92
TERMINAL OPERATIONS TERMINAL OPERATIONS GENERAL ASPECTS GENERAL ASPECTS CRITERIA FOR YARDPLANNING CRITERIA FOR YARDPLANNING CRITERIA FOR SHIPPLANNING CRITERIA FOR SHIPPLANNING

TERMINAL OPERATIONS

  • Upload
    javan

  • View
    38

  • Download
    1

Embed Size (px)

DESCRIPTION

TERMINAL OPERATIONS. GENERAL ASPECTS CRITERIA FOR YARDPLANNING CRITERIA FOR SHIPPLANNING. IN GENERAL: EXCEPTIONS – SPECIAL COMMODITIES - SPECIAL REQUESTS. TERMINAL OPERATIONS YARDPLANNING. INBOUND (IMPORT) Rough planning (stack/zone size) - PowerPoint PPT Presentation

Citation preview

Page 1: TERMINAL OPERATIONS

TERMINAL OPERATIONS TERMINAL OPERATIONS • GENERAL ASPECTS GENERAL ASPECTS

• CRITERIA FOR YARDPLANNING CRITERIA FOR YARDPLANNING

• CRITERIA FOR SHIPPLANNING CRITERIA FOR SHIPPLANNING

Page 2: TERMINAL OPERATIONS
Page 3: TERMINAL OPERATIONS
Page 4: TERMINAL OPERATIONS
Page 5: TERMINAL OPERATIONS
Page 6: TERMINAL OPERATIONS
Page 7: TERMINAL OPERATIONS
Page 8: TERMINAL OPERATIONS
Page 9: TERMINAL OPERATIONS
Page 10: TERMINAL OPERATIONS
Page 11: TERMINAL OPERATIONS
Page 12: TERMINAL OPERATIONS
Page 13: TERMINAL OPERATIONS
Page 14: TERMINAL OPERATIONS
Page 15: TERMINAL OPERATIONS
Page 16: TERMINAL OPERATIONS
Page 17: TERMINAL OPERATIONS
Page 18: TERMINAL OPERATIONS
Page 19: TERMINAL OPERATIONS
Page 20: TERMINAL OPERATIONS

IN GENERAL: EXCEPTIONS – SPECIALCOMMODITIES - SPECIAL REQUESTS

Page 21: TERMINAL OPERATIONS
Page 22: TERMINAL OPERATIONS
Page 23: TERMINAL OPERATIONS
Page 24: TERMINAL OPERATIONS
Page 25: TERMINAL OPERATIONS
Page 26: TERMINAL OPERATIONS
Page 27: TERMINAL OPERATIONS
Page 28: TERMINAL OPERATIONS
Page 29: TERMINAL OPERATIONS
Page 30: TERMINAL OPERATIONS
Page 31: TERMINAL OPERATIONS
Page 32: TERMINAL OPERATIONS
Page 33: TERMINAL OPERATIONS
Page 34: TERMINAL OPERATIONS
Page 35: TERMINAL OPERATIONS
Page 36: TERMINAL OPERATIONS
Page 37: TERMINAL OPERATIONS
Page 38: TERMINAL OPERATIONS
Page 39: TERMINAL OPERATIONS
Page 40: TERMINAL OPERATIONS
Page 41: TERMINAL OPERATIONS
Page 42: TERMINAL OPERATIONS
Page 43: TERMINAL OPERATIONS
Page 44: TERMINAL OPERATIONS
Page 45: TERMINAL OPERATIONS
Page 46: TERMINAL OPERATIONS

TERMINAL OPERATIONSTERMINAL OPERATIONSYARDPLANNINGYARDPLANNING

• INBOUND (IMPORT) INBOUND (IMPORT)

• Rough planning (stack/zone size) Rough planning (stack/zone size)

• Specific only for relative large similar Specific only for relative large similar quantities:quantities: T/S: Ports of destination T/S: Ports of destination

LCL (CFS) containersLCL (CFS) containersSame mode of Same mode of

ontransport ontransport

• Otherwise: at random Otherwise: at random

• Limited stackingheight to avoid shifting Limited stackingheight to avoid shifting

Page 47: TERMINAL OPERATIONS
Page 48: TERMINAL OPERATIONS

TERMINAL OPERATIONSTERMINAL OPERATIONSYARDPLANNINGYARDPLANNING

• OUTBOUND (EXPORT) OUTBOUND (EXPORT)

• Port of Destination Port of Destination

• Size (20’- 40’etc.) Size (20’- 40’etc.)

• Weight class (MT - 10t - 18t -25t - >25t.) Weight class (MT - 10t - 18t -25t - >25t.)

• Specials (IMDG - Reefers - Oversize)Specials (IMDG - Reefers - Oversize)

Page 49: TERMINAL OPERATIONS
Page 50: TERMINAL OPERATIONS

TERMINAL OPERATIONSTERMINAL OPERATIONSYARDPLANNINGYARDPLANNING

• YARD/SHIPPLANNING EXPORT YARD/SHIPPLANNING EXPORT

• Criteria Shipplanning:Criteria Shipplanning:Ship’s requirements (Stability, list Ship’s requirements (Stability, list

etc.)etc.) Terminal requirements : Terminal requirements : stacking stacking

• Sequential order of loading based on Sequential order of loading based on stacking of the containers on the terminal stacking of the containers on the terminal in order to avoid shifting. in order to avoid shifting.

Page 51: TERMINAL OPERATIONS
Page 52: TERMINAL OPERATIONS
Page 53: TERMINAL OPERATIONS
Page 54: TERMINAL OPERATIONS
Page 55: TERMINAL OPERATIONS
Page 56: TERMINAL OPERATIONS
Page 57: TERMINAL OPERATIONS
Page 58: TERMINAL OPERATIONS
Page 59: TERMINAL OPERATIONS

TERMINAL OPERATIONSTERMINAL OPERATIONSYARDPLANNING YARDPLANNING

• PRE - STACKING PRE - STACKING

• Some ports Some ports

• Before arrival of the vessel the export Before arrival of the vessel the export stack is re-stacked as a reverse ship’s stack is re-stacked as a reverse ship’s stowage stowage

• Very expensive - double handlings Very expensive - double handlings

• ?? If export stack too far from berth ?? ?? If export stack too far from berth ??

Page 60: TERMINAL OPERATIONS
Page 61: TERMINAL OPERATIONS
Page 62: TERMINAL OPERATIONS
Page 63: TERMINAL OPERATIONS
Page 64: TERMINAL OPERATIONS
Page 65: TERMINAL OPERATIONS
Page 66: TERMINAL OPERATIONS
Page 67: TERMINAL OPERATIONS
Page 68: TERMINAL OPERATIONS
Page 69: TERMINAL OPERATIONS
Page 70: TERMINAL OPERATIONS
Page 71: TERMINAL OPERATIONS
Page 72: TERMINAL OPERATIONS
Page 73: TERMINAL OPERATIONS
Page 74: TERMINAL OPERATIONS
Page 75: TERMINAL OPERATIONS
Page 76: TERMINAL OPERATIONS
Page 77: TERMINAL OPERATIONS
Page 78: TERMINAL OPERATIONS
Page 79: TERMINAL OPERATIONS
Page 80: TERMINAL OPERATIONS
Page 81: TERMINAL OPERATIONS
Page 82: TERMINAL OPERATIONS
Page 83: TERMINAL OPERATIONS
Page 84: TERMINAL OPERATIONS
Page 85: TERMINAL OPERATIONS
Page 86: TERMINAL OPERATIONS
Page 87: TERMINAL OPERATIONS
Page 88: TERMINAL OPERATIONS
Page 89: TERMINAL OPERATIONS
Page 90: TERMINAL OPERATIONS
Page 91: TERMINAL OPERATIONS
Page 92: TERMINAL OPERATIONS