The route The new line runs approx. 125 km and starts in the vicinity of the station of Torino Stura to finish shortly before the station of Milan- Certosa. The route runs closely alongside the A4 Turin-Milan motorway through to the municipality of Sedriano. Here it crosses the A4, runs along the north side of the motorway for about 3 km as far as the municipality of Rho. The line then deviates sharply north-east away from the motorway - and after a wide curve to the south-east, re-joins the existing Turin-Milan rail line to enter the junction of Milan. The mainly flat landscape crossed by the lines leads to much interference with existing roadways, with the consequent demolition and reconstruction of virtually all current overpasses and branches of the motorway. Most of the line extends along embankments. The geographical characteristics of the area of land concerned do not represent a problem to introduction of the new line. In fact the route exploits the natural lie of the land and runs alongside the motorway to minimise environmental impact without causing other interference on the land. The choice to insert the line within a corridor with an already dense infrastructure has led to the need to deal with a number of interferences of the new line with the rail and motorway network, as well as the water network. The works will contribute to the upgrading and improvement of the infrastructure in an area of the country subject to intense productive traffic. The interventions envisaged regard: the road network (motorway junctions, overpasses, toll gates, service stations), with water network (implementation of hydraulic underground routes, optimisation of connected network) and the upgrading of the corridor (environmental mitigation, extension of viaducts in the areas crossing rivers, to guarantee maximum transfer in the event of high waters, construction of roads for civil protection services etc.). The structural integration with the existing rail line will be by means of five interconnections: two terminals at Settimo Torinese and Milano Certosa and three intermediate ones at Santhià (Vercellese ovest), Novara ovest and Novara est. The interconnections will also serve to route passenger trains on the historical line and freight trains on other itineraries. The main works The project involves construction of about 285 works, including 28 viaducts and 30 cut-and- cover tunnels. The main works include: the interconnection of Settimo/Stura where six tracks meet: two for the new high speed line, two for the existing line and two for the new rail line; the cut-and-cover tunnel of Rondissone: of 1,435 metres is the longest tunnel of this type on the route. The work has great value in terms of the landscape as it avoids any interruption to the continuity of the territory crossed in the vicinity of the Dora Baltea; The new high speed TURIN - MILAN line Technical characteristics Length 125 km Cuttings and embankments 99.5 km Viaducts and bridges 21.5 km Tunnels 4,4 km Speed 300Km/h Maximum gradient: 15 per thousand Minimum curve radius 5,450 m Power supply 25kV a.c. 50Hz Interconnections 17.1 km Journey time Now: 1h 30’ Future: 50’ Cover photo: Torino - Dora Baltea Viaduct Vercelli - Interconnection of Santhià Vercelli - Interconnection of Vercelli the viaduct Dora: of 1.410 metres is the longest river viaduct on the route. It consists of 39 spans, 35 of which constructed with double girder structurework in reinforced concrete and two in con- crete and steel each with a surface area of 75 metres, placed in the river bed; the viaduct Chivasso-Aosta: with a length of 980 metres comprises 28 spans, each of 35 metres and enables the new high speed line to cross the provincial road for Montanaro and the existing Chivasso-Aosta line; the viaduct Santhià: of 3.782 metres is the longest on the route. Made up of 152 spans each of the length of approx. 25 metres, enables the line to cross the A4 motorway junction A4 - A5 of Mont Blanc; the viaduct Ticino: 1.178 metres long, to cross the river of the same name, will be constructed in concrete and steel with 10 spans to avoid restricting the bed section; the bored/cut-and-cover tunnel passing under the motorway A4 extends for 1.5 km and is the lon- gest of the entire line. It will be built with a structure in reinforced concrete. The 41 municipalities crossed Province of Turin: Settimo Torinese, Volpiano, Brandizzo, Chivasso, Verolengo, Rondissone, Torrazza Piemonte. Province of Vercelli: Saluggia, Cigliano, Livorno Ferraris, Bianzè, Moncrivello, Borgo d’Ale, Alice Castello, Tronzano Vercellese, Santhià, Carisio, Formigliana, Balocco, Villarboit, Greggio. Province of Novara: Recetto, Biandrate, Vicolungo, Casaleggio Novara, S. Pietro Mosezzo, Novara, Galliate, Romentino. Province of Milan: Bernate Ticino, Marcallo con Casone, Mesero, Ossona, S. Stefano Ticino, Arluno, Sedriano, Pregnana Milanese, Cornaredo, Rho, Pero, Milan. Vercelli - Sesia Viaduct METROTIPO SpA RFI COMMUNICATIONS DEPARTMENT Piazza della Croce Rossa, 1 • 00161 Rome phone +39 06 44104402 fax +39 06 44103726 www.rfi.it [email protected] 10/2005 - 1.000 TAV E XTERNAL R ELATIONS Via Mantova, 24 • 00198 Rome phone (+39) 6 852581 fax (+39) 6 85258324 www.tav.it [email protected]

The new high speed TURIN - MILAN line - RFI - HomePage new high speed TURIN - MILAN... · The new line runs approx. 125 km and starts in the vicinity of the station of Torino Stura

  • Upload
    voxuyen

  • View
    216

  • Download
    1

Embed Size (px)

Citation preview

Page 1: The new high speed TURIN - MILAN line - RFI - HomePage new high speed TURIN - MILAN... · The new line runs approx. 125 km and starts in the vicinity of the station of Torino Stura

The route

The new line runs approx. 125 km and starts

in the vicinity of the station of Torino Stura to

finish shortly before the station of Milan-

Certosa. The route runs closely alongside the

A4 Turin-Milan motorway through to the

municipality of Sedriano. Here it crosses the

A4, runs along the north side of the

motorway for about 3 km as far as the

municipality of Rho. The line then deviates

sharply north-east away from the motorway -

and after a wide curve to the south-east,

re-joins the existing Turin-Milan rail line to

enter the junction of Milan.

The mainly flat landscape crossed by the lines

leads to much interference with existing

roadways, with the consequent demolition

and reconstruction of virtually all current

overpasses and branches of the motorway. Most of the line extends along embankments. The

geographical characteristics of the area of land concerned do not represent a problem to introduction

of the new line. In fact the route exploits the natural lie of the land and runs alongside the motorway

to minimise environmental impact without causing other interference on the land.

The choice to insert the line within a corridor with an already dense infrastructure has led to the need to

deal with a number of interferences of the new line with the rail and motorway network, as well as the

water network. The works will contribute to the upgrading and improvement of the infrastructure in an

area of the country subject to intense productive traffic. The interventions envisaged regard: the road

network (motorway junctions, overpasses, toll gates, service stations), with water network

(implementation of hydraulic underground routes, optimisation of connected network) and the

upgrading of the corridor (environmental mitigation, extension of viaducts in the areas crossing rivers, to

guarantee maximum transfer in the event of high waters, construction of roads for civil protection

services etc.). The structural integration with the existing rail line will be by means of five

interconnections: two terminals at Settimo Torinese and Milano Certosa and three intermediate

ones at Santhià (Vercellese ovest), Novara ovest and Novara est. The interconnections will also

serve to route passenger trains on the historical line and freight trains on other itineraries.

The main works

The project involves construction of about 285

works, including 28 viaducts and 30 cut-and-

cover tunnels. The main works include:

• the interconnection of Settimo/Stura where

six tracks meet: two for the new high speed

line, two for the existing line and two for

the new rail line;

• the cut-and-cover tunnel of Rondissone: of

1,435 metres is the longest tunnel of this

type on the route. The work has great value

in terms of the landscape as it avoids any

interruption to the continuity of the territory

crossed in the vicinity of the Dora Baltea;

The new high speedTURIN - MILAN line

Technical characteristics

Length 125 kmCuttings and embankments 99.5 kmViaducts and bridges 21.5 kmTunnels 4,4 kmSpeed 300Km/hMaximum gradient: 15 per thousandMinimum curve radius 5,450 mPower supply 25kV a.c. 50HzInterconnections 17.1 km

Journey time

Now: 1h 30’Future: 50’

Cover photo:

Torino - Dora Baltea Viaduct Vercelli - Interconnection of Santhià

Vercelli - Interconnection of Vercelli

• the viaduct Dora: of 1.410 metres is the longest river viaduct on the route. It consists of 39 spans,

35 of which constructed with double girder structurework in reinforced concrete and two in con-

crete and steel each with a surface area of 75 metres, placed in the river bed;

• the viaduct Chivasso-Aosta: with a length of 980 metres comprises 28 spans, each of 35 metres and

enables the new high speed line to cross the provincial road for Montanaro and the existing

Chivasso-Aosta line;

• the viaduct Santhià: of 3.782 metres is the longest on the route. Made up of 152 spans each of

the length of approx. 25 metres, enables the line to cross the A4 motorway junction A4 - A5 of

Mont Blanc;

• the viaduct Ticino: 1.178 metres long, to cross the river of the same name, will be constructed in

concrete and steel with 10 spans to avoid restricting the bed section;

• the bored/cut-and-cover tunnel passing under the motorway A4 extends for 1.5 km and is the lon-

gest of the entire line. It will be built with a structure in reinforced concrete.

The 41 municipalities crossed

Province of Turin: Settimo Torinese,

Volpiano, Brandizzo, Chivasso, Verolengo,

Rondissone, Torrazza Piemonte.

Province of Vercelli: Saluggia, Cigliano,

Livorno Ferraris, Bianzè, Moncrivello, Borgo

d’Ale, Alice Castello, Tronzano Vercellese,

Santhià, Carisio, Formigliana, Balocco,

Villarboit, Greggio.

Province of Novara: Recetto, Biandrate,

Vicolungo, Casaleggio Novara, S. Pietro Mosezzo, Novara, Galliate, Romentino.

Province of Milan: Bernate Ticino, Marcallo con Casone, Mesero, Ossona, S. Stefano Ticino, Arluno,

Sedriano, Pregnana Milanese, Cornaredo, Rho, Pero, Milan.

Vercelli - Sesia Viaduct

MET

ROTI

PO S

pA

RFICOMMUNICATIONS DEPARTMENT

Piazza della Croce Rossa, 1 • 00161 Rome

phone +39 06 44104402

fax +39 06 44103726

[email protected]

10/2005 - 1.000

TAVEXTERNAL RELATIONS

Via Mantova, 24 • 00198 Rome

phone (+39) 6 852581

fax (+39) 6 85258324

[email protected]

Page 2: The new high speed TURIN - MILAN line - RFI - HomePage new high speed TURIN - MILAN... · The new line runs approx. 125 km and starts in the vicinity of the station of Torino Stura

Estra

tto d

alle

Car

te n

. 561

-562

/I°

ed. 2

003

Km 0 Km 10 Km 20 Km 30 Km 40 Km 50 Km 60 Km 70 Km 80 Km 90 Km 100 Km 110 Km 120 Km 125

Map Terms

TURIN MILAN

Line in cutting or embankment

Line in tunnel

Line in viaduct

Urban crossing on existing line

Stations

Page 3: The new high speed TURIN - MILAN line - RFI - HomePage new high speed TURIN - MILAN... · The new line runs approx. 125 km and starts in the vicinity of the station of Torino Stura

Estra

tto d

alle

Car

te n

. 561

-562

/I°

ed. 2

003

Km 0 Km 10 Km 20 Km 30 Km 40 Km 50 Km 60 Km 70 Km 80 Km 90 Km 100 Km 110 Km 120 Km 125

Map Terms

TURIN MILAN

Line in cutting or embankment

Line in tunnel

Line in viaduct

Urban crossing on existing line

Stations