Test, Evaluation, and Certification Competency
SPAWAR 5.9 Overview
for AFCEA SDAugust 2011
BrieferJohn Iaia, SSC-PACIFIC Code 59000
SPAWAR Test , Evaluation & Certification National Competency Lead
Dist Statement
2
SPAWAR 5.0 Tier II Competency Functions
5.1 Enterprise Systems Engineering
5.2 Net-centric Engineering & Integration
5.3
C2
5.4
Business Systems/
EIS
5.5
Comms and
Networks
5.6
ISR/IO
5.7
Space Systems
5.8 Information Assurance
5.9 System T&E and Certification
5.0 Engineering
3
TEAM SPAWAR 5.9 Organization Chart
SPAWAR HQ 5.0 CHENGRDML Rodman
SPAWAR HQ 5.0 CHENGRDML Rodman
5.9 CAO HQ InitiativesDeputy - Keven Nelson5.9 CAO HQ InitiativesDeputy - Keven Nelson
5.9 TE&C Competency National Competency Lead
John Iaia / SSC-PAC
5.9 TE&C Competency National Competency Lead
John Iaia / SSC-PAC5.0.9 TE&C DEPT.
5.9 CAO Local Competency LeadScott Cramer / SPAWAR HQ
5.0.9 TE&C DEPT.5.9 CAO Local Competency Lead
Scott Cramer / SPAWAR HQ
5.9 TE&C Competency Jeff King / SSC LANT
5.9 TE&C Competency Jeff King / SSC LANT
SPAWAR TE&C Process Leadsand Certification Authority
SPAWAR TE&C Process Leadsand Certification Authority
Hilton, Paul TBDKirksharian, AronRicketts, Rose Le, BeemDr. Wu, Kevin
CA - NAVY CA TPO- V&V TAE -TA/SETRCA - LINK16 Certs TAE - FRCB TAE -SPEG
SPAWAR HQ TE&C LiaisonsSPAWAR HQ TE&C Liaisons
Nelson, KevenKolacki, BobLt. Roland, Theresa
5.9 CAO DoN, StakeholdersMilitary
5.9 CAO SSC-LANT NC Deputy / LCLJeff King
5.9 CAO SSC-LANT NC Deputy / LCLJeff King
5.9 CAO SSC-PAC Local CompetencyLead – Dan Slack
5.9 CAO SSC-PAC Local CompetencyLead – Dan Slack
SSC-LANT 5.9 CAO TA/TE&C LeadsSSC-LANT 5.9 CAO TA/TE&C Leads
Kassel, Ken
Guardia-Baker, Marilene
Vacant
Rideout, Ann
5.9.1 Planning and Req. Engineering
5.9.2 TE&C Execution
5.9.3 TE&C Resources
5.9.4 TE&C Cert. Standards & Verification
SSC-PAC 5.9 CAO TA/TE&C LeadsSSC-PAC 5.9 CAO TA/TE&C Leads
Vacant
Dimitriu, Anastasia
Watne, Nate
Whitby, Pete
5.9.1 Planning and Req. Engineering
5.9.2 TE&C Execution
5.9.3 TE&C Resources
5.9.4 TE&C Cert. Standards & Verification
SSC-PAC 5.9 CAO Tier II & III OrganizationSSC-PAC 5.9 CAO Tier II & III Organization SSC-LANT 5.9 CAO Tier II & III OrganizationSSC-LANT 5.9 CAO Tier II & III Organization
SSC Pacific 5.9 Competency Primary: 82Secondary: 305
SSC Atlantic 5.9 Competency Primary: 136Secondary: 150
TEAM SPAWAR
4
TE&C Competency – Primary/Secondary 5.9 Test, Evaluation, and Certification Competency Organization
5
5.9 Tier III Competency Functions▼ 5.9/5.9A
▼ Test, Evaluation
▼ and
▼ Certification
▼ 5.9.1
▼ TE&C Planning
▼ and
▼ Req’ts Engineering
▼ Provides TE&C process
▼ improvement and oversight,
▼ test/cert alignment
▼ across boundaries
▼ 5.9.2
▼ TE&C Execution
▼ Provides TE&C support,
▼ designs and conducts
▼ testing of C4I components,
▼ SoS, FoS, and E2E.
▼ 5.9.3
▼ TE&C Resources
▼ Provides TE&C support
▼ capabilities, management
▼ and innovation
▼ 5.9.4
▼ Certification
▼ and Standards
▼ Verification
▼ Provides independent
▼ verification and
▼ certification of IT/IS,
▼ standards and T&E Facilities
▼ Navy CA
▼ FRCB TAEs/SMEs
▼ SOVT TAEs
▼ Interop Test SMEs
▼ Link 16 EMC CA
▼ E2E Test SMEs
▼ T&E Labs
▼ Networks
▼ C4I Ranges
▼ M&S/Stim
▼ TE&C Tools
▼ Distributed Test
▼ E2E
▼C
2, B
us IT
, IA
, Com
ms
&
▼ N
etw
orks
, ISR
/IO, S
pace▼ TE&C Process
▼ Improvement
▼ SETR Checklists
▼ Guidance/Policy
▼ TE&C Rqmnts
▼ Analysis & Oversight ▼ TE&C Acq
▼ Doc Review
▼ RMA &
▼ Human
▼ Factors
▼ SoS
▼ FoS
6
SPAWAR TE&C Focus Areas
▼ Processes & Policy ▼ People & Organization
▼ Tools
▼ Resources▼ Tied together
▼ with Knowledge
5.9 TE&C National Lead
5.0 National Lead(RDML Rodman)
IPTs IPTs IPTs IPTs
A
5.9.1
5.9 TE&C Local Lead
5.9.1 5.9.2 5.9.4
5.9.25.9.3
5.9.4
5.9.15.9.2
5.9.35.9.4
5.9.15.9.2
5.9.35.9.4
5.9.15.9.2
5.9.35.9.4
B C D
5.9.3
7
TEAM SPAWAR
TE&C Strategy• Refine and advance standardized processes JPAT to further standardization Tailoring /scaling guidance PAL/PML/OMR-accessibility focus Template baseline expansion Systems Engineering Guide Vol. II
• 5.9 TE&C Academy- expand to DON
• 5.9 CDM DOE Training IT core plus IDP Guidelines Focused 852 course offerings• Continue DAWIA Billet
Adjudication
• Continue personnel alignment Primary/Secondary requirements and training• Enable Facilities alignment and management
• Pilot /Refine C4ISR Certification Process
C4ISR Certification- TBD/Essex• Advance the C5ISR Certification
Concept Develop cross SYSCOM
Certification CONOP/Way-Ahead• E2C Construct
Proposed JMETC Pilots DOD T&E Reliance Needs process
• E2C CONOP Refinement in concert with SE & Acquisition• Focused on linkages with E2E Acquisition WIPTs• Emphasis on distributed test environment operations• Ensure Comprehensive C5ISR Certification and TA Support
• Risk Management tied to all phases of test
• Key enabler/tool for E2E test scoping
8
TE&C Processes & Tools▼ E2C Test Activities and
Processes▼ V&V of Labs▼ C4ISR Certification
C4ISR Certification Model Effort− Assessment by
Demonstration− Assessment by Analysis− NWSCP Article 13
▼ PEO-C4I T&E Management PMW-120 PMW-130/160 PMW 170 PMW 150 Maritime C2
▼ SOVT Process and Execution Guidance (SPEG) Integrated SOVT
▼ Process and Artifact Management NSERC- T&E Document Archive SEG and CMMI OMR
▼ T&E Process JPAT▼ T&E TA Support▼ TE&C Education Efforts
T&E Academy-DON DAWIA Engagement Section 852 Funds DOE Training
9
C4I Platform Baseline ECR Stage 1 / Risk Assessment
PMW DevelopmentTesting and Documentation Completed. PMW submits Package to PEO boards
PGB E2C Event
Decision Point
Assessment By Demonstration
(SoS T&E)
C4I Platform Baseline ECR Stage 2 / Risk Assessment
Test/Cert Artifacts:IA Cert
OTA CertJITC
LinkQual Tests
SOVTEtc High Risk
InterfacesMed/LowRisk Interfaces
Assessment Data to Engineering Risk Assessment
5.0 Technical Authority
Review Board, review results
Cert Criteria
Met?
NWSCP WSCA/D(A-8/E-1)
Re-Work
Yes
No
Baseline Definition
Capability Assessment
Certification Decision
C4I Certification Process
C4I Platform Baseline ECR Stage 3 / Risk Assessment
TD SignatureFor Authorization/
Certification Approval
Cross SYSCOM Coordination
Other Cert Rqmnt TBD
Core E2C Lab
Distributed Node
SSC Pacific(San Diego)
SSC Atlantic(Charleston)
SPAWAR HQ(San Diego - Old Town)
SSC Atlantic(New Orleans)
SIPR/NIPR/JWICS, SDREN/DREN,
DISN/DISN-LES, ADMS, NMCI,
HSGR
SSC Atlantic(St. Julien’s Creek)
NCTAMS LANT
NCTS San Diego
NUWC(Newport, RI)
Distributed Lab Environment
Assessment By Analysis
10
C4I Certification ISO NWSCP Status
▼ Team in place 5.0.9, APEO(E), APMEs, CSEs, 5.X SMEs, .. Weekly Drumbeat established
▼ Building off work already done C4I Cert DFLSS/Non-E2C Assess RIE PEO Goal 1.1/1.2 No “test/cert” left behind
▼ Key Tenants Must be Achievable: executable within fiscal reality Must be Repeatable: not a one trick show Must be Fungible: adaptive to more than just NWSCP Must be Tangible: concrete enough to build a Policy
Stra
tegy
Com
plet
e
(Dra
ft C
ON
OP
S)
Fina
lize
CO
NO
PS
FY11 FY12 FY13
Dra
ft P
roce
ss
Def
ined
Wor
ksho
ps
Sta
rt P
ilot
End
Pilo
t
Pol
icy
Sig
ned
Exe
cute
Pro
cess
11
System of Systems Test – E2C Concept of Operations
SPAWAR/PEO C4I/SSC processes, engineers, and laboratory environments supporting development of End-to-End integrated solutions Verify system-of-systems components work together in an operationally
representative environment before they are fielded Provides operationally representative environment for development and
experimentation for new capabilities Entry Point to SPAWAR C4ISR (distributed test environment) for purposes of C4ISR Certification/C5ISR Test and Certification Support
Development
Integration
Delivery
TEAM SPAWAR
14
SOVT Preparation and Execution Guide (SPEG)
▼ Defines and requires standardized System SOVT▼ Defines and requires Platform SOVT based on the
approved System SOVT.▼ SOVT Common Format and Content requirements
Test boundary Test stages - A building block approach, where each
subsequent test stage builds upon known test results from previous test stages− Stage 1: Inspection and Validation− Stage 2: Cold Checks− Stage 3: Equipment Tests− Stage 4: Intra-system Tests− Stage 5: Inter-system Tests− Stage 6: Operational Tests− Stage 7: At-Sea and Other Special Tests
Minimum testing content Microsoft Word template included
▼ SOVT Test Element Rigor defined Analysis, selection, and mapping to specific test stages
15
FRCB Policy and Process▼ NETWARCOMINST 12271.1 dtd 17 Oct 2006:
“… all C4ISR systems planned for installation at Naval shore activities receive FRCB approval prior to the Installing Activity's commencement of onsite work.”
▼ COMNAVNETWARCOM deems the FRCB process to be invaluable and is committed to its continued use as a means of ensuring that mature C4ISR products are fielded to support Fleet operations and training”