The Allam Cycle offers leading efficiencies with full carbon capture Gross Turbine Output 74.65% 82.796 C0 2 Compressor Power -10. 47% -11.696 Plant Pa rasitic Auxiliary Power -11.01% -12.296 Net Efficiency 53.17% 58.9% Gross Turbine Output 71.12% 74.91% C0 2 Compressor Power -10.25% - 10.78% Plant Parasitic Auxiliary Power -11 .99% -12.69"16 Net Efficiency 48 .88% 51.44% Solar/Natural Gas Hybrid 74% (L HV) natural gas efficiency Water Desalination Co-production of 50,000 m3/day Direct EOR Integration 65% (l HV) efficiency 1 { { Parasitic Load Breakdown ASU I 91.8% NG Compressor I 8.2% Parasitic loads provide opportunity to drive hlcher efficiencies In future Parasitic Load Breakdown ASU 87.1% Coal Slurry Pump 1.5% Coal Slurry 0.6% Misc. 10.8% Courtesy f rom Net Pow er & 8RLvers

The Allam Cycle offers leading efficiencies with full ......The Allam Cycle offers leading efficiencies with full carbon capture Gross Turbine Output 74.65% 82.796 C02 Compressor Power

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: The Allam Cycle offers leading efficiencies with full ......The Allam Cycle offers leading efficiencies with full carbon capture Gross Turbine Output 74.65% 82.796 C02 Compressor Power

The Allam Cycle offers leading efficiencies with full carbon capture

Gross Turbine Output 74.65% 82.796

C02 Compressor Power -10.47% -11.696

Plant Parasitic Auxiliary Power -11.01% -12.296

Net Efficiency 53.17% 58.9%

Gross Turbine Output 71.12% 74.91%

C02 Compressor Power -10.25% -10.78%

Plant Parasitic Auxiliary Power -11.99% -12.69"16

Net Efficiency 48.88% 51.44%

Solar/Natural Gas Hybrid 74% (LHV) natural gas efficiency

Water Desalination Co-prod uction of 50,000 m3/day

Direct EOR Integration 65% (l HV) efficiency

1

{

{

Parasitic Load Breakdown

ASU I 91.8%

NG Compressor I 8.2%

Parasitic loads provide opportunity to drive hlcher

efficiencies In future

Parasitic Load Breakdown

ASU 87.1% Coal Slurry Pump 1.5% Coal Slurry ~chiller 0.6%

Misc. 10.8%

Courtesy f rom Net Power & 8RLvers

rtallman
Text Box
APPENDIX B
rtallman
Rectangle
Page 2: The Allam Cycle offers leading efficiencies with full ......The Allam Cycle offers leading efficiencies with full carbon capture Gross Turbine Output 74.65% 82.796 C02 Compressor Power

-

GTC 2014 28 October 2014 2 I Allam Cycle

Increased performance, lower capital cost and reduced system complexity create a lower projected LCOE

140

120

100

___________________________ r---------. Impact of

C02sales@ $20/ton

122.9 121.1

_____________ -------- ------------- ------w: T l----- ---- ----94~0 --------- ----~ 101 ,--

99.0

Reduction in costs from:

~~ 80 ~----- ---• Capital

• FOM

~VOM

'(/'). ....... w 0 60 u ..J

40

20

0

I 62.5

I I 48.1

Allam Cycle (Full SCPC

CCS)

SCPCw/CCS

Technology Type

IGCC

Notes

~ Fuel (lignite)

IGCCw/CCS

• Lu et al. Oxy-Lignite Syngas Fueled Semi-Closed Brayton Cycle Process Evaluation {2014) • Total Plant Cost and O&M costs were estimated for lignite-fired system in conjunction with EPRI; AACE Class 5 estimate

• Cost data for other technologies is taken from NETL baseline reports {Vol. 3, 2011)

8 RIVERS Contains the intellectual property of 8 Rivers Capital.

rtallman
Rectangle
Page 3: The Allam Cycle offers leading efficiencies with full ......The Allam Cycle offers leading efficiencies with full carbon capture Gross Turbine Output 74.65% 82.796 C02 Compressor Power

GTC2014 28 October 2014 3 I Allam Cycle

Allam Cycle Coal simplifies power from coal gasification

02

N2

COAL

Additional required components:

Gasifier Island Low-grade HX

Syngas compression

H20 FOR BlACKWATER TREATMENT

I

! I

: l I : t :

t I 0 I

! I

LOW-GRADS HEAT RECOVERYi

t e

------- • -------------------..!.--···----------

ZEUS COMBUSTOR

TT : I

Potential downstream DeSNOx Process

Core Allam Cycle Process

(plus downstream cleanup system in grey box)

L ________ _

COAL DRYER

N2 H20

: I '----~

: C02 DRIVE GAS

8 RIVERS HI<1H PRESSURE C~ FOR PIPEUNE PUMP

Contains the intellectual property of 8 Rivers Capital.

Efficiency (100% ccs) LHV HHV

Gross Turbine Output

Coal handling & milling

ASU

C02, Syngas Compressor

Other Auxiliaries (C02 pump, compressor, gasifier, etc.)

Net Efficien

0 . .:'>'3-a

-o.2% I -o.2%

-1o.2% I -9.7%

-9.1% I -8.7%

-6.5% -6.1%

47.8%

• High efficiency with existing gasifier technologies

• Minimal gasifier integration required, low complexity

• Overall process simplification

rtallman
Rectangle
Page 4: The Allam Cycle offers leading efficiencies with full ......The Allam Cycle offers leading efficiencies with full carbon capture Gross Turbine Output 74.65% 82.796 C02 Compressor Power

From~a;<:R~Need $_30_111illioq_Jota1 to complete Stage 2 actions with -­Development

Pathway $15 million coming from North Dakota team

Completed STAGE 1

Technology Feasibility

Study

Proof of Concept

2012-2014: $1 million

Weare Here

I I I

' I I I

c=f=> I I I I I I I

STAGE 4

Partnerships, Funding, Design

I I STAGE 2 \

Cycle and Key Component

Design

Further R&D, Partnerships, Funding, Pilot Plant Design

2015-2018: $30 million

Metallurgy, Gas Cleanup,

Gasifier Testing & Selection

Engineering Design Studies

{Pre-FEED & FEED)

STAGE 3

Pilot Plant Construction

Scale-up to ./'1L__----, Commercial Operation <..___ : I

Prove the Technology

2019-2020 construction 2021-2025 initial operation Cost: $200 to $400 million

Mid 2020s

Commercial Plant ~ilot Plant Initial Construction Operation -

5sii·-~- ·---~-- and Operation 3 to 5 years : -=!i'lOJ!l:S~ . =-- -- - -- --=---- ~-r ~