1
THE TIMES OF INDIA, MUMBAI | THURSDAY, MARCH 22, 2012 PROMENADES & PLAZAS | BEACHES | RIVERS & NULLAHS | MANGROVES, CREEKS & WETLANDS | LAKES, PONDS & TANKS | PARKS, GARDENS, RECREATION & PLAYGROUNDS Beaches TIMES CITY L i n a h B a l i g a | TNN A n ambitious plan to restore the eroded Dadar beach to its former glory has been stut- tering ahead, with the state Public Works Department (PWD) currently testing the availability and suitability of sand at Mahim Bay. If suitable, the sand would be transported to help nourish 500 metres of beach from Chaityabhoomi to the mayor’s bungalow. If that pilot project is a success, then the entire 4-km stretch from Prabhadevi to Hinduja Hospital, Mahim, would be re- vitalized. The plans, however, are steeped in un- certainty and controversy, with govern- ment officials saying they are unsure of the cost of transporting top-sand to Dadar and some environmentalists saying the beach is today dead because of reclama- tion at Bandra that should be reversed. As it stands, erosion plagues the de- crepit Dadar beach, which is today more of a garbage dump than a sandy shore. Architect P K Das first gave birth to the idea of using a Beach Nourishment Plan (BNP) in Dadar, when he gave Mha- da and then the BMC a BNP in the early 2000s. The PWD is today working on a Rs 15-to-20-crore Dadar-Prabhadevi plan, with Rs 5 crore expected from the civic body and the rest from the state. Last year, on May 15, the PWD’s coastal wing began a preliminary ‘trial bore’ study at Mahim Bay to check the quality of sand there. The boring was stopped in December 2011 due to the code of conduct for the civic elections. The tests have been restarted and boring has been completed at six sites. Work is on at another 24. “Before April 15, we will complete the boring and by April-end we will get the soil investigation report, complete with the type of sand available in Mahim Bay. After further investigation, we will pre- pare a detailed report and give it to the BMC,” said Santosh Sawant, harbour en- gineer, PWD. It is possible that the Mahim sand is found suitable, but for aesthetic reasons the top layer will have to be brought from elsewhere in the state. “If we have to buy sand from outside, our total cost may go up to Rs 30 crore. If it’s too expensive, we will find another alternative. So far, this is the only solution,” said Sawant. The PWD has appointed a local agency, Suryantak Constructions, which has a lab- oratory that specializes in subsoil investi- gations, to examine the sand at Mahim. The BMC has already allocated Rs 25 lakh for the trial bore investigation. A boring ma- chine is kept on a floating barge and drilled into the subsoil. It then takes samples from 5 to 25 m below the soil. The report will also be sent to the Cen- tral Water Power and Research Station in Pune for the design of geo-tubes for Dadar beach. This high-volume dewa- tering system helps prevent coastal ero- sion. The 20-metre-long tubes, filled with sand, would be placed horizontal to the coast about 100 metres from the com- pound walls of buildings. They would protect the beach from erosion by cur- rents, and also allow only water to filter back to sea while the sand is trapped in the geo-tube. The geo-tube would become rigid and elliptical. It would function like a tetra- pod, reducing wave pressure during high tide. It could take three to five years for Dadar beach to be restored. Sawant said the beach nourishment work will not be awarded to any private agency. “The protection and nourishment of that beach will be done by the coastal di- vision of the PWD. Also, CWPRS in Pune is a central government agency and has ex- perts in waterfronts,” said Sawant. In Phase II, the PWD has plans to con- vert Dadar’s shoreline into a tourist at- traction, like at Juhu and Girgaum. There are plans to build a promenade or walkway along the periphery of the beach, with work being carried out by the civic body. Meanwhile, residents are hoping the government does a competent job. “The government has spent a huge amount in- stalling boulders in some pockets of the beachfront, thereby making them inac- cessible. It has spoiled the look of the seafront. Why is the PWD allocating mon- ey in bits and installments? Every year, the BMC shells out Rs 75 lakh and appoints contractors to clean the stretch from Prab- hadevi to Mahim. The beach, however, con- tinues to resemble a garbage dump,” said Ashok Ravat of the Shivaji Park ALM. W e had submitted a report in 2002 pre- pared by Dr Z S Tarapore, ex-director of Central Water Power and Research Station (CWPRS), who brought to our notice that sand can be dredged from Mahim Bay. The final re- port by DHI Water and Environment, Copen- hagen, was submitted in 2003, confirming this. We spent Rs 25 lakh, through privately mobi- lized funds, for the study. Ironically, the PWD and BMC are now spending the same amount for the same work. Fugro Survey India Ltd and DHI Water and Environment did the first deep-sea sur- vey (bathymetric study) and wave-pattern study. After that, DHI did hydraulic and coastal studies, wave modelling and hydro-dynamic modelling to see the viability of beach nour- ishment. Now, the PWD report can formally establish if sand can be used from Mahim Bay. the sand would be dredged with a pump, laid along Dadar beach and then the geo-tube tech- nology would be used. It’s only the top sand, needed for aesthetic purposes, that needs to be brought from outside. This BNP is environmentally sustainable and supportive. It doesn’t involve civil con- struction or construction of sea walls, which are detrimental to coastal protection. It is also cost-effective. It takes less time to implement a BNP as compared to civil construction meth- ods. Moreover, you’ll get a natural beach as a public space at a location that was originally the heart of Mumbai’s central district. The cost of replenishing lost sand is small when compared to the cost of repairing sea walls. We have given a calculation for re- plenishing the sand every three to five years. BNP is used in most parts of Europe and the United States. In India, INS Hamla (Marve), Dahanu beach and Vishakapatnam are ex- amples of beach nourishment. This isn’t a new science. In fact, many countries have banned sea-wall construction for being envi- ronmentally detrimental. Nourishment re-es- tablishes the natural wave patterns and eco- logical systems in which sand is regenerated to protect our coast. So you’re bringing natu- ral conditions back. T he MMRDA and MSRDC have already killed the ecology of Mahim Bay and Mahim Creek, which is an estuary of the Mithi Riv- er. The working pattern of the Mithi has been destroyed. Before reclamation for the ap- proach to the sea link, the marine ecosystem was full of life. Now, when it is dead, they are talking of nour- ishment, which isn’t the right word. It is foolish of the PWD to try and beautify a dead beach. From Mahim Causeway to Bandra Land’s End a length of 2.25 km and width of three- quarter km was reclaimed. They started in 1999 and stopped in 2002 when residents complained. But eventually they finished it in patches. The approach to the sea link should have been a bridge, but it is a road on reclamation. It was recommended in govern- ment reports that there should be in-situ conser- vation and not reclama- tion. There was the Paran- jape Committee report of 1987, Central Institute of Fisheries Education report of 1992 (submitted to MM- RDA), state Mangrove Committee report of 1993 (with NIO involvement); a central government Neeri study in 1994-96 and a 1997 BNHS report for the Union environment ministry. Despite these reports, the state government went ahead with recla- mation. As a result, sand from Worli to Mahim was wiped out because the tide was blocked from entering Mahim Creek and start- ed hitting with force else- where. At the same time, the Mithi River was blocked from entering the Arabian Sea. The sandy bed present for centuries eroded. The flushing of Mahim Creek, which receives 80 crore litres of sewage and chemicals a day, was stopped. The creek turned into a toxic pond. As per the topography and slope, the creek moves towards Mahim Bay and the Arabian Sea. Dadar, Mahim and Prabhadevi beaches were harmed. There was also loss of sta- bilization on the shore. To make matters worse, some agency removed thousands of trucks of sand from the north side of Mahim Bay two years ago. Nobody knows where they took the sand. The solution is to go to the root of the problem and remove the recla- mation from Mahim Causeway to Land’s End and build a bridge in- stead of a road. Sand deposition will return to its original form. Also, if you bring in sand from Ratnagiri or Dahanu, you will de- prive their ecosystems. Sand isn’t a dead material, it’s a life-form habi- tat. Beach nourishment will not help filter toxic elements and provide a habitat for life forms. W orldwide there are many examples of environ- mentally friendly beaches and beach nourishment done due to erosion—like in Singapore, the United States and Europe. But the PWD should focus on what its purpose is—stabi- lization of the shore, beautifi- cation, recreation and/or promenades. Stabilization should be the first priority. A study on erosion and siltation should also be conducted. the causes of the erosion should be carefully studied before go- ing ahead with any beach nour- ishment. All like-minded ex- perts dealing with environ- ment and oceanography should form a think tank and help plan this project. B each nourishment is nothing but recla- mation. So, if you reclaim somewhere, repercussions will be felt elsewhere. Take the case of the sea link’s approach road. Re- claiming the eroded area will only erode some other beach. In Chennai, nourishment was done at Marina beach and its repercussions were felt in a fishing vil- lage that was a few miles away. Our concern is that whatever is done should be done in a synchronized manner. The right hand should know what the left hand is doing. They have put boulders at some places and tetrapods in other places. To overcome the high tide, some places have a retaining wall. So, what’s the bund for? We don’t want a haphazard job. The citizens’ opinions should be considered T a s n e e m S h u k u l | G-NORTH CITIZENSFORUM If we have to buy sand from outside, our cost may go up to Rs 30 crore. If it’s too expensive, we’ll find another alternative. So far, this (Mahim sand) is the only solution S a n t o s h S a w a n t | HARBOUR ENGINEER, PWD RECLAIMING LEADS TO MORE PROBLEMS NOURISHING BEACH IS SUSTAINABLE First Steps Being Taken To Revitalize Coast, But Availability Of Sand, Uncertainty Of Cost & Environmental Concerns Plague Project SHIVAJI PARK STABILIZING SHORELINE SHOULD BE FIRST PRIORITY REVERSE RECLAMATION TO STOP DADAR EROSION DEBATE: IS NOURISHMENT VIABLE? A s h o k R a v a t , SHIVAJI PARK ALM ACTIVIST S h a n k a r G a j b h i y e , SCIENTIST IN-CHARGE, NATIONAL INSTITUTE OF OCEANOGRAPHY, MUMBAI P K D a s , ARCHITECT & WATERFRONT RESTORATION EXPERT G i r i s h R a u t , ENVIRONMENTAL ACTIVIST AND MAHIM RESIDENT WHO CAMPAIGNED AGAINST RECLAMATION IN BANDRA Uma Kadam HARD FACTS: The erosion at Dadar seaface has left practically no sand along the shores Mahim Creek, through which Mithi empties into Bay, was narrowed by reclamation, say activists At present, due to reclamation, sewage and toxins from Mithi collect in the Bay and don’t get flushed out, say activists PWD is now testing sand in the Mahim seabed to check if it is suitable for transporting to Dadar and Prabhadevi for beach nourishment Bandra-Worli Sea Link If Mahim sand passes test, PWD will initiate pilot project to nourish 500 metres of beach from Chaityabhoomi to mayor’s bungalow IS BEACH NOURISHMENT THE ANSWER TO CHECKING SAND EROSION AT THE DADAR-PRABHADEVI BEACH? LINAH BALIGA FINDS OUT Genesis of the plan: Architect P K Das submitted a Beach Nourishment Plan (BNP) to the BMC for a 1.2-km stretch of Dadar beach (Kirti College to Hinduja Hospital) which was approved in 2003. Das’s BNP proposed to restore the beach to a vital, public space and to check erosion. The plan: a) nourish, regenerate and expand the beach; b) redevelop existing approach roads, gardens, hawkers’ stalls, steps, ramps and podia; c) provide public conveniences, general lighting and security; and d) maintain cleanliness by extending sewage outfalls and providing effective solid-waste management. Sand, comprising silt from Mithi River, would be dredged from Mahim Bay, washed and put on Dadar beach. It would then be covered with a top layer imported from elsewhere in Maharashtra. The plan is part of Das’s Open Mumbai exhibition, which is on at NGMA till April 7. The Public Works Department (PWD) has begun testing sand at Mahim, but PWD officials said importing a top layer for aesthetic reasons may be too expensive. MITHI RIVER POURS INTO MAHIM CREEK MAHIM MAHIM BAY DADAR HINDUJA HOSPITAL CHAITYABHOOMI WORLI MAYOR’S BUNGLOW PRABHADEVI BANDRA After sand is deposited at Dadar beach, GEO-TUBES filled with more sand from Mahim would be placed 100 metres from building walls to protect shore & seabed A geo-tube is made up of geo-textile polypropylene, multi-woven fabric. It is circular, measures 20 metres in length and has five holes During high tide,seawater enters and leaves, but sand remains This system was successfully used at INS Hamla, Marve 2.25-km road and promenade from Mahim Causeway to Land’s End, built on land reclaimed in the late 1990s. Environmental activists claim this killed the ecology of Mahim Bay and Mahim Creek and the pattern of the Mithi. Government reports called for conservation not reclamation Reclamation along Bandra has led to sea forcefully hitting the seafront from Mahim to Worli, speeding up erosion from beaches and sea bed, say environmentalists DIGGING FOR SOLUTIONS l The Dadar-Prabhadevi beach is a 4km stretch from Worli Village to Mahim fort. It covers an area of over 50,000 sq m l The sandy beach has eroded, with most parts rendered inaccessible l Properties along the beach have been exposed to high tide, so boulders have been dumped to halt erosion l This affects public movement and adversely affects the coast l It is being proposed that the beach be restored as a public space and erosion be checked Source: P K Das & Associates Tetrapods have been placed along some parts of the coast to counter the force of the waves 1 2 3 4 5 7 If pilot project is successful, PWD will attempt to nourish entire 4-km Dadar-Prabhadevi stretch 8 REBUILDING THE COAST SANDS OF TIME STRIPPED FROM Dadar beach A R A B I A N S E A >> You can also share your views in the ‘Mumbai’ section of timesofindia.indiatimes.com Or log onto ‘The Times Of India’ page on Facebook Type SO <space> DADAR <space> your views and name. SMS to 58888 [email protected] with ‘Dadar’ in the subject line Q. Will sand from Mahim help rebuild the Dadar-Prabhadevi stretch, or do the authorities need to look at other options? Will the beaches dying along the bay ever be revived? SMS to timesofindia.indiatimes. com & visit the Speak Out section LOG ON EMAIL TOI Interactive T he Phase-I revamp of Marine Drive was primarily structural and enabling in nature. Phase-II, estimated at Rs 100 crore, is ambitious and comprises all the aesthetic sections of the work which, when completed, will be visible to all. However, the BMC needs to interact with architects and residents. Work must start immediately. B i k r a m B a n e r j e a M ost buildings that face the Marine Drive wear a sorrowful look as they have not been painted since long. The blame may lie with the salty air. — M a h a v i r T e w a r i T he state can spend as much as it wants on parks and statues, to make the Marine Drive more attractive, but citizens will just end up painting the walls red with paan spit and litter the paths. It is a shame that due to the ignorance of a few, cities are deprived of a clean environment. K a r l B e h r a m f r a m We asked readers if the Marine Drive revamp lacks colour? Should the state consult with residents and begin work on Phase II of the project? Here are some of your replies: ‘WORK ON MARINE DRIVE BEAUTIFICATION’S PHASE-II MUST START’ Pics: Hemant Shirodkar Graphic: Shailesh Warang 6

TIMES CITY - PK DAS

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

THE TIMES OF INDIA, MUMBAI | THURSDAY, MARCH 22, 2012

PROMENADES & PLAZAS | BEACHES | RIVERS & NULLAHS | MANGROVES, CREEKS & WETLANDS | LAKES, PONDS & TANKS | PARKS, GARDENS, RECREATION & PLAYGROUNDS

BeachesTIMES CITY

Linah Baliga | TNN

An ambitious plan to restorethe eroded Dadar beach to itsformer glory has been stut-tering ahead, with the statePublic Works Department

(PWD) currently testing the availabilityand suitability of sand at Mahim Bay. Ifsuitable, the sand would be transportedto help nourish 500 metres of beach fromChaityabhoomi to the mayor’s bungalow.If that pilot project is a success, then theentire 4-km stretch from Prabhadevi toHinduja Hospital, Mahim, would be re-vitalized.

The plans, however, are steeped in un-certainty and controversy, with govern-ment officials saying they are unsure ofthe cost of transporting top-sand to Dadarand some environmentalists saying thebeach is today dead because of reclama-tion at Bandra that should be reversed.

As it stands, erosion plagues the de-crepit Dadar beach, which is today moreof a garbage dump than a sandy shore.

Architect P K Das first gave birth tothe idea of using a Beach NourishmentPlan (BNP) in Dadar, when he gave Mha-da and then the BMC a BNP in the early2000s. The PWD is today working on a Rs15-to-20-crore Dadar-Prabhadevi plan,with Rs 5 crore expected from the civicbody and the rest from the state.

Last year, on May 15, the PWD’s coastalwing began a preliminary ‘trial bore’ studyat Mahim Bay to check the quality of sandthere. The boring was stopped in December2011 due to the code of conduct for the civicelections. The tests have been restarted andboring has been completed at six sites. Workis on at another 24.

“Before April 15, we will complete theboring and by April-end we will get thesoil investigation report, complete withthe type of sand available in Mahim Bay.

After further investigation, we will pre-pare a detailed report and give it to theBMC,” said Santosh Sawant, harbour en-gineer, PWD.

It is possible that the Mahim sand isfound suitable, but for aesthetic reasonsthe top layer will have to be brought fromelsewhere in the state. “If we have to buysand from outside, our total cost may goup to Rs 30 crore. If it’s too expensive, wewill find another alternative. So far, thisis the only solution,” said Sawant.

The PWD has appointed a local agency,Suryantak Constructions, which has a lab-oratory that specializes in subsoil investi-gations, to examine the sand at Mahim. TheBMC has already allocated Rs 25 lakh forthe trial bore investigation. A boring ma-chine is kept on a floating barge and drilledinto the subsoil. It then takes samples from5 to 25 m below the soil.

The report will also be sent to the Cen-tral Water Power and Research Stationin Pune for the design of geo-tubes forDadar beach. This high-volume dewa-tering system helps prevent coastal ero-sion. The 20-metre-long tubes, filled withsand, would be placed horizontal to thecoast about 100 metres from the com-pound walls of buildings. They wouldprotect the beach from erosion by cur-rents, and also allow only water to filterback to sea while the sand is trapped in thegeo-tube. The geo-tube would become rigidand elliptical. It would function like a tetra-pod, reducing wave pressure during hightide. It could take three to five years forDadar beach to be restored.

Sawant said the beach nourishmentwork will not be awarded to any privateagency. “The protection and nourishmentof that beach will be done by the coastal di-vision of the PWD. Also, CWPRS in Puneis a central government agency and has ex-perts in waterfronts,” said Sawant.

In Phase II, the PWD has plans to con-vert Dadar’s shoreline into a tourist at-traction, like at Juhu and Girgaum. Thereare plans to build a promenade or walkwayalong the periphery of the beach, with workbeing carried out by the civic body.

Meanwhile, residents are hoping thegovernment does a competent job. “Thegovernment has spent a huge amount in-stalling boulders in some pockets of thebeachfront, thereby making them inac-cessible. It has spoiled the look of theseafront. Why is the PWD allocating mon-ey in bits and installments? Every year,the BMC shells out Rs 75 lakh and appointscontractors to clean the stretch from Prab-hadevi to Mahim. The beach, however, con-tinues to resemble a garbage dump,” saidAshok Ravat of the Shivaji Park ALM.

We had submitted a report in 2002 pre-pared by Dr Z S Tarapore, ex-director

of Central Water Power and Research Station(CWPRS), who brought to our notice that sandcan be dredged from Mahim Bay. The final re-port by DHI Water and Environment, Copen-hagen, was submitted in 2003, confirming this.We spent Rs 25 lakh, through privately mobi-lized funds, for the study. Ironically, the PWDand BMC are now spending the same amountfor the same work.

Fugro Survey India Ltd and DHI Waterand Environment did the first deep-sea sur-vey (bathymetric study) and wave-patternstudy. After that, DHI did hydraulic and coastalstudies, wave modelling and hydro-dynamicmodelling to see the viability of beach nour-ishment. Now, the PWD report can formallyestablish if sand can be used from Mahim Bay.the sand would be dredged with a pump, laidalong Dadar beach and then the geo-tube tech-nology would be used. It’s only the top sand,needed for aesthetic purposes, that needs tobe brought from outside.

This BNP is environmentally sustainableand supportive. It doesn’t involve civil con-struction or construction of sea walls, whichare detrimental to coastal protection. It is alsocost-effective. It takes less time to implementa BNP as compared to civil construction meth-ods. Moreover, you’ll get a natural beach as apublic space at a location that was originallythe heart of Mumbai’s central district.

The cost of replenishing lost sand is smallwhen compared to the cost of repairing seawalls. We have given a calculation for re-plenishing the sand every three to five years.

BNP is used in most parts of Europe andthe United States. In India, INS Hamla (Marve),Dahanu beach and Vishakapatnam are ex-amples of beach nourishment. This isn’t anew science. In fact, many countries havebanned sea-wall construction for being envi-ronmentally detrimental. Nourishment re-es-tablishes the natural wave patterns and eco-

logical systems in whichsand is regenerated to

protect our coast. Soyou’re bringing natu-ral conditions back.

The MMRDA and MSRDC havealready killed the ecology of

Mahim Bay and Mahim Creek,which is an estuary of the Mithi Riv-er. The working pattern of the Mithihas been destroyed.

Before reclamation for the ap-proach to the sea link, the marineecosystem was full of life. Now, whenit is dead, they are talking of nour-ishment, which isn’t the right word.It is foolish of the PWD to try andbeautify a dead beach. From MahimCauseway to Bandra Land’s End alength of 2.25 km and width of three-quarter km was reclaimed. Theystarted in 1999 and stopped in 2002when residents complained.But eventually they finishedit in patches.

The approach to thesea link should have beena bridge, but it is a roadon reclamation. It wasrecommended in govern-ment reports that thereshould be in-situ conser-vation and not reclama-tion. There was the Paran-jape Committee report of1987, Central Institute ofFisheries Education reportof 1992 (submitted to MM-RDA), state MangroveCommittee report of 1993

(with NIO involvement); a centralgovernment Neeri study in 1994-96and a 1997 BNHS report for theUnion environment ministry.

Despite these reports, the stategovernment went ahead with recla-

mation. As a result, sand fromWorli to Mahim was wiped

out because the tide wasblocked from enteringMahim Creek and start-ed hitting with force else-where. At the same time,the Mithi River wasblocked from enteringthe Arabian Sea. Thesandy bed present forcenturies eroded. Theflushing of MahimCreek, which receives 80crore litres of sewage andchemicals a day, wasstopped. The creekturned into a toxic pond.

As per the topography and slope, thecreek moves towards Mahim Bayand the Arabian Sea. Dadar, Mahimand Prabhadevi beaches wereharmed. There was also loss of sta-bilization on the shore.

To make matters worse, someagency removed thousands of trucksof sand from the north side ofMahim Bay two years ago. Nobodyknows where they took the sand.

The solution is to go to the rootof the problem and remove the recla-mation from Mahim Causeway toLand’s End and build a bridge in-stead of a road. Sand deposition willreturn to its original form.

Also, if you bring in sand fromRatnagiri or Dahanu, you will de-prive their ecosystems. Sand isn’t adead material, it’s a life-form habi-tat. Beach nourishment will not helpfilter toxic elements and provide ahabitat for life forms.

Worldwide there are manyexamples of environ-

mentally friendly beaches andbeach nourishment done dueto erosion—like in Singapore,the United States and Europe.But the PWD should focus onwhat its purpose is—stabi-lization of the shore, beautifi-cation, recreation and/orpromenades. Stabilization

should be the first priority. Astudy on erosion and siltationshould also be conducted. thecauses of the erosion shouldbe carefully studied before go-ing ahead with any beach nour-ishment. All like-minded ex-perts dealing with environ-ment and oceanographyshould form a think tank andhelp plan this project.

Beach nourishment is nothing but recla-mation. So, if you reclaim somewhere,

repercussions will be felt elsewhere. Takethe case of the sea link’s approach road. Re-claiming the eroded area will only erodesome other beach. In Chennai, nourishment

was done at Marina beachand its repercussions

were felt in a fishing vil-lage that was a fewmiles away.

Our concern isthat whatever isdone should be done ina synchronized manner.

The right hand should know whatthe left hand is doing. They haveput boulders at some places andtetrapods in other places. Toovercome the high tide, someplaces have a retaining wall. So,what’s the bund for? We don’t wanta haphazard job. The citizens’opinions should be considered— Tasneem Shukul | G-NORTH CITIZENS’ FORUM

If we have to buy sand fromoutside, our cost may go up to Rs 30crore. If it’s too expensive, we’ll findanother alternative. So far, this(Mahim sand) is the only solution— Santosh Sawant | HARBOUR ENGINEER, PWD

RECLAIMING LEADSTO MORE PROBLEMS

NOURISHING BEACHIS SUSTAINABLE

First Steps Being Taken To Revitalize Coast, But Availability Of Sand, Uncertainty Of Cost & Environmental Concerns Plague Project

SHIVAJIPARK

STABILIZING SHORELINESHOULD BE FIRST PRIORITY

REVERSE RECLAMATION TO STOP DADAR EROSION

DEBATE: IS NOURISHMENT VIABLE?

Ashok Ravat,SHIVAJI PARK ALM

ACTIVIST

Shankar Gajbhiye, SCIENTIST IN-CHARGE, NATIONAL INSTITUTE OF

OCEANOGRAPHY, MUMBAI

P K Das, ARCHITECT &WATERFRONT

RESTORATION EXPERT

Girish Raut,ENVIRONMENTAL

ACTIVIST AND

MAHIM RESIDENT

WHO CAMPAIGNED

AGAINST

RECLAMATION IN

BANDRA

Uma Kadam

HARD FACTS: The erosion at Dadar seaface has left practically no sand along the shores

Mahim Creek, throughwhich Mithi empties intoBay, was narrowed byreclamation, say activists

At present, due toreclamation, sewageand toxins from Mithicollect in the Bay anddon’t get flushed out,say activists

PWD is now testingsand in the Mahimseabed to check if it issuitable fortransporting to Dadarand Prabhadevi forbeach nourishment

Bandra-Worli Sea Link

If Mahim sand passestest, PWD will initiate

pilot project tonourish 500 metres of

beach fromChaityabhoomi tomayor’s bungalow

IS BEACH NOURISHMENT THE ANSWER TO CHECKING SAND EROSION ATTHE DADAR-PRABHADEVI BEACH? LINAH BALIGA FINDS OUTGenesis of the plan: Architect P K Das submitted aBeach Nourishment Plan (BNP) to the BMC for a 1.2-kmstretch of Dadar beach (Kirti College to HindujaHospital) which was approved in 2003. Das’s BNPproposed to restore the beach to a vital, public spaceand to check erosion. The plan: a) nourish, regenerateand expand the beach; b) redevelop existing approach

roads, gardens, hawkers’ stalls, steps, ramps and podia;c) provide public conveniences, general lighting andsecurity; and d) maintain cleanliness by extendingsewage outfalls and providing effective solid-wastemanagement.

Sand, comprising silt from Mithi River, would bedredged from Mahim Bay, washed and put on Dadar

beach. It would then be covered with a top layerimported from elsewhere in Maharashtra. The plan ispart of Das’s Open Mumbai exhibition, which is on atNGMA till April 7.

The Public Works Department (PWD) has beguntesting sand at Mahim, but PWD officials said importinga top layer for aesthetic reasons may be too expensive.

MITHI RIVERPOURS INTO

MAHIM CREEK

MAHIM

M A H I M B A Y

DADAR

HINDUJAHOSPITAL

C H A I T Y A B H O O M I

WORLI

MAYOR’SBUNGLOW

PRABHADEVI

BANDRA

� After sand is deposited at Dadar beach,GEO-TUBES filled with more sand fromMahim would be placed 100 metres frombuilding walls to protect shore & seabed� A geo-tube is made up of geo-textilepolypropylene, multi-woven fabric. It iscircular, measures 20 metres in lengthand has five holes� During high tide,seawater enters andleaves, but sand remains� This system was successfully used atINS Hamla, Marve

2.25-km road and promenadefrom Mahim Causeway toLand’s End, built on landreclaimed in the late 1990s.Environmental activists claimthis killed the ecology ofMahim Bay and Mahim Creekand the pattern of the Mithi.Government reports called forconservation not reclamation

Reclamation alongBandra has led to seaforcefully hitting theseafront from Mahimto Worli, speeding uperosion from beaches

and sea bed, sayenvironmentalists

DIGGING FOR SOLUTIONSl The Dadar-Prabhadevi beach is a 4kmstretch from Worli Village to Mahim fort.It covers an area of over 50,000 sq m

l The sandy beach has eroded, with mostparts rendered inaccessible

l Properties along the beach have beenexposed to high tide, so boulders havebeen dumped to halt erosion

l This affects public movement andadversely affects the coast

l It is being proposed that the beach berestored as a public space and erosion be checked

Source: P K Das & Associates

Tetrapods have been placedalong some parts of the coast tocounter the force of the waves

1

2

3

4

5

7

If pilot project issuccessful, PWD will

attempt to nourish entire4-km Dadar-Prabhadevi

stretch

8

REBUILDING

THE COAST

SANDS OF TIMESTRIPPED FROM

Dadar beach

AR

AB

I A NS E A

>>

� You can also share your views in the ‘Mumbai’

section of timesofindia.indiatimes.com � Or log onto

‘The Times Of India’ page on Facebook

Type SO <space> DADAR <space> yourviews and name. SMS to 58888

[email protected] with ‘Dadar’in the subject line

Q. Will sand from Mahim help rebuild the Dadar-Prabhadevi stretch, or do the authoritiesneed to look at other options? Will the beachesdying along the bay ever be revived?

SMS

to timesofindia.indiatimes. com& visit the Speak Out section

LOG ON

EMAIL

TOI Interactive

The Phase-I revamp ofMarine Drive was

primarily structural andenabling in nature.Phase-II, estimated at Rs100 crore, is ambitiousand comprises all theaesthetic sections of thework which, whencompleted, will bevisible to all. However,the BMC needs tointeract with architectsand residents. Workmust start immediately.—Bikram Banerjea

Most buildings thatface the Marine

Drive wear a sorrowful

look as they have notbeen painted since long.The blame may lie with the salty air. —Mahavir Tewari

The state can spendas much as it wants

on parks and statues, tomake the Marine Drivemore attractive, butcitizens will just end uppainting the walls redwith paan spit and litterthe paths. It is a shamethat due to theignorance of a few, cities are deprived of aclean environment.— Karl Behramfram

We asked readers if the Marine Driverevamp lacks colour? Should the stateconsult with residents and begin work onPhase II of the project? Here are some of your replies:

‘WORK ON MARINE DRIVE BEAUTIFICATION’S PHASE-II MUST START’

Pics: Hemant Shirodkar

Graphic: Shailesh Warang

6