    Increasing Water Conservation in Cooling Towers Using Sphagnum

    MossDavid R. Knighton MD

    CEO and Co-Founder CWS

  • Creative Water Solutions © 2014

    Introduction• Cooling towers are the

    second largest user of potable water behind agriculture

  • Creative Water Solutions © 2014

    History of CWS

    • Started 2003• First commercial product 2004 for spas• Pools• Industrial water in 2013• Home and commercial potable water 2019

  • Creative Water Solutions © 2014

    Sphagnum Moss

    • Harvested by hand

    • Green • Sustainable• Renewable

  • Creative Water Solutions © 2014

    Sphagnum Moss Leaf Structure

  • Creative Water Solutions © 2014

    • Select species of Sphagnum moss

    • Leaves are separated and cleaned

    • CWS products are made from moss leaves

    First Step in CWS Product Journey

  • Creative Water Solutions © 2014

    • Cut and compressed

    • Leaves are pressed and formed into a board

    • Boards are cut into correct shapes

    • Moss is sterilized

    Second Step in CWS Product Journey

  • Creative Water Solutions © 2014

    Product for Industrial Applications

    • Sphagnum moss forcommercial and industrial applications

    • Select species

    • Patented

  • Creative Water Solutions © 2014

    Industrial Contact ChamberSubmerged Water Body

    • ProMoss™ are exposed to water using a contact chamber

    • Contact chamber is submerged in flowing water

    • Flow within the tank allows exposure of the ProMoss™ leaves to the water

  • Creative Water Solutions © 2014

    Industrial Off-line or In-line Contact Chamber

    • Installed off line

    • Maintain 15 Gal/min flow

    • Plumbed across an existing pump or an auxiliary pump

  • Creative Water Solutions © 2014

    Known Sphagnum Moss Functions

    • Absorbs 20X its dry weight in water• Absorbs 10X its dry weight in oil• Absorbs positively charged ions• Acidifies Water• Removes CO2 from the atmosphere

  • Creative Water Solutions © 2014

    What ProMoss™ Does

    • Absorbs water and oil• Absorbs cations• Clarifies water decreasing turbidity• Inhibits organic contamination• Inhibits the formation and removes scale• Inhibits corrosion

  • Creative Water Solutions © 2014

    Cation Absorption into Sphagnum Moss Leaves using Plasma Mass Spectroscopy

  • Creative Water Solutions © 2014

    Organic Contamination

  • Creative Water Solutions © 2014

    Organic Contamination

  • Creative Water Solutions © 2014

    Air Scrubber Water Pipe at a Tobacco

    Factory

  • Creative Water Solutions © 2014

    ProMoss™ Effect on Scale in a Cooling Tower Rochester, NY

    Scale without ProMoss™ Scale with ProMoss™

  • Creative Water Solutions © 2014

    End caps – pool heat exchangerWater From boiler treated with polymer and dispersant - four years of service

    Pool side of the same heat exchangerPoolMoss® treated pool water – 4 years

    Heat Exchanger Indoor Pool

    Effect of ProMoss™onScale

    Field Results

  • Creative Water Solutions © 2014

    Cooling Tower Example90% Reduction in Corrosion for Copper

    • Tower without Moss • Tower with Moss

    0

    0.5

    1

    1.5

    2

    2.5

    3

    3.5

    4

    4.5

    5

    8/4/

    13

    8/14

    /13

    8/24

    /13

    9/3/

    13

    9/13

    /13

    9/23

    /13

    10/3

    /13

    10/1

    3/13

    10/2

    3/13

    MPY

    Date

    Probe 1

    Probe 2

    Linear (Probe 1)

    Linear (Probe 2)

    0

    0.5

    1

    1.5

    2

    2.5

    3

    3.5

    4

    4.5

    5

    0 5 10 15

    MPY

    Probe 1

    Probe 2

    coupon

    Linear (Probe 1)

    Linear (Probe 2)

    Linear (coupon)

  • Creative Water Solutions © 2014

    Cooling Towers and Chillers

  • Creative Water Solutions © 2014

    Cooling Tower Examples

    • 2200 Ton tower Corning, NY• 2000 Ton tower Rochester, NY

  • Creative Water Solutions © 2014

    ProMoss™ Trial at Corning Inc

  • Creative Water Solutions © 2014

    Corning Kiln Tower #2

    • Mfg: Marley• Tons: 2200• Make up water:

    13,000 g/day• ProMoss™ dosage

    – 5 ProMoss™3– 1 ProMoss™2

  • Creative Water Solutions © 2014

    Scope and ObjectivesCorning Cooling Tower Trial

    • Determine and compare effectiveness and benefits of ProMoss™ on a kiln cooling tower– Scale– Corrosion– Biological (bacterial counts and organic contamination)– pH, conductivity, calcium hardness– Operating costs/savings

    • Compare results with a tower on traditional chemical water treatment and another with an electro-precipitator on non-chemical water treatment

  • Creative Water Solutions © 2014

    Corning Criteria for SuccessSystem Performance

    Desired Outcome• Corrosion

    – Mild Steel

  • Creative Water Solutions © 2014

    Corning Criteria for SuccessCooling Water Chemistry

    Desired Outcome• Conductivity/pH

    – 100% compliance with specified tower range

    • Corrosion products– Fe < 1.0 mg/l– Cu < 0.2 mg/l

    Acceptable Outcome• Conductivity/pH

    – 75% compliance with specific tower range

    • Corrosion products– Fe < 2.0 mg/l– Cu < 0.5 mg/l

  • Creative Water Solutions © 2014

    Corning Criteria for SuccessEnvironmental ROI

    Desired Outcome• Water use

    – Lower water use than baseline

    • Energy– Lower energy consumption

    than baseline• Energize pumps• Energize chemical feed

    pumps• Energy to operate non-

    chemical system• Supports and enhances

    Cornig’s corporate sustainability goals

    Acceptable Outcome• Water use

    – Similar water use as baseline

    • Energy– Similar energy consumption

    as baseline• Energize pumps• Energize chemical feed

    pumps• Energy to operate non-

    chemical system• Neutral with respect to

    Corning’s sustainability goals

  • Creative Water Solutions © 2014

    Corning Criteria for SuccessSystem Reliability

    Desired Outcome• Decreased maintenance

    from baseline• No down time for tower

    function

    Acceptable Outcome• No change in

    maintenance from baseline

    • No increase in down time for tower function

  • Creative Water Solutions © 2014

    Water Savings ResultsProMoss™ Tower

  • Creative Water Solutions © 2014

    Bacterial Dip Slide DataProMoss™ Tower

  • Creative Water Solutions © 2014

    Corrosion Coupon DataProMoss™ Tower

  • Creative Water Solutions © 2014

    18 Month Followup

    Test Result

    pH 8.59

    Turbidity NTU .279

    TDS mg/l 437

    Conductivity μS/cm 891

    Fe mg/l 0.01

    Copper Free mg/l 0.04

    Copper Total mg/l 0.08

    Ca Hardness mg/l CaC03 198

    Alkalinity mg/l 295

    ATP Free RLU / ATP Total RLU 179 / 179

    5 cycles of concentration/ 196,497 gallonsmakeup per month down from 338,454

    gallons before ProMoss™ - 42% decrease

  • Creative Water Solutions © 2014

    11 Month Trial In Rochester, NY

    • Major defense contractor• Removed all chemical treatment• Used Sphagnum moss• Biocide hydrogen peroxide from a generator

  • Creative Water Solutions © 2014

    11 Month Trial in Rochester NY

    System Volume 16,000 gal

    Average Daily Makeup 21,356 gal

    Makeup Savings to Date 275,644 gal

    Blow-down Savings to Date 3,684 gal

  • Creative Water Solutions © 2014

    11 Month Trial in Rochester NY

    0 10000 20000 30000 40000 50000 60000 70000 80000 90000 10000010/2/1710/6/17

    10/11/1710/16/1710/19/1710/24/1710/27/17

    11/1/1711/6/1711/9/17

    11/14/1711/17/1711/22/1711/29/17

    12/4/1712/7/17

    12/12/1712/15/1712/20/1712/28/17

    1/4/181/9/18

    1/12/181/18/181/23/181/26/181/31/18

    GALLONS

    Make Up Water Volume Comparison

    Make Up

    Make Up

    Linear (Make Up)

    Linear (Make Up)

    Chemical Water Treatment Linear Regression

    Sphagnum moss Water Treatment Linear Regression

  • Creative Water Solutions © 2014

    11 Month Trial in Rochester NY

    0 10000 20000 30000 40000 50000 60000 70000 8000010/2/2017

    10/10/201710/17/201710/24/201710/31/2017

    11/7/201711/14/201711/21/201711/30/2017

    12/7/201712/14/201712/21/2017

    1/4/20181/11/20181/19/20181/26/201810/4/2016

    10/12/201610/19/201610/26/2016

    Blow Down Water Volume Comparison

    Blowdown Blowdown

    Chemical Water Treatment

  • Creative Water Solutions © 2014

    11 Month Trial in Rochester NY

    Makeup water cost 1st 125,000 gal $390.00

    Makeup water cost additional $2.21/1000 $332.97

    Average water cost savings 12 months $2,168.09

    Average to Date Sewer Cost $2.2368/1000 $616.61

    Average to Date Sewer Savings per month $154.15

    Average to Date Sewer Savings per year $1,849.82

    Average To Date Sewer Credit per year $1,825.09

    Total Overall Water Cost Savings per year $3,993.89

    Improvement in Heat Transfer 3%

    Chemical cost savings are unknown

  • Creative Water Solutions © 2014

    Results in Rochester NY

    • Corporation changed it’s water treatment contract to Sphagnum moss even after the previous company lowered their price by $20,000.

    • They are in the process of switching all towers to the Sphagnum moss system

  • Creative Water Solutions © 2014

    Conclusions

    • Sphagnum moss treated cooling towers result in water savings by:• Removing the contribution of chemical treatment to total

    conductivity by 18-20%• Allowing increase in cycles of concentration 2-3 fold after

    Sphagnum moss conditions the water and removes scale from the system.

    • Cycles of concentration vary by location • North Carolina 16 cycles• New York 6-8 cycles

    • Average water savings is 40 – 50%• Potential similar savings worldwide

    WSI Cover Sheet.pdfSlide Number 1

    1515- David KnightonSlide Number 1Slide Number 2History of CWSSlide Number 4Sphagnum Moss Leaf StructureSlide Number 6Slide Number 7Slide Number 8Slide Number 9Slide Number 10Slide Number 11What ProMoss™ DoesCation Absorption into Sphagnum Moss Leaves using Plasma Mass SpectroscopySlide Number 14Slide Number 15Slide Number 16ProMoss™ Effect on Scale in a Cooling Tower Rochester, NYSlide Number 18Slide Number 19Cooling Towers and ChillersCooling Tower ExamplesProMoss™ Trial at Corning IncCorning Kiln Tower #2Scope and Objectives�Corning Cooling Tower TrialCorning Criteria for Success�System PerformanceCorning Criteria for Success�Cooling Water ChemistryCorning Criteria for Success�Environmental ROICorning Criteria for Success�System ReliabilityWater Savings Results�ProMoss™ TowerBacterial Dip Slide Data�ProMoss™ TowerCorrosion Coupon Data�ProMoss™ Tower18 Month Followup11 Month Trial In Rochester, NY11 Month Trial in Rochester NY11 Month Trial in Rochester NY11 Month Trial in Rochester NY11 Month Trial in Rochester NYResults in Rochester NYConclusions