22
1 The Park Hotel Instructions for Assembly Kit Contents: 280 ea. Laser Cut Acrylic Parts. 1 ea. 6" Plastic Coated Wire. 5 ea. Sidewalk Parts. 14 ea. Cast Resin Dormers. 12 ea. Window Glass Templates, 12 ea. Window Glazing, instructions with diagrams. Thank you for purchasing this kit. Please read these instructions completely before beginning and take your time. Allow parts to dry after painting or gluing and do not try to build this in one night. Drawings of all the parts have been included for ease of part identification. Practice gluing the acrylic together if you have never done it before. There is plenty of scrap in your kit that you can use for this. If by chance a part is missing or broken, please write us indicating the kit name and part number and we will send you a replacement. You will need the following items to assemble your model: Sharp hobby knife, file, paint (see “Painting Your Model”), paint brushes, glue (see “Gluing Acrylic”), modeling putty. About the Kit This kit will build a 24 story building. The kit is built up in modules labeled as units. There are six units in all. The units range from three to eight stories. The units stack on top of each other when completed. The assembly of each unit is very similar. Once you have built the first unit you will most likely be able to build the rest without reading the instructions. However... I spent a lot of time writing the instructions so I would appreciate it if you would. Repetitive sequences will be described in detail the first time and then less so subsequently. Parts are labeled in the instructions inside parentheses. The first number is the unit number and the second is the part number in that unit. For instance (3-6) would be unit three part six. Each unit has a base and top that are identified with a letter. Many parts have engraved details on them. Be sure that these are facing out when gluing the parts together. It is easy to install these backwards by mistake.

The Park Hotel Instructions for Assembly02f6eec.netsolstores.com/instructions/parkhotel...1 The Park Hotel Instructions for Assembly Kit Contents: 280 ea. Laser Cut Acrylic Parts

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: The Park Hotel Instructions for Assembly02f6eec.netsolstores.com/instructions/parkhotel...1 The Park Hotel Instructions for Assembly Kit Contents: 280 ea. Laser Cut Acrylic Parts

1

The Park HotelInstructions for Assembly

Kit Contents: 280 ea. Laser Cut Acrylic Parts. 1 ea.6" Plastic Coated Wire. 5 ea. Sidewalk Parts. 14 ea. CastResin Dormers. 12 ea. Window Glass Templates, 12 ea.Window Glazing, instructions with diagrams.

Thank you for purchasing this kit. Please read theseinstructions completely before beginning and take yourtime. Allow parts to dry after painting or gluing and do nottry to build this in one night.

Drawings of all the parts have been included for ease of partidentification.

Practice gluing the acrylic together if you have never done itbefore. There is plenty of scrap in your kit that you can usefor this. If by chance a part is missing or broken, pleasewrite us indicating the kit name and part number and wewill send you a replacement.

You will need the following items to assemble your model:Sharp hobby knife, file, paint (see “Painting Your Model”),paint brushes, glue (see “Gluing Acrylic”), modeling putty.

About the Kit

This kit will build a 24 story building. The kit is built up in modules labeled as units. There aresix units in all. The units range from three to eight stories. The units stack on top of each otherwhen completed.

The assembly of each unit is very similar. Once you have built the first unit you will most likelybe able to build the rest without reading the instructions. However... I spent a lot of time writingthe instructions so I would appreciate it if you would. Repetitive sequences will be described indetail the first time and then less so subsequently.

Parts are labeled in the instructions inside parentheses. The first number is the unit number andthe second is the part number in that unit. For instance (3-6) would be unit three part six.Each unit has a base and top that are identified with a letter.

Many parts have engraved details on them. Be sure that these are facing out when gluing theparts together. It is easy to install these backwards by mistake.

Page 2: The Park Hotel Instructions for Assembly02f6eec.netsolstores.com/instructions/parkhotel...1 The Park Hotel Instructions for Assembly Kit Contents: 280 ea. Laser Cut Acrylic Parts

2

Gluing Acrylic

Always glue acrylic in a well-ventilated area, and read the glue manufacturer’s label forinstructions.

We recommend using Tenax-7R by Hebco or Plastruct brand “Plastic Weld Solvent Cement”(PPC-2 or PPC-16) or “Bondine Solvent Cement”(Bond-2 or BOND-16). Tenax-7R comes witha dispenser and Plastruct sells a Solvent Syringe (HT-8 or HT-10) and various other solventdispensers. Most hobby shops carry these products or they may be ordered directly from Hebco(931)-796-7442 or Plastruct (626)-912-7016.

Acrylic must be glued together using a solvent that will melt the two edges and literally fusethem together. To do this, place the two pieces to be joined together and run a bead of solventdown the edge. Capillary action will suck the solvent into the joint and after several seconds thepieces will be fused. After only a few minutes the pieces will be strong enough to work with. Thebond will be completely dry within twenty-four hours using the above-mentioned products.Solvent can be dispensed two ways.

Typically the solvent comes in a small bottle with a brush in the lid. The brush allows you todispense a drop or two of solvent at a time.

You may want to use a polyethylene bottle or syringe with a blunt needle dispenser. This allowslarger amounts of solvent to be dispensed quickly and cleanly. Be sure the bottle you are using isapproved for the solvent you are using or you may melt through it. These may be purchased fromCMR.

Preparing Your Model for Painting

We recommend lightly sanding all parts to remove the raised edge created during the lasercutting process. In order to hide the seams we recommend using “hobbyist putty” such as GreenSquadron modeling putty. Do this in a very well-ventilated area. Apply the putty over the seams and allow to dry overnight. Once the putty has dried, placea sheet of fine sandpaper on a flat surface and sandsmooth. You may need to apply a second coat of puttyand sand again.

You may choose to “wrap” the engraved lines aroundthe corners with a small triangular jewelers file.

Page 3: The Park Hotel Instructions for Assembly02f6eec.netsolstores.com/instructions/parkhotel...1 The Park Hotel Instructions for Assembly Kit Contents: 280 ea. Laser Cut Acrylic Parts

3

Painting Your Model

After building each unit and prior to installing the windows, we primed our building with KrylonGray spray paint. We also primed the window frames. For our building paint scheme, we used“Poly Scale Acrylic” paints which are available in most hobby stores. We also used “Poly ScaleAcrylics” for details and weathering. Always test compatibility of your paint with the acrylic bypainting and testing a small area first.

We painted the first unit of the building very light grey and the windows light grey and bronze.We painted the upper stories dark grey and the windows light grey. We then made a white washwith “Poly Scale” paints. The building units were laid flat with a wall facing up and the washwas applied and allowed to dry. The unit was then rotated to the next wall and the process wasrepeated, and so on. We air brushed the back and alley walls with a dirty black mix so that theywould be darker. Finally, we installed the painted windows into the units. We painted the roof acorroded green tin color and gave it a heavy white wash. The dormers and chimneys were paintedthe same as the building.

Note on Tabs

Sometimes it is necessary to sand or file the tabs slightly in order to get them to seat themselvesinto the slots. This is due to slight variations in acrylic thickness. If the tabs are not fitting intothe slots properly, you may need to file them back at an angle to fit properly.

Window Glass

There are printed window shades included with your kit. These are designed to be laminated withacetate window glazing prior to installing in your model. The printed window shades arenumbered to correspond with the window frame parts.

Lightly spray glue the window shade page on the printed side with spray mount and apply a sheetof acetate. Press in place. We used 3M Spray Mount part number 6065 which is available at craft

and office supply stores. Glue these to theback of the painted window frames usingsuper glue (CA).

After gluing the window glazing to thewindow frames, place the assembly face upon a cutting matt and trim off any excessglazing with a hobby knife. See figure 1.

Figure 1

Page 4: The Park Hotel Instructions for Assembly02f6eec.netsolstores.com/instructions/parkhotel...1 The Park Hotel Instructions for Assembly Kit Contents: 280 ea. Laser Cut Acrylic Parts

4

Assembling the Tower Units

The first unit of this structure isasymmetrical in that opposite sidesdo not match one another in detailand character. Figure 2 shows basepart (A) face up with the first set ofwall parts face down and ready toinstall into their appropriate places. Be sure when installing parts thatthe engraved side is facing out.

Orientation is from the front. Theright side wall is to the right of thefront wall.

Please note that all pieces referred to as bases and tops (parts A, B, C, etc...) should have the partnumber facing up during assembly unless otherwise noted. This is the correct orientation toinsure that the tabs on the wall parts will fit into the slots facing the right direction.

Unit 1

Begin by taking base (A) and laying it flat on your work surface with the engraved part numberfacing up. Working clockwise, insert the tabs of the front wall (1-1) into the slots on the “front”side of part (A) and glue in place (see figure 2 for orientation). Note that the tabs on the top andbottom of the wall parts are different sizes, and the walls will only fit into part (A) in onedirection. Make sure that the engraved side is facing out.

Next, insert the tabs of the left side wall (1-2) intothe slots on the left side of part (A) and glue inplace. The two walls should meet and be glued atthe corner. Insert the tabs of the back wall (1-3) intothe slots on the “back” side of part (A) and glue inplace. Then, insert the tabs of the right side wall (1-4) into the slots on the right side of part (A) andglue in place to form a box. Make sure to glue allthe corners together. See Figure 3.

Figure 2

Figure 3

Page 5: The Park Hotel Instructions for Assembly02f6eec.netsolstores.com/instructions/parkhotel...1 The Park Hotel Instructions for Assembly Kit Contents: 280 ea. Laser Cut Acrylic Parts

5

Glue the top (B) onto the assembly with theengraved part number facing up. Check that all thetabs are seated properly. See Figure 4.

Now that the basic wall structure is together thewalls get built out to create a decorative facade.Begin by gluing the left side (1-6) and the right side(1-8) to their appropriate walls making sure they areflush with the adjoining wall. If necessary file theedges so that the corners are perfectly flush. Nextglue the front (1-5) and back (1-7) to theirrespective walls. They will overlap the sides andshould be perfectly flush on the edges. If necessaryfile the edges so that the corners are perfectly flush.See Figures 5 & 6.

Glue part (1-9) onto part (1-5). Glue part (C) on topof part (B). The center openings should alignperfectly. See Figure 7

Figure 4

Figure 6Figure 5

Figure 7

Page 6: The Park Hotel Instructions for Assembly02f6eec.netsolstores.com/instructions/parkhotel...1 The Park Hotel Instructions for Assembly Kit Contents: 280 ea. Laser Cut Acrylic Parts

6

Figure 10

Figure 8

Figure 9

Fill and sand the corners of the assembly ifnecessary. You may choose to “wrap” the engravedlines around the corners with a small triangularjewelers file. See “Preparing your Model forPainting”.

Paint the unit and set aside to dry. See Figure 8

Paint the window frames (1-10), (1-11), (1-12),(1-13), and (1-14) your choice of color. We paintedours light grey. Then we masked off the upperwindows and painted the large windows and doorsshiny gold. Install the window glazing as describedearlier. Install part (1-10) behind the “front” wall,part (1-11) behind the left “side” wall, part (1-12)behind the right “side” wall, and parts (1-13) and(1-14) behind the “back” wall. See Figure 9.

Assemble the awning by gluing parts (A-2), (A-3)and (A-4) to (A-1). Paint and attach to the front ofUnit 1 above the main door. Cut two lengths of wireto 1.25" long and glue in place to support theawning. See Figure 10.

Paint the Garage Door (1-15) dark gray and glue inplace behind the door opening in part (1-2).See Figure 10.

Page 7: The Park Hotel Instructions for Assembly02f6eec.netsolstores.com/instructions/parkhotel...1 The Park Hotel Instructions for Assembly Kit Contents: 280 ea. Laser Cut Acrylic Parts

7

Unit 2

Place base (D) flat on your work surface with theengraved number facing up. Glue part (2-1) into thecenter slots located in the front of part (D). Glueparts (2-2) and (2-3) on either side of part (2-1)using the tabs and slots for alignment.See Figure 11.

Glue part (2-4) into the center slots located in theleft side of part (D). Glue part (2-2) and (2-3) oneither side of part (2-4) using the tabs and slots foralignment. Repeat on the right side.See Figure 12

Glue the six parts (2-5) into the slots of part (D)using Figure 13 for placement.

Part (2-6) is shipped in two parts and will need to beglued together using a part (2-8) to bridge the seamas shown in figure 14. Note that part (2-8) is a widerpart than the similar part (2-7) that will be usedlater.

Figure 11

Figure 12

Figure 13

Figure 14

Page 8: The Park Hotel Instructions for Assembly02f6eec.netsolstores.com/instructions/parkhotel...1 The Park Hotel Instructions for Assembly Kit Contents: 280 ea. Laser Cut Acrylic Parts

8

Glue the assembled part (2-6) to the back ofpart (D). Make sure the corners are flush with theparts (2-5) on either side of it. See Figure 15.

Glue part (E) on top of the assembly using the tabsand slots for alignment. See Figure 15.

Next glue the decorative corners in place. Eachcorner is made up of one part (2-7) and one part(2-8). You will notice that part (2-7) is narrower andhas the edges notched only on one side. Part (2-8) iswider and has the edges notched on both sides. Gluepart (2-7) on first so that the non-notched side isflush with the corner. Next glue part (2-8) onto thecorner so that it overlaps part (2-7). Use part (2-8)on the side of the corner that will be the most visibleto prevent you from seeing the seam.See Figure 16.

Fill and sand the corners of the assembly if necessary. You may choose to “wrap” the engravedlines around the corners with a small triangular jewelers file. See “Preparing your Model forPainting”.

Paint the unit and set aside to dry.

Figure 15

Figure 16

Page 9: The Park Hotel Instructions for Assembly02f6eec.netsolstores.com/instructions/parkhotel...1 The Park Hotel Instructions for Assembly Kit Contents: 280 ea. Laser Cut Acrylic Parts

9

Paint the window frames (2-9), (2-10), (2-11), (2-12), and (2-13) your choice of color and installthe window glazing as described earlier.

Install window frame (2-9) behind wall part (2-1). Install the nine window frames (2-10) behindwalls (2-2), (2-3), (2-4) and the left side of (2-6A). Install the six window frames (2-11) behindthe walls (2-5). Install window frame (2-12) behind wall (2-6B). Install window frame (2-13)behind the right side of wall (2-6A). See Figure 17.

Figure 17

Page 10: The Park Hotel Instructions for Assembly02f6eec.netsolstores.com/instructions/parkhotel...1 The Park Hotel Instructions for Assembly Kit Contents: 280 ea. Laser Cut Acrylic Parts

10

Unit 3

Place base (F) flat on your work surface with theengraved number facing up. Glue part (3-1) into thecenter slots located in the front of part (F). Glueparts (3-2) and (3-3) on either side of part (3-1)using the tabs and slots for alignment.See Figure 18.

Glue part (3-4) into the center slots located in theleft side of part (F). Glue part (3-2) and (3-3) oneither side of part (3-4) using the tabs and slots foralignment. Repeat on the right side.See Figure 19.

Glue the six parts (3-5) into the slots of part (F)using Figure 20 for placement.

Glue part (3-6) to the back of part (F). Make surethe corners are flush with the parts (3-5) on eitherside of it.

Glue part (E) on top of the assembly using the tabsand slots for alignment. See Figure 21.

Figure 18

Figure 19

Figure 20

Figure 21

Page 11: The Park Hotel Instructions for Assembly02f6eec.netsolstores.com/instructions/parkhotel...1 The Park Hotel Instructions for Assembly Kit Contents: 280 ea. Laser Cut Acrylic Parts

11

Next glue the decorative corners in place. Each corner is made up of one part (3-7) and one part(3-8). You will notice that part (3-7) is narrower and has the edges notched only on one side. Part(3-8) is wider and has the edges notched on both sides. Glue part (3-7) on first so that the non-notched side is flush with the corner. Next glue part (3-8) onto the corner so that it overlaps part(3-7). Use part (3-8) on the side of the corner that will be the most visible to prevent you fromseeing the seam. See Figure 22.

Glue two parts (3-8) to the back wall part (3-6) using the engraved lines on the wall for location.See Figure 22.

Fill and sand the corners of the assembly if necessary. You may choose to “wrap” the engravedlines around the corners with a small triangular jewelers file. See “Preparing your Model forPainting”.

Paint the unit and set aside to dry.

Paint the window frames (3-9),(3-10), (3-11), and (3-12) yourchoice of color and install thewindow glazing as described earlier.

Install window frame (3-9) behindwall part (3-1). Install the eightwindow frames (3-10) behind walls(3-2), (3-3), and (3-4). Install the sixwindow frames (3-11) behind thewalls (3-5). Install window frame(3-12) behind wall (3-6). SeeFigure 23.

Figure 22

Figure 23

Page 12: The Park Hotel Instructions for Assembly02f6eec.netsolstores.com/instructions/parkhotel...1 The Park Hotel Instructions for Assembly Kit Contents: 280 ea. Laser Cut Acrylic Parts

12

Unit 4

Unit 4 has terraces that extend out from the bottomof it and sit on top of the unit below. In somesituations these terraces may curl or cusp afterconstruction as a result of glue or paint solventcausing the surface tension of the acrylic to bereleased on the top side only. To prevent this fromhappening we recommend that Unit 4 be built andattached to unit 3 with in a 48 hour period.

Unit four is different from the earlier units. Thewall assembly is symmetrical and the buildingbegins stepping in at this point. We will also beadding railings to the balconies.

Place base (G) flat on your work surface with theengraved number facing up. Glue part (4-1) into thecenter slots located in the front of part (G). Glueparts (4-2) and (4-3) on either side of part (4-1)using the tabs and slots for alignment. Repeat theprocess on the back of part (G). See Figure 24.

Glue part (4-4) into the center slots located in theleft side of part (G). Glue part (4-2) and (4-3) oneither side of part (4-4) using the tabs and slots foralignment. Repeat on the right side. See Figure 25.

Glue the eight parts (4-5) into the slots of part (F) tocreate the corners, using Figure 26 for placement.

Glue part (H) on top of the assembly using the tabsand slots for alignment. See Figure 26.

Figure 24

Figure 25

Figure 26

Page 13: The Park Hotel Instructions for Assembly02f6eec.netsolstores.com/instructions/parkhotel...1 The Park Hotel Instructions for Assembly Kit Contents: 280 ea. Laser Cut Acrylic Parts

13

Next glue the decorative corners in place. Eachcorner is made up of one part (4-6) and one part(4-7). You will notice that part (4-6) is narrowerand has the edges notched only on one side. Part(4-7) is wider and has the edges notched on bothsides. Glue part (4-6) on first so that the non-notched side is flush with the corner. Next glue part(4-7) onto the corner so that it overlaps part (4-6).Use part (4-7) on the side of the corner that will bethe most visible to prevent you from seeing theseam. See Figure 27.

Install the railings (R4-1), (R4-2), (R4-3) and(R4-4) as shown in Figure 28.

Fill and sand the corners of the assembly ifnecessary. You may choose to “wrap” the engravedlines around the corners with a small triangularjewelers file. See “Preparing your Model forPainting”.

Paint the unit and set aside to dry.

Paint the window frames (4-8), (4-9), and (4-10)your choice of color and install the window glazingas described earlier.

Install the window frames (4-8)behind walls (4-1). Install thewindow frames (4-9) behind walls(4-4). Install the window frames(4-10) behind the walls (4-5).See Figure 29.

Figure 27

Figure 28

Figure 29

Page 14: The Park Hotel Instructions for Assembly02f6eec.netsolstores.com/instructions/parkhotel...1 The Park Hotel Instructions for Assembly Kit Contents: 280 ea. Laser Cut Acrylic Parts

14

Unit 5

Unit 5 has terraces that extend out from the bottomof it and sit on top of the unit below. In somesituations these terraces may curl or cusp afterconstruction as a result of glue or paint solventcausing the surface tension of the acrylic to bereleased on the top side only. To prevent this fromhappening we recommend that Unit 5 be built andattached to unit 4 with in a 48 hour period.

Glue part (5-3) onto the back of part (5-1) using theengraved lines on part (5-3) for alignment. Do thistwice. See Figure 30.

Place base (I) flat on your work surface with theengraved number facing up. Glue one part (5-1) intothe slots located along the long side of part (I). Gluetwo parts (5-2) on either side of part (5-1) using thetabs and slots for alignment. Glue the remainingpart (5-1) on the other side of the assembly to forma box. Glue part J on top of your assembly. SeeFigures 31 & 32.

Next glue the decorative corners in place. Eachcorner is made up of one part (5-4) and one part(5-5). You will notice that part (5-4) is narrowerand has the edges notched only on one side. Part(5-5) is wider and has the edges notched on bothsides. Glue part (5-4) on first so that the non-notched side is flush with the corner. Next glue part(5-5) onto the corner so that it overlaps part (5-4).See Figure 32.

Glue two parts (5-5) onto each of the walls (5-1)and (5-2) as shown in Figure 32. VERYIMPORTANT!... parts (5-5) should align with thedecorative corners on Unit 4 and you should makesure they align vertically when you glue them inplace. See Figure 33 on the next page.

Install the railings (R5-1), (R5-2) and (R5-3) asshown in Figure 32.

Figure 30

Figure 31

Figure 32

Page 15: The Park Hotel Instructions for Assembly02f6eec.netsolstores.com/instructions/parkhotel...1 The Park Hotel Instructions for Assembly Kit Contents: 280 ea. Laser Cut Acrylic Parts

15

Fill and sand the corners of the assembly ifnecessary. You may choose to “wrap” the engravedlines around the corners with a small triangularjewelers file. See “Preparing your Model forPainting”.

Paint the unit and set aside to dry.

Paint the window frames (5-6), (5-7), and (5-8)your choice of color and install the window glazingas described earlier.

Install the window frames (5-6) behind walls (5-1).Install the window frames (5-7) behind walls (5-3).Install the window frames (5-8) behind walls (5-2).See Figure 34. Figure 33

Figure 34

Page 16: The Park Hotel Instructions for Assembly02f6eec.netsolstores.com/instructions/parkhotel...1 The Park Hotel Instructions for Assembly Kit Contents: 280 ea. Laser Cut Acrylic Parts

16

Unit 6

Begin by gluing the dentils part (K) to the bottomof part (L) centering it on all sides. The bottomwould be the side without the part number andengraving on it. See Figure 35.

Flip assembly over and glue trim part (M) to the topof part (L) using the outside engraved line foralignment.

Glue the roof support (6-1) into the slots on the topof part (L) followed by the two parts (6-2) whichslide down onto part (6-1) and into (L). SeeFigure 36.

Glue the two short roof pieces (6-4) onto the ends ofthe roof support (6-1) using the engraved lines onpart (L) to keep them square. Make sure theengraved lines are facing out on the roof parts. SeeFigure 37.

Glue the two long roof pieces (6-3) to form apyramid. One part is slightly taller than the other.Glue the shorter one on first and then the longer onewhich will overlap the top edge. Make sure theengraved lines are facing out on the roof. File andsand all the edges so that they are sharp and clean.See Figure 38.

Figure 35

Figure 36

Figure 37

Figure 38

Page 17: The Park Hotel Instructions for Assembly02f6eec.netsolstores.com/instructions/parkhotel...1 The Park Hotel Instructions for Assembly Kit Contents: 280 ea. Laser Cut Acrylic Parts

17

Assemble the two chimneys by gluing the thinchimney sections between the wide ones, using thetwo small rectangles as braces to keep them square.Glue the small roof cap part onto the larger roof cappart so the two are centered. Glue this on top of thechimney. When dry, file the bottoms of the thinsides to match the angles of the large sides.See Figure 39.

Prime and paint the fourteen cast resin dormer parts(6-5). We painted ours very dark grey inside thewindow area and light grey around it to match ourwindow frames on the rest of the building. We thenpainted the windows with gloss coat so that theywould be shiny. Paint the dormer fronts (6-6) tomatch the stone of the building. Glue the dormerfronts to the resin dormers so that the bottom areflush and the windows are centered. Sand the backsof the dormers so that they are flat. See Figure 40

Glue the dormers to the roof. The first row ofdormers sits on the base of the roof. You can usethe lines on the roof to help in placement as theyshould be symmetrical.

The sides of the roof have a slightlysteeper pitch and so you will need tosand the backs of the two dormersthat go on the sides of the building sothat the fronts are vertical. UseFigure 41 for placement.

Glue the chimneys to the top of theroof. Use Figure 41 for location.

Figure 39

Figure 40

Figure 41

Page 18: The Park Hotel Instructions for Assembly02f6eec.netsolstores.com/instructions/parkhotel...1 The Park Hotel Instructions for Assembly Kit Contents: 280 ea. Laser Cut Acrylic Parts

18

Assembling the Units

Now that you have built all of the building units, it is time to assemble them. Make sure that thebottom and top of each unit is perfectly flat and smooth. Sand or file any imperfections off asnecessary. It will be easier to glue the units together upside down.

Begin with Unit 5 upside down on your work table and glue Unit 4 to it upside down as well. Youcan run a bead of glue along the cornice where the two pieces meet. Continue gluing the unitstogether in this fashion making sure that everything is straight and true as you go along.

When finished you will have to turn the building back right side up in order to glue on the roofunit.

Once completed touch up any glue and paint imperfections along the cornices. Paint the providedsidewalk concrete and put in place.

Your building is finished and ready to install on your layout. You may add lights and other details.We thank you for purchasing this kit from CMR and hope that you have enjoyed building it. Besure to see our other kits at www.cmrtrain.com.

Page 19: The Park Hotel Instructions for Assembly02f6eec.netsolstores.com/instructions/parkhotel...1 The Park Hotel Instructions for Assembly Kit Contents: 280 ea. Laser Cut Acrylic Parts
Page 20: The Park Hotel Instructions for Assembly02f6eec.netsolstores.com/instructions/parkhotel...1 The Park Hotel Instructions for Assembly Kit Contents: 280 ea. Laser Cut Acrylic Parts
Page 21: The Park Hotel Instructions for Assembly02f6eec.netsolstores.com/instructions/parkhotel...1 The Park Hotel Instructions for Assembly Kit Contents: 280 ea. Laser Cut Acrylic Parts
Page 22: The Park Hotel Instructions for Assembly02f6eec.netsolstores.com/instructions/parkhotel...1 The Park Hotel Instructions for Assembly Kit Contents: 280 ea. Laser Cut Acrylic Parts