogeneration Plant (Gaziantep, Turkey, 2003)

Gülsan A.Ş.(Gaziantep, Turkey, 2002)

Las Vaguadas Project (Las Vaguadas, Spain, 2008)

Al Mansuriya Project (Iraq, 2013)

Mossul East Project(Iraq, 2012)

Pakistan Project(Pakistan, 2010-2012)Sabriya Project(Al Sabriya, Kuwait, 2008)

Magva Project(Al Ahmadi, Kuwait, 2008)

Poolberg Project(Ireland, 2007)

Herrenwasser Project(Switzerland, 2007)

Tishreen Project(France, 2007)

Moscow City Project(Russia, 2006)

Page 26: today for tomorrow - Anel Group...(TAV/CCC/Arabtec Joint Venture) Employer: ADAC Hamad International Airport Doha, QATAR Airport Electrical and Mechanical 680.000 m2 Employer: NDIA

42 Maslak(İstanbul, Turkey, 2014)

Is REIT Technology & Operation Center(İstanbul, Turkey, 2014)

Anel Business Center(İstanbul, Turkey, 2007)

Turkish Trade Center (Ankara, Turkey, 2007)

Bellevue Residence(İstanbul, Turkey, 2007)

Sun Plaza(İstanbul, Turkey, 2005)

Dim Plaza(İstanbul, Turkey, 2005)

Kosifler Plaza(İstanbul, Turkey, 2002)

Business Centers

Shopping Centers &Showrooms

Technological Buildings

Banks

GSM

Mavibahçe Shopping Mall (İzmir, Turkey, 2015)

Genjlik Mall (Baku, Azerbaijan, 2014 )

Magnesia Shopping Mall (Manisa, Turkey, 2011)

Marmara Forum(İstanbul, Turkey, 2010)

Forum İstanbul(İstanbul, Turkey, 2008)

Galleria Shopping Center (İstanbul, Turkey, 2006)

Hey Tekstil(İstanbul, Turkey, 2004)

Kuyumcukent(İstanbul, Turkey, 2003)

Favori Jewelry (İstanbul, Turkey, 2003)

Masera Shopping Center (Konya, Turkey, 2002)

HSBC Head Office(İstanbul, Turkey, 2007)

Akbank Branches (Turkey-wide, 2005)

Isbank Avcılar Branch (İstanbul, Turkey, 2002)

TFKB Head Office(İstanbul, Turkey, 2017)

Turkcell Kartal(İstanbul, Turkey, 2007)

Aycell Base Stations(Turkey-wide, 2002)

Sabancı University Nano Technology Center (İstanbul, Turkey, 2012)

Turkcell İzmir Data Center(İzmir, Turkey, 2017)

Turkcell Söğütözü Data Center(Ankara, Turkey, 2017)

Others Consulates

Social Facilities

Alcatel(Turkey-wide, 2005)

ABB(Turkey-wide and abroad, 2005-2006)

Opet Petrol Stations (Turkey-wide, 2005-2019)

Botaş Police Station Buildings (Turkey-wide, 2005-2006)

RMS-A/ RMS-B Type Stations(Turkey-wide, 2005)

Areva(Turkey-wide and abroad, 2005-2007)

Sport Facilities

Baku Olympic Stadium(Baku, Azerbaijan, 2014)

Kadir Has Stadium(Kayseri, Turkey, 2008)

TJK İzmir Hippodrome(İzmir, Turkey, 2006)

Consulate General Of Greece(İstanbul, Turkey, 2002)

Netherlands Consulate(Ankara, Turkey, 2002)

Muğla University(Muğla, Turkey, 2006)

ToyotoSA Social Facilities(Adapazarı, Turkey, 2002)

Panel Production Projects

Page 27: today for tomorrow - Anel Group...(TAV/CCC/Arabtec Joint Venture) Employer: ADAC Hamad International Airport Doha, QATAR Airport Electrical and Mechanical 680.000 m2 Employer: NDIA

Renewable EnergyWe, as AnelEnerji offer a wide range of turnkey services for investment and technical consultancies of solar power

plants. We provide engineering and system design, installation, licensing, operation and maintenance of solar power

plants for commercial and industrial clients.

We offer all these services with our experienced technical team in Gulf regions as well as in Turkey.

Project Designing First, we investigate whether solar power plant projects are both financially profitable and technically feasible.

If the evaluation process comes out positive, we make a comprehensive offer. We follow legal permission periods for the application process.

Engineering

Installation

We configure and organize the power plant sites, evaluate feasibility for grade or roof installations. We generate project reports for the activities being done.

We make on-site inspection of the investment area and work holistically with the contracting companies to deliver a successful project. We complete the installation process with great care without compromising safety and quality standards.

Operation and Maintenance

Remote Monitoring

We recognize the importance of the continuity and error-free operation of the systems as well as installation. We conduct on-site monitoring of the systems that we design and install, measure their performances and perform preventative periodic maintenance.

We utilize a software that allows investors to monitor the production of power plants remotely and provide instant follow-up.

Page 28: today for tomorrow - Anel Group...(TAV/CCC/Arabtec Joint Venture) Employer: ADAC Hamad International Airport Doha, QATAR Airport Electrical and Mechanical 680.000 m2 Employer: NDIA

Projects

Troyanovo Solar Power PlantTroyanovo, BULGARIA

Chirpan Solar Power PlantChirpan, BULGARIA

Dimitrovgrad Solar Power PlantDimitrovgrad, BULGARIA

1500 kWp33.000 m2

7.182 Panels5 Inverters

1500 kWp37.000 m2

7.128 Panels132 Inverters

2268 kWp50.000 m2

10.800 Panels6 Inverters

Cyprus Serhatköy Solar Power PlantLefkosia, Turkish RepublicOf Northern Cyprus

Komotini Solar Power PlantKomotini, GREECE

Anel Business Center Roof & Terraceİstanbul, TURKEY

Malatya İnönü University Turgut Özal Medical CenterMalatya, TURKEY

1300 kWp20.000 m2

6.192 Panels86 Inverters

100 kWp2.000 m2

420 Panels5 Inverters

52 kWp247 Panels4 Inverters

5300 kWp120.000 m2

21.200 Panels181 Inverters

Page 29: today for tomorrow - Anel Group...(TAV/CCC/Arabtec Joint Venture) Employer: ADAC Hamad International Airport Doha, QATAR Airport Electrical and Mechanical 680.000 m2 Employer: NDIA

Ship Electric & Electronic Systems(Defense Industry)

We, as AnelMarin, offer a wide range of services in the shipbuilding industry since 2005, thanks to our experience in the defense industry. Our services are in conformity with NATO standards and the rules of Standardization Societies. Our activities include;

■ Concept and configuration design and installation of ship electrical and electronic systems

■ Project management and consulting

■ Panel and console production

■ Design and production of special military systems

■ Cable termination

■ Performing system tests and engaging systems

■ Logistic support

■ Maintenance-repair

Page 30: today for tomorrow - Anel Group...(TAV/CCC/Arabtec Joint Venture) Employer: ADAC Hamad International Airport Doha, QATAR Airport Electrical and Mechanical 680.000 m2 Employer: NDIA

MİLGEM

MİLGEM İ

GENESIS

Ship Electrical System(Ada-Class Corvette 4 ships)Acquisition Authority: SSMMain Contractor: STM2006 - ongoing

Ship Electrical System(İ-Class Frigate 4 Ships)Acquisition Authority: SSMMain Contractor: STM2016 - ongoing

Ship Electrical System(G-Class Frigate 8 Ships)Acquisition Authority: SSMMain Contractor: HAVELSAN2005 - 2013

Ship Electrical System(A-Class M/V 4th ship)Acquisition Authority: SSMMain Contractor:German Mine Hunter Consortium2006 - 2007

Ship Electrical System(Replenishment at Sea & Combat Support Ship)Acquisition Authority: SSMMain Contractor: STM2013 - 2015

Cable Harnessing (MEKO & G-Class Frigate 8 Ships)Acquisition Authority: SSMMain Contractor: ASELSAN - MİKES2012 - 2015

Mine Hunter

DİMDEG

3D SR (3 DimensionSearch Radar)

Ship Electric & Electronic Systems Projects

Page 31: today for tomorrow - Anel Group...(TAV/CCC/Arabtec Joint Venture) Employer: ADAC Hamad International Airport Doha, QATAR Airport Electrical and Mechanical 680.000 m2 Employer: NDIA

MOSHIP, RATSHIP, SEISMIC Search Ship

LST

DivingBoat

Integration & Cable Harnessing (4 Ships)Acquisition Authority: SSMMain Contractor: İstanbul Shipyard ASELSAN 2013 - ongoing

Cable Harnessing (2 Ships)Acquisition Authority: SSMMain Contractor: Adik Shipyard ASELSAN2016 - ongoing

Ship Electrical System (2 Ships)Acquisition Authority:Royal Saudi Naval ForcesMain Subcontractor:Alkhorayef - Arı Makine2013 - 2014

ExportNavyProjects

TF2000 ÇAFRAD

LHD

Ship Electrical System (8 Various Class Ships) Main-Subcontractor: YALTES2014 - 2016

Radar Electrical Power Plant(Prototype & Serial-1 Phase) Acquisition Authority: SSMMain Contractor: ASELSAN2015 - 2016

Radar Electrical Power Plant(Prototype & Serial Phase)Acquisition Authority: SSMMain Subcontractor:Sedef Shipyard - ASELSAN2017 - ongoing

Ship Electric & Electronic Systems Projects

Page 32: today for tomorrow - Anel Group...(TAV/CCC/Arabtec Joint Venture) Employer: ADAC Hamad International Airport Doha, QATAR Airport Electrical and Mechanical 680.000 m2 Employer: NDIA

RecyclingThe ever-growing industries of Turkey, along with economic progress, and consumption prompt the increasing risk of pollution.

The relevant legislation passes the responsibility of collecting, storing, transporting, and disposing waste to the owners. For this reason, expertise is of great importance during the period from the discovery of wastes to their disposal.

We, as AnelDoğa, offer precise and integrated solutions complying with international standards employing trained and professional staff, and state of the art technological equipment.

We are the first integrated recycling plant in Turkey that adopts the mission of producing brand new recycling solutions and performing recycling at the highest level. We use the world’s state of art technological methods with our qualified staff following developments worldwide, as well as the dominating innovations in Turkey.

We provide services to our customers in every region of Turkey in the field of waste logistics with our special box vehicles which are licensed to transport hazardous waste, non-hazardous waste and waste accumulator etc. by our expert team, without compromising the environment.

Electric andElectronicWastes

Cable Recycling

Metal Wastes

We transform the wastes of manufacturers, distributors, suppliers, institutions and end-users into salvaged materials through parsing, disassembly and processing via guaranteed disposal processes. We put pre-sorted parts through appropriate disposal process.

We transform the cables removed from demolition sites or wastes generated during construction into salvaged materials through parsing and processing via guaranteed disposal processes. We put all pre-sorted parts of cables through appropriate disposal process.

We utilize the metal waste that come from industrial plants, production and service sectors as secondary raw material to raw material users (smelters) after processing them by cutting, pressing, crushing and sorting out with the use of environmentally-friendly technology.

Hazardous Wastes

RDF (Refuse Derived Fuel) ATY

Automobile and Service Wastes

This includes machinery, paint, chemicals, textiles, food, medicine, automotive and more. We provide consulting services, transportation, interim storage, recycling and disposal solutions for these kinds of hazardous wastes, which are generated by all industrial and service sectors.

We prepare alternative homogeneous fuels with the calorific values and parameters required by licensed cement plants.

In order to fulfill the “Economical Operator” responsibilities defined in the ELV (End-of-life Vehicles) Regulation, we established an ELV Management System under the title “Oto Kumbara (Automobile Piggybank)”. In this system, we decontaminate the ELVs, taken from institutional and individual end users, from hazardous materials in drying stations and from industrial waste materials (manually), and transform them into products to be shredded.Specifically for the automotive sector, we collect out- of-warranty vehicle parts in our plant with special logistics conditions. We carry out the destruction process in cooperation with our customers. We also carry out all stages of waste management professionally, which includes the waste materials that come out in car services and during maintenance and repair all around Turkey.

Page 33: today for tomorrow - Anel Group...(TAV/CCC/Arabtec Joint Venture) Employer: ADAC Hamad International Airport Doha, QATAR Airport Electrical and Mechanical 680.000 m2 Employer: NDIA

Social Responsibility

Education The studies in the field of education are conducted in cooperation with Çelikel Education Foundation established in 2007 by Anel Group Chairman of the Board Rıdvan Çelikel. Çelikel Education Foundation has a vision that serves the development of our country based on human rights and contributes to make it a country with confident people, who know their potentials and have international achievements.

The foundation develops and applies extensive programs to increase the quality of education.

As Anel Group, we support voluntary programs to help the Çelikel Education Foundation, together with our employees.

Art We work to defend the value of art in the context of social life and education. In Galeri 5, located at the entrance of our head office building, we organize exhibitions by bringing national and international artists together. We aim to give young generation artists, trained in fine arts, the opportunity to exhibit their talents as well as contributing to the development of art.

We organize live music concerts with young musicians.

Page 34: today for tomorrow - Anel Group...(TAV/CCC/Arabtec Joint Venture) Employer: ADAC Hamad International Airport Doha, QATAR Airport Electrical and Mechanical 680.000 m2 Employer: NDIA

We regularly calculate the amount of carbon released to the atmosphere as a result of our activities. To this end, we are taking actions to reduce/neutralize greenhouse gas emissions.

In order to fight against global climate change and the amount of carbon released into nature, we calculate the required amount of emissions and donate tree seedlings on behalf of our employees, accordingly. We also cooperate with municipalities for tree planting projects.

Environment

Carbon Footprint

Our primary goal is to produce as little waste as possible and re-use wastes through recycling. We recycle our wastes of our headquarters and worksites.Waste

Management

We work with a respect for nature and a sense of responsibility, to preserve natural resources and minimize potential adverse effects to the environment.

We produce energy for our building with the solar PV panels we built on the roof and on the terrace of our headquarters. Part of the building’s power consumption and exterior lighting are supplied by the solar power generated through these installations. As a result of renewable power generation on site, the consumption of electricity from the power grid and eventually, the carbon released to environment to generate the source energy are also reduced.

Usage of Renewable Energy Sources - Solar Power

Page 35: today for tomorrow - Anel Group...(TAV/CCC/Arabtec Joint Venture) Employer: ADAC Hamad International Airport Doha, QATAR Airport Electrical and Mechanical 680.000 m2 Employer: NDIA

www.anelgroup.com

The United Kingdom48 Charlotte Street,London, W1T 2NS

Phone: +44020 3701 0414E-mail: [email protected]

Head OfficeAnel İş Merkezi, Saray Mah. Site Yolu Caddesi, No:5/4 34768 Ümraniye/İstanbul/Türkiye

Phone: +90 216 636 20 00Fax: +90 216 636 25 00

United Arab EmiratesZayed The First Street, Pearl Plaza Building, Office No: MZ-9W - 10/C - 69 PO Box: 46373, Khalidiya,Abu Dhabi/UAE

Phone: +971 2 666 49 17 Fax: +971 2 666 49 27E-mail: [email protected]

QatarBldg 317, St. 250, Zone 43. 1st Floor Office # 3 & 5, PO Box 21346, D-Ring Road Al Hilal Doha/Qatar

Phone: +974 4 498 85 07 +974 4 421 02 01Fax: +974 4 436 36 29E-mail: [email protected]

AnelDoğaPhone: +90 262 352 25 20Fax: +90 216 636 28 01E-mail: [email protected]

AnelSisPhone: +90 216 636 20 00Fax: +90 216 636 25 00E-mail: [email protected]

AnelMarinPhone: +90 216 636 20 00Fax: +90 216 636 28 61E-mail: [email protected]

AnelEnerjiPhone: +90 216 636 20 00Fax: +90 216 636 25 00E-mail: [email protected]

The NetherlandsRegus Schiphol TetraSiriusdreef 17-27, 2132 WT Hoofddorp 1st Floor, room number: 37

Phone: +31 23 5689 205E-mail: [email protected]

Page 36: today for tomorrow - Anel Group...(TAV/CCC/Arabtec Joint Venture) Employer: ADAC Hamad International Airport Doha, QATAR Airport Electrical and Mechanical 680.000 m2 Employer: NDIA
Page 37: today for tomorrow - Anel Group...(TAV/CCC/Arabtec Joint Venture) Employer: ADAC Hamad International Airport Doha, QATAR Airport Electrical and Mechanical 680.000 m2 Employer: NDIA