TM0 components inventory and procurement schedule. In lab testing facility. Inventory layout. RF system Accelerating structure (x16) PETS structure (x8) RF distribution and loads Vacuum system BI and Vacuum systems BPM-DBQ chamber assembly Magnet system Cooling system Supporting system - PowerPoint PPT Presentation
Citation preview
A.Bartalesi
TM0 componentsinventory and procurement schedule
In lab testing facility
07/02/2011
Inventory layout
07/02/2011A.Bartalesi
RF system Accelerating structure (x16) PETS structure (x8) RF distribution and loads
Vacuum system BI and Vacuum systems
BPM-DBQ chamber assembly Magnet system Cooling system Supporting system Pre-alignment system
Components priority
07/02/2011A.Bartalesi
Priotity 0 -
30/11/2010
•Floor interface plate
•Floor interface plate
Priority 1 -
20/12/2010
•MB girders with V-shaped supports, cradles and actuators
•DB girders with V-shaped supports•Cradles•Actuators
Priority 2 -
31/01/2011
•Accelerating structures•Damping material
•Cooling interfaces
•RF flanges•Interconn. flanges
•Interconn. bellows
•PETS•Damping material
•Cooling interfaces
•RF flanges•Interconn. flanges
•DB QUADS•BPM•Vacuum chamber
•Support plate
•Interconn. bellows
Priority 3 -
15/02/2011
•Vacuum•Supports•Vacuum reservoir
•Interconn. bellows
Priority 4 -
28/02/2011
•RF distribution•Waveguides•RF components
•RF flanges•RF loads
Priority 5 -
10/03/2011
•Vacuum network
Priority 6 -
10/03/2011
•Cooling system
Priority 7 -
31/03/2011
•Heating device
•Transport device
Labels:3D
done2D
doneOrderedDelivere
d
A.Bartalesi
Accelerating structureoverview
07/02/2011
MB Unit (Assembly)Flange (VS)Compact load (RS)
Intermodule interconnection (VS)Cooling tubes (RS)
Manifold (RS)
Waveguides (RS)
07/02/2011A.Bartalesi
A.Bartalesi
RF systemAccelerating structure (1 of 4)
07/02/2011
Name Drawing #Quantit
y (2 TM0s)
Real or
Mock-
up?
StatusDeadline
for current status
FirmProcuremen
t Responsible
Comments
Last update in
this database
WG type 3 CLIATLAS0034 32+4 M Offer
received31/01/20
11 B-S A. French 10/01/2011
WG type 4 CLIATLAS0033 32+4 M Offer
received31/01/20
11 B-S A. French 10/01/2011
WG type 5 CLIATLAS0040 32+4 M Offer
received31/01/20
11 B-S A. French 10/01/2011
WG type 7 CLIATLAS0036 32+4 M Offer
received31/01/20
11 B-S A. French 10/01/2011
CLIC experimental
flangeCLIAVACU018
464+8(+8 in PETS)
R
Firm selected,
prototypes are
manufactured
30/12/2010
CERN C. Garion
Ø 74Prototypes
to be manufactur
ed
26/11/2010
WG type 1 body
CLIATLAS0037 64+8 M Offer
received31/01/20
11 B-S A. French 10/01/2011
WG type 1 cover
CLIATLAS0038 64+8 M Offer
received31/01/20
11 B-S A. French 10/01/2011
WFM WG body CLIATLAS0031 64+8 M Offer
received31/01/20
11 B-S A. French 10/01/2011
WFM WG cover CLIATLAS0030 64+8 M Offer
received31/01/20
11 B-S A. French 10/01/2011
Manifold body CLIATLAS0029 64 M Offer
received31/01/20
11 B-S A. French 10/01/2011
AS bar type 1 CLIATLAS0028 12 M Offer
received31/01/20
11 B-S A. French 10/01/2011
A.Bartalesi
RF systemAccelerating structure (2 of 4)
07/02/2011
Name Drawing #Quantit
y (2 TM0s)
Real or
Mock-
up?
StatusDeadline
for current status
FirmProcuremen
t Responsible
Comments
Last update in
this database
AS bar type 2 CLIATLAS0057 2 M Offer
received31/01/20
11 B-S A. French 10/01/2011
AS bar type 3 CLIATLAS0073 2 M Offer
received31/01/20
11 B-S A. French 10/01/2011
AS cooling fitting adapter
CLIATLAS0053
128+32 R
Ordered on 10/12/201
003/01/20
11 B-S A. French 13/12/2010
Plug CLIATLAS0052
64+16 R
Ordered on 10/12/201
003/01/20
11 B-S A. French 13/12/2010
MB-MB interconnection
bellowCLIATLVS000
4 4 R Received, leak tested
COM-VAT C. Garion 03/02/201
1
Intermediate piece
CLIATLAS0075 2 M Offer
received31/01/20
11 B-S A. French 10/01/2011
Intermediate piece 2
CLIATLAS0056 2 M Offer
received31/01/20
11 B-S A. French 10/01/2011
HOM Load (5x5, L=40)
CLIATLAS0004 64 M
Ordered on 30/11/201
015/01/20
11 M.P. A. French 13/12/2010
Manifold small cover 1
CLIATLAS0062 32 M Offer
received31/01/20
11 B-S A. French 10/01/2011
Manifold small cover 2
CLIATLAS0065 32 M Offer
received31/01/20
11 B-S A. French 10/01/2011
PIN CLIATLAS0063 32 M
Ordered on 10/12/201
003/01/20
11 B-S A. French 13/12/2010
A.Bartalesi
RF systemAccelerating structure (3 of 4)
07/02/2011
Name Drawing #Quantit
y (2 TM0s)
Real or
Mock-
up?
StatusDeadline
for current status
FirmProcuremen
t Responsible
Comments
Last update in
this database
Manifold small cover 3 insert
CLIATLAS0090 32 M Offer
received31/01/20
11 B-S A. French 10/01/2011
Manifold small cover 3 body
CLIATLAS0060 64 M Offer
received31/01/20
11 B-S A. French 10/01/2011
Wire d. 1 mm (St.)
Commercial3D:
ST029035232 M
Price inquiry launched on
01/1112/11/20
10 (any) A. French1 cm long
metal wire
17/11/2010
UHV CF FIXED FLANGE Ø114-63-
60STDVFUHV009
216
(+8 in PETS)
ROrdered
27/10/10, to be machined
? CERN C. Garion 26/11/201
0
Vacuum tube CLIATLAS0068 16 M
Ordered on 10/12/201
003/01/20
11 B-S A. French 13/12/2010
Cover 2 CLIATLAS0067 16 M Offer
received31/01/20
11 B-S A. French 10/01/2011
MB interconnection
flange Ø155CLIATLVS000
6 4 R Received, to be modified
End February 2011
CERN C. Garion 03/02/201
1
Screw VacomMC-310 Commercial 96 R Vaco
m A. French 17/11/2010
12WDSDVG1.8_R05_SIC CORNER SUPPORT_002
CLIAAS120081 32+8 M Offer
received31/01/20
11 B-S A. French 10/01/2011
12WDSDVG1.8_R05_SIC CORNER SUPPORT_001
CLIAAS120080
64+16 M Offer
received31/01/20
11 B-S A. French 10/01/2011
Cover CLIATLAS0070 48 M Offer
received31/01/20
11 B-S A. French 10/01/2011
A.Bartalesi
RF systemAccelerating structure (4 of 4)
07/02/2011
Name Drawing #Quantit
y (2 TM0s)
Real or
Mock-
up?
StatusDeadline
for current status
FirmProcuremen
t Responsible
Comments
Last update in
this database
Damping material 12
CLIATLAS0072
64 + 2 R
Price offer received
17/11/2010? M.P. A. French On hold 13/12/201
0
Cooling tubetype 1
CLIATLAS0080 8 M
Fabrication to be
launched? CER
N A. French 17/11/2010
Cooling tubetype 2
CLIATLAS0079 16 M
Fabrication to be
launched? CER
N A. French 17/11/2010
Cooling tubetype 3
CLIATLAS0082 32 M
Fabrication to be
launched? CER
N A. French 17/11/2010
Cooling tubetype 4
CLIATLAS0081 32 M
Fabrication to be
launched? CER
N A. French 17/11/2010
MB intermodule interconn.
Damping Mat.CLIATLAS008
6 4 ROrdered on 30/11/201
015/01/20
11 M.P. A. French 13/12/2010
Connector hokeCommercial 4LMFS4BR TD
8mm112 R Swagel
ok A. French 17/11/2010
Connector hokeCommercial
4COSBR TD 8mm
16 R Swagelok A. French 17/11/201
0
Screw Vacom MFA-412 Commercial 16 R Vaco
m A. French 17/11/2010
Target sphere holder 0.5”
Commercial Z04x06Ni-35 64 R Received HKCM H. Mainaud-
Durand
magnet Ø4,
length 6mm
10/01/2011
Spherical prism 0.5’’
CommercialBMR-.5-0.001 2 R Received
Leica/Hubb
sH. Mainaud-
Durand(removable device)
10/01/2011
A.Bartalesi
PETS structureoverview
07/02/2011
DRIVE BEAM – PETS ASSEMBLY
Interconnection Flanges (Fixed)
PETS On-Off (Coupler)
PETS Mock-Up
Interconnection Flanges (Fixed)
Cooling tubesCooling fittings adapter
Cooling adapterPETS Minitanks
07/02/2011A.Bartalesi
A.Bartalesi
RF systemPETS structure (1 of 3)
07/02/2011
Name Drawing #Quantit
y (2 TM0s)
Real or
Mock-
up?
StatusDeadline
for current status
FirmProcuremen
t Responsible
Comments
Last update in
this database
ON-OFF half 1 CLIATLPE0033 8 M
Offers received
20/01/201115/01/201
1CER
N A. FrenchS.A.
reference person
21/01/2011
ON-OFF half 2 CLIATLPE0034 8 M
Offers received
20/01/201115/01/201
1 CER
N A. FrenchS.A.
reference person
21/01/2011
ON-OFF main body
CLIATLPE0029 8 M
Offers received
20/01/201115/01/201
1CER
N A. FrenchS.A.
reference person
21/01/2011
CLIC experimental
flangeCLIAVACU018
48
(+72 in AS)
R
Firm selected,
prototypes are
manufactured
30/12/2010
CERN C. Garion
Ø 74Prototypes
to be manufactur
ed
26/11/2010
ON-OFF piston mock-up CLATLPE0028 8 M
Offers received
20/01/2011? CER
N A. FrenchJ.M.G.
reference person
21/01/2011
ON-OFF plug CLIATLPE0027 8 M
Offers received
20/01/2011? CER
N A. FrenchJ.M.G.
reference person
21/01/2011
Parallel pin 5x20
CLIATLPE0049 32 R
Offers received
20/01/2011? CER
N A. FrenchJ.M.G.
reference person
21/01/2011
UHV CV fixed flange Ø202
CLIATLPE0017 4 R
Offers received
20/01/2011? CER
N A. FrenchJ.M.G.
reference person
21/01/2011
PETS adapter disk 3
CLIATLPE0048 4 R
Offers received
20/01/2011? CER
N A. FrenchJ.M.G.
reference person
21/01/2011
PETS adapter disk 2
CLIATLPE0020 4 R
Offers received
20/01/2011? CER
N A. FrenchJ.M.G.
reference person
21/01/2011
PETS adapter disk 1
CLIATLPE0015 8 R
Offers received
20/01/2011? CER
N A. FrenchJ.M.G.
reference person
21/01/2011
A.Bartalesi
RF systemPETS structure (2 of 3)
07/02/2011
Name Drawing #Quantit
y (2 TM0s)
Real or
Mock-
up?
StatusDeadline
for current status
FirmProcuremen
t Responsible
Comments
Last update in
this database
PETS beam pipe
CLIATLPE0021 4 R
Offers received
20/01/2011? CER
N A. FrenchJ.M.G.
reference person
21/01/2011
DN 63 - UHV CF fixed flange
CLIATLPE0022 4 R To be
machinedDec 2010
CERN C. Garion Ø 114 26/11/201
0
PETS cooling adapter
CLIATLPE0030 16 R
Offers received
20/01/2011? CER
N A. FrenchJ.M.G.
reference person
21/01/2011
Plug Ø14 CLIATLPE0043 16 R
Offers received
20/01/2011? CER
N A. FrenchJ.M.G.
reference person
21/01/2011
PETS mock up bars
CLIATLPE0002 8 M
Price inquiry launched on
01/1112/11/20
10 B-S A. French 17/11/2010
PETS damping block
CLIATLPE0007 64 M
Ordered on 30/11/201
015/01/20
11 M.P. A. French 13/12/2010
Pin CLIATLPE0004 128 M
Price inquiry launched
28/10/201005/11/20
10 B-S A. French 17/11/2010
Holder plate CLIATLPE0003 64 M
Price inquiry launched
28/10/201005/11/20
10 B-S A. French 17/11/2010
VACOM MF-308 screw Commercial 128 R Vaco
m A. French 17/11/2010
Minitank tube CLIATLPE0009 4 R
Fabrication to be
launched? CER
N A. FrenchJ.M.G.
reference person
17/11/2010
Minitank tube (short)
CLIATLPE0051 4 R
Fabrication to be
launched? CER
N A. FrenchJ.M.G.
reference person
17/11/2010
A.Bartalesi
RF systemPETS structure (3 of 3)
07/02/2011
Name Drawing #Quantit
y (2 TM0s)
Real or
Mock-
up?
StatusDeadline
for current status
FirmProcuremen
t Responsible
Comments
Last update in
this database
Minitank flange CLIATLPE0010 16 R
Offers received
20/01/201105/11/20
10CER
N A. FrenchØ 120-
124 J.M.G.
reference person
21/01/2011
Tube CLIATLPE0011 8 R
Offers received
20/01/201105/11/20
10CER
N A. FrenchJ.M.G.
reference person
21/01/2011
UHV CF FIXED FLANGE Ø114-63-
60STDVFUHV009
28 (+16 in AS) R To be
machinedDec 2010
CERN C. Garion 26/11/201
0
PETS U-cooling tube
CLIATLPE0032 4 R
Fabrication to be
launched05/11/20
10CER
N A. French 17/11/2010
Connector (Swagelok)
CommercialB-10M0-1-4RP 16 R Received Swagelo
k A. French 04/02/2011
Copper gasket (Swagelok)
CommercialCU-4-RP-2 16 R Received Swagelo
k A. French 04/02/2011
Target sphere holder 0.5”
CommercialBN223 32 R Received BOSS
-ARDH. Mainaud-
Durand (Washer 8*16*2, glued on
pets)
10/01/2011
A.Bartalesi
RF distribution and loadsoverview
07/02/2011
Type 1 Type 2
Load Mock-up Load Mock-up
RF networks
A.Bartalesi
RF systemRF distribution and loads
07/02/2011
Name Drawing #Quantit
y (2 TM0s)
Real or
Mock-
up?
StatusDeadline
for current status
FirmProcuremen
t Responsible
Comments
Last update in
this database
RF distribution system None 2 Both Under
drafting14/11/20
10Multipl
e A. French3D
mockup study
ongoing
15/11/2010
Nipple 1/4" CLIATLRF0026 80 ROrdered
01/02/2011
CERN/B.S./
Bodycote
A. FrenchCERN
contact person: A.
Costa
04/02/2011
Mock-up body CLIATLRF0028 40 MOrdered
01/02/2011
CERN/B.S./
Bodycote
A. FrenchCERN
contact person: A.
Costa
04/02/2011
Adapter 1 CLIATLRF0029 40 MOrdered
01/02/2011
CERN/B.S./
Bodycote
A. FrenchCERN
contact person: A.
Costa
04/02/2011
Adapter 2 CLIATLRF0030 40 MOrdered
01/02/2011
CERN/B.S./
Bodycote
A. FrenchCERN
contact person: A.
Costa
04/02/2011
Cooling case CLIATLRF0031 40 MOrdered
01/02/2011
CERN/B.S./
Bodycote
A. FrenchCERN
contact person: A.
Costa
04/02/2011
DN 40 - Fixed flange, tube 16/10 CLIATLRF0035 40 M
Ordered01/02/201
1
CERN/B.S./
Bodycote
A. FrenchCERN
contact person: A.
Costa
04/02/2011
Connector (Commercial)B-8M0-1-4RP 40 M Received Swagelo
k A. French 04/02/2011
Connector (Commercial)B-8M0-2-4PR 40 M Received Swagelo
k A. French 04/02/2011
Copper gasket (Commercial)CU-4-RP-2 40 M Received Swagelo
k A. French 04/02/2011
A.Bartalesi
Vacuum systemoverview
07/02/2011
Type 1
Type 2
Central vacuum tank and pumps
Vacuum network
A.Bartalesi 07/02/2011
A.Bartalesi 07/02/2011
A.Bartalesi
Vacuum system (1 of 3)
07/02/2011
Name Drawing #Quantit
y (2 TM0s)
Real or
Mock-
up?
StatusDeadline
for current status
FirmProcuremen
t Responsible
Comments
Last update in
this database
Ion pumpCommercial
(Vaclon-plus75)
2 R On stock VARIAN C. Garion 19/01/2011
Cartridge pumpCommercial(SAES GP 500
MK5)4 R Received SAES C. Garion 19/01/201
1CENTRAL VACUUM
TANK BELLOW – ASSEMBLY
CLIATLVS0031 24 R Waiting
approvalCERN C. Garion 21/01/201
1
- DN 63 - UHV CF ROTAT. FLANGE HB
CLIATLVS0039 24 R Waiting
approvalCERN C. Garion 21/01/201
1
SCHCOCH END CAP 159,0 X 2.00
STANDARD(Acc. to DIN
28011)4 R Waiting
approval C. Garion 21/01/2011
FIXED UHV FLANGE DIA. 70_FOR TUBE
DIA. 34/38STDVFUHV003
0 4 R Waiting approval
CERN C. Garion 21/01/201
1FIXED UHV FLANGE
152 - FOR TUBE 100/103
STDVFUHV0052 2 R Waiting
approvalCERN C. Garion 21/01/201
1FIXED UHV FLANGE
114 - FOR TUBE 60/63
STDVFUHV0092 8 R Waiting
approvalCERN C. Garion 21/01/201
1T0 CENTRAL
VACUUM TANK - SPARE PUMPING
PORT TUBE
CLIATLVS0038 4 M Waiting
approvalCERN C. Garion 21/01/201
1
T0 CENTRAL VACUUM TANK -
RING TYPE 3CLIATLVS003
7 4 M Waiting approval
CERN C. Garion 21/01/201
1
A.Bartalesi
Vacuum system (2 of 3)
07/02/2011
Name Drawing #Quantit
y (2 TM0s)
Real or
Mock-
up?
StatusDeadline
for current status
FirmProcuremen
t Responsible
Comments
Last update in
this database
T0 CENTRAL VACUUM TANK -
RING TYPE 2CLIATLVS003
6 2 M Waiting approval
CERN C. Garion 21/01/201
1T0 CENTRAL
VACUUM TANK - RING TYPE 1
CLIATLVS0034 8 M Waiting
approvalCERN C. Garion 21/01/201
1CENTRAL VACUUM TANK - HOLDING
STRAPCLIATLVS003
3 8 M Waiting approval
CERN C. Garion 21/01/201
1T0 MODULE (LAB) VACUUM SYSTEM - CENTRAL VACUUM TANK EXTRUDED
TUBE
CLIATLVS0035 2 M Waiting
approvalCERN C. Garion 21/01/201
1
CLIC UHV RF gasket
CLIATLVS0005 80 R Ordered Jan
2010GARL-OCK C. Garion
To be moved in RF
section, Ø 74
26/11/2010
“Helicoflex” Commercial 3 R Ordered Jan 2010
GARL-OCK C. Garion 26/11/201
0- MB
INTERCONNECTION BLANK FLANGE
CLIATLVS0032 2 M CER
N C. GarionNEW!(MB
blank)25/01/201
1
UHV FLANGE_FIXED 202/150 SCEM 18.60.18.020.4
STDVFUHV0011 2 R CER
N C. GarionNEW!(DB
blank)25/01/201
1
A.Bartalesi
Vacuum system (3 of 3)
07/02/2011
Name Drawing #Quantit
y (2 TM0s)
Real or
Mock-
up?
StatusDeadline
for current status
FirmProcuremen
t Responsible
Comments
Last update in
this database
VACUUM NETWORK - BELLOW
INTERFACE ASSYCLIATLVS002
6 16 M Price inquiry launched
CERN C. Garion NEW! 03/02/201
1VACUUM NETWORK
- DN 63 - ROTAT. FLANGE 63.5/59.5
CLIATLVS0022 4 M to be
machinedMarch 2011
CERN C. Garion NEW! 03/02/201
1
VACUUM NETWORK - TUBE
CLIATLVS0016 8 M In
fabricationApril 2011
CERN C. Garion NEW! 03/02/201
1VACUUM
NETWORK - TUBECLIATLVS001
7 8 M In fabrication
April 2011
CERN C. Garion NEW! 03/02/201
1VACUUM NETWORK - COLLECTOR TUBE
STRAIGHTCLIATLVS001
8 2 M In fabrication
April 2011
CERN C. Garion NEW! 03/02/201
1VACUUM NETWORK - COLLECTOR TUBE
- SECTION 1CLIATLVS001
9 2 M In fabrication
April 2011
CERN C. Garion NEW! 03/02/201
1VACUUM NETWORK - COLLECTOR TUBE
- SECTION 2CLIATLVS002
0 2 M In fabrication
April 2011
CERN C. Garion NEW! 03/02/201
1
CAP DIAM. 64 mm
Commercial(FG INOX 2FB64)
4 R CERN C. Garion NEW! 03/02/201
1
A.Bartalesi
BI systemoverview
07/02/2011
Vacuum chamber
Rotating flange
BPM mockup
A.Bartalesi
BI System (1 of 2)(BPM-DBQ assembly)
07/02/2011
Name Drawing #Quantit
y (2 TM0s)
Real or
Mock-
up?
StatusDeadline
for current status
FirmProcuremen
t Responsible
Comments
Last update in
this database
UHV ROTATING FLANGE 114/63
insertCLIATLVS000
2 4 R
Raw ordered
(27/10/10), to be
machined
Dec 2010
CERN C. Garion 26/11/201
0
UHV flange ring 114/63
STDVFUHV0008 4 R Received CER
N C. Garion 26/11/2010
UHV ROTATING FLANGE
202/150 insertCLIATLVS000
1 4 R
Raw ordered
(27/10/10), to be
machined
Dec 2010
CERN C. Garion 26/11/201
0
UHV flange ring 202/150
CLIATLVS0003 4 R Received CER
N C. Garion 26/11/2010
Bellow(Ass.y
drawing) CLIATLBI0029
8 R Price inquiry
Feb 2011
CERN C. Garion 03/02/201
1
Welding fitting 1
(Ass.y drawing)
CLIATLBI00298 R Price
inquiryFeb
2011CERN C. Garion
Done by the
bellows manufactu
rer
03/02/2011
Welding fitting 2
(Ass.y drawing)
CLIATLBI00298 R Price
inquiryFeb
2011CERN C. Garion
Done by the
bellows manufactu
rer
03/02/2011
DB BEAM POSITION - MAGNET SYSTEM - BPM ALIGNMENT
FRAMECLIATLBI0008 4 M Production
requested15/02/20
11 AP L. Soby 20/01/2011
DB BPM ALIGNMENT - PIN
D4X10CLIATLBI0013 4 M Production
requested15/02/20
11 AP L. Soby 20/01/2011
HEX SKT HD CAP Screw
M4x8
Commercial(VIS
CHC_M4x8)8 M Production
requested15/02/20
11 AP L. Soby 20/01/2011
A.Bartalesi
BI System (2 of 2) (BPM-DBQ assembly)
07/02/2011
Name Drawing #Quantit
y (2 TM0s)
Real or
Mock-
up?
StatusDeadline
for current status
FirmProcuremen
t Responsible
Comments
Last update in
this database
DB BEAM POSITION - MAGNET SYSTEM -
DB BPM BODY MOCK-UP
CLIATLBI0024 4 M Productionrequested
15/02/2011 AP L. Soby 20/01/201
1
DB BPM MOCK-UP - INTERCONNECTION
INTERFACECLIATLBI0027 4 M Production
requested15/02/20
11 AP L. Soby 20/01/2011
DB BPM MOCK-UP - DRIFT
TUBECLIATLBI0026 4 M Production
requested15/02/20
11 AP L. Soby 20/01/2011
DB BPM MOCK-UP - DB BPM STRIPLINE
CLIATLBI0025 4 M Productionrequested
15/02/2011 AP L. Soby 20/01/201
1
Target sphere holder 0.5”
Commercial Z04x06Ni-35 12 R Received HKCM H. Mainaud-
Durand
magnet Ø4,
length 6mm
10/01/2011
A.Bartalesi
Magnet systemoverview
07/02/2011
DBQ mock-up
A.Bartalesi
Magnet system (1 of 2)
07/02/2011
Name Drawing #Quantit
y (2 TM0s)
Real or
Mock-
up?
StatusDeadline
for current status
FirmProcuremen
t Responsible
Comments
Last update in
this database
DBQ magnet mock-up - yoke
CLIMQNBP0001 8+2 M Shipped 31/01/20
11CERN A. Bartalesi 07/02/201
1DBQ magnet
mock-up - coil mock-up
CLIMQNBP0002 32+8 M Shipped 31/01/20
11CERN A. Bartalesi 07/02/201
1
DBQ magnet mock-up -
support angleCLIMQNBP000
3 4+1 M Shipped 31/01/2011
CERN A. Bartalesi 07/02/201
1
DBQ magnet mock-up -
assembly shaftCLIMQNBP000
4 1 M Shipped 31/01/2011
CERN A. Bartalesi 07/02/201
1
HEX SKT HD CAP SCREW
M8X65Commercial 64 R Received CER
N A. Bartalesi 10/01/2011
HEX SKT HD CAP SCREW
M4X14Commercial 8 R Received CER
N A. Bartalesi 10/01/2011
Normal PL washer 4X9 Commercial 8 R Received CER
N A. Bartalesi 10/01/2011
HEX SKT HD CAP SCREW M10X100
Commercial 16 R Received CERN A. Bartalesi 10/01/201
1
Normal PL washer 10X12 Commercial 32 R Received CER
N A. Bartalesi 10/01/2011
HEX NUT STYLE1 GRADE
A M10Commercial 16 R Received CER
N A. Bartalesi 10/01/2011
A.Bartalesi
Magnet system (2 of 2)
07/02/2011
Name Drawing #Quantit
y (2 TM0s)
Real or
Mock-
up?
StatusDeadline
for current status
FirmProcuremen
t Responsible
Comments
Last update in
this database
Target sphere holder 1.5”
glued on DBQCommercial1.5 SM-DN-3PS 24 R Received
Leica/Hubb
sH. Mainaud-
Durand10/01/201
1
Spherical prism 1.5’’
CommercialBMR-1.5-0.001 2 R Received
Leica/Hubb
sH. Mainaud-
Durand10/01/201
1
A.Bartalesi
Cooling system
07/02/2011
Name Drawing #Quantit
y (2 TM0s)
Real or
Mock-
up?
StatusDeadline
for current status
FirmProcuremen
t Responsible
Comments
Last update in
this database
Cooling system None 2 3D design done ? Multipl
e A. French 29/10/2010
Rack commercial? ? ? ? ? A. French 01/11/2010
Acquisition commercial? ? ? ? ? A. French 01/11/2010
Cabling commercial? ? ? ? ? A. French 01/11/2010
A.Bartalesi
Supporting systemoverview
07/02/2011
DB(boostec)
MB(microcontrol
e)
Central vacuum tank support
A.Bartalesi 07/02/2011
A.Bartalesi
Supporting system (1 of 2)
07/02/2011
Name Drawing #Quantit
y (2 TM0s)
Real or
Mock-
up?
StatusDeadline
for current status
FirmProcuremen
t Responsible
Comments
Last update in
this database
DB girder withV-supports
CLIATLSS0005 2 R
Delivered &measured at
CERN30/11/20
10Boost
ec N. Gazis 10/01/20110
DB cradle system
CLIGHGPA0001 3 R
2D drawings done, waiting
approval15/11/20
10CERN N. Chritin 26/11/201
0
MB girder CLIATLSS0006 2 R
Delivered, measured &
assembled at CERN
3/12/2010
Micro-Control
eN. Gazis 10/12/201
0
MB V-support CLIATLSS0006 10 R
Delivered, measured &
assembled at CERN
3/12/2010
Micro-control
eN. Gazis 10/12/201
0
MB cradle system
CLIATLSS0006 3 R
Delivered, tested
& assembled at CERN
3/12/2010
Micro-Control
eN. Gazis 10/12/201
0
U-clamps forV-support
CLIATLSS0011 44 R
Under integration
control17/12/20
10CERN N. Gazis 10/12/201
0
DBQ supporting plate type 1
CLIATLSS0009 2 M Delivered 17/12/20
10CERN N. Gazis 03/02/201
1DBQ supporting
plate type 2CLIATLSS001
3 2 M Delivered 17/12/2010
CERN N. Gazis 03/02/201
1
- LEG CLIATLSS0015 4 R
Under price
inquiry04/02/20
11CERN N. Gazis 20/01/201
1
A.Bartalesi
Supporting system (2 of 2)
07/02/2011
Name Drawing #Quantit
y (2 TM0s)
Real or
Mock-
up?
StatusDeadline
for current status
FirmProcuremen
t Responsible
Comments
Last update in
this database
- STIFFNESS RIB CLIATLSS0020 4 R
Under price
inquiry04/02/20
11CERN N. Gazis 20/01/201
1
- STIFFNESS RIB CLIATLSS0016 12 R
Under price
inquiry04/02/20
11CERN N. Gazis 20/01/201
1
- BOTTOM CLIATLSS0017 4 R
Under price
inquiry04/02/20
11CERN N. Gazis 20/01/201
1
- CVT PLATE CLIATLSS0018 4 R
Under price
inquiry04/02/20
11CERN N. Gazis 20/01/201
1
- SUPPORT CLIATLSS0019 4 R
Under price
inquiry04/02/20
11CERN N. Gazis 20/01/201
1
THREADED ROD M20 X 160 Commercial 12 R
Under price
inquiry04/02/20
11CERN N. Gazis 20/01/201
1
HEXAGON JAM NUT, M20; 0.5D Commercial 36 R
Under price
inquiry04/02/20
11CERN N. Gazis 20/01/201
1
FORME ‘D’ RONDELLE CONCAVE
Commercial 24 RUnder price
inquiry04/02/20
11CERN N. Gazis 20/01/201
1
FORME ‘C’ RONDELLE CONCAVE
Commercial 24 RUnder price
inquiry04/02/20
11CERN N. Gazis 20/01/201
1
NORMAL PL WASHER, 20 X
37Commercial 12 R
Under price
inquiry04/02/20
11CERN N. Gazis 20/01/201
1
A.Bartalesi
Pre-alignment systemDB components only (1 of 2)
07/02/2011
Name Drawing #Quantit
y (2 TM0s)
Real or
Mock-
up?
StatusDeadline
for current status
FirmProcuremen
t Responsible
Comments
Last update in
this database
cWPS with 3D interface Commercial 5 R Ready F.N. H. Mainaud-
Durand20/01/201
1cWPS
interfaces Commercial 8 R Ready M.S.N.
H. Mainaud-Durand
20/01/2011
oWPS Commercial 3 R Ready OSI H. Mainaud-Durand
20/01/2011
oWPS interfaces Commercial 3 R Ready H. Mainaud-
Durand20/01/201
1
Inclinometer 1 axis Commercial 3 R
Delivered (being tested)
Althen
H. Mainaud-Durand
20/01/2011
Temperature sensor
Commercial (PT100) 3 R Ready H. Mainaud-
Durand20/01/201
1
Linear actuator Commercial 9 R Received ZTS H. Mainaud-Durand
20/01/2011
Base settlement interface
? 3 R Installed CERN
H. Mainaud-Durand
20/01/2011
Sensor plate ? 2 R Design ready
30/11/2010
CERN
H. Mainaud-Durand
03/02/2011
Wire stretcher LHCGIWPS0189 2 R Ready CER
NH. Mainaud-
Durand20/01/201
1
Rack None 1 R ReadyCERN catalog
H. Mainaud-Durand
20/01/2011
A.Bartalesi
Pre-alignment systemDB components only (2 of 2)
07/02/2011
Name Drawing #Quantit
y (2 TM0s)
Real or
Mock-
up?
StatusDeadline
for current status
FirmProcuremen
t Responsible
Comments
Last update in
this database
Acquisition (SAS) None 1 R Ready CER
NH. Mainaud-
Durand20/01/201
1
MCA8 cable None 13 R Ready CERN
H. Mainaud-Durand
20/01/2011
Linear actuators cable None 5 R Given to
ZTSCERN
H. Mainaud-Durand
20/01/2011
PC None 1 R ReadyCERN catalog
H. Mainaud-Durand
20/01/2011
Target sphere holder 1.5”
Commercial1.5 SM-DN-3PS 20 R Received
Leica/Hubb
sH. Mainaud-
DurandGlued on
DB girders20/01/201
1
Target sphere holder 1.5”
Commercial1.5 SMN-SS-25mm-6mm
10 R ReceivedLeica/Hubb
sH. Mainaud-
DurandFixed on
DB girders20/01/201
1
A.Bartalesi
Pre-alignment systemMB components only (1 of 2)
07/02/2011
Name Drawing #Quantit
y (2 TM0s)
Real or
Mock-
up?
StatusDeadline
for current status
FirmProcuremen
t Responsible
Comments
Last update in
this database
cWPS with 3D interface Commercial 4 R Ready F.N. H. Mainaud-
Durand20/01/201
1cWPS
interfaces Commercial 7 R Ready M.S.N.
H. Mainaud-Durand
20/01/2011
oWPS Commercial 3 R Ready OSI H. Mainaud-Durand
20/01/2011
oWPS interfaces Commercial 3 R Ready H. Mainaud-
Durand20/01/201
1Inclinometer 1
axis Commercial 3 R Received Althen
H. Mainaud-Durand
20/01/2011
Temperature sensor
Commercial (PT100) 3 R Ready H. Mainaud-
Durand20/01/201
1Sensor
interface with girder
CERN 4 R Ready CERN
H. Mainaud-Durand
20/01/2011
Base settlement interface
CERN 3 R Installed CERN
H. Mainaud-Durand
20/01/2011
Sensor plate CERN 2 R Ready CERN
H. Mainaud-Durand
20/01/2011
Wire stretcher LHCGIWPS0189 2 R Ready CER
NH. Mainaud-
Durand20/01/201
1
Rack None 1 R ReadyCERN catalog
H. Mainaud-Durand
20/01/2011
A.Bartalesi
Pre-alignment systemMB components only (2 of 2)
07/02/2011
Name Drawing #Quantit
y (2 TM0s)
Real or
Mock-
up?
StatusDeadline
for current status
FirmProcuremen
t Responsible
Comments
Last update in
this database
Acquisition (SAS) None 1 R Ready CER
NH. Mainaud-
Durand20/01/201
1
MCA8 cable None 13 R Ready CERN
H. Mainaud-Durand
20/01/2011
Target sphere holder 1.5”
Commercial1.5 SM-DN-3PS 14 R Received
Leica/Hubb
sH. Mainaud-
DurandGlued on
MB girders20/01/201
1
Target sphere holder 1.5”
Commercial1.5 SMN-SS-25mm-6mm
8 R ReceivedLeica/Hubb
sH. Mainaud-
Durand
Fixed on sensor
interface with
girders
20/01/2011
A.Bartalesi 07/02/2011
Thanks for you interest-and-
Thanks to all the procurement responsible people for their
precious help!